52228                         Federal Register / Vol. 74, No. 195 / Friday, October 9, 2009 / Notices

                                                     the proposed priorities, requirements,                  action and the time needed to prepare                   Dated: October 6, 2009.
                                                     definitions, and selection criteria would               an application would likely be the same.              Arne Duncan,
                                                     be limited to paperwork burden related                     Further, the proposed action may help              Secretary of Education.
                                                     to preparing an application and that the                small entities determine whether they                 [FR Doc. E9–24387 Filed 10–8–09; 8:45 am]
                                                     benefits of implementing these                          have the interest, need, or capacity to               BILLING CODE 4000–01–P
                                                     proposals would outweigh any costs                      implement activities under the program
                                                     incurred by applicants.                                 and, thus, prevent small entities that do
                                                        Participation in this program is                     not have such an interest, need, and                  DEPARTMENT OF ENERGY
                                                     voluntary. For this reason, the proposed                capacity from absorbing the burden of
                                                     priorities, requirements, definitions, and              applying.                                             Notice of Intent To Prepare an
                                                     selection criteria would impose no                         This proposed regulatory action                    Environmental Impact Statement for a
                                                     burden on small entities in general.                    would not have a significant economic                 Proposed Federal Loan Guarantee To
                                                     Eligible applicants would determine                     impact on small entities once they                    Support Construction and Start-up of
                                                     whether to apply for funds, and have                    receive a grant because they would be                 the Taylorville Energy Center in
                                                     the opportunity to weigh the                            able to meet the costs of compliance                  Taylorville, IL
                                                     requirements for preparing applications,                using the funds provided under this                   AGENCY: Department of Energy, Loan
                                                     and any associated costs, against the                   program and with any matching funds                   Guarantee Program.
                                                     likelihood of receiving funding and the                 provided by private-sector partners.
                                                                                                                                                                   ACTION: Notice of intent to prepare an
                                                     requirements for implementing projects                     The Secretary invites comments from
                                                     under the program. Eligible applicants                                                                        environmental impact statement and
                                                                                                             small nonprofit organizations and small
                                                     most likely would apply only if they                                                                          conduct a public scoping meeting.
                                                                                                             LEAs as to whether they believe this
                                                     determine that the likely benefits exceed               proposed regulatory action would have                 SUMMARY: The U.S. Department of
                                                     the costs of preparing an application.                  a significant economic impact on them                 Energy (DOE) announces its intent to
                                                     The likely benefits include the potential               and, if so, requests evidence to support              prepare an environmental impact
                                                     receipt of a grant as well as other                     that belief.                                          statement (EIS) pursuant to the National
                                                     benefits that may accrue to an entity                      Intergovernmental Review: This                     Environmental Policy Act of 1969, as
                                                     through its development of an                           program is subject to Executive Order                 amended (NEPA), the Council on
                                                     application, such as the use of that                    12372 and the regulations in 34 CFR                   Environmental Quality (CEQ) NEPA
                                                     application to spur educational reforms                 part 79. One of the objectives of the                 regulations, and the DOE NEPA
                                                     and improvements without additional                     Executive order is to foster an                       implementing procedures to assess the
                                                     Federal funding.                                        intergovernmental partnership and a                   potential environmental impacts for its
                                                        The U.S. Small Business                              strengthened federalism. The Executive                proposed action of issuing a Federal
                                                     Administration Size Standards defines                   order relies on processes developed by                loan guarantee to Christian County
                                                     as ‘‘small entities’’ for-profit or                     State and local governments for                       Generation, L.L.C. (CCG) (DOE/EIS–
                                                     nonprofit institutions with total annual                coordination and review of proposed                   0430). CCG submitted an application to
                                                     revenue below $7,000,000 or, if they are                Federal financial assistance.                         DOE under the Federal loan guarantee
                                                     institutions controlled by small                           This document provides early                       program pursuant to the Energy Policy
                                                     governmental jurisdictions (that are                    notification of our specific plans and                Act of 2005 (EPAct 2005) to support
                                                     comprised of cities, counties, towns,                   actions for this program.                             construction and start-up of the
                                                     townships, villages, school districts, or                  Accessible Format: Individuals with                Taylorville Energy Center in Taylorville,
                                                     special districts), with a population of                disabilities can obtain this document in              Illinois (‘‘the Facility’’).1
                                                     less than 50,000. The Urban Institute’s                 an accessible format (e.g., braille, large               CCG is a limited liability company
                                                     National Center for Charitable Statistics               print, audiotape, or computer diskette)               that is currently owned by Tenaska
                                                     reported that of 203,635 nonprofit                      on request to the program contact                     Taylorville, LLC, an affiliate of Tenaska,
                                                     organizations that had an educational                   person listed under FOR FURTHER                       Inc., an Omaha, Nebraska-based power
                                                     mission and reported revenue to the IRS                 INFORMATION CONTACT.                                  development company, and by MDL
                                                     by July 2009, 200,342 (or about 98                         Electronic Access to This Document:                Holding Company, L.L.C. of Louisville,
                                                     percent) had revenues of less than $5                   You can view this document, as well as                Kentucky. CCG proposes to develop the
                                                     million. In addition, there are 12,484                  all other documents of this Department                Facility on an 886-acre parcel of land.
