SlideShare a Scribd company logo
CHAPTER 11 • ROOFING • 365
ROOFING
11.30 Good roofing practice
Introduction to MRC Group
MRC Group is the ONLY designer, installer and maintainer of metal roof systems in Africa whose services & works are backed with the ‘Guardian’
System Warranty. Our unique turn-key offering from “cradle to grave” provides all of our clients with peace of mind, not just during the on-site works,
but throughout the life of the guarantee.
Metal roof solutions in ‘Pierced Fix’ & ‘Concealed or Secret Fix’ roof sheeting include:
• Single Skin Roof Systems
• Compressed Insulation Roof Systems
• Double Skin Built-Up New Build Roof Systems
• Over-Roofing Roof Systems
• Energy effiecient roof systems
• Accoustic roof systems
• High security roof and cladding system
• Metal refurbishment systems
All metal roof systems are designed and supplied in a range of differing metals and finishes to suit the design brief and the location of the site.
Guarantees / Warranties
Generally, traditional guarantees are provided to the client and are split into two areas:
• Long term Product / Material Guarantees on the main roof system items up to 20 years depending on the material, the coating and the site location.
• Short term 1 or 5 Year Workmanship Warranty.
(This generally does not cover design, perimeter details, penetrations, junctions between different roof systems or maintenance.)
MRC’s unrivalled all encompassing, transferrable ‘Guardian’ System Warranty.
• Up to 20 year system warranty including design, materials, workmanship & maintenance.
• Cover is on all installed systems by MRC Group – Metal Roofing & Cladding, Green Roof Systems, Waterproofing, Protective Coatings & Fire Walls.
• Includes all parts of the system, perimeter details, penetrations, junction points between different roof system and maintenance.
The ‘Guardian’ System Warranty covers the roof system, junctions points AND perimeter details for:
• Design
• Materials
• Workmanship
• Maintenance
All the above are for the SAME length of term i.e. the workmanship & maintenance match the same length of term as the product guarantee. The length
of term is determined by the product guarantee of the roof sheeting and its location. Typically metal roof systems are up to 20 years.
IMAGES
366 • www.buildaid.co.za
Compressed insulation roof systems
System overview
A compressed insulated roof system is generally constructed using restraining wire laid 90 degrees to the purlin, at centres to suit the flexible bulk
density insulation, with the metal roof system installed on top of the insulation thereby compressing the insulation between roof sheet and purlin.The
compressed insulation can lose up to 40% of its stated uncompressed thermal performance.
Glass wool bulk density insulation has a Fire Classification of Class 1 (non-combustible) with a melting temperature of over 750 degrees °C. By
comparison polystyrene insulation has a dramatically lower melting temperature and needs to be careful considered if a roof system is installed above,
as the polystyrene insulation may shrink over time and then the metal roof system will become loose.
Pierced Fix Compressed insulation considerations:
• Should only be considered for roof pitches above 7.5 degrees.
• End laps should be sealed with two runs of sealant to ensure no
wind driven water ingress from outside or water ingress from internal
condensation.
• Side laps should be sealed and stitched to ensure no water ingress.
• Minumum of class 3 exposed fixings complete with washers,
depending on the site location.
Concealed Fix Compressed insulation considerations:
• Can be used on roof pitches down to 2 degrees. Should openings
or penetrations be designed into the roof system then increasing the
roof pitch to 7.5 degrees should be considered.
• Please note that the use of compressed insulation thicker than 100mm
is NOT advised with a ‘Secret Fix’ Roof System. Although additional
fixings can be used on the clip, there will be additional pressure from
the compressed insulation onto the roof sheet surrounding the clip.
Built-Up or double skin metal roof systems
System overview
A ‘Built-Up’ or ‘Double Skin’ Metal roof and cladding system using either metal trapezoidal profile liner sheet or wood liner over-purlin with the
AshGridTM
bar & bracket support system providing an uncompressed insulation solution. Please note that the insulation is not compressed therefore
higher thermal performance can be achieved compared to the compressed insulation systems.
The installation of the metal or timber liner over-purlin provides a safe working platform to install the rest of the roof system and enables the general
building works below to continue. The metal liner sheet is normally supplied in white providing a clean soffit within the building.
Due to the multi layered approach of ‘Built-Up’ or ‘Double Skin’ Metal roof systems, a large array of solutions can be designed as follows :-
• Air tight energy efficient roof systems • Specialist acoustic roofs • Green roof systems • High security systems • High humidity systems
Pierced Fix Built-Up considerations: Concealed Fix Built-Up considerations:
• R-Values of over 10 m2
.K/W achievable as the bracket heights range from 60mm to over 300mm.
• The over-purlin liner sheet provides top flange restraint of the purlins and increased protection from wind to the roof system above.
• The sealing of the liner sheet across the end laps, side laps and to the walls will provide an air-tight building.
• All Built-Up metal roof system provide a weighted sound reduction of 40dB+ and reduce rain drumming.
• Sound absorption option available with an perforated liner sheet.
CHAPTER 11 • ROOFING • 367
ROOFING
Metal Roof Refurbishment Solutions
System overview
Metal roofing and cladding refurbishment solutions include over-roofing / over-cladding and the opportunity to increase the roof pitch without removing
and disposing of the existing roof systems. Generally the building can remain operational during the works.
The patented AshGrid™ System is installed in the troughs of the existing roof sheeting with the brackets fixed directly to the underlying steel or timber
purlins, thus creating an engineered, structurally defined cavity between the old and new roof coverings.
Over-roofing Roof System considerations:
• Option of upgrading the existing thermal and acoustic performance
by insulating the structural void.
• The weight of the new roof system and the AshGridTM
system is
between 6 – 12 kg/m2 depending on the material and whether the
option of the insulation is to be used.
Increasing the Roof Pitch considerations:
• AshGrid’s range of brackets from 60mm to over 300mm provide the
opportunity to increase the pitch of the roof. Should a steeper pitch
be required then structural top-hat sections can be installed below
the bar and bracket system to gain the required height.
• Pitched to curved roof solutions can be designed using the same
system.
368 • www.buildaid.co.za
The purpose of a ridge/headwall flashing is to complete the intersection between two opposing roof planes and to seal the building against water
penetration.
N.B. ‘Secret’ or ‘Concealed’ Fix roof sheeting can be installed down to a 2 degree roof pitch and therefore a minimum overall ridge flashing should be
840mm using 0.8mm gauge steel.
The complete construction of the ridge/headwall detail must prevent direct and wind driven water from entering the building, close off the insulation
void and ensure that debris does not build-up forming moisture traps that will have a negative impact on the roof sheeting.
Essential key components:
Metal ridge flashing with Fasteners Metal serrated closure
Expanded polyethylene Polyclosure Mastic sealant to one side of polyclosure
Roof sheet ‘turn up’
Please note it is essential that ALL components are installed correctly to stop
water ingress
RIDGE	
• Flashing	Gauge	0.8mm	
• Total	Girth	840mm	
• Serrated	Closure	
• Polyclosure	
• Mastic	Seal	to	Polyclosure	
• Turn	Up	of	Roof	Sheet
HEADWALL	
• Flashing	Gauge	0.8mm	
• Total	Girth	840mm	
• Serrated	Closure	
• Polyclosure	
• Mastic	Seal	to	Polyclosure	
• Turn	Up	of	Roof	Sheet
SIDEWALL	
• Flashing	Gauge	0.55mm	
• Separate	Support	Zed	
• Isolating	Sealant	Tape	
• Metal	Counter	Flashing	
• Angled	Return	
• Height	Overall	min.	150mm
BARGE	
• Flashing	Gauge	0.55mm	
• Separate	Support	Zed	
• Isolating	Sealant	Tape
www.mrc-group.co.za	
info@mrc-group.co.za
Flashings
The Art of Perimeter Detailing
Roof sheeting manufacturers provide a guide to perimeter details such as ridges, barges, side walls, head walls and change in angle details, setting out
the principles of how the details should be designed and constructed to ensure no water ingress, but it is the responsibility of the designer to ensure
