This document provides a summary of Michael K. Baker's experience and qualifications. It outlines his current role as a Director and Systems Engineering Task Lead for SRA International, with responsibilities including managing a $3.3 million budget and 17 staff. It also details his extensive experience in project management, systems engineering, and enterprise management applications dating back to 1989, including roles with the IRS, USinternetworking, Harris Corporation, and Lockheed Martin.
The document outlines the phases and steps to start practising enterprise architecture. It involves first defining the as-is architecture, including business functions, processes, information systems, data, and technology. The second iteration defines the to-be architecture according to reference models and principles, including requirements, stakeholders, vision, and target architectures for business, information, and technology with gap analyses. The architecture is then implemented through change scenarios, transition architecture, projects, and governance.
Edward Lee is a certified Project Management Professional with over 20 years of experience managing engineering programs and projects across various industries. He has a track record of successfully leading teams, developing strategic plans, executing projects, and improving processes. Currently seeking new opportunities where he can apply his skills in engineering, program/project management, and process improvement.
This document is a resume for Mary Jo Watson that summarizes her professional experience and qualifications. She has over 20 years of experience in maintenance planning, scheduling, project management, document control, and safety/facilities management. Her resume lists positions with various employers where she has developed maintenance programs, databases, procedures, and translated technical documents. She also has proficiency with various software programs and asset management systems.
Peter Minetree has over 29 years of experience in data security, identity and access management, business analysis, and systems administration. He most recently worked at Fannie Mae from 1997 to 2016 as a Senior Data Security Specialist and Systems Administrator, where he was responsible for provisioning and de-provisioning user access across various platforms. Prior to that, he held various roles supporting business solutions, software testing, technical writing, and systems analysis.
Rose Ann L. Reyes is an IT professional based in Dutch Harbor, Alaska with over 5 years of experience as a Business Analyst and Systems Analyst. She has a background in business analysis, system analysis, web development, quality assurance, and project management. Her experience includes roles at Wesupport, Inc., 24/7 International, Prime Outsource Corporation, and Activ8 Solutions where she managed various IT projects, provided technical support, and developed systems using technologies like ASP, SQL, and SharePoint. She has a Bachelor's degree in Computer Science.
Rose Ann L. Reyes is an IT professional based in Dutch Harbor, Alaska with over 5 years of experience as a Business Analyst and Systems Analyst. She has a background in business analysis, system analysis, web development, quality assurance, and project management. Her experience includes roles at Wesupport, Inc., 24/7 International, Prime Outsource Corporation, and Activ8 Solutions where she managed various IT projects, provided technical support, and developed systems using technologies like ASP, SQL, and SharePoint. She has a Bachelor's degree in Computer Science.
Peter Barnam has over 25 years of experience in information technology with a focus on data architecture, software development, and business intelligence projects. He has worked on projects involving data integration, data warehousing, reporting, and analytics for clients in various industries including healthcare, insurance, utilities, and financial services. His experience includes roles as a data architect, data modeler, solution architect, project manager, and technical analyst.
This document provides a summary of Michael K. Baker's experience and qualifications. It outlines his current role as a Director and Systems Engineering Task Lead for SRA International, with responsibilities including managing a $3.3 million budget and 17 staff. It also details his extensive experience in project management, systems engineering, and enterprise management applications dating back to 1989, including roles with the IRS, USinternetworking, Harris Corporation, and Lockheed Martin.
The document outlines the phases and steps to start practising enterprise architecture. It involves first defining the as-is architecture, including business functions, processes, information systems, data, and technology. The second iteration defines the to-be architecture according to reference models and principles, including requirements, stakeholders, vision, and target architectures for business, information, and technology with gap analyses. The architecture is then implemented through change scenarios, transition architecture, projects, and governance.
Edward Lee is a certified Project Management Professional with over 20 years of experience managing engineering programs and projects across various industries. He has a track record of successfully leading teams, developing strategic plans, executing projects, and improving processes. Currently seeking new opportunities where he can apply his skills in engineering, program/project management, and process improvement.
