SlideShare a Scribd company logo
MATTHEW DEAN
Real Estate Development Professional
VALUE ADD
EXPERIENCE & CASE STUDIES
Updated September 2015
VALUE ADD :: ::
:: Areas of expertise ::
 Real Estate Development & Placemaking
 Property Due Diligence & Acquisitions
 Land Entitlements
 Master-Planned Community Development
 Land, Residential, & Mixed-Use Development
 Project Management / Construction Management
 Land Department Leadership
 Over 20-years experience leading the
development of over 25,000-acres & 3M SF
in excess of $1.5B in total cost
 Due diligence & pre-acquisition feasibility
on over 300 real estate assets
peopleplaces
places
process
:: Areas of expertise ::
 Leadership & Teamwork
 Directing cross-functional project teams, including land
development, vertical construction, marketing & sales
 Managing the land department for private real estate
investor/developers and homebuilder operating divisions
 Industry Best Practices, Project Staffing, & Training
 Integrity – “Do what you say you are going to do”
 Community Involvement
 Habitat for Humanity Land Committee
 Urban Land Institute Member
 Vail/Beaver Creek Buddy Werner League Ski Coach
people
VALUE ADD :: ::peopleplaces process
:: Areas of expertise ::
 Overall Real Estate Investment Lifecycle Experience
 Site Selections & Acquisitions
 Due Diligence & Feasibility Analysis
 Joint Venture Partnerships
 ProForma, Budget, & Schedule Management
 Project Visioning, Programming, & Planning
 Land Entitlements & Permitting
 Assembling & Managing Design Consultants
 Real Estate Development
 Land Development Contractor Management
 Vertical Construction Management
 Value Adding & Value Engineering
 Land Dispositions & Builder Negotiations
 Community Governing Documents
 HOA, ARC, & Metropolitan District Boards
process
VALUE ADD :: ::people processplaces
EXPERIENCE & CASE STUDIES
I. Industry Best Practices
II. Real Estate Development & Placemaking
III. Partnering & Joint Ventures
IV. Land Entitlements
V. Mixed-Use Development
VI. Project Visioning & Planning
Matthew Dean
I. Industry Best Practices
LAND DEVELOPMENT PRACTICES MANUAL & TRAINING PROGRAM
Role: Regional Director of Land Development for Centex Destination Properties
I. Industry Best Practices
Module 1: Overview of LD Practices Manual & Training Program
Module 2: Land Acquisition Contracting
Module 3: Due Diligence & Feasibility Review
Module 4: ProForma Development
Module 5: Land Development Consultant Contracting & Services Agreements
Module 6: Land Development Design & Permitting
Module 7: Land Development Bidding
Module 8: Land Development “SAVE” – Produced $22M in savings over 2 year period
Module 9: Land Development Construction Contracting & Construction Agreements
Module 10: Budget, Contract, & Schedule Management
Module 11: Land Development Construction
Module 12: Storm Water Compliance Process
Module 13: Customer Satisfaction & CDP Lot Orientation Process
II. Real Estate Development & Placemaking: MUELLER
Location: 3 miles north of downtown Austin, Texas
Employer: Catellus Development Corporation
Role: Vice President of Development
Project summary:
 700-acre, mixed-use New Urbanist master planned community
 Public-private partnership between the City of Austin & Catellus
 Redevelopment of Robert Mueller Municipal Airport
 At full build-out will include 6,200 residences, 3.6M SF of office
space, 750,000 SF of retail space, 140 acres of parks & open
space, and over 13 miles of hike and bike trails
 Town Center (Aldrich Street District) including a fully integrated
mix of residential, condominium, multi-family, commercial,
retail, office, restaurant, entertainment, and hotel uses
Project involvement:
 Lead the residential program and land dispositions
 Sold over $30M in land to national homebuilders, custom
homebuilders, and private developers
 Town Center planning, development, and land sales
 New Construction Council (design review board) member
II. Real Estate Development & Placemaking: MUELLER
II. Real Estate Development & Placemaking: MUELLER
Aldrich Street District Town Center
II. Real Estate Development & Placemaking: CORDILLERA
Location: Vail Valley, Colorado
Employer: The Cordillera Group
Role: Vice President of Community Development
Project summary:
 7,500-acre mountain residential community
