STONEYTHORPE DEVELOPMENT Co. and
THE DARLING FAMILY TRUST
Present promotional Document No2
(February 2014)
For a SUSTAINABLE VILLAGE DEVELOPMENT at
LOWER FARM, STONEYTHORPE, nr SOUTHAM
Introduction
The emerging spatial strategy faces the
challenge of delivering more homes and
greater employment opportunities whilst
protecting the historic areas of the District.
The evidence indicates a need to provide
many more homes than originally planned
for in order to meet the requirements of
an economically active population. With
such a historically important urban centre
and the predominately rural character of
the District, the challenge to address the
shortage of market and affordable homes
requires innovative thinking and bold
decision-taking.
The proposed settlement at Lower Farm,
Stoneythorpe is located next to a significant
employment site, and is well connected by
the local and strategic highway network.
Delivering a sustainable community here
offers the District an opportunity to
meet a significant portion of its housing
requirement. In doing so, the inherent
pressure of expanding the historic centre
of Stratford is minimised. The burden of
growth on outlying historic and sustainable
rural settlements will be reduced whilst still
accommodating growth to meet local need
and to sustain businesses, schools and local
services.
Both the emerging spatial strategy and the
core planning principles of the National
Planning Policy Framework have been
considered in bringing the site forward for
your consideration. The site is aligned with
both local and national planning policy
objectives and is considered a viable and
developable development fit for inclusion
within the Council’s emerging plans.
These abstract images are taken from local villages and
show the intimacy and density of the settlement and
the resultant grain.
These sample images attempt to show the variation
of typologies that may be applied through an agreed
design code.
PROPOSAL FOR NEW ECO-FRIENDLY SUSTAINABLE VILLAGE DEVELOPMENT AT STONEYTHORPE
Our goal is to invest in the creation of a sustainable, extremely energy efficient, environmentally friendly village community of the
future. Blending truly innovative use of the latest technologies and materials with traditional community values for people of all ages,
cultures and aspirations. Following the direction of other estates such as the Duchy of Cornwall, Calthorpe Estate, Bourneville Village
Trust and on a smaller scale and local, the Overbury Estate. The essence of a vibrant community is one of “live, work and play” ones
where the public realm and community facilities are as important as the home itself.
A Blueprint Village of the future.
Jim Darling, David Darling CBE
The proposed settlement will sit between the existing slopes framed by the swales and trees. Sustained by
the products of the elements within the site and the adjoining environs it will be planned to accommodate
a diverse community and encourage similar diversity for the ecological habitat that becomes it’s base.
Creating a walkable neighbourhood is a
Key objective in this proposal.
All key services and facilities such as the
school, shops and leisure will be within a
5 minute walk of all homes.. This will help
to generate a pattern that will reinforce
community through personal contact and
discourage car use. It will encourage a
modal shift from the private car to more
sustainable means of transport.
The quality of the routes is a major factor,
the roads and lanes will satisfy functional
criteria although there will be an underlying
emphaisis towards the pedestrian,
dog-walker, jogger and cyclist etc.
The beneficial experience of these and
similar groups and the connection with the
diverse environment that will surround the
settlement typifies the aspirations for this
proposal.
Aspirations for Innovation, Sustainability and Vision
The use of materials indigenous to the site is a
priority and design will be informed by the use
of materials that are sourced as locally as possible.
If materials rising from the site are limited in
availability then they will be used in central and
communal areas, in a framework of structural
and enclosing elements for walls and retaining
structures. This approach will distribute the
indigenous materials across the site for the benefit
of everyone who can experience the public realm
in Stoneythorpe and will create a locally distinctive
character.
Using ‘Lanes’ as informal routes will be a key
element in the Design Code that will be
developed with the Local Authority.
A hierarchy of streets with an emphasis on
creating shared surfaces of indeterminate width
(varying but having a minimum dimension) and
not necessarily having a pavement for all of its
length. It will create one zone for people, cars,
bikes to meet and integrate. The design detail will
discourage the intrusion of the large lorries. The
Estate Management Company will have the facility
to accept deliveries and distribute around the site.
Houses facing the village
green are part of the central
settlement area nd therefore densely
organised and having an intimate
relationship with the street/ lane/
footpath. The front elevation is close
up to the back of pavement or
separated by a shallow garden area
with railings
On the outer lying
areas of the development the
densities are generally reduced and
the plot ratios are larger. This gives the
opportunity for larger plots altough
there will be greater density and
lower values in the ‘Mews’ style courts
withinh these blocks or parcels.
Context, Connections and Linkages
The network of existing routes across
the site includes paths/ lanes suitable
for cycling that will link to the new
cycle paths that will be laid out over
the adjacent landfill site. As well as
connecting the sporting use to the
settlement the routes will be extended
to the existing public rights of way that
can link to Southam, Ufton and the Grand
Union Canal Walk along the towpath
near Bascote. This is a network that
connects to Leamington Spa and to the
Centenary Way.
The routes over the settlement will
connect with the areas surrounding
woodland.
The bridle path that surrounds the site
will be capable of giving access to visitors
and emergency vehicles across the site.
B4552 TOWARDS HARBURY, THE M43
AND BANBURY
OLYMPIC LEGACY
One of the first initiatives driving this proposal was to integrate
a sporting legacy from the recent London Olympics.
By making maximum use of the adjacent Biffa landfill site
which is currently being remediated the Trust believes that a
mixed woodland that will provide renewable fuel for all of the
dwellings and commercial and community accommodation.
In addition a cycle trail can be designed to create a rugged
competition course that can be varied to suit different ages and
abilities. The tracks will be integrated into the settlement and
extended to tie into the established public footpath network.
In line with the Governments aspirations to promote recovering
energy from waste, there is scope for the masterplan
development to incorporate energy from waste.
The proposed development is adjacent to Biffa waste
management site in it’s final stages and therefore the integration
of a “Energy from waste” facility to provide either heating and/or
electricity (via “Biogas” driven Combined heat and power plant)
will be explored.
This will be a key element of an overall sustainable development
by not only reducing the development’s reliance on valuable
fossil fuels, but also a better environmental solution by reducing
the amount of waste to landfill.
Geoff Neal, Director,
THE ENGINEERING PRACTICE
Environmental Service Engineers
The development will involve remodeling of the existing ground
to provide community and recreation areas. These excavations
together with those associated with construction will result in
a significant quantity of material. It is intended to optimize the
reuse of these arisings on the site.
The geology of the site is in the Blue Lias formation and is
characterized by alternate band of argillaceous limestone and
calcareous clays or shales below the top soils.
The limestone bands are thin and easily excavated. The separated
components can be used for:
•	 Stone for walling in the landscape.
•	 Crushed to provide road base and stone for SUDS drainage.
•	 Filling for gabions and crib wall for retaining walls.
•	 Mass fill to form banks and landscaped areas.
•	 Top soil for landscaping etc.
The masterplan will incorporate the concept of all arising
excavated material being retained on site with the most efficient
use of the various components.
This will minimize the import of material thereby reducing
transport impact and quarrying impacts elsewhere.
Richard Fenton, Director;
FENTON HOLLOWAY,
Civil Engineers, Structural Engineers and Innovators
A452 TOWARDS SOUTHAM
BIFFA LANDFILL SITE
Transport
The development would be accessible by a range on
non-car travel modes, there being existing or planned
pedestrian and cycle links providing connectivity to
Southam and other local settlements. The site is already
located on a bus route which would be brought into the
heart of the development, providing excellent access to
surrounding centres. The scale of the proposal considered
as a whole will comfortably support improved bus
provision. Access to the rail network would be provided
by the frequent bus connections to Leamington, with the
development improving the viability of a new station to
serve the local area near Deppers Bridge.
A mixture of on-site facilities, augmented by existing local
and other accessible provision located further afield,
means that the development proposals would be highly
sustainable in respect of access by non-car travel modes to
a wide range of employment, education, retail and leisure
opportunities and healthcare services.
Following discussions with Warwickshire County Council
(WCC), vehicular access to the site will be provided via a
single primary access from the A425 via a new roundabout
to the east of Codemasters, with a second emergency
access, As well as providing appropriate capacity, the
proposed junction arrangement has been designed to
ensure access to the site can be maintained at times of
emergency.
The primary access crosses the planned alignment of
HS2 where it lies within a green tunnel. HS2 Ltd has
advised that the construction of the tunnel will be able to
accommodate the access above.
The primary access and roundabout junction can be
constructed whilst the A425 is temporarily diverted as part
of the HS2 works, minimising disruption.
MAYER BROWN ; ENVIRONMENT & TRANSPORT
Within the site, alternative vehicular links through and
around the development will be provided, connecting
close to the primary access. As well as dispersing traffic
and providing for emergency and refuse access, this will
also facilitate the provision of a circular route through the
site for bus services.
Whilst subject to the undertaking of a detailed Transport
Assessment, preliminary studies and discussions with
WCC indicate that development traffic generations
can be accommodated an the surrounding highway
network without the need for any major infrastructure
improvements.
Noise & Air Quality
The noise environment within the site will be primarily
influenced by the A425 and HS2. The most sensitive
portion of the site in respect of noise and vibration
from HS2 is that 100 – 300m into the site where the
line enters the cutting. Assessment of traffic data for the
A425 indicates that noise levels are not a constraint to
development subject to refined mitigation, design and
layout.
Assessment undertaken to assess the likely effect of traffic
pollutants associated with the A425 demonstrates that air
quality will not be a significaant constraint to development.
Renewables / Technologies
The whole of the development will be subject to high
design and construction standards exceeding current
and planned regulations, providing for high standards of
energy and water efficiency. It is planned to build to code
level 5 of the Code for Sustainable Homes.
The ethos and scale of the development provide for range
of options in respect of energy generation on a variety of
scales. These range from individual building technologies
such as heat pumps, PV, and solar thermal to community
heating with CHP, biomass and/or energy from waste. The
proposed water attenuation within the site could provide
for hydro-electric generation and/or thermal storage, whilst
the adjacent Biffa site and limited views from the south
lend themselves photo-voltaic (PV) farms.
Rain-water harvesting and the re-use of grey water will be
considerations within both the micro and macro design
of the development. In addition to a local community
recycling centre, it is proposed that technologies such as
centralised vacuum waste disposal also be explored.
Ecology
Habitats within the site comprise grassland, trees and
hedgerow, water courses (including River Itchen) and
seasonally wet areas (reed beds present).
Based on the identified habitats, potential species within
the site include bats, birds, harvest mice, barn owl,
hedgehog, badger, fox, amphibians and reptiles.
The ecological significance of the site will be examined
further as part of an Extended Phase 1 habitat survey,
which will also determine the number and extent of
detailed ecological surveys.
Ecological considerations have been taken into account
during the development of the masterplan. Furthermore,
measures to protect and enhance the ecology of the site
and surrounding land will be incorporated within the
detailed design stages.
Arboriculture
There are areas of dense hedgerow, trees and woodland
within the site. These have been incorporated into
the masterplan and will be a key consideration in the
formulation of a detailed design.
An Arboricultural Assessment will be undertaken for the
site to ascertain the value and condition of the hedgerows,
trees and woodland. The outcome of the assessment will
feed into the development of the masterplan and detailed
design.
An objective of the scheme will be to significantly
enhance the tree and low level vegetation growth and to
use this and the ecology as an integral part of the unique
development setting.
Archaeology
The proposed development site does not contain any
designated heritage assets such as Scheduled Monuments,
Listed Buildings, Battlefields, Parks and Gardens or World
Heritage sites.
