This document outlines the curriculum and syllabus for the Bachelor of Engineering in Manufacturing Engineering program at Anna University in Chennai, India. It provides the course codes, titles, credit hours, and brief descriptions for 8 semesters of the program, including both theory and practical courses. Some of the core manufacturing courses covered include Manufacturing Processes I and II, Metrology, CAD, CAM, CNC Machining, Production Management, and Project Work. The document also lists available elective courses and provides more detailed syllabi for some core courses like Mathematics III, Engineering Materials and Metallurgy, Electrical Drives and Control, Strength of Materials, and Mechanics of Machines.