SlideShare a Scribd company logo
MATHIYAZHAGAN RAJARAMAN Mobile (Qatar): 00974-31291342
30767016
E-mail:mathisrk@yahoo.com (India): 0091-7402253627
LookingFor : SrSITE ENGINEER(CIVIL)
Total Experience : 12+ Years.
Career Objective : Seeking new challenges in project engineer level that effectively utilizes my
experience, Skills and competence in the field of Construction Management Services.
Educational Qualification:
Diploma in Civil Engineer, 2002, from Board of TechnicalExamination, India
ComputerSkills MS Office,AutoCAD
LanguagesKnow:
English, Hindi, Tamil & Malayalam, Arabic
Holding Qatar& IndianDrivinglicense
Strengthsand Attributes:
 Achievement oriented with management skills and ability to manage change with ease
 Provenstrength in problem solving ,coordination and analysis
 Learning and organizing skills matched with the ability to manage stress, time and people
effectively Self-motivated,energetic and hardworking, positive thinker and executes all entrusted
tasks withhonesty
EXPERIENCE DETAILS – 12+ years (From 2002 to till date)
 Solid General Construction Doha-Qatar
Duration: From 25thDecember 2012 to Still date
Position: Senior Site Engineer
ProjectNo1 : (SinceJan2015)Roads and Infrastructure in Birkat Al Awamer– Package3
Advance Grading and Asphalt Road
Client : ASHGHAL
ProjectNo2 : (From July2013to Jan 2015) Construction of New Roads and upgrading of
existing Roads in Dukhan (Approximately 7.50 km road & allied works) for On Shore Engineering.
Department, Dukhan.
Client : Qatar Petroleum.
ProjectNo3 : (From Dec2012to July2013) EPICof Road upgrade from Zikreet to Cluster-2
within Dukhan fields (Approximately 10kms road & allied works) forField Support Department,
Dukhan.
Client : Qatar Petroleum
Responsibility:
 Shifting of Qatar petroleum gas line pipes as per our new construction road
and making culvert.
 Small substation for street lights and HV panel rooms.
 Cable trench for 11KVA cable and protection of existing cable.
 Culvert, Duct bank, storm water construction.
 Precast unit for concert work
 Supervision of lifting operation of Precast.
 Soak way, Gully work.
 Coordinate with survey work(Dip sheet preparation, Level Sheet)
 Involved in FDT test for compaction
 Shuttering work measurement and rebar requesting as per drawing.
 Irrigation network work, pressure testing for pipe.
 DI pipe installation and Pressure testing.
 Curbstone pavement work and Material measurement and request.
 Galfar Engineering Contracting Saog – Oman (Jan2009 to Nov 2012)
Position : Site Engineer
Project : Highway project for the development of City by Oman , valued at OR 106
million With a duration of 32 months. Project comprises of Road infrastructure (123 kms)
Networks with allied utilities with Two lane, Three lane Dual carriage way, corridor both side,
Telecom Duct 12 km and Fire, Sewer & Portable net work
Client : NESPAKOMAN
Responsibility : Overall In charge of the site responsible for execution of the project
including Planning, Scheduling, and construction management. Also responsible for dealing with
the Client & Consultant Independently handling the project with a Team of 8 Staff and 400 work
forces and is reporting to Project Manager
 Arab Sand Oasis Trading & Cont. Est–(Sultanate ,Oman ) (Oct- 2008 to July 2009)
Position : Site Engineer
Project : For Infrastructure Project involving Civil & MEP works. Sewerage
Pipe Line and House Connection, Water Separator, Pump Station, Ponds & Service works etc.
Client : PETROLEUM DEVELOPMENTOFOMAN
Responsibility : Overall In charge of the site and responsible for Planning, Scheduling, and
Execution, Dealing with the Client & Consultant Independently handling the project with a Team of
8 Staff and 400 work forces and is reporting to Project Manager at site.
 K-Builders (Construction Company) Sirkali-India. (Oct-2002 to July-2008)
Position : Site Supervisor
Project : For Infrastructure ProjectinvolveCivil & Bridges, Roads, Causeways, and
Irrigation etc.worth value (IRs 800 Million).
Client : PWA
Responsibility: - Overall In charge of the site and responsible for Planning, Scheduling, and
Execution, Dealing with the Client & Consultant Independently handling the project with a Team of
18 Staff and 350 work forces and is reporting to Project Manager at site
Personal Details
Date of Birth : 20.06.1984
Placeof Birth : SIRKALI
Nationality : INDIAN
Marital Status : MARRIED
PassportDetails
Passport No : F9736848
Place& Date of Issue : TRICHY 09.10.2006
Date of Expiry : 08.10.2016
Permanent Address : P.Rajaraman
No.7, VOC South Street,
Thenpathi Post,Sirkali - 609 111
Nagai District
Thanking you
(MATHIYAZHAGANRAJARAMAN)