the correct size and gauge of the flashing which may well exceed the standard size.
Commonly, steel coils that are used in the manufacture of flat sheets for flashings are generally 925mm wide and therefore a standard total girth of a
barge, ridge or side wall tends to be 462mm i.e. 2 lengths of flashing produced from a flat sheet. However in many circumstances these perimeter
flashing details are applied to every project, with little consideration of the roof pitch, site location and roof height which all has an impact on their design
such as flashing girth and metal gauge.
However, coils do come in various widths which does therefore allow for wider flashing details. In most cases if there is a failure of the roof perimeter
details it is normally due to omission of elements such as polyclosures or undersized flashings.
MRC Group’s commitment to excellence in perimeter detailing is backed with the unrivalled single source ‘Guardian’ System Warranty which covers
design, materials, installation & maintenance for the term of the roofing and cladding system.
Principles of Ridge and Headwall design
CHAPTER 11 • ROOFING • 369
ROOFING
Indicative Sections
To determine the overall girth of the ridge/headwall flashing the following should be considered:-
• Roof Pitch
• Length of the roof sheet due to thermal expansion
• Wind loads, Site location and Environment
Dim. ‘A’ – The lower the roof pitch the longer this dimension should be to stop wind driven rain.
Dim. ‘B’ – This dimension is determined by the purlin distance. (*In the below table we have assumed 100mm)
Table of Minimum Dimensions to determine the correct girth of Ridge Flashings.
Flashing Girth
Calculator
Ridge Edge Turn
Down
Dim ‘A’ Dim ‘B’ (*)
Leg of the
Flashing
Total Girth (both
sides)
Minimum Gauge
of Steel
Roof Pitch up to
7.5 Degrees
20mm 300mm 100mm 420mm 840mm 0.8mm
Roof Pitch over
7.5 Degrees
20mm 225mm 100mm 345mm 690mm 0.8mm
Please note that any flat, unbent surfaces greater than 270mm should be formed from 0.8mm gauge steel
Edge of the flashing to turn
up of the roof sheet
Maximum cantilever of the roof
sheet 175 - 225mm max
Dim. ‘A’
Dim. ‘C’
Dim. ‘B’
370 • www.buildaid.co.za
The purpose of a barge/sidewall flashing is to complete the intersection between the roof and wall planes and to seal the building against water
penetration. For a barge/sidewall flashing to be effective, it must be durable, low-maintenance, weather resistant, compatible with adjoining materials,
and also able to accommodate thermal movement.
The complete construction of the barge/sidewall detail must prevent direct and wind driven water from entering the building and close off the insulation
void. All barge/sidewall flashings used with a concealed or secret fix roof system must be fixed to the independent zed support to allow the roof sheet
to thermally move without distorting the barge/sidewall flashing.
Essential key components:
Metal barge flashing with Fasteners Sealant tape between the rib and the zed
Metal counter flashing With angled return Flashing to be fixed to the Independent zed
Please note it is essential that ALL components are installed correctly to withstand the impact from wind driven rain and to stop water ingress
Principles of Sidewall and Barge design
Pierced fix Sidewall and Barge design Concealed fix Sidewall and Barge design
The barge/sidewall flashing is fixed to the independent zed support to
allow the roof sheet to thermally move without putting additional thermal
stress on the flashing. Should the fixing between the barge flashing & the
zed support leak then the water will drain onto the roof sheet & into the
gutter therefore not entering the building.
‘Secret fix’ or ‘concealed fix’ roof sheets can thermally move 1 – 2mm
per linear metre of roof sheet in steel or 5 – 6mm in aluminum i.e. a
30 metre long steel roof sheet can thermally move 30 – 60mm. If the
barge flashings are fixed to the rib of the roof sheet or the flashing barge/
sidewall clips do NOT allow for this amount of thermal expansion then the
pressure on the barge flashing will cause visual distortion, loosening the
fixings and could eventually fall off the building.
Dim. ‘A’ – A barge flashing must cover a minimum of two ribs.
If the position of roof sheet rib finishes flush then Dim ‘A’ will be 220mm,
should the rib of the roof sheet NOT finish flush then Dim ‘A’ could be in
excess of 344mm.
(Please note this calculation is based on a standard IBR Profile.)
Should the gable of the building be angled on plan then you could need
barge/sidewall flashings that cover 3 or 4 ribs, to provide the minimum of
2 ribs at the narrowest point.
The sealant tape between the roof sheet rib and the flashing is essential to
stop wind driven rain entering the barge/sidewall detail. Should any water
get into the detail, past the sealant, then the force from the wind will have
been stopped and the water will roll down the pan into the gutter.
Dim ‘A’ - Minimum of Two Ribs
Sealant tape
Sealant tape
Independent Zed
support
CHAPTER 11 • ROOFING • 371
ROOFING
If ‘Pierced Fix’ roof sheeting is installed and the roof slope length is longer than the manufactured roof sheeting supplied, then end laps need to be
formed over the supporting purlin.
For an end lap detail to be effective, the detail must prevent direct and wind driven water from entering the building, close off the insulation void and
also be able to accommodate thermal movement
All end laps must have 2 runs of end lap sealant and the roof sheeting secured at every rib position with fasteners.
Essential key components:
Fasteners at every rib End lap sealant tapes between roof sheets
Optional end lap sealant tapes for air tight seal
Please note it is essential that ALL components are installed correctly to withstand the impact from wind driven rain and to stop water ingress
Pierced fix end laps and sealants
Please note that end lap details are used with ‘Pierced Fix’ metal roof
systems and should ONLY be used down to a minimum roof pitch of 7.5
degrees. Roof pitches below 7.5 degrees should always use a single roof
sheet with no end laps i.e. a ‘Secret Fix’ metal roof system.
ASYMMETRIC OR SYMMETRICAL END LAP
Some designers recommend an asymmetric design where the fixing is
typically positioned towards the top third of the lap, however this has
been shown to apply most of its compression to the sealant positioned
towards the top of the end lap and less compression to sealant positioned
towards the bottom of the lap.
MRC Group prefers the symmetrical design of a centrally fixed end
lap detail that allows the fixing to apply equal pressure to the sealants
positioned at the upper and lower ends of the lap, which has been shown
to provide a more effective continuous seal.
SECURING THE END LAP
Class 3 or 4 (depending on the location of the site) main fixings complete
with washers to suit the roof sheet material and the structure, are to be
used through EVERY rib into the structure below.
372 • www.buildaid.co.za
Essential key components:
Fasteners at 500mm centres maximum
along the side lap
Side lap sealant tapes between roof sheets
Please note it is essential that ALL components are installed correctly to withstand the impact from wind driven rain and to stop water ingress
TECHNICAL DATA FOR CORRECT CONSTRUCTION:
SECURING THE SIDE LAP
Class 3 or 4 (depending on the location of the site) tapered stitching
screw fixings complete with washers to suit the roof sheet material, are to
be installed at EVERY 500mm centres maximum.
SIDE LAP SEALANT TAPE BETWEEEN THE ROOF SHEETS ON
ALL ROOFS BELOW 7.5 DEGREES.
It is essential to install 1 continuous compressed 8mm diameter
continuous self-adhesive butyl tape or impregnated polyurethane foam
sealing strip between each adjacent ‘pierced fix’ roof sheet to ensure a
clean, dry and high performing detail on all roof below 7.5 degrees.
It can be argued that the addition of sealant tape accross the side laps
and end laps helps strengthen the roof sheeting performance.
All ‘Pierced Fix’ roof sheeting should be with installed with fasteners at 500mm centres maximum on every side lap.
If the roof pitch is less than 7.5 degrees then side lap sealant tape should be installed between the roof sheets to ensure no water ingress.
For a side lap detail to be effective, the detail must prevent direct and wind driven water from entering the building, close off the insulation void and
also be able to accommodate thermal movement.
Pierced fix side laps and sealants
For our growing library of technical details, system data sheets, technical drawings and ‘how to’ guides please visit
www.mrc-group.co.za/technical-bulletins
MRC Group - (LOW RES) Excellence Metal Roofing pages

