SlideShare a Scribd company logo
1 of 6
Descent Management
Flight Operations Briefing Notes                                Descent and Approach Profile Management




                                                     Flight Operations Briefing Notes
                                                                    Descent Management
                                     Descent and Approach Profile Management




   I    Introduction
        Inadequate management       of descent-and-approach            profile   and/or    incorrect
        management of aircraft energy level may lead to:
        •   Loss of vertical situational awareness; and/or,
        •   Rushed and unstabilized approaches.

        Either situation increases the risk of approach-and-landing accidents, including those
        involving CFIT.


   II   Statistical Data
        Approximately 70 % of rushed and unstable approaches involve an inadequate
        management of the descent-and-approach profile and/or an incorrect management of
        energy level; this includes:
        •   Aircraft higher or lower than the desired vertical flight path; and/or,
        •   Aircraft faster or slower than the desired airspeed.


  III   Best Practices and Guidelines
        To prevent delay in initiating the descent and to ensure an optimum management of
        descent-and-approach profile, descent preparation and approach briefings should be
        initiated when pertinent data have been received (e.g ATIS, …), and completed before
        the top-of-descent (typically 10 minutes before).




                                                 Page 1 of 6
Descent Management
Flight Operations Briefing Notes                             Descent and Approach Profile Management




     Descent Preparation
     Insert a realistic FMS flight plan built up from the arrival expected to be flown. If, for
     example, a standard terminal arrival route (STAR) is inserted in the FMS flight plan but
     is not expected to be flown, because of anticipated radar vectors, the STAR should be
     revised (i.e. The track-distance, altitude restrictions and/or speed restrictions)
     according to pilot’s expectations so as to allow the FMS adjustment of the top-of-
     descent point; and,
     Wind forecast should be entered (as available) on the appropriate FMS page, at
     waypoints close to the top-of-descent point and along the descent profile in order to get
     a realistic top-of-descent.


     Descent and Approach Briefing
     The missed approach should be considered as being part of the approach. It may be
     part of the FMS flight plan, and it should be reviewed against the applicable approach
     chart.


     Descent Initiation
     If descent initiation is delayed by ATC, reduce speed as appropriate to minimize
     the impact on the descent profile (i.e. to be in a better position to recapture
     the nominal descent profile).


     Navigation Accuracy Check
     If FMS navigation accuracy does not meet the applicable criteria for terminal area
     navigation or approach, no descent should be made below the MEA or below the sector
     MSA without prior confirmation of the aircraft position, using navaids raw-data.
     Then, the descent will be continued using raw-data as aircraft position reference
     (e.g. navaids, DME, …).


     Descent Profile Monitoring
     Descent profile should be monitored, using all available instrument and chart
     references:
     •   FMS vertical-deviation indication, as applicable;
     •   Navaids and instruments raw-data; and,
     •   Charted descent-and-approach profile.

     Wind conditions and wind changes should be monitored closely to anticipate any
     reduction in head wind component or increase in tail wind component, and to adjust
     the flight path profile in a timely manner.
     The descent profile may be monitored and adjusted based on a typical 3000 ft per
     10 nm descent gradient (corrected for the prevailing head wind component or tail wind




                                              Page 2 of 6
Descent Management
Flight Operations Briefing Notes                            Descent and Approach Profile Management




     component), while complying with the required altitude and/or speed restrictions
     (i.e., ensuring adequate deceleration management).
     The flight path vector, as available, can be used to monitor the descent profile by
     checking that the remaining track-distance to touchdown (in nm) is approximately
     equal to the FL divided by the flight-path-angle (FPA, in degrees):

     Distance-to-go (nm) = FL / FPA (degrees)

     Note:
     In the above rule of thumb, the FL should be understood as the FL difference (Δ FL)
     between the current aircraft FL and the airfield FL.

     Below 10 000 ft, flying at 250 kt IAS, the following rules of thumb may be used to
     confirm the descent profile and ensure a smooth transition between the various phases
     of the approach:
     •   9000 ft above airport elevation at 30 nm from touchdown; and,
     •   3000 ft above airport elevation at 15 nm from touchdown (to account for
         deceleration and slats/flaps extension).


     Descent Profile Adjustment/Recovery
     If flight path is significantly above the desired descent profile (e.g. because of an ATC
     constraint or a higher-than-anticipated tail wind), to recover the desired flight path:
     •   Revert, if necessary, from FMS vertical navigation to a selected vertical mode, with
         an appropriate speed target;

     •   Maintain a high airspeed as long as practical and possible (e.g., in accordance with
         ATC speed constraint);

     •   Extend speed brakes (as allowed by SOPs depending on airspeed and configuration,
         keeping preferably one hand on the speed brakes handle until speed brakes are
         retracted);

     •   Extend landing gear, if the use of speed brakes is not sufficient;

     •   Notify ATC, for timely coordination, that the aircraft is unable to recover the desired
         flight path, as soon as it is ascertained;

     •   As a last resort, perform a 360-degree descending turn (as practical and cleared by
         ATC).
         Maintain close reference to instruments throughout the turn to monitor and control
         the rate of descent, bank angle and position, to prevent:
         −   Loss of control;
         −   CFIT; or,




                                              Page 3 of 6
Descent Management
Flight Operations Briefing Notes                           Descent and Approach Profile Management




         −   Overshoot of the localizer and/or of the extended runway centerline.

