4/26/2017 Myanmar/EAST ASIA AND PACIFIC­ P152936­ National Electrification Project ­ Procurement Plan (English) | The World Bank
http://documents.worldbank.org/curated/en/675531493137499178/Myanmar­EAST­ASIA­AND­PACIFIC­P152936­National­Electrification­Project­Procurement­Plan 1/3
The World Bank Home • Site Map • Index • FAQ • Contact Us
Documents & Reports
Document Date 2017/04/25 12:24:57
Document Type Procurement Plan
Report Number STEP1709
Volume No 1
Total Volume(s) 1
Country Myanmar; 
Region East Asia and Pacific; 
Disclosure Date 2017/04/25 12:24:57
Disclosure
Status
Disclosed
Doc Name Myanmar/EAST ASIA AND
PACIFIC­ P152936­ National
DETAILS DOWNLOADS
COMPLETE REPORT IN ENGLISH
Official version of document (may contain
signatures, etc)
Official PDF , 4 pages  0.1 mb
Total Downloads** : 5
TXT*
*The text version is uncorrected OCR text and is
included solely to benefit users with slow
connectivity.
**Download statistics measured since January 1st,
2014
CITATION
Myanmar/EAST ASIA AND PACIFIC­ P152936­
National Electrification Project ­ Procurement Plan
(English)
RELATED LINKS
See documents related
to the project(s)
ABOUT DATA RESEARCH LEARNING NEWS PROJECTS & OPERATIONS PUBLICATIONS COUNTRIES
TOPICS
A AThis Page in: English Español Français Português Русский ‫ﻋﺭﺑﻲ‬ 中文
4/26/2017 Myanmar/EAST ASIA AND PACIFIC­ P152936­ National Electrification Project ­ Procurement Plan (English) | The World Bank
http://documents.worldbank.org/curated/en/675531493137499178/Myanmar­EAST­ASIA­AND­PACIFIC­P152936­National­Electrification­Project­Procurement­Plan 2/3
Electrification Project ­
Procurement Plan
Language English
Rel. Proj ID MM­National Electrification
Project ­­ P152936;   
Sector Energy Transmission and
Distribution ;  Renewable
Energy Solar ;  Renewable
Energy Geothermal ; 
Renewable Energy Wind ; 
Renewable Energy Biomass; 
TF No/Name TF0A3652­Support for
Implementation of the
Sustainable Energy For All and
Nation ;  TF0A2560­Myanmar
National Electrification Project:
impact evaluation baseline ba ; 
TF0A2542­Myanmar National
Electrification Project: inclusive
community participa ; 
TF0A0448­Myanmar: Strengthen
the institutional framework for
on­ and off­grid e ;  TF018655­
Strengthening institutions for on­
and off­grid electrification in
Myan
Unit Owning Energy GP EAP
Originating Unit Energy GP EAP (GEE02)
Credit No 5727
Lending
Instrument
Investment Project Financing
Product Line IBRD/IDA
See Less ­
World Bank. 2017. Myanmar/EAST ASIA AND
PACIFIC­ P152936­ National Electrification Project
­ Procurement Plan. Washington, D.C. : World
Bank Group.
http://documents.worldbank.org/curated/en/675531
493137499178/Myanmar­EAST­ASIA­AND­
PACIFIC­P152936­National­Electrification­Project­
Procurement­Plan
1
National Electrification Project (P152936)
Detailed Procurement Plan
I. General
1. Project information: Myanmar - National Electrification Project (Component 2 – Off Grid)
Project ID Number: P152936
• Project Implementing Agency: Department of Rural Development
Ministry of Livestock, Fisheries and Rural Development
2. Date of General Procurement Notice: November 3, 2015
3. Period covered by this procurement plan: 18 months
II. Goods and Works and non-consulting services.
1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in
Appendix 1 to the Guidelines for Procurement:
Market Approa Method
Contract Value
Threshold (USD)
Prior Review
Threshold
(USD)
Comments
1. Goods - International (ICB) >1,000,000 All contracts
2. Goods - National – Open (NCB) <1,000,000 -
3. Goods – National RFQ (Shopping) <500,000
(Above 50,000 RFQ
with advertisement)
- Streamlining
process for standard
goods and
equipment
4. Works - International (ICB) >3,000,000 All contracts
5. Works - National – Open (NCB) <3,000,000 Above 2 million
6 Works – National RFQ (Shopping) <1,000,000 - Streamlining
process for simple
work
7 Direct Contracting -
8. Procurement from UN Agencies - >100,000
provided standard
contract template is
used
9. Community Participation in
Procurement (*)
- -
10. Commercial Practice (*) - -
11. Framework Agreement - -
12. Force account (*) - -
(*) Reference to Project Operational Manual
Procurement Packages with Methods and Time Schedule. (Updated procurement packages in the WB’s
Website)
PublicDisclosureAuthorizedPublicDisclosureAuthorizedPublicDisclosureAuthorizedPublicDisclosureAuthorized
2
III. Selection of Consultants
1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in
Appendix 1 to the Guidelines Selection and Employment of Consultants:
Selection Method Prior Review Threshold Method Threshold
1. QCBS/QBS Methods (Firms) Over $300,000 Over $500,000
2. CQS Methods (Firms) 1st contract and all over
$300,000
<$500,000
3. Single Source (Firms) All over $10,000
4. Individual Consultant (IC) SSS contract over $10,000;
and all fiduciary positions
2. Short list comprising entirely of national consultants: Short list of consultants for services,
estimated to cost less than $100,000 equivalent per contract, may comprise entirely of national
consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.
3. Any Other Special Selection Arrangements: No special selection arrangements are planned for the
Project.
4. Consultancy Assignments with Selection Methods and Time Schedule – Updated procurement
packages in the WB website
Page 1
PROCUREMENT
PLAN
Myanmar : National Electrification Project
General Information
Country: Myanmar Banks Approval Date of the Original Procurement Plan: 2016-11-28
Revised Plan Date(s): (comma delineated, leave blank if none) 2017-04-25
Project ID: P152936 GPN Date:
Project Name: National Electrification Project
Loan / Credit No: IDA / 57270
Executing Agency(ies): Department of Rural Development, Ministry of Electricity and Energy
WORKS
ActivityReference No. /
Description Loan / Credit No. Component Review Type Method Market Approach
Procurement
Process
Prequalification
(Y/N)
Estimated
Amount(US$)
ActualAmount
(US$)
Process
Status
Draft Pre-qualification
Documents
Prequalification
Evaluation Report
Draft Bidding Document
/ Justification
Specific Procurement
Notice / Invitation
Bidding Documents as
Issued
Proposal Submission /
Opening / Minutes
Bid Evaluation Report
and Recommendation
forAward
Signed Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
GOODS
ActivityReference No. /
Description Loan / Credit No. Component Review Type Method Market Approach
Procurement
Process
Prequalification
(Y/N)
Estimated
Amount(US$)
ActualAmount
(US$)
Process
Status
Draft Pre-qualification
Documents
Prequalification
Evaluation Report
Draft Bidding Document
/ Justification
Specific Procurement
Notice / Invitation
Bidding Documents as
Issued
Proposal Submission /
Opening / Minutes
Bid Evaluation Report
and Recommendation
forAward
Signed Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
C1-G1 / Distribution
Transformers
IDA / 57270 Grid extension Prior Request for Bids Open - International
Single Stage - One
Envelope
28,800,000.00 0.00
Under
Implementation
2016-10-24 2016-11-17 2017-01-02 2017-01-06 2017-07-01 2017-08-05 2018-02-01
C1-G2 / Concrete Poles IDA / 57270 Grid extension Prior Request for Bids Open - International
Single Stage - One
Envelope
10,160,000.00 0.00
Under
Implementation
2016-04-07 2016-12-05 2016-12-05 2017-01-19 2017-01-19 2017-02-18 2017-03-25 2017-09-21
SI1 / Solar PV Systems for
households, public institutions
and street light
IDA / 57270 Off-grid electrification Prior Request for Bids Open - International
Single Stage - One
Envelope
63,247,510.00 33,068,271.89
Under
Implementation
2015-12-18 2016-02-08 2016-05-12 2016-09-20 2017-01-10 2016-11-09 2016-11-09 2017-05-08
C1-G3 / Steel Poles IDA / 57270 Grid extension Prior Request for Bids Open - International
Single Stage - One
Envelope
7,170,000.00 0.00
Under
Implementation
2016-12-15 2017-01-11 2016-12-20 2017-02-20 2017-01-31 2017-04-21 2017-03-02 2017-04-06 2017-10-03
G16 / Laptops for Union Project
Staffs
IDA / 57270 Off-grid electrification Post
Request for
Quotations
Open - National
Single Stage - One
Envelope
37,400.00 0.00
Pending
Implementation
2017-01-18 2017-03-18 2017-06-16
G14 / Vehicles (2No) for Union
PMO
IDA / 57270 Off-grid electrification Post
Request for
Quotations
Open - National
Single Stage - One
Envelope
90,000.00 0.00
Pending
Implementation
2017-01-18 2017-03-15 2017-06-13
G15 / Survey Equipment for Mini-
Grid Project
IDA / 57270 Off-grid electrification Post
Request for
Quotations
Open - National
Single Stage - One
Envelope
5,500.00 0.00
Pending
Implementation
2017-01-18 2017-03-15 2017-06-13
C1-G4 / ACSR Conductor IDA / 57270 Grid extension Prior Request for Bids Open - International
Single Stage - One
Envelope
24,490,000.00 0.00
Under
Implementation
2017-01-27 2017-03-02 2017-02-01 2017-03-15 2017-04-14 2017-05-19 2017-11-15
SI2 / Solar PV Systems for
households, public institutions
and street lights **
IDA / 57270 Off-grid electrification Prior Request for Bids Open - International
Single Stage - One
Envelope
35,000,000.00 0.00
Under
