Curriculum Vitae
MANOJ. P.M
Mob: +918547596181
Email: manojpm27@gmail.com
POST APPLIED FOR :
OBJECTIVES :
ACADEMIC QUALIFICATION :
SUMMARY OF
QUALIFICATION
DRIVING LICENSE
ABROAD DRIVING LICENSE
PROFESSIONAL
EXPERIENCE:
MOBILE CRANE OPERATOR
To be part of a world class organization where I have an opportunity to learn
more skills required to effectively contribute to the growth of the organization.
Secondary School Leaving Certificate (S.S.L.C)
Outstanding working experience in a construction, warehouse and industrial
environment. Good knowledge of mechanics and electronics., excellent written
and verbal communications skills, outstanding ability to safely and efficiently
operate bulk moving equipment in tight, cramped spaces and in, around and
above other workers, amazing ability to deal with evolving operating conditions
with a ability to work with a team, take direction from supervision, work
effectively and cooperatively with other people, ability to analyze, adjust and
perform minor repairs on equipment, Ability to use physical force to lift, push,
pull and hold equipment.
Light, Heavy, & J.C.B
GCC Valid mobile crane License & (Velosi)
Total Work Experience : 14 Years
Experience in Gulf : 7 Years
Company Name :LEIGHTON CONTRACTING COMPANY,QATAR
Project Name : Al Shaqab Project, Qatar ( 5 Years)
People Mover System (PMS), Qatar (1 Year)
North Gate, Mall Project, Qatar (1 Year)
Work experience as Crane, JCB and Forklift Operator
 Moved heavy and bulky objects to assist construction procedures
 Observed load hook up and determine safe load capacities
 Positioned cranes in responsible to hand signals
 Maintenance of crane and hoisting mechanism
 Performed maintenance and preventive maintenance activities
 Responsible for successfully operating and maintain hydraulic, electric
and friction cranes at construction sites for unloading and back loading
equipment
 Responsible for inspecting and maintaining cranes against any defects
and overloading.
 Looking all the safety and security measures before operating the crane
Experience in India : 7 Years
Company Name : M/s Malayil Builders
Project Name : Constriction
Work Experience as Tower Crane Operator
 Determine load weights and check them against lifting capacities in
order to prevent overload.
 Move levers, depress foot pedals, and turn dials to operate cranes,
cherry pickers, electromagnets, or other moving equipment for lifting,
moving and placing loads.
 Inspect cables and grappling devices for wear, and install or replace
cables as needed.
 Clean, lubricate, and maintain mechanisms such as cables, pulleys,
and grappling devices for ear, and install or replace cables as needed.
 Inspect and adjust crane mechanisms and lifting accessories in order
to prevent malfunctions and damages.
 Direct helpers engaged in placing blocking and out rigging under
cranes.
 Load and unloading bundles from trucks and move containers to
storage bins, using moving equipment
 Weigh bundles, using floor scales, and record weights for company
records.
 Review daily work and delivery schedules to determine orders,
sequences of deliveries, and special loading instructions.
 Direct truck drivers backing vehicles in to loading bays, and over,
uncover, and secure loads for delivery.
 Inspect bundle packaging for conformance to regulations and
customer requirements and remove and batch packaging tickets.
Work Experience as Crane and Tower Crane Operator Apprentice
(Under Supervision)
Operated travelling/stationary overhead crane to lift, move, and position loads,
such as machinery equipment, products and solid or bulk materials, using
hoisting attachments, such as hook, sling, electromagnet, or bucket.
 Observed load hookup and determined safety of load
 Manipulated and depressed crane controls, such as pedals, levers,
and buttons, to regulate speed and direction of crane and hoist
movement according to written, verbal or signal instructions.
 Cleaned and maintained crane and hoisting mechanism
 Inspected crane for defective parts and notified supervisor of defects
or malfunctions.
PRESENT ADDRESS
PERSONAL DETAILS
 Attached load to hook or other crane accessory prior to operating
crane.
Pallathu House, PMC X1X/187, Iringole P.O., Perumbavoor, 683548,
Kerala, India
 Nationality:Indian
 Sex :Male
 Date of Birth :08 Jan 1972
 Passport Number :K 8704219
 Date of issue : 09 Jan 2013
 Date of Expiry:08 Jan 2023
 Place of issue :Qatar
 Marital Status : Married
 Languages Known :English, Malayalam, Hindi
DECLARATION:-
I hereby declare that the details furnished above are true to the best of my knowledge & belief.
Place: Qatar MANOJ P.M.
