MMX: CREATING CHOICES IN SEABORNE IRON
ORE SUPPLY
Rio de Janeiro | May 2013
This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the
Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities
Exchange Act of 1934. All statements other than statements of historical facts are statements that could be deemed forward-looking
statements and are often characterized by the use of words such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”,
“estimates”, “may”, “will”, or “intends”, or by discussions or comments about our objectives, strategy, plans or intentions and results of
operations. Forward-looking statements include projections regarding our operating capacity, operating expenditures, capital expenditures
and start-up dates.
By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and
specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in
such statements may not be indicative of results or developments in future periods. We caution participants of this presentation not to
place undue reliance on these forward-looking statements as a number of factors could cause future results to differ materially from these
statements.
Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a
timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves,
and changes in economic, political and regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on
forward-looking statements to make decisions, investors should carefully consider these factors as well as other uncertainties and events.
MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell
(which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States,
or any other jurisdiction. The securities referred to herein have not been registered in any jurisdiction, and in particular, will not be
registered under the U.S. Securities Act of 1933, as amended, or any applicable state securities laws and may not be offered or sold in the
United States absent registration or an applicable exemption from such registration requirements.
This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part
without MMX’s prior written consent.
DISCLAIMER
MMX INTRODUCTION
1
59.3%
Controlling
Shareholders
10.5% Wisco
8.8% SK Networks
21.4% Others
MMX Corumbá
Mineração MMX Sudeste
Superporto
Sudeste
Serra
Azul
Bom
Sucesso
100% 100%94.52%
5.48% EBX
MMXM3: SOLID CONTROLLING SHAREHOLDERS
4
HIGH QUALITY MINING ASSETS IN TRADITIONAL
MINING DISTRICTS
Sudeste System
Serra Azul Unit
Bom Sucesso Unit
Corumbá System
Sudeste Superport
Two operating systems: Serra Azul and
Corumbá
Current Capacity: 10.8 Mtpy
Mining rights in traditional iron ore
districts: Brazil (Minas Gerais and Mato
Grosso do Sul)
Production committed with strategic
consumers – China and South Korea –
through long-term contracts
Brownfield start up in Brazil
Expanding up to around 40 Mtpy in Brazil,
through fully integrated systems: Private
port
Strategic port location
5
SRK and Coffey Mining certifications (Serra Azul, Pau de Vinho e Bom Sucesso):
3,6 billion tons of mineral resources. Reserves of 1 billion tons in Serra Azul.
64% of future production already committed through long-term contracts
Experience management team with implementation and operational expertise
Installed Capacity of 10.8 Mtpy (Serra Azul and Corumbá sites)
Sudeste Superport at 50 Mtpy, expandable to 100 Mtpy, provides gateway to
seaborne markets
Long Term Railway Contract with MRS
Low stripping ratio
Competitive scale – New beneficiation plant
Energy supply contract with MPX
Infrastructure with integrated logistics
Resource Base
Secured Off-take
Operational
Track Record
Guaranteed
Logistics
Competitive
Production Cost
Structure
INGREDIENTS FOR A SUCCESSFUL IRON ORE
BUSINESS
6
New certification of mineral resources (SRK and Coffey Mining) totaling 3.6 billion
tons considering Serra Azul Unit, Mina Pau de Vinho and Bom Sucesso
Conclusion of the contracting of supplementary long term funding for the Sudeste
Superport with BNDES, in the sum of R$ 935 million
Renewal of the lease contracts for mineral rights with the CEFAR, extending the
terms of validity from 2021 to 2034
Arrival of 2 Ship Loaders in the Sudeste Superport
Conclusion of the capital increase in the amount of R$ 1.4 billion
BNDES approves eligibility for a long term financing for Serra Azul
Conclusion of the offshore civil works at the Sudeste Superport
Issuance of debentures at the amount of R$ 600 million
Public hearings in Itaguaí and Mangaratiba for the expansion of the Sudeste
Superport to 100 Mtpy
Beginning of construction of the Serra Azul Unit expansion
Installation License authorizing the Serra Azul Unit expansion
April
2013
January
2012
A LOT HAS BEEN DELIVERED
7
FINANCIAL HIGHLIGHTS
8
SUDESTE SYSTEM
2
SERRA AZUL UNIT
2.1
UNIQUE INTEGRATED LOGISTICS
Since Iron ore is a bulk commodity, an integrated logistic (mine 
railway  port) is the key factor for a successful operation
Mine SuperportRailway
Serra Azul unit is near to the
MRS railway - 10 km from the
