SlideShare a Scribd company logo
OFFICE OF OPERATIONAL SERVICES
PUBLIC WORKS DEPARTMENT
Commission Meeting
March 20, 2012 @ 6:00 p.m.
Temp. Resolution No. R-5103
Solid Waste Disposal RFP
Approval of Top-Ranked Firm to
Commence Negotiations
• Presentation team
• Overview
• Why issue an RFP
• Key RFP elements
• Procurement process
• Recommended next steps
• Process Value
Discussion Topics
• Vernon Hargray
– ACM Operational Services
• Thomas Good
– Public Works Director
– Resource Recovery Board – Technical Advisory Committee (RRB/TAC) representative for
over 10 years w/ 4 years as Chair
• Randy Cross
– Procurement Director
– National Institute of Government Procurement
• Sandy Gutner, P. E.
– President Value Added Consulting
– Over 25 years solid waste management w/ 6 years as the RRB and Broward County Solid
Waste Consultant
Presentation Team
• City enters into an ILA with Broward County for solid
waste disposal services in 1986 becoming a
“contract community”
• Other Cities executed same ILA creating the
Broward Solid Waste Disposal District (BSWDD)
dependent to the county
• Broward County issued bonds to support the
BSWDD and required all contract communities to
deliver wastes to system to ensure revenue stream
(Flow Control)
Overview
Overview (cont.)
• The Interlocal Agreement (ILA) for solid waste
disposal is set to expire in 2013
• City Manager recognized the City had a
window of opportunity to engage in free market
options that could return greater benefits to the
City
• City Commission voted to not sign the ILA on
November 26, 2010 and to proceed with its
own RFP for disposal services
Let’s Review
• 2010 Proposed Service Agreement would have
exposed City to many undefined risks and
liabilities:
– Pay for capital upgrade/replacements
– Cover increasing costs for treatment of ash landfill runoff
– Make up lost revenues due to changes in law
– Increase in property taxes
• No control on District programs and how they are
funded
• Potential exists for disproportionate costs to
Contract Communities
$65.19
To
$140.21
What Could’ve Happened?
Low range is a conservative firm price beginning 2013 and high range is potential
cost increase (risks and pass-thru’s) throughout 10-year term
$53.19
to
$110.02
Miramar
Tipping
Fee
Service
Agreement Fee
District
Program
Expenses
$12.00
To
$30.17
• The private disposal facilities no longer require
public obligation to share in risk after July 2013
• 2.5 year window of opportunity for market
competition
• Commission philosophy to competitively bid
services
Also Considered
Hence, City deferred ILA until results of an
formal competitive process
Note: Broward County and Ft. Lauderdale voted down the ILA Extension and Service
Agreement
• BCCMA Coconut Creek (1/13/2011)
• Stakeholder Meeting Miramar (1/27/11)
– All City Managers throughout Broward County
invited to participate;
– Total of 16 participating agencies:
• Lauderdale by-the-Sea, Hallandale Beach, Coconut Creek,
Coral Springs, Margate, Broward County, Davie, Southwest
Ranches, Oakland Park, Sunrise, Fort Lauderdale, Weston,
Deerfield Beach, Plantation, Cooper City, and Miramar
• RFP Review by Stakeholders (3/23/11)
Disposal RFP Participation
Leadership Objectives for RFP
• Minimize Risks and Liabilities
• Competitive Rate Structure for Residents
• Uninterrupted Waste Disposal Services at
expiration of ILA
• Environmentally Sound Solid Waste Management
• Service Reliability
• Opportunity for Market Participation
RFP Highlights
RFP Element Overview
Scope Requested Disposal services or Processing, Transfer
and Disposal.
Term 5 year initial term, up to (3) 5 year
renewals.
Technical Proposal • Technical and financial qualifications
• Project technical approach
• Business terms
Cost Proposals • Disposal (including receiving)
• Revenue Sharing (optional)
• Maximum Inflation (optional)
Technical Proposals
• Team experience
• Financial qualifications
• Technical Approach
– Direct disposal services
– Receipt, Processing and Disposal
– Existing or Proposed facilities
– Transition plan, if facility not existing
• Acceptance/Modification of RFP Business Terms
• Scope of service
• Contract Term
• Project Security
• Transition period responsibilities
• Addresses Unusual Circumstances
General Business Terms
• Disposal charges
– Service Fee ($/ton received)
• Inflationary Adjustments
– Bureau of Labor Statistics index, specified in RFP
– RFP allowed for optional reduced %. (% of index)
– Option for maximum inflationary adjustment
• Revenue Sharing
– $/ton of waste delivered
– Not based on performance or market pricing
Cost Proposals
City Protections
• If Unusual Circumstances result in Contractor
total costs to increase > 10%, Contractor may
request relief.
• Applies to total cost, not to individual cost items
(e.g. fuel or labor)
• Contractor must demonstrate cost increase.
• City is not obligated to grant relief.
Unusual Circumstances
• Guarantees performance of all Contractor’s
obligations and responsibilities.
• If Contractor fails to perform, Guarantor is
