This document outlines the curriculum and syllabus for eight semesters of the Bachelor of Engineering in Mechanical Engineering program at Anna University, Chennai. It provides details of the courses offered each semester, including course codes, titles, lecture hours, tutorial hours, practical hours and credits. Some key courses covered include engineering physics, mathematics, strength of materials, thermodynamics, fluid mechanics, heat transfer, machine design, manufacturing processes, and more. The document also lists available elective courses that can be taken in the sixth and seventh semesters, and specifies the total number of credits required to earn the degree.