 1,100 single-family homes & homesites
 Three, 18-hole golf courses designed by
Jack Nicklaus, Hale Irwin, & Tom Fazio
 10-hole short course designed by Dave Pelz
 Five-star, 56-room Lodge & Spa at Cordillera
 Several amenity facilities & restaurants
Project involvement:
 Residential development
 Land development
 Entitlements & permitting
 Subdivision platting & HOA formations
 Managed staff, including land development,
construction, marketing, & sales brokers
 Community governing documents
 Land dispositions to private developers and
national homebuilders
 Architectural Design Review Board member
 Metropolitan District Board member
 Cordillera Group Executive Forum member
II. Real Estate Development & Placemaking: CORDILLERA
II. Real Estate Development & Placemaking: CORDILLERA
Project: GreyHawk at Cordillera
Builder: The Cordillera Group
Project summary:
 Enclave of 15 single-
family homes
 4,500 SF each
 $900K to $1.3M each
 True timber-frame
construction
Project involvement:
 Directed land
development, vertical
construction,
marketing, & sales
 Product programming
& design management
 Proforma, budget, &
schedule management
 HOA creation
& homeowner
turnover
II. Real Estate Development & Placemaking: CORDILLERA
Project: GreyHawk at Cordillera
II. Real Estate Development & Placemaking: CORDILLERA
Location: Grand County, Colorado
Employer: The Atira Group
Role: Development Principal
Project summary:
 5,000-acre master-planned residential community
 4,300 homesites, single-family homes, custom homes,
cabins, duplexes, condominiums, & lodging
 Located 15-minutes north of Winter Park
 Ski mountain (SolVista Ski Basin)
 30,000 SF Base Ski Lodge & Pub
 18-hole Nicklaus Headwaters Golf Course
 4-miles private fishing access on Fraser River
 Open space & community trails system
 Mountain bike park
Project involvement:
 Amenity facility programming & development:
- Directed major renovation to base ski lodge & pub
- Lead the visioning, programming, development, &
construction of several amenity facilities, including base
ski lodge, golf clubhouse, and community amenity buildings
 Developed several infill single & multi-family
residential neighborhoods within the community
 Land dispositions to private developers and
national homebuilders
II. Real Estate Development & Placemaking: GRANBY RANCH
II. Real Estate Development & Placemaking: GRANBY RANCH
II. Real Estate Development & Placemaking: GRANBY RANCH
Project: Base Ski Lodge Remodel & Golf Clubhouse Planning
Builder: Granby Ranch Partners, LLC
II. Real Estate Development & Placemaking: GRANBY RANCH
II. Real Estate Development & Placemaking : THE HOLLOWS
Location: Lake Travis – Austin, Texas
Employer: Centex Destination Properties
Role: Regional Director of Land Development
Project summary:
 Located on Lake Travis in the Texas Hill Country
about one-hour north of Austin, Texas
 2,500-acre lake-front residential community
 Mixed-use & resort master-planned community
 Deep water marina with private boat slips
 Lake-front beach club, pools, & fitness center
 Amphitheater & sundecks
 Several restaurants & community amenity facilities
 Kayak club & boat house
 Extensive community trails & trailhead facilities
Project involvement:
 Property due diligence & land acquisitions
 Project visioning, programming, & planning
 Amenity facility programming & development
 ProForma, budget, & schedule management
 Assembled & managed design consultant &
development team – land planners, architects,
environmental, land development, etc.
 Land development permitting
 Project staffing & training
 Directed value engineering workshops
II. Real Estate Development & Placemaking : THE HOLLOWS
II. Real Estate Development & Placemaking : THE HOLLOWS
II. Real Estate Development & Placemaking : POINTE WEST
Location: Galveston Island, Texas
Employer: Centex Destination Properties
Role: Regional Director of Land Development
Project summary:
 Located on western-most end of
Galveston Island, Texas
 1,100-acre waterfront residential community
 Fronts both Gulf of Mexico & Galveston Bay
 Mixed-use & resort master-planned community
 Deep water marina with private boat slips
 Beach club & fitness center
 Ecotourism wildlife conservation area
 Several restaurants & community amenity facilities
 Extensive community trails & trailhead facilities