                                                     LEAs in the country that meet the                       published in the Federal Register, in                 As proposed, the approximately 730
                                                     definition of small entity. However, the                text or Adobe Portable Document                       megawatt (gross) electric generation
                                                     Secretary believes that only a small                    Format (PDF) on the Internet at the                   Facility would utilize integrated
                                                     number of these entities would be                       following site:http://www.ed.gov/news/                gasification combined-cycle technology
                                                     interested in applying for funds under                  fedregister.                                          to produce electricity from Illinois
                                                     this program, thus reducing the                                                                               bituminous coal. Synthesis gas
                                                                                                                To use PDF you must have Adobe
                                                     likelihood that the proposals contained                                                                       processing would also allow the
                                                                                                             Acrobat Reader, which is available free
                                                     in this notice would have a significant                                                                       separation and capture of carbon
                                                                                                             at this site. If you have questions about
                                                     economic impact on small entities.                                                                            dioxide (CO2) and the manufacture of
                                                                                                             using PDF, call the U.S. Government
                                                        In addition, the Secretary believes                  Printing Office (GPO), toll free, at 1–               pipeline-quality Substitute Natural Gas
                                                     that the proposed priorities,                                                                                 (‘‘SNG’’ or ‘‘methane’’). SNG would be
cprice-sewell on DSK89S0YB1PROD with NOTICES3




                                                                                                             888–293–6498; or in the Washington,
                                                     requirements, definitions, and selection                DC, area at (202) 512–1530.                           used in a power block with two
                                                     criteria discussed in this notice do not                                                                      combustion turbines and one steam
                                                     impose any additional burden on small                      Note: The official version of this document        turbine. The Facility would be designed
                                                                                                             is the document published in the Federal
                                                     entities applying for a grant than they                 Register. Free Internet access to the official           1 The amount requested for the loan guarantee is
                                                     would face in the absence of the                        edition of the Federal Register and the Code          not being disclosed at this time because it is
                                                     proposed action. That is, the length of                 of Federal Regulations is available on GPO            business sensitive. Moreover, should DOE approve
                                                     the applications those entities would                   Access at:http://www.gpoaccess.gov/nara/              a loan guarantee, the amount may differ from the
                                                     submit in the absence of the regulatory                 index.html.                                           original request.



                                                VerDate Nov<24>2008   10:12 Dec 03, 2009   Jkt 220001   PO 00000   Frm 00055   Fmt 4703   Sfmt 4703   E:ERIC09OCN1.SGM   09OCN1
Federal Register / Vol. 74, No. 195 / Friday, October 9, 2009 / Notices                                           52229

                                                     such that surplus SNG can be                            be submitted electronically by sending                construction and start-up of the
                                                     transported offsite to an interstate                    an email to: TEC-EIS@hq.doe.gov. All                  Taylorville Energy Center in Taylorville,
                                                     pipeline for sale. The Facility would                   electronic and written comments should                Illinois.
                                                     capture at least 50 percent of the CO2                  reference Project No. DOE/EIS–0430.                      The site of the proposed Facility
                                                     and over 99 percent of the sulfur                       FOR FURTHER INFORMATION CONTACT: To                   consists of an 886-acre parcel of land
                                                     compounds that would otherwise be                       obtain additional information about this              located in Taylorville, Illinois. Of the
                                                     emitted. The CO2 stream would be                        EIS, the public scoping meeting, or to                886 acres, CCG currently owns or
                                                     compressed and delivered at the                         receive a copy of the draft EIS when it               controls via option agreements 713
                                                     fenceline to another party for pipeline                 is issued, contact Angela Colamaria by                acres, and is attempting to option
                                                     transport to enhanced oil recovery                      telephone: 202–287–5387; toll-free                    approximately 173 additional,
                                                     operations and geologic storage. CCG is                 number: 800–832–0885 ext. 75387; or                   contiguous acres. The site and
                                                     also studying the feasibility of geologic               electronic mail:                                      additional acreage to be acquired is
                                                     storage of CO2 in the vicinity of the site.             Angela.Colamaria@hq.doe.gov. For                      bounded by County Road E1700N on
                                                        The EIS will evaluate the potential                  general information on the DOE NEPA                   the north, State Road 48 (and the
                                                     impacts of the issuance of a DOE Loan                   process, please contact: Ms. Carol M.                 Norfolk Southern Railroad) on the east,
                                                     Guarantee for CCG’s proposed project                    Borgstrom, Director, Office of NEPA                   farmland on the south, and County Road
                                                     and the range of reasonable alternatives.               Policy and Compliance (GC–20), U.S.                   N1400E on the west.
                                                     The purpose of this Notice of Intent is                 Department of Energy, 1000                               As proposed, the Facility would
                                                     to inform the public about DOE’s                        Independence Avenue, SW.,                             manufacture pipeline quality SNG from
                                                     proposed action; invite public                          Washington, DC 20585; telephone: 202–                 Illinois bituminous coal and produce
                                                     participation in the EIS process;                       586–4600; facsimile: 202–586–7031;                    electricity utilizing integrated
                                                     announce plans for a public scoping                     electronic mail: askNEPA@hq.doe.gov;                  gasification combined-cycle technology.
