Project Management Plan

Version: 1.0
Date: (mm/dd/yyyy)
Project Title here
Project Management Plan

Document History and Distribution
1. Revision History
Revision #
1.0

Revision Date
99/99/9999

Description of Change
Initial Document

Author
Author name

2. Distribution
Recipient Name

Recipient Organization

Distribution Method

3. Plan Approvers

Approver Name
Raymund P. Constante
Group leader’s Name

Approver Signature

Approval
Date

Approval Group
Represented
Project Title here
Project Management Plan
Group Name

Table of Contents
1.

2.

3.

4.

5.

6.

7.
8.

Executive Summary
1.1
Project Overview
1.2
Scope
1.3
Out Of Scope
1.4
Project Deliverables
1.5
Project Management Plan Updates
1.6
Definitions and Acronyms
Project Organization
2.1
Organizational Structure
2.2
Organizational Boundaries and Interfaces
2.3
Roles & Responsibilities
Management Process
3.1
Assumptions, Dependencies, and Constraints
3.2
Risk Management
3.3
Monitoring and Control Mechanisms
3.4
Staffing Plan
3.5
Communication Plan
3.6
Escalation Procedures
Technical Process
4.1
Methods, Tools, and Techniques
4.2
Architecture Plan
4.3
Software Documentation
4.4
Hardware Documentation
4.5
Security
4.6
Project Support Functions
Work Packages, Schedules, and Budget
5.1
Work Packages
5.2
Dependencies
5.3
Resource Requirements
5.4
Budget Requirements
5.5
Budget and Resource Allocation
5.6
Schedule
Project Success Criteria
6.1
Network Diagram
6.2
Project Milestones
6.3
Approval Process
6.4
Acceptance Criteria
6.5
Critical Success Factors
Data Conversion / Data Migration
Test Strategy

4
4
5
5
5
7
7
8
8
8
9
10
10
11
Error! Bookmark not defined.
Error! Bookmark not defined.
12
Error! Bookmark not defined.
12
12
12
12
13
13
13
14
14
14
15
15
15
15
16
16
16
Error! Bookmark not defined.
Error! Bookmark not defined.
Error! Bookmark not defined.
17
17
[Type the company name] |

2
Project Title here
Project Management Plan
Group Name

8.1
Unit Testing
8.2
Functional Testing
8.3
System Testing
8.4
User Acceptance testing
8.6
Performance / Scalability Testing
8.7
Data Verification
9. Deployment Plan
10.
System Transition / Rollout Plan
11.
Training Plans
12.
Procurement Plans
13.
Maintenance & Support Plans
14.
Additional Components
15.
Glossary of Terms

17
17
18
18
18
19
19
19
19
20
20
20
21

[Type the company name] |

3
Project Title here
Project Management Plan
Group Name

1. Executive Summary
The Executive Summary of the Project Management Plan provides an overview of the project and the
product, a list of deliverables, reference material, and agency definitions and acronyms used
throughout the Life Cycle of the project.

Project Overview
Through the continuous rapid growth of our society, people nowadays are facing
technological advancement. The use of technology has a great impact for our future resources.
The main objective of the project is to provide a website that is intended to design a
convenient and efficient online movie ticket purchase. The website comes along to eliminate
inconveniencies caused by waiting inline to buy a movie ticket, then realizing that the movie
has starting already. It will also help the users to go through the available or on show movies
and purchase in a reasonable time. The admins will have an organize database that helps
them to ease their works.
The major work activities will be updating the website, developing a user friendly interface
and organize online movie purchase that is efficient to database. The required resources will
be computers and Internet Connection.
People must acknowledge on how they will face the facts that with those technologies, we
can enhanced our individual capabilities and knowledge not only for the proponents but also
for all the users.

[Type the company name] |

4
Project Title here
Project Management Plan
Group Name

Scope
The project will be come up with movie trailers, upcoming shows, and on show movie in
cinemas. Users can purchase available movie tickets and look up for price and starting time. The
website also provides the customer feedbacks about the movie and update the most watchable
movie. Customers can invite their friends to watch movies connecting through facebook page. It
may also come up to advertise live paper view.

Out Of Scope
The online movie purchase will only take under the services of the client. Proponents must
be able to provide the updates, maintenance and upgrades for the website. Future developers will
take full responsibilities about the new features of the project.

Project Deliverables
Below is a list of artifacts to be delivered to the customer

ARTIFACT
Systems Development Life Cycle Methodology (SDLC)

(Y)es

(N)o

Y

Application Technical Architecture

[Type the company name] |

5
Project Title here
Project Management Plan
Group Name

Build vs. Buy Analysis for Software
Business Case

Y

Budget

Y

Configuration Management Plan
Deliverable Acceptance Criteria
Inconvenience Resources
Maintenance & Support Plan
Organizational Breakdown Structure

Y

Project Management Plan

Y

Project Milestones

Y

Project Schedule

Y

Project Success Measurements
Quality Assurance Plan

Y

Roles and Responsibilities

Y

Software Development Plans

Y

Software User Documentation

Y

[Type the company name] |

6
Project Title here
Project Management Plan
Group Name

Training Plan

Y

Unit Test Plan

Y

Work Breakdown Structure

Y

Project Management Plan Updates
The Project Management Plan will be created and maintained using standard version control
processes. Page3 of this document outlines the Document History, Distribution List, and Plan
Approvers.

Definitions and Acronyms
A list of terms and agency acronyms used for this project are listed in the “Glossary of Terms”
in Section 8 of this document.

[Type the company name] |

7
Project Title here
Project Management Plan
Group Name

2. Project Organization
Organizational Structure (Development Team)
The Development Team is composed of four members. The team is headed by the project
leader of Analyst who is responsible for the distribution of tasks which he/she must ensure that
it can accomplished the task based on its capability. The team has also a programmer which is
responsible for programming and encoding codes. The programmer is also responsible for the
desired outcome of the project based in System Designer. The System Designer must ensure
that everything he/she designed can accomplish by the programmer within the given time and
also responsible for user friendly interface. The last is the Documentation Manage who is in
charge of compiling and monitoring the flow of documents needed in the project.
For a successful project, the team decided to take a group activity and compiled some
opinions and suggestions that decided individually and evaluated properly to ensure that they
can achieve the project in time.

Organizational Boundaries and Interfaces
The development of this decided not to outsource any part of the project.
The company has also played the role of the one who will provide sufficient
and accurate information that will then be displayed in system. The system
analyst is responsible for maintaining the interface between the project and
[Type the company name] |

8
Project Title here
Project Management Plan
Group Name

the customer. The responsibility lies in addressing all issues of customer. This
will be accomplished by keeping in regular contact with the client in order to
share

and

discuss

how

those

documents

meet

expectations.

The project manager is responsible for maintaining the interface between the
project and the course instructor. It is the manager’s responsibility to
schedule the time and content of the project’s development in accordance
with the requirements of the instructor.

Roles & Responsibilities
In order to effectively enable each member of the group that will be a part of
the overall Star Mall Cinema Online Ticketing, roles and responsibilities are
clearly defined and are as follows:

PROJECT
ROLE
System
Analyst

Programmer

Project
Manager

DESCRIPTION
Responsible for
developing cost
analysis, design
configurations and
implementation.
Responsible for Code,
debug, test, and
document routine
application programs.
Responsible for
managing the
resources and

Group Resource/
Assigned Member
Donna Mae Laurente,
Jade Celine Tapawan

Dependencies

Jade Celine Tapawan,
DayanaraTopacio

Donna Mae Laurente

[Type the company name] |

9
Project Title here
Project Management Plan
Group Name

Designer

constraints of a
project.
Create detailed design Arlin Victoria Yalung,
documentation for the Dayanara Topacio,
development and
Jade Celine Tapawan,
integration of computer
systems to meet the
needs of businesses.

3. Management Process
This section describes project assumptions, dependencies, and constraints, risk management
techniques, monitoring and control practices, staffing plan, communication plan, and
escalation procedures.

Assumptions, Dependencies, and Constraints

This section will state the assumptions on which the project is based, the external
events the project is dependent upon, and the constraints under which the project is to
be conducted.

Assumptions
No cancellation of tickets
User is assumed to be aware of the terms movie, time and date.
Price fixed for tickets over the period of time

[Type the company name] |

10
Project Title here
Project Management Plan
Group Name

Dependencies
Movie data provider
User reviews: from users of other movie sites
The user is familiar with computers, the internet and web browsing so he/she
can simply and easily navigate the site and make purchases.

Constraints
Run on different type of browser such as Internet Explorer, Mozilla and Google
Chrome.
The system shall be developed using Java, Javascript, and Php programming
languages.
The system shall run using MySql Database Server.