mine, a distance currently
traversed by trucks.
MMX has a long term contract
with MRS railway, which connects
the mine with the CSN’s port and
the Sudeste Superport, both
located in Itaguaí.
Sudeste Superport will have
50Mtpy iron ore shipping
capacity. The Superport will have
a depth of 20 meters, enough to
handle Capesize vessels.
Offtakers (Shareholders)
Long-Term contract (20 years) to trade iron
ore. SK will take-off part of the Sudeste
System yearly production equivalent to its
participation in MMX Capital (9%).
SK and Wisco will together
offtake 64% of total production
Long-Term contract (20 years). Wisco will
off-take at least 50% of MMX Sudeste
production.
11
QUADRILÁTERO FERRÍFEROIron ore Quadrangle
12
RAILWAY
Railway access connecting MRS to the Sudeste Superport
13
Contract signed on December 28th 2011.
Long term contract through 2026.
Provides for a volume of up to 36 million tons of iron ore per year.
MRS CONTRACT
MMX signed a long term contract for railway services
14
SERRA AZUL
Expansion project with integrated logistic and pellet feed iron ore
Highlights
Production target: 29 Mtpy
64% of production already committed through long-term contracts
997.4 million tons of reserves already secured by SRK
Execution Update
Beginning of construction of Serra Azul Unit expansion
Construction license issued in April, 2012
Acquisition of stirrers, thickeners, gyratory crushers, ball mills, SAG
mills and vertical mills for the new beneficiation plant
Contract with CNEC WorleyParsons
Contract with MPX to supply power for 15 years at a base-price of
R$125/MWh
Expected Quality – Ouro Preto pilot plant test work
Fe: 66.65% P: 0.025%
SiO2: 3.23% Mn: 0.018%
AL2O3: 0.54% LOI: 0.75%
15
SERRA AZUL
Growth through consolidation while leveraging existing
infrastructure
16
SERRA AZUL
Serra Azul Unit Expansion Project
New Beneficiation Plant, transmission line and water pipelines,
Stockyard and Loading Terminal
Pit
17
Serra Azul Expansion
Beneficiation Plant 18
Primary CrusherGrinding
Construction Site
Beneficiation Main Access
Water Storage Tank
Grinding
Primary Crusher
Pump House, Sump
and Thickeners
Substation
Piles Construction Site
and Warehouse
Water Storage Tank
Inc.
Administrative
Buildings
Maintenance
Workshop
Earthwork
SERRA AZUL
SUDESTE SUPERPORT
2.2
Sudeste Superport
Location
21
Nautical Access
Offshore
Tunnel
Stockyard 32
Stockyard 06
Railway Access
Sudeste Superport
Artistic View
22
SUDESTE SUPERPORT
Overview
Licensed to 50 Mtpy, expandable to 100 Mtpy
Licensing for 100 Mtpy underway, public
hearing held on May, 2012
Navy Approval to 100 Mtpy
Loading: 2 ship loaders of 25 Mtpy each
Construction works for the tunnel and
offshore infrastructure completed
Fully funded (BNDES)
23
Sudeste Superport - Itaguaí
USIMINAS AGREEMENT
SRK resources audit : 805 million tons
Pau de Vinho target production: 8 Mtpy
Significant synergies with current
mining operations at Serra Azul
13.5% of production at Pau de Vinho
will be delivered to Usiminas
MMX will be responsible for the
licensing, CAPEX and operation for 30
years
Volumes:
■ Up to 12 Mtpy
80% Take-or-Pay
Usiminas can renew the contract in
2016 for 1 to 5 years
Pau de Vinho Joint Mining Sudeste Superport Handling
24
Railway Access to
Itaguaí Port
Road&Railway Access to
MMX
Sudeste Superport
Road&Railway Access
Sudeste Superport
Road&Railway Access
Sudeste Superport
Road&Railway Access
Sudeste Superport
Stockyard Elevation 6 m
28
Stockyard 32
Stockyard 6
Road Access
Stacker Reclaimer
Rolling Way
Car Dumpers
Stacker Reclaimer
Infrastructure
Car Dumpers Control Room
Sudeste Superport
Stockyard Elevation 6 m
29
30
Sudeste Superport
Car Dumpers
Car Dumpers
Control Room of Car
Dumpers
Train Positioners
Sudeste Superport
Stockyard Elevation 32 m
31
Transfer House
Concrete Base
Electric Substation
Infrastructure
Tunnel Entrance
11 m
20.5 m
Sudeste Superport
Tunnel entrance
32
Sudeste Superport
Tunnel
33
34
Superporto Sudeste
Estrutura Offshore
34
Sudeste Superport
Offshore Structure
34
35
Electric Substation Building
Bridge 2 (270 m)
Bridge 1 (430 m)
Platform 2
Tunnel Exit
Sudeste Superport
Substation Structure
on Platform 1
36
Superporto Sudeste
Estrutura Offshore
36
Sudeste Superport
Offshore Structure
36
37
Superporto Sudeste
Estrutura Offshore
37
Bridge
270 m
Bridge
430 m
Pier
766 m
Sudeste Superport
Offshore Structure
37
38
Superporto Sudeste
Estrutura Offshore
38
Sudeste Superport
Ship Loader
Ship Loader
39
Superporto Sudeste
Estrutura Offshore
39
Sudeste Superport
Ship Loader
40
Superporto Sudeste
Estrutura Offshore
40
Sudeste Superport
Ship Loader
CORUMBÁ
3
CORUMBÁ
Highlights
Current Capacity: 2.1 Mtpy
Long-term contracts signed with local and
international barge operators
SRK audit resources report: 192 million tons
plus a potential of an additional 123 million
tons
42
Investor Relations
Carlos Gonzalez – CEO and IRO
Adriana Marques – Manager
Daniella Maia - Analyst
Phone + 55 21 2163-6197
+55 21 2163-4366
ri@mmx.com.br