Project involvement:
 Property due diligence & land acquisitions
 Project visioning, programming, & planning
 Amenity facility programming & development
 ProForma, budget, & schedule management
 Assembled & managed design consultant &
development team – land planners, architects,
environmental, land development, etc.
 Land development permitting
 Project staffing & training
 Directed value engineering workshops
II. Real Estate Development & Placemaking : POINTE WEST
III. Partnering & Joint Ventures: HIDDEN CANYON RANCH
Location: Powell Butte - Bend, Oregon
Employer: The Atira Group
Role: Development Principal
Project summary:
 Located 30-minutes northeast of Bend, Oregon
 4,150-acre master-planned residential community
 Approved total density of 3,150 dwelling units
 Permitted for 36 holes of golf & golf facilities
 Mixed-use town village
 Other planned amenities included equestrian
facilities, neighborhood parks, recreation
center, network of trails, & open space
 Spectacular mountain views to the west of
Mt. Bachelor & Three Sisters
Project involvement:
 Created joint venture partnership
 Fostered relationships with landowner and
managed joint venture deal structure
 Comprehensive due diligence review
 Project visioning, programming, & planning
 Concept to add value through leveraging strengths:
- Pahlisch Homes as prominent homebuilder in local market
- The Atira Group as experienced community developer
- S&P Destination Properties as seasoned marketing & sales
III. Partnering & Joint Ventures: HIDDEN CANYON RANCH
IV. Land Entitlements: BACHELOR SPRINGS
Location: Arrowhead at the base of Bachelor Gulch – Avon, Colorado
Employer: Summit Habitats, Inc. / Treat Development
Role: Development Project Manager
Project summary:
 26-duplex unit, residential infill development
 10-acre site originally designated as Eagle County
“Buffer Zone” requiring upzoning entitlements
 2,100 to 2,400 SF per duplex home
Project involvement:
 Pre-acquisition site due diligence
 Fostered relationships with landowners
 Land acquisition contracting
 Obtained public upzoning entitlements
with local jurisdiction, including:
- Planned Unit Development rezoning/upzoning
- Change of land use designation
- Increase in allowable density from 3 to 26 units
- Subdivision platting
 Assembled & managed design consultant
team – land planner, architect, sitework, etc.
 Directed land development operations –
utilities extensions, sitework, managed site
contractors, etc.
IV. Land Entitlements: BACHELOR SPRINGS
V. Mixed-Use Development: RIVERWALK
Location: Riverwalk at Edwards – Edwards, Colorado
Employer: Summit Habitats, Inc. / Treat Development
Role: Development Project Manager
Project summary:
 The Inn at Riverwalk and 1st & Main – 150,000 SF
 Mixed-use infill development project, including
hotel, commercial, retail, office, & several restaurants
 Two buildings within the 900,000 SF Riverwalk at
Edwards commercial village project
 Pedestrian oriented village connecting to Eagle
County public ECO Trails system
Project involvement:
 Pre-acquisition site due diligence
 Project visioning, programming, & planning
 Assembled & managed design consultant
team – land planners, architects, & interiors
 Proforma, budget, & schedule management
 Managed all general construction, including
land development, vertical construction,
subcontractors, contract negotiations, site
superintendents, and tenant improvements
Project: The Inn at Riverwalk and 1st & Main
V. Mixed-Use Development: RIVERWALK
VI. Project Visioning & Planning: SUGARBUSH RESORT
Location: Warren, Vermont
Employer: The Atira Group
Role: Development Principal
Project summary:
 4,000-acre ski resort & mixed-use
residential community
 Two interconnected ski areas –
Lincoln Peak & Mount Ellen
 Key amenities include ski resort, base
skier facilities, 18-hole golf course,
hospitality, lodging, & trails system
Project involvement:
 Lead the creation of a “Vision Plan”
outlining a 20-year vision and
development plan for the resort
 Directed the planning & design of a
new base area village, including ski
schools, sales center, & skier facilities
 Comprehensive due diligence review
of entitlements, existing conditions,
& feasibility of new development
for joint venture partnership
VI. Project Visioning & Planning: SUGARBUSH RESORT