Implementation
2017-01-16 2017-02-03 2017-01-21 2017-02-27 2017-03-04 2017-04-03 2017-05-08 2017-11-04
C1-G5 / Insulators IDA / 57270 Grid extension Prior Request for Bids Open - International
Single Stage - One
Envelope
10,080,000.00 0.00
Pending
Implementation
2017-03-01 2017-03-06 2017-04-17 2017-05-17 2017-06-21 2017-12-18
C1-G6 / Surge Arrester, Fuse,
Transformer Accessories,
Medium Voltage Cable and Low
Voltage Cable
IDA / 57270 Grid extension Prior Request for Bids Open - International
Single Stage - One
Envelope
13,870,000.00 0.00
Pending
Implementation
2017-04-26 2017-05-01 2017-06-12 2017-07-12 2017-08-16 2018-02-12
C1-G7 / Channel, Angle for Line
& Transformer and Other
Accessories for Lines
IDA / 57270 Grid extension Prior Request for Bids Open - International
Single Stage - One
Envelope
56,230,000.00 0.00 Under Review 2017-03-20 2017-03-25 2017-05-06 2017-06-05 2017-07-10 2018-01-06
C1-G9 / For Local PMOs
-Office Equipment
(Computers)
-IT Equipment
(Satellite for Internet)
IDA / 57270 Grid extension Post
Request for
Quotations
Open - National
Single Stage - One
Envelope
50,000.00 0.00
Pending
Implementation
2017-04-01 2017-05-27 2017-11-23
C1-G10 / Vehicles for PMOs
Head Office PMO and Local
PMOs
IDA / 57270 Grid extension Post
Request for
Quotations
Open - National
Single Stage - One
Envelope
490,000.00 0.00
Pending
Implementation
2017-03-18 2017-05-13 2017-11-09
C1-G11 / Concrete Poles IDA / 57270 Grid extension Prior Request for Bids Open - International
Single Stage - One
Envelope
13,370,000.00 0.00
Pending
Implementation
2017-05-02 2017-05-07 2017-06-18 2017-07-18 2017-08-22 2018-02-18
C2-G2 / Air Conditioner (2HP) for
Union Level
IDA / 57270 Off-grid electrification Post
Request for
Quotations
Open - National
Single Stage - One
Envelope
4,200.00 0.00
Pending
Implementation
2016-10-11 2016-12-06 2017-03-06
C2-G4 / Computers IDA / 57270 Off-grid electrification Post
Request for
Quotations
Open - National
Single Stage - One
Envelope
36,600.00 0.00
Pending
Implementation
2016-10-11 2017-03-07 2017-04-21
C2-G6 / Tablets, cases and
power bank
IDA / 57270 Off-grid electrification Post
Request for
Quotations
Open - National
Single Stage - One
Envelope
195,000.00 0.00
Pending
Implementation
2016-10-11 2016-12-23 2017-02-06
C1-G8 C / For Union PMOs
Air Conditioner & Water Cooler
IDA / 57270 Grid extension Post
Request for
Quotations
Open - National
Single Stage - One
Envelope
2,000.00 0.00
Pending
Implementation
2017-02-26 2017-04-23 2017-10-20
C1-G8 D / For Union PMOs
Office Furniture (Desk, Chair,
etc)
IDA / 57270 Grid extension Post
Request for
Quotations
Open - National
Single Stage - One
Envelope
9,488.00 0.00
Pending
Implementation
2017-02-26 2017-04-23 2017-10-20
C1-G8 B / For Union PMOs
IT Equipment (Phones, Tablet,
MIS Server)
IDA / 57270 Grid extension Post
Request for
Quotations
Open - National
Single Stage - One
Envelope
56,613.00 0.00
Pending
Implementation
2017-02-26 2017-04-23 2017-10-20
C1-G8 A / For Union PMOs
-Office Equipment
(Computer, Scanner, Printer, etc)
IDA / 57270 Grid extension Post
Request for
Quotations
Open - National
Single Stage - One
Envelope
27,331.00 0.00
Pending
Implementation
2017-02-26 2017-04-23 2017-10-20
Page 2
NON CONSULTING SERVICES
ActivityReference No. /
Description Loan / Credit No. Component Review Type Method Market Approach
Procurement
Process
Prequalification
(Y/N)
Estimated
Amount(US$)
ActualAmount
(US$)
Process
Status
Draft Pre-qualification
Documents
Prequalification
Evaluation Report
Draft Bidding Document
/ Justification
Specific Procurement
Notice / Invitation
Bidding Documents as
Issued
Proposal Submission /
Opening / Minutes
Bid Evaluation Report
and Recommendation
forAward
Signed Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
CONSULTING FIRMS
ActivityReference No. /
Description Loan / Credit No. Component Review Type Method Market Approach
Contract Type Estimated
Amount(US$)
ActualAmount
(US$)
Process Status Terms of Reference
Expression of Interest
Notice
Short List and Draft
Request forProposals
Request forProposals
as Issued
Opening of Technical
Proposals / Minutes
Evaluation of Technical
Proposal
Combined Evaluation
Report and Draft
Negotiated Contract
Signed Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
C1-2-TA0 / a. Geospatial Least
Cost
Planning for distribution system
expansion; and
b. Geospatial Plan update
and data collection for off-grid
electrification
IDA / 57270 Off-grid electrification Prior
Quality And Cost-
Based Selection
Open - International 2,000,000.00 0.00
Pending
Implementation
2017-01-16 2017-02-06 2017-03-22 2017-04-19 2017-05-19 2017-06-23 2017-07-28 2018-07-28
C2-TA10 / Solar PV Inspection
and Verification Consulting Firm
IDA / 57270 Off-grid electrification Prior
Quality And Cost-
Based Selection
Open - International 3,000,000.00 1,613,701.12 Signed 2016-01-07 2016-01-28 2016-03-12 2016-04-09 2016-05-09 2016-06-13 2017-01-09 2016-07-18 2017-01-18 2017-07-18
C2-TA10B / Solar PV Inspection
and Verification Agent
IDA / 57270 Off-grid electrification Prior
Quality And Cost-
Based Selection
Open - International 603,550.00 0.00 Canceled 2015-12-18 2016-01-07 2016-07-31 2016-09-14 2016-10-19 2017-03-23 2017-04-27 2018-04-27
C2-TA10-B / Solar PV
Inspection and Verification Agent
IDA / 57270 Off-grid electrification Prior Least Cost Selection Open - International 603,550.00 603,550.00 Signed 2016-01-05 2016-01-05 2016-12-09 2016-12-23 2016-12-23 2017-01-06 2017-02-23 2017-02-15 2017-02-28 2017-10-16
C2-TA24 / Solar PV Inspection
and Verification Consulting Firm
(IVA-2)
IDA / 57270 Off-grid electrification Prior
Quality And Cost-
Based Selection
Open - International 3,000,000.00 0.00
Pending
Implementation
2017-03-01 2017-03-22 2017-05-05 2017-06-02 2017-07-02 2017-08-06 2017-09-10 2018-09-10
C1-TA4 / (a) Project
Management and Implementation
Support
(b) Development of Distribution
Network Technical
Specifications for National
Standard
IDA / 57270 Technical assistance Prior
Quality And Cost-
Based Selection
Open - International 6,500,000.00 0.00
Under
Implementation
2017-02-10 2017-03-03 2017-04-16 2017-05-14 2017-06-13 2017-07-18 2017-08-22 2018-08-22
C1 AND 2-TA2 / (a) Geospatial
least cost planning for
distribution system expansion
(b) Geospatial plan update and
data collection for off-grid
electrification
IDA / 57270 Technical assistance Prior
Quality And Cost-
Based Selection
Open - International 2,000,000.00 0.00
Pending
Implementation
2017-05-15 2017-06-05 2017-07-19 2017-08-16 2017-09-15 2017-10-20 2017-11-24 2018-11-24
C1-TA1 / Policy Making and
Regulations for Rural
Electrification
IDA / 57270 Technical assistance Prior
Quality And Cost-
Based Selection
Open - International 1,000,000.00 0.00
Pending
Implementation
2017-08-30 2017-09-20 2017-11-03 2017-12-01 2017-12-31 2018-02-04 2018-03-11 2019-03-11
C1-TA8 / Monitoring and Impact
Evaluation
IDA / 57270 Technical assistance Prior
Quality And Cost-
Based Selection
Open - International 500,000.00 0.00
Pending
Implementation
2017-07-05 2017-07-26 2017-09-08 2017-10-06 2017-11-05 2017-12-10 2018-01-14 2019-01-14
INDIVIDUAL CONSULTANTS
ActivityReference No. /
Description Loan / Credit No. Component Review Type Method Market Approach
Contract Type Estimated
Amount(US$)
ActualAmount
(US$)
Process Status Terms of Reference
Invitationto
Identified/Selected
Consultant
Draft Negotiated
Contract
Signed Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
C2-TA5 / INTERNATIONAL
PROCUREMENT SPECIALIST
IDA / 57270
Grid extension
Contingent emergency response
Technical assistance
Off-grid electrification
Prior
Individual Consultant
Selection
Open N 260,000.00 259,950.00 Signed 2016-06-17 2016-05-19
C2-TA18 / International Financial
Management Advisor
IDA / 57270
Grid extension
Contingent emergency response
Technical assistance
Off-grid electrification
Prior
Individual Consultant
Selection
Open N 120,000.00 74,235.00
Under
Implementation
2016-07-29
C2-TA23 / 5 National MIS
Assistant for the Uunion MIS
Team (for 1 year)
IDA / 57270 Off-grid electrification Post
Individual Consultant
Selection
Open 66,000.00 0.00
Pending
Implementation
2017-01-30 2017-03-20 2017-04-10 2017-05-15 2017-11-11
C1-TA5 / International
Procurement Consultant
IDA / 57270 Technical assistance Prior
Individual Consultant
Selection
Open 500,000.00 0.00
Under
Implementation
2017-02-10 2017-03-31 2017-04-21 2017-05-26 2017-11-22
C2-TA25 / MIS/Data Base
Consulting Firm
IDA / 57270 Off-grid electrification Prior Direct Selection Direct 150,000.00 0.00 Under Review 2017-03-01 2017-03-11 2017-05-15 2017-11-11
C1-TA7 B / Social Safeguard
Advisors
IDA / 57270 Technical assistance Post
Individual Consultant
Selection
Open 250,000.00 0.00
Pending
Implementation
2018-05-02 2018-06-20 2018-07-11 2018-08-15 2019-02-11
C1-TA7 A / Environmental
Advisors
IDA / 57270 Technical assistance Post
Individual Consultant
Selection
Open 250,000.00 0.00
Pending
Implementation
2018-05-02 2018-06-20 2018-07-11 2018-08-15 2019-02-11