Risk Management
Identify and assess the risk factors associated with the project. Describe the prescribed
mechanisms for tracking the various risk factors (e.g., Self-Assessment and risk
statistical analysis (RAMP) and implementing contingency plans. Risk factors that
should be considered include contractual risk, technology risk, size and complexity
risks, personnel acquisition and retention risks, and risks to achieving customer
acceptance of the product.

[Type the company name] |

11
Project Title here
Project Management Plan
Group Name

Communication Plan
In this section, the project manager
Remove the links

4. Technical Process
The Technical Processes are applicable across all phases of the life cycle of a system. These
processes should be carried out to create a technical methods, tools and techniques. It is use to develop a
system concept, to determine technological necessities and to plan future development costs, schedules
and risks.

Methods, Tools, and Techniques
Specifies the computing system, development methodology, team structure,
programming language, and other notations, tools, techniques, and methods to be used
to specify, design, build, test, integrate, document, deliver, modify, or maintain the
project deliverables. In addition, the technical standards, policies, procedures, and
guidelines governing development shall be included or by reference to other
documents.

Architecture Plan
Not applicable in this project.

Software Documentation
The Website can be run on different type of browser such as Internet Explorer, Mozilla and
[Type the company name] |

12
Project Title here
Project Management Plan
Group Name

Google Chrome.

Hardware Documentation
The website can run through computer or tablet with internet connection.

Security
The System will provide Admin’s account and User’s account to compromised with the
security level of the website.
The Online Ticketing website has security measures in place to protect the customer from
loss, misuse and alteration to the information under admin control. The secure server software,
Secure Socket Layers (SSL) is among the best software available today for secure commerce
transactions. When exchanging personal data such as your credit card number, your name,
email address etc, this data is encrypted thus becoming incomprehensible when it is sent
across the Internet.

Project Support Functions
This section shall contain, either directly or by reference, plans for the supporting
functions of the software project. Supporting functions include (but may not be limited
to):
Configuration management,
[Type the company name] |

13
Project Title here
Project Management Plan
Group Name

Software quality assurance,
Verification and validation plans,

5. Work Packages, Schedules, and Budget
This section of the Project Management Plan will specify the work packages, identify the
dependency relationships among them, state the project resource requirements, provide the
allocation of budget and resources to work packages, and establish a project schedule.

Work Packages
This subsection will define the work packages (work breakdown structure (WBS)) for the
activities and tasks that must be completed in order to satisfy the project agreement.
Each work package must be uniquely identified; identification may be based on a
numbering scheme and descriptive title. A diagram depicting the breakdown of
activities (Gantt Chart) may be used to depict a hierarchical relationship among work
packages.

Dependencies
This section will state the ordering relations among work packages to account for
interdependencies among them and dependencies on external events. Techniques such
as dependency lists, activity networks, and the critical path method may be used to
[Type the company name] |

14
Project Title here
Project Management Plan
Group Name

depict dependencies among work packages.

Resource Requirements
The project team requires a maximum of 4 personnel consist of a project manager,
programmers, GUI designers and documentation personnel to complete the project,The
project also requires computer and Internet.

Budget Requirements
Identifies, as a function of time, estimates of total budget peso required to complete the
project.

Budget and Resource Allocation
Not applicable in this project.

Schedule
The proponents must acquired weekly meeting wherein the different tasks like Designing the
Graphic User-Interface, Documentations must be accomplished within the given period. The

[Type the company name] |

15
Project Title here
Project Management Plan
Group Name

Project Manager is expected to conduct meetings and accomplished the different task that the
team has conducted.

Earned Value Analysis
Create a table showing the earned value to keep track of project activities.

6. Project Success Criteria
This section describes the project milestones and checkpoints, key deliverables, acceptance
criteria, and management approval process for project and product deliverables.

Network Diagram
This subsection will define the project network diagram, including the critical path. The
network diagram may be included as an Appendix.

Project Milestones

Design Configurations and Implementation

Graphical User-Interface of the website
 Creation of a fully functional software
[Type the company name] |

16
Project Title here
Project Management Plan
Group Name

 Coding and Programming
 Testing
 Complete Documentations

7. Data Conversion / Data Migration
This section will describe how data will be converted or migrated to production prior to the
application being deployed into production.

8. Test Strategy
Unit Testing
It is individually and independently scrutinized for proper operation. Unit Testing is
acquired to take the smallest piece of testable features in the software, isolate it from the
remainder of the code, and determine whether it behaves exactly as expected.
Designers can identify and fix problem immediately, as the modules are best known to
them. This helps in fixing multiple problems simultaneously.

Functional Testing

Process to validate an application that will be completed to ensure that input produces
expected outputs. It focused on validating business solutions, rather than just testing software.

[Type the company name] |

17
Project Title here
Project Management Plan
Group Name

Functional test planning should begin as early as during the design of the system development.

System Testing

The major concern of the developers in this testing level is how the system will behave in
the process of reliability and availability. The compatibility performance of the software will be
given due emphasis in here.

User Acceptance Testing

The project team ensures the users confidence for the system being delivered to them meets their
requirements.
The user acceptance testing is done using real world scenarios and perceptions relevant to the end
users.

Performance / Scalability Testing

The goal of this testing is to understand what point the system stops scaling and identify the
[Type the company name] |

18
Project Title here
Project Management Plan
Group Name

reasons conducted by the project team. It can also identify major workloads and mitigate
bottlenecks that can impede the scalability of the system.

Data Verification
The project team is concern to check to system producing an accurate display. It system must be
checked and reviewed carefully so that the quality of the system is assured.

9. Deployment Plan
This section will describe how the product will be deployed into production.

10. System Transition / Rollout Plan
This section will describe the knowledge transfer needed for software components, hardware
components, and transition knowledge from developer to maintenance support.

11. Training Plans
The Developers is responsible to conduct series of training for the team who will be tasked to
update and maintain the project. The project issue must be accomplished by the team before handling
down the training.

[Type the company name] |

19
Project Title here
Project Management Plan
Group Name

The Project Team should also conduct series of meeting to report the new featured updates of the
project and to maintain the capability functions. Trainings can also be a part of promoting and
introducing some newly features and updates of the project.

12. Procurement Plans
This section will describe how hardware, software, license, or any components will be
procured for the project. The items may be procured by purchase, leased, or borrowed.

13. Maintenance & Support Plans
The system will be maintained by updating upcoming movies and events. Advertise and

14. Additional Components

Certain additional components may be required. These may be included by appending
additional sections to the Project Management Plan. Additional items of importance may
include subcontractor management plans and SLA’s.

[Type the company name] |

20
Project Title here
Project Management Plan
Group Name

15. Glossary of Terms
(AN INDEX OR GLOSSARY OF TERMS OR ACRONYMS, USED THROUGHOUT THE PROJECT MANAGEMENT PLAN IS OPTIONAL BUT
RECOMMENDED TO IMPROVE USABILITY AND PROVIDE DEFINITIONS OF COMMON TERMS USED THROUGHOUT THE SYSTEM DEVELOPMENT
LIFE CYCLE.)

A
Acceptance Criteria – The list of requirements that must be satisfied prior to the customer accepting delivery of the
product.
Acceptance Test – Formal user performed testing performed prior to accepting the system (sometimes called client
acceptance test or user acceptance test).
Acquisition – Generic term for hardware, software, or services acquired from an outside vendor or contractor.
Action Plan - A plan that describes what needs to be done and when it needs to be completed. Project Management
Plans are action plans.
Activity - A specific project task, or group of tasks, that require resources and time to complete.
Adaptive System – Describes software that has flexibility as the primary design point.
Application – Generic term for a program, or system, that handles a specific business function.
Application Software – A complete, self-contained program that can perform work for a user. This is in contrast to
system software such as an operating system, server processes, and libraries that exist in support of application
software.
Approval Cycle – Process of gaining funding and management approval prior to project initiation.
Architecture – Imposes order and makes interconnections possible. Generally defined as an intermediate step
between initial requirements and business functional specifications during which the entire complex of hardware,
software, and design considerations are viewed as a whole. Refers to a blueprint for evolving a technical
infrastructure.
Assessment – A general term for the formal management review of a process.
Audit - A formal and detailed examination of the progress, costs, operations, results, or some other aspect of a
project or system performed by an independent party.
Availability – The portion of time that a system that is scheduled to operate actually can be used as expected.