More Related Content

What's hot

Mmx abril 2013 - ingles - v3
Mmx   abril 2013 - ingles - v3Mmx   abril 2013 - ingles - v3
Mmx abril 2013 - ingles - v3mmxriweb
 
Mmx abril 2013 - ingles - v2
Mmx   abril 2013 - ingles - v2Mmx   abril 2013 - ingles - v2
Mmx abril 2013 - ingles - v2mmxriweb
 
Mmx julho 2013 - ingles - vfinal
Mmx   julho 2013 - ingles - vfinalMmx   julho 2013 - ingles - vfinal
Mmx julho 2013 - ingles - vfinalmmxriweb
 
Corporate Presentation - February 2012
Corporate Presentation - February 2012Corporate Presentation - February 2012
Corporate Presentation - February 2012mmxriweb
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinalmmxriweb
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinalmmxriweb
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinalmmxriweb
 
Mmx setembro 2013 - ingles - vfinal
Mmx   setembro 2013 - ingles - vfinalMmx   setembro 2013 - ingles - vfinal
Mmx setembro 2013 - ingles - vfinalmmxriweb
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal novammxriweb
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal novammxriweb
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal novammxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal novammxriweb
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinalmmxriweb
 
Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property
Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property
Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property
volkmarguidohable
 
New base special 07 january 2014 khaled al awadi
New base special  07 january 2014 khaled al awadiNew base special  07 january 2014 khaled al awadi
New base special 07 january 2014 khaled al awadi
Khaled Al Awadi
 