More Related Content

Viewers also liked

Academic work_Portfolio
Academic work_PortfolioAcademic work_Portfolio
Academic work_Portfolio
Nazia Farnaz
 
Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...
Virtual ULI
 
Sharmeen Shahid-Portfolio
Sharmeen Shahid-PortfolioSharmeen Shahid-Portfolio
Sharmeen Shahid-Portfolio
Sharmeen Shahid
 
Commercial Real Estate Financial Analysis
Commercial Real Estate Financial AnalysisCommercial Real Estate Financial Analysis
Commercial Real Estate Financial Analysis
Rod Medallon
 
Real Estate Development Modeling Basics
Real Estate Development Modeling BasicsReal Estate Development Modeling Basics
Real Estate Development Modeling Basics
Real Estate Financial Modeling
 
N ational tourism development plan
N ational tourism development planN ational tourism development plan
N ational tourism development plan
Reymarie Oohlala
 
introduction to commercial real estate development
introduction to commercial real estate developmentintroduction to commercial real estate development
introduction to commercial real estate development
PMILebanonChapter
 
Belapur Incremental housing - A case study
Belapur Incremental housing - A case studyBelapur Incremental housing - A case study
Belapur Incremental housing - A case study
Rithika Ravishankar
 
planning resort planning
planning resort planningplanning resort planning
planning resort planning
arq0407 Quinones
 

Viewers also liked (9)

Academic work_Portfolio
Academic work_PortfolioAcademic work_Portfolio
Academic work_Portfolio
 
Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...
 
Sharmeen Shahid-Portfolio
Sharmeen Shahid-PortfolioSharmeen Shahid-Portfolio
Sharmeen Shahid-Portfolio
 
Commercial Real Estate Financial Analysis
Commercial Real Estate Financial AnalysisCommercial Real Estate Financial Analysis
Commercial Real Estate Financial Analysis
 
Real Estate Development Modeling Basics
Real Estate Development Modeling BasicsReal Estate Development Modeling Basics
Real Estate Development Modeling Basics
 
N ational tourism development plan
N ational tourism development planN ational tourism development plan
N ational tourism development plan
 
introduction to commercial real estate development
introduction to commercial real estate developmentintroduction to commercial real estate development
introduction to commercial real estate development
 
Belapur Incremental housing - A case study
Belapur Incremental housing - A case studyBelapur Incremental housing - A case study
Belapur Incremental housing - A case study
 
planning resort planning
planning resort planningplanning resort planning
planning resort planning
 

Similar to MATT DEAN PORTFOLIO - Real Estate Development Professional - SEPT 2015

Land Conservation and Tree Preservation Awards Ceremony
Land Conservation and Tree Preservation Awards CeremonyLand Conservation and Tree Preservation Awards Ceremony
Land Conservation and Tree Preservation Awards Ceremony
Fairfax County
 
Usingurbanrenewalplanstoattractprivatedevelopment
UsingurbanrenewalplanstoattractprivatedevelopmentUsingurbanrenewalplanstoattractprivatedevelopment
Usingurbanrenewalplanstoattractprivatedevelopment
Southern New England American Planning Association
 
RAL Project Overview 10052015a
RAL Project Overview 10052015aRAL Project Overview 10052015a
RAL Project Overview 10052015a
Ron Lindsey
 
Banker's Hill Development in San Diego, CA
Banker's Hill Development in San Diego, CABanker's Hill Development in San Diego, CA
Banker's Hill Development in San Diego, CA
Melissa Day
 
Resume
ResumeResume
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profile
pheyer351
 
ABACUS Statement of Qualifications
ABACUS Statement of QualificationsABACUS Statement of Qualifications
ABACUS Statement of Qualifications
Jonovich
 
2012 State of Downtown Luncheon
2012 State of Downtown Luncheon2012 State of Downtown Luncheon
2012 State of Downtown Luncheon
Becentro Bedowntown
 
Fairfax County Land Conservation Awards 2016
Fairfax County Land Conservation Awards 2016Fairfax County Land Conservation Awards 2016
Fairfax County Land Conservation Awards 2016
Fairfax County
 
Js Resume 2010font
Js Resume 2010fontJs Resume 2010font
Js Resume 2010font
jeanstolzman
 