Glossary of Terms* (continued)
[Type the company name] |

21
Project Title here
Project Management Plan
Group Name

B
Backbone – A high-speed computer network designed to interconnect lower-speed networks or clusters of dispersed
user devices.
Baseline – A specification, or product, that has been formally agreed upon which serves as the starting point against
which progress will be judged.
Baseline Plan - The initial approved plan to which deviations will be compared as the project proceeds. A work
product that has been formally approved and that can be changed only through formal change control procedures.
Batch – A term describing a method of operating computers. This method takes groups of transactions, executes
them, and returns the results, all without human intervention.
Bench Mark – A standard figure of merit which measurements or comparisons may be made.
Bridge – Devices that connect two separate networks. Once bridging is accomplished, the bridge makes
interconnected networks look like a single network.
Budget – A planned sequence of expenditures over time with costs assigned to specific tasks and activities.
C
CASE – Computer Aided Software Engineering - Systems that attempt to automate some or all of the tasks
involved in managing, designing, developing, and maintaining software systems.
Change Management – The formal process of recording, analyzing, estimating, tracking and reporting of changes to
the project baseline business functional requirements.
Checkpoint – A point in the development process at which project state, status, and results are checked, recorded,
and measured.
Client/Server System – Primarily a relationship between processes running on separate machines. A client initiates
the dialog by sending requests to the server asking for information or action.
Confidence Level - A level of confidence, stated as a percentage, for a budget or schedule estimate. The higher the
confidence level, the lower the risk.
Configuration Management – Methodical storage and recording of all software components and deliverables during
development.
Connectivity – Refers to the ability to send and receive information between locations, devices, and business
services.

Glossary of Terms* (continued)
[Type the company name] |

22
Project Title here
Project Management Plan
Group Name

Contingency Plan - An alternative for action if the project does not proceed according to plan or if the expected
results are not achieved.
Control - A process for assuring that reality, or actual performance, meets expectations or plans.
Cooperative Processing – Computing that requires two or more distinct processors to complete a single
transaction.
Cost / Benefit Analysis – A formal study in which the development, execution, and maintenance costs for a project
are matched against the anticipated value of the product.
Critical Activity - A task, activity, or event that, if delayed, will delay another important event - probably the
completion of the project or a major milestone in the project.
Critical Path – Derived from the PERT method, this term implies the set of activities that must be completed in
sequence and on time if the entire project is to be completed on time. A missed task on the critical path will cause a
product delivery delay. This is the longest time for the project from beginning to end.
Critical Path Method (CPM) - One of the two most common forms of networking systems. CPM uses a one-time
estimate for creating a project schedule.
Customer - The individual or organization that specifies and accepts the project deliverables.
D
Data – Describes the numbers, text, graphics, images, and voice stored in a form that can be used by a computer.
Data Warehouse – Where you consolidate and store data from many sources.
Deliverable – A tangible, physical object that is the output of a software development task.
Dependency Diagram - Another name for a network or precedence diagram that shows the dependencies among
tasks.
Design – The tasks associated with specifying and sketching the features and functions of a new application prior to
coding.
Development Project – The sum of all tasks and activities necessary to build a software product.
Document of Understanding – A formal agreement between two parties. A contract that is sometimes referred to as
a Statement of Work (SOW).

Glossary of Terms* (continued)
[Type the company name] |

23
Project Title here
Project Management Plan
Group Name

Documentation – The printed and displayed materials that explain an application to a user.
Duration - The period of time over which a task takes place. Duration establishes the schedule for a project.
E
Effectiveness - A measure of the quality of attainment in meeting objectives.
Efficiency - A measure of the volume of output received for the input used.
Effort - The amount of work or labor (in hours or workdays) required to complete a task.
Environment – The set of tools and physical surroundings in which software is developed.
EPMO – Enterprise Project Management Office.
Estimate – A predicted total of expenditures required to complete a task, activity, or project.
Exit Criteria – The set of conditions that must be met prior to completing a project phase or application.
F
Feasibility Project – A project designed to prove, or disprove, the appropriateness of the technology solution under
existing constraints (sometimes called “proof-of-concept” project).
Float - The amount of time for a task to be freely scheduled without affecting other tasks in the project.
Function - An activity that spans the entire duration of a software project (e.g., status reporting, quality assurance,
verification and validation).
G
Gantt Chart – A method of displaying overlapped and partially concurrent activities by using horizontal lines to reflect
the time required by each activity. The chart, named for Henry Lawrence Gantt, consists of a table of project task
information and a bar chart that graphically displays the project schedule to be used in planning and tracking.
Gateway – Hardware or software that translates between two dissimilar protocols.
Granular – Describes the art of writing small modules of code and / or objects.
Graphical User Interface (GUI) – A manner of presentation that makes use of windows, icons, menus, pointers, and
scroll bards.

Glossary of Terms* (continued)
[Type the company name] |

24
Project Title here
Project Management Plan
Group Name

H
Hardcode – An informal term that describes a programming technique where data or procedures are specifically
written into the program instructions.
Hardware – Physical equipment used to process, store, or transmit computer program data.
I
Independent Review – A formal examination of a project conducted by an organization other than the development
organization.
Information – The meaningful interpretation of data.
IRMC – Information Resource Management Commission.
Integration – Describes the work, or device, required to connect two different systems that were not originally
designed to work together.
Integration Test – Testing in which software components, hardware components, or both are combined and tested
to evaluate the interaction between them.
Interface – A connection between two devices or systems.
Interoperability – The ability to have applications and computers from different vendors work together on a network.
Intranet – An Internet network behind a firewall.
Issue – A problem to be solved or a decision that has not been made.
J
Joint Application Design (JAD) - The combined effort of client, program, and development staff to define and elicit
requirements for a system (JAR) or design a system (JAD).
K
L
Lag - The amount of time after one task is started or finished before the next task may be started or finished.
Lead - The amount of time that precedes the start of work on another task.
Local Area Network (LAN) – A communications system confined to a limited area, typically a building, occasionally
a group, and linking computers together via cable.

Glossary of Terms* (continued)
[Type the company name] |

25
Project Title here
Project Management Plan
Group Name

M
Maintenance – Refers to the ongoing activity that keeps software functioning in a technical and business
environment (production).
Methodology – A set of formal protocols followed when performing a task.
Middleware – Software that hides the complexity of the networked computing environment from the users and
application programmers.
Milestone – A major checkpoint in the activities involved in a project. A clearly defined point in a project that
summarized the completion of a related set of tasks.
Model - A way of looking at reality, usually for the purpose of abstracting and simplifying it to make it understandable
in a particular context.
Modular Programming – Programming that has as its fundamental assumption that a large piece of software should
be separated into its constituent parts or modules thereby making for easier and faster development and
maintainability. Modules were traditionally called subroutines or functions and now are often called objects.
N
Network – Describes the physical hardware and software connections between computers allowing information to be
shared and electronic communications to take place.
Network Diagram - The logical representation of tasks that defines the sequence of work in a project.
N-tier Architecture – Describes a method for dividing an application into a series of distinct layers to provide for
ease of maintenance and flexibility.
O
Operating System – System software that controls data storage, input and output to and from the keyboard, and the
execution of applications written for it. It performs base services: prioritizing work, scheduling, memory management,
etc.
P
Package Acquisition – The purchase, or lease, of software from an outside source.
Padding - A standard project management tactic used to add extra time or money to estimates to cover for the
uncertainty and risk of predicting future project activities.
Path - A sequence of lines and nodes in a project network.

[Type the company name] |

26
Project Title here
Project Management Plan
Group Name

Glossary of Terms* (continued)
PERT – Project Evaluation and Review Technique - The PERT method uses the concepts of milestones,
activities, and slack time to calculate the critical path. The chart, which resembles a flow chart, depicts a box to
represent each project task and a line connecting two boxes to represent the relationship between tasks.
Phases – The divisions of a software development life cycle into discrete stages (e.g., requirements, design, code,
test, etc.).
Planning Project – A project intended to gather, or predict, the sequence of activities and resources needed to
complete a work effort.
Platform – The hardware and support software with which a program is intended to operate.
Precedence - When one task must be completed before another task can be started, the first task is said to have
precedence over the other.
Process – The step-by-step sequence of activities (systematic approach) that must be carried out to complete a
project.
Programming – The art of writing, in a computer understandable language, a set of instructions that produces
software.
Project – The combined resources (people, machines, materials), processes, and activities that are dedicated to
building and delivering a product to a customer.
Project Duration - The time it takes to complete the entire project.
Project Management - The combination of systems, techniques, and people required to successfully complete a
project on time and within budget.
Project Manager – The senior person responsible for the entire project.
Project Management Plan – A formal document that describes the technical and management approach to be
followed for a project.
Project Sponsor – The department “customer” who will authorize project initiation, and who will receive, accept, and
use the software product or service.
Protocol – A set of rules and specifications that describes how a piece of software will behave and how other pieces
of software must behave in order to work with the first piece of software.
Q
Quality (Product) - Conformance to business functional requirements with defect-free products. Quality reflects both
the completeness of software or system features and functions, and error-free operation.
[Type the company name] |

27
Project Title here
Project Management Plan
Group Name

Glossary of Terms* (continued)
Quality (Process) – Verification and validation to established policies, standards, procedures and guidelines for
software development.
Quality Assurance – Within the State of North Carolina, the process tracking and oversight function for monitoring
project performance, adherence to commitments, and budget requirements. Performed under the control of the Office
of Information Technology Services (ITS), Enterprise Technology Strategies (ETS) staff.
R
Regression Test – Selective re-testing to detect errors or faults introduced during modification of a system.
Relational Database – A collection of data that is organized into tables so that relationships between and among
data can be established.
Resource Leveling - The process of shifting resources to even out the workload of team members.
RFP - Request for Proposal - Formal statement by a department that they are soliciting enterprises to bid on a
contract for a program, system or service.
Requirements – The statement of needs by a user that triggers the development of a program, system, or project.
May be called business functional requirements or requirement specifications.
Research and Development Project – A definition of a project type essentially exploring options for developing new
systems or work products.
Risk – The probability that a project will experience undesirable events, which may create, cost overruns, schedule
delays, or project cancellation. The identification, mitigation, tracking, and management of those elements creating
the risk situation.
Risk Analysis - An evaluation of the feasibility or probability that the outcome of a project will be the desired
outcome.
S
Scalable – A term describing an architecture or software that can handle expansion in the use as the need arises
without adversely impacting systems management and operations.
Scope - The magnitude of the effort required to complete a project.
Server – A computer on a network that makes applications, print services, data, and communications available.