                                                     meeting; and solicit public comments                    or leave a toll-free message at 800–472–              The Facility is expected to use 7,500
                                                     for consideration in establishing the                   2756.                                                 tons of coal per day (2.5 million tons of
                                                     scope and content of the EIS. DOE                       SUPPLEMENTARY INFORMATION:
                                                                                                                                                                   coal annually). The primary water
                                                     invites those agencies with jurisdiction                                                                      supply would be municipal treated
                                                     by law or special expertise to be                       Background                                            effluent from a local sanitary district.
                                                     cooperating agencies.                                      EPAct 2005 established a Federal loan                 The Facility is expected to contribute
                                                                                                             guarantee program for eligible energy                 2 billion kilowatt-hours per year to the
                                                     DATES: To ensure that all of the issues
                                                                                                             projects that employ innovative                       electric grid system. SNG would be used
                                                     related to this proposal are addressed,                                                                       to fuel a power block with two
                                                     DOE invites comments on the proposed                    technologies. Title XVII of EPAct 2005
                                                                                                             authorizes the Secretary of Energy to                 combustion turbines and one steam
                                                     scope and content of the EIS from all                                                                         turbine. The amount of SNG produced
                                                     interested parties. Comments must be                    make loan guarantees for a variety of
                                                                                                             types of projects, including those that               may exceed the requirements of the
                                                     postmarked or emailed by November 9,                                                                          power block under certain operating
                                                     2009 to ensure consideration. Late                      ‘‘avoid, reduce, or sequester air
                                                                                                             pollutants or anthropogenic emissions                 conditions. The Facility would be
                                                     comments will be considered to the                                                                            designed such that surplus SNG can be
                                                     extent practicable. In addition to                      of greenhouse gases; and employ new or
                                                                                                             significantly improved technologies as                transported offsite to an interstate
                                                     receiving written comments (see                                                                               pipeline for sale.
                                                     ADDRESSES below), DOE will conduct a                    compared to commercial technologies in
                                                                                                             service in the United States at the time                 The Facility would capture at least 50
                                                     public scoping meeting in the vicinity of                                                                     percent of the CO2 and over 99 percent
                                                     the proposed Facility at which                          the guarantee is issued.’’ A principal
                                                                                                             goal of the loan guarantee program is to              of the sulfur compounds that would
                                                     government agencies, private-sector                                                                           otherwise be emitted. The CO2 stream
                                                     organizations, and the general public are               encourage commercial use in the United
                                                                                                             States of new or significantly improved               would be compressed and delivered at
                                                     invited to provide comments or                                                                                the fenceline to another party for
                                                     suggestions with regard to the                          energy-related technologies. DOE
                                                                                                             believes that accelerated commercial                  pipeline transport to enhanced oil
                                                     alternatives and potential impacts to be                                                                      recovery operations and geologic storage
                                                     considered in the EIS. The date, time,                  use of these new or improved
                                                                                                             technologies will help to sustain                     at a location to be determined by the off-
                                                     and location of the public scoping                                                                            taker. CCG is also studying the
                                                     meeting will be announced in local                      economic growth, yield environmental
                                                                                                             benefits, and produce a more stable and               feasibility of geologic storage in the
                                                     news media and on the DOE Loan                                                                                vicinity of the site using the Mt. Simon
                                                                                                             secure energy supply.
                                                     Guarantee Program’s ‘‘NEPA Public                                                                             formation.
                                                     Involvement’’ Web site (http://                         Purpose and Need for Agency Action                       Supporting infrastructure and
                                                     www.lgprogram.energy.gov/NEPA-                             CCG submitted a Part I application to              facilities would include local access
                                                     2.html) at least 15 days prior to the date              DOE for a loan guarantee on December                  roads, rail interconnections, water
                                                     of the meeting.                                         19, 2008, and submitted a Part II                     supply and wastewater pipelines, CO2
                                                     ADDRESSES: Public comments can be                       application on March 23, 2009. The                    pipelines, a natural gas pipeline, and a
                                                     submitted electronically or by U.S. Mail.               purpose and need for agency action is                 high voltage transmission line to
                                                     Written comments on the proposed EIS                    to comply with DOE’s mandate under                    connect the Facility to the electric grid
                                                     scope should be addressed to: Ms.                       Title XVII of EPAct 2005 by selecting                 system. Rail access to the site would be
                                                     Angela Colamaria, Loan Guarantee                                                                              provided by construction of a rail
cprice-sewell on DSK89S0YB1PROD with NOTICES3




                                                                                                             eligible projects that meet the goals of
                                                     Program Office (CF–1.3), U.S.                           the Act. DOE is using the NEPA process                connection to the Norfolk Southern
                                                     Department of Energy, 1000                              to assist in determining whether to issue             Railroad east of the site. Coal may also
                                                     Independence Avenue, SW.,                               a loan guarantee to CCG to support the                be delivered by truck. Approximately 6
                                                     Washington, DC 20585. Please submit                     proposed project.                                     miles of County Road E1700N would be
                                                     one signed original paper copy.                                                                               reconstructed and enhanced to 80,000
                                                     Electronic submission of comments is                    Proposed Action                                       lbs. gross vehicle weight standards. DOE
                                                     encouraged due to processing time                         DOE’s proposed action is to issue a                 plans to analyze the impacts of
                                                     required for regular mail. Comments can                 loan guarantee to CCG to support the                  construction and operation of the


                                                VerDate Nov<24>2008   10:12 Dec 03, 2009   Jkt 220001   PO 00000   Frm 00056   Fmt 4703   Sfmt 4703   E:ERIC09OCN1.SGM   09OCN1