More Related Content

What's hot

Curtain wall%2 f facade system
Curtain wall%2 f facade systemCurtain wall%2 f facade system
Curtain wall%2 f facade system
ahmong4
 
Fm 00064 ams composite standing seam ii panel june, 2009_129236159432863269
Fm 00064 ams composite standing seam ii panel  june, 2009_129236159432863269Fm 00064 ams composite standing seam ii panel  june, 2009_129236159432863269
Fm 00064 ams composite standing seam ii panel june, 2009_129236159432863269Shaik Abdulla
 
IRJET- 3D Polysterene Wire Panel Construction System
IRJET- 3D Polysterene Wire Panel Construction SystemIRJET- 3D Polysterene Wire Panel Construction System
IRJET- 3D Polysterene Wire Panel Construction System
IRJET Journal
 
Curtain wall
Curtain wallCurtain wall
Curtain wall
Kamrul Hasan Sagar
 
2013-08-29 econogrid WEB
2013-08-29 econogrid WEB2013-08-29 econogrid WEB
2013-08-29 econogrid WEBJanine Course
 
Facade engineering
Facade engineeringFacade engineering
Facade engineering
Kunaraj Sujeevan
 
Airex Manufacturing Pro System Kit www.airexmfg.com
Airex Manufacturing Pro System Kit   www.airexmfg.comAirex Manufacturing Pro System Kit   www.airexmfg.com
Airex Manufacturing Pro System Kit www.airexmfg.com
Airex Manufacturing Inc
 