Eastwood Village Public Private partnership
Eastwood Village Public Private partnershipEastwood Village Public Private partnership
Eastwood Village Public Private partnership
DennisChurch
 
M mc d consultant resume template
M mc d consultant resume templateM mc d consultant resume template
M mc d consultant resume template
michaela.mcdonald
 
Avi portfolio 1
Avi portfolio 1Avi portfolio 1
Avi portfolio 1
Avi Nagel
 
ELinn portfolio
ELinn portfolioELinn portfolio
ELinn portfolio
Elaine Linn
 
ResumeMatthewLindley060315
ResumeMatthewLindley060315ResumeMatthewLindley060315
ResumeMatthewLindley060315
Matt Lindley
 
Noisette Community
Noisette CommunityNoisette Community
Noisette Community
socialmonkey
 
Cv And Portfolio March 2008 Small
Cv And Portfolio March 2008 SmallCv And Portfolio March 2008 Small
Cv And Portfolio March 2008 Small
markraeburn
 
Property Development Modelling. Helios Apartments - Bahamas
Property Development Modelling. Helios Apartments - BahamasProperty Development Modelling. Helios Apartments - Bahamas
Property Development Modelling. Helios Apartments - Bahamas
Gintautas Matukaitis
 
Richard E Smith resume storage 12-17-14
Richard E Smith resume storage  12-17-14Richard E Smith resume storage  12-17-14
Richard E Smith resume storage 12-17-14
Richard Smith
 
Stan Shipley Folio 11jly01
Stan Shipley   Folio 11jly01Stan Shipley   Folio 11jly01
Stan Shipley Folio 11jly01
stan_shipley
 

Similar to MATT DEAN PORTFOLIO - Real Estate Development Professional - SEPT 2015 (20)

Land Conservation and Tree Preservation Awards Ceremony
Land Conservation and Tree Preservation Awards CeremonyLand Conservation and Tree Preservation Awards Ceremony
Land Conservation and Tree Preservation Awards Ceremony
 
Usingurbanrenewalplanstoattractprivatedevelopment
UsingurbanrenewalplanstoattractprivatedevelopmentUsingurbanrenewalplanstoattractprivatedevelopment
Usingurbanrenewalplanstoattractprivatedevelopment
 
RAL Project Overview 10052015a
RAL Project Overview 10052015aRAL Project Overview 10052015a
RAL Project Overview 10052015a
 
Banker's Hill Development in San Diego, CA
Banker's Hill Development in San Diego, CABanker's Hill Development in San Diego, CA
Banker's Hill Development in San Diego, CA
 
Resume
ResumeResume
Resume
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profile
 
ABACUS Statement of Qualifications
ABACUS Statement of QualificationsABACUS Statement of Qualifications
ABACUS Statement of Qualifications
 
2012 State of Downtown Luncheon
2012 State of Downtown Luncheon2012 State of Downtown Luncheon
2012 State of Downtown Luncheon
 
Fairfax County Land Conservation Awards 2016
Fairfax County Land Conservation Awards 2016Fairfax County Land Conservation Awards 2016
Fairfax County Land Conservation Awards 2016
 
Js Resume 2010font
Js Resume 2010fontJs Resume 2010font
Js Resume 2010font
 
Eastwood Village Public Private partnership
Eastwood Village Public Private partnershipEastwood Village Public Private partnership
Eastwood Village Public Private partnership
 
M mc d consultant resume template
M mc d consultant resume templateM mc d consultant resume template
M mc d consultant resume template
 
Avi portfolio 1
Avi portfolio 1Avi portfolio 1
Avi portfolio 1
 
ELinn portfolio
ELinn portfolioELinn portfolio
ELinn portfolio
 
ResumeMatthewLindley060315
ResumeMatthewLindley060315ResumeMatthewLindley060315
ResumeMatthewLindley060315
 
Noisette Community
Noisette CommunityNoisette Community
Noisette Community
 
Cv And Portfolio March 2008 Small
Cv And Portfolio March 2008 SmallCv And Portfolio March 2008 Small
Cv And Portfolio March 2008 Small
 
Property Development Modelling. Helios Apartments - Bahamas
Property Development Modelling. Helios Apartments - BahamasProperty Development Modelling. Helios Apartments - Bahamas
Property Development Modelling. Helios Apartments - Bahamas
 
