SlideShare a Scribd company logo
1 of 46
Download to read offline
MMX: CREATING CHOICES IN SEABORNE IRON
ORE SUPPLY




Rio de Janeiro | September 2012
DISCLAIMER



This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term
is defined in the Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section
21E of the U.S. Securities Exchange Act of 1934. All statements other than statements of historical facts are statements
that could be deemed forward-looking statements and are often characterized by the use of words such as “projects”,
“expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, “may”, “will”, or “intends”, or by discussions or
comments about our objectives, strategy, plans or intentions and results of operations. Forward-looking statements include
projections regarding our operating capacity, operating expenditures, capital expenditures and start-up dates.

By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both
general and specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or
developments described in such statements may not be indicative of results or developments in future periods. We caution
participants of this presentation not to place undue reliance on these forward-looking statements as a number of factors
could cause future results to differ materially from these statements.

Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory
approvals on a timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological
resources into mineral reserves, and changes in economic, political and regulatory conditions. We caution that the
foregoing list is not exhaustive. When relying on forward-looking statements to make decisions, investors should carefully
consider these factors as well as other uncertainties and events.

MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an
offer to sell (which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any
securities in the United States, or any other jurisdiction. The securities referred to herein have not been registered in any
jurisdiction, and in particular, will not be registered under the U.S. Securities Act of 1933, as amended, or any applicable
state securities laws and may not be offered or sold in the United States absent registration or an applicable exemption
from such registration requirements.

This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in
whole or in part without MMX’s prior written consent.
1
MMX INTRODUCTION
HIGH QUALITY MINING ASSETS IN TRADITIONAL
MINING DISTRICTS




   Mining rights in traditional iron ore districts:
Brazil – Minas Gerais and Chile
   Production committed with strategic consumers
– China and South Korea – through long-term
contracts
   Brownfield start up in Brazil
    Expanding beyond 40 Mtpy in Brazil and Chile,
                                                                                    Sudeste System
through fully integrated systems: with private                                         Serra Azul Unit
                                                                 Corumbá System
ports in Brazil                                                                      Bom Sucesso Unit


   Unique port location                               Chile System



                                                                                  Sudeste Superport




                                                                                                         4
MMXM3: SOLID CONTROLLING SHAREHOLDERS




                                                            16% Wisco


       42% Controlling
        Shareholders                                      14% SK Networks


                                                           28% Free Float




            70%                  100%              100%                     99%


  MMX Corumbá                                Minera MMX            Superporto
                           MMX Sudeste
   Mineração                                   do Chile             Sudeste

5,48% EBX




                         Serra      Bom
                         Azul      Sucesso




                                                                                  5
INGREDIENTS FOR A SUCCESSFUL IRON ORE
BUSINESS



                    SRK certification: 3,1 billion tons of mineral resources, and further mineral
 Resource Base
                    potential of up to 1,4 billion tons. Reserves of 1 billion tons in Serra Azul.


                    Low stripping ratio
  Competitive       Competitive scale – New beneficiation plant
Production Cost
   Structure        Energy supply contract with MPX
                    Integrated infrastructure with the existing MRS railway


                    Sudeste Superport at 50 Mtpy, expandable to 100 Mtpy, provides gateway to
  Guaranteed
                    seaborne markets
   Logistics
                    Long Term Railway Contract with MRS


Secured Off-take    64% of future production already committed through long-term contracts



Operational Track   Experience management team with implementation and operational expertise
    Record          Installed Capacity of 10 Mtpy (Serra Azul and Corumbá sites)




                                                                                                     6
A LOT HAS BEEN DELIVERED



September    Conclusion of the offshore civil works at the Sudeste Superport
  2012       Issuance of debentures at the amount of R$ 600 million
             Approval of the merger of PORTX into MMX
             Public hearings in Itaguaí and Mangaratiba for the expansion of the Sudeste
            Superport to 100 Mtpy
             Beginning of construction of the Serra Azul Unit expansion
             Installation License authorizing the Serra Azul Unit expansion
             MMX signs contract for railway services with MRS through 2026
             SRK certified 997,4 million tons of mineral reserves at Serra Azul Unit
             Orders for long lead equipment for Serra Azul expansion
             EPCM contract with CNEC Worley Parsons for Serra Azul expansion
             Contract with MPX for energy supply for expansion of Serra Azul
             Financial advisory contract with Itaú BBA and Bradesco
February
             Deal with Usiminas
  2011




                                                                                           7
FINANCIAL HIGHLIGHTS




          Net Profit (R$ million)                         EBITDA (R$ million)
 200                                          90
 100                                          75
       90.9           49.3
   0                                          60

-100                                          45
                                                   75.2
-200                                -391.6    30
                                                                              13.9
                                              15                  4.2
-300
                                               0
-400
                                                   2Q11          1Q12         2Q12
       2Q11           1Q12          2Q12