Acp panel
Acp panelAcp panel
Acp panel
sonali parashar
 
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazing
aduiti
 
Fire proofing of steel
Fire proofing of steelFire proofing of steel
Fire proofing of steel
SHakar Husain
 
Airex Pro System Kit
Airex Pro System KitAirex Pro System Kit
Airex Pro System Kit
Airex Manufacturing Inc
 
Monel mesh- Highly durable material, preferred for fittings
Monel mesh- Highly durable material, preferred for fittingsMonel mesh- Highly durable material, preferred for fittings
Monel mesh- Highly durable material, preferred for fittings
Heanjia Alloys
 
false ceiling
false ceilingfalse ceiling
false ceiling
Manojnegi9777
 
LiamBaines_Construction_FACADES
LiamBaines_Construction_FACADESLiamBaines_Construction_FACADES
LiamBaines_Construction_FACADESLiam Baines
 
Flash peno roof_walls
Flash peno roof_wallsFlash peno roof_walls
Flash peno roof_wallsPhil House
 
Insulated metal wall and roof panels for sustainability and energy efficiency...
Insulated metal wall and roof panels for sustainability and energy efficiency...Insulated metal wall and roof panels for sustainability and energy efficiency...
Insulated metal wall and roof panels for sustainability and energy efficiency...Derrick Teal
 
Product Katalog Bluescope Lysaght
Product Katalog Bluescope LysaghtProduct Katalog Bluescope Lysaght
Product Katalog Bluescope Lysaght
Parama Steel
 

What's hot (20)

Curtain wall%2 f facade system
Curtain wall%2 f facade systemCurtain wall%2 f facade system
Curtain wall%2 f facade system
 
Fm 00064 ams composite standing seam ii panel june, 2009_129236159432863269
Fm 00064 ams composite standing seam ii panel  june, 2009_129236159432863269Fm 00064 ams composite standing seam ii panel  june, 2009_129236159432863269
Fm 00064 ams composite standing seam ii panel june, 2009_129236159432863269
 
IRJET- 3D Polysterene Wire Panel Construction System
IRJET- 3D Polysterene Wire Panel Construction SystemIRJET- 3D Polysterene Wire Panel Construction System
IRJET- 3D Polysterene Wire Panel Construction System
 
Curtain wall
Curtain wallCurtain wall
Curtain wall
 
2013-08-29 econogrid WEB
2013-08-29 econogrid WEB2013-08-29 econogrid WEB
2013-08-29 econogrid WEB
 
Facade engineering
Facade engineeringFacade engineering
Facade engineering
 
Airex Manufacturing Pro System Kit www.airexmfg.com
Airex Manufacturing Pro System Kit   www.airexmfg.comAirex Manufacturing Pro System Kit   www.airexmfg.com
Airex Manufacturing Pro System Kit www.airexmfg.com
 
Acp panel
Acp panelAcp panel
Acp panel
 
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazing
 
Fire proofing of steel
Fire proofing of steelFire proofing of steel
Fire proofing of steel
 
Structural glazing details
Structural glazing detailsStructural glazing details
Structural glazing details
 
Airex Pro System Kit
Airex Pro System KitAirex Pro System Kit
Airex Pro System Kit
 
Monel mesh- Highly durable material, preferred for fittings
Monel mesh- Highly durable material, preferred for fittingsMonel mesh- Highly durable material, preferred for fittings
Monel mesh- Highly durable material, preferred for fittings
 
false ceiling
false ceilingfalse ceiling
false ceiling
 
False ceiling 6th sem
False ceiling 6th sem False ceiling 6th sem
False ceiling 6th sem
 
LiamBaines_Construction_FACADES
LiamBaines_Construction_FACADESLiamBaines_Construction_FACADES
LiamBaines_Construction_FACADES
 
Flash peno roof_walls
Flash peno roof_wallsFlash peno roof_walls
Flash peno roof_walls
 
Insulated metal wall and roof panels for sustainability and energy efficiency...
Insulated metal wall and roof panels for sustainability and energy efficiency...Insulated metal wall and roof panels for sustainability and energy efficiency...
Insulated metal wall and roof panels for sustainability and energy efficiency...
 
ABLOY Candados
ABLOY CandadosABLOY Candados
ABLOY Candados
 
Product Katalog Bluescope Lysaght
Product Katalog Bluescope LysaghtProduct Katalog Bluescope Lysaght
Product Katalog Bluescope Lysaght
 

Viewers also liked

Local Area Marketing Partners
Local Area Marketing PartnersLocal Area Marketing Partners
Local Area Marketing Partners
Therenaissanceapts
 
Diapositiva - Medio ambiente
Diapositiva - Medio ambienteDiapositiva - Medio ambiente
Diapositiva - Medio ambiente
jess_1783
 
Från förvaltningsstyrning till digitalisering
Från förvaltningsstyrning till digitaliseringFrån förvaltningsstyrning till digitalisering
Från förvaltningsstyrning till digitalisering
Evelina Obäck
 
Wait! These are Mobile Marketing STATS That You Need To Know
Wait! These are Mobile Marketing STATS That You Need To KnowWait! These are Mobile Marketing STATS That You Need To Know
Wait! These are Mobile Marketing STATS That You Need To Know
Pepper Gang
 
What is On the Horizon for Academic Advising in Higher Ed?
What is On the Horizon for Academic Advising in Higher Ed?What is On the Horizon for Academic Advising in Higher Ed?
What is On the Horizon for Academic Advising in Higher Ed?Laura Pasquini
 
Env anal eval of veg oil ind att in India
Env anal eval of veg oil ind att in IndiaEnv anal eval of veg oil ind att in India
Env anal eval of veg oil ind att in IndiaVivekanandan M
 