A formal Desk-Based Assessment and Historic Buildings’
Assessment will be prepared to support any future
planning application. However, in consideration of the
information currently available there are no heritage
assets within the site that need to be considered in the
formulation of the masterplan.
Landscape and Visual Impact
Due to local topography and vegetation cover, the site is
visually contained within the surrounding landscape.
From the north and north-east, the site is generally visually
screened by the hedgerow and semi-mature trees that
align the A425 and those associated with the copses and
parkland around the polo grounds and Stoneythorpe Hall.
From the south and south-west, there are limited views into
the site. This is due to the existing woodland around the
landfill site and the rising land that is the landfill site.
From the east, the site is visually contained by the local
rolling topography and the semi-mature hedgerows and
mature trees within the hedges.
From the west, the site is visually screened by boundary
hedgerow vegetation and the existing trees and vegetation
associated with Lower Farm.
Flood Risk and Drainage
The majority of the development site is located within
what the Environment Agency identifies as being Flood
Zone 1, which presents very little risk of flooding. The
River Itchen runs through the eastern extents of the site
and thus the design has incorporated the river and its
flood plains.
A flood risk assessment (FRA) will be undertaken in respect
of the development proposals to ascertain the risk which
may be presented to the development and which the
development may pose in respect of increasing any risk of
flooding.
A sustainable drainage strategy (SuDS) will be formulated
whereby innovative engineering is incorporated such
that the risk of flooding is minimised. This provides the
opportunity through the creation of attenuation and
swales to enhance the ecological value of the site.
Ground Conditions
No detrimental risk of any naturally occurring or man-made
potential sources of contamination has been identified
within initial site investigation works that have been
undertaken. Potential sources of contamination accounted
for include ground gases generated from natural strata
beneath the site, naturally elevated metal concentrations
and reduced quality waste material and leachate from the
landfill and recycling centre.
Further site investigation will be undertaken as
necessary to determine any specific measures needed
to be incorporated within the detailed design of
the development in consideration of any potential
contaminants.
HS2
The HS2 rail line crosses the north eastern extents of the
site. The current proposals indicate that the line will tunnel
beneath the A425 Leamington Road and into the site.
Access can be positioned to ensure the alignment of the
HS2 has no impact on the development sighting
The alignment of the HS2 line has formed a key
consideration in the derivation of our plans.
Potential mitigation measures will also need to be
identified in respect of the impact the rail line may have
on potential residents of the development in respect
of noise and vibration, again best practice will ensure a
development of this nature can be accommodated in
proximity to the HS2.
The River Itchen runs through the site and is fed by two
minor streams/ ditches that do run dry. There is a flood
plain or water meadow area identified and this area will
be retained as an area to encourage biodiversity and as
a re-location area for any flora and fauna that will need
protection.
The new road will be built on a retaining structure that
will hold back the water to form a fish pond. Subject to
more detail analysis the available levels should produce a
difference in water level capable of driving a water wheel
that might be used for producing energy via a
hydro-turbine.
The Estate Management Company needs to work together
with the local authority and utilities companies to enable
the adoption of roads and services to a standard of
maintenance of repair that is acceptable to the EMC. The
desired solution will be more in keeping with the rural
vernacular of the location and a more pleasant experience
for the user.
A New Village Settlement: Densities and Grain
At the centre of the village the grain or texture is a close
weave. This becomes more open as one moves towards
the perimeter. The properties are closely grouped with
front walls close to the pavement and the narrowness of
the streets emphasised by the solid edge of the block
form. This is slowly eroded and broken down as the
development distances from the market place. Design
devices breakdown the solid continuous street elevations
to give a transition to a more open grain as the settlement
unfolds. The outer lyoing houses will have the larger plots.
The boundary of the settlement will be surrounded by
managed woodland and coppicing that will provide
renewable energy for the dwellings.
DEVELOPMENT OF DENSITY IDEASUSE THE INDIGENOUS LANDSCAPE
The
water meadow and the
swales frame the area
identified for the central
open space for the
settlement.
Settting the
pattern of densities
around the open
space and water
meadow.
The Market
Square has narrow
fronted shops facing
the open space and the
central area free for a
variety of activities.
The 1/1.5
Form Entry (FE) village school will house
a nursery and share the open space for
sports and activities. Located at the very
heart of the settlement the intention is
for the school to be a key component in
the new community with a strong tie to
the countryside. It is envisaged children
will have good access to learn about rural
issues and their surrounding
environment.
The perimeter houses face outwards to avoid a ‘back-fence’
situation and encourage engagement in use, supervision
and maintenance. Although visitors and service vehicles
can access via the perimeter lane the owners can use an
inner courtyard arrangement that includes some higher
density dwelling blocks to develop a secondary pattern
of accommodation that will frame a different macro
environment.
DEVELOP BUILT-FORM CONCEPTSINTRODUCE OPEN SPACESOpen spaces are
developed from the
village green and
give legibility to the
circulation routes.
The built-form extends
the density concept and
distributes the variety of
housing product over
the settlement.
The
parcels of development
towards the boundary of the
settlement will have a reduced
density but will have a Mews
style of inner courtyards that
can offer smaller, lower value
products.
Variety, Grain and Public Open Spaces
The River Itchen runs through the site, within which it is
fed by two minor streams. There is an area of flood plain
alongside the river and it is proposed to utilse this area for
multiple purposes, providing a key element of the drainage
strategy for the site, providing a biodiverse ecological
habitat and providing a focal point for the development.
A retaining structure will be formed across the flood plain
to create a large attenuation pond to accommodate run-off
water from the development and control downstream flow.
Where drainage conditions permit, water may be collected
from the pond and pumped to a cistern at high level, from
where it can be fed by gravity back down the levels to
provide irrigation to public areas of planting and green
space. At the point of discharge the retained water may be
capable of generating power, whilst the retaining structure
itself could provide a crossing point to permit circulation
around the site.
employment opportunities within the settlement.
Shops will sit alongside cafes bars and restaurants to
serve the inhabitants of the village, employees from the
offices and visitors. The intention is to provide support for
start-up businesses through the EMC to encourage young
entrepreneurs. Support that will endorse strongly the use
of environmentally sustainable practices and of sources as
local as possible.
The Retail model that is proposed for the Village centre
is multi faceted. It will provide an active frontage that will
bind the centre of the settlement, bring life interest and
employment to the heart of the village.
The EMC will encourage new ‘start-up’ businesses with the
financial and mentoring assistance that is the legacy from
the establishment of Codemasters in 1986 by the Darlings.
The shop front however could only be part of the facility
with supporting space and resources in the centre of
the block being able to accommodate a parallel internet
based business from the same location. Indeed for young
entrepreneurs the residential accommodation above the
shop could be their first home.
The aspiration here is to create a situation where specialist
retailers can develop national or international markets
utilising the internet, but with a street presence that will
attract visitors to this village high street. Potential internet
activities will be greatly enhanced with high speed
broadband connections and expertise available to all
village residents/businesses.
The following is a Case Study example;
A shop in Les jardins d’eini, Autoire, Midi Pyrennes, The
Lot, France imports and stocks exotic dried mushrooms
from around the world.
This facility that would be prohibitively expensive in
Paris but with the supporting resources and space the
business can have a public presence as well as a national
distribution network thanks to the internet.
One of the objectives of the Estate Management
Company is to manage the adjacent woodland sites and
to plant the landfill site with new woodland to produce
a new facility of diverse species. This will provide a wide
ranging environment for flora and fauna as well as product
for coppicing for logs, wood chippings and material for
charcoal.
The Woodland Trust have agreed to help develop this
thinking and Biffa have indicated that our proposals will not
prejudice the planned remediation strategy and that tree
planting can be accommodated on site in line with our
aspirations.
Cycling UK have also committed to encouraging the
development of a cycling facility that could include
woodland tracks and slopes.
There would be a particular interest in developing
technologies that help cyclists with disabilities. This could
be very appropriate with the technological pedigree of
the location and building a new facility from effectively a
new site.
Other employment opportunities will be created in the
procurement and the delivery of the construction of the
built form.
In using local materials compounds and yards will be
established on site to train young craftsmen in the use
of these materials both in a traditional way and to suit
contemporary applications. The vision is for this demand
to provide a programme of construction projects and new
business ventures that can be nutured from Stoneythorpe.
Connections to the local skills market should encorage new
jobs and new training opportunities in crafts and skills.
These light industrial uses will be sited to the north of the
site against the A425 or the edge of HS2 if / when it is
confirmed.
The village centre will be a mix of modest shops with the
flexibility to trade off site, a philosophy matched by other
The site is in the single ownership of the Darling family who
are committed to delivering a high quality development.
The family will establish a Trust and will invest substantial
funds in developing infrastructure. Working in partnership
with long term development partners, the project would
be delivered in accordance with Design Codes agreed in
partnership with local stakeholders.
There are several examples of this approach, the Duchy
of Cornwall, Bourneville Village Trust, the Calthorpe
Estate and Port Marine Bristol are some that have been
highlighted.
In the context of the National Planning Policy Framework,
it is considered that the site is available now and is suitable
for development in that it offers another option to
merely enlarging Stratford and outlying settlements and it
comprises land adjacent to a source of employment and a
potential source of renewable energy. It is also considered
to be achievable within the plan period and is not
adversely affected should HS2 be built.
Southam - Lower Farm Deliverability
Assessment
The reason for the delay is that the Core Strategy has
to meet the objectively assessed housing needs. The
latest evidence which underpins this is the Coventry
and Warwickshire Strategic Housing Market Assessment
(CWSHMA) which considered the wider housing market
area.
This document recommended that the objectively assessed
housing need for Stratford District over the period 2011-
2031 should lie at 570 dwellings per annum (11,400 over a
20-year period).
A further report prepared on behalf of the Council was
undertaken by Environmental Resource Management
(ERM). This report considered the objectively assessed
housing need lay between 10,500 and 10,800.
The Council’s own Strategic Housing Market Assessment
(SHMA) (Update) ( Jan 2013) objectively assessed the
needs for market and affordable housing in the district.
The SHMA indicates a housing requirement of 14,500 new
dwellings over the plan period (up to 2028). It notes that
this figure is based on continuing high levels of in-migration
to the district which the Council wishes to limit moving
forwards.
The Housing Provisions Options Study 2012 Update ( Jan
2013) is a further piece of evidence which informs housing
needs.
It states that an objective assessment of development
needs for housing up to 2028 would fall between 12,000
and 13,000.
There is therefore a strong body of evidence that indicates
that the Council will need to find additional sites for
housing in order to accommodate their objectively
assessed housing need; whichever housing requirement
figure is used.
The aspirations of the Council to limit in-migration is
acknowledged, however, the Council must meet its housing
needs and must ensure that its strategy for growth does
not impede economic growth within both the district
and neighbouring authorities. It is recognised that finding
locations for the additional homes required will be
challenging.
The current strategy of limiting growth at Stratford and
distributing housing to the outlying service villages and
main rural centres aims to safeguard the historic integrity of
Stratford. Distributing housing to the outlying settlements
has significant merit on sustainability grounds; however
