SlideShare a Scribd company logo
Multi-Family Design in Type V/III Podium vs. Type I High-Rise Construction
Multi-Family Design in Type V/III Podium vs. Type I High-Rise Construction
Photo Credit: Simon HaPhoto Credit: Simon Ha
Image Credit: Urbanize LA
2007 2014
Image Credit: Harley Ellis DevereauxImage Credit: KPF
Photo Credit: Buzzbuzzhome.comImage Credit: Studio Daniel Libeskind
2007 2014
Image credit: GBD Architects
2007
(Portland, OR)
Image Credit: Jones Architecture, GBD ArchitectsPhoto Credit: Andre Bonacin
2007 2017
Learning Objectives
Learning Objective #1
Understand and describe the design challenges and opportunities in designing high-density housing
in podium and high-rise construction.
Learning Objective #2
Understand and describe the economics of producing high-density housing in podium and high-rise
construction.
Learning Objective #3
Discuss the potential policies that may impact housing production.
Learning Objective #4
Understand and describe the basics of multi-family real estate development.
Speaker: Simon Ha, AIA, LEED AP
Partner @ Steinberg, Los Angeles, CA
AIA HCD Chair, DLANC Planning and Land Use, Re:Code LA
Why the shift from high-rise to podium housing?
Why the shift? Building Code change to allow mixed-use
buildings in 2007, 2010, 2013, 2016.
CBC Section 510 - Special Provisions
510.2 Horizontal Building Separation Allowance
Buildings are separate if:
1. 3 hour horizontal assembly
2. below horizontal assembly is max. 1** story
3. below horizontal assembly is Type IA
4-7. other requirements: shafts, occupancy, sprinklers, max height etc.
City of LA: Code Modification to allow 2 stories above grade
CBC 2016 eliminated limitations on stories below horizontal separation
7
6
5
4
3
2
1
Image Credit: TCA Architects
Image Credit: TCA Architects
Image Credit: Urbanize LA
Image Credit: Urbanize LA
Image Credit: Urbanize LA
“Not every building can be a
landmark, of course, but as
Downtown Los Angeles is in the
midst of a development boom
that will see numerous parking
lots replaced by residential
and other projects, one of the
most frequently asked questions
is, why is the crush of midrise
residential buildings so
unspectacular?”
Image Credit: Urbanize LA
Image Credit: GMP Architects
Image Credit: Tagawa Smith Martin
Image Credit: Tagawa Smith Martin
Development of Type III Podium vs. Type I High-Rise Construction
High-risePodium
Podium High-rise
Type III over Type I: Max Height 85’ Type I: Max Height Unlimited
168 units @ 625 sf per unit = 105,000 sf
Construction Hard Cost:
approximately $400/sf net rentable
105,000 sf x $400 = $42,000,000
$250,000 per unit
251 units @ 643 sf per unit = 161,391 sf
Construction Hard Cost: $385,800 per unit
approx. $600/sf net rentable
161,393 sf x $600 = $96,835,800
$385,800 per unit
Podium High-rise
Type III over Type I: Max Height 85’ Type I: Max Height Unlimited
168 units @ 625 sf per unit = 105,000 sf
Hard Cost: $250,000 per unit
Soft Costs: @ 30% = $75,000 per unit
Land Cost: $13.44m/168 = $80,000 per unit
Total Cost per unit = $405,000
251 units @ 643 sf per unit = 161,391 sf
Hard Cost: $385,800 per unit
Soft Costs: @ 30% = $115,740 per unit
Land Cost: $13.44m/251 = $53,545 per unit
Total Cost per unit = $554,285
Podium High-rise
Type III over Type I: Max Height 85’ Type I: Max Height Unlimited
168 units @ 625 sf per unit = 105,000 sf
Total Cost per unit = $405,000
Total Cost of building = $68,040,000
Gross income: $3.25 x 105,000sf = $341,250
$341,250 x 12 months x 95% (5% vacancy) =
$3,890,250
Net Operating Income (NOI)
@30% operating expense:
= $3,890,250 x 70% = $2,723,175
Value = NOI / Cap Rate
@4.0% Cap Rate, Value = $68,079,375
@4.5% Cap Rate, Value = $60,515,000
251 units @ 643 sf per unit = 161,391 sf
Total Cost per unit = $554,285
Total Cost of building = $139,125,000
Gross income: $4.33 x 161,391sf = $698,823