              Debt profile                                 Gross Margin (%)
100%                                         60%
                                                   61%
80%                                                             53%         56%
                                             45%
       63%            68%            67%
60%
                                             30%
40%
                                             15%
20%    37%            32%            33%
                                             0%
 0%
                                                   2Q11         1Q12        2Q12
       2Q11           1Q12           2Q12

         Short Term     Long Term
2
SUDESTE SYSTEM
2.1
SERRA AZUL UNIT
UNIQUE INTEGRATED LOGISTICS
Since Iron ore is a bulk commodity, an integrated logistic (mine 
railway  port) is the key factor for a successful operation




           Mine                              Railway                           Superport                        Offtakers (Shareholders)


                                                                                                            Long-Term contract (20 years) to trade iron
                                                                                                            ore. SK will take-off part of the Sudeste
                                                                                                            System yearly production equivalent to its
                                                                                                            participation in MMX Capital (14%).



                                  MMX has a long term contract       Sudeste Superport is located in
Serra Azul unit is near to the
                                  with MRS railway, which connects   Itaguaí and will have 50Mtpy iron      Long-Term contract (20 years). Wisco will
MRS railway - 10 km from the
                                  the mine with the CSN’s Itaguaí    ore shipping capacity. The Superport   off-take at least 50% of MMX Sudeste
mine,   a   distance  currently
                                  port   and    to  the    Sudeste   will have a depth of 20 meters,        production.
traversed by trucks.
                                  Superport.                         enough to handle Capesize vessels.

                                                                                                                  SK and Wisco will together
                                                                                                               offtake 64% of total production
                                                                                                                                                      11
Iron ore Quadrangle
     QUADRILÁTERO FERRÍFERO




                              12
RAILWAY
Railway access conecting MRS to the Sudeste Superport




                                                        13
MRS CONTRACT
MMX signed a long term contract for railway services



 Contract signed on December 28th 2011.

 Long term contract through 2026.

 Provides for a volume of up to 36 million tons of iron ore per year.

  Tariff: R$ 26.463/ton , net of tax, readjusted annually by a parametric
formula the variation in IGP-DI and in diesel oil.




                                                                            14
SERRA AZUL
Expansion project with integrated logistic and pellet feed iron ore

Highlights
 Production target: 29 Mtpy
 64% of production already committed through long-term
contracts
 997.4 million tons of reserves already secured by SRK


Execution Update
 Beginning of construction of Serra Azul Unit expansion
 Construction license issued in April, 2012
 Acquisition of gyratory crushers, ball mills, SAG mills and
vertical mills for the new beneficiation plant
 Contract with CNEC WorleyParsons
 Contract with MPX to supply power for 15 years at a
base-price of R$125/MWh


Expected Quality – Ouro Preto pilot plant test work
Fe: 67.0%               P: 0.03%
SiO2: 3.5%              Mn: 0.5%
AL2O3: 0.5%             LOI: 0.25%

                                                                      15
SERRA AZUL
Growth through consolidation while leveraging existing
infrastructure




                                                         16
SERRA AZUL
Serra Azul Unit Expansion Project




   Pit     New Beneficiation Plant, transmission line and water pipelines,
           Stockyard and Loading Terminal


                                                                             17
Serra Azul Expansion
Beneficiation Plant
                       18
SERRA AZUL
    Earthwork




                                                Grind
Sump and              Processing
Thickners                                                            Construction
                                                        Pile           Site and
                                    Benefic.
                                                                      Warehouse
                                   substation
                                                                                    Maintenance
                                                               Primary               workshop
       Construction
                                                               Crushing                           Administrative
           Site
                                                                                                    Buildings




                                                                                                              1
2.2
SUDESTE SUPERPORT
Sudeste Superport
         Location

               21
Offshore
                    Nautical Access




                                               Tunnel



                                                                                Stockyard 06

                                Stockyard 32




Sudeste Superport
Artistic View
                                                                                               22
                                                               Railway Access
SUDESTE SUPERPORT
Overview



Highlights
   50 mtpy capacity, expandable to 100 mtpy
   Capesizes handling
   Loading: 2 ship loaders of 25 Mtpy each
   Fully funded (BNDES)
   Start-up forecast: 2Q13
   100% of equipment already ordered
   Licensing for 100 Mtpy underway




                                              Sudeste Superport - Itaguaí


                                                                            23
SUDESTE SUPERPORT
Overview



Highlights
   Public hearing for 100 Mtpy held on May, 2012
   Construction works for the tunnel and offshore
   infraestructure completed
   EIA-RIMA for 100 Mtpy filed with Inea in
   September 2011
   Licensed to 50 Mtpy
   Navy Approval to 100 Mtpy




