Delia Edejer
148 N Starboard drive Gilbert, AZ 85234 tel hm: (480) 264-9833 cell: (415) 264-0695 work: (480) 437-
6615
_____________________________________________________________________________________
____
PROFILE
• Over 30 years experience in Management Information Systems using Structured
Development Methodology.
• Proficient in all mainframe development, testing utilities, and design methodologies.
• Solid background in mainframe development both online and batch. Four years of WEB
development accessing DB2 data from mainframe using OS390 server and NET.DATA.
• Over 7 years experience developing programs in a LAN environment and Microsoft NT
and 4 years developing front-end system using scripting (HTML, and _JAVASCRIPT).
• Hands-on development in Websphere and J2EE.
• Strongest skills in the Business Analysis, Systems Design and Construction Phases of the
Systems Development Life Cycle.
• Very effective Project Lead/Manager - All projects handled were on time and no major
defects found
• Worked as an Independent Contractor in the San Francisco Bay area for over 10 years
• Excellent oral and written communication skills.
TECHNICAL SKILLS SUMMARY
HADWARE:AMDHAL, IBM mainframe, FACOM, IBM PC and compatibles OPERATING
SYSTEM:MVS/XA/ESA, VM, DOS/VSE, WINDOWS, WINDOWS NT, PC DOS, UNIX,
Net.DataTELECOMMUNICATION SYSTEM:XCOM, CICS, PBCF, LU 6.2 PROTOCOL, INTERNET,
EDIT, NET.DATALANGUAGES:COBOL II, SQL, IBM ASSEMBLER, SAS, PL/1, C, C++,
FORTRAN, LU 6.2 PROTOCOL, HTML, _JavaScript, shell programming, ASPEDITORS:TSO/ISPF,
MICROSOFT WORD, MICROSOFT EXCEL, PROFS, VM EDIT, TELON, BMS SCREEN EDITOR,
UNIX/ISPFFILE ACCESS/DATABASES:DB2, VSAM, DAM, IMS, IDMS, QSAMSOFTWARE
TOOLS:CICS (command and macro level), DB2, QMF, FILEAID, FILEAID/DB2, XPEDITER, MVS
utilities, IDCAMS, SAS, MVS JCL, DOS JCL, MICROSOFT WINDOWS, WORD, EXCEL, POWER-
POINT, DESIGN/1, PBCF, LOTUS 1-2-3, E-MAIL, ENDEVOR, IOF, COMPAREX, SAR, SPUFI,
NDM, IEW, BRACKETS, WordPerfect, LIBRARIAN, SYNCSORT, INTERTEST, PANVALET,
ABEND-AID, DUMPMSTR, NET-DATA, RACF, SDSF, Project 2000APPLICATION
PROGRAMMING:Financial System, Billing System, International Money Market, Commercial Loan
System, Manufacturing, EDI, Order Entry System, Revenue Accounting, Delivery System, Domestic
Banking, WEB Application SOFTWARE PROGRAMMING:Enhancement to CICS terminal and file
control programs. Modules for DB2 XPERT (DB2 Editor). CICS system programmer supporting Online
Banking
EDUCATION
Bachelor of Science in Electronics Engineering
University of Santo Tomas
Republic of the Philippines
EMPLOYMENT HISTORY
Jan, 2004 to Present Application Systems Engineer 5 Wells Fargo Services Tempe, AZ Member of KR-
Collections Support group. Customize and support CACS vendor product used by collections group. The
application’s front end uses WEBSPHERE, and VSAM files are updated in batch after end of day. Design,
code, and test interfaces and reports as requested by users. Uses COBOL II, INSYNC, FILEAID, VSAM,
EASYTRIEVE, IBM utilities (IDCAMS, IEBGENER, etc) in creating test data. Create JCL for all testing
required. Create production procedures for production install.