$698,823 x 12 months x 95% (5% vacancy)
= $7,966,582
Net Operating Income (NOI)
@30% operating expense:
= $7,966,582 x 70% = $5,576,607
Value = NOI / Cap Rate
@4.0% Cap Rate, Value = $139,415,175
@4.5% Cap Rate, Value = $123,924,600
Podium High-rise
Type III over Type I: Max Height 85’ Type I: Max Height Unlimited
168 units @ 625 sf per unit = 105,000 sf
Total Cost per unit = $405,000
Total Cost of building = $68,040,000
Rent: $3.25/sf or $2,275 per month
(700sf 1br)
251 units @ 643 sf per unit = 161,391 sf
Total Cost per unit = $554,285
Total Cost of building = $139,125,000
Rent: $4.33/sf or $3,031 per month
(700sf 1br)
How does land price relate to development costs?
2012: $221 per square foot
2015: $585 per square foot (Increase of 264%)
2017: $893 per square foot (Increase of 404% from 2012 & Increase of 152% from 2015)
How much can I pay for the land?
Land Price = Estimated Value – Cost of Production – Profit
What happens when the land price doubles?
Podium High-rise
168 units @ 625 sf per unit = 105,000 sf
Hard Cost: $250,000 per unit
Soft Costs: @ 30% = $75,000 per unit
Land Cost: $26.88m/168 = $160,000 per unit
Total Cost per unit = $485,000
251 units @ 643 sf per unit = 161,391 sf
Hard Cost: $385,800 per unit
Soft Costs: @ 30% = $115,740 per unit
Land Cost: $26.88m/251 = $107,091 per unit
Total Cost per unit = $608,631
Podium High-rise
Type III over Type I: Max Height 85’ Type I: Max Height Unlimited
168 units @ 625 sf per unit = 105,000 sf
Total Cost per unit = $485,000
Total Cost of building = $81,480,000
Rent required: $3.89
1br @ 700 sf
Increase from $2,275 to $2,723 = 19.6%
Net Operating Income (NOI)
@30% operating expense:
= $4,656,000 x 70% = $3,259,200
Value = NOI / Cap Rate
@4.0% Cap Rate, Value = $81,480,000
251 units @ 643 sf per unit = 161,391 sf
Total Cost per unit = $608,631
Total Cost of building = $152,766,381
Rent required: $4.74
1br @ 700 sf
Increase from $3,031 to $3,318 = 9.4%
Net Operating Income (NOI)
@30% operating expense:
= $8,729,507 x 70% = $6,110,655
Value = NOI / Cap Rate
@4.0% Cap Rate, Value = $152,766,381
Knee-jerk Reaction Policy:
Why can’t all buildings be high-rise?
Image Credit: Simon Ha
Podium High-rise
1 bedroom: $2,275 per month
2 bedroom: $3,250 per month
1 bedroom: $3,031 per month
2 bedroom: $4,330 per month
Housing is a product. We need housing at different price points.
High-risePodium
Active uses above retail at sidewalk level for additional
“Eyes on the street”
High-rise with above grade parking podiums
contribute to bad urban design
Photo Credit (both pictures): Simon Ha
Variety of high-rise and low-rise building and mix of uses are appropriate for DTLA.
Photo Credit: Google Earth
Image Credit: Steinberg
Image Credit: Steinberg
Image Credit: Simon Ha
Prohibition impacts:
1. Slow down housing production in DTLA
2. Decrease investor confidence due to anti-
development measures by the city
3. Only allowing high-rise housing with high rents
would result in an exclusive neighborhood only for
the high income individuals
4. Slowed the renaissance of DTLA: urban growth is
organic and takes decades.
• Rising land costs priced out podium buildings
organically.
• DTLA currently has 11,104 units under
construction and 29,891 units proposed.
Why are podium buildings so ugly?
Good design can be found in all building types.
Good design does not have to expensive.
“Not every building can be a
landmark, of course, but as
Downtown Los Angeles is in the
midst of a development boom
that will see numerous parking
lots replaced by residential
and other projects, one of the
most frequently asked questions
is, why is the crush of midrise
residential buildings so
unspectacular?”
Podium
Image Credit: Steinberg
Podium
Image Credit: Steinberg
Podium
Image Credit: Steinberg
Podium
Photo Credit: Paul Vu
Podium
Image Credit: Skid Row Housing Trust
Q&A