                                                    Sudeste Superport - Itaguaí


                                                                                  24
Sudeste Superport
Railway access




                    25
Sudeste Superport
Stockyard Elevation 6 m




                          26
Sudeste Superport
Car Dumpers Elevation 6 m




                            27
Sudeste Superport
Mariquita Hill
                    28
Sudeste Superport
Stockyard Elevation 32 m




                      29
11 m




                    20.5 m




Sudeste Superport
Tunnel entrance
                             30
Sudeste Superport
Tunnel exit




                    31
Superporto Sudeste
Offshore Structure - Bridge




                              Bridge
                              450 m




                                       32
Superporto Sudeste
Offshore Structure
                     33
SUDESTE SUPERPORT
Shiploader (China)




                     34
SUDESTE SUPERPORT
Shiploader (China)




                     35
SUDESTE SUPERPORT
Assembly of car dumpers
SUDESTE SUPERPORT
Assembly of car dumpers




                          37
USIMINAS AGREEMENT


  Pau de Vinho Joint Mining                Sudeste Superport Handling

 SRK resources audit : 810 million tons    Handling fee: USD 12.63/ton adjusted
plus a potential 75 million tons          by US-PPI
 Pau de Vinho target production: 8 Mtpy
                                           Volumes:
 Significant synergies with current
mining operations at Serra Azul            ■ 12 Mtpy


 13.5% of production at Pau de Vinho
                                           80% Take-or-Pay
will be delivered to Usiminas

  MMX will be responsible for the
licensing, CAPEX and operation for 30       Usiminas can renew the contract for 1
years                                     to 5 years




                                                                                    38
2.3
BOM SUCESSO
BOM SUCESSO
High-quality iron ore with high magnetite content


Highlights
 Production target: 10 Mtpy
 64% of production already committed through long-term
contracts


Execution Update
 Conceptual engineering
 SRK resources audit update: 365 million tons plus a
potential of 741 million tons


Expected Quality – Ouro Preto pilot plant test work

Fe: 67.2%              P: 0.033%
SiO2: 2.5%             PPC: 0.6%
AL2O3: 0.5%            FeO: 8.8%




                                                         40
3
CHILE
CHILE



Highlights
 High-quality iron ore with magnetite content
 Production target: 10 Mtpy
  50% of production already committed through long-
term contracts
 460 Mt of iron ore potential


Execution Update
  Drilling performed 2011: approximately 43
thousand meters
 Water permits


Expected Quality – Ouro Preto pilot plant test
work


Fe: 67.50%               SiO2: 2.5%
Al2O3: 0.85%             P: 0.015%



                                                      42
CHILE
Castilha Port



 Deep water port – 28 meter draft: Chinamax vessels
 Shared construction with MPX (Sister Company)




BERTH N° 1 – COAL

                    BERTH N° 2 – IRON ORE

                                            BERTH N° 3 – COPPER




                                                                  43
4
CORUMBÁ
CORUMBÁ




Highlights
 Current Capacity: 2.1 Mtpy
 Long-term contracts signed with local and international
barge operators
 77% of production already committed through long-term
contracts
 SRK audit resources report: 192 million tons plus a
potential of an additional 123 million tons




                                                           45
Investor Relations
Guilherme Escalhão – CEO and IRO
       Adriana Marques – Manager
            Daniella Maia - Analyst
        Phone + 55 21 2163-6197
               +55 21 2163-4366
                   ri@mmx.com.br

More Related Content

What's hot

Mmx agosto 2012 - ingles
Mmx   agosto 2012 - inglesMmx   agosto 2012 - ingles
Mmx agosto 2012 - inglesmmxriweb
 
Mmx julho 2012 - ingles atualizado v2
Mmx   julho 2012 - ingles atualizado v2Mmx   julho 2012 - ingles atualizado v2
Mmx julho 2012 - ingles atualizado v2mmxriweb
 
Mmx julho 2012 - ingles atualizado v2
Mmx   julho 2012 - ingles atualizado v2Mmx   julho 2012 - ingles atualizado v2
Mmx julho 2012 - ingles atualizado v2mmxriweb
 
Corporate Presentation – March 2012
Corporate Presentation – March 2012Corporate Presentation – March 2012
Corporate Presentation – March 2012mmxriweb
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012mmxriweb
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012mmxriweb
 
Corporate Presentation – April 2012
Corporate Presentation – April 2012Corporate Presentation – April 2012
Corporate Presentation – April 2012mmxriweb
 
Mmx novembro 2012 - ingles
Mmx   novembro 2012 - inglesMmx   novembro 2012 - ingles
Mmx novembro 2012 - inglesmmxriweb
 
Mmx novembro 2012 - ingles
Mmx   novembro 2012 - inglesMmx   novembro 2012 - ingles
Mmx novembro 2012 - inglesmmxriweb
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012mmxriweb
 