     Refer to the Flight Operations Briefing Note Aircraft Energy Management during Approach
     for additional information.


     Concept of Next Target and Decision Gates
     Throughout the entire flight a next target should be defined, in order to stay ahead of
     the aircraft at all times.

     The next target should be any required combination of one or more of the following
     elements:
     •   A position;
     •   An altitude;
     •   A configuration;
     •   A speed;
     •   A vertical speed (as applicable); and,
     •   A power setting (e.g. thrust is stabilized, usually above idle, to maintain the target
         approach speed along the desired final approach path).

     If it is anticipated that one or more element(s) of the next target will not be met,
     the required corrective action(s) should be taken without delay.
     During the approach and landing, the successive next targets should constitute gates
     that should be met for the approach to be continued.
     The Final Approach Fix (FAF), the Outer Marker (OM) or an equivalent fix (as
     applicable) constitute an assessment gate to confirm the readiness to proceed further.
     The minimum stabilization height should constitute a particular gate (i.e. decision gate)
     along the final approach.
     If the aircraft is not stabilized on the approach path in landing configuration, at
     the minimum stabilization height, a go-around must be initiated unless the crew
     estimates that only small corrections are necessary to rectify minor deviations from
     stabilized conditions due, amongst others, to external perturbations.

     The Flight Operations Briefing Note Flying Stabilized Approaches describes:
     •   All the elements of a stabilized approach; and,
     •   The flight parameter exceedance callouts performed by the PNF if one flight
         parameter exceeds the criteria defined for one of the elements of a stabilized
         approach.




                                             Page 4 of 6
Descent Management
Flight Operations Briefing Notes                             Descent and Approach Profile Management




  IV   Adverse Factors and Typical Errors
       The following factors and working errors often are observed during transition and line
       training:
       •   Late, therefore rushed descent, approach preparation and briefing, resulting in
           the omission of important items;
       •   Failure to cross-check FMS data entries;
       •   Failure to account for track-distance differences between expected routing and
           actual routing (i.e., STAR versus radar vectors);
       •   Distraction leading to or resulting from a two-heads-down situation;
       •   Failure to resolve ambiguities, doubts or disagreements;
       •   Failure to effectively monitor the descent progress using all available instrument
           references (e.g., failure to monitor wind conditions and/or wind changes); and/or,
       •   Use of inappropriate technique to recover the descent profile.


   V   Summary of Key Points
       The following key points should be emphasized during transition training and line
       training as well as during line checks and line audits:
       •   Timeliness of descent and approach preparation;
       •   Strict adherence to SOPs for FMS setup;
       •   Cross-check of all data entries by both crewmembers;
       •   Use of PFD, ND and FMS CDU to support and illustrate the descent, approach and
           go-around briefings;
       •   Confirmation of FMS navigation accuracy, before deciding the use of automation
           (i.e., use of FMS modes or selected modes) and of associated monitoring cues
           (e.g. ND Rose NAV or Rose VOR, needles, VDEV, …) for the descent and approach;
       •   Review of terrain information and other approach hazards; and,
       •   Guidelines for descent planning, monitoring and adjustment.


  VI   Associated Flight Operations Briefing Notes
       The following Flight Operations Briefing Notes may be referred to for a complete
       overview of the procedures, operational recommendations and techniques involved in
       the conduct of the descent and approach:
       •   Conducting Effective Briefings
       •   Aircraft Energy Management during Approach
       •   Flying Stabilized Approaches
       •   Being Prepared for Go-around




                                               Page 5 of 6
Descent Management
Flight Operations Briefing Notes                                                     Descent and Approach Profile Management




  VII   Regulatory References
        •    ICAO – Procedures for Air navigation Services – Aircraft Operations (PANS-OPS, Doc
             8168), Volume I – Flight procedures


 VIII   Airbus References
        •    Flight Crew Operating Manuals (FCOM) – Standard Operating Procedures – Descent
             – Descent Monitoring & Descent Adjustment
        •    A320 Family and A330/A340 Family Flight Crew Training Manuals (FCTM) – Normal
             Operations – Descent – Guidance and Monitoring




        This Flight Operations Briefing Note (FOBN) has been adapted from the corresponding ALAR Briefing Note developed by
        Airbus in the frame of the Approach-and-Landing Accident Reduction (ALAR) international task force led by the Flight Safety
        Foundation.

        This FOBN is part of a set of Flight Operations Briefing Notes that provide an overview of the applicable standards,
        flying techniques and best practices, operational and human factors, suggested company prevention strategies and personal
        lines-of-defense related to major threats and hazards to flight operations safety.

        This FOBN is intended to enhance the reader's flight safety awareness but it shall not supersede the applicable regulations
        and the Airbus or airline's operational documentation; should any deviation appear between this FOBN and the Airbus or
        airline’s AFM / (M)MEL / FCOM / QRH / FCTM, the latter shall prevail at all times.

        In the interest of aviation safety, this FOBN may be reproduced in whole or in part - in all media - or translated; any use of
        this FOBN shall not modify its contents or alter an excerpt from its original context. Any commercial use is strictly excluded.
        All uses shall credit Airbus and the Flight Safety Foundation.