More Related Content

Similar to Myanmar East Asia and Pacific National Electrification Project - Procurement plan

Example-Project Brief
Example-Project BriefExample-Project Brief
Example-Project BriefPeter Zhou
 
Contract Procurement Management Report of Ntpc
Contract Procurement Management Report of  NtpcContract Procurement Management Report of  Ntpc
Contract Procurement Management Report of Ntpc1988chandan
 
CERTs 2012-2013 Seed Grants Introductory Presentation
CERTs 2012-2013 Seed Grants Introductory PresentationCERTs 2012-2013 Seed Grants Introductory Presentation
CERTs 2012-2013 Seed Grants Introductory PresentationUniversity of Minnesota
 
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide share
Rajiva Gupta
 
Errp ia report dec 2012
Errp ia report dec 2012Errp ia report dec 2012
Errp ia report dec 2012
zubeditufail
 
Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13
jpeabody
 
Tpt's supplier development (sd) initiative outline
Tpt's supplier  development (sd) initiative outlineTpt's supplier  development (sd) initiative outline
Tpt's supplier development (sd) initiative outline
Transnet Port Terminals
 
Detailed project report
Detailed project reportDetailed project report
Detailed project report
Vengadesh Vengadesh
 
Trans facility timeline and other bs
Trans facility timeline and other bsTrans facility timeline and other bs
Trans facility timeline and other bs
Kenneth Hogge Sr
 
Coastal Canal Grant Program BOCC Policy
Coastal Canal Grant Program BOCC PolicyCoastal Canal Grant Program BOCC Policy
Coastal Canal Grant Program BOCC Policy
marygracekamis
 
Standard Procurement DocumentspresentationApril2018.pptx
Standard Procurement DocumentspresentationApril2018.pptxStandard Procurement DocumentspresentationApril2018.pptx
Standard Procurement DocumentspresentationApril2018.pptx
KechaTaye
 
Ice professional review-guidance.pdf
Ice professional review-guidance.pdfIce professional review-guidance.pdf
Ice professional review-guidance.pdf
sk1875
 
Day 2: Plan to Project Process
Day 2: Plan to Project ProcessDay 2: Plan to Project Process
Day 2: Plan to Project Process
NAP Global Network
 
NIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsNIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation Projects
South Shore Clean Cities
 
