Aim Directional Record Run Midland County, TexasParker Hooks
Successfully drilled from spud (Includes Surface Hole) to
total depth (TD) in 15.20 days.
One run in intermediate section, 5669’ in 90.89hrs
Drilled Curve Section in under 24hrs (20hr Curve)
Drilled 10,345’ Lateral Section in 4.08 Days (98hrs)
Proven Results - Midland County RecordParker Hooks
Successfully drilled from spud (Includes Surface Hole) to
total depth (TD) in 15.20 days.
One run in intermediate section, 5669’ in 90.89hrs
Drilled Curve Section in under 24hrs (20hr Curve)
Drilled 10,345’ Lateral Section in 4.08 Days (98hrs)
Aim Sets Record Run with Contender 40 Series MotorParker Hooks
• First 100% Successful Curve/Lateral Run in Eagle Ford
• Most Footage Drilled with a Single BHA (11,028’)
• Exceeded ROP Goal for both Curve and Lateral Sections
All of us at Aim Directional Services want to thank our clients and employees for their support over the past ten years.
We greatly appreciate and value everyone’s hard work and dedication.
We look forward to continued growth and success for years to come.
Aim Directional Services is seeking a motivated and reliable shop hand to work in our Corpus MWD shop.
Preferred Requirements:
High school diploma or equivalent
1 year of previous oil field experience
Familiar with Tensor/Tolteq tools
Computer literate
Must be able to comprehend instructions and willing to take direction
Aim Directional Record Run Midland County, TexasParker Hooks
Successfully drilled from spud (Includes Surface Hole) to
total depth (TD) in 15.20 days.
One run in intermediate section, 5669’ in 90.89hrs
Drilled Curve Section in under 24hrs (20hr Curve)
Drilled 10,345’ Lateral Section in 4.08 Days (98hrs)
Proven Results - Midland County RecordParker Hooks
Successfully drilled from spud (Includes Surface Hole) to
total depth (TD) in 15.20 days.
One run in intermediate section, 5669’ in 90.89hrs
Drilled Curve Section in under 24hrs (20hr Curve)
Drilled 10,345’ Lateral Section in 4.08 Days (98hrs)
Aim Sets Record Run with Contender 40 Series MotorParker Hooks
• First 100% Successful Curve/Lateral Run in Eagle Ford
• Most Footage Drilled with a Single BHA (11,028’)
• Exceeded ROP Goal for both Curve and Lateral Sections
All of us at Aim Directional Services want to thank our clients and employees for their support over the past ten years.
We greatly appreciate and value everyone’s hard work and dedication.
We look forward to continued growth and success for years to come.
Aim Directional Services is seeking a motivated and reliable shop hand to work in our Corpus MWD shop.
Preferred Requirements:
High school diploma or equivalent
1 year of previous oil field experience
Familiar with Tensor/Tolteq tools
Computer literate
Must be able to comprehend instructions and willing to take direction
Aim Directional Services is hiring an experienced MWD technician to work in their Midland, Texas shop. The ideal candidate will have at least 2 years of experience as a MWD technician and be familiar with Tolteq tools including pulsers, data modules, and gammas. They should also have experience with Tensor/Tolteq data analysis, basic understanding of APS tools, and experience performing gamma calibrations. Resumes should be emailed to resumes@aimdir.com.
The document summarizes the results of drilling a horizontal well in Kingfisher County, Oklahoma that was drilled from spud to total depth (TD) in only 8.43 days, averaging 1449 ft/day. The well consisted of 4 runs and drilled a total of 12,215 feet over 126.83 hours with an average rate of penetration of 93.07' per hour. The well objectives of drilling from spud to TD in under 10.5 days while maintaining tight geological targets and minimizing sliding and dog legs were achieved, providing value to the client through reduced costs and non-productive time.
RSP Permian drilled two lateral runs over 8,000 feet each in June 2017 using Aim Downhole Motors and Real-Time Monitoring. They maintained consistent performance across rigs, maximizing drill rate while minimizing sliding and doglegs. The laterals stayed on target with 15% slide and 85% rotation. This consistent performance allowed RSP Permian to reduce costs and days on multiple rigs while ensuring optimal wellbore placement.
Determination of Equivalent Circuit parameters and performance characteristic...pvpriya2
Includes the testing of induction motor to draw the circle diagram of induction motor with step wise procedure and calculation for the same. Also explains the working and application of Induction generator
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfBalvir Singh
Sri Guru Hargobind Ji (19 June 1595 - 3 March 1644) is revered as the Sixth Nanak.