        Airbus shall have no liability or responsibility for the use of this FOBN, the correctness of the duplication, adaptation or
        translation and for the updating and revision of any duplicated version.

                                                          Airbus Customer Services

                                                   Flight Operations Support and Services

                                       1 Rond Point Maurice Bellonte - 31707 BLAGNAC CEDEX France

                                     FOBN Reference : FLT_OPS – DESC – SEQ02– REV03 – OCT. 2006




                                                                 Page 6 of 6

More Related Content

What's hot

Procedure of carrying out aircraft weight and balance in a wide body commerci...
Procedure of carrying out aircraft weight and balance in a wide body commerci...Procedure of carrying out aircraft weight and balance in a wide body commerci...
Procedure of carrying out aircraft weight and balance in a wide body commerci...Lahiru Dilshan
 
Edwards - ATC Bulleted Resume
Edwards - ATC Bulleted ResumeEdwards - ATC Bulleted Resume
Edwards - ATC Bulleted ResumeGreg Edwards
 
Instrument approach procedures GSR 751 E provision & PANS OPS ops
Instrument approach procedures GSR 751 E provision & PANS OPS  opsInstrument approach procedures GSR 751 E provision & PANS OPS  ops
Instrument approach procedures GSR 751 E provision & PANS OPS opsARVIND KUMAR SINGH
 
2017 Heli-Expo - Helicopter FDM Research.
2017 Heli-Expo - Helicopter FDM Research.2017 Heli-Expo - Helicopter FDM Research.
2017 Heli-Expo - Helicopter FDM Research.IHSTFAA
 
Check interval escalation
Check interval escalationCheck interval escalation
Check interval escalationMohammed Hadi
 
2 manuales de_mantenimiento
2 manuales de_mantenimiento2 manuales de_mantenimiento
2 manuales de_mantenimientoAquiles Terrones
 
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).IHSTFAA
 
2017 Heli-Expo - "What the FRAT?" Helicopter Risk Analysis Tool
2017 Heli-Expo - "What the FRAT?" Helicopter Risk Analysis Tool2017 Heli-Expo - "What the FRAT?" Helicopter Risk Analysis Tool
2017 Heli-Expo - "What the FRAT?" Helicopter Risk Analysis ToolIHSTFAA
 
High Altitude Flight Operations
High Altitude Flight OperationsHigh Altitude Flight Operations
High Altitude Flight OperationsCarlos Pera
 
Check interval escalation
Check interval escalation Check interval escalation
Check interval escalation Mohammed Awad
 
Flight Mechanics Issues presentation
Flight Mechanics Issues presentationFlight Mechanics Issues presentation
Flight Mechanics Issues presentationstephen_mcparlin
 
Aircraft maintenance program enhancement badawood mamdooh
Aircraft maintenance program enhancement  badawood mamdoohAircraft maintenance program enhancement  badawood mamdooh
Aircraft maintenance program enhancement badawood mamdoohbmamdooh
 

What's hot (20)

Cmr
CmrCmr
Cmr
 
Separation Standard
Separation StandardSeparation Standard
Separation Standard
 
Radar
RadarRadar
Radar
 
Avionics
AvionicsAvionics
Avionics
 
Procedure of carrying out aircraft weight and balance in a wide body commerci...
Procedure of carrying out aircraft weight and balance in a wide body commerci...Procedure of carrying out aircraft weight and balance in a wide body commerci...
Procedure of carrying out aircraft weight and balance in a wide body commerci...
 
Edwards - ATC Bulleted Resume
Edwards - ATC Bulleted ResumeEdwards - ATC Bulleted Resume
Edwards - ATC Bulleted Resume
 
Instrument approach procedures GSR 751 E provision & PANS OPS ops
Instrument approach procedures GSR 751 E provision & PANS OPS  opsInstrument approach procedures GSR 751 E provision & PANS OPS  ops
Instrument approach procedures GSR 751 E provision & PANS OPS ops
 
2017 Heli-Expo - Helicopter FDM Research.
2017 Heli-Expo - Helicopter FDM Research.2017 Heli-Expo - Helicopter FDM Research.
2017 Heli-Expo - Helicopter FDM Research.
 
resume
resumeresume
resume
 
Check interval escalation
Check interval escalationCheck interval escalation
Check interval escalation
 
2 manuales de_mantenimiento
2 manuales de_mantenimiento2 manuales de_mantenimiento
2 manuales de_mantenimiento
 
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
 
2017 Heli-Expo - "What the FRAT?" Helicopter Risk Analysis Tool
2017 Heli-Expo - "What the FRAT?" Helicopter Risk Analysis Tool2017 Heli-Expo - "What the FRAT?" Helicopter Risk Analysis Tool
2017 Heli-Expo - "What the FRAT?" Helicopter Risk Analysis Tool
 
Airplane Upset Recovery: High Altitude Operations
Airplane Upset Recovery:  High Altitude OperationsAirplane Upset Recovery:  High Altitude Operations
Airplane Upset Recovery: High Altitude Operations
 
High Altitude Flight Operations
High Altitude Flight OperationsHigh Altitude Flight Operations
High Altitude Flight Operations
 
