SlideShare a Scribd company logo
1 of 42
0 1 Company profile
Company profile
vision: To make energy cleaner and more
efficient
Shenzhen Megarevo Technology Co.,Ltd. is a national high-
tech enterprise focusing on the R& D, manufacturing and
salesof energy storage inverters and systems.The company
was founded in 2018 and headquartered in Guangming
District, Shenzhen. The core team of the enterprise is
composed of domestic leading technical talents and senior
experts in power electronics technology.
It can provide customers with standardized energy storage
inverter products, customized solutions and OEM services.
1GW+
The cumulative
delivery quantity is
up to
30,000
sets
Annual production
delivery capacity
23+
Invention patents
and software
works
Founding team
• Northwestern Polytechnical University,
Master of Power Electronics and Power
Transmission;
• Shenzhen leading talents;
• Enterprise operation management experts,
former global TOP 500 solar enterprise CEO;
• Master of Control Theory and
Control Engineering, Harbin
Institute of Technology;
• More than 15 years of experience in
solar and energy storage R&D and
market management;
William Wu- VP
David
Wang-
R&D
Director
Frank
Wan
Chief
Technical
Officer
• Master degree from Nankai
University;
• Senior technical engineers with
experience in research and
development
• More than 8 years of solar and
storage industry;
• Master of Electrical Engineering, North China
Electric Power University
• Shenzhen leading talents;
• Senior technical expert, co-founder of a
solar inverter head enterprise;
Brian Yaw - Chairman
• Master of Huazhong University of
Science and Technology;
• With 8 years of R&D experience in
the field of smart grid and solar
inverter;
• International innovation rewards;
Wiken Huang-CEO
• In July 2018, Shenzhen Megarevo
Technology Co., Ltd was formally
established;
• Launched MEGA series high power
industrial and commercial energy
storage converters in December
2018;
2018
• In June2020, the first all-in-
one storage product was
launched in Southeast Asian
and Australian market ;
• October 2020 won the 2020
National renewable Energy
solution award in the China
renewable Investment
Association;
2020
• May 2019 won the best PCS
Supplier award of China nergy
Storage Network;
• June2019 received 43.2MW sales
order from Guangzhou Rail Transit;
• The first REVOresidential storage
inverter was released in December
2019 and was quickly massselling
in the Southeast Asian market
2019
• In March 2022, the
global cumulative
delivery exceeded1GW;
• In April 2022, the 48V
split- phase inverter
obtained the North
American certification;
• Obtained the ISO system
certification in May 2022;
• In June2022, it won the
award of "best domestic
energy storage medium
and small power
bidirectional converter
supplier";
• In August 2022, the
market turnover
exceeded 200 million
RMB ;
2022
2021
• In June 2021, won the best PCS
Supplier award in China energy
Storage Industry;
• Megarevo was officially
recognized asthe National
High-tech Enterpriseon
July,2021;
• In August 2021, won the best
High-power bidirectional
converter award of EastChina
Energy Storage Alliance;
• In November 2021, the first
North American hybrid inverter
was released, and passed UL
certification;
• The market turnover exceeded
100 million RMBin December
2021;
Development History
Enterprise qualification
Applied to more than 1GW worldwide