Gfatm 081208 partnership forum arnsa pres v9
Gfatm 081208 partnership forum arnsa pres v9Gfatm 081208 partnership forum arnsa pres v9
Gfatm 081208 partnership forum arnsa pres v9Mohamed Rafique
 
How to Execute Standardized ISO 20022 Payment Initiation Via the ACH Network
How to Execute Standardized ISO 20022 Payment Initiation Via the ACH Network How to Execute Standardized ISO 20022 Payment Initiation Via the ACH Network
How to Execute Standardized ISO 20022 Payment Initiation Via the ACH Network
Nasreen Quibria
 
LECTURE - Planning.ppt
LECTURE - Planning.pptLECTURE - Planning.ppt
LECTURE - Planning.ppt
shinawaro27
 
DOPWIC Program Year 2019 Applicant Workshop
DOPWIC Program Year 2019 Applicant WorkshopDOPWIC Program Year 2019 Applicant Workshop
DOPWIC Program Year 2019 Applicant Workshop
Cuyahoga County Planning Commission
 
financial concurrence-ntpc
financial concurrence-ntpcfinancial concurrence-ntpc
financial concurrence-ntpcumesh yadav
 

Similar to Myanmar East Asia and Pacific National Electrification Project - Procurement plan (20)

Example-Project Brief
Example-Project BriefExample-Project Brief
Example-Project Brief
 
Contract Procurement Management Report of Ntpc
Contract Procurement Management Report of  NtpcContract Procurement Management Report of  Ntpc
Contract Procurement Management Report of Ntpc
 
CERTs 2012-2013 Seed Grants Introductory Presentation
CERTs 2012-2013 Seed Grants Introductory PresentationCERTs 2012-2013 Seed Grants Introductory Presentation
CERTs 2012-2013 Seed Grants Introductory Presentation
 
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide share
 
Errp ia report dec 2012
Errp ia report dec 2012Errp ia report dec 2012
Errp ia report dec 2012
 
Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13
 
Tpt's supplier development (sd) initiative outline
Tpt's supplier  development (sd) initiative outlineTpt's supplier  development (sd) initiative outline
Tpt's supplier development (sd) initiative outline
 
Detailed project report
Detailed project reportDetailed project report
Detailed project report
 
Trans facility timeline and other bs
Trans facility timeline and other bsTrans facility timeline and other bs
Trans facility timeline and other bs
 
Coastal Canal Grant Program BOCC Policy
Coastal Canal Grant Program BOCC PolicyCoastal Canal Grant Program BOCC Policy
Coastal Canal Grant Program BOCC Policy
 
Standard Procurement DocumentspresentationApril2018.pptx
Standard Procurement DocumentspresentationApril2018.pptxStandard Procurement DocumentspresentationApril2018.pptx
Standard Procurement DocumentspresentationApril2018.pptx
 
Ice professional review-guidance.pdf
Ice professional review-guidance.pdfIce professional review-guidance.pdf
Ice professional review-guidance.pdf
 
Day 2: Plan to Project Process
Day 2: Plan to Project ProcessDay 2: Plan to Project Process
Day 2: Plan to Project Process
 
NIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsNIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation Projects
 
Gfatm 081208 partnership forum arnsa pres v9
Gfatm 081208 partnership forum arnsa pres v9Gfatm 081208 partnership forum arnsa pres v9
Gfatm 081208 partnership forum arnsa pres v9
 
How to Execute Standardized ISO 20022 Payment Initiation Via the ACH Network
How to Execute Standardized ISO 20022 Payment Initiation Via the ACH Network How to Execute Standardized ISO 20022 Payment Initiation Via the ACH Network
How to Execute Standardized ISO 20022 Payment Initiation Via the ACH Network
 
LECTURE - Planning.ppt
LECTURE - Planning.pptLECTURE - Planning.ppt
LECTURE - Planning.ppt
 
DOPWIC Program Year 2019 Applicant Workshop
DOPWIC Program Year 2019 Applicant WorkshopDOPWIC Program Year 2019 Applicant Workshop
DOPWIC Program Year 2019 Applicant Workshop
 
financial concurrence-ntpc
financial concurrence-ntpcfinancial concurrence-ntpc
financial concurrence-ntpc
 

More from MYO AUNG Myanmar

MAP OF DISTRESS MYANMAR (Burmese version)
MAP OF DISTRESS MYANMAR (Burmese version)MAP OF DISTRESS MYANMAR (Burmese version)
MAP OF DISTRESS MYANMAR (Burmese version)
MYO AUNG Myanmar
 
Identity crisis ethnicity and conflict in myanmar crisis group
Identity crisis  ethnicity and conflict in myanmar crisis groupIdentity crisis  ethnicity and conflict in myanmar crisis group
Identity crisis ethnicity and conflict in myanmar crisis group
MYO AUNG Myanmar
 
CHINA IS PLAYING MYANMAR GROUND THE KYAUKPHYU SPECIAL ECONOMIC ZONE AND CHIN...
 CHINA IS PLAYING MYANMAR GROUND THE KYAUKPHYU SPECIAL ECONOMIC ZONE AND CHIN... CHINA IS PLAYING MYANMAR GROUND THE KYAUKPHYU SPECIAL ECONOMIC ZONE AND CHIN...
CHINA IS PLAYING MYANMAR GROUND THE KYAUKPHYU SPECIAL ECONOMIC ZONE AND CHIN...
MYO AUNG Myanmar
 
The climate crisis and threats against land and environmental defenders
The climate crisis and threats against land and environmental defendersThe climate crisis and threats against land and environmental defenders
The climate crisis and threats against land and environmental defenders
MYO AUNG Myanmar
 
User Privacy or Cyber Sovereignty Freedom House Special Report 2020
User Privacy or Cyber Sovereignty Freedom House Special Report 2020User Privacy or Cyber Sovereignty Freedom House Special Report 2020
User Privacy or Cyber Sovereignty Freedom House Special Report 2020
MYO AUNG Myanmar
 
Freedom of Expression Active and Seeking Justice from Myanmar
Freedom of Expression Active and Seeking Justice from MyanmarFreedom of Expression Active and Seeking Justice from Myanmar
Freedom of Expression Active and Seeking Justice from Myanmar
MYO AUNG Myanmar
 
NATIONAL LEAGUE FOR DEMOCRACY MYANMAR 2020 SEPTEMBER ELECTION GEAR UP
NATIONAL LEAGUE FOR DEMOCRACY MYANMAR 2020 SEPTEMBER ELECTION GEAR UPNATIONAL LEAGUE FOR DEMOCRACY MYANMAR 2020 SEPTEMBER ELECTION GEAR UP
NATIONAL LEAGUE FOR DEMOCRACY MYANMAR 2020 SEPTEMBER ELECTION GEAR UP
MYO AUNG Myanmar
 
SHWE KOKKO BORDER KAYIN STATE PROJECT COLLECTION
SHWE KOKKO BORDER KAYIN STATE PROJECT COLLECTIONSHWE KOKKO BORDER KAYIN STATE PROJECT COLLECTION
SHWE KOKKO BORDER KAYIN STATE PROJECT COLLECTION
MYO AUNG Myanmar
 
Myanmar language version of the UN Charter.Yangon charter myanmar
Myanmar language version of the UN Charter.Yangon charter myanmarMyanmar language version of the UN Charter.Yangon charter myanmar
Myanmar language version of the UN Charter.Yangon charter myanmar
MYO AUNG Myanmar
 