52230                         Federal Register / Vol. 74, No. 195 / Friday, October 9, 2009 / Notices

                                                     supporting infrastructure and facilities                Preliminary Identification of                         ‘‘NEPA Public Involvement’’ Web site
                                                     in the EIS.                                             Environmental Issues                                  (http://www.lgprogram.energy.gov/
                                                        The Facility would eliminate process                                                                       NEPA-2.html) at least 15 days prior to
                                                                                                                The following environmental resource
                                                     wastewater entirely through use of                                                                            the date of the meeting. Members of the
                                                                                                             areas have been tentatively identified
                                                     water treatment, recycling, and zero                                                                          public and representatives of groups
                                                                                                             for consideration in the EIS. This list is
                                                     liquid discharge systems. Solid waste                                                                         and Federal, State, local, and tribal
                                                                                                             neither intended to be all-inclusive nor
                                                     (slag) and sulfur, by-products from the                                                                       agencies are invited to attend. The
                                                                                                             a predetermined set of potential
                                                     process, would be sold as a commercial                                                                        meeting will include both a formal
                                                                                                             environmental impacts:
                                                     product, disposed of onsite, or                                                                               opportunity to present oral comments
                                                                                                                • Air quality;
                                                     transported offsite for disposal at a non-                                                                    and an informal session during which
                                                                                                                • Greenhouse gas emissions and
                                                     hazardous, solid waste landfill. The                                                                          DOE and CCG personnel will be
                                                                                                             climate change;
                                                     construction work force would peak at                                                                         available for discussions with attendees.
                                                                                                                • Energy use and production;
                                                     up to 1,500 construction workers over a                                                                       Displays and other forms of information
                                                                                                                • Water resources, including
                                                     4-year period. The Facility would be                                                                          about the proposed agency action, the
                                                     operated and maintained by a staff of                   groundwater and surface waters;
                                                                                                                • Wetlands and floodplains;                        EIS process, and the CCG proposed
                                                     approximately 145 employees and                                                                               Facility will also be available for review.
                                                     contractors.                                               • Geological resources;
                                                                                                                • Ecological resources, including                  DOE requests that anyone who wishes
                                                        Coal gasification and electric                                                                             to present oral comments at the meeting
                                                     generation components of the Facility                   threatened and endangered species and
                                                                                                             species of special concern;                           contact Ms. Colamaria by phone or e-
                                                     would be constructed on approximately                                                                         mail (see ADDRESSES above). Individuals
                                                     70 acres of the site. The site is currently                • Cultural resources, including
                                                                                                             historic structures and properties; sites             who do not make advance arrangements
                                                     used for agriculture (row crops), is                                                                          to speak may register at the meeting.
                                                     surrounded by farmland, and is zoned                    of religious and cultural significance to
                                                                                                             tribes; and archaeological resources;                 Speakers who need more than five
                                                     for industrial and agricultural use. The                                                                      minutes should indicate the length of
                                                     coal gasification and electric generation                  • Land use;
                                                                                                                • Visual resources and aesthetics;                 time desired in their request. DOE may
                                                     components of the Facility are entirely                                                                       need to limit speakers to five minutes
                                                     within property that is zoned for                          • Transportation and traffic;
                                                                                                                • Noise and vibration;                             initially, but will provide additional
                                                     industrial use. In addition, several                                                                          opportunities as time permits. Written
                                                     hundred acres of Prime Farmland                            • Hazardous materials and solid
                                                                                                             waste management;                                     comments regarding the scoping process
                                                     within the 886-acre parcel could be                                                                           can also be submitted to DOE officials
                                                     affected by the construction of the                        • Human health and safety;
                                                                                                                • Accidents and terrorism;                         at the scoping meeting.
                                                     Facility. Preliminary assessments
                                                     indicate that the footprint of the                         • Socioeconomics, including impacts                  Issued in Washington, DC, on October 6,
                                                     proposed facility would not affect any                  to community services;                                2009.
                                                     wetlands or floodplains. In the event                      • Environmental justice.                           Steve Isakowitz,
                                                     that further analysis indicates that                       DOE invites comments on whether                    Chief Financial Officer, Office of the Chief
                                                     wetlands or floodplains would be                        other resource areas or potential issues              Financial Officer.
                                                     affected, DOE will prepare a floodplain                 should be considered in the EIS.                      [FR Doc. E9–24422 Filed 10–8–09; 8:45 am]
                                                     and wetland assessment in accordance                    Public Scoping Process                                BILLING CODE 6450–01–P
                                                     with its regulations at 10 CFR part 1022
                                                     and include the assessment in the EIS.                     To ensure that all issues related to
                                                                                                             DOE’s proposed action are addressed,                  ENVIRONMENTAL PROTECTION
                                                     Alternatives                                            DOE seeks public input to define the                  AGENCY
                                                        In determining the range of reasonable               scope of the EIS. The public scoping
                                                     alternatives to be considered in the EIS                period will begin with publication of                 [ER–FRL–8598–2]
                                                     for the proposed CCG Facility, DOE                      the NOI and end on November 9, 2009.