these settlements will only be able to accommodate a level
of growth commensurate with the infrastructure in place.
The latest round of consultation is encouraging and it is
evident that the Council is meeting the challenge head on.
The new freestanding, sustainable, community-focused
settlement outlined in this document offers the Council an
opportunity to meet its identified housing needs whilst
delivering on its objective of minimising development at
Stratford and at the other rural centres.
Due to the scale and nature of the proposal, the spatial
strategy and strategic objectives of the emerging Core
Strategy have been considered, along with the associated
evidence base on housing and the policies and objectives
of the National Planning Policy Framework (NPPF).
In January 2014, Cabinet resolved to extend the plan
period so that it will now run from 2011 to 2031. The
emerging Stratford-upon-Avon Core Strategy will set out
the Council’s spatial strategy for the district. Emerging
policies of the Core Strategy will carry greater weight
further along the adoption process.
Given that additional consultation has since taken place on
new proposals and that the Council is currently carrying
out a focused consultation on the 2011-2031 housing
requirement and strategic site options (Feb/March 2014),
the Council have acknowledged that the date for adoption
has slipped considerably.
In order to assist the local planning authority in considering alternative options for growth it is considered that the 12 Core Planning Principals contained within the NPPF provide an
excellent framework to initially appraise the site.
Be Genuinely Plan Led
The proposed development should be
Considered in the context of the Council’s emerging
spatial strategy and the need to provide significantly more
housing than originally planned for. The Council’s spatial
strategy of limiting growth within Stratford and distributing
housing to its main Service Centres and local service
villages is not comprised by this development. Indeed, the
development compliments the spatial strategy and can
assist in limiting future growth within Stratford and some of
the more sensitive rural settlements.
It is anticipated that significant involvement from the
community and from local stakeholders including Parish
and Ward Councillors would help shape the proposals and
to ensure that local issues are addressed from the outset.
It is considered therefore that the development does not
prejudice the wider strategy for growth within Stratford
District and can assist the Council’s need for economic and
housing growth.
Planning should be a creative exercise in finding ways to
enhance and improve in which places people live their
lives
The site is located next to the locally significant employer,
Codemasters. The firm has recently been granted planning
permission for extensions which would see employment on
site increase from 500 to up to 1,000 jobs.
The site also lies next to a former waste disposal site which
is currently in the process of being remediated.
A recycling centre is located on this site and has the
potential for significant growth to assist the Council
in achieving its aim to reduce landfill and meeting the
challenge of a changing climate.
Locating housing adjacent to a significant local employer
and alongside the former waste disposal site offers
imaginative solutions to both sustainable energy generation
and local employment.
The development would tie in with the existing business
and provide opportunities for IT, financial services and
professional and research companies to locate to a pleasant
setting, close to regional centres and strategic transport
routes. The establishment of a new community would
require a democratic framework to be created so to ensure
that a community is supported by the necessary social
infrastructure.
This could be a Trust which would maintain a level of
control and ‘sponsorship’ of village centre uses, and
provides the bedrock for committee’s tasked to manage
sports and social clubs, allotments and other local
community enterprises.
Pro-actively drive and support sustainable economic
development through objectively assessing the housing
business and other development needs of an area.
There is now a significant body of evidence that indicates
the District’s objectively assessed housing need lies
between 10,500 and 14,500 homes. Under-providing is
not an option and would result in a decline in the number
of residents in the district in employment.
It is therefore the case that in order to meet the Council’s
objectively assessed economic and housing needs
additional homes are needed. A new freestanding
settlement under single ownership represents an
exceptional opportunity for an innovative and exciting
response to the challenge.
Always seek to secure high quality design.
The document sets out the very high quality design
intent that would be delivered on this site. A range of
innovative technologies are proposed to link in with
surrounding sustainable/renewable energy opportunities.
The development would be focused on a village centre
with the range of traditional shops, services and amenities
planned in an organic and diverse manner. It is anticipated
that the proposal would include a Primary School and has
the potential to provide for new health and community
facilities. Design codes would be supported to ensure
the vision for the new community would be retained
throughout the development of the site. It is expected that
the Local Planning Authority and other local stakeholders,
including the Parish Council, would be involved in the
preparation of the detailed design codes.
Assessment
The proposed settlement will assist significantly in achieving
this by providing the additional housing in a manner
that protects and safeguards the historic character of
Stratford and ensures that growth in outlying rural centres
remains proportionate to their existing size. It also places
housing very close to an existing and expanding source
of employment and is an opportunity to create a high
quality, innovative, sustainable development with a strong
community focus.
Take account of the different roles and character of
different areas
The development would still allow for a proportionate
and appropriate amount of development to be directed
towards urban areas and existing settlements to ensure that
there remains an urban focus and that villages and other
rural centres remain sustainable in the future.
Development would retain existing hedgerows and
mature trees and would supplement these with significant
new planting. Any proposal would work with the existing
topography to ensure that development assimilates
successfully into the landscape. Whilst development would
represent a change, the landscape is not subject to any
specific landscape designation and is not Green Belt.
The delivery of homes on this site would safeguard
Stratford from excessive growth and would ensure the main
rural centres and the local service villages are not
over-burdened with housing and the infrastructure and
social pressures this can entail.
Support the transition to the low carbon future in a
changing climate
The scale of the development and its location next to a
former waste disposal centre provides an opportunity to
utilise a range of renewable energy technologies.
The mix of uses also allows for energy that has been
generated on site to be used throughout the day.
There is also the opportunity to quarry building materials
from the site as there is a known source of aggregate
beneath the ground.
This locally sourced material is sustainable and whilst it is
unlikely to be used for building homes, its use on walls
and within public open space will give a strong sense of
character and place. The document sets out the range of
technologies that are feasible for use on this scheme.
Contribute to conserving and enhancing the natural
environment
The vision is to create a sustainable place with a working
community. Primary Schools, shops, services and facilities
would be provided on site and would enable residents to
remain car free for much of their day to day needs.
The proposed mix of uses also enables local employment
thus reducing the necessity for out-commuting.
Habitat creation and woodland management would be a
key priority under the proposals.
The number of homes that are needed within the District
is such that the development of greenfield land will be
necessary. The construction of a significant portion of the
housing requirement in one single location will minimise
the impact of the alternative which would see a wider and
more dispersed development of greenfield sites.
Encourage the effective use of land by re-using land that
has been previously developed
In order to meet the objectively assessed housing and
economic needs for the district the authority will have
to release greenfield sites. In order to safeguard the
historic integrity of Stratford this site represents a good
opportunity to strike a balance between housing growth
and the protection of heritage assets.
More pertinent perhaps is that there is simply not enough
brownfield sites within the District to meet the objectively
assessed housing needs.
Promote mixed use developments
The proposal would deliver a range of housing to meet
local market and affordable needs, Primary School and
Nursery provision, local shops, services and facilities
including retail, take-away/restaurant and pub uses.
It would also provide for employment uses (B1/B2 Use) as
well as Medical/Health facilities such as a local GP surgery
or dental practice..
Conserve heritage assets in a manner appropriate to
their significance
The character and setting of the nearby heritage assets
will be maintained through the provision of appropriate
landscape buffers. The development would enable the
Council to limit housing growth at its more sensitive historic
centres such as Stratford and Southam.
Manage patterns of growth to make fullest possible use
of public transport, walking and cycling
The site is located alongside the A425 (Leamington Road)
which provides convenient links to the Southam, Warwick,
Leamington and the M40. Public transport, cycle and
walking routes would be incorporated throughout and
to the edges of the development so that no part would
be further than 800m from any other part. This walkable
neighbourhood will be complimented by access to
public transport which will connect to local service and
employment centres.
Take account and support local strategies to improve
health, social and cultural well-being
The development would be of a size that could
accommodate health facilities. Outdoor recreational
activities will be a strong feature of the development and
will encourage residents to walk and cycle within, around
and out of the site into the surrounding countryside.
The social, health and well-being will be strengthened by
the creation of a connected community.
This will include a strong village centre and sport and
recreational ground and importantly a democratic
framework which would ensure that opportunities for
public participation are facilitated.
Southam - Lower Farm policy references
NPPF Core Planning Principle Stratford Upon Avon Local Plan Review (saved policies)
(LPR)
Stratford Upon Avon Core Strategy (CS)
Be Genuinely Plan Led STR1, STR3 Strategic objections 1-8, CS1, CS16
A creative exercise in finding ways to enhance and
improve the places in which people live
STR1, STR3, PR6, EF7, EF9, EF10, DEV1, DEV8, COM3,
COM5, COM7, COM9
CS1, CS2, CS11, CS15, CS16, CS20, CS25, CS27,
CS28, CS29
Drive and support sustainable economic development STR1 CS1, CS16
Secure high quality design DEV1, DEV2, DEV9, DEV11, IMP2, IMP3 CS1, CS10, CS13, CS15, CS17, CS19, CS20, CS22,
CS25, CS27
Consider the different roles and character of different
areas
DEV1, DEV2, DEV11, IMP2, IMP3, EF7, EF9 CS1, CS10, CS11, CS15, CS25
Support a low carbon future PR5, PR6, IMP2, DEV8 CS1, CS2
Conserve and enhance the natural
environment
EF7, EF9, EF10, DEV2 CS1, CS10, CS11, CS13, CS15, CS25
Encourage the effective use of land STR1 CS1, CS16
Promote mixed use developments DEV1, COM3, COM13, COM14, COM17, COM18,
COM19, STR3
CS1, CS15, CS17, CS20, CS22, CS23, CS24, CS25,
CS27, CS28, CS29
Conserve heritage assets EF11, EF13 CS15
Maximise the use of public transport, walking and
cycling
STR1, STR2, DEV1, DEV9, COM7, COM9, COM17,
COM18, SUA.D, IMP4, IMP5, IMP6, IMP7
CS1, CS16M CS28, CS29
Support and improve strategies on health, social and
cultural well-being
DEV6, COM4, COM5, COM9, SUA.D, STY10, IMP4,
IMP5
CS13, CS15, CS27, CS28, CS29
This document has been prepared to support the District
Council’s evidence base which indicates a need to provide
many more homes than originally planned for.
The proposal site would assist in safeguarding Stratford
from unsympathetic levels of housing growth and ensures
the District provides enough homes for its economically
active population. The document sets out the core
planning principles of the NPPF and details how the
proposal site accords to their over arching aims.
Policies of the saved Local Plan and the emerging Core
Strategy have been considered and it is concluded that
the proposal site is aligned to the main policies and in
particular does not prejudice the Council’s spatial vision for
the District.
The proposal site is deliverable and is available and can
proceed should HS2 be constructed. It can assist the
Council with a sound strategy and can deliver a significant
number of market and affordable homes, employment, also
health and social infrastructure and will limit the need for
excessive growth in more sensitive parts of the District.
The alternative may be to direct substantial housing and
employment provision within and to the edge of the urban
area of Stratford.
This will impact on the historic core and the town’s wider
setting.
In summary, the proposals have been positively prepared,
are justified against alternative options, will be effective and
are consistent with national policy.
Southam - Lower Farm Conclusion
Document prepared by David C Higgens RIBA in collaboration with Cerda Planning Ltd, other consultants;
Mayer Brown, Environment and Transport, Philip King and Co. Property Consultants, EC Harris Built asset consultancy, Fenton Holloway, Civil
and Structural Engineering, The Engineering Practice, Services Engineers
c David C Higgens RIBA; June, 2013