New base special 07 january 2014 li khaled alawadi
New base special  07 january 2014 li khaled alawadiNew base special  07 january 2014 li khaled alawadi
New base special 07 january 2014 li khaled alawadi
Khaled Al Awadi
 
New base special 07 january 2014
New base special  07 january 2014New base special  07 january 2014
New base special 07 january 2014
Khaled Al Awadi
 

What's hot (17)

Mmx abril 2013 - ingles - v3
Mmx   abril 2013 - ingles - v3Mmx   abril 2013 - ingles - v3
Mmx abril 2013 - ingles - v3
 
Mmx abril 2013 - ingles - v2
Mmx   abril 2013 - ingles - v2Mmx   abril 2013 - ingles - v2
Mmx abril 2013 - ingles - v2
 
Mmx julho 2013 - ingles - vfinal
Mmx   julho 2013 - ingles - vfinalMmx   julho 2013 - ingles - vfinal
Mmx julho 2013 - ingles - vfinal
 
Corporate Presentation - February 2012
Corporate Presentation - February 2012Corporate Presentation - February 2012
Corporate Presentation - February 2012
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinal
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinal
 
Mmx agosto 2013 - ingles - vfinal
Mmx   agosto 2013 - ingles - vfinalMmx   agosto 2013 - ingles - vfinal
Mmx agosto 2013 - ingles - vfinal
 
Mmx setembro 2013 - ingles - vfinal
Mmx   setembro 2013 - ingles - vfinalMmx   setembro 2013 - ingles - vfinal
Mmx setembro 2013 - ingles - vfinal
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal nova
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal nova
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal nova
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinal
 
Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property
Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property
Volkmar Guido Hable enters into Agreement to Acquire North OTU Gold Property
 
New base special 07 january 2014 khaled al awadi
New base special  07 january 2014 khaled al awadiNew base special  07 january 2014 khaled al awadi
New base special 07 january 2014 khaled al awadi
 
New base special 07 january 2014 li khaled alawadi
New base special  07 january 2014 li khaled alawadiNew base special  07 january 2014 li khaled alawadi
New base special 07 january 2014 li khaled alawadi
 
New base special 07 january 2014
New base special  07 january 2014New base special  07 january 2014
New base special 07 january 2014
 

Viewers also liked

Liminar reserva legal
Liminar reserva legalLiminar reserva legal
Liminar reserva legal
Eduardo Sens Dos Santos
 
Postureo madrileño
Postureo madrileñoPostureo madrileño
Postureo madrileño
Silvi Anton Garcia
 
Σχολικές Ανακυκλω-κατασκευές: σελίδες 128-137
 Σχολικές Ανακυκλω-κατασκευές: σελίδες 128-137 Σχολικές Ανακυκλω-κατασκευές: σελίδες 128-137
Σχολικές Ανακυκλω-κατασκευές: σελίδες 128-137
TINA MANTIKOU
 
Maxima versimilitud
Maxima versimilitudMaxima versimilitud
Maxima versimilitud
SCG 52
 
AVON Ukraine 10/2015 (Sveta)
AVON Ukraine 10/2015 (Sveta)AVON Ukraine 10/2015 (Sveta)
AVON Ukraine 10/2015 (Sveta)
Dmitriy Machushenko
 
Lectura tiempo continuo
Lectura tiempo continuoLectura tiempo continuo
Lectura tiempo continuomendozaamerico
 
Dinero urgente sin papeles
Dinero urgente sin papelesDinero urgente sin papeles
Dinero urgente sin papeles
abrasiveboyfrie26
 

Viewers also liked (7)

Liminar reserva legal
Liminar reserva legalLiminar reserva legal
Liminar reserva legal
 
Postureo madrileño
Postureo madrileñoPostureo madrileño
Postureo madrileño
 
Σχολικές Ανακυκλω-κατασκευές: σελίδες 128-137
 Σχολικές Ανακυκλω-κατασκευές: σελίδες 128-137 Σχολικές Ανακυκλω-κατασκευές: σελίδες 128-137
Σχολικές Ανακυκλω-κατασκευές: σελίδες 128-137
 