                                                                                                             Interested government agencies, private-              Environmental Impact Statements and
                                                     identified the reasonable alternatives
                                                                                                             sector organizations, and the general                 Regulations; Availability of EPA
                                                     that would satisfy the underlying
                                                                                                             public are encouraged to submit                       Comments
                                                     purpose and need for agency action.
                                                     DOE currently plans to analyze in detail                comments concerning the content of the                  Availability of EPA comments
                                                     the project proposed by CCG and the no                  EIS, issues and impacts to be addressed               prepared pursuant to the Environmental
                                                     action alternative. DOE will also analyze               in the EIS, and alternatives that should              Review Process (ERP), under section
                                                     design options available to CCG within                  be considered. Scoping comments                       309 of the Clean Air Act and Section
                                                     the scope of the project (e.g., various                 should clearly describe specific issues               102(2)(c) of the National Environmental
                                                     methods for disposition of slag and                     or topics that the EIS should address to              Policy Act as amended. Requests for
                                                     sulfur and transportation of coal) and                  assist DOE in identifying significant                 copies of EPA comments can be directed
                                                     mitigation measures as appropriate.                     issues. Comments must be postmarked                   to the Office of Federal Activities at
                                                        Under the no action alternative, DOE                 or e-mailed by November 9, 2009 to                    202–564–7146 or http://www.epa.gov/
                                                     would not provide the loan guarantee                    ensure consideration. (See ADDRESSES                  compliance/nepa/.
                                                     for the CCG project and the project                     above). Late comments will be                           An explanation of the ratings assigned
                                                     would not be constructed as part of the                 considered to the extent practicable.                 to draft environmental impact
cprice-sewell on DSK89S0YB1PROD with NOTICES3




                                                     DOE loan guarantee program. This                        DOE invites those agencies with                       statements (EISs) was published in FR
                                                     option would not contribute to the                      jurisdiction by law or special expertise              dated July 17, 2009 (74 FR 34754).
                                                     Federal loan guarantee program goals to                 to be cooperating agencies.
                                                                                                                                                                   Draft EISs
                                                     make loan guarantees for energy projects                   A public scoping meeting will be held
                                                     that ‘‘avoid, reduce, or sequester air                  at a date, time, and location to be                   EIS No. 20090038, ERP No. D–COE–
                                                     pollutants or anthropogenic emissions                   determined. Notice of this meeting will                 K35045–CA, PROGRAMMATIC—Los
                                                     of greenhouse gases; and employ new or                  be provided in local news media and on                  Angeles Regional Dredge Material
                                                     significantly improved technologies.’’                  the DOE Loan Guarantee Program’s                        Management Plan, Develop a Long-


                                                VerDate Nov<24>2008   10:12 Dec 03, 2009   Jkt 220001   PO 00000   Frm 00057   Fmt 4703   Sfmt 4703   E:ERIC09OCN1.SGM   09OCN1

Notice of Intent DOE/EIS-0430

  • 1.
    52228 Federal Register / Vol. 74, No. 195 / Friday, October 9, 2009 / Notices the proposed priorities, requirements, action and the time needed to prepare Dated: October 6, 2009. definitions, and selection criteria would an application would likely be the same. Arne Duncan, be limited to paperwork burden related Further, the proposed action may help Secretary of Education. to preparing an application and that the small entities determine whether they [FR Doc. E9–24387 Filed 10–8–09; 8:45 am] benefits of implementing these have the interest, need, or capacity to BILLING CODE 4000–01–P proposals would outweigh any costs implement activities under the program incurred by applicants. and, thus, prevent small entities that do Participation in this program is not have such an interest, need, and DEPARTMENT OF ENERGY voluntary. For this reason, the proposed capacity from absorbing the burden of priorities, requirements, definitions, and applying. Notice of Intent To Prepare an selection criteria would impose no This proposed regulatory action Environmental Impact Statement for a burden on small entities in general. would not have a significant economic Proposed Federal Loan Guarantee To Eligible applicants would determine impact on small entities once they Support Construction and Start-up of whether to apply for funds, and have receive a grant because they would be the Taylorville Energy Center in the opportunity to weigh the able to meet the costs of compliance Taylorville, IL requirements for preparing