More Related Content

What's hot

Revitalizing The Figueroa Corridor
Revitalizing The Figueroa CorridorRevitalizing The Figueroa Corridor
Revitalizing The Figueroa Corridorkvon15
 
Jasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draftJasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draftMatthew Crane
 
PPD 531 Council for Watershed
PPD 531 Council for WatershedPPD 531 Council for Watershed
PPD 531 Council for Watershedkvon15
 
Rowan Park Community Overview
Rowan Park Community OverviewRowan Park Community Overview
Rowan Park Community OverviewBrookfieldRP
 
Clifton Ave Streetscape Report- Spring 2015.compressed
Clifton Ave Streetscape Report- Spring 2015.compressedClifton Ave Streetscape Report- Spring 2015.compressed
Clifton Ave Streetscape Report- Spring 2015.compressedJake Henderson
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014onthewight
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayToronto Public Consultation Unit
 
PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]Michael Walton
 
Water Works: A future destination park on the Mississippi River's only true w...
Water Works: A future destination park on the Mississippi River's only true w...Water Works: A future destination park on the Mississippi River's only true w...
Water Works: A future destination park on the Mississippi River's only true w...Minneapolis Parks Foundation
 
Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017Minneapolis Parks Foundation
 
Feasibility Report - CREDM
Feasibility Report - CREDMFeasibility Report - CREDM
Feasibility Report - CREDMWilliam Grogan
 
Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...
Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...
Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...KatthyLucas2100
 
Walk on Wall
Walk on Wall Walk on Wall
Walk on Wall kvon15
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front RevitalisationVitastaRaina
 

What's hot (20)

Commercial strip4.29.13
Commercial strip4.29.13Commercial strip4.29.13
Commercial strip4.29.13
 
Revitalizing The Figueroa Corridor
Revitalizing The Figueroa CorridorRevitalizing The Figueroa Corridor
Revitalizing The Figueroa Corridor
 
Jasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draftJasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draft
 
New York's Next Great Waterfront Park - Urban Design
New York's Next Great Waterfront Park - Urban DesignNew York's Next Great Waterfront Park - Urban Design
New York's Next Great Waterfront Park - Urban Design
 
PPD 531 Council for Watershed
PPD 531 Council for WatershedPPD 531 Council for Watershed
PPD 531 Council for Watershed
 
Rowan Park Community Overview
Rowan Park Community OverviewRowan Park Community Overview
Rowan Park Community Overview
 
Clifton Ave Streetscape Report- Spring 2015.compressed
Clifton Ave Streetscape Report- Spring 2015.compressedClifton Ave Streetscape Report- Spring 2015.compressed
Clifton Ave Streetscape Report- Spring 2015.compressed
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner Expressway
 
PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]
 
The Cermak/Blue Island Sustainable Streetscape
The Cermak/Blue Island Sustainable StreetscapeThe Cermak/Blue Island Sustainable Streetscape
The Cermak/Blue Island Sustainable Streetscape
 
Water Works: A future destination park on the Mississippi River's only true w...
Water Works: A future destination park on the Mississippi River's only true w...Water Works: A future destination park on the Mississippi River's only true w...
Water Works: A future destination park on the Mississippi River's only true w...
 
Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017
 
Feasibility Report - CREDM
Feasibility Report - CREDMFeasibility Report - CREDM
Feasibility Report - CREDM
 
130423 pubmtgppt2
130423 pubmtgppt2130423 pubmtgppt2
130423 pubmtgppt2
 
Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...
Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...
Waterfront Master Planning | Urban Waterfronts and Marinas Services | Moffatt...
 
APWA mid atlantic awards
APWA mid atlantic awardsAPWA mid atlantic awards
APWA mid atlantic awards
 
Beaufort-Sector1-Charrette-DrawingsBooklet
Beaufort-Sector1-Charrette-DrawingsBookletBeaufort-Sector1-Charrette-DrawingsBooklet
Beaufort-Sector1-Charrette-DrawingsBooklet
 
Walk on Wall
Walk on Wall Walk on Wall
Walk on Wall
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front Revitalisation
 

Viewers also liked

Kuching | Jan-15 | Case Study: Long Lamai Socio-economic Transformation via S...
Kuching | Jan-15 | Case Study: Long Lamai Socio-economic Transformation via S...Kuching | Jan-15 | Case Study: Long Lamai Socio-economic Transformation via S...
Kuching | Jan-15 | Case Study: Long Lamai Socio-economic Transformation via S...Smart Villages
 
Kigali | Nov-14 | Sustainable village energy: off the planning board and into...
Kigali | Nov-14 | Sustainable village energy: off the planning board and into...Kigali | Nov-14 | Sustainable village energy: off the planning board and into...
Kigali | Nov-14 | Sustainable village energy: off the planning board and into...Smart Villages
 
Kuching | Jan-15 | Terrat Village
Kuching | Jan-15 | Terrat VillageKuching | Jan-15 | Terrat Village
Kuching | Jan-15 | Terrat VillageSmart Villages
 
convert the semi-developed villages in modern villages
convert the semi-developed villages in modern villagesconvert the semi-developed villages in modern villages
convert the semi-developed villages in modern villagesrachna juyal
 
Copy of model dairy village
Copy of model dairy villageCopy of model dairy village
Copy of model dairy villageSanjika Perera
 
Dhaka | Aug-15 | The Smart Village Initiative
Dhaka | Aug-15 | The Smart Village InitiativeDhaka | Aug-15 | The Smart Village Initiative
Dhaka | Aug-15 | The Smart Village InitiativeSmart Villages
 
Lavasa Corporate Presentation March 2012
Lavasa Corporate Presentation March 2012Lavasa Corporate Presentation March 2012
Lavasa Corporate Presentation March 2012Lavasa Corporation Ltd
 
Lavasa – Tourism, Retail, Hospitality, City Services & Leisure
Lavasa – Tourism, Retail, Hospitality, City Services & LeisureLavasa – Tourism, Retail, Hospitality, City Services & Leisure
Lavasa – Tourism, Retail, Hospitality, City Services & LeisureLavasa Corporation Ltd
 
Project to develope a model village by 2016 ( eng)
Project to develope a model village by 2016 ( eng)Project to develope a model village by 2016 ( eng)
Project to develope a model village by 2016 ( eng)Nutan Chaturvedi
 
Ankapur a model village in india
Ankapur  a model village in indiaAnkapur  a model village in india
Ankapur a model village in indiaKiran Reddy Paidi
 
Village Study Segment Presentation by Nishant & Sunil
Village Study Segment Presentation by Nishant & SunilVillage Study Segment Presentation by Nishant & Sunil
Village Study Segment Presentation by Nishant & SunilNishant Jaiswal
 

Viewers also liked (20)

Kuching | Jan-15 | Case Study: Long Lamai Socio-economic Transformation via S...
Kuching | Jan-15 | Case Study: Long Lamai Socio-economic Transformation via S...Kuching | Jan-15 | Case Study: Long Lamai Socio-economic Transformation via S...
Kuching | Jan-15 | Case Study: Long Lamai Socio-economic Transformation via S...
 
