TVA



Kelsey Herbert and Madison
          Temple
Purpose of the TVA
Improve navigation in
Tennessee River

Control destructive
Flood waters

Electricity generation
Accomplishments of the TVA

 Includes three nuclear power plants,
  11 coal-fired plants, 29 hydroelectric
  dams, five combustion-turbine
  plants and about 17000 miles of
  transmission lines
 Electricity produced now reaches
  over 8 million residents of the
  Tennessee Valley
 Largest public power system in the
  US
Leaders of the Tva
 Chairman Bill Baxter


 Director Skila
 Harris



 David Lilienthal
Legacy of the TVA
 Succeeded
 provide electricity
 increase water supply
 provide recreational lakes
 create a series of lakes that
form one long navigation channel
from Knoxville, Tennessee, to
Paducah, Kentucky
 stores excess water in flood season
and lowers flood levels

New Deal

  • 1.
    TVA Kelsey Herbert andMadison Temple
  • 2.
    Purpose of theTVA Improve navigation in Tennessee River Control destructive Flood waters Electricity generation
  • 3.
    Accomplishments of theTVA  Includes three nuclear power plants, 11 coal-fired plants, 29 hydroelectric dams, five combustion-turbine plants and about 17000 miles of transmission lines  Electricity produced now reaches over 8 million residents of the Tennessee Valley  Largest public power system in the US
  • 4.
    Leaders of theTva  Chairman Bill Baxter  Director Skila Harris  David Lilienthal
  • 5.
    Legacy of theTVA  Succeeded  provide electricity  increase water supply  provide recreational lakes  create a series of lakes that form one long navigation channel from Knoxville, Tennessee, to Paducah, Kentucky  stores excess water in flood season and lowers flood levels