This document is a resume for Mary Jo Watson that summarizes her professional experience and qualifications. She has over 20 years of experience in maintenance planning, scheduling, project management, document control, and safety/facilities management. Her resume lists positions with various employers where she has developed maintenance programs, databases, procedures, and translated technical documents. She also has proficiency with various software programs and asset management systems.
Peter Minetree has over 29 years of experience in data security, identity and access management, business analysis, and systems administration. He most recently worked at Fannie Mae from 1997 to 2016 as a Senior Data Security Specialist and Systems Administrator, where he was responsible for provisioning and de-provisioning user access across various platforms. Prior to that, he held various roles supporting business solutions, software testing, technical writing, and systems analysis.
Rose Ann L. Reyes is an IT professional based in Dutch Harbor, Alaska with over 5 years of experience as a Business Analyst and Systems Analyst. She has a background in business analysis, system analysis, web development, quality assurance, and project management. Her experience includes roles at Wesupport, Inc., 24/7 International, Prime Outsource Corporation, and Activ8 Solutions where she managed various IT projects, provided technical support, and developed systems using technologies like ASP, SQL, and SharePoint. She has a Bachelor's degree in Computer Science.
Rose Ann L. Reyes is an IT professional based in Dutch Harbor, Alaska with over 5 years of experience as a Business Analyst and Systems Analyst. She has a background in business analysis, system analysis, web development, quality assurance, and project management. Her experience includes roles at Wesupport, Inc., 24/7 International, Prime Outsource Corporation, and Activ8 Solutions where she managed various IT projects, provided technical support, and developed systems using technologies like ASP, SQL, and SharePoint. She has a Bachelor's degree in Computer Science.
Peter Barnam has over 25 years of experience in information technology with a focus on data architecture, software development, and business intelligence projects. He has worked on projects involving data integration, data warehousing, reporting, and analytics for clients in various industries including healthcare, insurance, utilities, and financial services. His experience includes roles as a data architect, data modeler, solution architect, project manager, and technical analyst.
Michael Cohn has over 30 years of experience in information technology, including roles in digital marketing, systems architecture, project management, and software engineering. He has a track record of leveraging technologies to increase productivity and reduce costs. Currently, he works as an online presence and digital marketing strategist, helping small businesses improve their online visibility and lead generation through web and social media strategies.
Over 15 years of experience with PeopleSoft applications including implementation, development, customizations, testing and support of modules such as HCM, Financials, Payroll and Benefits. Experience with all phases of the project lifecycle including requirements gathering, design, development, testing and production support. Specialized expertise in PeopleSoft upgrades, security, data integration interfaces and technical administration. Provides leadership in application development and acts as the primary point of contact for functional and technical questions.
Scott D. Church is a senior-level IT manager with over 25 years of experience in information technology management and architecture. He has held several leadership roles at Cash America International, where he managed enterprise architecture, developed and implemented new point of sale systems, and led teams in system development. His areas of expertise include leadership, project management, budget management, enterprise architecture, and off-shore team management.
This document is a resume for Jack P. Kern that summarizes his experience in project management and IT. It lists his contact information, qualifications, technical expertise, education, and professional experience managing various IT projects, implementations, and upgrades over the past 30 years.
Andrew Chard has over 25 years of experience leading large technology projects for companies in various industries. He has a track record of directing teams to deliver business initiatives on time while aligning technology and business goals. Chard's areas of expertise include application development, program management, operations management, and client relationship building. He currently serves as an IT Project Director for Gwinnett County, Georgia overseeing public safety technology projects.
Barbara Newman has over 30 years of experience in program/project management, systems administration, and information security. She currently works as a Project Manager at Boeing, where she manages projects involving data center modernization, server virtualization, and mainframe retirement. Previously she held systems administration and security roles at Boeing, Rockwell, and other defense contractors.
Michael Richardson is a versatile developer with extensive experience in full stack web development using technologies like C#, VB.NET, SQL, Java, JavaScript, and Python. He has over 20 years of experience developing complex software systems across multiple domains. His most recent roles have included enhancing lending platforms and fuel management applications.