Dec, 2000 to August 12, 2003 Sr. Software developer Inovant Corp (VISA) Foster City, CA Treasury
Application (VFTS) VISA Travel Services Center Application (VTSC) Support Treasury Applications
running in multi-platform environment - mainframe and client server. As a senior team member, I
analyzed business requirements and presented systems solutions to clients. I have estimated work efforts
and submitted Statement of Work (SOW) document, created project schedule using Project 2000, created
high level and detailed level design documents, and code and tested the complex programs in the project
while monitoring project status. Application supported runs in CICS and batch with data residing in DB2
tables and VSAM files. Client server programs are written in Visual Basic Support VTSC applications
running in CICS and batch system using VSAM files and remotely accessing DB2 tables from other
applications. VTSC is a global application being access online by users all over the world. Serve as
Project Lead for Treasury System Application. Mainframe programs were written in COBOL II.
May, 1997 to Dec, 2000Technical Architect Pacific Bell - San Ramon Valley, CA Receivable
Accounting Project (RAP) Develop the most complex programs for the project. Responsible for mentoring
3 newly hired programmers. Researched technical solutions for problems involving performance,
accessibility, external interfaces, and other system problems involving the application supported.
Participated in the development of a new WEB-base Application for the Corporate Accounting Group
using Net.Data, DB2, HTML, and _JavaScript running in UNIX operating system. Server used is IBM
OS390. Written new SQL queries, source codes in HTML, _JavaScript, and EXCEL to create WEB
reports in a client-server environment using OS390 server and DB2 database kept in an MVS mainframe
where programs were written in COBOL II. Re-engineered and coded the general edit program tabulating
edit rules making it more maintainable in the future, and making it modular for re-useability and easy
program update. New programs have better performance, maintainability and re-usability.
October, 1996 to March 1997Independent Contractor GAP, Inc - San Mateo, CA Hired as an
independent contractor to write several CICS/COBOL II programs interfacing with EDI. Programs were
written on time and users were very satisfied.
Jan, 1996 to August, 1996Independent Contractor Pacific Bell - San Ramon Valley, CA PBCOM
Project - Requirement Phase Worked with Andersen Group in designing a multi-platform Billing System
for PBCOM project. Participated in the Reverse Engineering of Core Billing System and the creation of
interface to a new Revenue Accounting System which were to reside in a SAP platform. Used Design/1
and Microsoft Access to create functional design documents, detailed design, and data flowcharts.
July, 1995 to Jan, 1996Independent Contractor Clorox Corporation - Oakland, CA Order Entry System
Maintain Order Entry and Logistics Systems using CICS, COBOL II, and DB2 System. Created
functional design documents, high level and detailed design, and coded and tested CICS programs to
enhance several online programs. Also added new online functions for users.
March, 1995 to July, 1995Independent Contractor Safeway Corporation - Oakland, CA Data
Conversion Team Worked with data conversion team to convert old data into DB2 tables. Created several
SAS programs to perform file validation.
Dec, 1991 to March, 1995Independent Contractor Pacific Bell, San Ramon Valley, CA Billing Project
Phase II - BPP2 (ADR Team) Worked with ADR team to maintain BPP2 programs. Participated in the
development of programs in several releases. Programs were written in COBOL II, and used DB2
databases. Regional Master File and Adjustment Group Worked with RM and AI group to maintain
COBOL II programs within CORE Billing System. Participated in all major releases. Responsible for the
most complex programs in the Adjustment process and gained expertise with the Pacific Bell’s Core
Billing System. Created high level, and detailed design documents as part of SDLC requirement.
Participated in external interface meetings to determine interface requirements for several project
involving application supported. Created cost estimates, project plans, and submitted deliverables to
Software Integration team as part of overall billing project. Participated in Quality Assurance meetings to
discuss testing problems with interfaces.
March, 1990 to Dec, 1991Independent Contractor IBM Corporation - San Jose, CA QMF Group
Participated in testing QMF 3.0 and QMF 3.1. Wrote several online and interactive PC programs to test
QMF responses.