Gambia
Nigeria
Burkina Faso
China
Pakistan
India Philippines
Malaysia
Vietnam
Australia
England
Germany
Greece
Poland
Netherlands
America
Canada
Brazil
South Africa
Turkey
Saudi
Arabia
New Zealand
02 Solutions and products
Residential PV+BESS solutions
• Compatible with lithium-iron batteries and lead-acid
batteries;
• Compatible with high and low voltage batteries;
• Compatible with house intelligent energy management
system;
• Compatible with grid power dispatching instructions;
• Power expanding due to transformer limitation
• Reactive power compensation and APF function;
• Built in transformer, high load tolerance and high
reliability;
• Flexible for all kinds of grid instructions such aspeak
shaving;
C&I ESSsolutions AC-BUS solutions
• Integrated container solution of PV,energystorage
and battery can be realized;
• Can be used for power supply in areas without
electricity, integrated application of PV& storage and
charging, electricity trade in industrial parks, large
charging stations and other micro-grid applications;
Grid-side energy storage solution
• Support IEC61850 communication protocol;
• Peakshaving and other grid instructions;
• Independent participation in grid power services;
• Secondary frequency modulation, AVC,rotary standby,
cold standby, black start
Large microgrid off-grid solution
• High power (above MW level) independent microgrid, AC
bus topology to reduce the input source coupling,
improve reliability;
• The system operates under off-grid mode, with energy
storage systems or diesel generators providing voltage
and frequency support for the entire microgrid;
Medium micro-grid solutions
• Master/slave control function, all machines work in
V/F mode;
• Redundancy. The failure of one or more machines
does not affect the normal operation of other
machines;
• Current balance control, current unbalance <5%;
Products Line
03 References case
Vietnam
Residential PV+BESS
The project is located in the delta region of
Vietnam which is rich in solar energy,and the cost
of diesel generators is high due to the
inconvenient transportation. In order to reduce
electricity costs ,Megarevo provided more than 50
sets of R5KL1for more than 20 local residents.
They combined with residential rooftop PVto
work together to provide clean energy for
customers and reduce their living energy costs.
• Output power 5KVA
• Support 2 MPPT
• CE,TUV,SAA,NRS certification
Product information
• R5KL1Single-phase hybridinverter
Project information
•Capacity • 10kW/8kWh
•PV • 10kwp
•Position • Vietnam
•On grid time • 2019.06
•Application • on/off grid, emergency power supply
Greece
Residential PV+BESS
Local earthquake disasters occur frequently, fuel
prices and energy costs continue to rise. The
project adopts Megarevo R5KL1series hybrid
inverter + 10kwh lithium battery energy storage
system, combined with 8kwp roof PVof residents,
to jointly provide users with clean energy and
reduce users' living energy cost.
• Output power 5KVA
• Support 2 MPPT
• CE,TUV,SAA,NRScertification
Product information
• R5KL1Single-phase hybridinverter
Project information
• Capacity • 5kW/10kWh
• PV • 8kwp
• Position • Larissa,Greece
• On grid time • 2020.03
• Application • Off-grid、 emergency power supply
California, USA
Residential PV+BESS
The project is located in the suburbs of California.
With the help of time of use tariff and subsidy
policy, in 2022, Megarevo and local PVpartners in
North America provided energy services to 112
local residents. In this cooperation, R5KLNA
products customized and developed by Megarevo
for the American market were adopted for the first
time. With the online operation of the system, it
created asafe, comfortable and economical energy
consumption experience.
• R5KLNAAmerican PV+ESSsplit- phaseinverter
• Output power 5kVA
• Efficiency ≥97.2%
• UL1741,CSA,IEEE1547 certification
Product information
Project information
• Capacity • 5kW/10kWh
• PV • 5kwp
• Position •California, USA
• On grid time • 2022.03
• Application • On/ Off grid、 emergency power supply
Texas, USA
Residential PV+BESS
• Capacity
• PV
• Position
• On grid time
• Application
Product information
Due to the good solar conditions and preferential
policies, in April 2022, Megarevo provided customers
with a set of 16kW / 20kWh household energy storage
solutions to help customers achieve self-consumption.
Two 48V split- phase inverter R8KLNAare adopted in
the schemeto meet the energy demand of customers
through parallel connection. After one month's
comprehensive verification, the project shows excellent
economy.
• 16kW/20kWh
• 10kwp
• Texas,USA
• 2022.04
• self-consumption
• R8KLNAAmerican ESSsplit- phaseinverter(48V)
• Output power 8 kVA
• Efficiency ≥97.2%
• UL1741,CSA,IEEE1547 certification
Project information
Africa
Residential PV+BESS
Today, more than 640 million people in Africa still
live without electricity. To improve the energy use
of people in areas with no or weak electricity in
Africa, the United Nations has implemented
infrastructure assistancefor them. Megarevo is
proud to be involved and has provided the three-
phase ESShybrid inverter to help improve the
energy environment for local residents.
• R10KH3Three phase ESShybrid inverter
• Output power 10kVA
• Efficiency ≥98.2%
• UL,IEC,VDE,G99,NRScertification
Product information
Project information
•Capacity • 10kW/30kWh
•PV • 11kwp
•Position • Africa
•On grid time • 2022.08
•Application • self-consumption
Sierra Leone, Africa
Off grid microgrid
This project is located in an undeveloped area of
Africa with very weak power public facilities. Only
2
%of the local rural people have accessto
electricity. Due to the rich local solar and hydraulic
resources, renewable energy has great potential. In
October 2020, Megarevo and local PVdealers
jointly provided a set of 250KW / 576kwh micro
grid system and 248kwp roof PVsystem for this
area, Help them improve their living conditions.
Product information
• MPS0250 MPSHybrid inverter
• Rated power 250kW
• MPPToperating voltage range 250-850v
• TUV,CEcertification
Project information
• Capacity • 250kW/576kWh
• PV • 248kwp
• Position • Sierra Leone,Africa
• On grid time • 2020.10
• Application • PV+ESS+DG
Ganzi Prefecture, Sichuan
Microgrid
The project is located in Ganzi Tibetan Autonomous
Prefecture, Sichuanprovince.the area is sparsely
populated and the power grid is weak. However, due to
sufficient sunshine, 160kwp PVpower generation
modules are equipped there. .In order to ensure the
continuity of power supply at night, Megarevo deployed
a 150kW/ 391.68kWh microgrid system for the temple in
June2021. PCSadopts Megarevo's new-generation
MPS0150 high power hybrid system,which makes
friendly coordination between PVand battery through
intelligent control algorithm, thus to provide electricity
for local residents.
• MPS0150 MPSHybrid inverter
• Rated power 150kW
• MPPToperating voltage range 250-850V
• TUV,CEcertification
Product information
Project information
•Capacity • 150kW/391.68kWh
•PV • 160kwp
•Position • Ganzi Prefecture, Sichuan
•On grid time • 2021.06
•Application • On/ Off grid、 emergency power supply
The project is located in the plateau area of Pakistan,
which is rich in solar resources.In order to make full use
of the existing local power resources ,improve the
energy consumption structure of local communities and
reduce the environmental impact causedby diesel
generators, Megarevo and AlphaESShave provided a set
of 150KW / 306kwh microgrid system for this project,
which supports on/off grid operation, It can bring clean
and cost-effective energy consumption experience to
local residents.
• MPS0150 MPSHybrid inverter
• Rated power 150kW
• MPPToperating voltage range 250-850V
• TUV,CEcertification
Product information
Project information
• Capacity • 150kW/306kWh
• PV • 165kWp
• Position • pakistan
• On grid time • 2022.04
• Application • On/ Off grid、emergency power supply
Pakistan
Microgrid
Norway
PV+BESS+Charging Station
In order to meet the power supply capacity of the
station and support the demand for high-power
fast charging,in April 2022, Megarevo provided a
250kW/520kWh BESSand 50KW rooftop PVfor this
project, which together with the three fast charging
piles at the base, formed an intelligent power
supply system. after the project operation, it not
only provided convenient and economical
charging services for more new energy vehicles,
but also obtained additional economic benefits.
• MEGA0250TS
• Output power 250kVA
• Efficiency 97.3%
• IECcertification
Product information
Project information
•Capacity • 250kW/520kWh
•PV • 50kwp
•Position • Norway
•On grid time • 2022.04
•Application • Dynamicexpansion
Xinjiang Taklimakan Desert Highway
Off grid microgrid
On June2, Megarevo MPShybrid inverter helped
the Tarim desert highway to achieve zero carbon
emissions. The project replaces traditional diesel
power generation with PVpower generation. After
the project completes on-grid, it will reduce diesel
oil consumption by 1,000 tons and carbon dioxide
emissions by about 3,410 tons per year.
• MPS0030 MPSHybrid inverter
• Output power 30kW
• MPPToperating voltage range 250-850V
• TUV,CEcertification
Product information
Project information
• Capacity • 2580kW/6450kWh
• PV • 4644kwp
• Position • XinJiang
• On grid time • 2022.06
• Application • self-consumption, off-grid
Zhuhai
Peak shaving and frequency modulation
Located in the beautiful coastal area of Hengqin,
Zhuhai, the project is a peak shaving and
frequency modulation project on the power grid
side, with atotal capacity of 5MW/ 15.889MWh.
On the AC side, two sets of MEGA2500 20-foot
booster integrated machines are used to support
active and reactive power output and realize
independent decoupling control of active and
reactive power. The system was launched in
December 2020 and has been running well so far.
frequency modulation
• MEGA2500 Container storage system
• Rated power 2500kW
• Support parallel expansion
Product information
Project information
•Capacity • 5MW/15.88MWh
•Position • Zhuhai Hengqin Island
•On grid time • 2020.12
•Application • Grid-side peak shavingand
Hunan
Peak shaving and frequency modulation
The project is located in Shaoyang, Hunan Province. It is a
power grid side peak shaving and frequency modulation
project constructed by the State Grid. 1Chigh rate cells
are used on the DCside. In order to improve the
utilization efficiency of the energy storage system, 80 sets
of Megarevo mega0630 energy storage converters are
installed. This product has the highlights of safety,
reliability and intelligent efficiency, with a maximum
efficiency of 98.7%,which can better meet the application
needs of the scenario.
modulation
• MEGA0630 Energy storage converter
(without isolation transformer)
• Rated power 630kW
• Maximum efficiency 98.7%
• CE,CGC,TUV,l1hvrt certification
Product information
Project information
• Capacity • 100MW/200MWh
• Position • Shaoyang,Hunan
• On grid time • 2021.05
• Application • Grid-side peak shaving and frequency
Hunan
Peak shaving and frequency modulation
Located in The Miao Autonomous Region of
Hunan Province, it belongs to the power grid side
peak shaving and frequency modulation
demonstration project built by the State Grid. 40
sets of 630kW MEGA series energy storage
inverters are applied in this project, and the
security and stability of the system is fully
guaranteed by the unique patent control detection
algorithm and high-performance DSPof Megarevo.
modulation
• MEGA0630 Energy storage converter (without isolation
transformer)
• Rated power 630kW
• Maximum efficiency 98.7%
• CE,CGC,TUV,l1hvrt certification
Product information
Project information
•Capacity • 100MW/200MWh
•Position • Hunan Miao Autonomous Region
•On grid time • 2022.02
•Application • Grid-side peak shaving and frequency
Megarevo has provided product solutions and customized services to more than 200 well-known enterprises around the world, which
has been widely recognized by customers. It also forms strategic cooperative relations with excellent enterprises such asstate grid,
China Southern Power Grid, CNTE,alpha, northern international and Nandu power supply.
REVO residential Energy Storage
inverters
Single-phaseESS
hybrid inverter
Product features:
Safe &reliable
• Passed IEC/EN62109-1/-2,IEC/EN62477-1, South Africa NRS097-2-1:2017, IEC/EN61000-6-1,IEC/EN61000-6-3 test
certification;
Friendly & flexible
• Support multi-parallelconnection;
• Support flexibleaccess of dieselgenerator;
• Compatible with lead-acid and lithium-ion battery;
Economical & practica
• Support intelligent EMS management function;
• Support on/off-gridautomatic switching function to
ensure uninterrupted power when important loads
are off-grid;
Technical specification:
sales@megarevo.com.cn www.megarevopower.com
REVO residentialEnergy Storage inverters-Single-phaseESS hybrid inverte
Technical specification R3KL1 R3K6L1 R4KL1 R4K6L1 R5KL1 R6KL1
Input (PV)
Max. power(kW) 4.6 4.6 6 6 7 7
Max. DCvoltage(V) 550
MPPT voltage range(V) 125~500
Max.input current of single MPPT(A) 14
MPPT tracker/strings 2/1
ACoutput
Rated output power(kVA) 3 3.68 4 4.6 5 6
Max. output current(A) 13 16 17.4 20 21.7 26
Grid voltage/range(V) 230/176~270
Frequency (Hz) 50/60
PF 0.8lagging-0.8leading
THDi <3%
ACoutput topology L+N+PE
Battery
Battery voltagerange(V) 40~58
Max. charging voltage(V) 58
Max. charge/discharge current(A) 95/62.2 95/75 95/83.3 95/95.8 95/104.2 95/110
Battery type lithium /Lead-acid
Communication interface CAN/RS485
EPSoutput
Rated power (kVA) 3 3.68 4 4.6 5 6
Rated output voltage(V) 230
Rated output current(A) 13 16 17.4 20 21.7 26
Rated frequency (Hz) 50/60
Automatic switching time (ms) <20
THDu <2%
Overload capacity 110%, 30S/120%, 10S/150%, 0.02S
General data
Battery chage/dischage efficiency 95.0%
DC Max. efficiency 97.6%
Europe efficiency 97.0%
MPPT efficiency 99.9%
Ingress protection IP65
Noise emission(dB) <35
Operation temperature - 25℃~60℃
Cooling Natural
Relative humidity 0 ~95%(non-condensing)
Altitude 2,000m(>2,000 Derating)
Dimensions W * D * H (mm) 550*200*515
Weight(kg) 25
Isolation transformer No
Self-consumption(W) <3
Display andcommunication
Display LCD
I
C
n
A
t
N
er
/
f
D
a
R
ce
M
:RS485/Wifi/4G/
Yes/ Opt/ Opt/ Yes/ Yes
Safety standard IEC/EN62109-1/-2, IEC/EN62477-1
EMC IEC/EN 61000-6-1, IEC/EN 61000-6-3
On-grid South Africa NRS097-2-1:2017, UKG98,G99
REVO residential Energy Storage
inverters
Three phaseESS
hybrid inverter
Product features:
Safe & reliable
• Passed IEC/EN62109-1/-2,IEC/EN 62477-1, IEC/EN61000-6-1/-6-3,European gridconnection: EN50549-1, German