Rose Ann L. Reyes is an IT professional based in Dutch Harbor, Alaska with over 5 years of experience as a Business Analyst and Systems Analyst. She has a background in business analysis, systems analysis, web development, quality assurance, and project management. Her experience includes managing IT support projects for various clients and developing systems to improve business processes.
Rose Ann L. Reyes is an IT professional based in Dutch Harbor, Alaska with over 5 years of experience as a Business Analyst and Systems Analyst. She has a background in business analysis, system analysis, web development, quality assurance, and project management. Her experience includes managing IT support and evaluating requirements for various projects at Wesupport, Inc. and conceptualizing, overseeing development, and integrating new systems as a Systems Analyst at 24/7 International.
Rose Ann L. Reyes is an IT professional based in Dutch Harbor, Alaska with over 5 years of experience as a Business Analyst and Systems Analyst. She has a background in business analysis, system analysis, web development, quality assurance, and project management. Her experience includes managing IT support projects for various clients and developing systems to improve business processes. She is proficient in a variety of technologies, databases, programming languages, and software.
This document is a resume for Brent A. Bode summarizing his experience as an IT Service Manager and Application Support Manager. Over 15 years of experience leading teams and managing middleware, applications, and IT operations at CenturyLink. Experience with technologies like Pivotal Cloud Foundry, JBoss, Microsoft .NET, Linux, and establishing DevOps processes. Holds ITIL and other technical certifications with a focus on strategic planning, change management, and team leadership.
This document provides a summary of Ramesha Rao's qualifications and experience. Ramesha Rao has over 30 years of experience in quality assurance, project management, software testing and development. He has extensive experience in both government and commercial projects, and has worked with technologies such as Java, C++, Oracle, SQL Server, Siebel, and testing tools from HP, IBM and Micro Focus. He holds an MS in Physics and security clearances from the Department of Justice and DoD.
IT professional with extensive experience in the Financial, Insurance, Retail, Manufacturing & Credit Card Industries, creating innovative solutions for complex projects and technology integration. Proven expertise in quantitative and qualitative data analysis, data evaluation, impact analysis and trend and error evaluation. Strengths include advanced problem solving, technical, multitasking, communication and presentation skills.
Professional Profile And Project Summary Of Bernadette TaylorBernadette Taylor
Bernadette Taylor has over 20 years of experience as a technical business analyst and educator. She has designed over 25 applications across various industries including finance, manufacturing, human resources, and professional services. Currently, she is studying for business intelligence certification and teaching social media courses while volunteering for a political campaign.
Richard Snyder has over 20 years of experience in project management, data storage infrastructure implementation, and software/hardware services projects. He is a certified Project Management Professional (PMP) who has managed projects ranging from $50,000 to $5 million as a Senior Project Manager at EMC Corporation. The document provides details on his work experience, education, certifications, technical knowledge, and security clearances.
Dennis J. Gawera is an accomplished technical leader with extensive experience directing and managing successful research and development programs. He has a background in new product development, managing multiple projects, quality assurance, and serving as a project manager and engineer for programs involving large databases, software development, and system integration.
Christopher Lang has over 20 years of experience in strategic planning, business development, project management, and system engineering for global technology and telecommunications companies. He holds a Bachelor's degree in Business Administration and is pursuing a Master's degree in Computer Science. Lang has a proven track record of leading teams, developing innovative solutions, and improving operations through his roles as Director of Network Operations, NOC/SOC Manager, and Technical Assurance Center Manager at several large companies. He has strong skills in network architecture, security, budgeting, and change management.
James Adams has over 29 years of experience managing software development, systems engineering, modeling, simulation and integration projects for NASA and aerospace companies. He is currently the Associate Division Chief for NASA's Software, Robotics & Simulation Division, overseeing 850 people. Previously he held management roles on projects including the Orion spacecraft, Commercial Crew Program, and International Space Station.
Eric Montgomery is a Project Manager with experience managing data collection and analysis to increase organizational efficiency and effectiveness. He has over 10 years of experience in roles such as Associate Test Engineer, Field Service Supervisor, and Project Manager. His skills include project management, process optimization, quality management, and data analysis.