Kigali | Nov-14 | Sustainable village energy: off the planning board and into...
Kigali | Nov-14 | Sustainable village energy: off the planning board and into...Kigali | Nov-14 | Sustainable village energy: off the planning board and into...
Kigali | Nov-14 | Sustainable village energy: off the planning board and into...
 
Kuching | Jan-15 | Terrat Village
Kuching | Jan-15 | Terrat VillageKuching | Jan-15 | Terrat Village
Kuching | Jan-15 | Terrat Village
 
convert the semi-developed villages in modern villages
convert the semi-developed villages in modern villagesconvert the semi-developed villages in modern villages
convert the semi-developed villages in modern villages
 
Copy of model dairy village
Copy of model dairy villageCopy of model dairy village
Copy of model dairy village
 
JOSÉ BASÍLIO SIMÕES - Presidente da ISA – Intelligent Sensing Anywhere
JOSÉ BASÍLIO SIMÕES - Presidente da ISA – Intelligent Sensing AnywhereJOSÉ BASÍLIO SIMÕES - Presidente da ISA – Intelligent Sensing Anywhere
JOSÉ BASÍLIO SIMÕES - Presidente da ISA – Intelligent Sensing Anywhere
 
Model village
Model villageModel village
Model village
 
Dhaka | Aug-15 | The Smart Village Initiative
Dhaka | Aug-15 | The Smart Village InitiativeDhaka | Aug-15 | The Smart Village Initiative
Dhaka | Aug-15 | The Smart Village Initiative
 
Lavasa Corporate Presentation March 2012
Lavasa Corporate Presentation March 2012Lavasa Corporate Presentation March 2012
Lavasa Corporate Presentation March 2012
 
Lavasa – Tourism, Retail, Hospitality, City Services & Leisure
Lavasa – Tourism, Retail, Hospitality, City Services & LeisureLavasa – Tourism, Retail, Hospitality, City Services & Leisure
Lavasa – Tourism, Retail, Hospitality, City Services & Leisure
 
Project to develope a model village by 2016 ( eng)
Project to develope a model village by 2016 ( eng)Project to develope a model village by 2016 ( eng)
Project to develope a model village by 2016 ( eng)
 
Green village Bali
Green village Bali Green village Bali
Green village Bali
 
Lavasa - India's Planned Hill City
Lavasa - India's Planned Hill CityLavasa - India's Planned Hill City
Lavasa - India's Planned Hill City
 
MY DREAM VILLAGE
MY DREAM VILLAGEMY DREAM VILLAGE
MY DREAM VILLAGE
 
Ankapur a model village in india
Ankapur  a model village in indiaAnkapur  a model village in india
Ankapur a model village in india
 
Smart Village
Smart VillageSmart Village
Smart Village
 
ideal village
ideal villageideal village
ideal village
 
Village Visit
Village VisitVillage Visit
Village Visit
 
Case study on village devp.
Case study on village devp.Case study on village devp.
Case study on village devp.
 
Village Study Segment Presentation by Nishant & Sunil
Village Study Segment Presentation by Nishant & SunilVillage Study Segment Presentation by Nishant & Sunil
Village Study Segment Presentation by Nishant & Sunil
 

Similar to feb2014 3

Wellesley Application Summary Brochure
Wellesley Application Summary BrochureWellesley Application Summary Brochure
Wellesley Application Summary BrochureKurt Mueller
 
Simran deo- architectural conservation- neighbourhood design and planning
Simran deo- architectural conservation- neighbourhood design and planningSimran deo- architectural conservation- neighbourhood design and planning
Simran deo- architectural conservation- neighbourhood design and planningsimrandeo3
 
Ogilvie ldn 1 12 pt text t5
Ogilvie ldn 1 12 pt text t5Ogilvie ldn 1 12 pt text t5
Ogilvie ldn 1 12 pt text t5elogilvie
 
Trial for online
Trial for onlineTrial for online
Trial for onlineelogilvie
 
Strategic plan poster final
Strategic plan poster finalStrategic plan poster final
Strategic plan poster finalVanessa Baratta
 
Fnbe march’15 enbe
Fnbe march’15 enbeFnbe march’15 enbe
Fnbe march’15 enbe温 庄壁
 
Urban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysTim Hays
 
FNBE March’15 ENBE.pdf
FNBE March’15 ENBE.pdfFNBE March’15 ENBE.pdf
FNBE March’15 ENBE.pdf温 庄壁
 
Ydf nhp-presentation-v2
Ydf nhp-presentation-v2Ydf nhp-presentation-v2
Ydf nhp-presentation-v2Peter Tipton
 
HUNTERS POINT SOUTH_PROJECT_
HUNTERS POINT SOUTH_PROJECT_HUNTERS POINT SOUTH_PROJECT_
HUNTERS POINT SOUTH_PROJECT_Christian Gabriel
 
Far(m)ore Project_DRP Profile
Far(m)ore Project_DRP ProfileFar(m)ore Project_DRP Profile
Far(m)ore Project_DRP ProfileGaurav_Sardana
 
Meanin of urban Population Density
Meanin of urban Population DensityMeanin of urban Population Density
Meanin of urban Population DensityNaasir Usmaan
 
Eco Innovation District Summary
Eco Innovation District SummaryEco Innovation District Summary
Eco Innovation District SummaryJamie Granger
 
Transportation Movement System
Transportation Movement SystemTransportation Movement System
Transportation Movement SystemShayne Galo
 
Improve kpmb+big booklet
Improve kpmb+big bookletImprove kpmb+big booklet
Improve kpmb+big bookletGardinerEast
 
Kaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn Fulton
 
Gateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.OdoguGateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.OdoguTEGA ODOGU
 
Old Oak and Park Royal Development Corporation: Community Local Plan update
Old Oak and Park Royal Development Corporation: Community Local Plan updateOld Oak and Park Royal Development Corporation: Community Local Plan update
Old Oak and Park Royal Development Corporation: Community Local Plan updateAlexandra Dobson
 
EIA Project - Presentation
EIA Project - PresentationEIA Project - Presentation
EIA Project - PresentationEmma Syrat
 

Similar to feb2014 3 (20)

Wellesley Application Summary Brochure
Wellesley Application Summary BrochureWellesley Application Summary Brochure
Wellesley Application Summary Brochure
 
Simran deo- architectural conservation- neighbourhood design and planning
Simran deo- architectural conservation- neighbourhood design and planningSimran deo- architectural conservation- neighbourhood design and planning
Simran deo- architectural conservation- neighbourhood design and planning
 
Ogilvie ldn 1 12 pt text t5
Ogilvie ldn 1 12 pt text t5Ogilvie ldn 1 12 pt text t5
Ogilvie ldn 1 12 pt text t5
 
Trial for online
Trial for onlineTrial for online
Trial for online
 
Strategic plan poster final
Strategic plan poster finalStrategic plan poster final
Strategic plan poster final
 
Fnbe march’15 enbe
Fnbe march’15 enbeFnbe march’15 enbe
Fnbe march’15 enbe
 
Urban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim Hays
 
FNBE March’15 ENBE.pdf
FNBE March’15 ENBE.pdfFNBE March’15 ENBE.pdf
FNBE March’15 ENBE.pdf
 
Ydf nhp-presentation-v2
Ydf nhp-presentation-v2Ydf nhp-presentation-v2
Ydf nhp-presentation-v2
 
HUNTERS POINT SOUTH_PROJECT_
HUNTERS POINT SOUTH_PROJECT_HUNTERS POINT SOUTH_PROJECT_
HUNTERS POINT SOUTH_PROJECT_
 
Far(m)ore Project_DRP Profile
Far(m)ore Project_DRP ProfileFar(m)ore Project_DRP Profile
Far(m)ore Project_DRP Profile
 
Meanin of urban Population Density
Meanin of urban Population DensityMeanin of urban Population Density
Meanin of urban Population Density
 
Eco Innovation District Summary
Eco Innovation District SummaryEco Innovation District Summary
Eco Innovation District Summary
 
Matrix
MatrixMatrix
Matrix
 
Transportation Movement System
Transportation Movement SystemTransportation Movement System
Transportation Movement System
 
Improve kpmb+big booklet
Improve kpmb+big bookletImprove kpmb+big booklet
Improve kpmb+big booklet
 
Kaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_Portfolio
 
Gateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.OdoguGateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.Odogu
 
Old Oak and Park Royal Development Corporation: Community Local Plan update
Old Oak and Park Royal Development Corporation: Community Local Plan updateOld Oak and Park Royal Development Corporation: Community Local Plan update
Old Oak and Park Royal Development Corporation: Community Local Plan update
 
EIA Project - Presentation
EIA Project - PresentationEIA Project - Presentation
EIA Project - Presentation
 