• On 25 May 1606 Guru Arjan nominated his son Sri Hargobind Ji as his successor. Shortly
afterwards, Guru Arjan was arrested, tortured and killed by order of the Mogul Emperor
Jahangir.
• Guru Hargobind's succession ceremony took place on 24 June 1606. He was barely
eleven years old when he became 6th Guru.
• As ordered by Guru Arjan Dev Ji, he put on two swords, one indicated his spiritual
authority (PIRI) and the other, his temporal authority (MIRI). He thus for the first time
initiated military tradition in the Sikh faith to resist religious persecution, protect
people’s freedom and independence to practice religion by choice. He transformed
Sikhs to be Saints and Soldier.
• He had a long tenure as Guru, lasting 37 years, 9 months and 3 days
Levelised Cost of Hydrogen (LCOH) Calculator ManualMassimo Talia
The aim of this manual is to explain the
methodology behind the Levelized Cost of
Hydrogen (LCOH) calculator. Moreover, this
manual also demonstrates how the calculator
can be used for estimating the expenses associated with hydrogen production in Europe
using low-temperature electrolysis considering different sources of electricity
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...DharmaBanothu
The Network on Chip (NoC) has emerged as an effective
solution for intercommunication infrastructure within System on
Chip (SoC) designs, overcoming the limitations of traditional
methods that face significant bottlenecks. However, the complexity
of NoC design presents numerous challenges related to
performance metrics such as scalability, latency, power
consumption, and signal integrity. This project addresses the
issues within the router's memory unit and proposes an enhanced
memory structure. To achieve efficient data transfer, FIFO buffers
are implemented in distributed RAM and virtual channels for
FPGA-based NoC. The project introduces advanced FIFO-based
memory units within the NoC router, assessing their performance
in a Bi-directional NoC (Bi-NoC) configuration. The primary
objective is to reduce the router's workload while enhancing the
FIFO internal structure. To further improve data transfer speed,
a Bi-NoC with a self-configurable intercommunication channel is
suggested. Simulation and synthesis results demonstrate
guaranteed throughput, predictable latency, and equitable
network access, showing significant improvement over previous
designs
Aim Directional Services is hiring an experienced MWD technician to work in their Midland, Texas shop. The ideal candidate will have at least 2 years of experience as a MWD technician and be familiar with Tolteq tools including pulsers, data modules, and gammas. They should also have experience with Tensor/Tolteq data analysis, basic understanding of APS tools, and experience performing gamma calibrations. Resumes should be emailed to resumes@aimdir.com.
The document summarizes the results of drilling a horizontal well in Kingfisher County, Oklahoma that was drilled from spud to total depth (TD) in only 8.43 days, averaging 1449 ft/day. The well consisted of 4 runs and drilled a total of 12,215 feet over 126.83 hours with an average rate of penetration of 93.07' per hour. The well objectives of drilling from spud to TD in under 10.5 days while maintaining tight geological targets and minimizing sliding and dog legs were achieved, providing value to the client through reduced costs and non-productive time.
RSP Permian drilled two lateral runs over 8,000 feet each in June 2017 using Aim Downhole Motors and Real-Time Monitoring. They maintained consistent performance across rigs, maximizing drill rate while minimizing sliding and doglegs. The laterals stayed on target with 15% slide and 85% rotation. This consistent performance allowed RSP Permian to reduce costs and days on multiple rigs while ensuring optimal wellbore placement.
Determination of Equivalent Circuit parameters and performance characteristic...pvpriya2
Includes the testing of induction motor to draw the circle diagram of induction motor with step wise procedure and calculation for the same. Also explains the working and application of Induction generator
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfBalvir Singh
Sri Guru Hargobind Ji (19 June 1595 - 3 March 1644) is revered as the Sixth Nanak.
• On 25 May 1606 Guru Arjan nominated his son Sri Hargobind Ji as his successor. Shortly
afterwards, Guru Arjan was arrested, tortured and killed by order of the Mogul Emperor
Jahangir.
• Guru Hargobind's succession ceremony took place on 24 June 1606. He was barely
eleven years old when he became 6th Guru.
• As ordered by Guru Arjan Dev Ji, he put on two swords, one indicated his spiritual
authority (PIRI) and the other, his temporal authority (MIRI). He thus for the first time
initiated military tradition in the Sikh faith to resist religious persecution, protect
people’s freedom and independence to practice religion by choice. He transformed
Sikhs to be Saints and Soldier.