[Type the company name] |

28
Project Title here
Project Management Plan
Group Name

Glossary of Terms* (continued)
Slack - see float.
Software – Computer programs, systems, and the associated documentation that describes them.
SDLC - Software Development Life Cycle – The period of time that begins with the decision to develop a software
product and ends when the software is delivered.
Software Development Process – The process by which user needs are translated into a software product.
Project Management Plan - The controlling document for managing a software project. The PP defines the technical
and managerial project functions, activities, and tasks necessary to satisfy the requirements of a software project.
Specifications – General term for the wide variety of paper-based descriptions of a program or system.
Stakeholders - People who have a personal or agency interest in the end results of a project.
Standalone – Describes a computer workstation where the computer is not connected to any other computer on a
network.
Statement of Work (SOW) - An integrated set of task descriptions, goal descriptions, risks, and assumptions that
accompany the evolving master Project Management Plan during development.
Strategic Plan – The long-range plan where the horizon is usually three to five years time span.
Subcontract - Delegating tasks or sub-projects to contractors or other organizations.
System – A linked collection of programs, or components, that perform a generic business or technical function.
System Test – The final stage of testing on a completed project (prior to client acceptance test) when all hardware
and software components are put together and tested as a whole.
SDLC - System Development Life Cycle - The complex of tasks and deliverables that are organized toward
developing software systems.

[Type the company name] |

29
Project Title here
Project Management Plan
Group Name

Glossary of Terms* (continued)
T
Tactical Plan – Specific improvements, or changes, that will be carried out in a fairly short time span (usually twelve
(12) months).
Task - A cohesive unit of work on a project (usually 40 to 80 hours of effort).
Task Description - A description that defines all the work required to complete a project task or activity including
input, output, expected results, and quality specifications.
Test Plan – A document that describes the scope, approach, resources, and schedule of intended test activities.
Testing – The set of defect removal tasks that include execution of all, or part, of an application on a computer.
Topology – The map or plan of a network.
U
Unit Test - The testing carried out personally by individual programmers on their own code.
V
W
Wide Area Network (WAN) – A network where the computers are separated by significant distances and
telecommunications links are implemented.
Work Breakdown Structure (WBS) – A formal analysis of the activities, tasks, and sub-tasks that must be
accomplished to build a software project. A product or activity oriented hierarchy tree depicting the elements of work
that need to be accomplished in order to deliver a product.
Work Package - A specification for the work to be accomplished in completing an activity or task.
Work Product - Any tangible item that results from a project function, activity, or task.
Workstation – Any machine with all of its installed storage, processing, and communications that can be either
standalone or networked.

[Type the company name] |

30
Project Title here
Project Management Plan
Group Name

Glossary of Terms* (continued)
X
Y
Z

* Definitions were extracted from Assessment and Control of Software Risks by Capers Jones (1994); Managing
Software Development Projects (Second edition) by Neal Whitten (1995); IEEE Standards Collection: Software
Engineering (1997 Edition); Best Practices in IT Architecture Planning and Implementation by Larry DeBoever;
Essential Client/Server Survival Guide by Robert Orfali; and The Complete Idiot's Guide to Project Management
by Sunny and Kim Baker.

[Type the company name] |

31
Project Title here
Project Management Plan
Group Name

10.

APPENDICES

Appendices may be included, either directly or by reference, to provide supporting details that could aid
in the understanding of the Project Management Plan.

Appendix A
Minutes of Meeting
Appendix B
Issue Log Template
Appendix C
Weekly Project Status Report

[Type the company name] |

32
Project Title here
Project Management Plan
Group Name

[Type the company name] |

33

More Related Content

What's hot

Online Movie ticket booking Project
Online Movie ticket booking ProjectOnline Movie ticket booking Project
Online Movie ticket booking ProjectSHAZIA JAMALI
 
Online movie ticket booking
Online movie ticket bookingOnline movie ticket booking
Online movie ticket bookingmrinnovater007
 
Online movie tickets
Online movie ticketsOnline movie tickets
Online movie ticketsJAI BAMORIYA
 
online movie ticket booking system
online movie ticket booking systemonline movie ticket booking system
online movie ticket booking systemSikandar Pandit
 
Online Movie or theater ticket booking system Details Requirement.
Online Movie or theater ticket booking system Details Requirement.Online Movie or theater ticket booking system Details Requirement.
Online Movie or theater ticket booking system Details Requirement.Niloy Biswas
 
Online movie booking synopsis
Online movie booking  synopsisOnline movie booking  synopsis
Online movie booking synopsismca projects
 
Srs (Software Requirement Specification Document)
Srs (Software Requirement Specification Document) Srs (Software Requirement Specification Document)
Srs (Software Requirement Specification Document) Fatima Qayyum
 
Project on multiplex ticket bookingn system globsyn2014
Project on multiplex ticket bookingn system globsyn2014Project on multiplex ticket bookingn system globsyn2014
Project on multiplex ticket bookingn system globsyn2014Md Imran
 
Documentation Hotel Management System
Documentation Hotel Management SystemDocumentation Hotel Management System
Documentation Hotel Management SystemSalman Dayal
 
A Low-Cost IoT Application for the Urban Traffic of Vehicles, Based on Wirele...
A Low-Cost IoT Application for the Urban Traffic of Vehicles, Based on Wirele...A Low-Cost IoT Application for the Urban Traffic of Vehicles, Based on Wirele...
A Low-Cost IoT Application for the Urban Traffic of Vehicles, Based on Wirele...Fatima Qayyum
 
Hotel management system
Hotel management systemHotel management system
Hotel management systemRoni Roy
 
Movie Ticket Booking Website Project Presentation
Movie Ticket Booking Website Project PresentationMovie Ticket Booking Website Project Presentation
Movie Ticket Booking Website Project PresentationAvinandan Ganguly
 
railway reservation software documentaion
railway reservation software documentaionrailway reservation software documentaion
railway reservation software documentaionJoveria Beg
 
Hotel Reservation System Project
Hotel Reservation System ProjectHotel Reservation System Project
Hotel Reservation System Projectraj_qn3
 
Airline Reservation System
Airline Reservation SystemAirline Reservation System
Airline Reservation SystemSahil Talwar
 
automated doctor appointment and prescription management system
automated doctor appointment and prescription management systemautomated doctor appointment and prescription management system
automated doctor appointment and prescription management systemluckymoni76
 
Online movie ticket booking system
Online movie ticket booking systemOnline movie ticket booking system
Online movie ticket booking systemSikandar Pandit
 
Online hotel booking application - Design Process
Online hotel booking application - Design ProcessOnline hotel booking application - Design Process
Online hotel booking application - Design Processchayapathi sarath
 

What's hot (20)

Online Movie ticket booking Project
Online Movie ticket booking ProjectOnline Movie ticket booking Project
Online Movie ticket booking Project
 
Online movie ticket booking
Online movie ticket bookingOnline movie ticket booking
Online movie ticket booking
 
movie.pptx
movie.pptxmovie.pptx
movie.pptx
 
Online movie tickets
Online movie ticketsOnline movie tickets
Online movie tickets
 
online movie ticket booking system
online movie ticket booking systemonline movie ticket booking system
online movie ticket booking system
 
Online Movie or theater ticket booking system Details Requirement.
Online Movie or theater ticket booking system Details Requirement.Online Movie or theater ticket booking system Details Requirement.
Online Movie or theater ticket booking system Details Requirement.
 