Essentials of Automations: Exploring Attributes & Automation ParametersSafe Software
Building automations in FME Flow can save time, money, and help businesses scale by eliminating data silos and providing data to stakeholders in real-time. One essential component to orchestrating complex automations is the use of attributes & automation parameters (both formerly known as “keys”). In fact, it’s unlikely you’ll ever build an Automation without using these components, but what exactly are they?
Attributes & automation parameters enable the automation author to pass data values from one automation component to the next. During this webinar, our FME Flow Specialists will cover leveraging the three types of these output attributes & parameters in FME Flow: Event, Custom, and Automation. As a bonus, they’ll also be making use of the Split-Merge Block functionality.
You’ll leave this webinar with a better understanding of how to maximize the potential of automations by making use of attributes & automation parameters, with the ultimate goal of setting your enterprise integration workflows up on autopilot.
Michael Cohn has over 30 years of experience in information technology, including roles in digital marketing, systems architecture, project management, and software engineering. He has a track record of leveraging technologies to increase productivity and reduce costs. Currently, he works as an online presence and digital marketing strategist, helping small businesses improve their online visibility and lead generation through web and social media strategies.
Over 15 years of experience with PeopleSoft applications including implementation, development, customizations, testing and support of modules such as HCM, Financials, Payroll and Benefits. Experience with all phases of the project lifecycle including requirements gathering, design, development, testing and production support. Specialized expertise in PeopleSoft upgrades, security, data integration interfaces and technical administration. Provides leadership in application development and acts as the primary point of contact for functional and technical questions.
Scott D. Church is a senior-level IT manager with over 25 years of experience in information technology management and architecture. He has held several leadership roles at Cash America International, where he managed enterprise architecture, developed and implemented new point of sale systems, and led teams in system development. His areas of expertise include leadership, project management, budget management, enterprise architecture, and off-shore team management.
This document is a resume for Jack P. Kern that summarizes his experience in project management and IT. It lists his contact information, qualifications, technical expertise, education, and professional experience managing various IT projects, implementations, and upgrades over the past 30 years.
Andrew Chard has over 25 years of experience leading large technology projects for companies in various industries. He has a track record of directing teams to deliver business initiatives on time while aligning technology and business goals. Chard's areas of expertise include application development, program management, operations management, and client relationship building. He currently serves as an IT Project Director for Gwinnett County, Georgia overseeing public safety technology projects.
Barbara Newman has over 30 years of experience in program/project management, systems administration, and information security. She currently works as a Project Manager at Boeing, where she manages projects involving data center modernization, server virtualization, and mainframe retirement. Previously she held systems administration and security roles at Boeing, Rockwell, and other defense contractors.
Michael Richardson is a versatile developer with extensive experience in full stack web development using technologies like C#, VB.NET, SQL, Java, JavaScript, and Python. He has over 20 years of experience developing complex software systems across multiple domains. His most recent roles have included enhancing lending platforms and fuel management applications.
Rose Ann L. Reyes is an IT professional based in Dutch Harbor, Alaska with over 5 years of experience as a Business Analyst and Systems Analyst. She has a background in business analysis, systems analysis, web development, quality assurance, and project management. Her experience includes managing IT support projects for various clients and developing systems to improve business processes.
Rose Ann L. Reyes is an IT professional based in Dutch Harbor, Alaska with over 5 years of experience as a Business Analyst and Systems Analyst. She has a background in business analysis, system analysis, web development, quality assurance, and project management. Her experience includes managing IT support and evaluating requirements for various projects at Wesupport, Inc. and conceptualizing, overseeing development, and integrating new systems as a Systems Analyst at 24/7 International.
Rose Ann L. Reyes is an IT professional based in Dutch Harbor, Alaska with over 5 years of experience as a Business Analyst and Systems Analyst. She has a background in business analysis, system analysis, web development, quality assurance, and project management. Her experience includes managing IT support projects for various clients and developing systems to improve business processes. She is proficient in a variety of technologies, databases, programming languages, and software.