grid connection: VDE4105/0124 , UK gridconnection: G99,SouthAfrica: NRS097-2-1:2017test certification;
Friendly & flexible
• Support diesel generator access;
• Support full power discharge, automatic management
of battery charge and discharge;
Economical & practica
• It is more economical to support multiple operating modes;
• Can be as a UPS for the important loads when power off;
sales@megarevo.com.cn www.megarevopower.com
sales@megarevo.com.cn www.megarevopower.com
REVO residentialEnergy Storage inverters-Three phase ESS hybrid inverter
R10KH3 R12KH3
Technical specification:
Technical specification R8KH3
Input (PV)
Max.power(kW) 12
Max. DCvoltage(V)
15 18
1,000
MPPT voltage range(V) 180~850
Max.input current of single MPPT(A)
MPPT tracker/strings 2/1
13
2/1 2/1
ACoutput
Rated output power(kVA) 8 10 12
Max. output current(A) 12.7 15.9 19.1
Grid voltage/range(V) 400/360~440
Frequency (Hz) 50/60
Power factor 0.8lagging-0.8leading
THDi <3%
ACoutput topology 3W+N+PE
Battery
Battery voltagerange(V)
Max. charging voltage(V)
125~600
600
Full battery voltage(V) 300
Rated charge/discharge current(A)
250
40 40
350
40
Battery type lithium /Lead-acid
Communication Interface CAN/RS485
EPSoutput
Rated power(kVA) 8.8 11 13.2
Rated output voltage(V) 400
Max. output current(A) 12.7 15.9 19.1
Rated frequency(Hz) 50/60
Automatic switchingtime(ms) <20
THDu
Overload capacity
<2%
110%, 30S/120%, 10S/150%, 0.02S
General data
Battery charge /discharge efficiency 96.6% 96.7% 96.8%
DC Max. efficiency 97.9% 98.2% 98.2%
Europe efficienc 97.5%
97.2%
99.5%
97.5%
99.5%
MPPT efficiency 99.5%
Ingress protection IP65
Noise emission(dB) <35
Operation temperature -25℃~ 60℃
Cooling Natural
Relative Humidity 0 ~95%(non-condensing)
Altitude 2,000m (>2,000Derating)
Dimensions W * D * H (mm) 530*200*600
Weight(kg) 29
Isolation transformer No
Self-consumption(W) <3
Display andcommunication
Display LCD
Interface:RS485/Wifi/4G/
CAN/DRM
Yes/ Opt/ Opt/ Yes/ Yes
IEC/EN62109-1/-2, IEC/EN62477-1
Safety standard
EMC IEC/EN 61000-6-1, IEC/EN 61000-6-3
On-grid Europe:EN50549-1, Germany:VDE4105/0124,UK:G99,South Africa:NRS097-2-1:2017
Object Description
A/B Battery +/Battery -
C/D PV1+/PV1-
J/K PV2+/PV2-
E DC switch
F WiFi port for external WiFi
L Reserved port
G DRM/BMS
H Grid current / DRY IO
M USB port for upgrading
N POWER CAN /LEAD-NTC
I Pressure valve
O EPS output
P Grid output
A B C D E F G H I
J K L M N O P
com
Note!
1.The Update port: For on-premises upgrades.
2.The BMS port: BMS communication for lithium batteries.
3.The CT port: For external grid side CT to detect current size.
4.The DRM port, CAN port, NTC port and DRY IO port: Reserved port,
temporarily unavailable
R5KL1 Megarevo 5kW Single Phase Hybrid Inverter
Interface definition and Technical Data
Interface definition
Norminal DC operating voltage[V] 360 360
360
Max. short circuit current [A] 14/14 14/14
14/14
Strings per MPP tracker 1 1 1
Model R3K6L1 R4K6L1 R5KL1
Model R3KL1 R3K6L1 R4KL1 R4K6L1 R5KL1 R6KL1
DC input
Max. recommended DC power [W] 4600 4600 6000 6000 7000 7000
Max. DC voltage[V] 550 550 550 550 550 550
Norminal DC operating voltage[V] 360 360 360 360 360 360
MPPT voltage range [V] 125-500 125-500 125-500 125-500 125-500 125-500
MPPT voltage range@full load [V] 150-500 150-500 170-500 170-500 220-500 220-500
Max. input current [A] 14/14 14/14 14/14 14/14 14/14 14/14
Max. short circuit current [A] 17.5/17.5 17.5/17.5 17.5/17.5 17.5/17.5 17.5/17.5 17.5/17.5
Start input voltage [V] 125 125 125 125 125 125
No. of MPP trackers 2 2 2 2 2 2
Strings per MPP tracker 1 1 1 1 1 1
Max. inverter backfeed current to array 0 0 0 0 0 0
DC disconnection swtich /
AC output
Norminal AC power[VA] 3000 3680 4000 4600 5000 6000
Max. apparent AC power[VA] 3000 3680 4000 4600 5000 6000
Rated grid voltage(range)[V] 230 (176 to 270)
Rated grid frequency[Hz] 50/60
Norminal AC current[A] 13 16 17.4 20 21.7 26
Max.AC current[A] 13 16 17.4 20 21.7 26
Displacement power factor 0.99 leading...0.99 lagging
Total harmonic distortion(THDI) < 2%
Load control optional
AC input
Norminal AC power[VA] 3000 3680 4000 4600 5000 6000
Rated grid voltage(range)[V] 230(176 to 270)
Rated grid frequency[Hz] 50/60
Norminal AC current[A] 13 16 17.4 20 21.7 26
Max.AC current[A] 13 16 17.4 20 21.7 26
Displacement power factor 0.99 leading~0.99 lagging
AC inrush current 35 35 35 35 35 35
EPS output
EPS rated power[VA] 3000 3680 4000 4600 5000 6000
Max. EPS power[VA] 3000 3680 4000 4600 5000 6000
EPS rated voltage, Frequency 230VAC, 50/60Hz
EPS rated current[A] 13 16 17.4 20 21.7 26
Max. EPS current[A] 13 16 17.4 20 21.7 26
Switch time[s] <20ms
Total harmonic distortion(THDv) <2%
Parallel operation Yes
Compatible with the generator Yes(signal provided only)
Battery parameter
Battery type Lithium battery/Lead-ACID
Battery voltage range[V] 40-58
Recommended battery voltage[V] 48
Cut Off Voltage[V] 40
Max. charging Voltag[V] 58
Max. Protective Voltage[V] 59
Max. charge/discharge current[A] 95/62.5 95/76.6 95/83.3 95/95.8 95/104.2 95/110
Peak charge/discharge current[A] 95/62.5 95/76.6 95/83.3 95/95.8 95/104.2 95/110
Communication interfaces
CAN/RS485/WIfI/LAN/DRM
Reverse connect protection Yes
Efficiency
MPPT efficiency 99.9%
Euro efficiency 97%
Max. efficiency 97.6%
Max. Battery charge efficiency 95%
Max. Battery discharge efficiency 95%
Note: If the South African national grid standard is selected, the grid power is only 4.6kW!
Technical Data
Safety & Protection
Over/under voltage protection YES
DC isolation protection YES
Monitoring ground fault protection YES
Grid protection YES
DC injection monitoring YES
Back feed current monitoring YES
Residual current detection YES
Anti-islanding protection YES
Over load protection YES
Over heat protection YES
Max. output fault current 55A
Max. output over current 28.7A
Model
R3KL1 R4KL1 R5KL1
R3K6L1 R4K6L1 R6KL1
Dimension [W/H/D](mm) 550*520*200
Dimension of packing [W/H/D](mm) 665*635*330
Net weight [kg] 25
Gross weight [kg] 31
Installation modularization
Operating temperature range[℃] -25~+60 (derating at 45)
Storage temperature [℃] -25~+60
Storage/Operation relative humidity 4%~100% (Condensing)
Altitude [m] <2000
Ingress Protection IP65(for outdoor use)
Protective Class Ⅰ
Night-time consumption <3W
Over Voltage Category lⅡ(MAINS),Ⅱ(PV,Battery)
Pollution Degree II
cooling Nautral
Noise level <40dB
Inverter Topology non-isolated
Active anti-islanding method Power variation
Communication interface CAN/RS485/WIfI/LAN/DRM
Basic Data
Safety and Protection
Position Min.size
Left 300mm
Right 300mm
Top 300mm
Bottom 300mm
Front 300mm
Table Available Space Size
S t e p 1
Step 2: Place the inverter on the wall mounted bracket by holding the handle on the side.
S t e p 2
Step 3: Tighten the fixing screws on both sides of the inverter.
Step 4: If necessary, costomer can install an anti-theft lock on the left-bottom of the inverter.
S t e p 3、Step 4
300mm 300mm
Mounting
Space Requirement
300mm
300mm
Step 1: Screw the wall bracket on the wall
1. Place the bracket on the wall and mark down the position of the 4 holes.
2. Drill holes with driller, make sure the holes are deep enough (at least 60mm) to support the inverter.
3. Install the expansion tubes in the holes, and tighten them. Then install the wall bracket with the
expansion screws.
4.1 Grid connection and EPS connection
Hybrid inverter are designed for single phase grid. Voltage is 220/230/240V, frequency is 50/60Hz.
Other technical requests should comply with the requirement of the local public grid.
Table 1 Cable and Micro-breaker recommended
Micro-breaker should be installed between inverter and grid, any load should not be connected with
inverter directly.
Model R3KL1 R3K6L1 R4KL1 R4K6L1 R5KL1 R6KL1
Cable 4-5 mm² 5-6mm²
Micro-breaker 20A 32A
GRID
L
N
PE
Meter
Grid side
Main Breaker
AC Breaker Home Load
On Grid
Breaker
CT
PV Breaker
PV Breaker
Lithium
BAT(48V)
BAT
Breaker
Pv1 PV2
(PV MAX:500V)
. .
. .
+
+
-
+
-
-
+
-
Grid
PV
BAT
Load
s
EPS
Breaker
CT EPS
Electrical Connection
 Electrical connection diagram
Object Name Description
A LCD
Screen
Display the information of the inverter.
B
Indicator
LED
lit in green: The inverter is in grid mode.
Off: The inverter is in not in grid mode.
C
lit in green: The inverter is in off-grid mode.
Off: The inverter is in not in off-grid mode.
D
lit in Yellow: The inverter is in Warning .
Off: The inverter has no Inverter Warning
E
lit in red: The inverter is in fault status.
Off: The inverter has no errors.
F
Function
Button
Esc: Return from current interface or function.
G Up: Move cursor to upside or increase value.
H Down: Move cursor to downside or decrease value.
I Enter: Confirm the selection.
Grid
(Green)
EPS
(Green)
Alarm
(Yellow)
Fault
(Red)
Initialization off off off off
Stand-by off off off off
Grid mode on off off off
Off-Grid off on off off
Bypass of mains off on on off
Fault off off off on
B C D E
A
F G H I
LCD Interface and Setting
Control Panel
Instructions for LED Indicator
Date: 07th September2022
Director General,
Telecommunication Regulatory Commission of Sri Lanka,
276,
ElvitigalaMawatha,
Narahenpita.
Dear Sir,
Maintenance and After Sales Service of Equipment
This is to confirm that Shenzhen Megarevo Technology Co., Ltd. support all warranty repairs and services
in our main service station in China. Building 2, Guangming Yunli Smart Park, No.143, Shutianpu
Community, Guangming District, Shenzhen, Where we have fully dedicated team of technical staff.
Therefore, end user doesn’t require to maintain any equipment or staff to do the services and repair of
Ingeteam string inverters within warranty period.
The operation and maintenance work will have the full agency of the local dealer, with full support from
us for sure.
Models:
R5KL1 Megarevo 5KW Single Phase Hybrid Inverter
This letter was issued on the request made by
First Energy SL Pvt Ltd ,55/5 Nikape, Dehiwala 10350, Sri Lanka
[Name] Lavier Song
[Position] Building 2, Guangming Yunli Smart Park, No.143, Shutianpu Community, Guangming
District, Shenzhen
[Company Name] Shenzhen Megarevo Technology Co., Ltd.
Date: 07th September2022
Director General,
Telecommunications Regulatory Commission of Sri Lanka,
276, Elvitigala Mawatha,
Colombo 00800
Dear Sir,
Declaration Letter
Megarevo
We, , hereby declare M/S First Energy SL (Pvt) Ltd is our authorized importer of our products
(Inverters and communication device) .
Imported shall be warrantied and can be replaced one to one during the warranty period--After
evaluation of the engineer, if it is true that the machine is damaged or affected by non-human or natural
factors.(For more details, please refer to our after-sales documents).
The purchase is made against the Invoice Nos: [ Invoice no SEB22YJ0628 ] ; The test reports shared are as
per CE standard.
Model Operation
Frequency
(MHz)
Tx. Output
power (dBm)
Antenna
gain
Wi-Fi
Equipment
Item
Wi-Fi Model Serial Nos.
R5KL
1
Megarevo
5KW Single
Phase Hybrid
Inverter
[Name] Lavier Song
[Position] Building 2, Guangming Yunli Smart Park, No.143, Shutianpu Community, Guangming
District, Shenzhen
[Company Name] Shenzhen Megarevo Technology Co., Ltd.
Authorization Letter
THIS LETTER IS PROUDLY PRESENTEDTO
Partner-ship
Date: June 24, 2022
ICB No:MBUSTDB/W/CB-01/2022/22
Alternative No.:N/A
To: First Energy SL (Private) Limited
No. 55/5, Nikape, Dehiwala, Sri Lanka
WHEREAS
We [Shenzhen Megarevo Technology Co.,Ltd.],who are official manufacturers
of Bidirectional Storage Inverter, having factories at 4Th to 1st floors of
Emerson Industrial Park,No.3Fengtang Avenue, Tangwei Community,Fuhai
Street,Baoan District,Shenzhen],do hereby authorize First Energy SL (Private)
Limited as an distributor. The distribution products are Revo hybrid inverters
and MPS microgrid inverter, which are valid for 12 months . Authorized
distributor area is Sri Lanka.
Signature:
Signed: Lavier Song
Title: Marketing director
Dated June 24th,2022
Signed date: June 24th, 2022
Shenzhen Megarevo Technology Co.,Ltd.
E-mail: info@sunnixenergy.com
www.sunnixerengy.com
Address: No. 25, Lushan Road, High Tech Zone, Suzhou City, P.R.China
SUNNIX ENERGY
ENERGYSTORAGE SOLUTIONS
RENEWYOUR POWER
SUNNIXENERGY
Global Layout
About
Us
Mexico
South Africa
Germany
Korea
Russia
Vietnam
Philippines
Malaysia
Australia
10,000 m²
Area of factory
100 million RMB
Total investment
200
Employees
2010 year
Established
Sunnix Energy
01 02
Sunnix Energy is an integrated company that has specialized in lithium ion battery products,
energy storage systems and PV solar systems since 2010. As a technology driven company
led by a top class R&D team with more than 12 years’ experience, Sunnix Energy keeps
focus on the development of BMS technology, battery pack and energy storage system.
With Sunnix Energy’s 500MWh large scale production capacity and high degree quality
control system, we have sold storage batteries for residential and commercial use to more
than 50 countries by the end of 2021. Sunnix Energy is proudly contributing our strength to
make householders and business more self-sustainable.
500 MWh
Capacity of production
Solutions
Battery
Energy Storage
System
Battery Management
System
Energy
Management
System
System Integration
Spontaneous Use
Microgrid
Peak-to-valley Arbitrage
Diesel Engine Replacement
Large-Scale Optical
Energy Storage
Peak Shaving and
Valley Filling
Home Energy Stroage
Optical Storage and
Charging Integration
Main Application Scenarios
SUNNIX
ENERGY
ESS
Cooperative
Partners
Sunnix Energy
03 04
Sunnix Energy Wall Mounted
Battery
FEATURES
Compact Design and Safety Protection
Easy Installation and After Sales Service Wall Mounted and Parallel Connection
>6,000 Cycles at 90% DOD
LiFePO4 Safe Battery Chemistry
Intelligent Build inBMS
Model
Battery Type
Nominal Energy(KWh)
Usable Energy(KWh)
Peak Output Power (KW,3 Seconds)
Round-TripEfficiency
NominalVoltage(V)
OperatingVoltage(V)
Max Charge/DischargeCurrent(A)
Communication
Enclosure ProtectionRating
Operating Temperature(°C)
CoolingType
Installation
Dimension (W*H*D,mm)
Weight(Kg)
Warranty
SafetyStandard
Scalability
Humidity
Altitude(m)
CyclesLife
DesignLife
RecommendDOD
≥97.5%
48V
42-55
CAN, RS485
IP21
-20 -55
NaturalCooling
Wall Mounted,Indoor
5% -95%
<2,000
>6,000
20+ Years (25℃@77℉)
90%
5Years
SNE-ES W5.0
48V 100 AH LiFePO4
7.68
80/80
480*500*240
48
4.8
4.32
48V 200 AH LiFePO4
8.64
9.6
SNE-ES W10.0
9.6
100/100
90
UL1973/IEC62619/UN38.3
Max 8 Pcsin Parallel Max 16 Pcs in Parallel
5KWH 10KWH
550*650*240
Sunnix Energy
05 06