Richard E Smith resume storage 12-17-14
Richard E Smith resume storage  12-17-14Richard E Smith resume storage  12-17-14
Richard E Smith resume storage 12-17-14
 
Stan Shipley Folio 11jly01
Stan Shipley   Folio 11jly01Stan Shipley   Folio 11jly01
Stan Shipley Folio 11jly01
 

MATT DEAN PORTFOLIO - Real Estate Development Professional - SEPT 2015

  • 1. MATTHEW DEAN Real Estate Development Professional VALUE ADD EXPERIENCE & CASE STUDIES Updated September 2015
  • 2. VALUE ADD :: :: :: Areas of expertise ::  Real Estate Development & Placemaking  Property Due Diligence & Acquisitions  Land Entitlements  Master-Planned Community Development  Land, Residential, & Mixed-Use Development  Project Management / Construction Management  Land Department Leadership  Over 20-years experience leading the development of over 25,000-acres & 3M SF in excess of $1.5B in total cost  Due diligence & pre-acquisition feasibility on over 300 real estate assets peopleplaces places process
  • 3. :: Areas of expertise ::  Leadership & Teamwork  Directing cross-functional project teams, including land development, vertical construction, marketing & sales  Managing the land department for private real estate investor/developers and homebuilder operating divisions  Industry Best Practices, Project Staffing, & Training  Integrity – “Do what you say you are going to do”  Community Involvement  Habitat for Humanity Land Committee  Urban Land Institute Member  Vail/Beaver Creek Buddy Werner League Ski Coach people VALUE ADD :: ::peopleplaces process
  • 4. :: Areas of expertise ::  Overall Real Estate Investment Lifecycle Experience  Site Selections & Acquisitions  Due Diligence & Feasibility Analysis  Joint Venture Partnerships  ProForma, Budget, & Schedule Management  Project Visioning, Programming, & Planning  Land Entitlements & Permitting  Assembling & Managing Design Consultants  Real Estate Development  Land Development Contractor Management  Vertical Construction Management  Value Adding & Value Engineering  Land Dispositions & Builder Negotiations  Community Governing Documents  HOA, ARC, & Metropolitan District Boards process VALUE ADD :: ::people processplaces
  • 5. EXPERIENCE & CASE STUDIES I. Industry Best Practices II. Real Estate Development & Placemaking III. Partnering & Joint Ventures IV. Land Entitlements V. Mixed-Use Development VI. Project Visioning & Planning Matthew Dean
  • 6. I. Industry Best Practices LAND DEVELOPMENT PRACTICES MANUAL & TRAINING PROGRAM Role: Regional Director of Land Development for Centex Destination Properties
  • 7. I. Industry Best Practices Module 1: Overview of LD Practices Manual & Training Program Module 2: Land Acquisition Contracting Module 3: Due Diligence & Feasibility Review Module 4: ProForma Development Module 5: Land Development Consultant Contracting & Services Agreements Module 6: Land Development Design & Permitting Module 7: Land Development Bidding Module 8: Land Development “SAVE” – Produced $22M in savings over 2 year period Module 9: Land Development Construction Contracting & Construction Agreements Module 10: Budget, Contract, & Schedule Management Module 11: Land Development Construction Module 12: Storm Water Compliance Process Module 13: Customer Satisfaction & CDP Lot Orientation Process
  • 8. II. Real Estate Development & Placemaking: MUELLER Location: 3 miles north of downtown Austin, Texas Employer: Catellus Development Corporation Role: Vice President of Development Project summary:  700-acre, mixed-use New Urbanist master planned community  Public-private partnership between the City of Austin & Catellus  Redevelopment of Robert Mueller Municipal Airport  At full build-out will include 6,200 residences, 3.6M SF of office space, 750,000 SF of retail space, 140 acres of parks & open space, and over 13 miles of hike and bike trails  Town Center (Aldrich Street District) including a fully integrated mix of residential, condominium, multi-family, commercial, retail, office, restaurant, entertainment, and hotel uses Project involvement:  Lead the residential program and land dispositions  Sold over $30M in land to national homebuilders, custom homebuilders, and private developers  Town Center planning, development, and land sales  New Construction Council (design review board) member
  • 9. II. Real Estate Development & Placemaking: MUELLER
  • 10. II. Real Estate Development & Placemaking: MUELLER Aldrich Street District Town Center