More Related Content

What's hot

Cv 01
Cv 01Cv 01
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)
muhammadmasood75
 
MUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For SurveyorMUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For SurveyorMalik Bilal Awan
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.zaid Abbas
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )Mumtaz Ahmad
 
Cv m.safdar.2016
Cv m.safdar.2016Cv m.safdar.2016
Cv m.safdar.2016
muhammad safdar
 
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017muhammad azeem
 
Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)
Jafarsadhik Mulla
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civil
syedmohd77
 
Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015
shahmeer memon
 
Civil engineer strategic
Civil engineer strategicCivil engineer strategic
Civil engineer strategic
ssuser351e58
 

What's hot (20)

Cv 01
Cv 01Cv 01
Cv 01
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)
 
MUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For SurveyorMUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For Surveyor
 
C.V. small size
C.V. small sizeC.V. small size
C.V. small size
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
 
Cv m.safdar.2016
Cv m.safdar.2016Cv m.safdar.2016
Cv m.safdar.2016
 
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
 
Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)
 
Ramanathan CV
Ramanathan CVRamanathan CV
Ramanathan CV
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civil
 
shoukat buildings and Roads -
shoukat buildings and Roads -shoukat buildings and Roads -
shoukat buildings and Roads -
 
MUHAMMAD JAVED
MUHAMMAD JAVEDMUHAMMAD JAVED
MUHAMMAD JAVED
 
CV
CVCV
CV
 
CV Ahmed Site
CV Ahmed SiteCV Ahmed Site
CV Ahmed Site
 
1.RESUME
1.RESUME1.RESUME
1.RESUME
 
Shahmeer Resume2-3
Shahmeer Resume2-3Shahmeer Resume2-3
Shahmeer Resume2-3
 
Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015
 
MUHAMMAD JAVED
MUHAMMAD JAVEDMUHAMMAD JAVED
MUHAMMAD JAVED
 
Civil engineer strategic
Civil engineer strategicCivil engineer strategic
Civil engineer strategic
 

Viewers also liked

Kenneth_Holmegaard_Hansen_CV
Kenneth_Holmegaard_Hansen_CVKenneth_Holmegaard_Hansen_CV
Kenneth_Holmegaard_Hansen_CVKenneth Hansen
 
新入生ゼミナール
新入生ゼミナール新入生ゼミナール
新入生ゼミナール
tkddms0424
 
хTramath
хTramathхTramath
Unidad 8. La recta y la parábola.
Unidad 8. La recta y la parábola.Unidad 8. La recta y la parábola.
Unidad 8. La recta y la parábola.
atajuelo1
 
New bollywood hindi film air lift .
New bollywood hindi film air lift .New bollywood hindi film air lift .
New bollywood hindi film air lift .
Deepak Somaji-Sawant
 
Physics project abhishek
Physics project abhishekPhysics project abhishek
Physics project abhishek
Abhishek Kushwaha
 
Presentacion corporativa Orión Dic 2016
Presentacion corporativa Orión Dic 2016Presentacion corporativa Orión Dic 2016
Presentacion corporativa Orión Dic 2016Marcela Roncancio
 
До роковин обстрілу Маріуполя
До роковин обстрілу МаріуполяДо роковин обстрілу Маріуполя
До роковин обстрілу Маріуполя
Security Service of Ukraine
 
Improved parking systems for enhanced experience
Improved parking systems for enhanced experienceImproved parking systems for enhanced experience
Improved parking systems for enhanced experience
Omnitec Group
 