More Related Content

What's hot

IoT eSIM Test Bed
IoT eSIM Test BedIoT eSIM Test Bed
IoT eSIM Test BedCellnetrix
 
ТПЛМ 1112 Альтернативи транспортування і критерії вибору логістичних посередн...
ТПЛМ 1112 Альтернативи транспортування і критерії вибору логістичних посередн...ТПЛМ 1112 Альтернативи транспортування і критерії вибору логістичних посередн...
ТПЛМ 1112 Альтернативи транспортування і критерії вибору логістичних посередн...Oleksiy Goryayinov
 
Cisco Meraki Overview
Cisco Meraki OverviewCisco Meraki Overview
Cisco Meraki OverviewSSISG
 
API Management for Software Defined Network (SDN)
API Management for Software Defined Network (SDN)API Management for Software Defined Network (SDN)
API Management for Software Defined Network (SDN)Apigee | Google Cloud
 
Opinion: The Politics of SA vs NSA 5G & 4G Speeds
Opinion: The Politics of SA vs NSA 5G & 4G SpeedsOpinion: The Politics of SA vs NSA 5G & 4G Speeds
Opinion: The Politics of SA vs NSA 5G & 4G Speeds3G4G
 

What's hot (8)

IoT eSIM Test Bed
IoT eSIM Test BedIoT eSIM Test Bed
IoT eSIM Test Bed
 
Gsm for-dummies
Gsm for-dummiesGsm for-dummies
Gsm for-dummies
 
ТПЛМ 1112 Альтернативи транспортування і критерії вибору логістичних посередн...
ТПЛМ 1112 Альтернативи транспортування і критерії вибору логістичних посередн...ТПЛМ 1112 Альтернативи транспортування і критерії вибору логістичних посередн...
ТПЛМ 1112 Альтернативи транспортування і критерії вибору логістичних посередн...
 
Cisco Meraki Overview
Cisco Meraki OverviewCisco Meraki Overview
Cisco Meraki Overview
 
Track SD-WAN.pdf
Track SD-WAN.pdfTrack SD-WAN.pdf
Track SD-WAN.pdf
 
Sunwoda Energy Corporate brochure.pdf
Sunwoda Energy Corporate brochure.pdfSunwoda Energy Corporate brochure.pdf
Sunwoda Energy Corporate brochure.pdf
 
API Management for Software Defined Network (SDN)
API Management for Software Defined Network (SDN)API Management for Software Defined Network (SDN)
API Management for Software Defined Network (SDN)
 
Opinion: The Politics of SA vs NSA 5G & 4G Speeds
Opinion: The Politics of SA vs NSA 5G & 4G SpeedsOpinion: The Politics of SA vs NSA 5G & 4G Speeds
Opinion: The Politics of SA vs NSA 5G & 4G Speeds
 

Similar to Megarevo PPT.pptx

Renewable Integration & Energy Strage Smart Grid Pilot Project
Renewable Integration & Energy Strage Smart Grid Pilot ProjectRenewable Integration & Energy Strage Smart Grid Pilot Project
Renewable Integration & Energy Strage Smart Grid Pilot ProjectPartha Deb
 
RECENT TRENDS IN MICRO GRIDS
     RECENT TRENDS IN MICRO GRIDS     RECENT TRENDS IN MICRO GRIDS
RECENT TRENDS IN MICRO GRIDSbetha divya
 
Energy storage fauzan kurnia
Energy storage fauzan kurniaEnergy storage fauzan kurnia
Energy storage fauzan kurniafznkurnia
 
20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slidesJennifer Szaro
 
References-Book-LQ-3
References-Book-LQ-3References-Book-LQ-3
References-Book-LQ-3Fabio Magnani
 
Bangalore | Jul-16 | Energy Storage for Microgrids: Poised for rapid adoption
Bangalore | Jul-16 | Energy Storage for Microgrids:Poised for rapid adoptionBangalore | Jul-16 | Energy Storage for Microgrids:Poised for rapid adoption
Bangalore | Jul-16 | Energy Storage for Microgrids: Poised for rapid adoptionSmart Villages
 
APsystems Value Proposition
APsystems Value PropositionAPsystems Value Proposition
APsystems Value PropositionClive Rippon
 