obligated to perform.
• Guarantee by corporate parent company,
or all corporate parents, if Joint Venture.
Project Guarantee
• Issued by bank.
• $ value equal to 6 months of total disposal
charges.
• If facility not available by July 2013, City can draw
on the LOC to cover the difference between
proposed cost and actual cost.
• LOC use can last for a long time
Irrevocable Letter of Credit
Irrevocable LOC Example
Assume Proposed Cost is $40/ton
Assume Miramar disposes 65,000 tons/year
Letter of Credit Value = 32,500 tons x $40/ton = $1.3M
If Actual Cost = $50/ton Cost if proposed facility not available July 2013
Difference $10/ton Amount eligible for LOC draw
LOC available 2 years [$1.3M ÷ 65,000 ton/yr] ÷ [$10/ton]
• Assures City that contractor is
fully able to deliver service before
City is fully committed
• If Conditions can not be met,
allows City to seek alternatives.
Conditions Precedent Concept
Contractor must provide:
• Evidence that all rights, permits and
approvals to provide the Disposal Services
• Executed Project Guaranty Agreement
• Executed Irrevocable Letter of Credit
Conditions Precedent in RFP
2nd Ranked
Firm
Milestones and Check Points
Ranking
Proposals
Received
Yes
No
Notice-to-
Proceed
No
Milestones and Check Points
Negotiat
e Agmt
Contract
Date
Conditions
Precedent
Met?
Agreement
on Terms?
• RFP formally issued on March 9th
• Pre-proposal conference held on March
28th
• RFP closed on June 2nd
• Three proposals received
– Wheelabrator Technologies
– Sun Recycling and Bergeron Environmental-Joint Venture
– Sun Recycling and Bergeron Environmental-Joint Venture
(Alternate Proposal)*
RFP Process Timeline
* Alternate geared primarily
toward C&D disposal.
Wheelabrator Proposal
Ash
Waste-to-
Energy
Landfill
Sun/Bergeron Proposal
Waste-to-
Energy
Landfill
OtherRecycle 25%
Ash
• Evaluation team charged with actual review and
scoring of proposals.
• Evaluation Team Members represents a
diversity of communities and decision makers:
– City Manager, Coconut Creek;
– Public Works Director, Hallandale Beach;
– Public Works Director, Oakland Park;
– Intergovernmental Affairs Manager, Davie;
– Finance Director, Miramar.
Evaluation Team Members
• Consists of three categories;
– Qualifications = 20 points
– Technical = 35 points
– Price = 45 points
• Proposers must receive 65 percent of max
points for technical and qualifications (each) to
have sealed prices opened;
• All proposals met technical/qualifications 65
percent requirements.
Evaluation Criteria
• Both proposers to submit best and final
offer
• Prices to be based on a single per-ton cost
– Simplified price evaluation process
– Easy to recognize costs
– Recognizes economies of scale
• Proposers were accorded fair and equal
treatment
Best & Final Offer
Proposer
Disposal
Price/Ton
Revenue
Share/Ton
% of CPI
Wheelabrator
Technologies
$52.50 $0.00 100%
Sun/Bergeron $45.25 $2.00 100%
Price Tabulation
5-Year Price Comparison
Year 2013 2014 2015 2016 2017
Wheelabrator
Fee/ton
$52.50 $52.50 $52.50 $52.50 $52.50
Sun/Berg.
Fee/ton
$43.25 $43.25 $43.25 $43.25 $43.25
Difference
/ton
$9.25 $9.25 $9.25 $9.25 $9.25
Difference @
65,000 ton/yr
$601,000 $601,000 $601,000 $601,000 $601,000
Total 5-Year Difference for Miramar = $3.01M
• On December 12, 2011 the Evaluation team
completed its review and scoring for the
proposals:
– Wheelabrator disposal
– Sun/Bergeron receiving and disposal
• City Procurement Department completed final
tabulation;
• Evaluation team ranks;
– Sun/Bergeron = No. 1;
– Wheelabrator = No. 2
Final Evaluation
Final Ranking
Disposal of Solid Waste
Services
Proposal Ranking
Sun/Bergeron Wheelabrator
Total 447.8 426.2
Ranking 1 2
• Time to meet Conditions Precedent
• Changes to disposal locations
• Reporting requirements
• Facility access
• Logistical and administrative details
Example of Items to Negotiate
Contract Negotiation Begins Clock
July
2013
March 20,
2012
15 months
Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13
Commission Approves
Contract 7/12
Negotiate
w/next ranked
YesNo
Notice-
to-
Proceed
No
Agreement
on Terms?
Negotiate
w/top
ranked
Conditions
Precedent
Met?
9+ months
Commission
Approves 3/12
Year 2013 2014 2015 2016 2017 TOTAL
ILA Proposed
Fee/ton*
$65.19 $67.80 $70.51 $73.33 $76.26
Sun/Berg.
RFP Fee/ton**
$47.25 $47.25 $47.25 $47.25 $47.25
Savings @
65,000 ton/yr
$1.12M $1.34M $1.51M $1.70M $1.89M $7.56M
Wheelabrator
RFP Fee/ton**
$56.50 $56.50 $56.50 $56.50 $56.50
Savings @
65,000 ton/yr
$0.56M $0.73M $0.91M $1.09M $1.28M $4.57M
* Proposed fee increases conservatively assumes risks and pass-thru’s at 4% per year
** Approximately $4/ton for ancillary services
Proposed District Fee Offered in 2010 Compared to
Sun/Bergeron and Wheelabrator
Competitive
Inclusive
Transparent
Fair
• Approving the ranking of the solid waste
disposal proposals and authorize
negotiation with the top-ranked firm,
Sun/Bergeron, and should negotiations
be unsuccessful, begin negotiations with
the second ranked firm, Wheelabrator.
Recommendation
Questions……