  • 11. II. Real Estate Development & Placemaking: CORDILLERA Location: Vail Valley, Colorado Employer: The Cordillera Group Role: Vice President of Community Development Project summary:  7,500-acre mountain residential community  1,100 single-family homes & homesites  Three, 18-hole golf courses designed by Jack Nicklaus, Hale Irwin, & Tom Fazio  10-hole short course designed by Dave Pelz  Five-star, 56-room Lodge & Spa at Cordillera  Several amenity facilities & restaurants Project involvement:  Residential development  Land development  Entitlements & permitting  Subdivision platting & HOA formations  Managed staff, including land development, construction, marketing, & sales brokers  Community governing documents  Land dispositions to private developers and national homebuilders  Architectural Design Review Board member  Metropolitan District Board member  Cordillera Group Executive Forum member
  • 12. II. Real Estate Development & Placemaking: CORDILLERA
  • 13. II. Real Estate Development & Placemaking: CORDILLERA
  • 14. Project: GreyHawk at Cordillera Builder: The Cordillera Group Project summary:  Enclave of 15 single- family homes  4,500 SF each  $900K to $1.3M each  True timber-frame construction Project involvement:  Directed land development, vertical construction, marketing, & sales  Product programming & design management  Proforma, budget, & schedule management  HOA creation & homeowner turnover II. Real Estate Development & Placemaking: CORDILLERA
  • 15. Project: GreyHawk at Cordillera II. Real Estate Development & Placemaking: CORDILLERA
  • 16. Location: Grand County, Colorado Employer: The Atira Group Role: Development Principal Project summary:  5,000-acre master-planned residential community  4,300 homesites, single-family homes, custom homes, cabins, duplexes, condominiums, & lodging  Located 15-minutes north of Winter Park  Ski mountain (SolVista Ski Basin)  30,000 SF Base Ski Lodge & Pub  18-hole Nicklaus Headwaters Golf Course  4-miles private fishing access on Fraser River  Open space & community trails system  Mountain bike park Project involvement:  Amenity facility programming & development: - Directed major renovation to base ski lodge & pub - Lead the visioning, programming, development, & construction of several amenity facilities, including base ski lodge, golf clubhouse, and community amenity buildings  Developed several infill single & multi-family residential neighborhoods within the community  Land dispositions to private developers and national homebuilders II. Real Estate Development & Placemaking: GRANBY RANCH
  • 17. II. Real Estate Development & Placemaking: GRANBY RANCH
  • 18. II. Real Estate Development & Placemaking: GRANBY RANCH
  • 19. Project: Base Ski Lodge Remodel & Golf Clubhouse Planning Builder: Granby Ranch Partners, LLC II. Real Estate Development & Placemaking: GRANBY RANCH
  • 20. II. Real Estate Development & Placemaking : THE HOLLOWS Location: Lake Travis – Austin, Texas Employer: Centex Destination Properties Role: Regional Director of Land Development Project summary:  Located on Lake Travis in the Texas Hill Country about one-hour north of Austin, Texas  2,500-acre lake-front residential community  Mixed-use & resort master-planned community  Deep water marina with private boat slips  Lake-front beach club, pools, & fitness center  Amphitheater & sundecks  Several restaurants & community amenity facilities  Kayak club & boat house  Extensive community trails & trailhead facilities Project involvement:  Property due diligence & land acquisitions  Project visioning, programming, & planning  Amenity facility programming & development  ProForma, budget, & schedule management  Assembled & managed design consultant & development team – land planners, architects, environmental, land development, etc.  Land development permitting  Project staffing & training  Directed value engineering workshops
  • 21. II. Real Estate Development & Placemaking : THE HOLLOWS
  • 22. II. Real Estate Development & Placemaking : THE HOLLOWS
