SlideShare a Scribd company logo
© THG SUSTAINABLE PLANNING ACT 2009 “What Consultants Should Look Out For” THG Sarah Farrelly Senior Town Planner
Introduction to SPA Sustainable Planning Act 2009 (SPA) commenced 18th December 2009 http://www.legislation.qld.gov.au/LEGISLTN/ACTS/2009/09AC036.pdf So also did the: Sustainable Planning Regulation 2009 http://www.legislation.qld.gov.au/LEGISLTN/CURRENT/S/SustPlanR09.pdf Six Statutory Guidelines http://www.dip.qld.gov.au/policies/statutory-guidelines-for-planning.html © THG
Intent of SPA Purpose of SPA is to ensure processes are: Accountable Effective Efficient ,and Delivers sustainable outcomes © THG
Existing Applications, Requests & Approvals  Applications and requests made prior to 18th December 2009 will continue under IPA. Existing approvals will be taken to be approvals under SPA Change to IPA approvals can be made using the new single process under SPA which is ‘permissible change’. DIP have released a Statutory Guideline (06/09): http://www.dip.qld.gov.au/resources/planning/planning/statutory-guideline-06-09.pdf This provides guidance on what may constitute a substantially different development. For reconfiguration of a lot approvals issued under IPA, the IPA endorsement of survey plans will continue to apply. © THG
Mandatory Supporting Information Development applications under SPA must now include the mandatory information indicated on the IDAS forms to be deemed properly made. http://www.dip.qld.gov.au/forms-templates/idas-forms-sustainable- planning-act.html Each development application must provide a statement about compliance with the planning instruments 	AND MCU:	Site plan, floor and elevation plans; ROL:	Reconfiguration plan to also show contours, levels, drainage and building 			envelopes; and OPW:	Site plan an detailed drawings with particular specifications for each types of 			operational work © THG
Declaration of Owners Consent Signed form or attachment or declaration http://www.dip.qld.gov.au/resources/form/idas-spa/idas-form-01 application-details.pdf 	Extract from form 1 applicants declaration © THG
Properly Made Process © THG Application made 10bd Acknowledgement notice Not properly made 20bd 10bd Application rectified Not rectified it lapses
Smart eDA Smart electronic development assessment is an on-line service that has been established to help streamline the development assessment process. https://www.smarteda.qld.gov.au/forms.action%3bjsessionid=E66A3A 28FC35161BDADCBFD3081E558 State assessment process available, however still recommend to utilise the IDAS checklist. © THG
Shortened Timeframes 20bd to refer the development application to referral agencies (previously 3 months); 6 months to respond to an information request (instead of 12months); and Within 5bd notify the assessment manager of public notification beginning Applicant’s ability to revive applications.  Applicant to issue assessment manager with notice of revival within 5bd of lapsing and then completing the action within a further 5bd. © THG
Missed Referral Agencies If an agency is missed, the application under SPA does not automatically lapse.   Written notice of the missed referral is given. Decision stage does not begin, or if previously started a decision can not be issued, until missed referral agency catches up. The missed referral notice does not have an approved form, just simply a notice issued pursuant to section 357 (2) of SPA. The applicant then has 10bd to refer the application to the missed referral agencies. © THG
Notification Stage DIP has released two new forms for public notification, being public notice on land and notice of compliance: http://www.dip.qld.gov.au/development-applications/public notification.html © THG
Notification Stage Cont’d Design layout for public notices on land © THG DIP has also release a ‘Guide on public notification’. http://www.dip.qld.gov.au/resources/guideline/public-notification-guide.pdf  
Changes to Development Applications Can change at any time before decided Four scenarios under SPA: Minor change (no IDAS timeframe stops) Change in response to an information request (no stop in IDAS however the public notification stage must restart or is repeated unless the AM is of the opinion that the change will not give rise to a submission) A change that deals with a matter raised in a submission (as above); and All other changes (IDAS process restarts) DIP have released a Statutory Guideline (06/09): http://www.dip.qld.gov.au/resources/planning/planning/statutory-guideline-06-09.pdf © THG