More Related Content

Similar to Multi Family Design & Development in LA

Business Case for Green Building in Canada
Business Case for Green Building in CanadaBusiness Case for Green Building in Canada
Business Case for Green Building in Canada
Jerry Yudelson
 
Demystifying Machine Learning
Demystifying Machine LearningDemystifying Machine Learning
Demystifying Machine Learning
Louis Dorard
 
Marcus & Millichap / IPA Multifamily Forum: San Francisco Bay Area Speaker Sl...
Marcus & Millichap / IPA Multifamily Forum: San Francisco Bay Area Speaker Sl...Marcus & Millichap / IPA Multifamily Forum: San Francisco Bay Area Speaker Sl...
Marcus & Millichap / IPA Multifamily Forum: San Francisco Bay Area Speaker Sl...
Ryan Slack
 
Scott Polikov Panel 1
Scott Polikov Panel 1Scott Polikov Panel 1
Scott Polikov Panel 1
San Diego Housing Federation
 
The Etobicoke Report_Spring 2016
The Etobicoke Report_Spring 2016The Etobicoke Report_Spring 2016
The Etobicoke Report_Spring 2016John LaFontaine
 
Building Energy Benchmarking and Disclosure in US Cities
Building Energy Benchmarking and Disclosure in US CitiesBuilding Energy Benchmarking and Disclosure in US Cities
Building Energy Benchmarking and Disclosure in US CitiesCliff Majersik
 
Portfolio_Digital Layout_Master LQ_05.18.16
Portfolio_Digital Layout_Master LQ_05.18.16Portfolio_Digital Layout_Master LQ_05.18.16
Portfolio_Digital Layout_Master LQ_05.18.16Noah Illes
 
The Hanover Investment Summary
The  Hanover Investment Summary The  Hanover Investment Summary
The Hanover Investment Summary
Jean Marc Landau
 
bidrenttheoryofficesector
bidrenttheoryofficesectorbidrenttheoryofficesector
bidrenttheoryofficesector
SasadeCastro
 
Toronto's Emerging South Core & Harbour Plaza Residences
Toronto's Emerging South Core & Harbour Plaza ResidencesToronto's Emerging South Core & Harbour Plaza Residences
Toronto's Emerging South Core & Harbour Plaza Residences
Lifestyles Realty Source Inc.
 
Real Estate Acquisition Case Presentation
Real Estate Acquisition Case PresentationReal Estate Acquisition Case Presentation
Real Estate Acquisition Case Presentation
Daniel Mandel
 
Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...
Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...
Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...Sustainable Business Partnership
 
Green x Design = Value
Green x Design = ValueGreen x Design = Value
Green x Design = Value
Tom Hootman
 
Bid rent theory office sector
Bid rent theory office sectorBid rent theory office sector
Bid rent theory office sector
Abhishek Kanwar
 
Civil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation SlidesCivil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation Slides
SlideTeam
 
Tinker Tower DFSS Class Exercise
Tinker Tower DFSS Class ExerciseTinker Tower DFSS Class Exercise
Tinker Tower DFSS Class Exercise
Ramon Balisnomo
 
Q1 2018 | Houston Office | Research & Forecast Report
Q1 2018 | Houston Office | Research & Forecast ReportQ1 2018 | Houston Office | Research & Forecast Report
Q1 2018 | Houston Office | Research & Forecast Report
Colliers International | Houston
 
Teplo.org.ua project presentation EN
Teplo.org.ua project presentation ENTeplo.org.ua project presentation EN
Teplo.org.ua project presentation EN
Nadia Sergiyenko
 
The 2010 U.S. Green Building Market
The 2010 U.S. Green Building MarketThe 2010 U.S. Green Building Market
The 2010 U.S. Green Building Market
Jerry Yudelson
 

Similar to Multi Family Design & Development in LA (20)

Business Case for Green Building in Canada
Business Case for Green Building in CanadaBusiness Case for Green Building in Canada
Business Case for Green Building in Canada
 
Demystifying Machine Learning
Demystifying Machine LearningDemystifying Machine Learning
Demystifying Machine Learning
 
Marcus & Millichap / IPA Multifamily Forum: San Francisco Bay Area Speaker Sl...
Marcus & Millichap / IPA Multifamily Forum: San Francisco Bay Area Speaker Sl...Marcus & Millichap / IPA Multifamily Forum: San Francisco Bay Area Speaker Sl...
Marcus & Millichap / IPA Multifamily Forum: San Francisco Bay Area Speaker Sl...
 