This document is a resume for Brent A. Bode summarizing his experience as an IT Service Manager and Application Support Manager. Over 15 years of experience leading teams and managing middleware, applications, and IT operations at CenturyLink. Experience with technologies like Pivotal Cloud Foundry, JBoss, Microsoft .NET, Linux, and establishing DevOps processes. Holds ITIL and other technical certifications with a focus on strategic planning, change management, and team leadership.
This document provides a summary of Ramesha Rao's qualifications and experience. Ramesha Rao has over 30 years of experience in quality assurance, project management, software testing and development. He has extensive experience in both government and commercial projects, and has worked with technologies such as Java, C++, Oracle, SQL Server, Siebel, and testing tools from HP, IBM and Micro Focus. He holds an MS in Physics and security clearances from the Department of Justice and DoD.
IT professional with extensive experience in the Financial, Insurance, Retail, Manufacturing & Credit Card Industries, creating innovative solutions for complex projects and technology integration. Proven expertise in quantitative and qualitative data analysis, data evaluation, impact analysis and trend and error evaluation. Strengths include advanced problem solving, technical, multitasking, communication and presentation skills.
Professional Profile And Project Summary Of Bernadette TaylorBernadette Taylor
Bernadette Taylor has over 20 years of experience as a technical business analyst and educator. She has designed over 25 applications across various industries including finance, manufacturing, human resources, and professional services. Currently, she is studying for business intelligence certification and teaching social media courses while volunteering for a political campaign.
Richard Snyder has over 20 years of experience in project management, data storage infrastructure implementation, and software/hardware services projects. He is a certified Project Management Professional (PMP) who has managed projects ranging from $50,000 to $5 million as a Senior Project Manager at EMC Corporation. The document provides details on his work experience, education, certifications, technical knowledge, and security clearances.
Dennis J. Gawera is an accomplished technical leader with extensive experience directing and managing successful research and development programs. He has a background in new product development, managing multiple projects, quality assurance, and serving as a project manager and engineer for programs involving large databases, software development, and system integration.
Christopher Lang has over 20 years of experience in strategic planning, business development, project management, and system engineering for global technology and telecommunications companies. He holds a Bachelor's degree in Business Administration and is pursuing a Master's degree in Computer Science. Lang has a proven track record of leading teams, developing innovative solutions, and improving operations through his roles as Director of Network Operations, NOC/SOC Manager, and Technical Assurance Center Manager at several large companies. He has strong skills in network architecture, security, budgeting, and change management.
James Adams has over 29 years of experience managing software development, systems engineering, modeling, simulation and integration projects for NASA and aerospace companies. He is currently the Associate Division Chief for NASA's Software, Robotics & Simulation Division, overseeing 850 people. Previously he held management roles on projects including the Orion spacecraft, Commercial Crew Program, and International Space Station.
Eric Montgomery is a Project Manager with experience managing data collection and analysis to increase organizational efficiency and effectiveness. He has over 10 years of experience in roles such as Associate Test Engineer, Field Service Supervisor, and Project Manager. His skills include project management, process optimization, quality management, and data analysis.
Similar to Oracle Primavera Unifier and Project Management Services Specialist (20)
Essentials of Automations: Exploring Attributes & Automation ParametersSafe Software
Building automations in FME Flow can save time, money, and help businesses scale by eliminating data silos and providing data to stakeholders in real-time. One essential component to orchestrating complex automations is the use of attributes & automation parameters (both formerly known as “keys”). In fact, it’s unlikely you’ll ever build an Automation without using these components, but what exactly are they?
Attributes & automation parameters enable the automation author to pass data values from one automation component to the next. During this webinar, our FME Flow Specialists will cover leveraging the three types of these output attributes & parameters in FME Flow: Event, Custom, and Automation. As a bonus, they’ll also be making use of the Split-Merge Block functionality.
You’ll leave this webinar with a better understanding of how to maximize the potential of automations by making use of attributes & automation parameters, with the ultimate goal of setting your enterprise integration workflows up on autopilot.