Check interval escalation
Check interval escalation Check interval escalation
Check interval escalation
 
Aircraft Maintenance Documentation
Aircraft Maintenance DocumentationAircraft Maintenance Documentation
Aircraft Maintenance Documentation
 
Flight Mechanics Issues presentation
Flight Mechanics Issues presentationFlight Mechanics Issues presentation
Flight Mechanics Issues presentation
 
Aircraft maintenance program enhancement badawood mamdooh
Aircraft maintenance program enhancement  badawood mamdoohAircraft maintenance program enhancement  badawood mamdooh
Aircraft maintenance program enhancement badawood mamdooh
 
Weightandbalance
WeightandbalanceWeightandbalance
Weightandbalance
 

Similar to Media Object File Flt Ops Desc Seq02

Media Object File Flt Ops Desc Seq01
Media Object File Flt Ops Desc Seq01Media Object File Flt Ops Desc Seq01
Media Object File Flt Ops Desc Seq01syed viquar
 
Media Object File Flt Ops Ops Env Seq02
Media Object File Flt Ops Ops Env Seq02Media Object File Flt Ops Ops Env Seq02
Media Object File Flt Ops Ops Env Seq02syed viquar
 
9. approach and landing
9. approach and landing9. approach and landing
9. approach and landingchococrispis37
 
airplane flying handbook
airplane flying handbookairplane flying handbook
airplane flying handbookcollinmakowski
 
Airbus safetylib -flt_ops-toff_dep_seq07
Airbus safetylib -flt_ops-toff_dep_seq07Airbus safetylib -flt_ops-toff_dep_seq07
Airbus safetylib -flt_ops-toff_dep_seq07Alberto Garcia Romera
 
Media Object File Flt Ops Supp Tech Seq02
Media Object File Flt Ops Supp Tech Seq02Media Object File Flt Ops Supp Tech Seq02
Media Object File Flt Ops Supp Tech Seq02syed viquar
 
Media Object File Flt Ops Sop Seq06
Media Object File Flt Ops Sop Seq06Media Object File Flt Ops Sop Seq06
Media Object File Flt Ops Sop Seq06syed viquar
 
Media Object File Flt Ops Gen Seq01
Media Object File Flt Ops Gen Seq01Media Object File Flt Ops Gen Seq01
Media Object File Flt Ops Gen Seq01syed viquar
 
Media Object File Flt Ops Sop Seq03
Media Object File Flt Ops Sop Seq03Media Object File Flt Ops Sop Seq03
Media Object File Flt Ops Sop Seq03syed viquar
 
Media Object File Flt Ops Toff Dep Seq04
Media Object File Flt Ops Toff Dep Seq04Media Object File Flt Ops Toff Dep Seq04
Media Object File Flt Ops Toff Dep Seq04syed viquar
 
Media Object File Flt Ops Toff Dep Seq06
Media Object File Flt Ops Toff Dep Seq06Media Object File Flt Ops Toff Dep Seq06
Media Object File Flt Ops Toff Dep Seq06syed viquar
 
Media Object File Flt Ops Toff Dep Seq08
Media Object File Flt Ops Toff Dep Seq08Media Object File Flt Ops Toff Dep Seq08
Media Object File Flt Ops Toff Dep Seq08syed viquar
 
Media Object File Flt Ops Sop Seq04
Media Object File Flt Ops Sop Seq04Media Object File Flt Ops Sop Seq04
Media Object File Flt Ops Sop Seq04syed viquar
 
New sid and star phraseologies scenarios v2
New sid and star phraseologies scenarios v2New sid and star phraseologies scenarios v2
New sid and star phraseologies scenarios v2Asser Ghani
 
Stage 2 ifh chapter 10 departures
Stage 2 ifh chapter 10 departuresStage 2 ifh chapter 10 departures
Stage 2 ifh chapter 10 departurespvandette
 
Terminal Part 3
Terminal Part 3Terminal Part 3
Terminal Part 3tomrickard
 

Similar to Media Object File Flt Ops Desc Seq02 (20)

Media Object File Flt Ops Desc Seq01
Media Object File Flt Ops Desc Seq01Media Object File Flt Ops Desc Seq01
Media Object File Flt Ops Desc Seq01
 
Media Object File Flt Ops Ops Env Seq02
Media Object File Flt Ops Ops Env Seq02Media Object File Flt Ops Ops Env Seq02
Media Object File Flt Ops Ops Env Seq02
 
9. approach and landing
9. approach and landing9. approach and landing
9. approach and landing
 
airplane flying handbook
airplane flying handbookairplane flying handbook
airplane flying handbook
 
Airbus safetylib -flt_ops-toff_dep_seq07
Airbus safetylib -flt_ops-toff_dep_seq07Airbus safetylib -flt_ops-toff_dep_seq07
Airbus safetylib -flt_ops-toff_dep_seq07
 
Media Object File Flt Ops Supp Tech Seq02
Media Object File Flt Ops Supp Tech Seq02Media Object File Flt Ops Supp Tech Seq02
Media Object File Flt Ops Supp Tech Seq02
 
Media Object File Flt Ops Sop Seq06
Media Object File Flt Ops Sop Seq06Media Object File Flt Ops Sop Seq06
Media Object File Flt Ops Sop Seq06
 