Maxima versimilitud
Maxima versimilitudMaxima versimilitud
Maxima versimilitud
 
AVON Ukraine 10/2015 (Sveta)
AVON Ukraine 10/2015 (Sveta)AVON Ukraine 10/2015 (Sveta)
AVON Ukraine 10/2015 (Sveta)
 
Lectura tiempo continuo
Lectura tiempo continuoLectura tiempo continuo
Lectura tiempo continuo
 
Dinero urgente sin papeles
Dinero urgente sin papelesDinero urgente sin papeles
Dinero urgente sin papeles
 

Similar to Mmx maio 2013 - ingles

Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Mmx outubro 2013 - ingles - vfinal
Mmx   outubro 2013 - ingles - vfinalMmx   outubro 2013 - ingles - vfinal
Mmx outubro 2013 - ingles - vfinalmmxriweb
 
Mmx novembro 2013 - ingles - vfinal
Mmx   novembro 2013 - ingles - vfinalMmx   novembro 2013 - ingles - vfinal
Mmx novembro 2013 - ingles - vfinalmmxriweb
 
Mmx fevereiro - en - vfinal
Mmx   fevereiro - en - vfinalMmx   fevereiro - en - vfinal
Mmx fevereiro - en - vfinalmmxriweb
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal novammxriweb
 
Mmx dezembro 13 - en - vfinal
Mmx   dezembro 13 - en - vfinalMmx   dezembro 13 - en - vfinal
Mmx dezembro 13 - en - vfinalmmxriweb
 
Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014mmxriweb
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinalmmxriweb
 
Mmx fevereiro - en - vfinal nova
Mmx   fevereiro - en - vfinal novaMmx   fevereiro - en - vfinal nova
Mmx fevereiro - en - vfinal novammxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal novammxriweb
 
Corporate presentation – september 2009
Corporate presentation – september 2009Corporate presentation – september 2009
Corporate presentation – september 2009mmxriweb
 
Corporate presentation – september 2009
Corporate presentation – september 2009Corporate presentation – september 2009
Corporate presentation – september 2009mmxriweb
 
LLX Corporate Presentation - September 2011
LLX Corporate Presentation - September 2011 LLX Corporate Presentation - September 2011
LLX Corporate Presentation - September 2011 LLX
 
LLX Corporate Presentation - September 2011
LLX Corporate Presentation - September 2011 LLX Corporate Presentation - September 2011
LLX Corporate Presentation - September 2011 LLX
 
LLX Corporate Presentation September 2011
LLX Corporate Presentation September 2011LLX Corporate Presentation September 2011
LLX Corporate Presentation September 2011LLX
 
LLX Corporate Presentation October 2011
LLX Corporate Presentation October 2011LLX Corporate Presentation October 2011
LLX Corporate Presentation October 2011LLX
 

Similar to Mmx maio 2013 - ingles (18)

Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Mmx outubro 2013 - ingles - vfinal
Mmx   outubro 2013 - ingles - vfinalMmx   outubro 2013 - ingles - vfinal
Mmx outubro 2013 - ingles - vfinal
 
Mmx novembro 2013 - ingles - vfinal
Mmx   novembro 2013 - ingles - vfinalMmx   novembro 2013 - ingles - vfinal
Mmx novembro 2013 - ingles - vfinal
 
Mmx fevereiro - en - vfinal
Mmx   fevereiro - en - vfinalMmx   fevereiro - en - vfinal
Mmx fevereiro - en - vfinal
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal nova
 
Mmx dezembro 13 - en - vfinal
Mmx   dezembro 13 - en - vfinalMmx   dezembro 13 - en - vfinal
Mmx dezembro 13 - en - vfinal
 
Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinal
 
Mmx fevereiro - en - vfinal nova
Mmx   fevereiro - en - vfinal novaMmx   fevereiro - en - vfinal nova
Mmx fevereiro - en - vfinal nova
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 
Corporate presentation – september 2009
Corporate presentation – september 2009Corporate presentation – september 2009
Corporate presentation – september 2009
 