Dec, 1989 to March, 1990Senior Programmer Analyst AMD Corporation - Santa Clara, CA Chief
Designer and Team Lead for the design & construction phases of the Financial System project. Presented
a multi-platform design utilizing XCOM software, PC front-end user interface, CICS, COBOL II, and
DB2 centralized database.
March, 1989 to Dec, 1989Independent Contractor ROLM Corporation - Santa Clara, CA Order Entry
System Participated in the re-write of the Order Entry System with online interface to the Plant Processing
System. Designed and coded the COBOL / CICS interface that handled the internal queueing from Order
Entry System to the Plant Scheduling Processes. Help resolved deadlock timeout using CICS TRACE and
transaction dumps. Suggested program improvements to avoid deadlock.
Sept, 1988 to March, 1989Senior Programmer Analyst XA Systems - San Jose, CA Member of the team
that created DB2/Xpert product. Written several programs in C as part of the Screen Manager. Programs
interface with TSO/ISPF.
Oct, 1975 to February, 1987 Bank of Montreal - Toronto, Canada Systems Support Analyst to Systems
Specialist Applications: International Money Market Domestic banking CICS Systems Software Group
Systems Technical Support Group Accomplishments: Systems Specialist reporting to the Department
manager for the International Money Market Application. Responsible for the system solutions, and data
integrity for the application supported. Act as design liaison to the user client group. Participated in the
evaluation of vendor products and tools and was involved in architectural designs of the Applications
supported by the department. Served as a technical resource in numerous Joint Application Design
meetings with the user groups and business analysts during Business Requirements Phase. Presented IT
Project Plans to the executive steering committee meetings. All projects handled were on-time and within
budget. In-charge of 9 designers and programmers maintaining both online and batch systems –
programs were written in COBOL II and Assembler. I Have worked my way from Data Control Analysis,
Technical Support Analysis, Systems development, to Systems Specialist recommending systems solutions
for the International Banking and Treasury Systems Application.

My-resume

  • 1.
    Delia Edejer 148 NStarboard drive Gilbert, AZ 85234 tel hm: (480) 264-9833 cell: (415) 264-0695 work: (480) 437- 6615 _____________________________________________________________________________________ ____ PROFILE • Over 30 years experience in Management Information Systems using Structured Development Methodology. • Proficient in all mainframe development, testing utilities, and design methodologies. • Solid background in mainframe development both online and batch. Four years of WEB development accessing DB2 data from mainframe using OS390 server and NET.DATA. • Over 7 years experience developing programs in a LAN environment and Microsoft NT and 4 years developing front-end system using scripting (HTML, and _JAVASCRIPT). • Hands-on development in Websphere and J2EE. • Strongest skills in the Business Analysis, Systems Design and Construction Phases of the Systems Development Life Cycle. • Very effective Project Lead/Manager - All projects handled were on time and no major defects found • Worked as an Independent Contractor in the San Francisco Bay area for over 10 years • Excellent oral and written communication skills. TECHNICAL SKILLS SUMMARY HADWARE:AMDHAL, IBM mainframe, FACOM, IBM PC and compatibles OPERATING SYSTEM:MVS/XA/ESA, VM, DOS/VSE, WINDOWS, WINDOWS NT, PC DOS, UNIX, Net.DataTELECOMMUNICATION SYSTEM:XCOM, CICS, PBCF, LU 6.2 PROTOCOL, INTERNET, EDIT, NET.DATALANGUAGES:COBOL II, SQL, IBM ASSEMBLER, SAS, PL/1, C, C++, FORTRAN, LU 6.2 PROTOCOL, HTML, _JavaScript, shell programming, ASPEDITORS:TSO/ISPF, MICROSOFT WORD, MICROSOFT EXCEL, PROFS, VM EDIT, TELON, BMS SCREEN EDITOR, UNIX/ISPFFILE ACCESS/DATABASES:DB2, VSAM, DAM, IMS, IDMS, QSAMSOFTWARE TOOLS:CICS (command and macro level), DB2, QMF, FILEAID, FILEAID/DB2, XPEDITER, MVS utilities, IDCAMS, SAS, MVS JCL, DOS JCL, MICROSOFT