Changing Development Approvals Under IPA, separate mechanisms/tests for changing approvals v changing conditions Under SPA, merged into single streamlined process for making a ‘permissible change’ New SPA process can be applied to changing an IPA approval © THG
Decision Stage No longer a presumption in favour of approval for a compliant code assessable application Relevant instruments: State planning regulatory provisions Regional plan State planning policies Structure plan/master plan Temporary local planning instrument Preliminary approval varying the effect of the planning scheme Applicable codes/planning scheme Priority infrastructure plan © THG
Preliminary Approvals Varying The Effect of the Planning Scheme Under IPA section 3.1.6, under SPA section 242 New default lapsing period of 5 years.  The application will lapse if development is started but not completed The default period can be override by either the applicant nominating a period in the application on application form 31, question 3; http://www.dip.qld.gov.au/resources/form/idas-spa/idas-form-31 preliminary-approval.pdf 	OR by the assessment manager nominating a period. © THG
Compliance Assessment For development, works or documents Identified in SPR, SPRP, planning schemes and development approvals Simple process of a ‘tick and flick’ Compliance request can not be refused by the compliance assessor © THG
Compliance Assessment Cont’d DIP have introduced a Temporary State Planning Policy 2/09 on compliance assessment http://www.dip.qld.gov.au/resources/policy/state-planning/temp-spp 2-09.pdf  Compliance assessment listed in the SPR’s are: Survey plan endorsement (sch 19); and 2 lot ROL/industrial ROL and OPW (sch 18) The applicable IDAS form for compliance assessment is form 32 http://www.dip.qld.gov.au/resources/form/idas-spa/idas-form-32 compliance-aassesment.pdf Survey plan endorsement criteria similar to that under IPA Council have 20bd to assess the compliance assessment request, if they do not issue a notice then it is deemed to be approved. © THG
Compliance Assessment Cont’d Now under SPA a residential 2 lot ROL and or associated OPW’s in a residential or industrial zone will be subject to compliance assessment only where: The required minimum lot size is met; No referral agency triggers; No planning scheme overlay triggers The proposed development must meet the compliance assessment criteria listed in the Temporary State Planning Policy 2/09 © THG
Prohibited Development A new level of assessment introduced under SPA Identified in Schedule 1 of SPA, SPRP’s, structure plans, and planning schemes (only if QPP state that the development can be prohibited) © THG
Exempt MCU’s and Detached / Attached Dwellings New MCU for some class 1 a, and class 10 buildings are exempt under sch 4 of the SPR’s if: Planning scheme doesn’t make them self assessable The MCU is for a residential purpose in a residential zone; and No planning scheme overlay applies (other than bushfire overlay when the premises are <2000m2 © THG
Superseded Planning Scheme Requests Under IPA we had 2 years to make the request and the associated development application. Under SPA this timeframe has been shortened to 1 year and introduces a new two step process: Applicant to submit request to council for the application to be assessed under the superseded planning scheme (to be submitted within the 1 year); If council accept the application to be submitted and assessed under the superseded planning scheme (notice to be issued within 30bd) then the applicant has 6 months to submit the development application. © THG
Building & Development Committee The building and development committee can now hear the following matters (i.e.. you do not have to take them to the P & E Court): Decisions in respect to a class 1 building; and Condition in respect of a class 2 building if no more than 3 stories and no more than 60 units The notice of appeal form is available on DIP’s website http://www.dip.qld.gov.au/index.php?option=com_content&task=view id=146&Itemid=234 © THG
Final Comments on SPA On paper moving forward Cultural change required © THG
Thank you © THG