BizTalk Server with SQL Server AlwaysOn
BizTalk Server with SQL Server AlwaysOnBizTalk Server with SQL Server AlwaysOn
BizTalk Server with SQL Server AlwaysOn
BizTalk360
 
How Can You Determined If A Contract Was Breached: A Guide for Conshohocken, ...
How Can You Determined If A Contract Was Breached: A Guide for Conshohocken, ...How Can You Determined If A Contract Was Breached: A Guide for Conshohocken, ...
How Can You Determined If A Contract Was Breached: A Guide for Conshohocken, ...
Curley & Rothman, LLC
 
Understanding Reasonable Accomodation: A Guide for Conshohocken Business Owne...
Understanding Reasonable Accomodation: A Guide for Conshohocken Business Owne...Understanding Reasonable Accomodation: A Guide for Conshohocken Business Owne...
Understanding Reasonable Accomodation: A Guide for Conshohocken Business Owne...
Curley & Rothman, LLC
 

Viewers also liked (12)

Local Area Marketing Partners
Local Area Marketing PartnersLocal Area Marketing Partners
Local Area Marketing Partners
 
2013 эмчилгээ 06
2013 эмчилгээ  062013 эмчилгээ  06
2013 эмчилгээ 06
 
Diapositiva - Medio ambiente
Diapositiva - Medio ambienteDiapositiva - Medio ambiente
Diapositiva - Medio ambiente
 
Mexico
MexicoMexico
Mexico
 
SHS Catalog
SHS CatalogSHS Catalog
SHS Catalog
 
Från förvaltningsstyrning till digitalisering
Från förvaltningsstyrning till digitaliseringFrån förvaltningsstyrning till digitalisering
Från förvaltningsstyrning till digitalisering
 
Wait! These are Mobile Marketing STATS That You Need To Know
Wait! These are Mobile Marketing STATS That You Need To KnowWait! These are Mobile Marketing STATS That You Need To Know
Wait! These are Mobile Marketing STATS That You Need To Know
 
What is On the Horizon for Academic Advising in Higher Ed?
What is On the Horizon for Academic Advising in Higher Ed?What is On the Horizon for Academic Advising in Higher Ed?
What is On the Horizon for Academic Advising in Higher Ed?
 
Env anal eval of veg oil ind att in India
Env anal eval of veg oil ind att in IndiaEnv anal eval of veg oil ind att in India
Env anal eval of veg oil ind att in India
 
BizTalk Server with SQL Server AlwaysOn
BizTalk Server with SQL Server AlwaysOnBizTalk Server with SQL Server AlwaysOn
BizTalk Server with SQL Server AlwaysOn
 
How Can You Determined If A Contract Was Breached: A Guide for Conshohocken, ...
How Can You Determined If A Contract Was Breached: A Guide for Conshohocken, ...How Can You Determined If A Contract Was Breached: A Guide for Conshohocken, ...
How Can You Determined If A Contract Was Breached: A Guide for Conshohocken, ...
 
Understanding Reasonable Accomodation: A Guide for Conshohocken Business Owne...
Understanding Reasonable Accomodation: A Guide for Conshohocken Business Owne...Understanding Reasonable Accomodation: A Guide for Conshohocken Business Owne...
Understanding Reasonable Accomodation: A Guide for Conshohocken Business Owne...
 

Similar to MRC Group - (LOW RES) Excellence Metal Roofing pages

LiveIn Quarters
LiveIn QuartersLiveIn Quarters
LiveIn Quarters
clicknow
 
Metal Roof Restoration
Metal Roof Restoration Metal Roof Restoration
Metal Roof Restoration
Daryle Bethea
 
All types of insulation material suppliers in Greater Noida
All types of insulation material suppliers in Greater NoidaAll types of insulation material suppliers in Greater Noida
All types of insulation material suppliers in Greater Noida
AVEngineers
 
Stick framing system with glazing
Stick framing system with glazingStick framing system with glazing
Stick framing system with glazing
DanishPathan7
 
CLADDING AND GLAZING.pptx
CLADDING AND GLAZING.pptxCLADDING AND GLAZING.pptx
CLADDING AND GLAZING.pptx
AKASHICWORLD
 
8.0 Installation of Ceiling Batts.pdf
8.0 Installation of Ceiling Batts.pdf8.0 Installation of Ceiling Batts.pdf
8.0 Installation of Ceiling Batts.pdf
Insulation2
 
Metal roofing system
Metal roofing systemMetal roofing system
Metal roofing system
graysherry24
 
material ppt
material pptmaterial ppt
material ppt
DeeshaKhamar1
 
five_e_brochure
five_e_brochurefive_e_brochure
five_e_brochureTim Kikot
 
Ash and Lacy SA Over Roofing Steel Roofs A4 4pp Hi
Ash and Lacy SA Over Roofing Steel Roofs A4 4pp HiAsh and Lacy SA Over Roofing Steel Roofs A4 4pp Hi
Ash and Lacy SA Over Roofing Steel Roofs A4 4pp HiDion Marsh
 
Curtain walls
Curtain wallsCurtain walls
Curtain walls
Aaqib Iqbal
 
Detay
DetayDetay
MaperGlas_CTU_Telescopic_Enclosures
MaperGlas_CTU_Telescopic_EnclosuresMaperGlas_CTU_Telescopic_Enclosures
MaperGlas_CTU_Telescopic_Enclosures
MAPERGLAS
 
XtraFlex Systems Brochure
XtraFlex Systems BrochureXtraFlex Systems Brochure
XtraFlex Systems BrochureJerry Solov
 
Building technology report
Building technology reportBuilding technology report
Building technology report
Chong Yi Hui
 

Similar to MRC Group - (LOW RES) Excellence Metal Roofing pages (20)

LiveIn Quarters
LiveIn QuartersLiveIn Quarters
LiveIn Quarters
 
Metal Roof Restoration
Metal Roof Restoration Metal Roof Restoration
Metal Roof Restoration
 