Scott Polikov Panel 1
Scott Polikov Panel 1Scott Polikov Panel 1
Scott Polikov Panel 1
 
The Etobicoke Report_Spring 2016
The Etobicoke Report_Spring 2016The Etobicoke Report_Spring 2016
The Etobicoke Report_Spring 2016
 
Building Energy Benchmarking and Disclosure in US Cities
Building Energy Benchmarking and Disclosure in US CitiesBuilding Energy Benchmarking and Disclosure in US Cities
Building Energy Benchmarking and Disclosure in US Cities
 
Portfolio_Digital Layout_Master LQ_05.18.16
Portfolio_Digital Layout_Master LQ_05.18.16Portfolio_Digital Layout_Master LQ_05.18.16
Portfolio_Digital Layout_Master LQ_05.18.16
 
The Hanover Investment Summary
The  Hanover Investment Summary The  Hanover Investment Summary
The Hanover Investment Summary
 
f7
f7f7
f7
 
bidrenttheoryofficesector
bidrenttheoryofficesectorbidrenttheoryofficesector
bidrenttheoryofficesector
 
Toronto's Emerging South Core & Harbour Plaza Residences
Toronto's Emerging South Core & Harbour Plaza ResidencesToronto's Emerging South Core & Harbour Plaza Residences
Toronto's Emerging South Core & Harbour Plaza Residences
 
Real Estate Acquisition Case Presentation
Real Estate Acquisition Case PresentationReal Estate Acquisition Case Presentation
Real Estate Acquisition Case Presentation
 
Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...
Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...
Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...
 
Green x Design = Value
Green x Design = ValueGreen x Design = Value
Green x Design = Value
 
Bid rent theory office sector
Bid rent theory office sectorBid rent theory office sector
Bid rent theory office sector
 
Civil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation SlidesCivil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation Slides
 
Tinker Tower DFSS Class Exercise
Tinker Tower DFSS Class ExerciseTinker Tower DFSS Class Exercise
Tinker Tower DFSS Class Exercise
 
Q1 2018 | Houston Office | Research & Forecast Report
Q1 2018 | Houston Office | Research & Forecast ReportQ1 2018 | Houston Office | Research & Forecast Report
Q1 2018 | Houston Office | Research & Forecast Report
 
Teplo.org.ua project presentation EN
Teplo.org.ua project presentation ENTeplo.org.ua project presentation EN
Teplo.org.ua project presentation EN
 
The 2010 U.S. Green Building Market
The 2010 U.S. Green Building MarketThe 2010 U.S. Green Building Market
The 2010 U.S. Green Building Market
 

More from garrjacobs

A Tale of Two CRAs: How Community Redevelopment Agencies in Florida Implement...
A Tale of Two CRAs: How Community Redevelopment Agencies in Florida Implement...A Tale of Two CRAs: How Community Redevelopment Agencies in Florida Implement...
A Tale of Two CRAs: How Community Redevelopment Agencies in Florida Implement...
garrjacobs
 
Living Paradigm - Harvey Response
Living Paradigm - Harvey Response Living Paradigm - Harvey Response
Living Paradigm - Harvey Response
garrjacobs
 
Resiliency Resources and Case Studies for your Architectural Practice
Resiliency Resources and Case Studies for your Architectural PracticeResiliency Resources and Case Studies for your Architectural Practice
Resiliency Resources and Case Studies for your Architectural Practice
garrjacobs
 
Affordable housing countering opposition
Affordable housing   countering opposition Affordable housing   countering opposition
Affordable housing countering opposition
garrjacobs
 
Mentoring the next Generation of Community Designers
Mentoring the next Generation of Community Designers Mentoring the next Generation of Community Designers
Mentoring the next Generation of Community Designers
garrjacobs
 