More Related Content

Similar to Sustainable Planning Act 1

LSC Technology Initiative Grant Conference 2015 | Session Materials - Managin...
LSC Technology Initiative Grant Conference 2015 | Session Materials - Managin...LSC Technology Initiative Grant Conference 2015 | Session Materials - Managin...
LSC Technology Initiative Grant Conference 2015 | Session Materials - Managin...
Legal Services Corporation
 
LSCTIG 2015 Session Materials - Managing your grant effectively
LSCTIG 2015 Session Materials -  Managing your grant effectively  LSCTIG 2015 Session Materials -  Managing your grant effectively
LSCTIG 2015 Session Materials - Managing your grant effectively
Legal Services Corporation
 
2021 CMS Audit Protocol Changes
2021 CMS Audit Protocol Changes2021 CMS Audit Protocol Changes
2021 CMS Audit Protocol Changes
Inovaare Corporation
 
New transfer pricing regime
New transfer pricing regimeNew transfer pricing regime
New transfer pricing regimeAnkur Mathur
 
LECTURE - Planning.ppt
LECTURE - Planning.pptLECTURE - Planning.ppt
LECTURE - Planning.ppt
shinawaro27
 
2013 AICUP Spring Institute - Redevelopment Capital Assistance Program (RACP)
2013 AICUP Spring Institute - Redevelopment Capital Assistance Program (RACP)2013 AICUP Spring Institute - Redevelopment Capital Assistance Program (RACP)
2013 AICUP Spring Institute - Redevelopment Capital Assistance Program (RACP)aicup
 
IDT - Operational Revised Guidelines for Cold chain Projects.pdf
IDT - Operational Revised Guidelines for Cold chain Projects.pdfIDT - Operational Revised Guidelines for Cold chain Projects.pdf
IDT - Operational Revised Guidelines for Cold chain Projects.pdf
Steadfast Business Consulting
 
Procedure to start small scale industries
Procedure to start small scale industriesProcedure to start small scale industries
Procedure to start small scale industries
zeeshanabdullateef
 
Société générale attracting finance for ccs projects
Société générale   attracting finance for ccs projectsSociété générale   attracting finance for ccs projects
Société générale attracting finance for ccs projectsGlobal CCS Institute
 
24 x7 water in three states of karnataka
24 x7 water in three states of karnataka24 x7 water in three states of karnataka
24 x7 water in three states of karnatakaKartikeya Pandey
 
Opportunities under RERA
Opportunities under RERAOpportunities under RERA
Opportunities under RERA
sandesh mundra
 
Multiple Project template.pptx
Multiple Project template.pptxMultiple Project template.pptx
Multiple Project template.pptx
AdilPatel34
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
anojan kanagarathnam
 
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFProject-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFRubab Tanveer
 
HAAD PART A ((notes)) VfFINAL 1101202023.pptx
HAAD PART A ((notes)) VfFINAL 1101202023.pptxHAAD PART A ((notes)) VfFINAL 1101202023.pptx
HAAD PART A ((notes)) VfFINAL 1101202023.pptx
engmo1234
 
2020 Annual General Meeting of Shareholders Presentation
2020 Annual General Meeting of Shareholders Presentation2020 Annual General Meeting of Shareholders Presentation
2020 Annual General Meeting of Shareholders Presentation
Thermal Energy International Inc.
 
USAID HOUSING PROGRAM IN HAITI FALLS SHORT
USAID HOUSING PROGRAM IN HAITI FALLS SHORTUSAID HOUSING PROGRAM IN HAITI FALLS SHORT
USAID HOUSING PROGRAM IN HAITI FALLS SHORT
Stanleylucas
 
Quarterly performance report Q3.pptx
Quarterly performance report Q3.pptxQuarterly performance report Q3.pptx
Quarterly performance report Q3.pptx
ErYogeshRaj
 
India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015
Varun Sethi
 
India Renewables-Eligible Overseas Capital Markets Candidate
India Renewables-Eligible Overseas Capital Markets CandidateIndia Renewables-Eligible Overseas Capital Markets Candidate
India Renewables-Eligible Overseas Capital Markets Candidate
Varun Sethi
 

Similar to Sustainable Planning Act 1 (20)

LSC Technology Initiative Grant Conference 2015 | Session Materials - Managin...
LSC Technology Initiative Grant Conference 2015 | Session Materials - Managin...LSC Technology Initiative Grant Conference 2015 | Session Materials - Managin...
LSC Technology Initiative Grant Conference 2015 | Session Materials - Managin...
 