applications, using the funds provided under this AGENCY: Department of Energy, Loan and any associated costs, against the program and with any matching funds Guarantee Program. likelihood of receiving funding and the provided by private-sector partners. ACTION: Notice of intent to prepare an requirements for implementing projects The Secretary invites comments from under the program. Eligible applicants environmental impact statement and small nonprofit organizations and small most likely would apply only if they conduct a public scoping meeting. LEAs as to whether they believe this determine that the likely benefits exceed proposed regulatory action would have SUMMARY: The U.S. Department of the costs of preparing an application. a significant economic impact on them Energy (DOE) announces its intent to The likely benefits include the potential and, if so, requests evidence to support prepare an environmental impact receipt of a grant as well as other that belief. statement (EIS) pursuant to the National benefits that may accrue to an entity Intergovernmental Review: This Environmental Policy Act of 1969, as through its development of an program is subject to Executive Order amended (NEPA), the Council on application, such as the use of that 12372 and the regulations in 34 CFR Environmental Quality (CEQ) NEPA application to spur educational reforms part 79. One of the objectives of the regulations, and the DOE NEPA and improvements without additional Executive order is to foster an implementing procedures to assess the Federal funding. intergovernmental partnership and a potential environmental impacts for its The U.S. Small Business strengthened federalism. The Executive proposed action of issuing a Federal Administration Size Standards defines order relies on processes developed by loan guarantee to Christian County as ‘‘small entities’’ for-profit or State and local governments for Generation, L.L.C. (CCG) (DOE/EIS– nonprofit institutions with total annual coordination and review of proposed 0430). CCG submitted an application to revenue below $7,000,000 or, if they are Federal financial assistance. DOE under the Federal loan guarantee institutions controlled by small This document provides early program pursuant to the Energy Policy governmental jurisdictions (that are notification of our specific plans and Act of 2005 (EPAct 2005) to support comprised of cities, counties, towns, actions for this program. construction and start-up of the townships, villages, school districts, or Accessible Format: Individuals with Taylorville Energy Center in Taylorville, special districts), with a population of disabilities can obtain this document in Illinois (‘‘the Facility’’).1 less than 50,000. The Urban Institute’s an accessible format (e.g., braille, large CCG is a limited liability company National Center for Charitable Statistics print, audiotape, or computer diskette) that is currently owned by Tenaska reported that of 203,635 nonprofit on request to the program contact Taylorville, LLC, an affiliate of Tenaska, organizations that had an educational person listed under FOR FURTHER Inc., an Omaha, Nebraska-based power mission and reported revenue to the IRS INFORMATION CONTACT. development company, and by MDL by July 2009, 200,342 (or about 98 Electronic Access to This Document: Holding Company, L.L.C. of Louisville, percent) had revenues of less than $5 You can view this document, as well as Kentucky. CCG proposes to develop the million. In addition, there are 12,484 all other documents of this Department Facility on an 886-acre parcel of land. LEAs in the country that meet the published in the Federal Register, in As proposed, the approximately 730 definition of small entity. However, the text or Adobe Portable Document megawatt (gross) electric generation Secretary believes that only a small Format (PDF) on the Internet at the Facility would utilize integrated number of these entities would be following site:http://www.ed.gov/news/ gasification combined-cycle technology interested in applying for funds under fedregister. to produce electricity from Illinois this program, thus reducing the bituminous coal. Synthesis gas To use PDF you must have Adobe likelihood that the proposals contained processing would also allow the Acrobat Reader, which is available free in this notice would have a significant separation and capture of carbon at this site. If you have questions about economic impact on small entities. dioxide (CO2) and the manufacture of using PDF, call the U.S. Government In addition, the Secretary believes Printing Office (GPO), toll free, at 1– pipeline-quality Substitute Natural Gas that the proposed priorities, (‘‘SNG’’ or ‘‘methane’’). SNG would be cprice-sewell on DSK89S0YB1PROD with NOTICES3 888–293–6498; or in the Washington, requirements, definitions, and selection DC, area at (202) 512–1530. used in a power block with two criteria discussed in this notice do not combustion turbines and one steam impose any additional burden on small Note: The official version of this document turbine. The Facility would be designed is the document published in the Federal entities applying for a grant than they Register. Free Internet access to the official 1 The amount requested for the loan guarantee is would face in the absence of the edition of the Federal Register and the Code not being disclosed at this time because it is proposed action. That is, the length of of Federal Regulations is available on GPO business sensitive. Moreover, should DOE approve the applications those entities would Access at:http://www.gpoaccess.gov/nara/ a loan guarantee, the amount may differ from the submit in the absence of the regulatory index.html. original request. VerDate Nov<24>2008 10:12 Dec 03, 2009 Jkt 220001 PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 E:ERIC09OCN1.SGM 09OCN1
  • 2.