Participatory Design for Co-Housing
Participatory Design for Co-Housing Participatory Design for Co-Housing
Participatory Design for Co-Housing
garrjacobs
 
Emily Mcglohn equality of energy efficiency presentation
Emily Mcglohn equality of energy efficiency presentationEmily Mcglohn equality of energy efficiency presentation
Emily Mcglohn equality of energy efficiency presentation
garrjacobs
 
Transit sketch planning (webinar slides)
Transit sketch planning (webinar slides)Transit sketch planning (webinar slides)
Transit sketch planning (webinar slides)
garrjacobs
 
The changing geospatial landscape by Lyzi Diamond
The changing geospatial landscape by Lyzi DiamondThe changing geospatial landscape by Lyzi Diamond
The changing geospatial landscape by Lyzi Diamond
garrjacobs
 

More from garrjacobs (9)

A Tale of Two CRAs: How Community Redevelopment Agencies in Florida Implement...
A Tale of Two CRAs: How Community Redevelopment Agencies in Florida Implement...A Tale of Two CRAs: How Community Redevelopment Agencies in Florida Implement...
A Tale of Two CRAs: How Community Redevelopment Agencies in Florida Implement...
 
Living Paradigm - Harvey Response
Living Paradigm - Harvey Response Living Paradigm - Harvey Response
Living Paradigm - Harvey Response
 
Resiliency Resources and Case Studies for your Architectural Practice
Resiliency Resources and Case Studies for your Architectural PracticeResiliency Resources and Case Studies for your Architectural Practice
Resiliency Resources and Case Studies for your Architectural Practice
 
Affordable housing countering opposition
Affordable housing   countering opposition Affordable housing   countering opposition
Affordable housing countering opposition
 
Mentoring the next Generation of Community Designers
Mentoring the next Generation of Community Designers Mentoring the next Generation of Community Designers
Mentoring the next Generation of Community Designers
 
Participatory Design for Co-Housing
Participatory Design for Co-Housing Participatory Design for Co-Housing
Participatory Design for Co-Housing
 
Emily Mcglohn equality of energy efficiency presentation
Emily Mcglohn equality of energy efficiency presentationEmily Mcglohn equality of energy efficiency presentation
Emily Mcglohn equality of energy efficiency presentation
 
Transit sketch planning (webinar slides)
Transit sketch planning (webinar slides)Transit sketch planning (webinar slides)
Transit sketch planning (webinar slides)
 
The changing geospatial landscape by Lyzi Diamond
The changing geospatial landscape by Lyzi DiamondThe changing geospatial landscape by Lyzi Diamond
The changing geospatial landscape by Lyzi Diamond
 

Recently uploaded

Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Mansi Shah
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
n0tivyq
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
7sd8fier
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
h7j5io0
 
定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样
qo1as76n
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
ameli25062005
 
Graphic Design Tools and Software .pptx
Graphic Design Tools and Software   .pptxGraphic Design Tools and Software   .pptx
Graphic Design Tools and Software .pptx
Virtual Real Design
 
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdfSECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
eloprejohn333
 
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptxUNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
GOWSIKRAJA PALANISAMY
 
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With DesignsGame Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
184804
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
9a93xvy
 
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEEASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
Febless Hernane
 
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
kecekev
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
h7j5io0
 
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
gpffo76j
 
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
h7j5io0
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
ameli25062005
 
Connect Conference 2022: Passive House - Economic and Environmental Solution...
Connect Conference 2022: Passive House -  Economic and Environmental Solution...Connect Conference 2022: Passive House -  Economic and Environmental Solution...
Connect Conference 2022: Passive House - Economic and Environmental Solution...
TE Studio
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
Virtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburghVirtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburgh
millarj46
 

Recently uploaded (20)

Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
 
定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
 
Graphic Design Tools and Software .pptx
Graphic Design Tools and Software   .pptxGraphic Design Tools and Software   .pptx
Graphic Design Tools and Software .pptx
 
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdfSECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
 
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptxUNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
UNIT IV-VISUAL STYLE AND MOBILE INTERFACES.pptx
 
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With DesignsGame Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
 
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEEASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
 
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
 
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
 
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
 
Connect Conference 2022: Passive House - Economic and Environmental Solution...
Connect Conference 2022: Passive House -  Economic and Environmental Solution...Connect Conference 2022: Passive House -  Economic and Environmental Solution...
Connect Conference 2022: Passive House - Economic and Environmental Solution...
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
Virtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburghVirtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburgh
 