LSCTIG 2015 Session Materials - Managing your grant effectively
LSCTIG 2015 Session Materials -  Managing your grant effectively  LSCTIG 2015 Session Materials -  Managing your grant effectively
LSCTIG 2015 Session Materials - Managing your grant effectively
 
2021 CMS Audit Protocol Changes
2021 CMS Audit Protocol Changes2021 CMS Audit Protocol Changes
2021 CMS Audit Protocol Changes
 
New transfer pricing regime
New transfer pricing regimeNew transfer pricing regime
New transfer pricing regime
 
LECTURE - Planning.ppt
LECTURE - Planning.pptLECTURE - Planning.ppt
LECTURE - Planning.ppt
 
2013 AICUP Spring Institute - Redevelopment Capital Assistance Program (RACP)
2013 AICUP Spring Institute - Redevelopment Capital Assistance Program (RACP)2013 AICUP Spring Institute - Redevelopment Capital Assistance Program (RACP)
2013 AICUP Spring Institute - Redevelopment Capital Assistance Program (RACP)
 
IDT - Operational Revised Guidelines for Cold chain Projects.pdf
IDT - Operational Revised Guidelines for Cold chain Projects.pdfIDT - Operational Revised Guidelines for Cold chain Projects.pdf
IDT - Operational Revised Guidelines for Cold chain Projects.pdf
 
Procedure to start small scale industries
Procedure to start small scale industriesProcedure to start small scale industries
Procedure to start small scale industries
 
Société générale attracting finance for ccs projects
Société générale   attracting finance for ccs projectsSociété générale   attracting finance for ccs projects
Société générale attracting finance for ccs projects
 
24 x7 water in three states of karnataka
24 x7 water in three states of karnataka24 x7 water in three states of karnataka
24 x7 water in three states of karnataka
 
Opportunities under RERA
Opportunities under RERAOpportunities under RERA
Opportunities under RERA
 
Multiple Project template.pptx
Multiple Project template.pptxMultiple Project template.pptx
Multiple Project template.pptx
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFProject-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
 
HAAD PART A ((notes)) VfFINAL 1101202023.pptx
HAAD PART A ((notes)) VfFINAL 1101202023.pptxHAAD PART A ((notes)) VfFINAL 1101202023.pptx
HAAD PART A ((notes)) VfFINAL 1101202023.pptx
 
2020 Annual General Meeting of Shareholders Presentation
2020 Annual General Meeting of Shareholders Presentation2020 Annual General Meeting of Shareholders Presentation
2020 Annual General Meeting of Shareholders Presentation
 
USAID HOUSING PROGRAM IN HAITI FALLS SHORT
USAID HOUSING PROGRAM IN HAITI FALLS SHORTUSAID HOUSING PROGRAM IN HAITI FALLS SHORT
USAID HOUSING PROGRAM IN HAITI FALLS SHORT
 
Quarterly performance report Q3.pptx
Quarterly performance report Q3.pptxQuarterly performance report Q3.pptx
Quarterly performance report Q3.pptx
 
India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015
 
India Renewables-Eligible Overseas Capital Markets Candidate
India Renewables-Eligible Overseas Capital Markets CandidateIndia Renewables-Eligible Overseas Capital Markets Candidate
India Renewables-Eligible Overseas Capital Markets Candidate
 

Recently uploaded

De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
Dorra BARTAGUIZ
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Tobias Schneck
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Ramesh Iyer
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 

Recently uploaded (20)