WINDOWS, WORD, EXCEL, POWER- POINT, DESIGN/1, PBCF, LOTUS 1-2-3, E-MAIL, ENDEVOR, IOF, COMPAREX, SAR, SPUFI, NDM, IEW, BRACKETS, WordPerfect, LIBRARIAN, SYNCSORT, INTERTEST, PANVALET, ABEND-AID, DUMPMSTR, NET-DATA, RACF, SDSF, Project 2000APPLICATION PROGRAMMING:Financial System, Billing System, International Money Market, Commercial Loan System, Manufacturing, EDI, Order Entry System, Revenue Accounting, Delivery System, Domestic Banking, WEB Application SOFTWARE PROGRAMMING:Enhancement to CICS terminal and file control programs. Modules for DB2 XPERT (DB2 Editor). CICS system programmer supporting Online Banking EDUCATION Bachelor of Science in Electronics Engineering University of Santo Tomas Republic of the Philippines EMPLOYMENT HISTORY Jan, 2004 to Present Application Systems Engineer 5 Wells Fargo Services Tempe, AZ Member of KR-
  • 2.
    Collections Support group.Customize and support CACS vendor product used by collections group. The application’s front end uses WEBSPHERE, and VSAM files are updated in batch after end of day. Design, code, and test interfaces and reports as requested by users. Uses COBOL II, INSYNC, FILEAID, VSAM, EASYTRIEVE, IBM utilities (IDCAMS, IEBGENER, etc) in creating test data. Create JCL for all testing required. Create production procedures for production install. Dec, 2000 to August 12, 2003 Sr. Software developer Inovant Corp (VISA) Foster City, CA Treasury Application (VFTS) VISA Travel Services Center Application (VTSC) Support Treasury Applications running in multi-platform environment - mainframe and client server. As a senior team member, I analyzed business requirements and presented systems solutions to clients. I have estimated work efforts and submitted Statement of Work (SOW) document, created project schedule using Project 2000, created high level and detailed level design documents, and code and tested the complex programs in the project while monitoring project status. Application supported runs in CICS and batch with data residing in DB2 tables and VSAM files. Client server programs are written in Visual Basic Support VTSC applications running in CICS and batch system using VSAM files and remotely accessing DB2 tables from other applications. VTSC is a global application being access online by users all over the world. Serve as Project Lead for Treasury System Application. Mainframe programs were written in COBOL II. May, 1997 to Dec, 2000Technical Architect Pacific Bell - San Ramon Valley, CA Receivable Accounting Project (RAP) Develop the most complex programs for the project. Responsible for mentoring 3 newly hired programmers. Researched technical solutions for problems involving performance, accessibility, external interfaces, and other system problems involving the application supported. Participated in the development of a new WEB-base Application for the Corporate Accounting Group using Net.Data, DB2, HTML, and _JavaScript running in UNIX operating system. Server used is IBM OS390. Written new SQL queries, source codes in HTML, _JavaScript, and EXCEL to create WEB reports in a client-server environment using OS390 server and DB2 database kept in an MVS mainframe where programs were written in COBOL II. Re-engineered and coded the general edit program tabulating edit rules making it more maintainable in the future, and making it modular for re-useability and easy program update. New programs have better performance, maintainability and re-usability. October, 1996 to March 1997Independent Contractor GAP, Inc - San Mateo, CA Hired as an independent contractor to write several CICS/COBOL II programs interfacing with EDI. Programs were written on time and users were very satisfied. Jan, 1996 to August, 1996Independent Contractor Pacific Bell - San Ramon Valley, CA PBCOM Project - Requirement Phase Worked with Andersen Group in designing a multi-platform Billing System for PBCOM project. Participated in the Reverse Engineering of Core Billing System and the creation of interface to a new Revenue Accounting System which were to reside in a SAP platform. Used Design/1 and Microsoft Access to create functional design documents, detailed