WORLD INVESTMENT REPORT 2020 BY UNITED NATIONS CONFERENCE ON TRADE AND DEVELO...
WORLD INVESTMENT REPORT 2020 BY UNITED NATIONS CONFERENCE ON TRADE AND DEVELO...WORLD INVESTMENT REPORT 2020 BY UNITED NATIONS CONFERENCE ON TRADE AND DEVELO...
WORLD INVESTMENT REPORT 2020 BY UNITED NATIONS CONFERENCE ON TRADE AND DEVELO...
MYO AUNG Myanmar
 
Myanmar Amber traps scientists in ethical dilemma over funding war
Myanmar Amber traps scientists in ethical dilemma over funding warMyanmar Amber traps scientists in ethical dilemma over funding war
Myanmar Amber traps scientists in ethical dilemma over funding war
MYO AUNG Myanmar
 
SITUATIONAL HUMAN RIGHTS OVERVIEW IN BURMA (JANUARY – APRIL 2020)
SITUATIONAL HUMAN RIGHTS OVERVIEW IN BURMA (JANUARY – APRIL 2020)SITUATIONAL HUMAN RIGHTS OVERVIEW IN BURMA (JANUARY – APRIL 2020)
SITUATIONAL HUMAN RIGHTS OVERVIEW IN BURMA (JANUARY – APRIL 2020)
MYO AUNG Myanmar
 
2019 country reports on human rights practices burma united state of america ...
2019 country reports on human rights practices burma united state of america ...2019 country reports on human rights practices burma united state of america ...
2019 country reports on human rights practices burma united state of america ...
MYO AUNG Myanmar
 
Executive Summary of Independent Commission of Enquiry "ICOE" Final Report En...
Executive Summary of Independent Commission of Enquiry "ICOE" Final Report En...Executive Summary of Independent Commission of Enquiry "ICOE" Final Report En...
Executive Summary of Independent Commission of Enquiry "ICOE" Final Report En...
MYO AUNG Myanmar
 
2019 ANNI Report on the Performance and Establishment of National Human Right...
2019 ANNI Report on the Performance and Establishment of National Human Right...2019 ANNI Report on the Performance and Establishment of National Human Right...
2019 ANNI Report on the Performance and Establishment of National Human Right...
MYO AUNG Myanmar
 
ALL ABOUT INTERNATIONAL COURT OF JUSTICE (ICJ) AND MYANMAR
ALL ABOUT  INTERNATIONAL COURT OF JUSTICE (ICJ) AND MYANMARALL ABOUT  INTERNATIONAL COURT OF JUSTICE (ICJ) AND MYANMAR
ALL ABOUT INTERNATIONAL COURT OF JUSTICE (ICJ) AND MYANMAR
MYO AUNG Myanmar
 
STIMSON INNOVATIVE IDEAS CHANGING THE WORLD AND CHINA-MEKONG RIVER AND MYANMAR
STIMSON INNOVATIVE IDEAS CHANGING THE WORLD AND CHINA-MEKONG RIVER AND MYANMARSTIMSON INNOVATIVE IDEAS CHANGING THE WORLD AND CHINA-MEKONG RIVER AND MYANMAR
STIMSON INNOVATIVE IDEAS CHANGING THE WORLD AND CHINA-MEKONG RIVER AND MYANMAR
MYO AUNG Myanmar
 
THE ASSIATANCE ASSOCIATION FOR POLITICAL PRISONERS (BURMA)
THE ASSIATANCE ASSOCIATION FOR POLITICAL PRISONERS (BURMA)THE ASSIATANCE ASSOCIATION FOR POLITICAL PRISONERS (BURMA)
THE ASSIATANCE ASSOCIATION FOR POLITICAL PRISONERS (BURMA)
MYO AUNG Myanmar
 
THE HUMAN RIGHT TO WATER A GUIDE FOR FIRST NATIONS COMUNITIES AND ADVOCATES
THE HUMAN RIGHT TO WATER A GUIDE FOR FIRST NATIONS COMUNITIES AND ADVOCATES THE HUMAN RIGHT TO WATER A GUIDE FOR FIRST NATIONS COMUNITIES AND ADVOCATES
THE HUMAN RIGHT TO WATER A GUIDE FOR FIRST NATIONS COMUNITIES AND ADVOCATES
MYO AUNG Myanmar
 
Natural Resource Governance Reform and the Peace Process in Myanmar
Natural Resource Governance Reform and the Peace Process in MyanmarNatural Resource Governance Reform and the Peace Process in Myanmar
Natural Resource Governance Reform and the Peace Process in Myanmar
MYO AUNG Myanmar
 

More from MYO AUNG Myanmar (20)

MAP OF DISTRESS MYANMAR (Burmese version)
MAP OF DISTRESS MYANMAR (Burmese version)MAP OF DISTRESS MYANMAR (Burmese version)
MAP OF DISTRESS MYANMAR (Burmese version)
 
Identity crisis ethnicity and conflict in myanmar crisis group
Identity crisis  ethnicity and conflict in myanmar crisis groupIdentity crisis  ethnicity and conflict in myanmar crisis group
Identity crisis ethnicity and conflict in myanmar crisis group
 
CHINA IS PLAYING MYANMAR GROUND THE KYAUKPHYU SPECIAL ECONOMIC ZONE AND CHIN...
 CHINA IS PLAYING MYANMAR GROUND THE KYAUKPHYU SPECIAL ECONOMIC ZONE AND CHIN... CHINA IS PLAYING MYANMAR GROUND THE KYAUKPHYU SPECIAL ECONOMIC ZONE AND CHIN...
CHINA IS PLAYING MYANMAR GROUND THE KYAUKPHYU SPECIAL ECONOMIC ZONE AND CHIN...
 
The climate crisis and threats against land and environmental defenders
The climate crisis and threats against land and environmental defendersThe climate crisis and threats against land and environmental defenders
The climate crisis and threats against land and environmental defenders
 
User Privacy or Cyber Sovereignty Freedom House Special Report 2020
User Privacy or Cyber Sovereignty Freedom House Special Report 2020User Privacy or Cyber Sovereignty Freedom House Special Report 2020
User Privacy or Cyber Sovereignty Freedom House Special Report 2020
 
Freedom of Expression Active and Seeking Justice from Myanmar
Freedom of Expression Active and Seeking Justice from MyanmarFreedom of Expression Active and Seeking Justice from Myanmar
Freedom of Expression Active and Seeking Justice from Myanmar
 
NATIONAL LEAGUE FOR DEMOCRACY MYANMAR 2020 SEPTEMBER ELECTION GEAR UP
NATIONAL LEAGUE FOR DEMOCRACY MYANMAR 2020 SEPTEMBER ELECTION GEAR UPNATIONAL LEAGUE FOR DEMOCRACY MYANMAR 2020 SEPTEMBER ELECTION GEAR UP
NATIONAL LEAGUE FOR DEMOCRACY MYANMAR 2020 SEPTEMBER ELECTION GEAR UP
 
SHWE KOKKO BORDER KAYIN STATE PROJECT COLLECTION
SHWE KOKKO BORDER KAYIN STATE PROJECT COLLECTIONSHWE KOKKO BORDER KAYIN STATE PROJECT COLLECTION
SHWE KOKKO BORDER KAYIN STATE PROJECT COLLECTION
 
Myanmar language version of the UN Charter.Yangon charter myanmar
Myanmar language version of the UN Charter.Yangon charter myanmarMyanmar language version of the UN Charter.Yangon charter myanmar
Myanmar language version of the UN Charter.Yangon charter myanmar
 
WORLD INVESTMENT REPORT 2020 BY UNITED NATIONS CONFERENCE ON TRADE AND DEVELO...
WORLD INVESTMENT REPORT 2020 BY UNITED NATIONS CONFERENCE ON TRADE AND DEVELO...WORLD INVESTMENT REPORT 2020 BY UNITED NATIONS CONFERENCE ON TRADE AND DEVELO...
WORLD INVESTMENT REPORT 2020 BY UNITED NATIONS CONFERENCE ON TRADE AND DEVELO...
 