De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 

Sustainable Planning Act 1

  • 1. © THG SUSTAINABLE PLANNING ACT 2009 “What Consultants Should Look Out For” THG Sarah Farrelly Senior Town Planner
  • 2. Introduction to SPA Sustainable Planning Act 2009 (SPA) commenced 18th December 2009 http://www.legislation.qld.gov.au/LEGISLTN/ACTS/2009/09AC036.pdf So also did the: Sustainable Planning Regulation 2009 http://www.legislation.qld.gov.au/LEGISLTN/CURRENT/S/SustPlanR09.pdf Six Statutory Guidelines http://www.dip.qld.gov.au/policies/statutory-guidelines-for-planning.html © THG
  • 3. Intent of SPA Purpose of SPA is to ensure processes are: Accountable Effective Efficient ,and Delivers sustainable outcomes © THG
  • 4. Existing Applications, Requests & Approvals  Applications and requests made prior to 18th December 2009 will continue under IPA. Existing approvals will be taken to be approvals under SPA Change to IPA approvals can be made using the new single process under SPA which is ‘permissible change’. DIP have released a Statutory Guideline (06/09): http://www.dip.qld.gov.au/resources/planning/planning/statutory-guideline-06-09.pdf This provides guidance on what may constitute a substantially different development. For reconfiguration of a lot approvals issued under IPA, the IPA endorsement of survey plans will continue to apply. © THG
  • 5. Mandatory Supporting Information Development applications under SPA must now include the mandatory information indicated on the IDAS forms to be deemed properly made. http://www.dip.qld.gov.au/forms-templates/idas-forms-sustainable- planning-act.html Each development application must provide a statement about compliance with the planning instruments AND MCU: Site plan, floor and elevation plans; ROL: Reconfiguration plan to also show contours, levels, drainage and building envelopes; and OPW: Site plan an detailed drawings with particular specifications for each types of operational work © THG
  • 6. Declaration of Owners Consent Signed form or attachment or declaration http://www.dip.qld.gov.au/resources/form/idas-spa/idas-form-01 application-details.pdf Extract from form 1 applicants declaration © THG
  • 7. Properly Made Process © THG Application made 10bd Acknowledgement notice Not properly made 20bd 10bd Application rectified Not rectified it lapses
  • 8. Smart eDA Smart electronic development assessment is an on-line service that has been established to help streamline the development assessment process. https://www.smarteda.qld.gov.au/forms.action%3bjsessionid=E66A3A 28FC35161BDADCBFD3081E558 State assessment process available, however still recommend to utilise the IDAS checklist. © THG
  • 9. Shortened Timeframes 20bd to refer the development application to referral agencies (previously 3 months); 6 months to respond to an information request (instead of 12months); and Within 5bd notify the assessment manager of public notification beginning Applicant’s ability to revive applications. Applicant to issue assessment manager with notice of revival within 5bd of lapsing and then completing the action within a further 5bd. © THG
  • 10. Missed Referral Agencies If an agency is missed, the application under SPA does not automatically lapse. Written notice of the missed referral is given. Decision stage does not begin, or if previously started a decision can not be issued, until missed referral agency catches up. The missed referral notice does not have an approved form, just simply a notice issued pursuant to section 357 (2) of SPA. The applicant then has 10bd to refer the application to the missed referral agencies. © THG
  • 11. Notification Stage DIP has released two new forms for public notification, being public notice on land and notice of compliance: http://www.dip.qld.gov.au/development-applications/public notification.html © THG
  • 12. Notification Stage Cont’d Design layout for public notices on land © THG DIP has also release a ‘Guide on public notification’. http://www.dip.qld.gov.au/resources/guideline/public-notification-guide.pdf  
  • 13. Changes to Development Applications Can change at any time before decided Four scenarios under SPA: Minor change (no IDAS timeframe stops) Change in response to an information request (no stop in IDAS however the public notification stage must restart or is repeated unless the AM is of the opinion that the change will not give rise to a submission) A change that deals with a matter raised in a submission (as above); and All other changes (IDAS process restarts) DIP have released a Statutory Guideline (06/09): http://www.dip.qld.gov.au/resources/planning/planning/statutory-guideline-06-09.pdf © THG