More Related Content

Similar to Miramar commission mtg 3 20-12 solid waste disposal rfp

beach corridor pec presentation
beach corridor pec presentationbeach corridor pec presentation
beach corridor pec presentation
Miami-Dade Transportation Planning Organization
 
Item #5 Automatic Meter Read Water Meter System RFP
Item #5   Automatic Meter Read Water Meter System RFPItem #5   Automatic Meter Read Water Meter System RFP
Item #5 Automatic Meter Read Water Meter System RFP
Marian Vargas Mendoza
 
City Projects - Concepts, Costing & Construction
City Projects - Concepts, Costing & ConstructionCity Projects - Concepts, Costing & Construction
City Projects - Concepts, Costing & Construction
UGPTI
 
Miramar risk assessment final
Miramar risk assessment   finalMiramar risk assessment   final
Miramar risk assessment final
Sandy Gutner
 
ACT 2014 Building a Regional TDM Program
ACT 2014 Building a Regional TDM ProgramACT 2014 Building a Regional TDM Program
ACT 2014 Building a Regional TDM Program
Association for Commuter Transportation (ACT)
 
2018 Chestnuthill Township Budget Breakdown
2018 Chestnuthill Township Budget Breakdown2018 Chestnuthill Township Budget Breakdown
2018 Chestnuthill Township Budget Breakdown
jmathews91
 
NIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsNIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation Projects
South Shore Clean Cities
 
TIF Updates
TIF UpdatesTIF Updates
TIF Updates
Vierbicher
 
Overview of LACMTA Green Construction Policy
Overview of LACMTA Green Construction PolicyOverview of LACMTA Green Construction Policy
Overview of LACMTA Green Construction Policy
cliban
 