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor IvaniukFwdays
At this talk we will discuss DDoS protection tools and best practices, discuss network architectures and what AWS has to offer. Also, we will look into one of the largest DDoS attacks on Ukrainian infrastructure that happened in February 2022. We'll see, what techniques helped to keep the web resources available for Ukrainians and how AWS improved DDoS protection for all customers based on Ukraine experience
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...DanBrown980551
This LF Energy webinar took place June 20, 2024. It featured:
-Alex Thornton, LF Energy
-Hallie Cramer, Google
-Daniel Roesler, UtilityAPI
-Henry Richardson, WattTime
In response to the urgency and scale required to effectively address climate change, open source solutions offer significant potential for driving innovation and progress. Currently, there is a growing demand for standardization and interoperability in energy data and modeling. Open source standards and specifications within the energy sector can also alleviate challenges associated with data fragmentation, transparency, and accessibility. At the same time, it is crucial to consider privacy and security concerns throughout the development of open source platforms.
This webinar will delve into the motivations behind establishing LF Energy’s Carbon Data Specification Consortium. It will provide an overview of the draft specifications and the ongoing progress made by the respective working groups.
Three primary specifications will be discussed:
-Discovery and client registration, emphasizing transparent processes and secure and private access
-Customer data, centering around customer tariffs, bills, energy usage, and full consumption disclosure
-Power systems data, focusing on grid data, inclusive of transmission and distribution networks, generation, intergrid power flows, and market settlement data
This talk will cover ScyllaDB Architecture from the cluster-level view and zoom in on data distribution and internal node architecture. In the process, we will learn the secret sauce used to get ScyllaDB's high availability and superior performance. We will also touch on the upcoming changes to ScyllaDB architecture, moving to strongly consistent metadata and tablets.
In the realm of cybersecurity, offensive security practices act as a critical shield. By simulating real-world attacks in a controlled environment, these techniques expose vulnerabilities before malicious actors can exploit them. This proactive approach allows manufacturers to identify and fix weaknesses, significantly enhancing system security.
This presentation delves into the development of a system designed to mimic Galileo's Open Service signal using software-defined radio (SDR) technology. We'll begin with a foundational overview of both Global Navigation Satellite Systems (GNSS) and the intricacies of digital signal processing.
The presentation culminates in a live demonstration. We'll showcase the manipulation of Galileo's Open Service pilot signal, simulating an attack on various software and hardware systems. This practical demonstration serves to highlight the potential consequences of unaddressed vulnerabilities, emphasizing the importance of offensive security practices in safeguarding critical infrastructure.
"Scaling RAG Applications to serve millions of users", Kevin GoedeckeFwdays
How we managed to grow and scale a RAG application from zero to thousands of users in 7 months. Lessons from technical challenges around managing high load for LLMs, RAGs and Vector databases.
Conversational agents, or chatbots, are increasingly used to access all sorts of services using natural language. While open-domain chatbots - like ChatGPT - can converse on any topic, task-oriented chatbots - the focus of this paper - are designed for specific tasks, like booking a flight, obtaining customer support, or setting an appointment. Like any other software, task-oriented chatbots need to be properly tested, usually by defining and executing test scenarios (i.e., sequences of user-chatbot interactions). However, there is currently a lack of methods to quantify the completeness and strength of such test scenarios, which can lead to low-quality tests, and hence to buggy chatbots.
To fill this gap, we propose adapting mutation testing (MuT) for task-oriented chatbots. To this end, we introduce a set of mutation operators that emulate faults in chatbot designs, an architecture that enables MuT on chatbots built using heterogeneous technologies, and a practical realisation as an Eclipse plugin. Moreover, we evaluate the applicability, effectiveness and efficiency of our approach on open-source chatbots, with promising results.
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...AlexanderRichford
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation Functions to Prevent Interaction with Malicious QR Codes.
Aim of the Study: The goal of this research was to develop a robust hybrid approach for identifying malicious and insecure URLs derived from QR codes, ensuring safe interactions.
This is achieved through:
Machine Learning Model: Predicts the likelihood of a URL being malicious.