Date :
manoj resume new
manoj resume new
manoj resume new
manoj resume new
manoj resume new
manoj resume new
manoj resume new
manoj resume new
manoj resume new
manoj resume new

manoj resume new

  • 1.
    Curriculum Vitae MANOJ. P.M Mob:+918547596181 Email: manojpm27@gmail.com POST APPLIED FOR : OBJECTIVES : ACADEMIC QUALIFICATION : SUMMARY OF QUALIFICATION DRIVING LICENSE ABROAD DRIVING LICENSE PROFESSIONAL EXPERIENCE: MOBILE CRANE OPERATOR To be part of a world class organization where I have an opportunity to learn more skills required to effectively contribute to the growth of the organization. Secondary School Leaving Certificate (S.S.L.C) Outstanding working experience in a construction, warehouse and industrial environment. Good knowledge of mechanics and electronics., excellent written and verbal communications skills, outstanding ability to safely and efficiently operate bulk moving equipment in tight, cramped spaces and in, around and above other workers, amazing ability to deal with evolving operating conditions with a ability to work with a team, take direction from supervision, work effectively and cooperatively with other people, ability to analyze, adjust and perform minor repairs on equipment, Ability to use physical force to lift, push, pull and hold equipment. Light, Heavy, & J.C.B GCC Valid mobile crane License & (Velosi) Total Work Experience : 14 Years Experience in Gulf : 7 Years Company Name :LEIGHTON CONTRACTING COMPANY,QATAR Project Name : Al Shaqab Project, Qatar ( 5 Years) People Mover System (PMS), Qatar (1 Year) North Gate, Mall Project, Qatar (1 Year) Work experience as Crane, JCB and Forklift Operator  Moved heavy and bulky objects to assist construction procedures  Observed load hook up and determine safe load capacities  Positioned cranes in responsible to hand signals  Maintenance of crane and hoisting mechanism  Performed maintenance and preventive maintenance activities  Responsible for successfully operating and maintain hydraulic, electric and friction cranes at construction sites for unloading and back loading equipment  Responsible for inspecting and maintaining cranes against any defects and overloading.  Looking all the safety and security measures before operating the crane
  • 2.
    Experience in India: 7 Years Company Name : M/s Malayil Builders Project Name : Constriction Work Experience as Tower Crane Operator  Determine load weights and check them against lifting capacities in order to prevent overload.  Move levers, depress foot pedals, and turn dials to operate cranes, cherry pickers, electromagnets, or other moving equipment for lifting, moving and placing loads.  Inspect cables and grappling devices for wear, and install or replace cables as needed.  Clean, lubricate, and maintain mechanisms such as cables, pulleys, and grappling devices for ear, and install or replace cables as needed.  Inspect and adjust crane mechanisms and lifting accessories in order to prevent malfunctions and damages.  Direct helpers engaged in placing blocking and out rigging under cranes.  Load and unloading bundles from trucks and move containers to storage bins, using moving equipment  Weigh bundles, using floor scales, and record weights for company records.  Review daily work and delivery schedules to determine orders, sequences of deliveries, and special loading instructions.  Direct truck drivers backing vehicles in to loading bays, and over, uncover, and secure loads for delivery.  Inspect bundle packaging for conformance to regulations and customer requirements and remove and batch packaging tickets. Work Experience as Crane and Tower Crane Operator Apprentice (Under Supervision) Operated travelling/stationary overhead crane to lift, move, and position loads, such as machinery equipment, products and solid or bulk materials, using hoisting attachments, such as hook, sling, electromagnet, or bucket.  Observed load hookup and determined safety of load  Manipulated and depressed crane controls, such as pedals, levers, and buttons, to regulate speed and direction of crane and hoist movement according to written, verbal or signal instructions.  Cleaned and maintained crane and hoisting mechanism  Inspected crane for defective parts and notified supervisor of defects or malfunctions.
  • 3.
    PRESENT ADDRESS PERSONAL DETAILS Attached load to hook or other crane accessory prior to operating crane. Pallathu House, PMC X1X/187, Iringole P.O., Perumbavoor, 683548, Kerala, India  Nationality:Indian  Sex :Male  Date of Birth :08 Jan 1972  Passport Number :K 8704219  Date of issue : 09 Jan 2013  Date of Expiry:08 Jan 2023  Place of issue :Qatar  Marital Status : Married  Languages Known :English, Malayalam, Hindi DECLARATION:- I hereby declare that the details furnished above are true to the best of my knowledge & belief. Place: Qatar MANOJ P.M. Date :