AH CCM 02.12.18 - Item #4 PPT Water and Wastewater rate study
AH CCM 02.12.18 - Item #4   PPT Water and Wastewater rate studyAH CCM 02.12.18 - Item #4   PPT Water and Wastewater rate study
AH CCM 02.12.18 - Item #4 PPT Water and Wastewater rate study
ahcitycouncil
 
Green communities selectmen for slideshare
Green communities selectmen for slideshareGreen communities selectmen for slideshare
Green communities selectmen for slideshare
Green Needham
 
Item # 11 - PPT Auustin Hwy/Lower Broadway Improvement Project RFQ
Item # 11 - PPT Auustin Hwy/Lower Broadway Improvement Project RFQItem # 11 - PPT Auustin Hwy/Lower Broadway Improvement Project RFQ
Item # 11 - PPT Auustin Hwy/Lower Broadway Improvement Project RFQ
ahcitycouncil
 
Concurrency Developer's Forum 11/2015
Concurrency Developer's Forum 11/2015Concurrency Developer's Forum 11/2015
Concurrency Developer's Forum 11/2015
Scott Skraban, MPA, CH-ERIM
 
Design-Build Operate and Finance
Design-Build Operate and FinanceDesign-Build Operate and Finance
Design-Build Operate and Finance
Water Design-Build Council
 
Public Private Partnership in Municipal Solid Waste Management in India
Public Private Partnership in Municipal Solid Waste Management in IndiaPublic Private Partnership in Municipal Solid Waste Management in India
Public Private Partnership in Municipal Solid Waste Management in India
Bashir Shirazi
 
New Trump Administration Updates: Federal, State and Local Energy & Specialt...
 New Trump Administration Updates: Federal, State and Local Energy & Specialt... New Trump Administration Updates: Federal, State and Local Energy & Specialt...
New Trump Administration Updates: Federal, State and Local Energy & Specialt...
Ryan Slack
 
DHSEM Presentation to Local Officials and Staff for Flood Recovery
DHSEM Presentation to Local Officials and Staff for Flood RecoveryDHSEM Presentation to Local Officials and Staff for Flood Recovery
DHSEM Presentation to Local Officials and Staff for Flood Recovery
Trost, Micki
 
3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_PublicRichard B. Petch
 
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Fairfax County
 
Nov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule UpdateNov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule Update
Adina Levin
 

Similar to Miramar commission mtg 3 20-12 solid waste disposal rfp (20)

beach corridor pec presentation
beach corridor pec presentationbeach corridor pec presentation
beach corridor pec presentation
 
Item #5 Automatic Meter Read Water Meter System RFP
Item #5   Automatic Meter Read Water Meter System RFPItem #5   Automatic Meter Read Water Meter System RFP
Item #5 Automatic Meter Read Water Meter System RFP
 
City Projects - Concepts, Costing & Construction
City Projects - Concepts, Costing & ConstructionCity Projects - Concepts, Costing & Construction
City Projects - Concepts, Costing & Construction
 
Miramar risk assessment final
Miramar risk assessment   finalMiramar risk assessment   final
Miramar risk assessment final
 
ACT 2014 Building a Regional TDM Program
ACT 2014 Building a Regional TDM ProgramACT 2014 Building a Regional TDM Program
ACT 2014 Building a Regional TDM Program
 
2018 Chestnuthill Township Budget Breakdown
2018 Chestnuthill Township Budget Breakdown2018 Chestnuthill Township Budget Breakdown
2018 Chestnuthill Township Budget Breakdown
 
NIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsNIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation Projects
 
TIF Updates
TIF UpdatesTIF Updates
TIF Updates
 
Overview of LACMTA Green Construction Policy
Overview of LACMTA Green Construction PolicyOverview of LACMTA Green Construction Policy
Overview of LACMTA Green Construction Policy
 
AH CCM 02.12.18 - Item #4 PPT Water and Wastewater rate study
AH CCM 02.12.18 - Item #4   PPT Water and Wastewater rate studyAH CCM 02.12.18 - Item #4   PPT Water and Wastewater rate study
AH CCM 02.12.18 - Item #4 PPT Water and Wastewater rate study
 