Corporate presentation – september 2009
Corporate presentation – september 2009Corporate presentation – september 2009
Corporate presentation – september 2009
 
LLX Corporate Presentation - September 2011
LLX Corporate Presentation - September 2011 LLX Corporate Presentation - September 2011
LLX Corporate Presentation - September 2011
 
LLX Corporate Presentation - September 2011
LLX Corporate Presentation - September 2011 LLX Corporate Presentation - September 2011
LLX Corporate Presentation - September 2011
 
LLX Corporate Presentation September 2011
LLX Corporate Presentation September 2011LLX Corporate Presentation September 2011
LLX Corporate Presentation September 2011
 
LLX Corporate Presentation October 2011
LLX Corporate Presentation October 2011LLX Corporate Presentation October 2011
LLX Corporate Presentation October 2011
 

More from mmxriweb

Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014mmxriweb
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal novammxriweb
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1mmxriweb
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vfmmxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal novammxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal novammxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal novammxriweb
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalmmxriweb
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalmmxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal novammxriweb
 
Mmx fevereiro - pt - vfinal nova
Mmx   fevereiro - pt - vfinal novaMmx   fevereiro - pt - vfinal nova
Mmx fevereiro - pt - vfinal novammxriweb
 
Mmx fevereiro - pt - vfinal
Mmx   fevereiro - pt - vfinalMmx   fevereiro - pt - vfinal
Mmx fevereiro - pt - vfinalmmxriweb
 
Mmx fevereiro - pt - vfinal2
Mmx   fevereiro - pt - vfinal2Mmx   fevereiro - pt - vfinal2
Mmx fevereiro - pt - vfinal2mmxriweb
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinalmmxriweb
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinalmmxriweb
 

More from mmxriweb (19)

Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal nova
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vf
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal nova
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinal
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinal
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx fevereiro - pt - vfinal nova
Mmx   fevereiro - pt - vfinal novaMmx   fevereiro - pt - vfinal nova
Mmx fevereiro - pt - vfinal nova
 
Mmx fevereiro - pt - vfinal
Mmx   fevereiro - pt - vfinalMmx   fevereiro - pt - vfinal
Mmx fevereiro - pt - vfinal
 
Mmx fevereiro - pt - vfinal2
Mmx   fevereiro - pt - vfinal2Mmx   fevereiro - pt - vfinal2
Mmx fevereiro - pt - vfinal2
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinal
 
Mmx janeiro - pt - vfinal
Mmx   janeiro - pt - vfinalMmx   janeiro - pt - vfinal
Mmx janeiro - pt - vfinal
 

Recently uploaded

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 

Recently uploaded (20)

