This document describes modules for the Electronics B.Sc. study course. It provides details for 22 modules covering topics such as fundamentals of natural science, mathematics, electronics, mechanics, creativity, technical drawing, project management, analog and digital electronics, programming, embedded systems, signals, and a bachelor thesis. For each module it lists the name, code, courses, semester, coordinator, content, assessment, and literature. The document is a guide for the electronics degree program structure and requirements.