Mmx fevereiro 2013 - ingles
Mmx   fevereiro 2013 - inglesMmx   fevereiro 2013 - ingles
Mmx fevereiro 2013 - inglesmmxriweb
 
Mmx novembro 2012 - ingles - v2
Mmx   novembro 2012 - ingles - v2Mmx   novembro 2012 - ingles - v2
Mmx novembro 2012 - ingles - v2mmxriweb
 
Mmx janeiro 2013 - ingles
Mmx   janeiro 2013 - inglesMmx   janeiro 2013 - ingles
Mmx janeiro 2013 - inglesmmxriweb
 
Mmx dezembro 2012 - ingles - v2
Mmx   dezembro 2012 - ingles - v2Mmx   dezembro 2012 - ingles - v2
Mmx dezembro 2012 - ingles - v2mmxriweb
 
Mmx abril 2013 - ingles - v2
Mmx   abril 2013 - ingles - v2Mmx   abril 2013 - ingles - v2
Mmx abril 2013 - ingles - v2mmxriweb
 
Mmx março 2013 - ingles vfinal
Mmx   março 2013 - ingles vfinalMmx   março 2013 - ingles vfinal
Mmx março 2013 - ingles vfinalmmxriweb
 
Mmx março 2013 - ingles v3
Mmx   março 2013 - ingles v3Mmx   março 2013 - ingles v3
Mmx março 2013 - ingles v3mmxriweb
 
Corporate presentation – october 2009
Corporate presentation – october 2009Corporate presentation – october 2009
Corporate presentation – october 2009mmxriweb
 
Panama juan urriola
Panama   juan urriola Panama   juan urriola
Panama juan urriola enmoveme
 
ARGOMARINE Final Conference - SeaU presentation - C.F. Gianluca D'Agostino
ARGOMARINE Final Conference - SeaU presentation - C.F. Gianluca D'AgostinoARGOMARINE Final Conference - SeaU presentation - C.F. Gianluca D'Agostino
ARGOMARINE Final Conference - SeaU presentation - C.F. Gianluca D'AgostinoARGOMARINE
 

What's hot (20)

Mmx agosto 2012 - ingles
Mmx   agosto 2012 - inglesMmx   agosto 2012 - ingles
Mmx agosto 2012 - ingles
 
Mmx julho 2012 - ingles atualizado v2
Mmx   julho 2012 - ingles atualizado v2Mmx   julho 2012 - ingles atualizado v2
Mmx julho 2012 - ingles atualizado v2
 
Mmx julho 2012 - ingles atualizado v2
Mmx   julho 2012 - ingles atualizado v2Mmx   julho 2012 - ingles atualizado v2
Mmx julho 2012 - ingles atualizado v2
 
Corporate Presentation – March 2012
Corporate Presentation – March 2012Corporate Presentation – March 2012
Corporate Presentation – March 2012
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012
 
Corporate Presentation – April 2012
Corporate Presentation – April 2012Corporate Presentation – April 2012
Corporate Presentation – April 2012
 
Mmx novembro 2012 - ingles
Mmx   novembro 2012 - inglesMmx   novembro 2012 - ingles
Mmx novembro 2012 - ingles
 
Mmx novembro 2012 - ingles
Mmx   novembro 2012 - inglesMmx   novembro 2012 - ingles
Mmx novembro 2012 - ingles
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012
 
Mmx fevereiro 2013 - ingles
Mmx   fevereiro 2013 - inglesMmx   fevereiro 2013 - ingles
Mmx fevereiro 2013 - ingles
 
Mmx novembro 2012 - ingles - v2
Mmx   novembro 2012 - ingles - v2Mmx   novembro 2012 - ingles - v2
Mmx novembro 2012 - ingles - v2
 
Mmx janeiro 2013 - ingles
Mmx   janeiro 2013 - inglesMmx   janeiro 2013 - ingles
Mmx janeiro 2013 - ingles
 
Mmx dezembro 2012 - ingles - v2
Mmx   dezembro 2012 - ingles - v2Mmx   dezembro 2012 - ingles - v2
Mmx dezembro 2012 - ingles - v2
 
Mmx abril 2013 - ingles - v2
Mmx   abril 2013 - ingles - v2Mmx   abril 2013 - ingles - v2
Mmx abril 2013 - ingles - v2
 
Mmx março 2013 - ingles vfinal
Mmx   março 2013 - ingles vfinalMmx   março 2013 - ingles vfinal
Mmx março 2013 - ingles vfinal
 
Mmx março 2013 - ingles v3
Mmx   março 2013 - ingles v3Mmx   março 2013 - ingles v3
Mmx março 2013 - ingles v3
 
Corporate presentation – october 2009
Corporate presentation – october 2009Corporate presentation – october 2009
Corporate presentation – october 2009
 