  • 14. Changing Development Approvals Under IPA, separate mechanisms/tests for changing approvals v changing conditions Under SPA, merged into single streamlined process for making a ‘permissible change’ New SPA process can be applied to changing an IPA approval © THG
  • 15. Decision Stage No longer a presumption in favour of approval for a compliant code assessable application Relevant instruments: State planning regulatory provisions Regional plan State planning policies Structure plan/master plan Temporary local planning instrument Preliminary approval varying the effect of the planning scheme Applicable codes/planning scheme Priority infrastructure plan © THG
  • 16. Preliminary Approvals Varying The Effect of the Planning Scheme Under IPA section 3.1.6, under SPA section 242 New default lapsing period of 5 years. The application will lapse if development is started but not completed The default period can be override by either the applicant nominating a period in the application on application form 31, question 3; http://www.dip.qld.gov.au/resources/form/idas-spa/idas-form-31 preliminary-approval.pdf OR by the assessment manager nominating a period. © THG
  • 17. Compliance Assessment For development, works or documents Identified in SPR, SPRP, planning schemes and development approvals Simple process of a ‘tick and flick’ Compliance request can not be refused by the compliance assessor © THG
  • 18. Compliance Assessment Cont’d DIP have introduced a Temporary State Planning Policy 2/09 on compliance assessment http://www.dip.qld.gov.au/resources/policy/state-planning/temp-spp 2-09.pdf  Compliance assessment listed in the SPR’s are: Survey plan endorsement (sch 19); and 2 lot ROL/industrial ROL and OPW (sch 18) The applicable IDAS form for compliance assessment is form 32 http://www.dip.qld.gov.au/resources/form/idas-spa/idas-form-32 compliance-aassesment.pdf Survey plan endorsement criteria similar to that under IPA Council have 20bd to assess the compliance assessment request, if they do not issue a notice then it is deemed to be approved. © THG
  • 19. Compliance Assessment Cont’d Now under SPA a residential 2 lot ROL and or associated OPW’s in a residential or industrial zone will be subject to compliance assessment only where: The required minimum lot size is met; No referral agency triggers; No planning scheme overlay triggers The proposed development must meet the compliance assessment criteria listed in the Temporary State Planning Policy 2/09 © THG
  • 20. Prohibited Development A new level of assessment introduced under SPA Identified in Schedule 1 of SPA, SPRP’s, structure plans, and planning schemes (only if QPP state that the development can be prohibited) © THG
  • 21. Exempt MCU’s and Detached / Attached Dwellings New MCU for some class 1 a, and class 10 buildings are exempt under sch 4 of the SPR’s if: Planning scheme doesn’t make them self assessable The MCU is for a residential purpose in a residential zone; and No planning scheme overlay applies (other than bushfire overlay when the premises are <2000m2 © THG
  • 22. Superseded Planning Scheme Requests Under IPA we had 2 years to make the request and the associated development application. Under SPA this timeframe has been shortened to 1 year and introduces a new two step process: Applicant to submit request to council for the application to be assessed under the superseded planning scheme (to be submitted within the 1 year); If council accept the application to be submitted and assessed under the superseded planning scheme (notice to be issued within 30bd) then the applicant has 6 months to submit the development application. © THG
  • 23. Building & Development Committee The building and development committee can now hear the following matters (i.e.. you do not have to take them to the P & E Court): Decisions in respect to a class 1 building; and Condition in respect of a class 2 building if no more than 3 stories and no more than 60 units The notice of appeal form is available on DIP’s website http://www.dip.qld.gov.au/index.php?option=com_content&task=view id=146&Itemid=234 © THG
  • 24. Final Comments on SPA On paper moving forward Cultural change required © THG