feb2014 3

  • 1. STONEYTHORPE DEVELOPMENT Co. and THE DARLING FAMILY TRUST Present promotional Document No2 (February 2014) For a SUSTAINABLE VILLAGE DEVELOPMENT at LOWER FARM, STONEYTHORPE, nr SOUTHAM
  • 2. Introduction The emerging spatial strategy faces the challenge of delivering more homes and greater employment opportunities whilst protecting the historic areas of the District. The evidence indicates a need to provide many more homes than originally planned for in order to meet the requirements of an economically active population. With such a historically important urban centre and the predominately rural character of the District, the challenge to address the shortage of market and affordable homes requires innovative thinking and bold decision-taking. The proposed settlement at Lower Farm, Stoneythorpe is located next to a significant employment site, and is well connected by the local and strategic highway network. Delivering a sustainable community here offers the District an opportunity to meet a significant portion of its housing requirement. In doing so, the inherent pressure of expanding the historic centre of Stratford is minimised. The burden of growth on outlying historic and sustainable rural settlements will be reduced whilst still accommodating growth to meet local need and to sustain businesses, schools and local services. Both the emerging spatial strategy and the core planning principles of the National Planning Policy Framework have been considered in bringing the site forward for your consideration. The site is aligned with both local and national planning policy objectives and is considered a viable and developable development fit for inclusion within the Council’s emerging plans. These abstract images are taken from local villages and show the intimacy and density of the settlement and the resultant grain. These sample images attempt to show the variation of typologies that may be applied through an agreed design code.
  • 3. PROPOSAL FOR NEW ECO-FRIENDLY SUSTAINABLE VILLAGE DEVELOPMENT AT STONEYTHORPE Our goal is to invest in the creation of a sustainable, extremely energy efficient, environmentally friendly village community of the future. Blending truly innovative use of the latest technologies and materials with traditional community values for people of all ages, cultures and aspirations. Following the direction of other estates such as the Duchy of Cornwall, Calthorpe Estate, Bourneville Village Trust and on a smaller scale and local, the Overbury Estate. The essence of a vibrant community is one of “live, work and play” ones where the public realm and community facilities are as important as the home itself. A Blueprint Village of the future. Jim Darling, David Darling CBE The proposed settlement will sit between the existing slopes framed by the swales and trees. Sustained by the products of the elements within the site and the adjoining environs it will be planned to accommodate a diverse community and encourage similar diversity for the ecological habitat that becomes it’s base.
  • 4. Creating a walkable neighbourhood is a Key objective in this proposal. All key services and facilities such as the school, shops and leisure will be within a 5 minute walk of all homes.. This will help to generate a pattern that will reinforce community through personal contact and discourage car use. It will encourage a modal shift from the private car to more sustainable means of transport. The quality of the routes is a major factor, the roads and lanes will satisfy functional criteria although there will be an underlying emphaisis towards the pedestrian, dog-walker, jogger and cyclist etc. The beneficial experience of these and similar groups and the connection with the diverse environment that will surround the settlement typifies the aspirations for this proposal. Aspirations for Innovation, Sustainability and Vision
  • 5. The use of materials indigenous to the site is a priority and design will be informed by the use of materials that are sourced as locally as possible. If materials rising from the site are limited in availability then they will be used in central and communal areas, in a framework of structural and enclosing elements for walls and retaining structures. This approach will distribute the indigenous materials across the site for the benefit of everyone who can experience the public realm in Stoneythorpe and will create a locally distinctive character. Using ‘Lanes’ as informal routes will be a key element in the Design Code that will be developed with the Local Authority. A hierarchy of streets with an emphasis on creating shared surfaces of indeterminate width (varying but having a minimum dimension) and not necessarily having a pavement for all of its length. It will create one zone for people, cars, bikes to meet and integrate. The design detail will discourage the intrusion of the large lorries. The Estate Management Company will have the facility to accept deliveries and distribute around the site. Houses facing the village green are part of the central settlement area nd therefore densely organised and having an intimate relationship with the street/ lane/ footpath. The front elevation is close up to the back of pavement or separated by a shallow garden area with railings On the outer lying areas of the development the densities are generally reduced and the plot ratios are larger. This gives the opportunity for larger plots altough there will be greater density and lower values in the ‘Mews’ style courts withinh these blocks or parcels.
  • 6. Context, Connections and Linkages The network of existing routes across the site includes paths/ lanes suitable for cycling that will link to the new cycle paths that will be laid out over the adjacent landfill site. As well as connecting the sporting use to the settlement the routes will be extended to the existing public rights of way that can link to Southam, Ufton and the Grand Union Canal Walk along the towpath near Bascote. This is a network that connects to Leamington Spa and to the Centenary Way. The routes over the settlement will connect with the areas surrounding woodland. The bridle path that surrounds the site will be capable of giving access to visitors and emergency vehicles across the site. B4552 TOWARDS HARBURY, THE M43 AND BANBURY
  • 7. OLYMPIC LEGACY One of the first initiatives driving this proposal was to integrate a sporting legacy from the recent London Olympics. By making maximum use of the adjacent Biffa landfill site which is currently being remediated the Trust believes that a mixed woodland that will provide renewable fuel for all of the dwellings and commercial and community accommodation. In addition a cycle trail can be designed to create a rugged competition course that can be varied to suit different ages and abilities. The tracks will be integrated into the settlement and extended to tie into the established public footpath network. In line with the Governments aspirations to promote recovering energy from waste, there is scope for the masterplan development to incorporate energy from waste. The proposed development is adjacent to Biffa waste management site in it’s final stages and therefore the integration of a “Energy from waste” facility to provide either heating and/or electricity (via “Biogas” driven Combined heat and power plant) will be explored. This will be a key element of an overall sustainable development by not only reducing the development’s reliance on valuable fossil fuels, but also a better environmental solution by reducing the amount of waste to landfill. Geoff Neal, Director, THE ENGINEERING PRACTICE Environmental Service Engineers The development will involve remodeling of the existing ground to provide community and recreation areas. These excavations together with those associated with construction will result in a significant quantity of material. It is intended to optimize the reuse of these arisings on the site. The geology of the site is in the Blue Lias formation and is characterized by alternate band of argillaceous limestone and calcareous clays or shales below the top soils. The limestone bands are thin and easily excavated. The separated components can be used for: • Stone for walling in the landscape. • Crushed to provide road base and stone for SUDS drainage. • Filling for gabions and crib wall for retaining walls. • Mass fill to form banks and landscaped areas. • Top soil for landscaping etc. The masterplan will incorporate the concept of all arising excavated material being retained on site with the most efficient use of the various components. This will minimize the import of material thereby reducing transport impact and quarrying impacts elsewhere. Richard Fenton, Director; FENTON HOLLOWAY, Civil Engineers, Structural Engineers and Innovators A452 TOWARDS SOUTHAM BIFFA LANDFILL SITE
  • 8. Transport The development would be accessible by a range on non-car travel modes, there being existing or planned pedestrian and cycle links providing connectivity to Southam and other local settlements. The site is already located on a bus route which would be brought into the heart of the development, providing excellent access to surrounding centres. The scale of the proposal considered as a whole will comfortably support improved bus provision. Access to the rail network would be provided by the frequent bus connections to Leamington, with the development improving the viability of a new station to serve the local area near Deppers Bridge. A mixture of on-site facilities, augmented by existing local and other accessible provision located further afield, means that the development proposals would be highly sustainable in respect of access by non-car travel modes to a wide range of employment, education, retail and leisure opportunities and healthcare services. Following discussions with Warwickshire County Council (WCC), vehicular access to the site will be provided via a single primary access from the A425 via a new roundabout to the east of Codemasters, with a second emergency access, As well as providing appropriate capacity, the proposed junction arrangement has been designed to ensure access to the site can be maintained at times of emergency. The primary access crosses the planned alignment of HS2 where it lies within a green tunnel. HS2 Ltd has advised that the construction of the tunnel will be able to accommodate the access above. The primary access and roundabout junction can be constructed whilst the A425 is temporarily diverted as part of the HS2 works, minimising disruption. MAYER BROWN ; ENVIRONMENT & TRANSPORT Within the site, alternative vehicular links through and around the development will be provided, connecting close to the primary access. As well as dispersing traffic and providing for emergency and refuse access, this will also facilitate the provision of a circular route through the site for bus services. Whilst subject to the undertaking of a detailed Transport Assessment, preliminary studies and discussions with WCC indicate that development traffic generations can be accommodated an the surrounding highway network without the need for any major infrastructure improvements. Noise & Air Quality The noise environment within the site will be primarily influenced by the A425 and HS2. The most sensitive portion of the site in respect of noise and vibration from HS2 is that 100 – 300m into the site where the line enters the cutting. Assessment of traffic data for the A425 indicates that noise levels are not a constraint to development subject to refined mitigation, design and layout. Assessment undertaken to assess the likely effect of traffic pollutants associated with the A425 demonstrates that air quality will not be a significaant constraint to development. Renewables / Technologies The whole of the development will be subject to high design and construction standards exceeding current and planned regulations, providing for high standards of energy and water efficiency. It is planned to build to code level 5 of the Code for Sustainable Homes. The ethos and scale of the development provide for range of options in respect of energy generation on a variety of scales. These range from individual building technologies such as heat pumps, PV, and solar thermal to community heating with CHP, biomass and/or energy from waste. The proposed water attenuation within the site could provide for hydro-electric generation and/or thermal storage, whilst