Multi Family Design & Development in LA

  • 1. Multi-Family Design in Type V/III Podium vs. Type I High-Rise Construction
  • 2. Multi-Family Design in Type V/III Podium vs. Type I High-Rise Construction Photo Credit: Simon HaPhoto Credit: Simon Ha
  • 4. 2007 2014 Image Credit: Harley Ellis DevereauxImage Credit: KPF
  • 5. Photo Credit: Buzzbuzzhome.comImage Credit: Studio Daniel Libeskind 2007 2014
  • 6. Image credit: GBD Architects 2007 (Portland, OR)
  • 7. Image Credit: Jones Architecture, GBD ArchitectsPhoto Credit: Andre Bonacin 2007 2017
  • 9. Learning Objective #1 Understand and describe the design challenges and opportunities in designing high-density housing in podium and high-rise construction. Learning Objective #2 Understand and describe the economics of producing high-density housing in podium and high-rise construction. Learning Objective #3 Discuss the potential policies that may impact housing production. Learning Objective #4 Understand and describe the basics of multi-family real estate development.
  • 10. Speaker: Simon Ha, AIA, LEED AP Partner @ Steinberg, Los Angeles, CA AIA HCD Chair, DLANC Planning and Land Use, Re:Code LA
  • 11. Why the shift from high-rise to podium housing?
  • 12. Why the shift? Building Code change to allow mixed-use buildings in 2007, 2010, 2013, 2016. CBC Section 510 - Special Provisions 510.2 Horizontal Building Separation Allowance Buildings are separate if: 1. 3 hour horizontal assembly 2. below horizontal assembly is max. 1** story 3. below horizontal assembly is Type IA 4-7. other requirements: shafts, occupancy, sprinklers, max height etc. City of LA: Code Modification to allow 2 stories above grade CBC 2016 eliminated limitations on stories below horizontal separation
  • 14. Image Credit: TCA Architects
  • 18. “Not every building can be a landmark, of course, but as Downtown Los Angeles is in the midst of a development boom that will see numerous parking lots replaced by residential and other projects, one of the most frequently asked questions is, why is the crush of midrise residential buildings so unspectacular?”
  • 20. Image Credit: GMP Architects
  • 21. Image Credit: Tagawa Smith Martin
  • 22. Image Credit: Tagawa Smith Martin
  • 23. Development of Type III Podium vs. Type I High-Rise Construction
  • 25. Podium High-rise Type III over Type I: Max Height 85’ Type I: Max Height Unlimited 168 units @ 625 sf per unit = 105,000 sf Construction Hard Cost: approximately $400/sf net rentable 105,000 sf x $400 = $42,000,000 $250,000 per unit 251 units @ 643 sf per unit = 161,391 sf Construction Hard Cost: $385,800 per unit approx. $600/sf net rentable 161,393 sf x $600 = $96,835,800 $385,800 per unit
  • 26. Podium High-rise Type III over Type I: Max Height 85’ Type I: Max Height Unlimited 168 units @ 625 sf per unit = 105,000 sf Hard Cost: $250,000 per unit Soft Costs: @ 30% = $75,000 per unit Land Cost: $13.44m/168 = $80,000 per unit Total Cost per unit = $405,000 251 units @ 643 sf per unit = 161,391 sf Hard Cost: $385,800 per unit Soft Costs: @ 30% = $115,740 per unit Land Cost: $13.44m/251 = $53,545 per unit Total Cost per unit = $554,285
  • 27. Podium High-rise Type III over Type I: Max Height 85’ Type I: Max Height Unlimited 168 units @ 625 sf per unit = 105,000 sf Total Cost per unit = $405,000 Total Cost of building = $68,040,000 Gross income: $3.25 x 105,000sf = $341,250 $341,250 x 12 months x 95% (5% vacancy) = $3,890,250 Net Operating Income (NOI) @30% operating expense: = $3,890,250 x 70% = $2,723,175 Value = NOI / Cap Rate @4.0% Cap Rate, Value = $68,079,375 @4.5% Cap Rate, Value = $60,515,000 251 units @ 643 sf per unit = 161,391 sf Total Cost per unit = $554,285 Total Cost of building = $139,125,000 Gross income: $4.33 x 161,391sf = $698,823 $698,823 x 12 months x 95% (5% vacancy) = $7,966,582 Net Operating Income (NOI) @30% operating expense: = $7,966,582 x 70% = $5,576,607 Value = NOI / Cap Rate @4.0% Cap Rate, Value = $139,415,175 @4.5% Cap Rate, Value = $123,924,600