Online movie booking synopsis
Online movie booking  synopsisOnline movie booking  synopsis
Online movie booking synopsis
 
Srs (Software Requirement Specification Document)
Srs (Software Requirement Specification Document) Srs (Software Requirement Specification Document)
Srs (Software Requirement Specification Document)
 
BYS Report
BYS ReportBYS Report
BYS Report
 
Project on multiplex ticket bookingn system globsyn2014
Project on multiplex ticket bookingn system globsyn2014Project on multiplex ticket bookingn system globsyn2014
Project on multiplex ticket bookingn system globsyn2014
 
Documentation Hotel Management System
Documentation Hotel Management SystemDocumentation Hotel Management System
Documentation Hotel Management System
 
A Low-Cost IoT Application for the Urban Traffic of Vehicles, Based on Wirele...
A Low-Cost IoT Application for the Urban Traffic of Vehicles, Based on Wirele...A Low-Cost IoT Application for the Urban Traffic of Vehicles, Based on Wirele...
A Low-Cost IoT Application for the Urban Traffic of Vehicles, Based on Wirele...
 
Hotel management system
Hotel management systemHotel management system
Hotel management system
 
Movie Ticket Booking Website Project Presentation
Movie Ticket Booking Website Project PresentationMovie Ticket Booking Website Project Presentation
Movie Ticket Booking Website Project Presentation
 
railway reservation software documentaion
railway reservation software documentaionrailway reservation software documentaion
railway reservation software documentaion
 
Hotel Reservation System Project
Hotel Reservation System ProjectHotel Reservation System Project
Hotel Reservation System Project
 
Airline Reservation System
Airline Reservation SystemAirline Reservation System
Airline Reservation System
 
automated doctor appointment and prescription management system
automated doctor appointment and prescription management systemautomated doctor appointment and prescription management system
automated doctor appointment and prescription management system
 
Online movie ticket booking system
Online movie ticket booking systemOnline movie ticket booking system
Online movie ticket booking system
 
Online hotel booking application - Design Process
Online hotel booking application - Design ProcessOnline hotel booking application - Design Process
Online hotel booking application - Design Process
 

Similar to Online cinematicketingdocx

RUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docxRUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docxjoellemurphey
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overviewcford1973
 
SE18_Lec 13_ Project Planning
SE18_Lec 13_ Project PlanningSE18_Lec 13_ Project Planning
SE18_Lec 13_ Project PlanningAmr E. Mohamed
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxAssignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxbraycarissa250
 
Movie Ticket Management System Class 12 synopsis.pdf
Movie Ticket Management System Class 12 synopsis.pdfMovie Ticket Management System Class 12 synopsis.pdf
Movie Ticket Management System Class 12 synopsis.pdfPyami
 
Project Plan template
Project Plan templateProject Plan template
Project Plan templateDemand Metric
 
CLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docx
CLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docxCLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docx
CLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docxmonicafrancis71118
 
GAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdfGAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdfRmsDagi
 
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT .docx
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT                   .docxRUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT                   .docx
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT .docxsusanschei
 
Part 02 Connecting Business Strategy and Project Management
Part 02 Connecting Business Strategy and Project ManagementPart 02 Connecting Business Strategy and Project Management
Part 02 Connecting Business Strategy and Project ManagementLilis Rusliyawati
 
RajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_InfosysRajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_InfosysRajeev Gautam
 
Project management-plan
Project management-planProject management-plan
Project management-planTran Tien
 
19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit MittalCourtney Esco
 
BUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docx
BUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docxBUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docx
BUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docxjasoninnes20
 
Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodologyray biztech
 
Project managment software
Project managment softwareProject managment software
Project managment softwareZilicus
 
General checklist for the development project
General checklist for the development projectGeneral checklist for the development project
General checklist for the development projectkeshav2011
 
Lessons learned report
Lessons learned reportLessons learned report
Lessons learned reportMarsha Cooper
 

Similar to Online cinematicketingdocx (20)

RUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docxRUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docx
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
SE18_Lec 13_ Project Planning
SE18_Lec 13_ Project PlanningSE18_Lec 13_ Project Planning
SE18_Lec 13_ Project Planning
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxAssignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
 
Movie Ticket Management System Class 12 synopsis.pdf
Movie Ticket Management System Class 12 synopsis.pdfMovie Ticket Management System Class 12 synopsis.pdf
Movie Ticket Management System Class 12 synopsis.pdf
 
Project Plan template
Project Plan templateProject Plan template
Project Plan template
 
CLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docx
CLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docxCLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docx
CLASS NAMEMIS600PROFESSORS NAME STUDENTS NAME PRO.docx
 
GAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdfGAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdf
 
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT .docx
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT                   .docxRUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT                   .docx
RUNNING HEAD ERP SYSTEM IMPLIMENTATION PROJECT .docx
 
Part 02 Connecting Business Strategy and Project Management
Part 02 Connecting Business Strategy and Project ManagementPart 02 Connecting Business Strategy and Project Management
Part 02 Connecting Business Strategy and Project Management
 
RajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_InfosysRajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_Infosys
 
Project management-plan
Project management-planProject management-plan
Project management-plan
 
19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal
 
BUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docx
BUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docxBUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docx
BUSINESS CASE CAPSTONE2BUSINESS CASE CAPSTONE3.docx
 
Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodology
 
Project managment software
Project managment softwareProject managment software
Project managment software
 
General checklist for the development project
General checklist for the development projectGeneral checklist for the development project
General checklist for the development project
 
Lessons learned report
Lessons learned reportLessons learned report
Lessons learned report
 

Recently uploaded

Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 

Recently uploaded (20)

Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 

Online cinematicketingdocx

  • 1. (Star Mall Online Cinema Ticketing) Project Management Plan Version: 1.0 Date: (mm/dd/yyyy)
  • 2. Project Title here Project Management Plan Document History and Distribution 1. Revision History Revision # 1.0 Revision Date 99/99/9999 Description of Change Initial Document Author Author name 2. Distribution Recipient Name Recipient Organization Distribution Method 3. Plan Approvers Approver Name Raymund P. Constante Group leader’s Name Approver Signature Approval Date Approval Group Represented
  • 3. Project Title here Project Management Plan Group Name Table of Contents 1. 2. 3. 4. 5. 6. 7. 8. Executive Summary 1.1 Project Overview 1.2 Scope 1.3 Out Of Scope 1.4 Project Deliverables 1.5 Project Management Plan Updates 1.6 Definitions and Acronyms Project Organization 2.1 Organizational Structure 2.2 Organizational Boundaries and Interfaces 2.3 Roles & Responsibilities Management Process 3.1 Assumptions, Dependencies, and Constraints 3.2 Risk Management 3.3 Monitoring and Control Mechanisms 3.4 Staffing Plan 3.5 Communication Plan 3.6 Escalation Procedures Technical Process 4.1 Methods, Tools, and Techniques 4.2 Architecture Plan 4.3 Software Documentation 4.4 Hardware Documentation 4.5 Security 4.6 Project Support Functions Work Packages, Schedules, and Budget 5.1 Work Packages 5.2 Dependencies 5.3 Resource Requirements 5.4 Budget Requirements 5.5 Budget and Resource Allocation 5.6 Schedule Project Success Criteria 6.1 Network Diagram 6.2 Project Milestones 6.3 Approval Process 6.4 Acceptance Criteria 6.5 Critical Success Factors Data Conversion / Data Migration Test Strategy 4 4 5 5 5 7 7 8 8 8 9 10 10 11 Error! Bookmark not defined. Error! Bookmark not defined. 12 Error! Bookmark not defined. 12 12 12 12 13 13 13 14 14 14 15 15 15 15 16 16 16 Error! Bookmark not defined. Error! Bookmark not defined. Error! Bookmark not defined. 17 17 [Type the company name] | 2
  • 4. Project Title here Project Management Plan Group Name 8.1 Unit Testing 8.2 Functional Testing 8.3 System Testing 8.4 User Acceptance testing 8.6 Performance / Scalability Testing 8.7 Data Verification 9. Deployment Plan 10. System Transition / Rollout Plan 11. Training Plans 12. Procurement Plans 13. Maintenance & Support Plans 14. Additional Components 15. Glossary of Terms 17 17 18 18 18 19 19 19 19 20 20 20 21 [Type the company name] | 3
  • 5. Project Title here Project Management Plan Group Name 1. Executive Summary The Executive Summary of the Project Management Plan provides an overview of the project and the product, a list of deliverables, reference material, and agency definitions and acronyms used throughout the Life Cycle of the project. Project Overview Through the continuous rapid growth of our society, people nowadays are facing technological advancement. The use of technology has a great impact for our future resources. The main objective of the project is to provide a website that is intended to design a convenient and efficient online movie ticket purchase. The website comes along to eliminate inconveniencies caused by waiting inline to buy a movie ticket, then realizing that the movie has starting already. It will also help the users to go through the available or on show movies and purchase in a reasonable time. The admins will have an organize database that helps them to ease their works. The major work activities will be updating the website, developing a user friendly interface and organize online movie purchase that is efficient to database. The required resources will be computers and Internet Connection. People must acknowledge on how they will face the facts that with those technologies, we can enhanced our individual capabilities and knowledge not only for the proponents but also for all the users. [Type the company name] | 4
  • 6. Project Title here Project Management Plan Group Name Scope The project will be come up with movie trailers, upcoming shows, and on show movie in cinemas. Users can purchase available movie tickets and look up for price and starting time. The website also provides the customer feedbacks about the movie and update the most watchable movie. Customers can invite their friends to watch movies connecting through facebook page. It may also come up to advertise live paper view. Out Of Scope The online movie purchase will only take under the services of the client. Proponents must be able to provide the updates, maintenance and upgrades for the website. Future developers will take full responsibilities about the new features of the project. Project Deliverables Below is a list of artifacts to be delivered to the customer ARTIFACT Systems Development Life Cycle Methodology (SDLC) (Y)es (N)o Y Application Technical Architecture [Type the company name] | 5
  • 7. Project Title here Project Management Plan Group Name Build vs. Buy Analysis for Software Business Case Y Budget Y Configuration Management Plan Deliverable Acceptance Criteria Inconvenience Resources Maintenance & Support Plan Organizational Breakdown Structure Y Project Management Plan Y Project Milestones Y Project Schedule Y Project Success Measurements Quality Assurance Plan Y Roles and Responsibilities Y Software Development Plans Y Software User Documentation Y [Type the company name] | 6
  • 8. Project Title here Project Management Plan Group Name Training Plan Y Unit Test Plan Y Work Breakdown Structure Y Project Management Plan Updates The Project Management Plan will be created and maintained using standard version control processes. Page3 of this document outlines the Document History, Distribution List, and Plan Approvers. Definitions and Acronyms A list of terms and agency acronyms used for this project are listed in the “Glossary of Terms” in Section 8 of this document. [Type the company name] | 7
  • 9. Project Title here Project Management Plan Group Name 2. Project Organization Organizational Structure (Development Team) The Development Team is composed of four members. The team is headed by the project leader of Analyst who is responsible for the distribution of tasks which he/she must ensure that it can accomplished the task based on its capability. The team has also a programmer which is responsible for programming and encoding codes. The programmer is also responsible for the desired outcome of the project based in System Designer. The System Designer must ensure that everything he/she designed can accomplish by the programmer within the given time and also responsible for user friendly interface. The last is the Documentation Manage who is in charge of compiling and monitoring the flow of documents needed in the project. For a successful project, the team decided to take a group activity and compiled some opinions and suggestions that decided individually and evaluated properly to ensure that they can achieve the project in time. Organizational Boundaries and Interfaces The development of this decided not to outsource any part of the project. The company has also played the role of the one who will provide sufficient and accurate information that will then be displayed in system. The system analyst is responsible for maintaining the interface between the project and [Type the company name] | 8
  • 10. Project Title here Project Management Plan Group Name the customer. The responsibility lies in addressing all issues of customer. This will be accomplished by keeping in regular contact with the client in order to share and discuss how those documents meet expectations. The project manager is responsible for maintaining the interface between the project and the course instructor. It is the manager’s responsibility to schedule the time and content of the project’s development in accordance with the requirements of the instructor. Roles & Responsibilities In order to effectively enable each member of the group that will be a part of the overall Star Mall Cinema Online Ticketing, roles and responsibilities are clearly defined and are as follows: PROJECT ROLE System Analyst Programmer Project Manager DESCRIPTION Responsible for developing cost analysis, design configurations and implementation. Responsible for Code, debug, test, and document routine application programs. Responsible for managing the resources and Group Resource/ Assigned Member Donna Mae Laurente, Jade Celine Tapawan Dependencies Jade Celine Tapawan, DayanaraTopacio Donna Mae Laurente [Type the company name] | 9
  • 11. Project Title here Project Management Plan Group Name Designer constraints of a project. Create detailed design Arlin Victoria Yalung, documentation for the Dayanara Topacio, development and Jade Celine Tapawan, integration of computer systems to meet the needs of businesses. 3. Management Process This section describes project assumptions, dependencies, and constraints, risk management techniques, monitoring and control practices, staffing plan, communication plan, and escalation procedures. Assumptions, Dependencies, and Constraints This section will state the assumptions on which the project is based, the external events the project is dependent upon, and the constraints under which the project is to be conducted. Assumptions No cancellation of tickets User is assumed to be aware of the terms movie, time and date. Price fixed for tickets over the period of time [Type the company name] | 10
  • 12. Project Title here Project Management Plan Group Name Dependencies Movie data provider User reviews: from users of other movie sites The user is familiar with computers, the internet and web browsing so he/she can simply and easily navigate the site and make purchases. Constraints Run on different type of browser such as Internet Explorer, Mozilla and Google Chrome. The system shall be developed using Java, Javascript, and Php programming languages. The system shall run using MySql Database Server. Risk Management Identify and assess the risk factors associated with the project. Describe the prescribed mechanisms for tracking the various risk factors (e.g., Self-Assessment and risk statistical analysis (RAMP) and implementing contingency plans. Risk factors that should be considered include contractual risk, technology risk, size and complexity risks, personnel acquisition and retention risks, and risks to achieving customer acceptance of the product. [Type the company name] | 11
  • 13. Project Title here Project Management Plan Group Name Communication Plan In this section, the project manager Remove the links 4. Technical Process The Technical Processes are applicable across all phases of the life cycle of a system. These processes should be carried out to create a technical methods, tools and techniques. It is use to develop a system concept, to determine technological necessities and to plan future development costs, schedules and risks. Methods, Tools, and Techniques Specifies the computing system, development methodology, team structure, programming language, and other notations, tools, techniques, and methods to be used to specify, design, build, test, integrate, document, deliver, modify, or maintain the project deliverables. In addition, the technical standards, policies, procedures, and guidelines governing development shall be included or by reference to other documents. Architecture Plan Not applicable in this project. Software Documentation The Website can be run on different type of browser such as Internet Explorer, Mozilla and [Type the company name] | 12
  • 14. Project Title here Project Management Plan Group Name Google Chrome. Hardware Documentation The website can run through computer or tablet with internet connection. Security The System will provide Admin’s account and User’s account to compromised with the security level of the website. The Online Ticketing website has security measures in place to protect the customer from loss, misuse and alteration to the information under admin control. The secure server software, Secure Socket Layers (SSL) is among the best software available today for secure commerce transactions. When exchanging personal data such as your credit card number, your name, email address etc, this data is encrypted thus becoming incomprehensible when it is sent across the Internet. Project Support Functions This section shall contain, either directly or by reference, plans for the supporting functions of the software project. Supporting functions include (but may not be limited to): Configuration management, [Type the company name] | 13
  • 15. Project Title here Project Management Plan Group Name Software quality assurance, Verification and validation plans, 5. Work Packages, Schedules, and Budget This section of the Project Management Plan will specify the work packages, identify the dependency relationships among them, state the project resource requirements, provide the allocation of budget and resources to work packages, and establish a project schedule. Work Packages This subsection will define the work packages (work breakdown structure (WBS)) for the activities and tasks that must be completed in order to satisfy the project agreement. Each work package must be uniquely identified; identification may be based on a numbering scheme and descriptive title. A diagram depicting the breakdown of activities (Gantt Chart) may be used to depict a hierarchical relationship among work packages. Dependencies This section will state the ordering relations among work packages to account for interdependencies among them and dependencies on external events. Techniques such as dependency lists, activity networks, and the critical path method may be used to [Type the company name] | 14