All types of insulation material suppliers in Greater Noida
All types of insulation material suppliers in Greater NoidaAll types of insulation material suppliers in Greater Noida
All types of insulation material suppliers in Greater Noida
 
Gypsum Board
Gypsum BoardGypsum Board
Gypsum Board
 
Stick framing system with glazing
Stick framing system with glazingStick framing system with glazing
Stick framing system with glazing
 
D Block
D BlockD Block
D Block
 
CLADDING AND GLAZING.pptx
CLADDING AND GLAZING.pptxCLADDING AND GLAZING.pptx
CLADDING AND GLAZING.pptx
 
CONFORTO
CONFORTOCONFORTO
CONFORTO
 
8.0 Installation of Ceiling Batts.pdf
8.0 Installation of Ceiling Batts.pdf8.0 Installation of Ceiling Batts.pdf
8.0 Installation of Ceiling Batts.pdf
 
Metal roofing system
Metal roofing systemMetal roofing system
Metal roofing system
 
material ppt
material pptmaterial ppt
material ppt
 
five_e_brochure
five_e_brochurefive_e_brochure
five_e_brochure
 
Ash and Lacy SA Over Roofing Steel Roofs A4 4pp Hi
Ash and Lacy SA Over Roofing Steel Roofs A4 4pp HiAsh and Lacy SA Over Roofing Steel Roofs A4 4pp Hi
Ash and Lacy SA Over Roofing Steel Roofs A4 4pp Hi
 
Curtain walls
Curtain wallsCurtain walls
Curtain walls
 
Detay
DetayDetay
Detay
 
ASHTECH
ASHTECHASHTECH
ASHTECH
 
MaperGlas_CTU_Telescopic_Enclosures
MaperGlas_CTU_Telescopic_EnclosuresMaperGlas_CTU_Telescopic_Enclosures
MaperGlas_CTU_Telescopic_Enclosures
 
XtraFlex Systems Brochure
XtraFlex Systems BrochureXtraFlex Systems Brochure
XtraFlex Systems Brochure
 
Building technology report
Building technology reportBuilding technology report
Building technology report
 