20160112 포럼x 발표
20160112 포럼x 발표20160112 포럼x 발표
20160112 포럼x 발표
Leo Kim
 
Invitation-eng-no-contacts-book-sponser
Invitation-eng-no-contacts-book-sponserInvitation-eng-no-contacts-book-sponser
Invitation-eng-no-contacts-book-sponserNatalia Rotenberg
 
Codigo de convivencia maria guerrero 11
Codigo de convivencia maria guerrero 11Codigo de convivencia maria guerrero 11
Codigo de convivencia maria guerrero 11
Patricia Guerrero Profe De 7 B Igncio Escandon
 
Resume- Tiwari
Resume- TiwariResume- Tiwari
Resume- TiwariAk Tiwari
 

Viewers also liked (15)

Kenneth_Holmegaard_Hansen_CV
Kenneth_Holmegaard_Hansen_CVKenneth_Holmegaard_Hansen_CV
Kenneth_Holmegaard_Hansen_CV
 
新入生ゼミナール
新入生ゼミナール新入生ゼミナール
新入生ゼミナール
 
хTramath
хTramathхTramath
хTramath
 
Unidad 8. La recta y la parábola.
Unidad 8. La recta y la parábola.Unidad 8. La recta y la parábola.
Unidad 8. La recta y la parábola.
 
New bollywood hindi film air lift .
New bollywood hindi film air lift .New bollywood hindi film air lift .
New bollywood hindi film air lift .
 
Physics project abhishek
Physics project abhishekPhysics project abhishek
Physics project abhishek
 
Presentacion corporativa Orión Dic 2016
Presentacion corporativa Orión Dic 2016Presentacion corporativa Orión Dic 2016
Presentacion corporativa Orión Dic 2016
 
До роковин обстрілу Маріуполя
До роковин обстрілу МаріуполяДо роковин обстрілу Маріуполя
До роковин обстрілу Маріуполя
 
Improved parking systems for enhanced experience
Improved parking systems for enhanced experienceImproved parking systems for enhanced experience
Improved parking systems for enhanced experience
 
20160112 포럼x 발표
20160112 포럼x 발표20160112 포럼x 발표
20160112 포럼x 발표
 
7-23
7-237-23
7-23
 
Invitation-eng-no-contacts-book-sponser
Invitation-eng-no-contacts-book-sponserInvitation-eng-no-contacts-book-sponser
Invitation-eng-no-contacts-book-sponser
 
Codigo de convivencia maria guerrero 11
Codigo de convivencia maria guerrero 11Codigo de convivencia maria guerrero 11
Codigo de convivencia maria guerrero 11
 
Mohd Muttalib CV.pdf
Mohd Muttalib CV.pdfMohd Muttalib CV.pdf
Mohd Muttalib CV.pdf
 
Resume- Tiwari
Resume- TiwariResume- Tiwari
Resume- Tiwari
 

Similar to mathy 2015

new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copyali haider
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copyali haider
 
Malik@ cv
Malik@  cvMalik@  cv
Malik@ cv
Malik Saleem
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNshaat Hafez
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
Mohamad Safarudin
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
Mohamad Safarudin
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)AHMED SAKR
 
New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)siddesh siddu
 

Similar to mathy 2015 (20)

AL SARABI CV
AL SARABI CVAL SARABI CV
AL SARABI CV
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
CV
CVCV
CV
 
CV1
CV1CV1
CV1
 
Aathikesavan CV
Aathikesavan CVAathikesavan CV
Aathikesavan CV
 
jainco
jaincojainco
jainco
 
Malik@ cv
Malik@  cvMalik@  cv
Malik@ cv
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
Rahman cv
Rahman cvRahman cv
Rahman cv
 
FAHD_CV
FAHD_CVFAHD_CV
FAHD_CV
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Survey Engr
Survey EngrSurvey Engr
Survey Engr
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)
 