  • 28. Podium High-rise Type III over Type I: Max Height 85’ Type I: Max Height Unlimited 168 units @ 625 sf per unit = 105,000 sf Total Cost per unit = $405,000 Total Cost of building = $68,040,000 Rent: $3.25/sf or $2,275 per month (700sf 1br) 251 units @ 643 sf per unit = 161,391 sf Total Cost per unit = $554,285 Total Cost of building = $139,125,000 Rent: $4.33/sf or $3,031 per month (700sf 1br)
  • 29. How does land price relate to development costs?
  • 30.
  • 31. 2012: $221 per square foot 2015: $585 per square foot (Increase of 264%) 2017: $893 per square foot (Increase of 404% from 2012 & Increase of 152% from 2015)
  • 32. How much can I pay for the land? Land Price = Estimated Value – Cost of Production – Profit What happens when the land price doubles? Podium High-rise 168 units @ 625 sf per unit = 105,000 sf Hard Cost: $250,000 per unit Soft Costs: @ 30% = $75,000 per unit Land Cost: $26.88m/168 = $160,000 per unit Total Cost per unit = $485,000 251 units @ 643 sf per unit = 161,391 sf Hard Cost: $385,800 per unit Soft Costs: @ 30% = $115,740 per unit Land Cost: $26.88m/251 = $107,091 per unit Total Cost per unit = $608,631
  • 33. Podium High-rise Type III over Type I: Max Height 85’ Type I: Max Height Unlimited 168 units @ 625 sf per unit = 105,000 sf Total Cost per unit = $485,000 Total Cost of building = $81,480,000 Rent required: $3.89 1br @ 700 sf Increase from $2,275 to $2,723 = 19.6% Net Operating Income (NOI) @30% operating expense: = $4,656,000 x 70% = $3,259,200 Value = NOI / Cap Rate @4.0% Cap Rate, Value = $81,480,000 251 units @ 643 sf per unit = 161,391 sf Total Cost per unit = $608,631 Total Cost of building = $152,766,381 Rent required: $4.74 1br @ 700 sf Increase from $3,031 to $3,318 = 9.4% Net Operating Income (NOI) @30% operating expense: = $8,729,507 x 70% = $6,110,655 Value = NOI / Cap Rate @4.0% Cap Rate, Value = $152,766,381
  • 34. Knee-jerk Reaction Policy: Why can’t all buildings be high-rise?
  • 35.
  • 37. Podium High-rise 1 bedroom: $2,275 per month 2 bedroom: $3,250 per month 1 bedroom: $3,031 per month 2 bedroom: $4,330 per month Housing is a product. We need housing at different price points.
  • 38. High-risePodium Active uses above retail at sidewalk level for additional “Eyes on the street” High-rise with above grade parking podiums contribute to bad urban design Photo Credit (both pictures): Simon Ha
  • 39. Variety of high-rise and low-rise building and mix of uses are appropriate for DTLA. Photo Credit: Google Earth
  • 42. Image Credit: Simon Ha Prohibition impacts: 1. Slow down housing production in DTLA 2. Decrease investor confidence due to anti- development measures by the city 3. Only allowing high-rise housing with high rents would result in an exclusive neighborhood only for the high income individuals 4. Slowed the renaissance of DTLA: urban growth is organic and takes decades. • Rising land costs priced out podium buildings organically. • DTLA currently has 11,104 units under construction and 29,891 units proposed.
  • 43. Why are podium buildings so ugly? Good design can be found in all building types. Good design does not have to expensive.
  • 44. “Not every building can be a landmark, of course, but as Downtown Los Angeles is in the midst of a development boom that will see numerous parking lots replaced by residential and other projects, one of the most frequently asked questions is, why is the crush of midrise residential buildings so unspectacular?”
  • 49. Podium Image Credit: Skid Row Housing Trust
  • 50. Q&A