Myanmar Amber traps scientists in ethical dilemma over funding war
Myanmar Amber traps scientists in ethical dilemma over funding warMyanmar Amber traps scientists in ethical dilemma over funding war
Myanmar Amber traps scientists in ethical dilemma over funding war
 
SITUATIONAL HUMAN RIGHTS OVERVIEW IN BURMA (JANUARY – APRIL 2020)
SITUATIONAL HUMAN RIGHTS OVERVIEW IN BURMA (JANUARY – APRIL 2020)SITUATIONAL HUMAN RIGHTS OVERVIEW IN BURMA (JANUARY – APRIL 2020)
SITUATIONAL HUMAN RIGHTS OVERVIEW IN BURMA (JANUARY – APRIL 2020)
 
2019 country reports on human rights practices burma united state of america ...
2019 country reports on human rights practices burma united state of america ...2019 country reports on human rights practices burma united state of america ...
2019 country reports on human rights practices burma united state of america ...
 
Executive Summary of Independent Commission of Enquiry "ICOE" Final Report En...
Executive Summary of Independent Commission of Enquiry "ICOE" Final Report En...Executive Summary of Independent Commission of Enquiry "ICOE" Final Report En...
Executive Summary of Independent Commission of Enquiry "ICOE" Final Report En...
 
2019 ANNI Report on the Performance and Establishment of National Human Right...
2019 ANNI Report on the Performance and Establishment of National Human Right...2019 ANNI Report on the Performance and Establishment of National Human Right...
2019 ANNI Report on the Performance and Establishment of National Human Right...
 
ALL ABOUT INTERNATIONAL COURT OF JUSTICE (ICJ) AND MYANMAR
ALL ABOUT  INTERNATIONAL COURT OF JUSTICE (ICJ) AND MYANMARALL ABOUT  INTERNATIONAL COURT OF JUSTICE (ICJ) AND MYANMAR
ALL ABOUT INTERNATIONAL COURT OF JUSTICE (ICJ) AND MYANMAR
 
STIMSON INNOVATIVE IDEAS CHANGING THE WORLD AND CHINA-MEKONG RIVER AND MYANMAR
STIMSON INNOVATIVE IDEAS CHANGING THE WORLD AND CHINA-MEKONG RIVER AND MYANMARSTIMSON INNOVATIVE IDEAS CHANGING THE WORLD AND CHINA-MEKONG RIVER AND MYANMAR
STIMSON INNOVATIVE IDEAS CHANGING THE WORLD AND CHINA-MEKONG RIVER AND MYANMAR
 
THE ASSIATANCE ASSOCIATION FOR POLITICAL PRISONERS (BURMA)
THE ASSIATANCE ASSOCIATION FOR POLITICAL PRISONERS (BURMA)THE ASSIATANCE ASSOCIATION FOR POLITICAL PRISONERS (BURMA)
THE ASSIATANCE ASSOCIATION FOR POLITICAL PRISONERS (BURMA)
 
THE HUMAN RIGHT TO WATER A GUIDE FOR FIRST NATIONS COMUNITIES AND ADVOCATES
THE HUMAN RIGHT TO WATER A GUIDE FOR FIRST NATIONS COMUNITIES AND ADVOCATES THE HUMAN RIGHT TO WATER A GUIDE FOR FIRST NATIONS COMUNITIES AND ADVOCATES
THE HUMAN RIGHT TO WATER A GUIDE FOR FIRST NATIONS COMUNITIES AND ADVOCATES
 
Natural Resource Governance Reform and the Peace Process in Myanmar
Natural Resource Governance Reform and the Peace Process in MyanmarNatural Resource Governance Reform and the Peace Process in Myanmar
Natural Resource Governance Reform and the Peace Process in Myanmar
 

Recently uploaded

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 

Recently uploaded (20)

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 

Myanmar East Asia and Pacific National Electrification Project - Procurement plan