Green communities selectmen for slideshare
Green communities selectmen for slideshareGreen communities selectmen for slideshare
Green communities selectmen for slideshare
 
Item # 11 - PPT Auustin Hwy/Lower Broadway Improvement Project RFQ
Item # 11 - PPT Auustin Hwy/Lower Broadway Improvement Project RFQItem # 11 - PPT Auustin Hwy/Lower Broadway Improvement Project RFQ
Item # 11 - PPT Auustin Hwy/Lower Broadway Improvement Project RFQ
 
Concurrency Developer's Forum 11/2015
Concurrency Developer's Forum 11/2015Concurrency Developer's Forum 11/2015
Concurrency Developer's Forum 11/2015
 
Design-Build Operate and Finance
Design-Build Operate and FinanceDesign-Build Operate and Finance
Design-Build Operate and Finance
 
Public Private Partnership in Municipal Solid Waste Management in India
Public Private Partnership in Municipal Solid Waste Management in IndiaPublic Private Partnership in Municipal Solid Waste Management in India
Public Private Partnership in Municipal Solid Waste Management in India
 
New Trump Administration Updates: Federal, State and Local Energy & Specialt...
 New Trump Administration Updates: Federal, State and Local Energy & Specialt... New Trump Administration Updates: Federal, State and Local Energy & Specialt...
New Trump Administration Updates: Federal, State and Local Energy & Specialt...
 
DHSEM Presentation to Local Officials and Staff for Flood Recovery
DHSEM Presentation to Local Officials and Staff for Flood RecoveryDHSEM Presentation to Local Officials and Staff for Flood Recovery
DHSEM Presentation to Local Officials and Staff for Flood Recovery
 
3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public
 
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
 
Nov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule UpdateNov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule Update
 

Recently uploaded

RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 

Recently uploaded (20)

RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 

Miramar commission mtg 3 20-12 solid waste disposal rfp

  • 1. OFFICE OF OPERATIONAL SERVICES PUBLIC WORKS DEPARTMENT Commission Meeting March 20, 2012 @ 6:00 p.m. Temp. Resolution No. R-5103 Solid Waste Disposal RFP Approval of Top-Ranked Firm to Commence Negotiations
  • 2. • Presentation team • Overview • Why issue an RFP • Key RFP elements • Procurement process • Recommended next steps • Process Value Discussion Topics
  • 3. • Vernon Hargray – ACM Operational Services • Thomas Good – Public Works Director – Resource Recovery Board – Technical Advisory Committee (RRB/TAC) representative for over 10 years w/ 4 years as Chair • Randy Cross – Procurement Director – National Institute of Government Procurement • Sandy Gutner, P. E. – President Value Added Consulting – Over 25 years solid waste management w/ 6 years as the RRB and Broward County Solid Waste Consultant Presentation Team
  • 4. • City enters into an ILA with Broward County for solid waste disposal services in 1986 becoming a “contract community” • Other Cities executed same ILA creating the Broward Solid Waste Disposal District (BSWDD) dependent to the county • Broward County issued bonds to support the BSWDD and required all contract communities to deliver wastes to system to ensure revenue stream (Flow Control) Overview
  • 5. Overview (cont.) • The Interlocal Agreement (ILA) for solid waste disposal is set to expire in 2013 • City Manager recognized the City had a window of opportunity to engage in free market options that could return greater benefits to the City • City Commission voted to not sign the ILA on November 26, 2010 and to proceed with its own RFP for disposal services
  • 6.
  • 7. Let’s Review • 2010 Proposed Service Agreement would have exposed City to many undefined risks and liabilities: – Pay for capital upgrade/replacements – Cover increasing costs for treatment of ash landfill runoff – Make up lost revenues due to changes in law – Increase in property taxes • No control on District programs and how they are funded • Potential exists for disproportionate costs to Contract Communities
  • 8. $65.19 To $140.21 What Could’ve Happened? Low range is a conservative firm price beginning 2013 and high range is potential cost increase (risks and pass-thru’s) throughout 10-year term $53.19 to $110.02 Miramar Tipping Fee Service Agreement Fee District Program Expenses $12.00 To $30.17
  • 9. • The private disposal facilities no longer require public obligation to share in risk after July 2013 • 2.5 year window of opportunity for market competition • Commission philosophy to competitively bid services Also Considered Hence, City deferred ILA until results of an formal competitive process Note: Broward County and Ft. Lauderdale voted down the ILA Extension and Service Agreement
  • 10. • BCCMA Coconut Creek (1/13/2011) • Stakeholder Meeting Miramar (1/27/11) – All City Managers throughout Broward County invited to participate; – Total of 16 participating agencies: • Lauderdale by-the-Sea, Hallandale Beach, Coconut Creek, Coral Springs, Margate, Broward County, Davie, Southwest Ranches, Oakland Park, Sunrise, Fort Lauderdale, Weston, Deerfield Beach, Plantation, Cooper City, and Miramar • RFP Review by Stakeholders (3/23/11) Disposal RFP Participation
  • 11. Leadership Objectives for RFP • Minimize Risks and Liabilities • Competitive Rate Structure for Residents • Uninterrupted Waste Disposal Services at expiration of ILA • Environmentally Sound Solid Waste Management • Service Reliability • Opportunity for Market Participation
  • 12.
  • 13. RFP Highlights RFP Element Overview Scope Requested Disposal services or Processing, Transfer and Disposal. Term 5 year initial term, up to (3) 5 year renewals. Technical Proposal • Technical and financial qualifications • Project technical approach • Business terms Cost Proposals • Disposal (including receiving) • Revenue Sharing (optional) • Maximum Inflation (optional)
  • 14. Technical Proposals • Team experience • Financial qualifications • Technical Approach – Direct disposal services – Receipt, Processing and Disposal – Existing or Proposed facilities – Transition plan, if facility not existing • Acceptance/Modification of RFP Business Terms
  • 15. • Scope of service • Contract Term • Project Security • Transition period responsibilities • Addresses Unusual Circumstances General Business Terms
  • 16. • Disposal charges – Service Fee ($/ton received) • Inflationary Adjustments – Bureau of Labor Statistics index, specified in RFP – RFP allowed for optional reduced %. (% of index) – Option for maximum inflationary adjustment • Revenue Sharing – $/ton of waste delivered – Not based on performance or market pricing Cost Proposals
  • 18. • If Unusual Circumstances result in Contractor total costs to increase > 10%, Contractor may request relief. • Applies to total cost, not to individual cost items (e.g. fuel or labor) • Contractor must demonstrate cost increase. • City is not obligated to grant relief. Unusual Circumstances