  • 9. the adjacent Biffa site and limited views from the south lend themselves photo-voltaic (PV) farms. Rain-water harvesting and the re-use of grey water will be considerations within both the micro and macro design of the development. In addition to a local community recycling centre, it is proposed that technologies such as centralised vacuum waste disposal also be explored. Ecology Habitats within the site comprise grassland, trees and hedgerow, water courses (including River Itchen) and seasonally wet areas (reed beds present). Based on the identified habitats, potential species within the site include bats, birds, harvest mice, barn owl, hedgehog, badger, fox, amphibians and reptiles. The ecological significance of the site will be examined further as part of an Extended Phase 1 habitat survey, which will also determine the number and extent of detailed ecological surveys. Ecological considerations have been taken into account during the development of the masterplan. Furthermore, measures to protect and enhance the ecology of the site and surrounding land will be incorporated within the detailed design stages. Arboriculture There are areas of dense hedgerow, trees and woodland within the site. These have been incorporated into the masterplan and will be a key consideration in the formulation of a detailed design. An Arboricultural Assessment will be undertaken for the site to ascertain the value and condition of the hedgerows, trees and woodland. The outcome of the assessment will feed into the development of the masterplan and detailed design. An objective of the scheme will be to significantly enhance the tree and low level vegetation growth and to use this and the ecology as an integral part of the unique development setting. Archaeology The proposed development site does not contain any designated heritage assets such as Scheduled Monuments, Listed Buildings, Battlefields, Parks and Gardens or World Heritage sites. A formal Desk-Based Assessment and Historic Buildings’ Assessment will be prepared to support any future planning application. However, in consideration of the information currently available there are no heritage assets within the site that need to be considered in the formulation of the masterplan. Landscape and Visual Impact Due to local topography and vegetation cover, the site is visually contained within the surrounding landscape. From the north and north-east, the site is generally visually screened by the hedgerow and semi-mature trees that align the A425 and those associated with the copses and parkland around the polo grounds and Stoneythorpe Hall. From the south and south-west, there are limited views into the site. This is due to the existing woodland around the landfill site and the rising land that is the landfill site. From the east, the site is visually contained by the local rolling topography and the semi-mature hedgerows and mature trees within the hedges. From the west, the site is visually screened by boundary hedgerow vegetation and the existing trees and vegetation associated with Lower Farm. Flood Risk and Drainage The majority of the development site is located within what the Environment Agency identifies as being Flood Zone 1, which presents very little risk of flooding. The River Itchen runs through the eastern extents of the site and thus the design has incorporated the river and its flood plains. A flood risk assessment (FRA) will be undertaken in respect of the development proposals to ascertain the risk which may be presented to the development and which the development may pose in respect of increasing any risk of flooding. A sustainable drainage strategy (SuDS) will be formulated whereby innovative engineering is incorporated such that the risk of flooding is minimised. This provides the opportunity through the creation of attenuation and swales to enhance the ecological value of the site. Ground Conditions No detrimental risk of any naturally occurring or man-made potential sources of contamination has been identified within initial site investigation works that have been undertaken. Potential sources of contamination accounted for include ground gases generated from natural strata beneath the site, naturally elevated metal concentrations and reduced quality waste material and leachate from the landfill and recycling centre. Further site investigation will be undertaken as necessary to determine any specific measures needed to be incorporated within the detailed design of the development in consideration of any potential contaminants. HS2 The HS2 rail line crosses the north eastern extents of the site. The current proposals indicate that the line will tunnel beneath the A425 Leamington Road and into the site. Access can be positioned to ensure the alignment of the HS2 has no impact on the development sighting The alignment of the HS2 line has formed a key consideration in the derivation of our plans. Potential mitigation measures will also need to be identified in respect of the impact the rail line may have on potential residents of the development in respect of noise and vibration, again best practice will ensure a development of this nature can be accommodated in proximity to the HS2.
  • 10. The River Itchen runs through the site and is fed by two minor streams/ ditches that do run dry. There is a flood plain or water meadow area identified and this area will be retained as an area to encourage biodiversity and as a re-location area for any flora and fauna that will need protection. The new road will be built on a retaining structure that will hold back the water to form a fish pond. Subject to more detail analysis the available levels should produce a difference in water level capable of driving a water wheel that might be used for producing energy via a hydro-turbine. The Estate Management Company needs to work together with the local authority and utilities companies to enable the adoption of roads and services to a standard of maintenance of repair that is acceptable to the EMC. The desired solution will be more in keeping with the rural vernacular of the location and a more pleasant experience for the user. A New Village Settlement: Densities and Grain At the centre of the village the grain or texture is a close weave. This becomes more open as one moves towards the perimeter. The properties are closely grouped with front walls close to the pavement and the narrowness of the streets emphasised by the solid edge of the block form. This is slowly eroded and broken down as the development distances from the market place. Design devices breakdown the solid continuous street elevations to give a transition to a more open grain as the settlement unfolds. The outer lyoing houses will have the larger plots. The boundary of the settlement will be surrounded by managed woodland and coppicing that will provide renewable energy for the dwellings. DEVELOPMENT OF DENSITY IDEASUSE THE INDIGENOUS LANDSCAPE The water meadow and the swales frame the area identified for the central open space for the settlement. Settting the pattern of densities around the open space and water meadow. The Market Square has narrow fronted shops facing the open space and the central area free for a variety of activities. The 1/1.5 Form Entry (FE) village school will house a nursery and share the open space for sports and activities. Located at the very heart of the settlement the intention is for the school to be a key component in the new community with a strong tie to the countryside. It is envisaged children will have good access to learn about rural issues and their surrounding environment.
  • 11. The perimeter houses face outwards to avoid a ‘back-fence’ situation and encourage engagement in use, supervision and maintenance. Although visitors and service vehicles can access via the perimeter lane the owners can use an inner courtyard arrangement that includes some higher density dwelling blocks to develop a secondary pattern of accommodation that will frame a different macro environment. DEVELOP BUILT-FORM CONCEPTSINTRODUCE OPEN SPACESOpen spaces are developed from the village green and give legibility to the circulation routes. The built-form extends the density concept and distributes the variety of housing product over the settlement. The parcels of development towards the boundary of the settlement will have a reduced density but will have a Mews style of inner courtyards that can offer smaller, lower value products.
  • 12. Variety, Grain and Public Open Spaces The River Itchen runs through the site, within which it is fed by two minor streams. There is an area of flood plain alongside the river and it is proposed to utilse this area for multiple purposes, providing a key element of the drainage strategy for the site, providing a biodiverse ecological habitat and providing a focal point for the development. A retaining structure will be formed across the flood plain to create a large attenuation pond to accommodate run-off water from the development and control downstream flow. Where drainage conditions permit, water may be collected from the pond and pumped to a cistern at high level, from where it can be fed by gravity back down the levels to provide irrigation to public areas of planting and green space. At the point of discharge the retained water may be capable of generating power, whilst the retaining structure itself could provide a crossing point to permit circulation around the site.
  • 13. employment opportunities within the settlement. Shops will sit alongside cafes bars and restaurants to serve the inhabitants of the village, employees from the offices and visitors. The intention is to provide support for start-up businesses through the EMC to encourage young entrepreneurs. Support that will endorse strongly the use of environmentally sustainable practices and of sources as local as possible. The Retail model that is proposed for the Village centre is multi faceted. It will provide an active frontage that will bind the centre of the settlement, bring life interest and employment to the heart of the village. The EMC will encourage new ‘start-up’ businesses with the financial and mentoring assistance that is the legacy from the establishment of Codemasters in 1986 by the Darlings. The shop front however could only be part of the facility with supporting space and resources in the centre of the block being able to accommodate a parallel internet based business from the same location. Indeed for young entrepreneurs the residential accommodation above the shop could be their first home. The aspiration here is to create a situation where specialist retailers can develop national or international markets utilising the internet, but with a street presence that will attract visitors to this village high street. Potential internet activities will be greatly enhanced with high speed broadband connections and expertise available to all village residents/businesses. The following is a Case Study example; A shop in Les jardins d’eini, Autoire, Midi Pyrennes, The Lot, France imports and stocks exotic dried mushrooms from around the world. This facility that would be prohibitively expensive in Paris but with the supporting resources and space the business can have a public presence as well as a national distribution network thanks to the internet. One of the objectives of the Estate Management Company is to manage the adjacent woodland sites and to plant the landfill site with new woodland to produce a new facility of diverse species. This will provide a wide ranging environment for flora and fauna as well as product for coppicing for logs, wood chippings and material for charcoal. The Woodland Trust have agreed to help develop this thinking and Biffa have indicated that our proposals will not prejudice the planned remediation strategy and that tree planting can be accommodated on site in line with our aspirations. Cycling UK have also committed to encouraging the development of a cycling facility that could include woodland tracks and slopes. There would be a particular interest in developing technologies that help cyclists with disabilities. This could be very appropriate with the technological pedigree of the location and building a new facility from effectively a new site. Other employment opportunities will be created in the procurement and the delivery of the construction of the built form. In using local materials compounds and yards will be established on site to train young craftsmen in the use of these materials both in a traditional way and to suit contemporary applications. The vision is for this demand to provide a programme of construction projects and new business ventures that can be nutured from Stoneythorpe. Connections to the local skills market should encorage new jobs and new training opportunities in crafts and skills. These light industrial uses will be sited to the north of the site against the A425 or the edge of HS2 if / when it is confirmed. The village centre will be a mix of modest shops with the flexibility to trade off site, a philosophy matched by other
  • 14. The site is in the single ownership of the Darling family who are committed to delivering a high quality development. The family will establish a Trust and will invest substantial funds in developing infrastructure. Working in partnership with long term development partners, the project would be delivered in accordance with Design Codes agreed in partnership with local stakeholders. There are several examples of this approach, the Duchy of Cornwall, Bourneville Village Trust, the Calthorpe Estate and Port Marine Bristol are some that have been highlighted. In the context of the National Planning Policy Framework, it is considered that the site is available now and is suitable for development in that it offers another option to merely enlarging Stratford and outlying settlements and it comprises land adjacent to a source of employment and a potential source of renewable energy. It is also considered to be achievable within the plan period and is not adversely affected should HS2 be built. Southam - Lower Farm Deliverability
  • 15. Assessment The reason for the delay is that the Core Strategy has to meet the objectively assessed housing needs. The latest evidence which underpins this is the Coventry and Warwickshire Strategic Housing Market Assessment (CWSHMA) which considered the wider housing market area. This document recommended that the objectively assessed housing need for Stratford District over the period 2011- 2031 should lie at 570 dwellings per annum (11,400 over a 20-year period). A further report prepared on behalf of the Council was undertaken by Environmental Resource Management (ERM). This report considered the objectively assessed housing need lay between 10,500 and 10,800. The Council’s own Strategic Housing Market Assessment (SHMA) (Update) ( Jan 2013) objectively assessed the needs for market and affordable housing in the district. The SHMA indicates a housing requirement of 14,500 new dwellings over the plan period (up to 2028). It notes that this figure is based on continuing high levels of in-migration to the district which the Council wishes to limit moving forwards. The Housing Provisions Options Study 2012 Update ( Jan 2013) is a further piece of evidence which informs housing needs. It states that an objective assessment of development needs for housing up to 2028 would fall between 12,000 and 13,000. There is therefore a strong body of evidence that indicates that the Council will need to find additional sites for housing in order to accommodate their objectively assessed housing need; whichever housing requirement figure is used. The aspirations of the Council to limit in-migration is acknowledged, however, the Council must meet its housing needs and must ensure that its strategy for growth does not impede economic growth within both the district and neighbouring authorities. It is recognised that finding locations for the additional homes required will be challenging. The current strategy of limiting growth at Stratford and distributing housing to the outlying service villages and main rural centres aims to safeguard the historic integrity of Stratford. Distributing housing to the outlying settlements has significant merit on sustainability grounds; however these settlements will only be able to accommodate a level of growth commensurate with the infrastructure in place. The latest round of consultation is encouraging and it is evident that the Council is meeting the challenge head on. The new freestanding, sustainable, community-focused settlement outlined in this document offers the Council an opportunity to meet its identified housing needs whilst delivering on its objective of minimising development at Stratford and at the other rural centres. Due to the scale and nature of the proposal, the spatial strategy and strategic objectives of the emerging Core Strategy have been considered, along with the associated evidence base on housing and the policies and objectives of the National Planning Policy Framework (NPPF). In January 2014, Cabinet resolved to extend the plan period so that it will now run from 2011 to 2031. The emerging Stratford-upon-Avon Core Strategy will set out the Council’s spatial strategy for the district. Emerging policies of the Core Strategy will carry greater weight further along the adoption process. Given that additional consultation has since taken place on new proposals and that the Council is currently carrying out a focused consultation on the 2011-2031 housing requirement and strategic site options (Feb/March 2014), the Council have acknowledged that the date for adoption has slipped considerably.