Prefired Module
Prefired ModulePrefired Module
Prefired Module
 

MRC Group - (LOW RES) Excellence Metal Roofing pages

  • 1. CHAPTER 11 • ROOFING • 365 ROOFING 11.30 Good roofing practice Introduction to MRC Group MRC Group is the ONLY designer, installer and maintainer of metal roof systems in Africa whose services & works are backed with the ‘Guardian’ System Warranty. Our unique turn-key offering from “cradle to grave” provides all of our clients with peace of mind, not just during the on-site works, but throughout the life of the guarantee. Metal roof solutions in ‘Pierced Fix’ & ‘Concealed or Secret Fix’ roof sheeting include: • Single Skin Roof Systems • Compressed Insulation Roof Systems • Double Skin Built-Up New Build Roof Systems • Over-Roofing Roof Systems • Energy effiecient roof systems • Accoustic roof systems • High security roof and cladding system • Metal refurbishment systems All metal roof systems are designed and supplied in a range of differing metals and finishes to suit the design brief and the location of the site. Guarantees / Warranties Generally, traditional guarantees are provided to the client and are split into two areas: • Long term Product / Material Guarantees on the main roof system items up to 20 years depending on the material, the coating and the site location. • Short term 1 or 5 Year Workmanship Warranty. (This generally does not cover design, perimeter details, penetrations, junctions between different roof systems or maintenance.) MRC’s unrivalled all encompassing, transferrable ‘Guardian’ System Warranty. • Up to 20 year system warranty including design, materials, workmanship & maintenance. • Cover is on all installed systems by MRC Group – Metal Roofing & Cladding, Green Roof Systems, Waterproofing, Protective Coatings & Fire Walls. • Includes all parts of the system, perimeter details, penetrations, junction points between different roof system and maintenance. The ‘Guardian’ System Warranty covers the roof system, junctions points AND perimeter details for: • Design • Materials • Workmanship • Maintenance All the above are for the SAME length of term i.e. the workmanship & maintenance match the same length of term as the product guarantee. The length of term is determined by the product guarantee of the roof sheeting and its location. Typically metal roof systems are up to 20 years. IMAGES
  • 2. 366 • www.buildaid.co.za Compressed insulation roof systems System overview A compressed insulated roof system is generally constructed using restraining wire laid 90 degrees to the purlin, at centres to suit the flexible bulk density insulation, with the metal roof system installed on top of the insulation thereby compressing the insulation between roof sheet and purlin.The compressed insulation can lose up to 40% of its stated uncompressed thermal performance. Glass wool bulk density insulation has a Fire Classification of Class 1 (non-combustible) with a melting temperature of over 750 degrees °C. By comparison polystyrene insulation has a dramatically lower melting temperature and needs to be careful considered if a roof system is installed above, as the polystyrene insulation may shrink over time and then the metal roof system will become loose. Pierced Fix Compressed insulation considerations: • Should only be considered for roof pitches above 7.5 degrees. • End laps should be sealed with two runs of sealant to ensure no wind driven water ingress from outside or water ingress from internal condensation. • Side laps should be sealed and stitched to ensure no water ingress. • Minumum of class 3 exposed fixings complete with washers, depending on the site location. Concealed Fix Compressed insulation considerations: • Can be used on roof pitches down to 2 degrees. Should openings or penetrations be designed into the roof system then increasing the roof pitch to 7.5 degrees should be considered. • Please note that the use of compressed insulation thicker than 100mm is NOT advised with a ‘Secret Fix’ Roof System. Although additional fixings can be used on the clip, there will be additional pressure from the compressed insulation onto the roof sheet surrounding the clip. Built-Up or double skin metal roof systems System overview A ‘Built-Up’ or ‘Double Skin’ Metal roof and cladding system using either metal trapezoidal profile liner sheet or wood liner over-purlin with the AshGridTM bar & bracket support system providing an uncompressed insulation solution. Please note that the insulation is not compressed therefore higher thermal performance can be achieved compared to the compressed insulation systems. The installation of the metal or timber liner over-purlin provides a safe working platform to install the rest of the roof system and enables the general building works below to continue. The metal liner sheet is normally supplied in white providing a clean soffit within the building. Due to the multi layered approach of ‘Built-Up’ or ‘Double Skin’ Metal roof systems, a large array of solutions can be designed as follows :- • Air tight energy efficient roof systems • Specialist acoustic roofs • Green roof systems • High security systems • High humidity systems Pierced Fix Built-Up considerations: Concealed Fix Built-Up considerations: • R-Values of over 10 m2 .K/W achievable as the bracket heights range from 60mm to over 300mm. • The over-purlin liner sheet provides top flange restraint of the purlins and increased protection from wind to the roof system above. • The sealing of the liner sheet across the end laps, side laps and to the walls will provide an air-tight building. • All Built-Up metal roof system provide a weighted sound reduction of 40dB+ and reduce rain drumming. • Sound absorption option available with an perforated liner sheet.
  • 3. CHAPTER 11 • ROOFING • 367 ROOFING Metal Roof Refurbishment Solutions System overview Metal roofing and cladding refurbishment solutions include over-roofing / over-cladding and the opportunity to increase the roof pitch without removing and disposing of the existing roof systems. Generally the building can remain operational during the works. The patented AshGrid™ System is installed in the troughs of the existing roof sheeting with the brackets fixed directly to the underlying steel or timber purlins, thus creating an engineered, structurally defined cavity between the old and new roof coverings. Over-roofing Roof System considerations: • Option of upgrading the existing thermal and acoustic performance by insulating the structural void. • The weight of the new roof system and the AshGridTM system is between 6 – 12 kg/m2 depending on the material and whether the option of the insulation is to be used. Increasing the Roof Pitch considerations: • AshGrid’s range of brackets from 60mm to over 300mm provide the opportunity to increase the pitch of the roof. Should a steeper pitch be required then structural top-hat sections can be installed below the bar and bracket system to gain the required height. • Pitched to curved roof solutions can be designed using the same system.
  • 4. 368 • www.buildaid.co.za The purpose of a ridge/headwall flashing is to complete the intersection between two opposing roof planes and to seal the building against water penetration. N.B. ‘Secret’ or ‘Concealed’ Fix roof sheeting can be installed down to a 2 degree roof pitch and therefore a minimum overall ridge flashing should be 840mm using 0.8mm gauge steel. The complete construction of the ridge/headwall detail must prevent direct and wind driven water from entering the building, close off the insulation void and ensure that debris does not build-up forming moisture traps that will have a negative impact on the roof sheeting. Essential key components: Metal ridge flashing with Fasteners Metal serrated closure Expanded polyethylene Polyclosure Mastic sealant to one side of polyclosure Roof sheet ‘turn up’ Please note it is essential that ALL components are installed correctly to stop water ingress RIDGE • Flashing Gauge 0.8mm • Total Girth 840mm • Serrated Closure • Polyclosure • Mastic Seal to Polyclosure • Turn Up of Roof Sheet HEADWALL • Flashing Gauge 0.8mm • Total Girth 840mm • Serrated Closure • Polyclosure • Mastic Seal to Polyclosure • Turn Up of Roof Sheet SIDEWALL • Flashing Gauge 0.55mm • Separate Support Zed • Isolating Sealant Tape • Metal Counter Flashing • Angled Return • Height Overall min. 150mm BARGE • Flashing Gauge 0.55mm • Separate Support Zed • Isolating Sealant Tape www.mrc-group.co.za info@mrc-group.co.za Flashings The Art of Perimeter Detailing Roof sheeting manufacturers provide a guide to perimeter details such as ridges, barges, side walls, head walls and change in angle details, setting out the principles of how the details should be designed and constructed to ensure no water ingress, but it is the responsibility of the designer to ensure the correct size and gauge of the flashing which may well exceed the standard size. Commonly, steel coils that are used in the manufacture of flat sheets for flashings are generally 925mm wide and therefore a standard total girth of a barge, ridge or side wall tends to be 462mm i.e. 2 lengths of flashing produced from a flat sheet. However in many circumstances these perimeter flashing details are applied to every project, with little consideration of the roof pitch, site location and roof height which all has an impact on their design such as flashing girth and metal gauge. However, coils do come in various widths which does therefore allow for wider flashing details. In most cases if there is a failure of the roof perimeter details it is normally due to omission of elements such as polyclosures or undersized flashings. MRC Group’s commitment to excellence in perimeter detailing is backed with the unrivalled single source ‘Guardian’ System Warranty which covers design, materials, installation & maintenance for the term of the roofing and cladding system. Principles of Ridge and Headwall design