Media Object File Flt Ops Gen Seq01
Media Object File Flt Ops Gen Seq01Media Object File Flt Ops Gen Seq01
Media Object File Flt Ops Gen Seq01
 
FINAL ROPS (1).pptx
FINAL ROPS (1).pptxFINAL ROPS (1).pptx
FINAL ROPS (1).pptx
 
Media Object File Flt Ops Sop Seq03
Media Object File Flt Ops Sop Seq03Media Object File Flt Ops Sop Seq03
Media Object File Flt Ops Sop Seq03
 
Media Object File Flt Ops Toff Dep Seq04
Media Object File Flt Ops Toff Dep Seq04Media Object File Flt Ops Toff Dep Seq04
Media Object File Flt Ops Toff Dep Seq04
 
Media Object File Flt Ops Toff Dep Seq06
Media Object File Flt Ops Toff Dep Seq06Media Object File Flt Ops Toff Dep Seq06
Media Object File Flt Ops Toff Dep Seq06
 
Media Object File Flt Ops Toff Dep Seq08
Media Object File Flt Ops Toff Dep Seq08Media Object File Flt Ops Toff Dep Seq08
Media Object File Flt Ops Toff Dep Seq08
 
On Landings Part I FAA P-8740-48.
 On Landings Part I  FAA P-8740-48. On Landings Part I  FAA P-8740-48.
On Landings Part I FAA P-8740-48.
 
Media Object File Flt Ops Sop Seq04
Media Object File Flt Ops Sop Seq04Media Object File Flt Ops Sop Seq04
Media Object File Flt Ops Sop Seq04
 
Stabilized Approach and Landing
Stabilized Approach and LandingStabilized Approach and Landing
Stabilized Approach and Landing
 
New sid and star phraseologies scenarios v2
New sid and star phraseologies scenarios v2New sid and star phraseologies scenarios v2
New sid and star phraseologies scenarios v2
 
Stage 2 ifh chapter 10 departures
Stage 2 ifh chapter 10 departuresStage 2 ifh chapter 10 departures
Stage 2 ifh chapter 10 departures
 
1 managing_threat.ppt
1 managing_threat.ppt1 managing_threat.ppt
1 managing_threat.ppt
 
Terminal Part 3
Terminal Part 3Terminal Part 3
Terminal Part 3
 

More from syed viquar

Media Object File Maint Bst Prac Seq01
Media Object File Maint Bst Prac Seq01Media Object File Maint Bst Prac Seq01
Media Object File Maint Bst Prac Seq01syed viquar
 
Media Object File Maint Hum Per Seq01
Media Object File Maint Hum Per Seq01Media Object File Maint Hum Per Seq01
Media Object File Maint Hum Per Seq01syed viquar
 
Media Object File Maint Hum Per Seq02
Media Object File Maint Hum Per Seq02Media Object File Maint Hum Per Seq02
Media Object File Maint Hum Per Seq02syed viquar
 
Media Object File Hyperlinks
Media Object File HyperlinksMedia Object File Hyperlinks
Media Object File Hyperlinkssyed viquar
 
Media Object File Flt Ops Sop Seq05
Media Object File Flt Ops Sop Seq05Media Object File Flt Ops Sop Seq05
Media Object File Flt Ops Sop Seq05syed viquar
 
Media Object File Flt Ops Hum Per Seq02
Media Object File Flt Ops Hum Per Seq02Media Object File Flt Ops Hum Per Seq02
Media Object File Flt Ops Hum Per Seq02syed viquar
 
Media Object File Flt Ops Rwy Ops Seq01
Media Object File Flt Ops Rwy Ops Seq01Media Object File Flt Ops Rwy Ops Seq01
Media Object File Flt Ops Rwy Ops Seq01syed viquar
 
Media Object File Flt Ops Gnd Hand Seq01
Media Object File Flt Ops Gnd Hand Seq01Media Object File Flt Ops Gnd Hand Seq01
Media Object File Flt Ops Gnd Hand Seq01syed viquar
 
Media Object File Flt Ops Hum Per Seq01
Media Object File Flt Ops Hum Per Seq01Media Object File Flt Ops Hum Per Seq01
Media Object File Flt Ops Hum Per Seq01syed viquar
 
Media Object File Flt Ops Ops Env Seq07
Media Object File Flt Ops Ops Env Seq07Media Object File Flt Ops Ops Env Seq07
Media Object File Flt Ops Ops Env Seq07syed viquar
 
Media Object File Flt Ops Supp Tech Seq01
Media Object File Flt Ops Supp Tech Seq01Media Object File Flt Ops Supp Tech Seq01
Media Object File Flt Ops Supp Tech Seq01syed viquar
 
Media Object File Flt Ops Sop Seq01
Media Object File Flt Ops Sop Seq01Media Object File Flt Ops Sop Seq01
Media Object File Flt Ops Sop Seq01syed viquar
 
Media Object File Flt Ops Supp Tech Seq07
Media Object File Flt Ops Supp Tech Seq07Media Object File Flt Ops Supp Tech Seq07
Media Object File Flt Ops Supp Tech Seq07syed viquar
 
