Page 1 of 3
Mahmoud Basuany Ali Hafez
4 Emtidad Ramsis St., El Safa Bldg., Nasr City- Cairo-Egypt
Telephone Number: + (202)27254440, Cell: (002) 012-21645263
Email Address: Mahmoudbasuany@yahoo.com
Objective
Seeking a full –time job opportunity in which I can apply my education, enhance my capabilities and
develop both personally and professionally. Challenging position through which my knowledge may be
utilized and developed. Looking for a position in a growing, well establish and multinational.
Education
 Mechanical Power Engineering – Menufia University (2001:2005)
 Mechanical Engineering and Technology (Power Department).
 Graduation Project:
Graduation Project Name: Studying Waves in Various Media (Air and Steam).
Grade of Graduation Project: Excellent.
Extra courses
In (Nov 2014):
Basic principles of Hydraulic Systems, Egyptian engineer syndicate.
In (May 2004):
Photoshop & AutoCAD.
Work experience.
 Arab organization for Industrialization, Engine Factory. (7/2009-Present)
* Workshop Engineer for overhauling turbojet engine (Mirage & F16 Aircraft)
engines.
* Overhaul Planning Engineer for overhauling turbojet, turboprop,…etc engines.
Page 2 of 3
Job description:
 Plans and directs activities concerned with development, application, and maintenance of quality
standards for industrial processes, materials, and products: Develops and initiates standards and
methods for inspection, testing, and evaluation, utilizing knowledge in engineering fields such as
chemical, electrical, or mechanical.
 Devises sampling procedures and designs and develops forms and instructions for recording,
evaluating, and reporting quality and reliability data.
 Establishes program to evaluate precision and accuracy of production equipment and testing,
measurement, and analytical equipment and facilities.
 Develops and implements methods and procedures for disposition of discrepant material and devises
methods to assess cost and responsibility.
 Directs workers engaged in measuring and testing product and tabulating data concerning materials,
product, or process quality and reliability.
 Compiles and writes training material and conducts training sessions on quality control activities.
 May specialize in areas of quality control engineering, such as design, incoming material, process
control, product evaluation, product reliability, inventory control, metrology, automated testing,
software, research and development, and administrative application.
 May manage quality control program.
 Travel Line & Grind Circle " Ship Nile Cruise" (7/2005-7/2009)
 Repair and maintenance of power generation machines, different electrical power station ,
air condition system and fire system.
 Manufacturing a ship in (The Arab Contractors Osman Ahmed Osman & co. shipyard)
TechnicalSkills
 Team Leadership (Good of inspiring workers to do the best through daily meeting).
 Teaching (Good of PowerPoint presentation, on-job training, Public Speaking).
 Problem Solving.
 Team Building and teamwork (Built of successful engine quality improvement team).
 Project Planning.
 Computer (very good of Microsoft Office) & Minitab 16 statistical program.
Language Skills
Arabic: Native.
English: Very good.
Page 3 of 3
Activities
 Volunteer in EL-RESALA Association.
 Member in EL-MAADI public library.
PersonalInformation
Date of Birth: 26 April 1981.
Nationality: Egyptian.
Military Services: Completed
Social status: Married.
Gender: Male.

cv eng mahmoud BASUANY

  • 1.
    Page 1 of3 Mahmoud Basuany Ali Hafez 4 Emtidad Ramsis St., El Safa Bldg., Nasr City- Cairo-Egypt Telephone Number: + (202)27254440, Cell: (002) 012-21645263 Email Address: Mahmoudbasuany@yahoo.com Objective Seeking a full –time job opportunity in which I can apply my education, enhance my capabilities and develop both personally and professionally. Challenging position through which my knowledge may be utilized and developed. Looking for a position in a growing, well establish and multinational. Education  Mechanical Power Engineering – Menufia University (2001:2005)  Mechanical Engineering and Technology (Power Department).  Graduation Project: Graduation Project Name: Studying Waves in Various Media (Air and Steam). Grade of Graduation Project: Excellent. Extra courses In (Nov 2014): Basic principles of Hydraulic Systems, Egyptian engineer syndicate. In (May 2004): Photoshop & AutoCAD. Work experience.  Arab organization for Industrialization, Engine Factory. (7/2009-Present) * Workshop Engineer for overhauling turbojet engine (Mirage & F16 Aircraft) engines. * Overhaul Planning Engineer for overhauling turbojet, turboprop,…etc engines.
  • 2.
    Page 2 of3 Job description:  Plans and directs activities concerned with development, application, and maintenance of quality standards for industrial processes, materials, and products: Develops and initiates standards and methods for inspection, testing, and evaluation, utilizing knowledge in engineering fields such as chemical, electrical, or mechanical.  Devises sampling procedures and designs and develops forms and instructions for recording, evaluating, and reporting quality and reliability data.  Establishes program to evaluate precision and accuracy of production equipment and testing, measurement, and analytical equipment and facilities.  Develops and implements methods and procedures for disposition of discrepant material and devises methods to assess cost and responsibility.  Directs workers engaged in measuring and testing product and tabulating data concerning materials, product, or process quality and reliability.  Compiles and writes training material and conducts training sessions on quality control activities.  May specialize in areas of quality control engineering, such as design, incoming material, process control, product evaluation, product reliability, inventory control, metrology, automated testing, software, research and development, and administrative application.  May manage quality control program.  Travel Line & Grind Circle " Ship Nile Cruise" (7/2005-7/2009)  Repair and maintenance of power generation machines, different electrical power station , air condition system and fire system.  Manufacturing a ship in (The Arab Contractors Osman Ahmed Osman & co. shipyard) TechnicalSkills  Team Leadership (Good of inspiring workers to do the best through daily meeting).  Teaching (Good of PowerPoint presentation, on-job training, Public Speaking).  Problem Solving.  Team Building and teamwork (Built of successful engine quality improvement team).  Project Planning.  Computer (very good of Microsoft Office) & Minitab 16 statistical program. Language Skills Arabic: Native. English: Very good.
  • 3.
    Page 3 of3 Activities  Volunteer in EL-RESALA Association.  Member in EL-MAADI public library. PersonalInformation Date of Birth: 26 April 1981. Nationality: Egyptian. Military Services: Completed Social status: Married. Gender: Male.