Security Validation Functions: Ensures the derived URL has a valid certificate and proper URL format.
This innovative blend of technology aims to enhance cybersecurity measures and protect users from potential threats hidden within QR codes 🖥 🔒
This study was my first introduction to using ML which has shown me the immense potential of ML in creating more secure digital environments!
The Microsoft 365 Migration Tutorial For Beginner.pptxoperationspcvita
This presentation will help you understand the power of Microsoft 365. However, we have mentioned every productivity app included in Office 365. Additionally, we have suggested the migration situation related to Office 365 and how we can help you.
You can also read: https://www.systoolsgroup.com/updates/office-365-tenant-to-tenant-migration-step-by-step-complete-guide/
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...Jason Yip
The typical problem in product engineering is not bad strategy, so much as “no strategy”. This leads to confusion, lack of motivation, and incoherent action. The next time you look for a strategy and find an empty space, instead of waiting for it to be filled, I will show you how to fill it in yourself. If you’re wrong, it forces a correction. If you’re right, it helps create focus. I’ll share how I’ve approached this in the past, both what works and lessons for what didn’t work so well.
As AI technology is pushing into IT I was wondering myself, as an “infrastructure container kubernetes guy”, how get this fancy AI technology get managed from an infrastructure operational view? Is it possible to apply our lovely cloud native principals as well? What benefit’s both technologies could bring to each other?
Let me take this questions and provide you a short journey through existing deployment models and use cases for AI software. On practical examples, we discuss what cloud/on-premise strategy we may need for applying it to our own infrastructure to get it to work from an enterprise perspective. I want to give an overview about infrastructure requirements and technologies, what could be beneficial or limiting your AI use cases in an enterprise environment. An interactive Demo will give you some insides, what approaches I got already working for real.
Keywords: AI, Containeres, Kubernetes, Cloud Native
Event Link: https://meine.doag.org/events/cloudland/2024/agenda/#agendaId.4211
AppSec PNW: Android and iOS Application Security with MobSFAjin Abraham
Mobile Security Framework - MobSF is a free and open source automated mobile application security testing environment designed to help security engineers, researchers, developers, and penetration testers to identify security vulnerabilities, malicious behaviours and privacy concerns in mobile applications using static and dynamic analysis. It supports all the popular mobile application binaries and source code formats built for Android and iOS devices. In addition to automated security assessment, it also offers an interactive testing environment to build and execute scenario based test/fuzz cases against the application.
This talk covers:
Using MobSF for static analysis of mobile applications.
Interactive dynamic security assessment of Android and iOS applications.
Solving Mobile app CTF challenges.
Reverse engineering and runtime analysis of Mobile malware.
How to shift left and integrate MobSF/mobsfscan SAST and DAST in your build pipeline.
"Choosing proper type of scaling", Olena SyrotaFwdays
Imagine an IoT processing system that is already quite mature and production-ready and for which client coverage is growing and scaling and performance aspects are life and death questions. The system has Redis, MongoDB, and stream processing based on ksqldb. In this talk, firstly, we will analyze scaling approaches and then select the proper ones for our system.
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving
Manufacturing custom quality metal nameplates and badges involves several standard operations. Processes include sheet prep, lithography, screening, coating, punch press and inspection. All decoration is completed in the flat sheet with adhesive and tooling operations following. The possibilities for creating unique durable nameplates are endless. How will you create your brand identity? We can help!
Northern Engraving | Nameplate Manufacturing Process - 2024
Oracle Primavera Unifier and Project Management Services Specialist
1. MAURO (MO) DANIELE
Phoenix, A Z 85004 480.326.9920
https://www.linkedin.com/in/modaniele mo.daniele@gmail.com
PRIMAVERA UNIFIER ADMINISTRATOR & PROJECT MANAGEMENT PROCESS DEVELOPER
Diverse technical background in analysis, systematization, and customized reporting of project
related data.
Unifier solution provider focused on increasing efficiency across multi-departmental Project team requirements
throughout the project life-cycle and developing technology based project management platforms.