Media Object File Flt Ops Ops Env Seq06
Media Object File Flt Ops Ops Env Seq06Media Object File Flt Ops Ops Env Seq06
Media Object File Flt Ops Ops Env Seq06syed viquar
 
Media Object File Flt Ops Ops Env Seq05
Media Object File Flt Ops Ops Env Seq05Media Object File Flt Ops Ops Env Seq05
Media Object File Flt Ops Ops Env Seq05syed viquar
 
Media Object File Flt Ops Hum Per Seq07
Media Object File Flt Ops Hum Per Seq07Media Object File Flt Ops Hum Per Seq07
Media Object File Flt Ops Hum Per Seq07syed viquar
 
Media Object File Flt Ops Fobn Seq02
Media Object File Flt Ops Fobn Seq02Media Object File Flt Ops Fobn Seq02
Media Object File Flt Ops Fobn Seq02syed viquar
 
Media Object File Flt Ops Fobn Seq03
Media Object File Flt Ops Fobn Seq03Media Object File Flt Ops Fobn Seq03
Media Object File Flt Ops Fobn Seq03syed viquar
 
Media Object File Flt Ops Adv Wx Seq02
Media Object File Flt Ops Adv Wx Seq02Media Object File Flt Ops Adv Wx Seq02
Media Object File Flt Ops Adv Wx Seq02syed viquar
 
Media Object File Flt Ops Adv Wx Seq07
Media Object File Flt Ops Adv Wx Seq07Media Object File Flt Ops Adv Wx Seq07
Media Object File Flt Ops Adv Wx Seq07syed viquar
 

More from syed viquar (20)

Media Object File Maint Bst Prac Seq01
Media Object File Maint Bst Prac Seq01Media Object File Maint Bst Prac Seq01
Media Object File Maint Bst Prac Seq01
 
Media Object File Maint Hum Per Seq01
Media Object File Maint Hum Per Seq01Media Object File Maint Hum Per Seq01
Media Object File Maint Hum Per Seq01
 
Media Object File Maint Hum Per Seq02
Media Object File Maint Hum Per Seq02Media Object File Maint Hum Per Seq02
Media Object File Maint Hum Per Seq02
 
Media Object File Hyperlinks
Media Object File HyperlinksMedia Object File Hyperlinks
Media Object File Hyperlinks
 
Media Object File Flt Ops Sop Seq05
Media Object File Flt Ops Sop Seq05Media Object File Flt Ops Sop Seq05
Media Object File Flt Ops Sop Seq05
 
Media Object File Flt Ops Hum Per Seq02
Media Object File Flt Ops Hum Per Seq02Media Object File Flt Ops Hum Per Seq02
Media Object File Flt Ops Hum Per Seq02
 
Media Object File Flt Ops Rwy Ops Seq01
Media Object File Flt Ops Rwy Ops Seq01Media Object File Flt Ops Rwy Ops Seq01
Media Object File Flt Ops Rwy Ops Seq01
 
Media Object File Flt Ops Gnd Hand Seq01
Media Object File Flt Ops Gnd Hand Seq01Media Object File Flt Ops Gnd Hand Seq01
Media Object File Flt Ops Gnd Hand Seq01
 
Media Object File Flt Ops Hum Per Seq01
Media Object File Flt Ops Hum Per Seq01Media Object File Flt Ops Hum Per Seq01
Media Object File Flt Ops Hum Per Seq01
 
Media Object File Flt Ops Ops Env Seq07
Media Object File Flt Ops Ops Env Seq07Media Object File Flt Ops Ops Env Seq07
Media Object File Flt Ops Ops Env Seq07
 
Media Object File Flt Ops Supp Tech Seq01
Media Object File Flt Ops Supp Tech Seq01Media Object File Flt Ops Supp Tech Seq01
Media Object File Flt Ops Supp Tech Seq01
 
Media Object File Flt Ops Sop Seq01
Media Object File Flt Ops Sop Seq01Media Object File Flt Ops Sop Seq01
Media Object File Flt Ops Sop Seq01
 
Media Object File Flt Ops Supp Tech Seq07
Media Object File Flt Ops Supp Tech Seq07Media Object File Flt Ops Supp Tech Seq07
Media Object File Flt Ops Supp Tech Seq07
 
Media Object File Flt Ops Ops Env Seq06
Media Object File Flt Ops Ops Env Seq06Media Object File Flt Ops Ops Env Seq06
Media Object File Flt Ops Ops Env Seq06
 
Media Object File Flt Ops Ops Env Seq05
Media Object File Flt Ops Ops Env Seq05Media Object File Flt Ops Ops Env Seq05
Media Object File Flt Ops Ops Env Seq05
 
Media Object File Flt Ops Hum Per Seq07
Media Object File Flt Ops Hum Per Seq07Media Object File Flt Ops Hum Per Seq07
Media Object File Flt Ops Hum Per Seq07
 
Media Object File Flt Ops Fobn Seq02
Media Object File Flt Ops Fobn Seq02Media Object File Flt Ops Fobn Seq02
Media Object File Flt Ops Fobn Seq02
 
Media Object File Flt Ops Fobn Seq03
Media Object File Flt Ops Fobn Seq03Media Object File Flt Ops Fobn Seq03
Media Object File Flt Ops Fobn Seq03
 