    Federal Register /Vol. 74, No. 195 / Friday, October 9, 2009 / Notices 52229 such that surplus SNG can be be submitted electronically by sending construction and start-up of the transported offsite to an interstate an email to: TEC-EIS@hq.doe.gov. All Taylorville Energy Center in Taylorville, pipeline for sale. The Facility would electronic and written comments should Illinois. capture at least 50 percent of the CO2 reference Project No. DOE/EIS–0430. The site of the proposed Facility and over 99 percent of the sulfur FOR FURTHER INFORMATION CONTACT: To consists of an 886-acre parcel of land compounds that would otherwise be obtain additional information about this located in Taylorville, Illinois. Of the emitted. The CO2 stream would be EIS, the public scoping meeting, or to 886 acres, CCG currently owns or compressed and delivered at the receive a copy of the draft EIS when it controls via option agreements 713 fenceline to another party for pipeline is issued, contact Angela Colamaria by acres, and is attempting to option transport to enhanced oil recovery telephone: 202–287–5387; toll-free approximately 173 additional, operations and geologic storage. CCG is number: 800–832–0885 ext. 75387; or contiguous acres. The site and also studying the feasibility of geologic electronic mail: additional acreage to be acquired is storage of CO2 in the vicinity of the site. Angela.Colamaria@hq.doe.gov. For bounded by County Road E1700N on The EIS will evaluate the potential general information on the DOE NEPA the north, State Road 48 (and the impacts of the issuance of a DOE Loan process, please contact: Ms. Carol M. Norfolk Southern Railroad) on the east, Guarantee for CCG’s proposed project Borgstrom, Director, Office of NEPA farmland on the south, and County Road and the range of reasonable alternatives. Policy and Compliance (GC–20), U.S. N1400E on the west. The purpose of this Notice of Intent is Department of Energy, 1000 As proposed, the Facility would to inform the public about DOE’s Independence Avenue, SW., manufacture pipeline quality SNG from proposed action; invite public Washington, DC 20585; telephone: 202– Illinois bituminous coal and produce participation in the EIS process; 586–4600; facsimile: 202–586–7031; electricity utilizing integrated announce plans for a public scoping electronic mail: askNEPA@hq.doe.gov; gasification combined-cycle technology. meeting; and solicit public comments or leave a toll-free message at 800–472– The Facility is expected to use 7,500 for consideration in establishing the 2756. tons of coal per day (2.5 million tons of scope and content of the EIS. DOE SUPPLEMENTARY INFORMATION: coal annually). The primary water invites those agencies with jurisdiction supply would be municipal treated by law or special expertise to be Background effluent from a local sanitary district. cooperating agencies. EPAct 2005 established a Federal loan The Facility is expected to contribute guarantee program for eligible energy 2 billion kilowatt-hours per year to the DATES: To ensure that all of the issues projects that employ innovative electric grid system. SNG would be used related to this proposal are addressed, to fuel a power block with two DOE invites comments on the proposed technologies. Title XVII of EPAct 2005 authorizes the Secretary of Energy to combustion turbines and one steam scope and content of the EIS from all turbine. The amount of SNG produced interested parties. Comments must be make loan guarantees for a variety of types of projects, including those that may exceed the requirements of the postmarked or emailed by November 9, power block under certain operating 2009 to ensure consideration. Late ‘‘avoid, reduce, or sequester air pollutants or anthropogenic emissions conditions. The Facility would be comments will be considered to the designed such that surplus SNG can be extent practicable. In addition to of greenhouse gases; and employ new or significantly improved technologies as transported offsite to an interstate receiving written comments (see pipeline for sale. ADDRESSES below), DOE will conduct a compared to commercial technologies in service in the United States at the time The Facility would capture at least 50 public scoping meeting in the vicinity of percent of the CO2 and over 99 percent the proposed Facility at which the guarantee is issued.’’ A principal goal of the loan guarantee program is to of the sulfur compounds that would government agencies, private-sector otherwise be emitted. The CO2 stream organizations, and the general public are encourage commercial use in the United States of new or significantly improved would be compressed and delivered at invited to provide comments or the fenceline to another party for suggestions with regard to the energy-related technologies. DOE believes that accelerated commercial pipeline transport to enhanced oil alternatives and potential impacts to be recovery operations and geologic storage considered in the EIS. The date, time, use of these new or improved technologies will help to sustain at a location to be determined by the off- and location of the public scoping taker. CCG is also studying the meeting will be announced in local economic growth, yield environmental benefits, and produce a more stable and feasibility of geologic storage in the news media and on the DOE Loan vicinity of the site using the Mt. Simon secure energy supply. Guarantee Program’s ‘‘NEPA Public formation. Involvement’’ Web site (http:// Purpose and Need for Agency Action Supporting infrastructure and www.lgprogram.energy.gov/NEPA- CCG submitted a Part I application to facilities would include local access 2.html) at least 15 days prior to the date DOE for a loan guarantee on December roads, rail interconnections, water of the meeting. 19, 2008, and submitted a Part II supply and wastewater pipelines, CO2 ADDRESSES: Public comments can be application on March 23, 2009. The pipelines, a natural gas pipeline, and a submitted electronically or by U.S. Mail. purpose and need for agency action is high voltage transmission line to Written comments on the proposed EIS to comply with DOE’s mandate under connect the Facility to the electric grid scope should be addressed to: Ms. Title XVII of EPAct 2005 by selecting system. Rail access to the site would be Angela Colamaria, Loan Guarantee provided by construction of a rail cprice-sewell on DSK89S0YB1PROD with NOTICES3 eligible projects that meet the goals of Program Office (CF–1.3), U.S. the Act. DOE is using the NEPA process connection to the Norfolk Southern Department of Energy, 1000 to assist in determining whether to issue Railroad east of the site. Coal may also Independence Avenue, SW., a loan guarantee to CCG to support the be delivered by truck. Approximately 6 Washington, DC 20585. Please submit proposed project. miles of County Road E1700N would be one signed original paper copy. reconstructed and enhanced to 80,000 Electronic submission of comments is Proposed Action lbs. gross vehicle weight standards. DOE encouraged due to processing time DOE’s proposed action is to issue a plans to analyze the impacts of required for regular mail. Comments can loan guarantee to CCG to support the construction and operation of the VerDate Nov<24>2008 10:12 Dec 03, 2009 Jkt 220001 PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 E:ERIC09OCN1.SGM 09OCN1
  • 3.