Hyderabad | Sep-16 | TERI : Renewable Energy & Mini-grids for Agriculture
Hyderabad | Sep-16 | TERI : Renewable Energy & Mini-grids for Agriculture Hyderabad | Sep-16 | TERI : Renewable Energy & Mini-grids for Agriculture
Hyderabad | Sep-16 | TERI : Renewable Energy & Mini-grids for Agriculture Smart Villages
 
Emerging energy generation and storage technology by Ken Nakahara
Emerging energy generation and storage technology by Ken NakaharaEmerging energy generation and storage technology by Ken Nakahara
Emerging energy generation and storage technology by Ken NakaharaMaRS Discovery District
 
Cambridge | Jan-16 | Business models in practice: off-grid RE success stories...
Cambridge | Jan-16 | Business models in practice: off-grid RE success stories...Cambridge | Jan-16 | Business models in practice: off-grid RE success stories...
Cambridge | Jan-16 | Business models in practice: off-grid RE success stories...Smart Villages
 
2013 EDTA V2G Panel_Jayanthi v3.0
2013 EDTA V2G Panel_Jayanthi v3.02013 EDTA V2G Panel_Jayanthi v3.0
2013 EDTA V2G Panel_Jayanthi v3.0Suresh Jayanthi
 
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...Clean Coalition
 
Energy Storage Systems and Technology
Energy Storage Systems and TechnologyEnergy Storage Systems and Technology
Energy Storage Systems and TechnologyBushveld Energy
 
Ghana | May-16 | Green Village Electricity Project
Ghana | May-16 | Green Village Electricity ProjectGhana | May-16 | Green Village Electricity Project
Ghana | May-16 | Green Village Electricity ProjectSmart Villages
 
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon PowerFlinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Powerjames hamilton
 
Solving Energy Storage Challenges Offshore | Offshore Europe 2017
Solving Energy Storage Challenges Offshore | Offshore Europe 2017Solving Energy Storage Challenges Offshore | Offshore Europe 2017
Solving Energy Storage Challenges Offshore | Offshore Europe 2017Parker Hannifin Corporation
 
schneider-electric-storage.pptx
schneider-electric-storage.pptxschneider-electric-storage.pptx
schneider-electric-storage.pptxPoooi2
 
Brian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building PowerBrian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building PowerEnergyTech2015
 
Abb pln pres-2017
Abb   pln pres-2017Abb   pln pres-2017
Abb pln pres-2017Budi Supomo
 

Similar to Megarevo PPT.pptx (20)

Renewable Integration & Energy Strage Smart Grid Pilot Project
Renewable Integration & Energy Strage Smart Grid Pilot ProjectRenewable Integration & Energy Strage Smart Grid Pilot Project
Renewable Integration & Energy Strage Smart Grid Pilot Project
 
RECENT TRENDS IN MICRO GRIDS
     RECENT TRENDS IN MICRO GRIDS     RECENT TRENDS IN MICRO GRIDS
RECENT TRENDS IN MICRO GRIDS
 
Energy storage fauzan kurnia
Energy storage fauzan kurniaEnergy storage fauzan kurnia
Energy storage fauzan kurnia
 
20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides
 
References-Book-LQ-3
References-Book-LQ-3References-Book-LQ-3
References-Book-LQ-3
 
Bangalore | Jul-16 | Energy Storage for Microgrids: Poised for rapid adoption
Bangalore | Jul-16 | Energy Storage for Microgrids:Poised for rapid adoptionBangalore | Jul-16 | Energy Storage for Microgrids:Poised for rapid adoption
Bangalore | Jul-16 | Energy Storage for Microgrids: Poised for rapid adoption
 
1.1 integrating renewables srm
1.1 integrating renewables   srm1.1 integrating renewables   srm
1.1 integrating renewables srm
 
APsystems Value Proposition
APsystems Value PropositionAPsystems Value Proposition
APsystems Value Proposition
 
Hyderabad | Sep-16 | TERI : Renewable Energy & Mini-grids for Agriculture
Hyderabad | Sep-16 | TERI : Renewable Energy & Mini-grids for Agriculture Hyderabad | Sep-16 | TERI : Renewable Energy & Mini-grids for Agriculture
Hyderabad | Sep-16 | TERI : Renewable Energy & Mini-grids for Agriculture
 
Emerging energy generation and storage technology by Ken Nakahara
Emerging energy generation and storage technology by Ken NakaharaEmerging energy generation and storage technology by Ken Nakahara
Emerging energy generation and storage technology by Ken Nakahara
 
Cambridge | Jan-16 | Business models in practice: off-grid RE success stories...
Cambridge | Jan-16 | Business models in practice: off-grid RE success stories...Cambridge | Jan-16 | Business models in practice: off-grid RE success stories...
Cambridge | Jan-16 | Business models in practice: off-grid RE success stories...
 
2013 EDTA V2G Panel_Jayanthi v3.0
2013 EDTA V2G Panel_Jayanthi v3.02013 EDTA V2G Panel_Jayanthi v3.0
2013 EDTA V2G Panel_Jayanthi v3.0
 
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
 
Energy Storage Systems and Technology
Energy Storage Systems and TechnologyEnergy Storage Systems and Technology
Energy Storage Systems and Technology
 
Ghana | May-16 | Green Village Electricity Project
Ghana | May-16 | Green Village Electricity ProjectGhana | May-16 | Green Village Electricity Project
Ghana | May-16 | Green Village Electricity Project
 
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon PowerFlinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
Flinders Island Isolated Power System (IPS) Connect 2016 L CURRO Horizon Power
 
Solving Energy Storage Challenges Offshore | Offshore Europe 2017
Solving Energy Storage Challenges Offshore | Offshore Europe 2017Solving Energy Storage Challenges Offshore | Offshore Europe 2017
Solving Energy Storage Challenges Offshore | Offshore Europe 2017
 
schneider-electric-storage.pptx
schneider-electric-storage.pptxschneider-electric-storage.pptx
schneider-electric-storage.pptx
 
Brian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building PowerBrian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building Power
 