Media Object File Flt Ops Adv Wx Seq02
Media Object File Flt Ops Adv Wx Seq02Media Object File Flt Ops Adv Wx Seq02
Media Object File Flt Ops Adv Wx Seq02
 
Media Object File Flt Ops Adv Wx Seq07
Media Object File Flt Ops Adv Wx Seq07Media Object File Flt Ops Adv Wx Seq07
Media Object File Flt Ops Adv Wx Seq07
 

Recently uploaded

Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 

Recently uploaded (20)

Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 

Media Object File Flt Ops Desc Seq02

  • 1. Descent Management Flight Operations Briefing Notes Descent and Approach Profile Management Flight Operations Briefing Notes Descent Management Descent and Approach Profile Management I Introduction Inadequate management of descent-and-approach profile and/or incorrect management of aircraft energy level may lead to: • Loss of vertical situational awareness; and/or, • Rushed and unstabilized approaches. Either situation increases the risk of approach-and-landing accidents, including those involving CFIT. II Statistical Data Approximately 70 % of rushed and unstable approaches involve an inadequate management of the descent-and-approach profile and/or an incorrect management of energy level; this includes: • Aircraft higher or lower than the desired vertical flight path; and/or, • Aircraft faster or slower than the desired airspeed. III Best Practices and Guidelines To prevent delay in initiating the descent and to ensure an optimum management of descent-and-approach profile, descent preparation and approach briefings should be initiated when pertinent data have been received (e.g ATIS, …), and completed before the top-of-descent (typically 10 minutes before). Page 1 of 6
  • 2. Descent Management Flight Operations Briefing Notes Descent and Approach Profile Management Descent Preparation Insert a realistic FMS flight plan built up from the arrival expected to be flown. If, for example, a standard terminal arrival route (STAR) is inserted in the FMS flight plan but is not expected to be flown, because of anticipated radar vectors, the STAR should be revised (i.e. The track-distance, altitude restrictions and/or speed restrictions) according to pilot’s expectations so as to allow the FMS adjustment of the top-of- descent point; and, Wind forecast should be entered (as available) on the appropriate FMS page, at waypoints close to the top-of-descent point and along the descent profile in order to get a realistic top-of-descent. Descent and Approach Briefing The missed approach should be considered as being part of the approach. It may be part of the FMS flight plan, and it should be reviewed against the applicable approach chart. Descent Initiation If descent initiation is delayed by ATC, reduce speed as appropriate to minimize the impact on the descent profile (i.e. to be in a better position to recapture the nominal descent profile). Navigation Accuracy Check If FMS navigation accuracy does not meet the applicable criteria for terminal area navigation or approach, no descent should be made below the MEA or below the sector MSA without prior confirmation of the aircraft position, using navaids raw-data. Then, the descent will be continued using raw-data as aircraft position reference (e.g. navaids, DME, …). Descent Profile Monitoring Descent profile should be monitored, using all available instrument and chart references: • FMS vertical-deviation indication, as applicable; • Navaids and instruments raw-data; and, • Charted descent-and-approach profile. Wind conditions and wind changes should be monitored closely to anticipate any reduction in head wind component or increase in tail wind component, and to adjust the flight path profile in a timely manner. The descent profile may be monitored and adjusted based on a typical 3000 ft per 10 nm descent gradient (corrected for the prevailing head wind component or tail wind Page 2 of 6
  • 3. Descent Management Flight Operations Briefing Notes Descent and Approach Profile Management component), while complying with the required altitude and/or speed restrictions (i.e., ensuring adequate deceleration management). The flight path vector, as available, can be used to monitor the descent profile by checking that the remaining track-distance to touchdown (in nm) is approximately equal to the FL divided by the flight-path-angle (FPA, in degrees): Distance-to-go (nm) = FL / FPA (degrees) Note: In the above rule of thumb, the FL should be understood as the FL difference (Δ FL) between the current aircraft FL and the airfield FL. Below 10 000 ft, flying at 250 kt IAS, the following rules of thumb may be used to confirm the descent profile and ensure a smooth transition between the various phases of the approach: • 9000 ft above airport elevation at 30 nm from touchdown; and, • 3000 ft above airport elevation at 15 nm from touchdown (to account for deceleration and slats/flaps extension). Descent Profile Adjustment/Recovery If flight path is significantly above the desired descent profile (e.g. because of an ATC constraint or a higher-than-anticipated tail wind), to recover the desired flight path: • Revert, if necessary, from FMS vertical navigation to a selected vertical mode, with an appropriate speed target; • Maintain a high airspeed as long as practical and possible (e.g., in accordance with ATC speed constraint); • Extend speed brakes (as allowed by SOPs depending on airspeed and configuration, keeping preferably one hand on the speed brakes handle until speed brakes are retracted); • Extend landing gear, if the use of speed brakes is not sufficient; • Notify ATC, for timely coordination, that the aircraft is unable to recover the desired flight path, as soon as it is ascertained; • As a last resort, perform a 360-degree descending turn (as practical and cleared by ATC). Maintain close reference to instruments throughout the turn to monitor and control the rate of descent, bank angle and position, to prevent: − Loss of control; − CFIT; or, Page 3 of 6