  • 16. Project Title here Project Management Plan Group Name depict dependencies among work packages. Resource Requirements The project team requires a maximum of 4 personnel consist of a project manager, programmers, GUI designers and documentation personnel to complete the project,The project also requires computer and Internet. Budget Requirements Identifies, as a function of time, estimates of total budget peso required to complete the project. Budget and Resource Allocation Not applicable in this project. Schedule The proponents must acquired weekly meeting wherein the different tasks like Designing the Graphic User-Interface, Documentations must be accomplished within the given period. The [Type the company name] | 15
  • 17. Project Title here Project Management Plan Group Name Project Manager is expected to conduct meetings and accomplished the different task that the team has conducted. Earned Value Analysis Create a table showing the earned value to keep track of project activities. 6. Project Success Criteria This section describes the project milestones and checkpoints, key deliverables, acceptance criteria, and management approval process for project and product deliverables. Network Diagram This subsection will define the project network diagram, including the critical path. The network diagram may be included as an Appendix. Project Milestones  Design Configurations and Implementation  Graphical User-Interface of the website  Creation of a fully functional software [Type the company name] | 16
  • 18. Project Title here Project Management Plan Group Name  Coding and Programming  Testing  Complete Documentations 7. Data Conversion / Data Migration This section will describe how data will be converted or migrated to production prior to the application being deployed into production. 8. Test Strategy Unit Testing It is individually and independently scrutinized for proper operation. Unit Testing is acquired to take the smallest piece of testable features in the software, isolate it from the remainder of the code, and determine whether it behaves exactly as expected. Designers can identify and fix problem immediately, as the modules are best known to them. This helps in fixing multiple problems simultaneously. Functional Testing Process to validate an application that will be completed to ensure that input produces expected outputs. It focused on validating business solutions, rather than just testing software. [Type the company name] | 17
  • 19. Project Title here Project Management Plan Group Name Functional test planning should begin as early as during the design of the system development. System Testing The major concern of the developers in this testing level is how the system will behave in the process of reliability and availability. The compatibility performance of the software will be given due emphasis in here. User Acceptance Testing The project team ensures the users confidence for the system being delivered to them meets their requirements. The user acceptance testing is done using real world scenarios and perceptions relevant to the end users. Performance / Scalability Testing The goal of this testing is to understand what point the system stops scaling and identify the [Type the company name] | 18
  • 20. Project Title here Project Management Plan Group Name reasons conducted by the project team. It can also identify major workloads and mitigate bottlenecks that can impede the scalability of the system. Data Verification The project team is concern to check to system producing an accurate display. It system must be checked and reviewed carefully so that the quality of the system is assured. 9. Deployment Plan This section will describe how the product will be deployed into production. 10. System Transition / Rollout Plan This section will describe the knowledge transfer needed for software components, hardware components, and transition knowledge from developer to maintenance support. 11. Training Plans The Developers is responsible to conduct series of training for the team who will be tasked to update and maintain the project. The project issue must be accomplished by the team before handling down the training. [Type the company name] | 19
  • 21. Project Title here Project Management Plan Group Name The Project Team should also conduct series of meeting to report the new featured updates of the project and to maintain the capability functions. Trainings can also be a part of promoting and introducing some newly features and updates of the project. 12. Procurement Plans This section will describe how hardware, software, license, or any components will be procured for the project. The items may be procured by purchase, leased, or borrowed. 13. Maintenance & Support Plans The system will be maintained by updating upcoming movies and events. Advertise and 14. Additional Components Certain additional components may be required. These may be included by appending additional sections to the Project Management Plan. Additional items of importance may include subcontractor management plans and SLA’s. [Type the company name] | 20
  • 22. Project Title here Project Management Plan Group Name 15. Glossary of Terms (AN INDEX OR GLOSSARY OF TERMS OR ACRONYMS, USED THROUGHOUT THE PROJECT MANAGEMENT PLAN IS OPTIONAL BUT RECOMMENDED TO IMPROVE USABILITY AND PROVIDE DEFINITIONS OF COMMON TERMS USED THROUGHOUT THE SYSTEM DEVELOPMENT LIFE CYCLE.) A Acceptance Criteria – The list of requirements that must be satisfied prior to the customer accepting delivery of the product. Acceptance Test – Formal user performed testing performed prior to accepting the system (sometimes called client acceptance test or user acceptance test). Acquisition – Generic term for hardware, software, or services acquired from an outside vendor or contractor. Action Plan - A plan that describes what needs to be done and when it needs to be completed. Project Management Plans are action plans. Activity - A specific project task, or group of tasks, that require resources and time to complete. Adaptive System – Describes software that has flexibility as the primary design point. Application – Generic term for a program, or system, that handles a specific business function. Application Software – A complete, self-contained program that can perform work for a user. This is in contrast to system software such as an operating system, server processes, and libraries that exist in support of application software. Approval Cycle – Process of gaining funding and management approval prior to project initiation. Architecture – Imposes order and makes interconnections possible. Generally defined as an intermediate step between initial requirements and business functional specifications during which the entire complex of hardware, software, and design considerations are viewed as a whole. Refers to a blueprint for evolving a technical infrastructure. Assessment – A general term for the formal management review of a process. Audit - A formal and detailed examination of the progress, costs, operations, results, or some other aspect of a project or system performed by an independent party. Availability – The portion of time that a system that is scheduled to operate actually can be used as expected. Glossary of Terms* (continued) [Type the company name] | 21
  • 23. Project Title here Project Management Plan Group Name B Backbone – A high-speed computer network designed to interconnect lower-speed networks or clusters of dispersed user devices. Baseline – A specification, or product, that has been formally agreed upon which serves as the starting point against which progress will be judged. Baseline Plan - The initial approved plan to which deviations will be compared as the project proceeds. A work product that has been formally approved and that can be changed only through formal change control procedures. Batch – A term describing a method of operating computers. This method takes groups of transactions, executes them, and returns the results, all without human intervention. Bench Mark – A standard figure of merit which measurements or comparisons may be made. Bridge – Devices that connect two separate networks. Once bridging is accomplished, the bridge makes interconnected networks look like a single network. Budget – A planned sequence of expenditures over time with costs assigned to specific tasks and activities. C CASE – Computer Aided Software Engineering - Systems that attempt to automate some or all of the tasks involved in managing, designing, developing, and maintaining software systems. Change Management – The formal process of recording, analyzing, estimating, tracking and reporting of changes to the project baseline business functional requirements. Checkpoint – A point in the development process at which project state, status, and results are checked, recorded, and measured. Client/Server System – Primarily a relationship between processes running on separate machines. A client initiates the dialog by sending requests to the server asking for information or action. Confidence Level - A level of confidence, stated as a percentage, for a budget or schedule estimate. The higher the confidence level, the lower the risk. Configuration Management – Methodical storage and recording of all software components and deliverables during development. Connectivity – Refers to the ability to send and receive information between locations, devices, and business services. Glossary of Terms* (continued) [Type the company name] | 22
  • 24. Project Title here Project Management Plan Group Name Contingency Plan - An alternative for action if the project does not proceed according to plan or if the expected results are not achieved. Control - A process for assuring that reality, or actual performance, meets expectations or plans. Cooperative Processing – Computing that requires two or more distinct processors to complete a single transaction. Cost / Benefit Analysis – A formal study in which the development, execution, and maintenance costs for a project are matched against the anticipated value of the product. Critical Activity - A task, activity, or event that, if delayed, will delay another important event - probably the completion of the project or a major milestone in the project. Critical Path – Derived from the PERT method, this term implies the set of activities that must be completed in sequence and on time if the entire project is to be completed on time. A missed task on the critical path will cause a product delivery delay. This is the longest time for the project from beginning to end. Critical Path Method (CPM) - One of the two most common forms of networking systems. CPM uses a one-time estimate for creating a project schedule. Customer - The individual or organization that specifies and accepts the project deliverables. D Data – Describes the numbers, text, graphics, images, and voice stored in a form that can be used by a computer. Data Warehouse – Where you consolidate and store data from many sources. Deliverable – A tangible, physical object that is the output of a software development task. Dependency Diagram - Another name for a network or precedence diagram that shows the dependencies among tasks. Design – The tasks associated with specifying and sketching the features and functions of a new application prior to coding. Development Project – The sum of all tasks and activities necessary to build a software product. Document of Understanding – A formal agreement between two parties. A contract that is sometimes referred to as a Statement of Work (SOW). Glossary of Terms* (continued) [Type the company name] | 23
  • 25. Project Title here Project Management Plan Group Name Documentation – The printed and displayed materials that explain an application to a user. Duration - The period of time over which a task takes place. Duration establishes the schedule for a project. E Effectiveness - A measure of the quality of attainment in meeting objectives. Efficiency - A measure of the volume of output received for the input used. Effort - The amount of work or labor (in hours or workdays) required to complete a task. Environment – The set of tools and physical surroundings in which software is developed. EPMO – Enterprise Project Management Office. Estimate – A predicted total of expenditures required to complete a task, activity, or project. Exit Criteria – The set of conditions that must be met prior to completing a project phase or application. F Feasibility Project – A project designed to prove, or disprove, the appropriateness of the technology solution under existing constraints (sometimes called “proof-of-concept” project). Float - The amount of time for a task to be freely scheduled without affecting other tasks in the project. Function - An activity that spans the entire duration of a software project (e.g., status reporting, quality assurance, verification and validation). G Gantt Chart – A method of displaying overlapped and partially concurrent activities by using horizontal lines to reflect the time required by each activity. The chart, named for Henry Lawrence Gantt, consists of a table of project task information and a bar chart that graphically displays the project schedule to be used in planning and tracking. Gateway – Hardware or software that translates between two dissimilar protocols. Granular – Describes the art of writing small modules of code and / or objects. Graphical User Interface (GUI) – A manner of presentation that makes use of windows, icons, menus, pointers, and scroll bards. Glossary of Terms* (continued) [Type the company name] | 24