Areas of expertise:
Business Processes Dynamic Cost Sheet Workflow Management
Data Integration Change Management Root Cause Analysis
Budget Management Cost Reporting Implementation & Training
PROFESSIONAL EXPERIENCE
FREEPORT MCMORAN INC., Phoenix, AZ 2008 – 2016
Project Management Controls System Developer 2008 – 2014
Recruited based on prior development of technology-based project management platforms (similar to Primavera
Unifier).
UDesigner, UStage, and Unifier specialist. (2008-2013)
Administered the Oracle Primavera Unifier platform, managed users and all access rights.
Set up new projects (Unifier).
Developed new business processes to upload project costs (commitments, expenditures, and accrual data into
the Unifier cost sheets in order to track real-time project costs against budget.
Developed complex workflows (Unifier).
Created custom cost reports (Unifier).
Developed change order business processes that dynamically adjusted the cost sheet (Unifier).
Integrated costs from multiple sources into Unifier and created the initial standard for multi-tiered executive
reports pinpointing areas of concern or interest. Standardizing project reporting allowed management to review
multiple projects more efficiently.
Developed a method to capture and monitor the root cause of change orders. (Unifier).
Developed WBS coding standards and implemented the process, defining and validating WBS codes for specific
project activities, making it easy to use the program across multiple projects by controllers and accounting
teams (Unifier Cost Sheet).
Commissioning System Developer 2013 – 2016
Developed web-based Commissioning System processes to support the commissioning team during various
phases of construction projects, providing information required to complete the client turnover packages.
(Unifier) then SharePoint.
Managed and imported Commissioning data for the Equipment, Instrument, and IO data tables, Work Packages,
EQ and Inst Protocol Forms, Punch Lists, System and Sub-System definition tables, standardizing reporting
formats for tracking work package and punch lists progress at the system and detail levels.
Supplemented FAT, UAT, and field tests of applications, as well as providing instruction documents and end
user training, reducing rollout durations.
Administered the corporate commissioning projects SharePoint sites and created 1st
time method to monitor
commissioning data via mobile devices.
2. MAURO (MO) DANIELE mo.daniele@gmail.com PAGE TWO
AMEC, Mining and Metals Division, (Now AMEC Foster Wheeler), Phoenix, AZ 2002 – 2008
Technology Services Provider – Technical Consultant
Worked as a Primavera Unifier developer/consultant (Nov 2007-Sep 2008)
Functional team leader in the development of a web-based equipment data collection platform for
commissioning and maintenance system. Automated the collection and processing of electronic data and files
collected from vendors, and integrated into the client maintenance information management system for use by
the commissioning and plant maintenance teams.
Instrument field data technician during the reconstruction of a 40MW power platform. Applied instrument
equipment knowledge and ability to read construction drawings, saving additional staff expense.
Performed engineering drawing and data collection and review, and compilation of instrumentation and
equipment lists, ensuring correct items were purchased.
Provided debugging assistance during database development of an operations risk analysis program at power
plants.
Analysed resulting effects of potential equipment failure in order to prevent catastrophic events, and to justify
the cost of spare equipment inventory.
Developed an environmental safety data information management system to collect and categorized materials
safety data information for all materials used during a mine restart project to determine the impact to the
environment. Product knowledge and database skills helped to complete the compliance requirements ahead of
schedule.
ADDITIONAL RELATED EXPERIENCE
ENGINEERING MATRIX, Seattle, WA
Project Management System Development and End-User Training and Support
SIMONS ENGINEERING (Now AMEC Foster Wheeler), Phoenix, AZ
IT Systems Manager
PHELPS DODGE CORPORATION (now Freeport McMoran Inc.), Phoenix, AZ
Project Cost Data Analyst, Integrator, and Trainer
SUNDT CONSTRUCTION, Tucson, AZ
Procurement Agent
EDUCATION
Engineering studies, Western New England Engineering College, Springfield, MA
Engineering studies, Springfield Technical Community College, Springfield, MA
Percussion Performance studies, Berklee College of Music, Boston, MA
Writing studies, University of Arizona, Tucson, AZ
LANGUAGES
English, Italian, Spanish