Panama juan urriola
Panama   juan urriola Panama   juan urriola
Panama juan urriola
 
ARGOMARINE Final Conference - SeaU presentation - C.F. Gianluca D'Agostino
ARGOMARINE Final Conference - SeaU presentation - C.F. Gianluca D'AgostinoARGOMARINE Final Conference - SeaU presentation - C.F. Gianluca D'Agostino
ARGOMARINE Final Conference - SeaU presentation - C.F. Gianluca D'Agostino
 

Viewers also liked

Corporate presentation october 2010
Corporate presentation   october 2010Corporate presentation   october 2010
Corporate presentation october 2010mmxriweb
 
Presentation mmx, llx, port x and usiminas...
Presentation mmx, llx, port x and usiminas...Presentation mmx, llx, port x and usiminas...
Presentation mmx, llx, port x and usiminas...mmxriweb
 
Corporate presentation – may 2010
Corporate presentation – may 2010Corporate presentation – may 2010
Corporate presentation – may 2010mmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx webcast ingles 3 t13 v1
Mmx webcast ingles 3 t13   v1Mmx webcast ingles 3 t13   v1
Mmx webcast ingles 3 t13 v1mmxriweb
 
Corporate presentation – october 2008
Corporate presentation – october 2008Corporate presentation – october 2008
Corporate presentation – october 2008mmxriweb
 
Sudeste superport
Sudeste superportSudeste superport
Sudeste superportmmxriweb
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinalmmxriweb
 
Mmx julho 2013 - ingles - vfinal
Mmx   julho 2013 - ingles - vfinalMmx   julho 2013 - ingles - vfinal
Mmx julho 2013 - ingles - vfinalmmxriweb
 
Presentation of the new business plan
Presentation of the new business planPresentation of the new business plan
Presentation of the new business planmmxriweb
 
Mmx webcast ingles 4 t12 vfinal
Mmx webcast ingles 4 t12   vfinalMmx webcast ingles 4 t12   vfinal
Mmx webcast ingles 4 t12 vfinalmmxriweb
 
Mmx maio 2013 - ingles
Mmx   maio 2013 - inglesMmx   maio 2013 - ingles
Mmx maio 2013 - inglesmmxriweb
 

Viewers also liked (13)

Corporate presentation october 2010
Corporate presentation   october 2010Corporate presentation   october 2010
Corporate presentation october 2010
 
Presentation mmx, llx, port x and usiminas...
Presentation mmx, llx, port x and usiminas...Presentation mmx, llx, port x and usiminas...
Presentation mmx, llx, port x and usiminas...
 
Corporate presentation – may 2010
Corporate presentation – may 2010Corporate presentation – may 2010
Corporate presentation – may 2010
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx webcast ingles 3 t13 v1
Mmx webcast ingles 3 t13   v1Mmx webcast ingles 3 t13   v1
Mmx webcast ingles 3 t13 v1
 
Corporate presentation – october 2008
Corporate presentation – october 2008Corporate presentation – october 2008
Corporate presentation – october 2008
 
Sudeste superport
Sudeste superportSudeste superport
Sudeste superport
 
Mmx maio 2013 - ingles - vfinal
Mmx   maio 2013 - ingles - vfinalMmx   maio 2013 - ingles - vfinal
Mmx maio 2013 - ingles - vfinal
 
Mmx julho 2013 - ingles - vfinal
Mmx   julho 2013 - ingles - vfinalMmx   julho 2013 - ingles - vfinal
Mmx julho 2013 - ingles - vfinal
 
Aa
AaAa
Aa
 
Presentation of the new business plan
Presentation of the new business planPresentation of the new business plan
Presentation of the new business plan
 
Mmx webcast ingles 4 t12 vfinal
Mmx webcast ingles 4 t12   vfinalMmx webcast ingles 4 t12   vfinal
Mmx webcast ingles 4 t12 vfinal
 
Mmx maio 2013 - ingles
Mmx   maio 2013 - inglesMmx   maio 2013 - ingles
Mmx maio 2013 - ingles
 

Similar to MMX: CREATING CHOICES IN SEABORNE IRON ORE SUPPLY

Mmx webcast ingles 2 t12
Mmx webcast ingles 2 t12Mmx webcast ingles 2 t12
Mmx webcast ingles 2 t12mmxriweb
 
Mmx abril 2013 - ingles - v2
Mmx   abril 2013 - ingles - v2Mmx   abril 2013 - ingles - v2
Mmx abril 2013 - ingles - v2mmxriweb
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal novammxriweb
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal novammxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal novammxriweb
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinalmmxriweb
 
Mmx abril 2013 - ingles - vfinal
Mmx   abril 2013 - ingles - vfinalMmx   abril 2013 - ingles - vfinal
Mmx abril 2013 - ingles - vfinalmmxriweb
 