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 

Mmx maio 2013 - ingles

  • 1. MMX: CREATING CHOICES IN SEABORNE IRON ORE SUPPLY Rio de Janeiro | May 2013
  • 2. This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities Exchange Act of 1934. All statements other than statements of historical facts are statements that could be deemed forward-looking statements and are often characterized by the use of words such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, “may”, “will”, or “intends”, or by discussions or comments about our objectives, strategy, plans or intentions and results of operations. Forward-looking statements include projections regarding our operating capacity, operating expenditures, capital expenditures and start-up dates. By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in such statements may not be indicative of results or developments in future periods. We caution participants of this presentation not to place undue reliance on these forward-looking statements as a number of factors could cause future results to differ materially from these statements. Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves, and changes in economic, political and regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on forward-looking statements to make decisions, investors should carefully consider these factors as well as other uncertainties and events. MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell (which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States, or any other jurisdiction. The securities referred to herein have not been registered in any jurisdiction, and in particular, will not be registered under the U.S. Securities Act of 1933, as amended, or any applicable state securities laws and may not be offered or sold in the United States absent registration or an applicable exemption from such registration requirements. This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MMX’s prior written consent. DISCLAIMER
  • 4. 59.3% Controlling Shareholders 10.5% Wisco 8.8% SK Networks 21.4% Others MMX Corumbá Mineração MMX Sudeste Superporto Sudeste Serra Azul Bom Sucesso 100% 100%94.52% 5.48% EBX MMXM3: SOLID CONTROLLING SHAREHOLDERS 4
  • 5. HIGH QUALITY MINING ASSETS IN TRADITIONAL MINING DISTRICTS Sudeste System Serra Azul Unit Bom Sucesso Unit Corumbá System Sudeste Superport Two operating systems: Serra Azul and Corumbá Current Capacity: 10.8 Mtpy Mining rights in traditional iron ore districts: Brazil (Minas Gerais and Mato Grosso do Sul) Production committed with strategic consumers – China and South Korea – through long-term contracts Brownfield start up in Brazil Expanding up to around 40 Mtpy in Brazil, through fully integrated systems: Private port Strategic port location 5
  • 6. SRK and Coffey Mining certifications (Serra Azul, Pau de Vinho e Bom Sucesso): 3,6 billion tons of mineral resources. Reserves of 1 billion tons in Serra Azul. 64% of future production already committed through long-term contracts Experience management team with implementation and operational expertise Installed Capacity of 10.8 Mtpy (Serra Azul and Corumbá sites) Sudeste Superport at 50 Mtpy, expandable to 100 Mtpy, provides gateway to seaborne markets Long Term Railway Contract with MRS Low stripping ratio Competitive scale – New beneficiation plant Energy supply contract with MPX Infrastructure with integrated logistics Resource Base Secured Off-take Operational Track Record Guaranteed Logistics Competitive Production Cost Structure INGREDIENTS FOR A SUCCESSFUL IRON ORE BUSINESS 6
  • 7. New certification of mineral resources (SRK and Coffey Mining) totaling 3.6 billion tons considering Serra Azul Unit, Mina Pau de Vinho and Bom Sucesso Conclusion of the contracting of supplementary long term funding for the Sudeste Superport with BNDES, in the sum of R$ 935 million Renewal of the lease contracts for mineral rights with the CEFAR, extending the terms of validity from 2021 to 2034 Arrival of 2 Ship Loaders in the Sudeste Superport Conclusion of the capital increase in the amount of R$ 1.4 billion BNDES approves eligibility for a long term financing for Serra Azul Conclusion of the offshore civil works at the Sudeste Superport Issuance of debentures at the amount of R$ 600 million Public hearings in Itaguaí and Mangaratiba for the expansion of the Sudeste Superport to 100 Mtpy Beginning of construction of the Serra Azul Unit expansion Installation License authorizing the Serra Azul Unit expansion April 2013 January 2012 A LOT HAS BEEN DELIVERED 7
