SlideShare a Scribd company logo
1 of 26
Management of Commercial
Risks in Construction Projects
COMMERCIAL RISKS OR PROJECT RISKS
Inherent in the project itself, or the market in which it operates: QS in
Risk-analysis process can be summarized as:
• Commercial viability: does the project make overall commercial sense
for all parties.
• Construction risks: can the project be built on time and on budget?
• Revenue risks: will its operating revenues be as projected?
• Operating risks: is the project capable of operating at the projected
performance level and cost?
• Input supply risks: can raw materials or other inputs be obtained at the
projected costs?
• Force majeure risks: how can the project cope with force majeure ...
EXAMPLES-KEY COMMER DECISIONS
• MOVEMENT OF RESOURCES AND ASSOCIATED SUMS,
BETWEEN ITEMS THAT ARE CONSIDERED OVER- OR
UNDER-MEASURED
• POTENTIAL EFFICIENCIES OR INEFFICIENCIES, SUCH
AS THE SHARING OF PRELIMS OR OTHER OVERHEAD
COSTS, WITH OTHER CONTRACTS SECURED
• VALUE ENGINEERING AND ALTERNATIVE METHODS,
SUCH AS OFF-SITE FABRICATION
KEY COMMER DECISIONS-ADJUSTMENTS
• TO PARTICULAR PACKAGES OR ACTIVITIES
• FOR FORECAST BUYING GAINS OR LOSSES, POST-CONTRACT
• TO PEOPLE OR EQUIPMENT RATES
• FOR THE RECOVERY OF SUMS FROM THIRD PARTIES OR SERVICES
THAT CAN BE OBTAINED AT NO COST OR PAID FOR ELSEWHERE
• FOR OMISSIONS IN THE CONTRACT DOCUMENTS
• FOR AMBIGUITIES OR GAPS BETWEEN THE METHOD OF
MEASUREMENT, THE SPECIFICATION, THE DRAWINGS AND ANY BOQ
OR SCHEDULES OF RATES (SOR)
• BOTTOM-LINE ADJUSTMENTS TO THE MARGIN ADDED TO THE NET
ESTIMATE
CONTINGENCY SUMS-VARIABLE COSTS?
1. RISK-IDENTIFIED FROM TENDER DOCUMENTS-
QUANTITIES/ITEMS.
2. ESTIMATED PRICE ESCALATION ALLOWANCES FOR
PROJECTED INCREASES-INFLATION/OTHER EXTERNAL
FACTORS.
3. ESTIMATED ADJUSTMENTS FOR FOREIGN-
EXCHANGE
HOW RISK IDENTIFIED IN THE TENDER
DOCUMENTS?
• QUANTIFIABLE RISKS: AN APPROPRIATE INCLUSION
MADE, DEPENDENT ON EXPOSURE TO RISK.
• UNQUANTIFIABLE RISKS: AMOUNTS BASED ON
MANAGEMENT PERCEPTION OF SITUATION. RESULT-
QUALIFICATION OR EXCLUSION?
DEALING WITH RISKS?
• IN EXTREME CIRCUMSTANCES, CONTRACTING
ORGANISATION WITHDRAWS FROM TENDER PROCESS
• A COMMERCIAL VIEW TAKEN-ON THE MONETARY
VALUE OF RISKS AND
• APPROPRIATE ADJUSTMENT MADE BASED ON
CONTRACTUAL PROVISIONS-PRICE ADJUSTMENT
FORMULA, FOREIGN EXCH FLUCTUATIONS ETC. &
• HIGHER MANAGEMENT PERCEPTION OF COMETITION
& STRATEGY.
ESTIMATED ADJUSTMENTS FOR FOREIGN-EXCHANGE
FLUCTUATIONS
• WORK IN A COUNTRY/PACKAGES-DIFFERENT
CURRENCY OR
• IN LARGER ORGANISATIONS-A VARIABLE THAT IS
SOMETIMES MANAGED OUTSIDE OF THE PROJECT
ITSELF INCL CORPORATE OVERHEADS
• HOW TO MITIGATE RISK? HEDGING CURRENCY: EG.
BY FORWARD-BUYING FOREIGN CURRENCY AT
CURRENT OR OTHER AGREED RATES.
PEER REVIEW
PURPOSE?
• REVIEW/FINALISE PROGRAMME AND
• PRELIMINARIES AND TO FINALISE THE PRICE (FIXED,
GUARANTEED MAXIMUM OR TARGET)
• TO CARRY OUT THE WORKS, BASED FURTHER
ADJUSTMENTS TO THE NET COST, AND
• NOTING OTHER VARIABLES, INCLUDING THE RISKS AND
OPPORTUNITIES DETAILED ABOVE.
PRELIMINARIES AND SITE OVERHEADS
PRELIMINARIES & SITE/HO OVERHEADS OVERHEADS
RICS NEW RULES OF MEASUREMENT: PRELIMS INTO ?? PARTS:
•PART 1-PROJECT INFO & EMPLOYER’S
REQMNT
•PART 2-MAIN CONTRACTOR’S COST ITEMS
•PART 3-WORK PACKAGE CONTRACTOR’S
PRELIMINARIES
PRELIMINARIES & SITE OVERHEADS
• PRICING OF ITEMS CAN BE “QUANTITY” RELATED OR
“TIME” RELATED
• WHAT ARE PRELIMINARIES SECTION OF A BOQ MEANT
FOR?