Mmx abril 2013 - ingles - v3
Mmx   abril 2013 - ingles - v3Mmx   abril 2013 - ingles - v3
Mmx abril 2013 - ingles - v3mmxriweb
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal novammxriweb
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinalmmxriweb
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinalmmxriweb
 
Mmx fevereiro - en - vfinal
Mmx   fevereiro - en - vfinalMmx   fevereiro - en - vfinal
Mmx fevereiro - en - vfinalmmxriweb
 
Mmx setembro 2013 - ingles - vfinal
Mmx   setembro 2013 - ingles - vfinalMmx   setembro 2013 - ingles - vfinal
Mmx setembro 2013 - ingles - vfinalmmxriweb
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal novammxriweb
 

Similar to MMX: CREATING CHOICES IN SEABORNE IRON ORE SUPPLY (14)

Mmx webcast ingles 2 t12
Mmx webcast ingles 2 t12Mmx webcast ingles 2 t12
Mmx webcast ingles 2 t12
 
Mmx abril 2013 - ingles - v2
Mmx   abril 2013 - ingles - v2Mmx   abril 2013 - ingles - v2
Mmx abril 2013 - ingles - v2
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal nova
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal nova
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinal
 
Mmx abril 2013 - ingles - vfinal
Mmx   abril 2013 - ingles - vfinalMmx   abril 2013 - ingles - vfinal
Mmx abril 2013 - ingles - vfinal
 
Mmx abril 2013 - ingles - v3
Mmx   abril 2013 - ingles - v3Mmx   abril 2013 - ingles - v3
Mmx abril 2013 - ingles - v3
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal nova
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinal
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinal
 
Mmx fevereiro - en - vfinal
Mmx   fevereiro - en - vfinalMmx   fevereiro - en - vfinal
Mmx fevereiro - en - vfinal
 
Mmx setembro 2013 - ingles - vfinal
Mmx   setembro 2013 - ingles - vfinalMmx   setembro 2013 - ingles - vfinal
Mmx setembro 2013 - ingles - vfinal
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal nova
 

More from mmxriweb

Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014mmxriweb
 
Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014mmxriweb
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal novammxriweb
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1mmxriweb
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vfmmxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal novammxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal novammxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal novammxriweb
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalmmxriweb
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalmmxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal novammxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal novammxriweb
 
Mmx fevereiro - en - vfinal nova
Mmx   fevereiro - en - vfinal novaMmx   fevereiro - en - vfinal nova
Mmx fevereiro - en - vfinal novammxriweb
 
Mmx fevereiro - pt - vfinal nova
Mmx   fevereiro - pt - vfinal novaMmx   fevereiro - pt - vfinal nova
Mmx fevereiro - pt - vfinal novammxriweb
 
Mmx fevereiro - pt - vfinal
Mmx   fevereiro - pt - vfinalMmx   fevereiro - pt - vfinal
Mmx fevereiro - pt - vfinalmmxriweb
 
Mmx fevereiro - pt - vfinal2
Mmx   fevereiro - pt - vfinal2Mmx   fevereiro - pt - vfinal2
Mmx fevereiro - pt - vfinal2mmxriweb
 

More from mmxriweb (20)

Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014
 
Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal nova
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vf
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal nova
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinal
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinal
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx fevereiro - en - vfinal nova
Mmx   fevereiro - en - vfinal novaMmx   fevereiro - en - vfinal nova
Mmx fevereiro - en - vfinal nova
 
Mmx fevereiro - pt - vfinal nova
Mmx   fevereiro - pt - vfinal novaMmx   fevereiro - pt - vfinal nova
Mmx fevereiro - pt - vfinal nova
 
Mmx fevereiro - pt - vfinal
Mmx   fevereiro - pt - vfinalMmx   fevereiro - pt - vfinal
Mmx fevereiro - pt - vfinal
 
Mmx fevereiro - pt - vfinal2
Mmx   fevereiro - pt - vfinal2Mmx   fevereiro - pt - vfinal2
Mmx fevereiro - pt - vfinal2
 

Recently uploaded

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 

Recently uploaded (20)