Abb pln pres-2017
Abb   pln pres-2017Abb   pln pres-2017
Abb pln pres-2017
 

Recently uploaded

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Megarevo PPT.pptx

  • 1. 0 1 Company profile
  • 2. Company profile vision: To make energy cleaner and more efficient Shenzhen Megarevo Technology Co.,Ltd. is a national high- tech enterprise focusing on the R& D, manufacturing and salesof energy storage inverters and systems.The company was founded in 2018 and headquartered in Guangming District, Shenzhen. The core team of the enterprise is composed of domestic leading technical talents and senior experts in power electronics technology. It can provide customers with standardized energy storage inverter products, customized solutions and OEM services. 1GW+ The cumulative delivery quantity is up to 30,000 sets Annual production delivery capacity 23+ Invention patents and software works
  • 3. Founding team • Northwestern Polytechnical University, Master of Power Electronics and Power Transmission; • Shenzhen leading talents; • Enterprise operation management experts, former global TOP 500 solar enterprise CEO; • Master of Control Theory and Control Engineering, Harbin Institute of Technology; • More than 15 years of experience in solar and energy storage R&D and market management; William Wu- VP David Wang- R&D Director Frank Wan Chief Technical Officer • Master degree from Nankai University; • Senior technical engineers with experience in research and development • More than 8 years of solar and storage industry; • Master of Electrical Engineering, North China Electric Power University • Shenzhen leading talents; • Senior technical expert, co-founder of a solar inverter head enterprise; Brian Yaw - Chairman • Master of Huazhong University of Science and Technology; • With 8 years of R&D experience in the field of smart grid and solar inverter; • International innovation rewards; Wiken Huang-CEO
  • 4. • In July 2018, Shenzhen Megarevo Technology Co., Ltd was formally established; • Launched MEGA series high power industrial and commercial energy storage converters in December 2018; 2018 • In June2020, the first all-in- one storage product was launched in Southeast Asian and Australian market ; • October 2020 won the 2020 National renewable Energy solution award in the China renewable Investment Association; 2020 • May 2019 won the best PCS Supplier award of China nergy Storage Network; • June2019 received 43.2MW sales order from Guangzhou Rail Transit; • The first REVOresidential storage inverter was released in December 2019 and was quickly massselling in the Southeast Asian market 2019 • In March 2022, the global cumulative delivery exceeded1GW; • In April 2022, the 48V split- phase inverter obtained the North American certification; • Obtained the ISO system certification in May 2022; • In June2022, it won the award of "best domestic energy storage medium and small power bidirectional converter supplier"; • In August 2022, the market turnover exceeded 200 million RMB ; 2022 2021 • In June 2021, won the best PCS Supplier award in China energy Storage Industry; • Megarevo was officially recognized asthe National High-tech Enterpriseon July,2021; • In August 2021, won the best High-power bidirectional converter award of EastChina Energy Storage Alliance; • In November 2021, the first North American hybrid inverter was released, and passed UL certification; • The market turnover exceeded 100 million RMBin December 2021; Development History
  • 6. Applied to more than 1GW worldwide Gambia Nigeria Burkina Faso China Pakistan India Philippines Malaysia Vietnam Australia England Germany Greece Poland Netherlands America Canada Brazil South Africa Turkey Saudi Arabia New Zealand
  • 7. 02 Solutions and products
  • 8. Residential PV+BESS solutions • Compatible with lithium-iron batteries and lead-acid batteries; • Compatible with high and low voltage batteries; • Compatible with house intelligent energy management system; • Compatible with grid power dispatching instructions; • Power expanding due to transformer limitation • Reactive power compensation and APF function; • Built in transformer, high load tolerance and high reliability; • Flexible for all kinds of grid instructions such aspeak shaving; C&I ESSsolutions AC-BUS solutions • Integrated container solution of PV,energystorage and battery can be realized; • Can be used for power supply in areas without electricity, integrated application of PV& storage and charging, electricity trade in industrial parks, large charging stations and other micro-grid applications;
  • 9. Grid-side energy storage solution • Support IEC61850 communication protocol; • Peakshaving and other grid instructions; • Independent participation in grid power services; • Secondary frequency modulation, AVC,rotary standby, cold standby, black start Large microgrid off-grid solution • High power (above MW level) independent microgrid, AC bus topology to reduce the input source coupling, improve reliability; • The system operates under off-grid mode, with energy storage systems or diesel generators providing voltage and frequency support for the entire microgrid; Medium micro-grid solutions • Master/slave control function, all machines work in V/F mode; • Redundancy. The failure of one or more machines does not affect the normal operation of other machines; • Current balance control, current unbalance <5%;
  • 12. Vietnam Residential PV+BESS The project is located in the delta region of Vietnam which is rich in solar energy,and the cost of diesel generators is high due to the inconvenient transportation. In order to reduce electricity costs ,Megarevo provided more than 50 sets of R5KL1for more than 20 local residents. They combined with residential rooftop PVto work together to provide clean energy for customers and reduce their living energy costs. • Output power 5KVA • Support 2 MPPT • CE,TUV,SAA,NRS certification Product information • R5KL1Single-phase hybridinverter Project information •Capacity • 10kW/8kWh •PV • 10kwp •Position • Vietnam •On grid time • 2019.06 •Application • on/off grid, emergency power supply
  • 13. Greece Residential PV+BESS Local earthquake disasters occur frequently, fuel prices and energy costs continue to rise. The project adopts Megarevo R5KL1series hybrid inverter + 10kwh lithium battery energy storage system, combined with 8kwp roof PVof residents, to jointly provide users with clean energy and reduce users' living energy cost. • Output power 5KVA • Support 2 MPPT • CE,TUV,SAA,NRScertification Product information • R5KL1Single-phase hybridinverter Project information • Capacity • 5kW/10kWh • PV • 8kwp • Position • Larissa,Greece • On grid time • 2020.03 • Application • Off-grid、 emergency power supply
  • 14. California, USA Residential PV+BESS The project is located in the suburbs of California. With the help of time of use tariff and subsidy policy, in 2022, Megarevo and local PVpartners in North America provided energy services to 112 local residents. In this cooperation, R5KLNA products customized and developed by Megarevo for the American market were adopted for the first time. With the online operation of the system, it created asafe, comfortable and economical energy consumption experience. • R5KLNAAmerican PV+ESSsplit- phaseinverter • Output power 5kVA • Efficiency ≥97.2% • UL1741,CSA,IEEE1547 certification Product information Project information • Capacity • 5kW/10kWh • PV • 5kwp • Position •California, USA • On grid time • 2022.03 • Application • On/ Off grid、 emergency power supply
  • 15. Texas, USA Residential PV+BESS • Capacity • PV • Position • On grid time • Application Product information Due to the good solar conditions and preferential policies, in April 2022, Megarevo provided customers with a set of 16kW / 20kWh household energy storage solutions to help customers achieve self-consumption. Two 48V split- phase inverter R8KLNAare adopted in the schemeto meet the energy demand of customers through parallel connection. After one month's comprehensive verification, the project shows excellent economy. • 16kW/20kWh • 10kwp • Texas,USA • 2022.04 • self-consumption • R8KLNAAmerican ESSsplit- phaseinverter(48V) • Output power 8 kVA • Efficiency ≥97.2% • UL1741,CSA,IEEE1547 certification Project information
  • 16. Africa Residential PV+BESS Today, more than 640 million people in Africa still live without electricity. To improve the energy use of people in areas with no or weak electricity in Africa, the United Nations has implemented infrastructure assistancefor them. Megarevo is proud to be involved and has provided the three- phase ESShybrid inverter to help improve the energy environment for local residents. • R10KH3Three phase ESShybrid inverter • Output power 10kVA • Efficiency ≥98.2% • UL,IEC,VDE,G99,NRScertification Product information Project information •Capacity • 10kW/30kWh •PV • 11kwp •Position • Africa •On grid time • 2022.08 •Application • self-consumption
  • 17. Sierra Leone, Africa Off grid microgrid This project is located in an undeveloped area of Africa with very weak power public facilities. Only 2 %of the local rural people have accessto electricity. Due to the rich local solar and hydraulic resources, renewable energy has great potential. In October 2020, Megarevo and local PVdealers jointly provided a set of 250KW / 576kwh micro grid system and 248kwp roof PVsystem for this area, Help them improve their living conditions. Product information • MPS0250 MPSHybrid inverter • Rated power 250kW • MPPToperating voltage range 250-850v • TUV,CEcertification Project information • Capacity • 250kW/576kWh • PV • 248kwp • Position • Sierra Leone,Africa • On grid time • 2020.10 • Application • PV+ESS+DG
  • 18. Ganzi Prefecture, Sichuan Microgrid The project is located in Ganzi Tibetan Autonomous Prefecture, Sichuanprovince.the area is sparsely populated and the power grid is weak. However, due to sufficient sunshine, 160kwp PVpower generation modules are equipped there. .In order to ensure the continuity of power supply at night, Megarevo deployed a 150kW/ 391.68kWh microgrid system for the temple in June2021. PCSadopts Megarevo's new-generation MPS0150 high power hybrid system,which makes friendly coordination between PVand battery through intelligent control algorithm, thus to provide electricity for local residents. • MPS0150 MPSHybrid inverter • Rated power 150kW • MPPToperating voltage range 250-850V • TUV,CEcertification Product information Project information •Capacity • 150kW/391.68kWh •PV • 160kwp •Position • Ganzi Prefecture, Sichuan •On grid time • 2021.06 •Application • On/ Off grid、 emergency power supply