design, and data flowcharts. July, 1995 to Jan, 1996Independent Contractor Clorox Corporation - Oakland, CA Order Entry System Maintain Order Entry and Logistics Systems using CICS, COBOL II, and DB2 System. Created functional design documents, high level and detailed design, and coded and tested CICS programs to enhance several online programs. Also added new online functions for users. March, 1995 to July, 1995Independent Contractor Safeway Corporation - Oakland, CA Data Conversion Team Worked with data conversion team to convert old data into DB2 tables. Created several SAS programs to perform file validation. Dec, 1991 to March, 1995Independent Contractor Pacific Bell, San Ramon Valley, CA Billing Project Phase II - BPP2 (ADR Team) Worked with ADR team to maintain BPP2 programs. Participated in the development of programs in several releases. Programs were written in COBOL II, and used DB2 databases. Regional Master File and Adjustment Group Worked with RM and AI group to maintain COBOL II programs within CORE Billing System. Participated in all major releases. Responsible for the most complex programs in the Adjustment process and gained expertise with the Pacific Bell’s Core Billing System. Created high level, and detailed design documents as part of SDLC requirement. Participated in external interface meetings to determine interface requirements for several project involving application supported. Created cost estimates, project plans, and submitted deliverables to
  • 3.
    Software Integration teamas part of overall billing project. Participated in Quality Assurance meetings to discuss testing problems with interfaces. March, 1990 to Dec, 1991Independent Contractor IBM Corporation - San Jose, CA QMF Group Participated in testing QMF 3.0 and QMF 3.1. Wrote several online and interactive PC programs to test QMF responses. Dec, 1989 to March, 1990Senior Programmer Analyst AMD Corporation - Santa Clara, CA Chief Designer and Team Lead for the design & construction phases of the Financial System project. Presented a multi-platform design utilizing XCOM software, PC front-end user interface, CICS, COBOL II, and DB2 centralized database. March, 1989 to Dec, 1989Independent Contractor ROLM Corporation - Santa Clara, CA Order Entry System Participated in the re-write of the Order Entry System with online interface to the Plant Processing System. Designed and coded the COBOL / CICS interface that handled the internal queueing from Order Entry System to the Plant Scheduling Processes. Help resolved deadlock timeout using CICS TRACE and transaction dumps. Suggested program improvements to avoid deadlock. Sept, 1988 to March, 1989Senior Programmer Analyst XA Systems - San Jose, CA Member of the team that created DB2/Xpert product. Written several programs in C as part of the Screen Manager. Programs interface with TSO/ISPF. Oct, 1975 to February, 1987 Bank of Montreal - Toronto, Canada Systems Support Analyst to Systems Specialist Applications: International Money Market Domestic banking CICS Systems Software Group Systems Technical Support Group Accomplishments: Systems Specialist reporting to the Department manager for the International Money Market Application. Responsible for the system solutions, and data integrity for the application supported. Act as design liaison to the user client group. Participated in the evaluation of vendor products and tools and was involved in architectural designs of the Applications supported by the department. Served as a technical resource in numerous Joint Application Design meetings with the user groups and business analysts during Business Requirements Phase. Presented IT Project Plans to the executive steering committee meetings. All projects handled were on-time and within budget. In-charge of 9 designers and programmers maintaining both online and batch systems – programs were written in COBOL II and Assembler. I Have worked my way from Data Control Analysis, Technical Support Analysis, Systems development, to Systems Specialist recommending systems solutions for the International Banking and Treasury Systems Application.