  • 1. 4/26/2017 Myanmar/EAST ASIA AND PACIFIC­ P152936­ National Electrification Project ­ Procurement Plan (English) | The World Bank http://documents.worldbank.org/curated/en/675531493137499178/Myanmar­EAST­ASIA­AND­PACIFIC­P152936­National­Electrification­Project­Procurement­Plan 1/3 The World Bank Home • Site Map • Index • FAQ • Contact Us Documents & Reports Document Date 2017/04/25 12:24:57 Document Type Procurement Plan Report Number STEP1709 Volume No 1 Total Volume(s) 1 Country Myanmar;  Region East Asia and Pacific;  Disclosure Date 2017/04/25 12:24:57 Disclosure Status Disclosed Doc Name Myanmar/EAST ASIA AND PACIFIC­ P152936­ National DETAILS DOWNLOADS COMPLETE REPORT IN ENGLISH Official version of document (may contain signatures, etc) Official PDF , 4 pages  0.1 mb Total Downloads** : 5 TXT* *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity. **Download statistics measured since January 1st, 2014 CITATION Myanmar/EAST ASIA AND PACIFIC­ P152936­ National Electrification Project ­ Procurement Plan (English) RELATED LINKS See documents related to the project(s) ABOUT DATA RESEARCH LEARNING NEWS PROJECTS & OPERATIONS PUBLICATIONS COUNTRIES TOPICS A AThis Page in: English Español Français Português Русский ‫ﻋﺭﺑﻲ‬ 中文
  • 2. 4/26/2017 Myanmar/EAST ASIA AND PACIFIC­ P152936­ National Electrification Project ­ Procurement Plan (English) | The World Bank http://documents.worldbank.org/curated/en/675531493137499178/Myanmar­EAST­ASIA­AND­PACIFIC­P152936­National­Electrification­Project­Procurement­Plan 2/3 Electrification Project ­ Procurement Plan Language English Rel. Proj ID MM­National Electrification Project ­­ P152936;    Sector Energy Transmission and Distribution ;  Renewable Energy Solar ;  Renewable Energy Geothermal ;  Renewable Energy Wind ;  Renewable Energy Biomass;  TF No/Name TF0A3652­Support for Implementation of the Sustainable Energy For All and Nation ;  TF0A2560­Myanmar National Electrification Project: impact evaluation baseline ba ;  TF0A2542­Myanmar National Electrification Project: inclusive community participa ;  TF0A0448­Myanmar: Strengthen the institutional framework for on­ and off­grid e ;  TF018655­ Strengthening institutions for on­ and off­grid electrification in Myan Unit Owning Energy GP EAP Originating Unit Energy GP EAP (GEE02) Credit No 5727 Lending Instrument Investment Project Financing Product Line IBRD/IDA See Less ­ World Bank. 2017. Myanmar/EAST ASIA AND PACIFIC­ P152936­ National Electrification Project ­ Procurement Plan. Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/675531 493137499178/Myanmar­EAST­ASIA­AND­ PACIFIC­P152936­National­Electrification­Project­ Procurement­Plan
  • 3. 1 National Electrification Project (P152936) Detailed Procurement Plan I. General 1. Project information: Myanmar - National Electrification Project (Component 2 – Off Grid) Project ID Number: P152936 • Project Implementing Agency: Department of Rural Development Ministry of Livestock, Fisheries and Rural Development 2. Date of General Procurement Notice: November 3, 2015 3. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Market Approa Method Contract Value Threshold (USD) Prior Review Threshold (USD) Comments 1. Goods - International (ICB) >1,000,000 All contracts 2. Goods - National – Open (NCB) <1,000,000 - 3. Goods – National RFQ (Shopping) <500,000 (Above 50,000 RFQ with advertisement) - Streamlining process for standard goods and equipment 4. Works - International (ICB) >3,000,000 All contracts 5. Works - National – Open (NCB) <3,000,000 Above 2 million 6 Works – National RFQ (Shopping) <1,000,000 - Streamlining process for simple work 7 Direct Contracting - 8. Procurement from UN Agencies - >100,000 provided standard contract template is used 9. Community Participation in Procurement (*) - - 10. Commercial Practice (*) - - 11. Framework Agreement - - 12. Force account (*) - - (*) Reference to Project Operational Manual Procurement Packages with Methods and Time Schedule. (Updated procurement packages in the WB’s Website) PublicDisclosureAuthorizedPublicDisclosureAuthorizedPublicDisclosureAuthorizedPublicDisclosureAuthorized
  • 4. 2 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Method Threshold 1. QCBS/QBS Methods (Firms) Over $300,000 Over $500,000 2. CQS Methods (Firms) 1st contract and all over $300,000 <$500,000 3. Single Source (Firms) All over $10,000 4. Individual Consultant (IC) SSS contract over $10,000; and all fiduciary positions 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $100,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: No special selection arrangements are planned for the Project. 4. Consultancy Assignments with Selection Methods and Time Schedule – Updated procurement packages in the WB website
  • 5. Page 1 PROCUREMENT PLAN Myanmar : National Electrification Project General Information Country: Myanmar Banks Approval Date of the Original Procurement Plan: 2016-11-28 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-04-25 Project ID: P152936 GPN Date: Project Name: National Electrification Project Loan / Credit No: IDA / 57270 Executing Agency(ies): Department of Rural Development, Ministry of Electricity and Energy WORKS ActivityReference No. / Description Loan / Credit No. Component Review Type Method Market Approach Procurement Process Prequalification (Y/N) Estimated Amount(US$) ActualAmount (US$) Process Status Draft Pre-qualification Documents Prequalification Evaluation Report Draft Bidding Document / Justification Specific Procurement Notice / Invitation Bidding Documents as Issued Proposal Submission / Opening / Minutes Bid Evaluation Report and Recommendation forAward Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS ActivityReference No. / Description Loan / Credit No. Component Review Type Method Market Approach Procurement Process Prequalification (Y/N) Estimated Amount(US$) ActualAmount (US$) Process Status Draft Pre-qualification Documents Prequalification Evaluation Report Draft Bidding Document / Justification Specific Procurement Notice / Invitation Bidding Documents as Issued Proposal Submission / Opening / Minutes Bid Evaluation Report and Recommendation forAward Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C1-G1 / Distribution Transformers IDA / 57270 Grid extension Prior Request for Bids Open - International Single Stage - One Envelope 28,800,000.00 0.00 Under Implementation 2016-10-24 2016-11-17 2017-01-02 2017-01-06 2017-07-01 2017-08-05 2018-02-01 C1-G2 / Concrete Poles IDA / 57270 Grid extension Prior Request for Bids Open - International Single Stage - One Envelope 10,160,000.00 0.00 Under Implementation 2016-04-07 2016-12-05 2016-12-05 2017-01-19 2017-01-19 2017-02-18 2017-03-25 2017-09-21 SI1 / Solar PV Systems for households, public institutions and street light IDA / 57270 Off-grid electrification Prior Request for Bids Open - International Single Stage - One Envelope 63,247,510.00 33,068,271.89 Under Implementation 2015-12-18 2016-02-08 2016-05-12 2016-09-20 2017-01-10 2016-11-09 2016-11-09 2017-05-08 C1-G3 / Steel Poles IDA / 57270 Grid extension Prior Request for Bids Open - International Single Stage - One Envelope 7,170,000.00 0.00 Under Implementation 2016-12-15 2017-01-11 2016-12-20 2017-02-20 2017-01-31 2017-04-21 2017-03-02 2017-04-06 2017-10-03 G16 / Laptops for Union Project Staffs IDA / 57270 Off-grid electrification Post Request for Quotations Open - National Single Stage - One Envelope 37,400.00 0.00 Pending Implementation 2017-01-18 2017-03-18 2017-06-16 G14 / Vehicles (2No) for Union PMO IDA / 57270 Off-grid electrification Post Request for Quotations Open - National Single Stage - One Envelope 90,000.00 0.00 Pending Implementation 2017-01-18 2017-03-15 2017-06-13 G15 / Survey Equipment for Mini- Grid Project IDA / 57270 Off-grid electrification Post Request for Quotations Open - National Single Stage - One Envelope 5,500.00 0.00 Pending Implementation 2017-01-18 2017-03-15 2017-06-13 C1-G4 / ACSR Conductor IDA / 57270 Grid extension Prior Request for Bids Open - International Single Stage - One Envelope 24,490,000.00 0.00 Under Implementation 2017-01-27 2017-03-02 2017-02-01 2017-03-15 2017-04-14 2017-05-19 2017-11-15 SI2 / Solar PV Systems for households, public institutions and street lights ** IDA / 57270 Off-grid electrification Prior Request for Bids Open - International Single Stage - One Envelope 35,000,000.00 0.00 Under Implementation 2017-01-16 2017-02-03 2017-01-21 2017-02-27 2017-03-04 2017-04-03 2017-05-08 2017-11-04 C1-G5 / Insulators IDA / 57270 Grid extension Prior Request for Bids Open - International Single Stage - One Envelope 10,080,000.00 0.00 Pending Implementation 