  • 4. Descent Management Flight Operations Briefing Notes Descent and Approach Profile Management − Overshoot of the localizer and/or of the extended runway centerline. Refer to the Flight Operations Briefing Note Aircraft Energy Management during Approach for additional information. Concept of Next Target and Decision Gates Throughout the entire flight a next target should be defined, in order to stay ahead of the aircraft at all times. The next target should be any required combination of one or more of the following elements: • A position; • An altitude; • A configuration; • A speed; • A vertical speed (as applicable); and, • A power setting (e.g. thrust is stabilized, usually above idle, to maintain the target approach speed along the desired final approach path). If it is anticipated that one or more element(s) of the next target will not be met, the required corrective action(s) should be taken without delay. During the approach and landing, the successive next targets should constitute gates that should be met for the approach to be continued. The Final Approach Fix (FAF), the Outer Marker (OM) or an equivalent fix (as applicable) constitute an assessment gate to confirm the readiness to proceed further. The minimum stabilization height should constitute a particular gate (i.e. decision gate) along the final approach. If the aircraft is not stabilized on the approach path in landing configuration, at the minimum stabilization height, a go-around must be initiated unless the crew estimates that only small corrections are necessary to rectify minor deviations from stabilized conditions due, amongst others, to external perturbations. The Flight Operations Briefing Note Flying Stabilized Approaches describes: • All the elements of a stabilized approach; and, • The flight parameter exceedance callouts performed by the PNF if one flight parameter exceeds the criteria defined for one of the elements of a stabilized approach. Page 4 of 6
  • 5. Descent Management Flight Operations Briefing Notes Descent and Approach Profile Management IV Adverse Factors and Typical Errors The following factors and working errors often are observed during transition and line training: • Late, therefore rushed descent, approach preparation and briefing, resulting in the omission of important items; • Failure to cross-check FMS data entries; • Failure to account for track-distance differences between expected routing and actual routing (i.e., STAR versus radar vectors); • Distraction leading to or resulting from a two-heads-down situation; • Failure to resolve ambiguities, doubts or disagreements; • Failure to effectively monitor the descent progress using all available instrument references (e.g., failure to monitor wind conditions and/or wind changes); and/or, • Use of inappropriate technique to recover the descent profile. V Summary of Key Points The following key points should be emphasized during transition training and line training as well as during line checks and line audits: • Timeliness of descent and approach preparation; • Strict adherence to SOPs for FMS setup; • Cross-check of all data entries by both crewmembers; • Use of PFD, ND and FMS CDU to support and illustrate the descent, approach and go-around briefings; • Confirmation of FMS navigation accuracy, before deciding the use of automation (i.e., use of FMS modes or selected modes) and of associated monitoring cues (e.g. ND Rose NAV or Rose VOR, needles, VDEV, …) for the descent and approach; • Review of terrain information and other approach hazards; and, • Guidelines for descent planning, monitoring and adjustment. VI Associated Flight Operations Briefing Notes The following Flight Operations Briefing Notes may be referred to for a complete overview of the procedures, operational recommendations and techniques involved in the conduct of the descent and approach: • Conducting Effective Briefings • Aircraft Energy Management during Approach • Flying Stabilized Approaches • Being Prepared for Go-around Page 5 of 6
  • 6. Descent Management Flight Operations Briefing Notes Descent and Approach Profile Management VII Regulatory References • ICAO – Procedures for Air navigation Services – Aircraft Operations (PANS-OPS, Doc 8168), Volume I – Flight procedures VIII Airbus References • Flight Crew Operating Manuals (FCOM) – Standard Operating Procedures – Descent – Descent Monitoring & Descent Adjustment • A320 Family and A330/A340 Family Flight Crew Training Manuals (FCTM) – Normal Operations – Descent – Guidance and Monitoring This Flight Operations Briefing Note (FOBN) has been adapted from the corresponding ALAR Briefing Note developed by Airbus in the frame of the Approach-and-Landing Accident Reduction (ALAR) international task force led by the Flight Safety Foundation. This FOBN is part of a set of Flight Operations Briefing Notes that provide an overview of the applicable standards, flying techniques and best practices, operational and human factors, suggested company prevention strategies and personal lines-of-defense related to major threats and hazards to flight operations safety. This FOBN is intended to enhance the reader's flight safety awareness but it shall not supersede the applicable regulations and the Airbus or airline's operational documentation; should any deviation appear between this FOBN and the Airbus or airline’s AFM / (M)MEL / FCOM / QRH / FCTM, the latter shall prevail at all times. In the interest of aviation safety, this FOBN may be reproduced in whole or in part - in all media - or translated; any use of this FOBN shall not modify its contents or alter an excerpt from its original context. Any commercial use is strictly excluded. All uses shall credit Airbus and the Flight Safety Foundation. Airbus shall have no liability or responsibility for the use of this FOBN, the correctness of the duplication, adaptation or translation and for the updating and revision of any duplicated version. Airbus Customer Services Flight Operations Support and Services 1 Rond Point Maurice Bellonte - 31707 BLAGNAC CEDEX France FOBN Reference : FLT_OPS – DESC – SEQ02– REV03 – OCT. 2006 Page 6 of 6