  • 16. In order to assist the local planning authority in considering alternative options for growth it is considered that the 12 Core Planning Principals contained within the NPPF provide an excellent framework to initially appraise the site. Be Genuinely Plan Led The proposed development should be Considered in the context of the Council’s emerging spatial strategy and the need to provide significantly more housing than originally planned for. The Council’s spatial strategy of limiting growth within Stratford and distributing housing to its main Service Centres and local service villages is not comprised by this development. Indeed, the development compliments the spatial strategy and can assist in limiting future growth within Stratford and some of the more sensitive rural settlements. It is anticipated that significant involvement from the community and from local stakeholders including Parish and Ward Councillors would help shape the proposals and to ensure that local issues are addressed from the outset. It is considered therefore that the development does not prejudice the wider strategy for growth within Stratford District and can assist the Council’s need for economic and housing growth. Planning should be a creative exercise in finding ways to enhance and improve in which places people live their lives The site is located next to the locally significant employer, Codemasters. The firm has recently been granted planning permission for extensions which would see employment on site increase from 500 to up to 1,000 jobs. The site also lies next to a former waste disposal site which is currently in the process of being remediated. A recycling centre is located on this site and has the potential for significant growth to assist the Council in achieving its aim to reduce landfill and meeting the challenge of a changing climate. Locating housing adjacent to a significant local employer and alongside the former waste disposal site offers imaginative solutions to both sustainable energy generation and local employment. The development would tie in with the existing business and provide opportunities for IT, financial services and professional and research companies to locate to a pleasant setting, close to regional centres and strategic transport routes. The establishment of a new community would require a democratic framework to be created so to ensure that a community is supported by the necessary social infrastructure. This could be a Trust which would maintain a level of control and ‘sponsorship’ of village centre uses, and provides the bedrock for committee’s tasked to manage sports and social clubs, allotments and other local community enterprises. Pro-actively drive and support sustainable economic development through objectively assessing the housing business and other development needs of an area. There is now a significant body of evidence that indicates the District’s objectively assessed housing need lies between 10,500 and 14,500 homes. Under-providing is not an option and would result in a decline in the number of residents in the district in employment. It is therefore the case that in order to meet the Council’s objectively assessed economic and housing needs additional homes are needed. A new freestanding settlement under single ownership represents an exceptional opportunity for an innovative and exciting response to the challenge. Always seek to secure high quality design. The document sets out the very high quality design intent that would be delivered on this site. A range of innovative technologies are proposed to link in with surrounding sustainable/renewable energy opportunities. The development would be focused on a village centre with the range of traditional shops, services and amenities planned in an organic and diverse manner. It is anticipated that the proposal would include a Primary School and has the potential to provide for new health and community facilities. Design codes would be supported to ensure the vision for the new community would be retained throughout the development of the site. It is expected that the Local Planning Authority and other local stakeholders, including the Parish Council, would be involved in the preparation of the detailed design codes. Assessment The proposed settlement will assist significantly in achieving this by providing the additional housing in a manner that protects and safeguards the historic character of Stratford and ensures that growth in outlying rural centres remains proportionate to their existing size. It also places housing very close to an existing and expanding source of employment and is an opportunity to create a high quality, innovative, sustainable development with a strong community focus.
  • 17. Take account of the different roles and character of different areas The development would still allow for a proportionate and appropriate amount of development to be directed towards urban areas and existing settlements to ensure that there remains an urban focus and that villages and other rural centres remain sustainable in the future. Development would retain existing hedgerows and mature trees and would supplement these with significant new planting. Any proposal would work with the existing topography to ensure that development assimilates successfully into the landscape. Whilst development would represent a change, the landscape is not subject to any specific landscape designation and is not Green Belt. The delivery of homes on this site would safeguard Stratford from excessive growth and would ensure the main rural centres and the local service villages are not over-burdened with housing and the infrastructure and social pressures this can entail. Support the transition to the low carbon future in a changing climate The scale of the development and its location next to a former waste disposal centre provides an opportunity to utilise a range of renewable energy technologies. The mix of uses also allows for energy that has been generated on site to be used throughout the day. There is also the opportunity to quarry building materials from the site as there is a known source of aggregate beneath the ground. This locally sourced material is sustainable and whilst it is unlikely to be used for building homes, its use on walls and within public open space will give a strong sense of character and place. The document sets out the range of technologies that are feasible for use on this scheme. Contribute to conserving and enhancing the natural environment The vision is to create a sustainable place with a working community. Primary Schools, shops, services and facilities would be provided on site and would enable residents to remain car free for much of their day to day needs. The proposed mix of uses also enables local employment thus reducing the necessity for out-commuting. Habitat creation and woodland management would be a key priority under the proposals. The number of homes that are needed within the District is such that the development of greenfield land will be necessary. The construction of a significant portion of the housing requirement in one single location will minimise the impact of the alternative which would see a wider and more dispersed development of greenfield sites. Encourage the effective use of land by re-using land that has been previously developed In order to meet the objectively assessed housing and economic needs for the district the authority will have to release greenfield sites. In order to safeguard the historic integrity of Stratford this site represents a good opportunity to strike a balance between housing growth and the protection of heritage assets. More pertinent perhaps is that there is simply not enough brownfield sites within the District to meet the objectively assessed housing needs. Promote mixed use developments The proposal would deliver a range of housing to meet local market and affordable needs, Primary School and Nursery provision, local shops, services and facilities including retail, take-away/restaurant and pub uses. It would also provide for employment uses (B1/B2 Use) as well as Medical/Health facilities such as a local GP surgery or dental practice.. Conserve heritage assets in a manner appropriate to their significance The character and setting of the nearby heritage assets will be maintained through the provision of appropriate landscape buffers. The development would enable the Council to limit housing growth at its more sensitive historic centres such as Stratford and Southam. Manage patterns of growth to make fullest possible use of public transport, walking and cycling The site is located alongside the A425 (Leamington Road) which provides convenient links to the Southam, Warwick, Leamington and the M40. Public transport, cycle and walking routes would be incorporated throughout and to the edges of the development so that no part would be further than 800m from any other part. This walkable neighbourhood will be complimented by access to public transport which will connect to local service and employment centres. Take account and support local strategies to improve health, social and cultural well-being The development would be of a size that could accommodate health facilities. Outdoor recreational activities will be a strong feature of the development and will encourage residents to walk and cycle within, around and out of the site into the surrounding countryside. The social, health and well-being will be strengthened by the creation of a connected community. This will include a strong village centre and sport and recreational ground and importantly a democratic framework which would ensure that opportunities for public participation are facilitated.
  • 18. Southam - Lower Farm policy references NPPF Core Planning Principle Stratford Upon Avon Local Plan Review (saved policies) (LPR) Stratford Upon Avon Core Strategy (CS) Be Genuinely Plan Led STR1, STR3 Strategic objections 1-8, CS1, CS16 A creative exercise in finding ways to enhance and improve the places in which people live STR1, STR3, PR6, EF7, EF9, EF10, DEV1, DEV8, COM3, COM5, COM7, COM9 CS1, CS2, CS11, CS15, CS16, CS20, CS25, CS27, CS28, CS29 Drive and support sustainable economic development STR1 CS1, CS16 Secure high quality design DEV1, DEV2, DEV9, DEV11, IMP2, IMP3 CS1, CS10, CS13, CS15, CS17, CS19, CS20, CS22, CS25, CS27 Consider the different roles and character of different areas DEV1, DEV2, DEV11, IMP2, IMP3, EF7, EF9 CS1, CS10, CS11, CS15, CS25 Support a low carbon future PR5, PR6, IMP2, DEV8 CS1, CS2 Conserve and enhance the natural environment EF7, EF9, EF10, DEV2 CS1, CS10, CS11, CS13, CS15, CS25 Encourage the effective use of land STR1 CS1, CS16 Promote mixed use developments DEV1, COM3, COM13, COM14, COM17, COM18, COM19, STR3 CS1, CS15, CS17, CS20, CS22, CS23, CS24, CS25, CS27, CS28, CS29 Conserve heritage assets EF11, EF13 CS15 Maximise the use of public transport, walking and cycling STR1, STR2, DEV1, DEV9, COM7, COM9, COM17, COM18, SUA.D, IMP4, IMP5, IMP6, IMP7 CS1, CS16M CS28, CS29 Support and improve strategies on health, social and cultural well-being DEV6, COM4, COM5, COM9, SUA.D, STY10, IMP4, IMP5 CS13, CS15, CS27, CS28, CS29
  • 19. This document has been prepared to support the District Council’s evidence base which indicates a need to provide many more homes than originally planned for. The proposal site would assist in safeguarding Stratford from unsympathetic levels of housing growth and ensures the District provides enough homes for its economically active population. The document sets out the core planning principles of the NPPF and details how the proposal site accords to their over arching aims. Policies of the saved Local Plan and the emerging Core Strategy have been considered and it is concluded that the proposal site is aligned to the main policies and in particular does not prejudice the Council’s spatial vision for the District. The proposal site is deliverable and is available and can proceed should HS2 be constructed. It can assist the Council with a sound strategy and can deliver a significant number of market and affordable homes, employment, also health and social infrastructure and will limit the need for excessive growth in more sensitive parts of the District. The alternative may be to direct substantial housing and employment provision within and to the edge of the urban area of Stratford. This will impact on the historic core and the town’s wider setting. In summary, the proposals have been positively prepared, are justified against alternative options, will be effective and are consistent with national policy. Southam - Lower Farm Conclusion
  • 20. Document prepared by David C Higgens RIBA in collaboration with Cerda Planning Ltd, other consultants; Mayer Brown, Environment and Transport, Philip King and Co. Property Consultants, EC Harris Built asset consultancy, Fenton Holloway, Civil and Structural Engineering, The Engineering Practice, Services Engineers c David C Higgens RIBA; June, 2013