2017-03-01 2017-03-06 2017-04-17 2017-05-17 2017-06-21 2017-12-18 C1-G6 / Surge Arrester, Fuse, Transformer Accessories, Medium Voltage Cable and Low Voltage Cable IDA / 57270 Grid extension Prior Request for Bids Open - International Single Stage - One Envelope 13,870,000.00 0.00 Pending Implementation 2017-04-26 2017-05-01 2017-06-12 2017-07-12 2017-08-16 2018-02-12 C1-G7 / Channel, Angle for Line & Transformer and Other Accessories for Lines IDA / 57270 Grid extension Prior Request for Bids Open - International Single Stage - One Envelope 56,230,000.00 0.00 Under Review 2017-03-20 2017-03-25 2017-05-06 2017-06-05 2017-07-10 2018-01-06 C1-G9 / For Local PMOs -Office Equipment (Computers) -IT Equipment (Satellite for Internet) IDA / 57270 Grid extension Post Request for Quotations Open - National Single Stage - One Envelope 50,000.00 0.00 Pending Implementation 2017-04-01 2017-05-27 2017-11-23 C1-G10 / Vehicles for PMOs Head Office PMO and Local PMOs IDA / 57270 Grid extension Post Request for Quotations Open - National Single Stage - One Envelope 490,000.00 0.00 Pending Implementation 2017-03-18 2017-05-13 2017-11-09 C1-G11 / Concrete Poles IDA / 57270 Grid extension Prior Request for Bids Open - International Single Stage - One Envelope 13,370,000.00 0.00 Pending Implementation 2017-05-02 2017-05-07 2017-06-18 2017-07-18 2017-08-22 2018-02-18 C2-G2 / Air Conditioner (2HP) for Union Level IDA / 57270 Off-grid electrification Post Request for Quotations Open - National Single Stage - One Envelope 4,200.00 0.00 Pending Implementation 2016-10-11 2016-12-06 2017-03-06 C2-G4 / Computers IDA / 57270 Off-grid electrification Post Request for Quotations Open - National Single Stage - One Envelope 36,600.00 0.00 Pending Implementation 2016-10-11 2017-03-07 2017-04-21 C2-G6 / Tablets, cases and power bank IDA / 57270 Off-grid electrification Post Request for Quotations Open - National Single Stage - One Envelope 195,000.00 0.00 Pending Implementation 2016-10-11 2016-12-23 2017-02-06 C1-G8 C / For Union PMOs Air Conditioner & Water Cooler IDA / 57270 Grid extension Post Request for Quotations Open - National Single Stage - One Envelope 2,000.00 0.00 Pending Implementation 2017-02-26 2017-04-23 2017-10-20 C1-G8 D / For Union PMOs Office Furniture (Desk, Chair, etc) IDA / 57270 Grid extension Post Request for Quotations Open - National Single Stage - One Envelope 9,488.00 0.00 Pending Implementation 2017-02-26 2017-04-23 2017-10-20 C1-G8 B / For Union PMOs IT Equipment (Phones, Tablet, MIS Server) IDA / 57270 Grid extension Post Request for Quotations Open - National Single Stage - One Envelope 56,613.00 0.00 Pending Implementation 2017-02-26 2017-04-23 2017-10-20 C1-G8 A / For Union PMOs -Office Equipment (Computer, Scanner, Printer, etc) IDA / 57270 Grid extension Post Request for Quotations Open - National Single Stage - One Envelope 27,331.00 0.00 Pending Implementation 2017-02-26 2017-04-23 2017-10-20
  • 6. Page 2 NON CONSULTING SERVICES ActivityReference No. / Description Loan / Credit No. Component Review Type Method Market Approach Procurement Process Prequalification (Y/N) Estimated Amount(US$) ActualAmount (US$) Process Status Draft Pre-qualification Documents Prequalification Evaluation Report Draft Bidding Document / Justification Specific Procurement Notice / Invitation Bidding Documents as Issued Proposal Submission / Opening / Minutes Bid Evaluation Report and Recommendation forAward Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS ActivityReference No. / Description Loan / Credit No. Component Review Type Method Market Approach Contract Type Estimated Amount(US$) ActualAmount (US$) Process Status Terms of Reference Expression of Interest Notice Short List and Draft Request forProposals Request forProposals as Issued Opening of Technical Proposals / Minutes Evaluation of Technical Proposal Combined Evaluation Report and Draft Negotiated Contract Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C1-2-TA0 / a. Geospatial Least Cost Planning for distribution system expansion; and b. Geospatial Plan update and data collection for off-grid electrification IDA / 57270 Off-grid electrification Prior Quality And Cost- Based Selection Open - International 2,000,000.00 0.00 Pending Implementation 2017-01-16 2017-02-06 2017-03-22 2017-04-19 2017-05-19 2017-06-23 2017-07-28 2018-07-28 C2-TA10 / Solar PV Inspection and Verification Consulting Firm IDA / 57270 Off-grid electrification Prior Quality And Cost- Based Selection Open - International 3,000,000.00 1,613,701.12 Signed 2016-01-07 2016-01-28 2016-03-12 2016-04-09 2016-05-09 2016-06-13 2017-01-09 2016-07-18 2017-01-18 2017-07-18 C2-TA10B / Solar PV Inspection and Verification Agent IDA / 57270 Off-grid electrification Prior Quality And Cost- Based Selection Open - International 603,550.00 0.00 Canceled 2015-12-18 2016-01-07 2016-07-31 2016-09-14 2016-10-19 2017-03-23 2017-04-27 2018-04-27 C2-TA10-B / Solar PV Inspection and Verification Agent IDA / 57270 Off-grid electrification Prior Least Cost Selection Open - International 603,550.00 603,550.00 Signed 2016-01-05 2016-01-05 2016-12-09 2016-12-23 2016-12-23 2017-01-06 2017-02-23 2017-02-15 2017-02-28 2017-10-16 C2-TA24 / Solar PV Inspection and Verification Consulting Firm (IVA-2) IDA / 57270 Off-grid electrification Prior Quality And Cost- Based Selection Open - International 3,000,000.00 0.00 Pending Implementation 2017-03-01 2017-03-22 2017-05-05 2017-06-02 2017-07-02 2017-08-06 2017-09-10 2018-09-10 C1-TA4 / (a) Project Management and Implementation Support (b) Development of Distribution Network Technical Specifications for National Standard IDA / 57270 Technical assistance Prior Quality And Cost- Based Selection Open - International 6,500,000.00 0.00 Under Implementation 2017-02-10 2017-03-03 2017-04-16 2017-05-14 2017-06-13 2017-07-18 2017-08-22 2018-08-22 C1 AND 2-TA2 / (a) Geospatial least cost planning for distribution system expansion (b) Geospatial plan update and data collection for off-grid electrification IDA / 57270 Technical assistance Prior Quality And Cost- Based Selection Open - International 2,000,000.00 0.00 Pending Implementation 2017-05-15 2017-06-05 2017-07-19 2017-08-16 2017-09-15 2017-10-20 2017-11-24 2018-11-24 C1-TA1 / Policy Making and Regulations for Rural Electrification IDA / 57270 Technical assistance Prior Quality And Cost- Based Selection Open - International 1,000,000.00 0.00 Pending Implementation 2017-08-30 2017-09-20 2017-11-03 2017-12-01 2017-12-31 2018-02-04 2018-03-11 2019-03-11 C1-TA8 / Monitoring and Impact Evaluation IDA / 57270 Technical assistance Prior Quality And Cost- Based Selection Open - International 500,000.00 0.00 Pending Implementation 2017-07-05 2017-07-26 2017-09-08 2017-10-06 2017-11-05 2017-12-10 2018-01-14 2019-01-14 INDIVIDUAL CONSULTANTS ActivityReference No. / Description Loan / Credit No. Component Review Type Method Market Approach Contract Type Estimated Amount(US$) ActualAmount (US$) Process Status Terms of Reference Invitationto Identified/Selected Consultant Draft Negotiated Contract Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C2-TA5 / INTERNATIONAL PROCUREMENT SPECIALIST IDA / 57270 Grid extension Contingent emergency response Technical assistance Off-grid electrification Prior Individual Consultant Selection Open N 260,000.00 259,950.00 Signed 2016-06-17 2016-05-19 C2-TA18 / International Financial Management Advisor IDA / 57270 Grid extension Contingent emergency response Technical assistance Off-grid electrification Prior Individual Consultant Selection Open N 120,000.00 74,235.00 Under Implementation 2016-07-29 C2-TA23 / 5 National MIS Assistant for the Uunion MIS Team (for 1 year) IDA / 57270 Off-grid electrification Post Individual Consultant Selection Open 66,000.00 0.00 Pending Implementation 2017-01-30 2017-03-20 2017-04-10 2017-05-15 2017-11-11 C1-TA5 / International Procurement Consultant IDA / 57270 Technical assistance Prior Individual Consultant Selection Open 500,000.00 0.00 Under Implementation 2017-02-10 2017-03-31 2017-04-21 2017-05-26 2017-11-22 C2-TA25 / MIS/Data Base Consulting Firm IDA / 57270 Off-grid electrification Prior Direct Selection Direct 150,000.00 0.00 Under Review 2017-03-01 2017-03-11 2017-05-15 2017-11-11 C1-TA7 B / Social Safeguard Advisors IDA / 57270 Technical assistance Post Individual Consultant Selection Open 250,000.00 0.00 Pending Implementation 2018-05-02 2018-06-20 2018-07-11 2018-08-15 2019-02-11 C1-TA7 A / Environmental Advisors IDA / 57270 Technical assistance Post Individual Consultant Selection Open 250,000.00 0.00 Pending Implementation 2018-05-02 2018-06-20 2018-07-11 2018-08-15 2019-02-11