    52230 Federal Register / Vol. 74, No. 195 / Friday, October 9, 2009 / Notices supporting infrastructure and facilities Preliminary Identification of ‘‘NEPA Public Involvement’’ Web site in the EIS. Environmental Issues (http://www.lgprogram.energy.gov/ The Facility would eliminate process NEPA-2.html) at least 15 days prior to The following environmental resource wastewater entirely through use of the date of the meeting. Members of the areas have been tentatively identified water treatment, recycling, and zero public and representatives of groups for consideration in the EIS. This list is liquid discharge systems. Solid waste and Federal, State, local, and tribal neither intended to be all-inclusive nor (slag) and sulfur, by-products from the agencies are invited to attend. The a predetermined set of potential process, would be sold as a commercial meeting will include both a formal environmental impacts: product, disposed of onsite, or opportunity to present oral comments • Air quality; transported offsite for disposal at a non- and an informal session during which • Greenhouse gas emissions and hazardous, solid waste landfill. The DOE and CCG personnel will be climate change; construction work force would peak at available for discussions with attendees. • Energy use and production; up to 1,500 construction workers over a Displays and other forms of information • Water resources, including 4-year period. The Facility would be about the proposed agency action, the operated and maintained by a staff of groundwater and surface waters; • Wetlands and floodplains; EIS process, and the CCG proposed approximately 145 employees and Facility will also be available for review. contractors. • Geological resources; • Ecological resources, including DOE requests that anyone who wishes Coal gasification and electric to present oral comments at the meeting generation components of the Facility threatened and endangered species and species of special concern; contact Ms. Colamaria by phone or e- would be constructed on approximately mail (see ADDRESSES above). Individuals 70 acres of the site. The site is currently • Cultural resources, including historic structures and properties; sites who do not make advance arrangements used for agriculture (row crops), is to speak may register at the meeting. surrounded by farmland, and is zoned of religious and cultural significance to tribes; and archaeological resources; Speakers who need more than five for industrial and agricultural use. The minutes should indicate the length of coal gasification and electric generation • Land use; • Visual resources and aesthetics; time desired in their request. DOE may components of the Facility are entirely need to limit speakers to five minutes within property that is zoned for • Transportation and traffic; • Noise and vibration; initially, but will provide additional industrial use. In addition, several opportunities as time permits. Written hundred acres of Prime Farmland • Hazardous materials and solid waste management; comments regarding the scoping process within the 886-acre parcel could be can also be submitted to DOE officials affected by the construction of the • Human health and safety; • Accidents and terrorism; at the scoping meeting. Facility. Preliminary assessments indicate that the footprint of the • Socioeconomics, including impacts Issued in Washington, DC, on October 6, proposed facility would not affect any to community services; 2009. wetlands or floodplains. In the event • Environmental justice. Steve Isakowitz, that further analysis indicates that DOE invites comments on whether Chief Financial Officer, Office of the Chief wetlands or floodplains would be other resource areas or potential issues Financial Officer. affected, DOE will prepare a floodplain should be considered in the EIS. [FR Doc. E9–24422 Filed 10–8–09; 8:45 am] and wetland assessment in accordance Public Scoping Process BILLING CODE 6450–01–P with its regulations at 10 CFR part 1022 and include the assessment in the EIS. To ensure that all issues related to DOE’s proposed action are addressed, ENVIRONMENTAL PROTECTION Alternatives DOE seeks public input to define the AGENCY In determining the range of reasonable scope of the EIS. The public scoping alternatives to be considered in the EIS period will begin with publication of [ER–FRL–8598–2] for the proposed CCG Facility, DOE the NOI and end on November 9, 2009. Interested government agencies, private- Environmental Impact Statements and identified the reasonable alternatives sector organizations, and the general Regulations; Availability of EPA that would satisfy the underlying public are encouraged to submit Comments purpose and need for agency action. DOE currently plans to analyze in detail comments concerning the content of the Availability of EPA comments the project proposed by CCG and the no EIS, issues and impacts to be addressed prepared pursuant to the Environmental action alternative. DOE will also analyze in the EIS, and alternatives that should Review Process (ERP), under section design options available to CCG within be considered. Scoping comments 309 of the Clean Air Act and Section the scope of the project (e.g., various should clearly describe specific issues 102(2)(c) of the National Environmental methods for disposition of slag and or topics that the EIS should address to Policy Act as amended. Requests for sulfur and transportation of coal) and assist DOE in identifying significant copies of EPA comments can be directed mitigation measures as appropriate. issues. Comments must be postmarked to the Office of Federal Activities at Under the no action alternative, DOE or e-mailed by November 9, 2009 to 202–564–7146 or http://www.epa.gov/ would not provide the loan guarantee ensure consideration. (See ADDRESSES compliance/nepa/. for the CCG project and the project above). Late comments will be An explanation of the ratings assigned would not be constructed as part of the considered to the extent practicable. to draft environmental impact cprice-sewell on DSK89S0YB1PROD with NOTICES3 DOE loan guarantee program. This DOE invites those agencies with statements (EISs) was published in FR option would not contribute to the jurisdiction by law or special expertise dated July 17, 2009 (74 FR 34754). Federal loan guarantee program goals to to be cooperating agencies. Draft EISs make loan guarantees for energy projects A public scoping meeting will be held that ‘‘avoid, reduce, or sequester air at a date, time, and location to be EIS No. 20090038, ERP No. D–COE– pollutants or anthropogenic emissions determined. Notice of this meeting will K35045–CA, PROGRAMMATIC—Los of greenhouse gases; and employ new or be provided in local news media and on Angeles Regional Dredge Material significantly improved technologies.’’ the DOE Loan Guarantee Program’s Management Plan, Develop a Long- VerDate Nov<24>2008 10:12 Dec 03, 2009 Jkt 220001 PO 00000 Frm 00057 Fmt 4703 Sfmt 4703 E:ERIC09OCN1.SGM 09OCN1