  • 23. II. Real Estate Development & Placemaking : POINTE WEST Location: Galveston Island, Texas Employer: Centex Destination Properties Role: Regional Director of Land Development Project summary:  Located on western-most end of Galveston Island, Texas  1,100-acre waterfront residential community  Fronts both Gulf of Mexico & Galveston Bay  Mixed-use & resort master-planned community  Deep water marina with private boat slips  Beach club & fitness center  Ecotourism wildlife conservation area  Several restaurants & community amenity facilities  Extensive community trails & trailhead facilities Project involvement:  Property due diligence & land acquisitions  Project visioning, programming, & planning  Amenity facility programming & development  ProForma, budget, & schedule management  Assembled & managed design consultant & development team – land planners, architects, environmental, land development, etc.  Land development permitting  Project staffing & training  Directed value engineering workshops
  • 24. II. Real Estate Development & Placemaking : POINTE WEST
  • 25. III. Partnering & Joint Ventures: HIDDEN CANYON RANCH Location: Powell Butte - Bend, Oregon Employer: The Atira Group Role: Development Principal Project summary:  Located 30-minutes northeast of Bend, Oregon  4,150-acre master-planned residential community  Approved total density of 3,150 dwelling units  Permitted for 36 holes of golf & golf facilities  Mixed-use town village  Other planned amenities included equestrian facilities, neighborhood parks, recreation center, network of trails, & open space  Spectacular mountain views to the west of Mt. Bachelor & Three Sisters Project involvement:  Created joint venture partnership  Fostered relationships with landowner and managed joint venture deal structure  Comprehensive due diligence review  Project visioning, programming, & planning  Concept to add value through leveraging strengths: - Pahlisch Homes as prominent homebuilder in local market - The Atira Group as experienced community developer - S&P Destination Properties as seasoned marketing & sales
  • 26. III. Partnering & Joint Ventures: HIDDEN CANYON RANCH
  • 27. IV. Land Entitlements: BACHELOR SPRINGS Location: Arrowhead at the base of Bachelor Gulch – Avon, Colorado Employer: Summit Habitats, Inc. / Treat Development Role: Development Project Manager Project summary:  26-duplex unit, residential infill development  10-acre site originally designated as Eagle County “Buffer Zone” requiring upzoning entitlements  2,100 to 2,400 SF per duplex home Project involvement:  Pre-acquisition site due diligence  Fostered relationships with landowners  Land acquisition contracting  Obtained public upzoning entitlements with local jurisdiction, including: - Planned Unit Development rezoning/upzoning - Change of land use designation - Increase in allowable density from 3 to 26 units - Subdivision platting  Assembled & managed design consultant team – land planner, architect, sitework, etc.  Directed land development operations – utilities extensions, sitework, managed site contractors, etc.
  • 28. IV. Land Entitlements: BACHELOR SPRINGS
  • 29. V. Mixed-Use Development: RIVERWALK Location: Riverwalk at Edwards – Edwards, Colorado Employer: Summit Habitats, Inc. / Treat Development Role: Development Project Manager Project summary:  The Inn at Riverwalk and 1st & Main – 150,000 SF  Mixed-use infill development project, including hotel, commercial, retail, office, & several restaurants  Two buildings within the 900,000 SF Riverwalk at Edwards commercial village project  Pedestrian oriented village connecting to Eagle County public ECO Trails system Project involvement:  Pre-acquisition site due diligence  Project visioning, programming, & planning  Assembled & managed design consultant team – land planners, architects, & interiors  Proforma, budget, & schedule management  Managed all general construction, including land development, vertical construction, subcontractors, contract negotiations, site superintendents, and tenant improvements
  • 30. Project: The Inn at Riverwalk and 1st & Main V. Mixed-Use Development: RIVERWALK
  • 31. VI. Project Visioning & Planning: SUGARBUSH RESORT Location: Warren, Vermont Employer: The Atira Group Role: Development Principal Project summary:  4,000-acre ski resort & mixed-use residential community  Two interconnected ski areas – Lincoln Peak & Mount Ellen  Key amenities include ski resort, base skier facilities, 18-hole golf course, hospitality, lodging, & trails system Project involvement:  Lead the creation of a “Vision Plan” outlining a 20-year vision and development plan for the resort  Directed the planning & design of a new base area village, including ski schools, sales center, & skier facilities  Comprehensive due diligence review of entitlements, existing conditions, & feasibility of new development for joint venture partnership
  • 32. VI. Project Visioning & Planning: SUGARBUSH RESORT