  • 11. UNIQUE INTEGRATED LOGISTICS Since Iron ore is a bulk commodity, an integrated logistic (mine  railway  port) is the key factor for a successful operation Mine SuperportRailway Serra Azul unit is near to the MRS railway - 10 km from the mine, a distance currently traversed by trucks. MMX has a long term contract with MRS railway, which connects the mine with the CSN’s port and the Sudeste Superport, both located in Itaguaí. Sudeste Superport will have 50Mtpy iron ore shipping capacity. The Superport will have a depth of 20 meters, enough to handle Capesize vessels. Offtakers (Shareholders) Long-Term contract (20 years) to trade iron ore. SK will take-off part of the Sudeste System yearly production equivalent to its participation in MMX Capital (9%). SK and Wisco will together offtake 64% of total production Long-Term contract (20 years). Wisco will off-take at least 50% of MMX Sudeste production. 11
  • 13. RAILWAY Railway access connecting MRS to the Sudeste Superport 13
  • 14. Contract signed on December 28th 2011. Long term contract through 2026. Provides for a volume of up to 36 million tons of iron ore per year. MRS CONTRACT MMX signed a long term contract for railway services 14
  • 15. SERRA AZUL Expansion project with integrated logistic and pellet feed iron ore Highlights Production target: 29 Mtpy 64% of production already committed through long-term contracts 997.4 million tons of reserves already secured by SRK Execution Update Beginning of construction of Serra Azul Unit expansion Construction license issued in April, 2012 Acquisition of stirrers, thickeners, gyratory crushers, ball mills, SAG mills and vertical mills for the new beneficiation plant Contract with CNEC WorleyParsons Contract with MPX to supply power for 15 years at a base-price of R$125/MWh Expected Quality – Ouro Preto pilot plant test work Fe: 66.65% P: 0.025% SiO2: 3.23% Mn: 0.018% AL2O3: 0.54% LOI: 0.75% 15
  • 16. SERRA AZUL Growth through consolidation while leveraging existing infrastructure 16
  • 17. SERRA AZUL Serra Azul Unit Expansion Project New Beneficiation Plant, transmission line and water pipelines, Stockyard and Loading Terminal Pit 17
  • 19. Primary CrusherGrinding Construction Site Beneficiation Main Access Water Storage Tank Grinding Primary Crusher Pump House, Sump and Thickeners Substation Piles Construction Site and Warehouse Water Storage Tank Inc. Administrative Buildings Maintenance Workshop Earthwork SERRA AZUL
  • 22. Nautical Access Offshore Tunnel Stockyard 32 Stockyard 06 Railway Access Sudeste Superport Artistic View 22
  • 23. SUDESTE SUPERPORT Overview Licensed to 50 Mtpy, expandable to 100 Mtpy Licensing for 100 Mtpy underway, public hearing held on May, 2012 Navy Approval to 100 Mtpy Loading: 2 ship loaders of 25 Mtpy each Construction works for the tunnel and offshore infrastructure completed Fully funded (BNDES) 23 Sudeste Superport - Itaguaí
  • 24. USIMINAS AGREEMENT SRK resources audit : 805 million tons Pau de Vinho target production: 8 Mtpy Significant synergies with current mining operations at Serra Azul 13.5% of production at Pau de Vinho will be delivered to Usiminas MMX will be responsible for the licensing, CAPEX and operation for 30 years Volumes: ■ Up to 12 Mtpy 80% Take-or-Pay Usiminas can renew the contract in 2016 for 1 to 5 years Pau de Vinho Joint Mining Sudeste Superport Handling 24
  • 25. Railway Access to Itaguaí Port Road&Railway Access to MMX Sudeste Superport Road&Railway Access
  • 28. Sudeste Superport Stockyard Elevation 6 m 28 Stockyard 32 Stockyard 6 Road Access Stacker Reclaimer Rolling Way Car Dumpers Stacker Reclaimer Infrastructure Car Dumpers Control Room
  • 30. 30 Sudeste Superport Car Dumpers Car Dumpers Control Room of Car Dumpers Train Positioners
  • 31. Sudeste Superport Stockyard Elevation 32 m 31 Transfer House Concrete Base Electric Substation Infrastructure Tunnel Entrance
  • 32. 11 m 20.5 m Sudeste Superport Tunnel entrance 32
  • 34. 34 Superporto Sudeste Estrutura Offshore 34 Sudeste Superport Offshore Structure 34
  • 35. 35 Electric Substation Building Bridge 2 (270 m) Bridge 1 (430 m) Platform 2 Tunnel Exit Sudeste Superport Substation Structure on Platform 1
  • 36. 36 Superporto Sudeste Estrutura Offshore 36 Sudeste Superport Offshore Structure 36
  • 37. 37 Superporto Sudeste Estrutura Offshore 37 Bridge 270 m Bridge 430 m Pier 766 m Sudeste Superport Offshore Structure 37
  • 38. 38 Superporto Sudeste Estrutura Offshore 38 Sudeste Superport Ship Loader Ship Loader
  • 42. CORUMBÁ Highlights Current Capacity: 2.1 Mtpy Long-term contracts signed with local and international barge operators SRK audit resources report: 192 million tons plus a potential of an additional 123 million tons 42
  • 43. Investor Relations Carlos Gonzalez – CEO and IRO Adriana Marques – Manager Daniella Maia - Analyst Phone + 55 21 2163-6197 +55 21 2163-4366 ri@mmx.com.br