  • 5. CHAPTER 11 • ROOFING • 369 ROOFING Indicative Sections To determine the overall girth of the ridge/headwall flashing the following should be considered:- • Roof Pitch • Length of the roof sheet due to thermal expansion • Wind loads, Site location and Environment Dim. ‘A’ – The lower the roof pitch the longer this dimension should be to stop wind driven rain. Dim. ‘B’ – This dimension is determined by the purlin distance. (*In the below table we have assumed 100mm) Table of Minimum Dimensions to determine the correct girth of Ridge Flashings. Flashing Girth Calculator Ridge Edge Turn Down Dim ‘A’ Dim ‘B’ (*) Leg of the Flashing Total Girth (both sides) Minimum Gauge of Steel Roof Pitch up to 7.5 Degrees 20mm 300mm 100mm 420mm 840mm 0.8mm Roof Pitch over 7.5 Degrees 20mm 225mm 100mm 345mm 690mm 0.8mm Please note that any flat, unbent surfaces greater than 270mm should be formed from 0.8mm gauge steel Edge of the flashing to turn up of the roof sheet Maximum cantilever of the roof sheet 175 - 225mm max Dim. ‘A’ Dim. ‘C’ Dim. ‘B’
  • 6. 370 • www.buildaid.co.za The purpose of a barge/sidewall flashing is to complete the intersection between the roof and wall planes and to seal the building against water penetration. For a barge/sidewall flashing to be effective, it must be durable, low-maintenance, weather resistant, compatible with adjoining materials, and also able to accommodate thermal movement. The complete construction of the barge/sidewall detail must prevent direct and wind driven water from entering the building and close off the insulation void. All barge/sidewall flashings used with a concealed or secret fix roof system must be fixed to the independent zed support to allow the roof sheet to thermally move without distorting the barge/sidewall flashing. Essential key components: Metal barge flashing with Fasteners Sealant tape between the rib and the zed Metal counter flashing With angled return Flashing to be fixed to the Independent zed Please note it is essential that ALL components are installed correctly to withstand the impact from wind driven rain and to stop water ingress Principles of Sidewall and Barge design Pierced fix Sidewall and Barge design Concealed fix Sidewall and Barge design The barge/sidewall flashing is fixed to the independent zed support to allow the roof sheet to thermally move without putting additional thermal stress on the flashing. Should the fixing between the barge flashing & the zed support leak then the water will drain onto the roof sheet & into the gutter therefore not entering the building. ‘Secret fix’ or ‘concealed fix’ roof sheets can thermally move 1 – 2mm per linear metre of roof sheet in steel or 5 – 6mm in aluminum i.e. a 30 metre long steel roof sheet can thermally move 30 – 60mm. If the barge flashings are fixed to the rib of the roof sheet or the flashing barge/ sidewall clips do NOT allow for this amount of thermal expansion then the pressure on the barge flashing will cause visual distortion, loosening the fixings and could eventually fall off the building. Dim. ‘A’ – A barge flashing must cover a minimum of two ribs. If the position of roof sheet rib finishes flush then Dim ‘A’ will be 220mm, should the rib of the roof sheet NOT finish flush then Dim ‘A’ could be in excess of 344mm. (Please note this calculation is based on a standard IBR Profile.) Should the gable of the building be angled on plan then you could need barge/sidewall flashings that cover 3 or 4 ribs, to provide the minimum of 2 ribs at the narrowest point. The sealant tape between the roof sheet rib and the flashing is essential to stop wind driven rain entering the barge/sidewall detail. Should any water get into the detail, past the sealant, then the force from the wind will have been stopped and the water will roll down the pan into the gutter. Dim ‘A’ - Minimum of Two Ribs Sealant tape Sealant tape Independent Zed support
  • 7. CHAPTER 11 • ROOFING • 371 ROOFING If ‘Pierced Fix’ roof sheeting is installed and the roof slope length is longer than the manufactured roof sheeting supplied, then end laps need to be formed over the supporting purlin. For an end lap detail to be effective, the detail must prevent direct and wind driven water from entering the building, close off the insulation void and also be able to accommodate thermal movement All end laps must have 2 runs of end lap sealant and the roof sheeting secured at every rib position with fasteners. Essential key components: Fasteners at every rib End lap sealant tapes between roof sheets Optional end lap sealant tapes for air tight seal Please note it is essential that ALL components are installed correctly to withstand the impact from wind driven rain and to stop water ingress Pierced fix end laps and sealants Please note that end lap details are used with ‘Pierced Fix’ metal roof systems and should ONLY be used down to a minimum roof pitch of 7.5 degrees. Roof pitches below 7.5 degrees should always use a single roof sheet with no end laps i.e. a ‘Secret Fix’ metal roof system. ASYMMETRIC OR SYMMETRICAL END LAP Some designers recommend an asymmetric design where the fixing is typically positioned towards the top third of the lap, however this has been shown to apply most of its compression to the sealant positioned towards the top of the end lap and less compression to sealant positioned towards the bottom of the lap. MRC Group prefers the symmetrical design of a centrally fixed end lap detail that allows the fixing to apply equal pressure to the sealants positioned at the upper and lower ends of the lap, which has been shown to provide a more effective continuous seal. SECURING THE END LAP Class 3 or 4 (depending on the location of the site) main fixings complete with washers to suit the roof sheet material and the structure, are to be used through EVERY rib into the structure below.
  • 8. 372 • www.buildaid.co.za Essential key components: Fasteners at 500mm centres maximum along the side lap Side lap sealant tapes between roof sheets Please note it is essential that ALL components are installed correctly to withstand the impact from wind driven rain and to stop water ingress TECHNICAL DATA FOR CORRECT CONSTRUCTION: SECURING THE SIDE LAP Class 3 or 4 (depending on the location of the site) tapered stitching screw fixings complete with washers to suit the roof sheet material, are to be installed at EVERY 500mm centres maximum. SIDE LAP SEALANT TAPE BETWEEEN THE ROOF SHEETS ON ALL ROOFS BELOW 7.5 DEGREES. It is essential to install 1 continuous compressed 8mm diameter continuous self-adhesive butyl tape or impregnated polyurethane foam sealing strip between each adjacent ‘pierced fix’ roof sheet to ensure a clean, dry and high performing detail on all roof below 7.5 degrees. It can be argued that the addition of sealant tape accross the side laps and end laps helps strengthen the roof sheeting performance. All ‘Pierced Fix’ roof sheeting should be with installed with fasteners at 500mm centres maximum on every side lap. If the roof pitch is less than 7.5 degrees then side lap sealant tape should be installed between the roof sheets to ensure no water ingress. For a side lap detail to be effective, the detail must prevent direct and wind driven water from entering the building, close off the insulation void and also be able to accommodate thermal movement. Pierced fix side laps and sealants For our growing library of technical details, system data sheets, technical drawings and ‘how to’ guides please visit www.mrc-group.co.za/technical-bulletins