  • 26. Project Title here Project Management Plan Group Name H Hardcode – An informal term that describes a programming technique where data or procedures are specifically written into the program instructions. Hardware – Physical equipment used to process, store, or transmit computer program data. I Independent Review – A formal examination of a project conducted by an organization other than the development organization. Information – The meaningful interpretation of data. IRMC – Information Resource Management Commission. Integration – Describes the work, or device, required to connect two different systems that were not originally designed to work together. Integration Test – Testing in which software components, hardware components, or both are combined and tested to evaluate the interaction between them. Interface – A connection between two devices or systems. Interoperability – The ability to have applications and computers from different vendors work together on a network. Intranet – An Internet network behind a firewall. Issue – A problem to be solved or a decision that has not been made. J Joint Application Design (JAD) - The combined effort of client, program, and development staff to define and elicit requirements for a system (JAR) or design a system (JAD). K L Lag - The amount of time after one task is started or finished before the next task may be started or finished. Lead - The amount of time that precedes the start of work on another task. Local Area Network (LAN) – A communications system confined to a limited area, typically a building, occasionally a group, and linking computers together via cable. Glossary of Terms* (continued) [Type the company name] | 25
  • 27. Project Title here Project Management Plan Group Name M Maintenance – Refers to the ongoing activity that keeps software functioning in a technical and business environment (production). Methodology – A set of formal protocols followed when performing a task. Middleware – Software that hides the complexity of the networked computing environment from the users and application programmers. Milestone – A major checkpoint in the activities involved in a project. A clearly defined point in a project that summarized the completion of a related set of tasks. Model - A way of looking at reality, usually for the purpose of abstracting and simplifying it to make it understandable in a particular context. Modular Programming – Programming that has as its fundamental assumption that a large piece of software should be separated into its constituent parts or modules thereby making for easier and faster development and maintainability. Modules were traditionally called subroutines or functions and now are often called objects. N Network – Describes the physical hardware and software connections between computers allowing information to be shared and electronic communications to take place. Network Diagram - The logical representation of tasks that defines the sequence of work in a project. N-tier Architecture – Describes a method for dividing an application into a series of distinct layers to provide for ease of maintenance and flexibility. O Operating System – System software that controls data storage, input and output to and from the keyboard, and the execution of applications written for it. It performs base services: prioritizing work, scheduling, memory management, etc. P Package Acquisition – The purchase, or lease, of software from an outside source. Padding - A standard project management tactic used to add extra time or money to estimates to cover for the uncertainty and risk of predicting future project activities. Path - A sequence of lines and nodes in a project network. [Type the company name] | 26
  • 28. Project Title here Project Management Plan Group Name Glossary of Terms* (continued) PERT – Project Evaluation and Review Technique - The PERT method uses the concepts of milestones, activities, and slack time to calculate the critical path. The chart, which resembles a flow chart, depicts a box to represent each project task and a line connecting two boxes to represent the relationship between tasks. Phases – The divisions of a software development life cycle into discrete stages (e.g., requirements, design, code, test, etc.). Planning Project – A project intended to gather, or predict, the sequence of activities and resources needed to complete a work effort. Platform – The hardware and support software with which a program is intended to operate. Precedence - When one task must be completed before another task can be started, the first task is said to have precedence over the other. Process – The step-by-step sequence of activities (systematic approach) that must be carried out to complete a project. Programming – The art of writing, in a computer understandable language, a set of instructions that produces software. Project – The combined resources (people, machines, materials), processes, and activities that are dedicated to building and delivering a product to a customer. Project Duration - The time it takes to complete the entire project. Project Management - The combination of systems, techniques, and people required to successfully complete a project on time and within budget. Project Manager – The senior person responsible for the entire project. Project Management Plan – A formal document that describes the technical and management approach to be followed for a project. Project Sponsor – The department “customer” who will authorize project initiation, and who will receive, accept, and use the software product or service. Protocol – A set of rules and specifications that describes how a piece of software will behave and how other pieces of software must behave in order to work with the first piece of software. Q Quality (Product) - Conformance to business functional requirements with defect-free products. Quality reflects both the completeness of software or system features and functions, and error-free operation. [Type the company name] | 27
  • 29. Project Title here Project Management Plan Group Name Glossary of Terms* (continued) Quality (Process) – Verification and validation to established policies, standards, procedures and guidelines for software development. Quality Assurance – Within the State of North Carolina, the process tracking and oversight function for monitoring project performance, adherence to commitments, and budget requirements. Performed under the control of the Office of Information Technology Services (ITS), Enterprise Technology Strategies (ETS) staff. R Regression Test – Selective re-testing to detect errors or faults introduced during modification of a system. Relational Database – A collection of data that is organized into tables so that relationships between and among data can be established. Resource Leveling - The process of shifting resources to even out the workload of team members. RFP - Request for Proposal - Formal statement by a department that they are soliciting enterprises to bid on a contract for a program, system or service. Requirements – The statement of needs by a user that triggers the development of a program, system, or project. May be called business functional requirements or requirement specifications. Research and Development Project – A definition of a project type essentially exploring options for developing new systems or work products. Risk – The probability that a project will experience undesirable events, which may create, cost overruns, schedule delays, or project cancellation. The identification, mitigation, tracking, and management of those elements creating the risk situation. Risk Analysis - An evaluation of the feasibility or probability that the outcome of a project will be the desired outcome. S Scalable – A term describing an architecture or software that can handle expansion in the use as the need arises without adversely impacting systems management and operations. Scope - The magnitude of the effort required to complete a project. Server – A computer on a network that makes applications, print services, data, and communications available. [Type the company name] | 28
  • 30. Project Title here Project Management Plan Group Name Glossary of Terms* (continued) Slack - see float. Software – Computer programs, systems, and the associated documentation that describes them. SDLC - Software Development Life Cycle – The period of time that begins with the decision to develop a software product and ends when the software is delivered. Software Development Process – The process by which user needs are translated into a software product. Project Management Plan - The controlling document for managing a software project. The PP defines the technical and managerial project functions, activities, and tasks necessary to satisfy the requirements of a software project. Specifications – General term for the wide variety of paper-based descriptions of a program or system. Stakeholders - People who have a personal or agency interest in the end results of a project. Standalone – Describes a computer workstation where the computer is not connected to any other computer on a network. Statement of Work (SOW) - An integrated set of task descriptions, goal descriptions, risks, and assumptions that accompany the evolving master Project Management Plan during development. Strategic Plan – The long-range plan where the horizon is usually three to five years time span. Subcontract - Delegating tasks or sub-projects to contractors or other organizations. System – A linked collection of programs, or components, that perform a generic business or technical function. System Test – The final stage of testing on a completed project (prior to client acceptance test) when all hardware and software components are put together and tested as a whole. SDLC - System Development Life Cycle - The complex of tasks and deliverables that are organized toward developing software systems. [Type the company name] | 29
  • 31. Project Title here Project Management Plan Group Name Glossary of Terms* (continued) T Tactical Plan – Specific improvements, or changes, that will be carried out in a fairly short time span (usually twelve (12) months). Task - A cohesive unit of work on a project (usually 40 to 80 hours of effort). Task Description - A description that defines all the work required to complete a project task or activity including input, output, expected results, and quality specifications. Test Plan – A document that describes the scope, approach, resources, and schedule of intended test activities. Testing – The set of defect removal tasks that include execution of all, or part, of an application on a computer. Topology – The map or plan of a network. U Unit Test - The testing carried out personally by individual programmers on their own code. V W Wide Area Network (WAN) – A network where the computers are separated by significant distances and telecommunications links are implemented. Work Breakdown Structure (WBS) – A formal analysis of the activities, tasks, and sub-tasks that must be accomplished to build a software project. A product or activity oriented hierarchy tree depicting the elements of work that need to be accomplished in order to deliver a product. Work Package - A specification for the work to be accomplished in completing an activity or task. Work Product - Any tangible item that results from a project function, activity, or task. Workstation – Any machine with all of its installed storage, processing, and communications that can be either standalone or networked. [Type the company name] | 30
  • 32. Project Title here Project Management Plan Group Name Glossary of Terms* (continued) X Y Z * Definitions were extracted from Assessment and Control of Software Risks by Capers Jones (1994); Managing Software Development Projects (Second edition) by Neal Whitten (1995); IEEE Standards Collection: Software Engineering (1997 Edition); Best Practices in IT Architecture Planning and Implementation by Larry DeBoever; Essential Client/Server Survival Guide by Robert Orfali; and The Complete Idiot's Guide to Project Management by Sunny and Kim Baker. [Type the company name] | 31
  • 33. Project Title here Project Management Plan Group Name 10. APPENDICES Appendices may be included, either directly or by reference, to provide supporting details that could aid in the understanding of the Project Management Plan. Appendix A Minutes of Meeting Appendix B Issue Log Template Appendix C Weekly Project Status Report [Type the company name] | 32
  • 34. Project Title here Project Management Plan Group Name [Type the company name] | 33