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 

MMX: CREATING CHOICES IN SEABORNE IRON ORE SUPPLY

  • 1. MMX: CREATING CHOICES IN SEABORNE IRON ORE SUPPLY Rio de Janeiro | September 2012
  • 2. DISCLAIMER This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities Exchange Act of 1934. All statements other than statements of historical facts are statements that could be deemed forward-looking statements and are often characterized by the use of words such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, “may”, “will”, or “intends”, or by discussions or comments about our objectives, strategy, plans or intentions and results of operations. Forward-looking statements include projections regarding our operating capacity, operating expenditures, capital expenditures and start-up dates. By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in such statements may not be indicative of results or developments in future periods. We caution participants of this presentation not to place undue reliance on these forward-looking statements as a number of factors could cause future results to differ materially from these statements. Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves, and changes in economic, political and regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on forward-looking statements to make decisions, investors should carefully consider these factors as well as other uncertainties and events. MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell (which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States, or any other jurisdiction. The securities referred to herein have not been registered in any jurisdiction, and in particular, will not be registered under the U.S. Securities Act of 1933, as amended, or any applicable state securities laws and may not be offered or sold in the United States absent registration or an applicable exemption from such registration requirements. This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MMX’s prior written consent.
  • 4. HIGH QUALITY MINING ASSETS IN TRADITIONAL MINING DISTRICTS Mining rights in traditional iron ore districts: Brazil – Minas Gerais and Chile Production committed with strategic consumers – China and South Korea – through long-term contracts Brownfield start up in Brazil Expanding beyond 40 Mtpy in Brazil and Chile, Sudeste System through fully integrated systems: with private Serra Azul Unit Corumbá System ports in Brazil Bom Sucesso Unit Unique port location Chile System Sudeste Superport 4
  • 5. MMXM3: SOLID CONTROLLING SHAREHOLDERS 16% Wisco 42% Controlling Shareholders 14% SK Networks 28% Free Float 70% 100% 100% 99% MMX Corumbá Minera MMX Superporto MMX Sudeste Mineração do Chile Sudeste 5,48% EBX Serra Bom Azul Sucesso 5
  • 6. INGREDIENTS FOR A SUCCESSFUL IRON ORE BUSINESS SRK certification: 3,1 billion tons of mineral resources, and further mineral Resource Base potential of up to 1,4 billion tons. Reserves of 1 billion tons in Serra Azul. Low stripping ratio Competitive Competitive scale – New beneficiation plant Production Cost Structure Energy supply contract with MPX Integrated infrastructure with the existing MRS railway Sudeste Superport at 50 Mtpy, expandable to 100 Mtpy, provides gateway to Guaranteed seaborne markets Logistics Long Term Railway Contract with MRS Secured Off-take 64% of future production already committed through long-term contracts Operational Track Experience management team with implementation and operational expertise Record Installed Capacity of 10 Mtpy (Serra Azul and Corumbá sites) 6
  • 7. A LOT HAS BEEN DELIVERED September Conclusion of the offshore civil works at the Sudeste Superport 2012 Issuance of debentures at the amount of R$ 600 million Approval of the merger of PORTX into MMX Public hearings in Itaguaí and Mangaratiba for the expansion of the Sudeste Superport to 100 Mtpy Beginning of construction of the Serra Azul Unit expansion Installation License authorizing the Serra Azul Unit expansion MMX signs contract for railway services with MRS through 2026 SRK certified 997,4 million tons of mineral reserves at Serra Azul Unit Orders for long lead equipment for Serra Azul expansion EPCM contract with CNEC Worley Parsons for Serra Azul expansion Contract with MPX for energy supply for expansion of Serra Azul Financial advisory contract with Itaú BBA and Bradesco February Deal with Usiminas 2011 7
  • 8. FINANCIAL HIGHLIGHTS Net Profit (R$ million) EBITDA (R$ million) 200 90 100 75 90.9 49.3 0 60 -100 45 75.2 -200 -391.6 30 13.9 15 4.2 -300 0 -400 2Q11 1Q12 2Q12 2Q11 1Q12 2Q12 Debt profile Gross Margin (%) 100% 60% 61% 80% 53% 56% 45% 63% 68% 67% 60% 30% 40% 15% 20% 37% 32% 33% 0% 0% 2Q11 1Q12 2Q12 2Q11 1Q12 2Q12 Short Term Long Term