  • 19. • Guarantees performance of all Contractor’s obligations and responsibilities. • If Contractor fails to perform, Guarantor is obligated to perform. • Guarantee by corporate parent company, or all corporate parents, if Joint Venture. Project Guarantee
  • 20. • Issued by bank. • $ value equal to 6 months of total disposal charges. • If facility not available by July 2013, City can draw on the LOC to cover the difference between proposed cost and actual cost. • LOC use can last for a long time Irrevocable Letter of Credit
  • 21. Irrevocable LOC Example Assume Proposed Cost is $40/ton Assume Miramar disposes 65,000 tons/year Letter of Credit Value = 32,500 tons x $40/ton = $1.3M If Actual Cost = $50/ton Cost if proposed facility not available July 2013 Difference $10/ton Amount eligible for LOC draw LOC available 2 years [$1.3M ÷ 65,000 ton/yr] ÷ [$10/ton]
  • 22. • Assures City that contractor is fully able to deliver service before City is fully committed • If Conditions can not be met, allows City to seek alternatives. Conditions Precedent Concept
  • 23. Contractor must provide: • Evidence that all rights, permits and approvals to provide the Disposal Services • Executed Project Guaranty Agreement • Executed Irrevocable Letter of Credit Conditions Precedent in RFP
  • 24. 2nd Ranked Firm Milestones and Check Points Ranking Proposals Received Yes No Notice-to- Proceed No Milestones and Check Points Negotiat e Agmt Contract Date Conditions Precedent Met? Agreement on Terms?
  • 25.
  • 26. • RFP formally issued on March 9th • Pre-proposal conference held on March 28th • RFP closed on June 2nd • Three proposals received – Wheelabrator Technologies – Sun Recycling and Bergeron Environmental-Joint Venture – Sun Recycling and Bergeron Environmental-Joint Venture (Alternate Proposal)* RFP Process Timeline * Alternate geared primarily toward C&D disposal.
  • 29. • Evaluation team charged with actual review and scoring of proposals. • Evaluation Team Members represents a diversity of communities and decision makers: – City Manager, Coconut Creek; – Public Works Director, Hallandale Beach; – Public Works Director, Oakland Park; – Intergovernmental Affairs Manager, Davie; – Finance Director, Miramar. Evaluation Team Members
  • 30. • Consists of three categories; – Qualifications = 20 points – Technical = 35 points – Price = 45 points • Proposers must receive 65 percent of max points for technical and qualifications (each) to have sealed prices opened; • All proposals met technical/qualifications 65 percent requirements. Evaluation Criteria
  • 31. • Both proposers to submit best and final offer • Prices to be based on a single per-ton cost – Simplified price evaluation process – Easy to recognize costs – Recognizes economies of scale • Proposers were accorded fair and equal treatment Best & Final Offer
  • 32. Proposer Disposal Price/Ton Revenue Share/Ton % of CPI Wheelabrator Technologies $52.50 $0.00 100% Sun/Bergeron $45.25 $2.00 100% Price Tabulation
  • 33. 5-Year Price Comparison Year 2013 2014 2015 2016 2017 Wheelabrator Fee/ton $52.50 $52.50 $52.50 $52.50 $52.50 Sun/Berg. Fee/ton $43.25 $43.25 $43.25 $43.25 $43.25 Difference /ton $9.25 $9.25 $9.25 $9.25 $9.25 Difference @ 65,000 ton/yr $601,000 $601,000 $601,000 $601,000 $601,000 Total 5-Year Difference for Miramar = $3.01M
  • 34. • On December 12, 2011 the Evaluation team completed its review and scoring for the proposals: – Wheelabrator disposal – Sun/Bergeron receiving and disposal • City Procurement Department completed final tabulation; • Evaluation team ranks; – Sun/Bergeron = No. 1; – Wheelabrator = No. 2 Final Evaluation
  • 35. Final Ranking Disposal of Solid Waste Services Proposal Ranking Sun/Bergeron Wheelabrator Total 447.8 426.2 Ranking 1 2
  • 36.
  • 37. • Time to meet Conditions Precedent • Changes to disposal locations • Reporting requirements • Facility access • Logistical and administrative details Example of Items to Negotiate
  • 38. Contract Negotiation Begins Clock July 2013 March 20, 2012 15 months Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Commission Approves Contract 7/12 Negotiate w/next ranked YesNo Notice- to- Proceed No Agreement on Terms? Negotiate w/top ranked Conditions Precedent Met? 9+ months Commission Approves 3/12
  • 39.
  • 40. Year 2013 2014 2015 2016 2017 TOTAL ILA Proposed Fee/ton* $65.19 $67.80 $70.51 $73.33 $76.26 Sun/Berg. RFP Fee/ton** $47.25 $47.25 $47.25 $47.25 $47.25 Savings @ 65,000 ton/yr $1.12M $1.34M $1.51M $1.70M $1.89M $7.56M Wheelabrator RFP Fee/ton** $56.50 $56.50 $56.50 $56.50 $56.50 Savings @ 65,000 ton/yr $0.56M $0.73M $0.91M $1.09M $1.28M $4.57M * Proposed fee increases conservatively assumes risks and pass-thru’s at 4% per year ** Approximately $4/ton for ancillary services Proposed District Fee Offered in 2010 Compared to Sun/Bergeron and Wheelabrator
  • 42. • Approving the ranking of the solid waste disposal proposals and authorize negotiation with the top-ranked firm, Sun/Bergeron, and should negotiations be unsuccessful, begin negotiations with the second ranked firm, Wheelabrator. Recommendation

Editor's Notes

  1. Key elements of the RFP How they were structured to protect the City Achieve the leadership objectives
  2. 31
  3. 34
  4. 35
  5. 37