  • 19. The project is located in the plateau area of Pakistan, which is rich in solar resources.In order to make full use of the existing local power resources ,improve the energy consumption structure of local communities and reduce the environmental impact causedby diesel generators, Megarevo and AlphaESShave provided a set of 150KW / 306kwh microgrid system for this project, which supports on/off grid operation, It can bring clean and cost-effective energy consumption experience to local residents. • MPS0150 MPSHybrid inverter • Rated power 150kW • MPPToperating voltage range 250-850V • TUV,CEcertification Product information Project information • Capacity • 150kW/306kWh • PV • 165kWp • Position • pakistan • On grid time • 2022.04 • Application • On/ Off grid、emergency power supply Pakistan Microgrid
  • 20. Norway PV+BESS+Charging Station In order to meet the power supply capacity of the station and support the demand for high-power fast charging,in April 2022, Megarevo provided a 250kW/520kWh BESSand 50KW rooftop PVfor this project, which together with the three fast charging piles at the base, formed an intelligent power supply system. after the project operation, it not only provided convenient and economical charging services for more new energy vehicles, but also obtained additional economic benefits. • MEGA0250TS • Output power 250kVA • Efficiency 97.3% • IECcertification Product information Project information •Capacity • 250kW/520kWh •PV • 50kwp •Position • Norway •On grid time • 2022.04 •Application • Dynamicexpansion
  • 21. Xinjiang Taklimakan Desert Highway Off grid microgrid On June2, Megarevo MPShybrid inverter helped the Tarim desert highway to achieve zero carbon emissions. The project replaces traditional diesel power generation with PVpower generation. After the project completes on-grid, it will reduce diesel oil consumption by 1,000 tons and carbon dioxide emissions by about 3,410 tons per year. • MPS0030 MPSHybrid inverter • Output power 30kW • MPPToperating voltage range 250-850V • TUV,CEcertification Product information Project information • Capacity • 2580kW/6450kWh • PV • 4644kwp • Position • XinJiang • On grid time • 2022.06 • Application • self-consumption, off-grid
  • 22. Zhuhai Peak shaving and frequency modulation Located in the beautiful coastal area of Hengqin, Zhuhai, the project is a peak shaving and frequency modulation project on the power grid side, with atotal capacity of 5MW/ 15.889MWh. On the AC side, two sets of MEGA2500 20-foot booster integrated machines are used to support active and reactive power output and realize independent decoupling control of active and reactive power. The system was launched in December 2020 and has been running well so far. frequency modulation • MEGA2500 Container storage system • Rated power 2500kW • Support parallel expansion Product information Project information •Capacity • 5MW/15.88MWh •Position • Zhuhai Hengqin Island •On grid time • 2020.12 •Application • Grid-side peak shavingand
  • 23. Hunan Peak shaving and frequency modulation The project is located in Shaoyang, Hunan Province. It is a power grid side peak shaving and frequency modulation project constructed by the State Grid. 1Chigh rate cells are used on the DCside. In order to improve the utilization efficiency of the energy storage system, 80 sets of Megarevo mega0630 energy storage converters are installed. This product has the highlights of safety, reliability and intelligent efficiency, with a maximum efficiency of 98.7%,which can better meet the application needs of the scenario. modulation • MEGA0630 Energy storage converter (without isolation transformer) • Rated power 630kW • Maximum efficiency 98.7% • CE,CGC,TUV,l1hvrt certification Product information Project information • Capacity • 100MW/200MWh • Position • Shaoyang,Hunan • On grid time • 2021.05 • Application • Grid-side peak shaving and frequency
  • 24. Hunan Peak shaving and frequency modulation Located in The Miao Autonomous Region of Hunan Province, it belongs to the power grid side peak shaving and frequency modulation demonstration project built by the State Grid. 40 sets of 630kW MEGA series energy storage inverters are applied in this project, and the security and stability of the system is fully guaranteed by the unique patent control detection algorithm and high-performance DSPof Megarevo. modulation • MEGA0630 Energy storage converter (without isolation transformer) • Rated power 630kW • Maximum efficiency 98.7% • CE,CGC,TUV,l1hvrt certification Product information Project information •Capacity • 100MW/200MWh •Position • Hunan Miao Autonomous Region •On grid time • 2022.02 •Application • Grid-side peak shaving and frequency
  • 25. Megarevo has provided product solutions and customized services to more than 200 well-known enterprises around the world, which has been widely recognized by customers. It also forms strategic cooperative relations with excellent enterprises such asstate grid, China Southern Power Grid, CNTE,alpha, northern international and Nandu power supply.
  • 26. REVO residential Energy Storage inverters Single-phaseESS hybrid inverter Product features: Safe &reliable • Passed IEC/EN62109-1/-2,IEC/EN62477-1, South Africa NRS097-2-1:2017, IEC/EN61000-6-1,IEC/EN61000-6-3 test certification; Friendly & flexible • Support multi-parallelconnection; • Support flexibleaccess of dieselgenerator; • Compatible with lead-acid and lithium-ion battery; Economical & practica • Support intelligent EMS management function; • Support on/off-gridautomatic switching function to ensure uninterrupted power when important loads are off-grid;
  • 27. Technical specification: sales@megarevo.com.cn www.megarevopower.com REVO residentialEnergy Storage inverters-Single-phaseESS hybrid inverte Technical specification R3KL1 R3K6L1 R4KL1 R4K6L1 R5KL1 R6KL1 Input (PV) Max. power(kW) 4.6 4.6 6 6 7 7 Max. DCvoltage(V) 550 MPPT voltage range(V) 125~500 Max.input current of single MPPT(A) 14 MPPT tracker/strings 2/1 ACoutput Rated output power(kVA) 3 3.68 4 4.6 5 6 Max. output current(A) 13 16 17.4 20 21.7 26 Grid voltage/range(V) 230/176~270 Frequency (Hz) 50/60 PF 0.8lagging-0.8leading THDi <3% ACoutput topology L+N+PE Battery Battery voltagerange(V) 40~58 Max. charging voltage(V) 58 Max. charge/discharge current(A) 95/62.2 95/75 95/83.3 95/95.8 95/104.2 95/110 Battery type lithium /Lead-acid Communication interface CAN/RS485 EPSoutput Rated power (kVA) 3 3.68 4 4.6 5 6 Rated output voltage(V) 230 Rated output current(A) 13 16 17.4 20 21.7 26 Rated frequency (Hz) 50/60 Automatic switching time (ms) <20 THDu <2% Overload capacity 110%, 30S/120%, 10S/150%, 0.02S General data Battery chage/dischage efficiency 95.0% DC Max. efficiency 97.6% Europe efficiency 97.0% MPPT efficiency 99.9% Ingress protection IP65 Noise emission(dB) <35 Operation temperature - 25℃~60℃ Cooling Natural Relative humidity 0 ~95%(non-condensing) Altitude 2,000m(>2,000 Derating) Dimensions W * D * H (mm) 550*200*515 Weight(kg) 25 Isolation transformer No Self-consumption(W) <3 Display andcommunication Display LCD I C n A t N er / f D a R ce M :RS485/Wifi/4G/ Yes/ Opt/ Opt/ Yes/ Yes Safety standard IEC/EN62109-1/-2, IEC/EN62477-1 EMC IEC/EN 61000-6-1, IEC/EN 61000-6-3 On-grid South Africa NRS097-2-1:2017, UKG98,G99
  • 28. REVO residential Energy Storage inverters Three phaseESS hybrid inverter Product features: Safe & reliable • Passed IEC/EN62109-1/-2,IEC/EN 62477-1, IEC/EN61000-6-1/-6-3,European gridconnection: EN50549-1, German grid connection: VDE4105/0124 , UK gridconnection: G99,SouthAfrica: NRS097-2-1:2017test certification; Friendly & flexible • Support diesel generator access; • Support full power discharge, automatic management of battery charge and discharge; Economical & practica • It is more economical to support multiple operating modes; • Can be as a UPS for the important loads when power off; sales@megarevo.com.cn www.megarevopower.com
  • 29. sales@megarevo.com.cn www.megarevopower.com REVO residentialEnergy Storage inverters-Three phase ESS hybrid inverter R10KH3 R12KH3 Technical specification: Technical specification R8KH3 Input (PV) Max.power(kW) 12 Max. DCvoltage(V) 15 18 1,000 MPPT voltage range(V) 180~850 Max.input current of single MPPT(A) MPPT tracker/strings 2/1 13 2/1 2/1 ACoutput Rated output power(kVA) 8 10 12 Max. output current(A) 12.7 15.9 19.1 Grid voltage/range(V) 400/360~440 Frequency (Hz) 50/60 Power factor 0.8lagging-0.8leading THDi <3% ACoutput topology 3W+N+PE Battery Battery voltagerange(V) Max. charging voltage(V) 125~600 600 Full battery voltage(V) 300 Rated charge/discharge current(A) 250 40 40 350 40 Battery type lithium /Lead-acid Communication Interface CAN/RS485 EPSoutput Rated power(kVA) 8.8 11 13.2 Rated output voltage(V) 400 Max. output current(A) 12.7 15.9 19.1 Rated frequency(Hz) 50/60 Automatic switchingtime(ms) <20 THDu Overload capacity <2% 110%, 30S/120%, 10S/150%, 0.02S General data Battery charge /discharge efficiency 96.6% 96.7% 96.8% DC Max. efficiency 97.9% 98.2% 98.2% Europe efficienc 97.5% 97.2% 99.5% 97.5% 99.5% MPPT efficiency 99.5% Ingress protection IP65 Noise emission(dB) <35 Operation temperature -25℃~ 60℃ Cooling Natural Relative Humidity 0 ~95%(non-condensing) Altitude 2,000m (>2,000Derating) Dimensions W * D * H (mm) 530*200*600 Weight(kg) 29 Isolation transformer No Self-consumption(W) <3 Display andcommunication Display LCD Interface:RS485/Wifi/4G/ CAN/DRM Yes/ Opt/ Opt/ Yes/ Yes IEC/EN62109-1/-2, IEC/EN62477-1 Safety standard EMC IEC/EN 61000-6-1, IEC/EN 61000-6-3 On-grid Europe:EN50549-1, Germany:VDE4105/0124,UK:G99,South Africa:NRS097-2-1:2017
  • 30. Object Description A/B Battery +/Battery - C/D PV1+/PV1- J/K PV2+/PV2- E DC switch F WiFi port for external WiFi L Reserved port G DRM/BMS H Grid current / DRY IO M USB port for upgrading N POWER CAN /LEAD-NTC I Pressure valve O EPS output P Grid output A B C D E F G H I J K L M N O P com Note! 1.The Update port: For on-premises upgrades. 2.The BMS port: BMS communication for lithium batteries. 3.The CT port: For external grid side CT to detect current size. 4.The DRM port, CAN port, NTC port and DRY IO port: Reserved port, temporarily unavailable R5KL1 Megarevo 5kW Single Phase Hybrid Inverter Interface definition and Technical Data Interface definition