  • 11. UNIQUE INTEGRATED LOGISTICS Since Iron ore is a bulk commodity, an integrated logistic (mine  railway  port) is the key factor for a successful operation Mine Railway Superport Offtakers (Shareholders) Long-Term contract (20 years) to trade iron ore. SK will take-off part of the Sudeste System yearly production equivalent to its participation in MMX Capital (14%). MMX has a long term contract Sudeste Superport is located in Serra Azul unit is near to the with MRS railway, which connects Itaguaí and will have 50Mtpy iron Long-Term contract (20 years). Wisco will MRS railway - 10 km from the the mine with the CSN’s Itaguaí ore shipping capacity. The Superport off-take at least 50% of MMX Sudeste mine, a distance currently port and to the Sudeste will have a depth of 20 meters, production. traversed by trucks. Superport. enough to handle Capesize vessels. SK and Wisco will together offtake 64% of total production 11
  • 12. Iron ore Quadrangle QUADRILÁTERO FERRÍFERO 12
  • 13. RAILWAY Railway access conecting MRS to the Sudeste Superport 13
  • 14. MRS CONTRACT MMX signed a long term contract for railway services Contract signed on December 28th 2011. Long term contract through 2026. Provides for a volume of up to 36 million tons of iron ore per year. Tariff: R$ 26.463/ton , net of tax, readjusted annually by a parametric formula the variation in IGP-DI and in diesel oil. 14
  • 15. SERRA AZUL Expansion project with integrated logistic and pellet feed iron ore Highlights Production target: 29 Mtpy 64% of production already committed through long-term contracts 997.4 million tons of reserves already secured by SRK Execution Update Beginning of construction of Serra Azul Unit expansion Construction license issued in April, 2012 Acquisition of gyratory crushers, ball mills, SAG mills and vertical mills for the new beneficiation plant Contract with CNEC WorleyParsons Contract with MPX to supply power for 15 years at a base-price of R$125/MWh Expected Quality – Ouro Preto pilot plant test work Fe: 67.0% P: 0.03% SiO2: 3.5% Mn: 0.5% AL2O3: 0.5% LOI: 0.25% 15
  • 16. SERRA AZUL Growth through consolidation while leveraging existing infrastructure 16
  • 17. SERRA AZUL Serra Azul Unit Expansion Project Pit New Beneficiation Plant, transmission line and water pipelines, Stockyard and Loading Terminal 17
  • 19. SERRA AZUL Earthwork Grind Sump and Processing Thickners Construction Pile Site and Benefic. Warehouse substation Maintenance Primary workshop Construction Crushing Administrative Site Buildings 1
  • 21. Sudeste Superport Location 21
  • 22. Offshore Nautical Access Tunnel Stockyard 06 Stockyard 32 Sudeste Superport Artistic View 22 Railway Access
  • 23. SUDESTE SUPERPORT Overview Highlights 50 mtpy capacity, expandable to 100 mtpy Capesizes handling Loading: 2 ship loaders of 25 Mtpy each Fully funded (BNDES) Start-up forecast: 2Q13 100% of equipment already ordered Licensing for 100 Mtpy underway Sudeste Superport - Itaguaí 23
  • 24. SUDESTE SUPERPORT Overview Highlights Public hearing for 100 Mtpy held on May, 2012 Construction works for the tunnel and offshore infraestructure completed EIA-RIMA for 100 Mtpy filed with Inea in September 2011 Licensed to 50 Mtpy Navy Approval to 100 Mtpy Sudeste Superport - Itaguaí 24
  • 27. Sudeste Superport Car Dumpers Elevation 6 m 27
  • 30. 11 m 20.5 m Sudeste Superport Tunnel entrance 30
  • 32. Superporto Sudeste Offshore Structure - Bridge Bridge 450 m 32
  • 38. USIMINAS AGREEMENT Pau de Vinho Joint Mining Sudeste Superport Handling SRK resources audit : 810 million tons Handling fee: USD 12.63/ton adjusted plus a potential 75 million tons by US-PPI Pau de Vinho target production: 8 Mtpy Volumes: Significant synergies with current mining operations at Serra Azul ■ 12 Mtpy 13.5% of production at Pau de Vinho 80% Take-or-Pay will be delivered to Usiminas MMX will be responsible for the licensing, CAPEX and operation for 30 Usiminas can renew the contract for 1 years to 5 years 38
  • 40. BOM SUCESSO High-quality iron ore with high magnetite content Highlights Production target: 10 Mtpy 64% of production already committed through long-term contracts Execution Update Conceptual engineering SRK resources audit update: 365 million tons plus a potential of 741 million tons Expected Quality – Ouro Preto pilot plant test work Fe: 67.2% P: 0.033% SiO2: 2.5% PPC: 0.6% AL2O3: 0.5% FeO: 8.8% 40
  • 42. CHILE Highlights High-quality iron ore with magnetite content Production target: 10 Mtpy 50% of production already committed through long- term contracts 460 Mt of iron ore potential Execution Update Drilling performed 2011: approximately 43 thousand meters Water permits Expected Quality – Ouro Preto pilot plant test work Fe: 67.50% SiO2: 2.5% Al2O3: 0.85% P: 0.015% 42
  • 43. CHILE Castilha Port Deep water port – 28 meter draft: Chinamax vessels Shared construction with MPX (Sister Company) BERTH N° 1 – COAL BERTH N° 2 – IRON ORE BERTH N° 3 – COPPER 43
  • 45. CORUMBÁ Highlights Current Capacity: 2.1 Mtpy Long-term contracts signed with local and international barge operators 77% of production already committed through long-term contracts SRK audit resources report: 192 million tons plus a potential of an additional 123 million tons 45
  • 46. Investor Relations Guilherme Escalhão – CEO and IRO Adriana Marques – Manager Daniella Maia - Analyst Phone + 55 21 2163-6197 +55 21 2163-4366 ri@mmx.com.br