mathy 2015

  • 1. MATHIYAZHAGAN RAJARAMAN Mobile (Qatar): 00974-31291342 30767016 E-mail:mathisrk@yahoo.com (India): 0091-7402253627 LookingFor : SrSITE ENGINEER(CIVIL) Total Experience : 12+ Years. Career Objective : Seeking new challenges in project engineer level that effectively utilizes my experience, Skills and competence in the field of Construction Management Services. Educational Qualification: Diploma in Civil Engineer, 2002, from Board of TechnicalExamination, India ComputerSkills MS Office,AutoCAD LanguagesKnow: English, Hindi, Tamil & Malayalam, Arabic Holding Qatar& IndianDrivinglicense Strengthsand Attributes:  Achievement oriented with management skills and ability to manage change with ease  Provenstrength in problem solving ,coordination and analysis  Learning and organizing skills matched with the ability to manage stress, time and people effectively Self-motivated,energetic and hardworking, positive thinker and executes all entrusted tasks withhonesty EXPERIENCE DETAILS – 12+ years (From 2002 to till date)  Solid General Construction Doha-Qatar Duration: From 25thDecember 2012 to Still date Position: Senior Site Engineer ProjectNo1 : (SinceJan2015)Roads and Infrastructure in Birkat Al Awamer– Package3 Advance Grading and Asphalt Road Client : ASHGHAL ProjectNo2 : (From July2013to Jan 2015) Construction of New Roads and upgrading of existing Roads in Dukhan (Approximately 7.50 km road & allied works) for On Shore Engineering. Department, Dukhan. Client : Qatar Petroleum. ProjectNo3 : (From Dec2012to July2013) EPICof Road upgrade from Zikreet to Cluster-2 within Dukhan fields (Approximately 10kms road & allied works) forField Support Department, Dukhan. Client : Qatar Petroleum
  • 2. Responsibility:  Shifting of Qatar petroleum gas line pipes as per our new construction road and making culvert.  Small substation for street lights and HV panel rooms.  Cable trench for 11KVA cable and protection of existing cable.  Culvert, Duct bank, storm water construction.  Precast unit for concert work  Supervision of lifting operation of Precast.  Soak way, Gully work.  Coordinate with survey work(Dip sheet preparation, Level Sheet)  Involved in FDT test for compaction  Shuttering work measurement and rebar requesting as per drawing.  Irrigation network work, pressure testing for pipe.  DI pipe installation and Pressure testing.  Curbstone pavement work and Material measurement and request.  Galfar Engineering Contracting Saog – Oman (Jan2009 to Nov 2012) Position : Site Engineer Project : Highway project for the development of City by Oman , valued at OR 106 million With a duration of 32 months. Project comprises of Road infrastructure (123 kms) Networks with allied utilities with Two lane, Three lane Dual carriage way, corridor both side, Telecom Duct 12 km and Fire, Sewer & Portable net work Client : NESPAKOMAN Responsibility : Overall In charge of the site responsible for execution of the project including Planning, Scheduling, and construction management. Also responsible for dealing with the Client & Consultant Independently handling the project with a Team of 8 Staff and 400 work forces and is reporting to Project Manager  Arab Sand Oasis Trading & Cont. Est–(Sultanate ,Oman ) (Oct- 2008 to July 2009) Position : Site Engineer Project : For Infrastructure Project involving Civil & MEP works. Sewerage Pipe Line and House Connection, Water Separator, Pump Station, Ponds & Service works etc. Client : PETROLEUM DEVELOPMENTOFOMAN Responsibility : Overall In charge of the site and responsible for Planning, Scheduling, and Execution, Dealing with the Client & Consultant Independently handling the project with a Team of 8 Staff and 400 work forces and is reporting to Project Manager at site.  K-Builders (Construction Company) Sirkali-India. (Oct-2002 to July-2008) Position : Site Supervisor Project : For Infrastructure ProjectinvolveCivil & Bridges, Roads, Causeways, and Irrigation etc.worth value (IRs 800 Million). Client : PWA Responsibility: - Overall In charge of the site and responsible for Planning, Scheduling, and Execution, Dealing with the Client & Consultant Independently handling the project with a Team of 18 Staff and 350 work forces and is reporting to Project Manager at site
  • 3. Personal Details Date of Birth : 20.06.1984 Placeof Birth : SIRKALI Nationality : INDIAN Marital Status : MARRIED PassportDetails Passport No : F9736848 Place& Date of Issue : TRICHY 09.10.2006 Date of Expiry : 08.10.2016 Permanent Address : P.Rajaraman No.7, VOC South Street, Thenpathi Post,Sirkali - 609 111 Nagai District Thanking you (MATHIYAZHAGANRAJARAMAN)