• He had a long tenure as Guru, lasting 37 years, 9 months and 3 days
Levelised Cost of Hydrogen (LCOH) Calculator ManualMassimo Talia
The aim of this manual is to explain the
methodology behind the Levelized Cost of
Hydrogen (LCOH) calculator. Moreover, this
manual also demonstrates how the calculator
can be used for estimating the expenses associated with hydrogen production in Europe
using low-temperature electrolysis considering different sources of electricity
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...DharmaBanothu
The Network on Chip (NoC) has emerged as an effective
solution for intercommunication infrastructure within System on
Chip (SoC) designs, overcoming the limitations of traditional
methods that face significant bottlenecks. However, the complexity
of NoC design presents numerous challenges related to
performance metrics such as scalability, latency, power
consumption, and signal integrity. This project addresses the
issues within the router's memory unit and proposes an enhanced
memory structure. To achieve efficient data transfer, FIFO buffers
are implemented in distributed RAM and virtual channels for
FPGA-based NoC. The project introduces advanced FIFO-based
memory units within the NoC router, assessing their performance
in a Bi-directional NoC (Bi-NoC) configuration. The primary
objective is to reduce the router's workload while enhancing the
FIFO internal structure. To further improve data transfer speed,
a Bi-NoC with a self-configurable intercommunication channel is
suggested. Simulation and synthesis results demonstrate
guaranteed throughput, predictable latency, and equitable
network access, showing significant improvement over previous
designs
AI in customer support Use cases solutions development and implementation.pdfmahaffeycheryld
AI in customer support will integrate with emerging technologies such as augmented reality (AR) and virtual reality (VR) to enhance service delivery. AR-enabled smart glasses or VR environments will provide immersive support experiences, allowing customers to visualize solutions, receive step-by-step guidance, and interact with virtual support agents in real-time. These technologies will bridge the gap between physical and digital experiences, offering innovative ways to resolve issues, demonstrate products, and deliver personalized training and support.
https://www.leewayhertz.com/ai-in-customer-support/#How-does-AI-work-in-customer-support
Null Bangalore | Pentesters Approach to AWS IAMDivyanshu
#Abstract:
- Learn more about the real-world methods for auditing AWS IAM (Identity and Access Management) as a pentester. So let us proceed with a brief discussion of IAM as well as some typical misconfigurations and their potential exploits in order to reinforce the understanding of IAM security best practices.
- Gain actionable insights into AWS IAM policies and roles, using hands on approach.
#Prerequisites:
- Basic understanding of AWS services and architecture
- Familiarity with cloud security concepts
- Experience using the AWS Management Console or AWS CLI.
- For hands on lab create account on [killercoda.com](https://killercoda.com/cloudsecurity-scenario/)
# Scenario Covered:
- Basics of IAM in AWS
- Implementing IAM Policies with Least Privilege to Manage S3 Bucket
- Objective: Create an S3 bucket with least privilege IAM policy and validate access.
- Steps:
- Create S3 bucket.
- Attach least privilege policy to IAM user.
- Validate access.
- Exploiting IAM PassRole Misconfiguration
-Allows a user to pass a specific IAM role to an AWS service (ec2), typically used for service access delegation. Then exploit PassRole Misconfiguration granting unauthorized access to sensitive resources.
- Objective: Demonstrate how a PassRole misconfiguration can grant unauthorized access.
- Steps:
- Allow user to pass IAM role to EC2.
- Exploit misconfiguration for unauthorized access.
- Access sensitive resources.
- Exploiting IAM AssumeRole Misconfiguration with Overly Permissive Role
- An overly permissive IAM role configuration can lead to privilege escalation by creating a role with administrative privileges and allow a user to assume this role.
- Objective: Show how overly permissive IAM roles can lead to privilege escalation.
- Steps:
- Create role with administrative privileges.
- Allow user to assume the role.
- Perform administrative actions.
- Differentiation between PassRole vs AssumeRole
Try at [killercoda.com](https://killercoda.com/cloudsecurity-scenario/)
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Transcat
Join us for this solutions-based webinar on the tools and techniques for commissioning and maintaining PV Systems. In this session, we'll review the process of building and maintaining a solar array, starting with installation and commissioning, then reviewing operations and maintenance of the system. This course will review insulation resistance testing, I-V curve testing, earth-bond continuity, ground resistance testing, performance tests, visual inspections, ground and arc fault testing procedures, and power quality analysis.
Fluke Solar Application Specialist Will White is presenting on this engaging topic:
Will has worked in the renewable energy industry since 2005, first as an installer for a small east coast solar integrator before adding sales, design, and project management to his skillset. In 2022, Will joined Fluke as a solar application specialist, where he supports their renewable energy testing equipment like IV-curve tracers, electrical meters, and thermal imaging cameras. Experienced in wind power, solar thermal, energy storage, and all scales of PV, Will has primarily focused on residential and small commercial systems. He is passionate about implementing high-quality, code-compliant installation techniques.