  • 31. Norminal DC operating voltage[V] 360 360 360 Max. short circuit current [A] 14/14 14/14 14/14 Strings per MPP tracker 1 1 1 Model R3K6L1 R4K6L1 R5KL1 Model R3KL1 R3K6L1 R4KL1 R4K6L1 R5KL1 R6KL1 DC input Max. recommended DC power [W] 4600 4600 6000 6000 7000 7000 Max. DC voltage[V] 550 550 550 550 550 550 Norminal DC operating voltage[V] 360 360 360 360 360 360 MPPT voltage range [V] 125-500 125-500 125-500 125-500 125-500 125-500 MPPT voltage range@full load [V] 150-500 150-500 170-500 170-500 220-500 220-500 Max. input current [A] 14/14 14/14 14/14 14/14 14/14 14/14 Max. short circuit current [A] 17.5/17.5 17.5/17.5 17.5/17.5 17.5/17.5 17.5/17.5 17.5/17.5 Start input voltage [V] 125 125 125 125 125 125 No. of MPP trackers 2 2 2 2 2 2 Strings per MPP tracker 1 1 1 1 1 1 Max. inverter backfeed current to array 0 0 0 0 0 0 DC disconnection swtich / AC output Norminal AC power[VA] 3000 3680 4000 4600 5000 6000 Max. apparent AC power[VA] 3000 3680 4000 4600 5000 6000 Rated grid voltage(range)[V] 230 (176 to 270) Rated grid frequency[Hz] 50/60 Norminal AC current[A] 13 16 17.4 20 21.7 26 Max.AC current[A] 13 16 17.4 20 21.7 26 Displacement power factor 0.99 leading...0.99 lagging Total harmonic distortion(THDI) < 2% Load control optional AC input Norminal AC power[VA] 3000 3680 4000 4600 5000 6000 Rated grid voltage(range)[V] 230(176 to 270) Rated grid frequency[Hz] 50/60 Norminal AC current[A] 13 16 17.4 20 21.7 26 Max.AC current[A] 13 16 17.4 20 21.7 26 Displacement power factor 0.99 leading~0.99 lagging AC inrush current 35 35 35 35 35 35 EPS output EPS rated power[VA] 3000 3680 4000 4600 5000 6000 Max. EPS power[VA] 3000 3680 4000 4600 5000 6000 EPS rated voltage, Frequency 230VAC, 50/60Hz EPS rated current[A] 13 16 17.4 20 21.7 26 Max. EPS current[A] 13 16 17.4 20 21.7 26 Switch time[s] <20ms Total harmonic distortion(THDv) <2% Parallel operation Yes Compatible with the generator Yes(signal provided only) Battery parameter Battery type Lithium battery/Lead-ACID Battery voltage range[V] 40-58 Recommended battery voltage[V] 48 Cut Off Voltage[V] 40 Max. charging Voltag[V] 58 Max. Protective Voltage[V] 59 Max. charge/discharge current[A] 95/62.5 95/76.6 95/83.3 95/95.8 95/104.2 95/110 Peak charge/discharge current[A] 95/62.5 95/76.6 95/83.3 95/95.8 95/104.2 95/110 Communication interfaces CAN/RS485/WIfI/LAN/DRM Reverse connect protection Yes Efficiency MPPT efficiency 99.9% Euro efficiency 97% Max. efficiency 97.6% Max. Battery charge efficiency 95% Max. Battery discharge efficiency 95% Note: If the South African national grid standard is selected, the grid power is only 4.6kW! Technical Data
  • 32. Safety & Protection Over/under voltage protection YES DC isolation protection YES Monitoring ground fault protection YES Grid protection YES DC injection monitoring YES Back feed current monitoring YES Residual current detection YES Anti-islanding protection YES Over load protection YES Over heat protection YES Max. output fault current 55A Max. output over current 28.7A Model R3KL1 R4KL1 R5KL1 R3K6L1 R4K6L1 R6KL1 Dimension [W/H/D](mm) 550*520*200 Dimension of packing [W/H/D](mm) 665*635*330 Net weight [kg] 25 Gross weight [kg] 31 Installation modularization Operating temperature range[℃] -25~+60 (derating at 45) Storage temperature [℃] -25~+60 Storage/Operation relative humidity 4%~100% (Condensing) Altitude [m] <2000 Ingress Protection IP65(for outdoor use) Protective Class Ⅰ Night-time consumption <3W Over Voltage Category lⅡ(MAINS),Ⅱ(PV,Battery) Pollution Degree II cooling Nautral Noise level <40dB Inverter Topology non-isolated Active anti-islanding method Power variation Communication interface CAN/RS485/WIfI/LAN/DRM Basic Data Safety and Protection
  • 33. Position Min.size Left 300mm Right 300mm Top 300mm Bottom 300mm Front 300mm Table Available Space Size S t e p 1 Step 2: Place the inverter on the wall mounted bracket by holding the handle on the side. S t e p 2 Step 3: Tighten the fixing screws on both sides of the inverter. Step 4: If necessary, costomer can install an anti-theft lock on the left-bottom of the inverter. S t e p 3、Step 4 300mm 300mm Mounting Space Requirement 300mm 300mm Step 1: Screw the wall bracket on the wall 1. Place the bracket on the wall and mark down the position of the 4 holes. 2. Drill holes with driller, make sure the holes are deep enough (at least 60mm) to support the inverter. 3. Install the expansion tubes in the holes, and tighten them. Then install the wall bracket with the expansion screws.
  • 34. 4.1 Grid connection and EPS connection Hybrid inverter are designed for single phase grid. Voltage is 220/230/240V, frequency is 50/60Hz. Other technical requests should comply with the requirement of the local public grid. Table 1 Cable and Micro-breaker recommended Micro-breaker should be installed between inverter and grid, any load should not be connected with inverter directly. Model R3KL1 R3K6L1 R4KL1 R4K6L1 R5KL1 R6KL1 Cable 4-5 mm² 5-6mm² Micro-breaker 20A 32A GRID L N PE Meter Grid side Main Breaker AC Breaker Home Load On Grid Breaker CT PV Breaker PV Breaker Lithium BAT(48V) BAT Breaker Pv1 PV2 (PV MAX:500V) . . . . + + - + - - + - Grid PV BAT Load s EPS Breaker CT EPS Electrical Connection  Electrical connection diagram
  • 35. Object Name Description A LCD Screen Display the information of the inverter. B Indicator LED lit in green: The inverter is in grid mode. Off: The inverter is in not in grid mode. C lit in green: The inverter is in off-grid mode. Off: The inverter is in not in off-grid mode. D lit in Yellow: The inverter is in Warning . Off: The inverter has no Inverter Warning E lit in red: The inverter is in fault status. Off: The inverter has no errors. F Function Button Esc: Return from current interface or function. G Up: Move cursor to upside or increase value. H Down: Move cursor to downside or decrease value. I Enter: Confirm the selection. Grid (Green) EPS (Green) Alarm (Yellow) Fault (Red) Initialization off off off off Stand-by off off off off Grid mode on off off off Off-Grid off on off off Bypass of mains off on on off Fault off off off on B C D E A F G H I LCD Interface and Setting Control Panel Instructions for LED Indicator
  • 36. Date: 07th September2022 Director General, Telecommunication Regulatory Commission of Sri Lanka, 276, ElvitigalaMawatha, Narahenpita. Dear Sir, Maintenance and After Sales Service of Equipment This is to confirm that Shenzhen Megarevo Technology Co., Ltd. support all warranty repairs and services in our main service station in China. Building 2, Guangming Yunli Smart Park, No.143, Shutianpu Community, Guangming District, Shenzhen, Where we have fully dedicated team of technical staff. Therefore, end user doesn’t require to maintain any equipment or staff to do the services and repair of Ingeteam string inverters within warranty period. The operation and maintenance work will have the full agency of the local dealer, with full support from us for sure. Models: R5KL1 Megarevo 5KW Single Phase Hybrid Inverter This letter was issued on the request made by First Energy SL Pvt Ltd ,55/5 Nikape, Dehiwala 10350, Sri Lanka [Name] Lavier Song [Position] Building 2, Guangming Yunli Smart Park, No.143, Shutianpu Community, Guangming District, Shenzhen [Company Name] Shenzhen Megarevo Technology Co., Ltd.
  • 37. Date: 07th September2022 Director General, Telecommunications Regulatory Commission of Sri Lanka, 276, Elvitigala Mawatha, Colombo 00800 Dear Sir, Declaration Letter Megarevo We, , hereby declare M/S First Energy SL (Pvt) Ltd is our authorized importer of our products (Inverters and communication device) . Imported shall be warrantied and can be replaced one to one during the warranty period--After evaluation of the engineer, if it is true that the machine is damaged or affected by non-human or natural factors.(For more details, please refer to our after-sales documents). The purchase is made against the Invoice Nos: [ Invoice no SEB22YJ0628 ] ; The test reports shared are as per CE standard. Model Operation Frequency (MHz) Tx. Output power (dBm) Antenna gain Wi-Fi Equipment Item Wi-Fi Model Serial Nos. R5KL 1 Megarevo 5KW Single Phase Hybrid Inverter [Name] Lavier Song [Position] Building 2, Guangming Yunli Smart Park, No.143, Shutianpu Community, Guangming District, Shenzhen [Company Name] Shenzhen Megarevo Technology Co., Ltd.
  • 38. Authorization Letter THIS LETTER IS PROUDLY PRESENTEDTO Partner-ship Date: June 24, 2022 ICB No:MBUSTDB/W/CB-01/2022/22 Alternative No.:N/A To: First Energy SL (Private) Limited No. 55/5, Nikape, Dehiwala, Sri Lanka WHEREAS We [Shenzhen Megarevo Technology Co.,Ltd.],who are official manufacturers of Bidirectional Storage Inverter, having factories at 4Th to 1st floors of Emerson Industrial Park,No.3Fengtang Avenue, Tangwei Community,Fuhai Street,Baoan District,Shenzhen],do hereby authorize First Energy SL (Private) Limited as an distributor. The distribution products are Revo hybrid inverters and MPS microgrid inverter, which are valid for 12 months . Authorized distributor area is Sri Lanka. Signature: Signed: Lavier Song Title: Marketing director Dated June 24th,2022 Signed date: June 24th, 2022 Shenzhen Megarevo Technology Co.,Ltd.
  • 39. E-mail: info@sunnixenergy.com www.sunnixerengy.com Address: No. 25, Lushan Road, High Tech Zone, Suzhou City, P.R.China SUNNIX ENERGY ENERGYSTORAGE SOLUTIONS RENEWYOUR POWER SUNNIXENERGY
  • 40. Global Layout About Us Mexico South Africa Germany Korea Russia Vietnam Philippines Malaysia Australia 10,000 m² Area of factory 100 million RMB Total investment 200 Employees 2010 year Established Sunnix Energy 01 02 Sunnix Energy is an integrated company that has specialized in lithium ion battery products, energy storage systems and PV solar systems since 2010. As a technology driven company led by a top class R&D team with more than 12 years’ experience, Sunnix Energy keeps focus on the development of BMS technology, battery pack and energy storage system. With Sunnix Energy’s 500MWh large scale production capacity and high degree quality control system, we have sold storage batteries for residential and commercial use to more than 50 countries by the end of 2021. Sunnix Energy is proudly contributing our strength to make householders and business more self-sustainable. 500 MWh Capacity of production
  • 41. Solutions Battery Energy Storage System Battery Management System Energy Management System System Integration Spontaneous Use Microgrid Peak-to-valley Arbitrage Diesel Engine Replacement Large-Scale Optical Energy Storage Peak Shaving and Valley Filling Home Energy Stroage Optical Storage and Charging Integration Main Application Scenarios SUNNIX ENERGY ESS Cooperative Partners Sunnix Energy 03 04
  • 42. Sunnix Energy Wall Mounted Battery FEATURES Compact Design and Safety Protection Easy Installation and After Sales Service Wall Mounted and Parallel Connection >6,000 Cycles at 90% DOD LiFePO4 Safe Battery Chemistry Intelligent Build inBMS Model Battery Type Nominal Energy(KWh) Usable Energy(KWh) Peak Output Power (KW,3 Seconds) Round-TripEfficiency NominalVoltage(V) OperatingVoltage(V) Max Charge/DischargeCurrent(A) Communication Enclosure ProtectionRating Operating Temperature(°C) CoolingType Installation Dimension (W*H*D,mm) Weight(Kg) Warranty SafetyStandard Scalability Humidity Altitude(m) CyclesLife DesignLife RecommendDOD ≥97.5% 48V 42-55 CAN, RS485 IP21 -20 -55 NaturalCooling Wall Mounted,Indoor 5% -95% <2,000 >6,000 20+ Years (25℃@77℉) 90% 5Years SNE-ES W5.0 48V 100 AH LiFePO4 7.68 80/80 480*500*240 48 4.8 4.32 48V 200 AH LiFePO4 8.64 9.6 SNE-ES W10.0 9.6 100/100 90 UL1973/IEC62619/UN38.3 Max 8 Pcsin Parallel Max 16 Pcs in Parallel 5KWH 10KWH 550*650*240 Sunnix Energy 05 06