PRICING OF ITEMS WHICH ARE “FIXED CHARGES” NOT
QUANTITY RELATED….I.E. IRRESPECTIVE OF QTY OF
WORK BEING CARRIED OUT
 MAIN CONTRCATOR’S COST ITEMS “TIME” RELATED
 NORMALLY “ONE OFF” PAYMENTS (FIXED) OR
REGULAR PAYMENTS “TIME” RELATED DURING THE
COURSE OF CONTRACT
PRELIMS-CLASSIFY FIXED &/OR TIME RELATED EXPENSES
DESCRIPTION TIME RELATED FIXED
START END
1. PRE COMMENCEMENT CHARGES
2. MANAGEMENT AND STAFF
3. INITIAL SITE ESTABLISHMENT & MAIN CONTRACTOR
4. TEMP SERVICES
5. TEMP WORKS
6. SECURITY
7. EMPLOYER’S REQUIREMENTS
8. CONTRACT CONDITIONS
9. FEES AND CHARGES
10.INSURANCE, WARRANTIES, GUARANTEES
PRELIMS-CLASSIFY FIXED &/OR TIME RELATED EXPENSES
DESCRIPTION TIME RELATED FIXED
START END
11. HEALTH, SAFETY AND ENVIRON PROTECTION
12. QUALITY ASSURRANCE
13. SURVEY, CONTROL & PROTECTION
14. HOUSEKEEPING & WASHING
15. SITE RECORDS
16. NON MECHANICAL PLANTS
17. MECH PLANT MAJOR
18. MECH PLANT-MINOR
19. POST COMPLETION REQUIREMENTS/AS BUILT DRAWINGS/SITE CLEARANCE/DEMOB
20. DEFECT LIABILITY REQUIREMENTS
PART 1-PROJECT INFO & EMPLOYER’S REQMNT
PART 1-PROJECT INFO: TENDERING CONTRACTORS GIVEN GEN
DESCRIPTION OF PROJECT, WHICH MAY AFFECT THEIR BID PRICE
• DRAWINGS & PRE CONSTRUCTION INFO USED TO PREPARE BILLS OF QTYS
IF PROVIDED
• QUALITY ASSURANCE PLAN, SAFETY MANUAL
• ANY DESIGN RESPONSIBILITY
• IDENTIFICATION/SUPPORT OF EXISTING UTILITIES REQUIRING
SHIFTING/RELOCATION OF UTILITIES
• TRAFFIC DIVERSION, BARRICADING, TOPO/ALIGNMENT SURVEY
• ANY FOLLOW UP ACTIONS ON BEHALF OF EMPLOYER?
• ANY OTHER WORKS ON GOING AT SITE
• AS BUILT DRAWINGS, VIDEO RECORDING
• O&M MANUAL, SPARES AND TRAINING BEFORE TESTING AND
COMMISSIONING
• DISPOSAL OF DEMOLITION WASTE, EXCESS SOIL
• HOW PROJECT WILL BE MANAGED BY PMC OR CLIENT DIRECTLY FOR
SUPERVISION, PROGRESS MONITORING AND SHE REQUIREMENTS
REQMNTS OF SITE OFFICES, ACs FOR EMPLOYER, CONSULTANTS:
• TRANSPORT REQUIREMENT
• FURNITURE, IT AND OTHER OFFICE SUPPORT
• POWER, BACK UP DG, WATER SUP, OPERATIONS AND
MAINTENANCE
• ANY STAFF/OPERATORS?
• ARE THESE REIMBURSABLE BASIS OR DEEMED TO BE INCLUDED IN
RATES?
PART 1-EMPLOYER’S REQMNT:
PART 2-MAIN CONTRACTOR’S COST ITEMS
1. STAFF: CONTRACTOR’S MANAGEMENT OF STAFF-
RELATED TO “THE” PROJECT BUT NOT INCLUDED IN
CONTAINED IN UNIT RATES OF ITEMS OF MEASURED
WORK. INCLUDING HSE
2. SITE ACCOMODATION: ALL
3. SITE SECURITY-STAFF, EQPT, HOARDINGS, FENCING.
EFFECT ON INSURANCE PREMIUMS
4. TEMP WORKS: DRAINAGE, SITE ROADS,
HARDSTANDINGS, CAR PARKS, STORAGE, OFFICE,
QUALITY LABORATORY
5. FFE-FURNITURE, FITTINGS AND EQPT OF TEMP WORKS
INCL MAINT
6. TEMP UTILITY SUPPLIES- BACK UP, IT/COMNS INCLUDING
MAINT & CONSUMABLES
7. MECH PLANT & EQPT-USED ACROSS SITE (NOT SPECIFIC TO A SPECIFIC ITEM OF
MEASURED WORK): TOWER CRANES, HOISTS, TMs, DUMPERS, EXCAVATORS,
MOBILE CRANES, CONCRETE BATCHING PLANT ETC. COSTS.. REFURBISMENT OF
USED PLANT BY OTHER PROJECTS, TRANSPORTATION, INSURANCE, INCL RTO
(FIXED), TRANSFER FROM OTHER STATES ETC.
8. SCAFFOLDINGS & TEMP WORKS- REQD FOR PERMNT WORKS: ERECTION &
DISMANTLING COSTS (FIXED), WEEKLY HIRE CHARGES (TIME RELATED); INCLUDING
DESIGN OF TEMP WORKS.
9. SPECIALISED ENGG DESIGN & CONSTR OF CAISSONS/COFFER DAMS/
(SIGNIFICANT COSTS) IF NOT INCLUDED IN MEASURED WORKS
1 0. TESTING & COMMISSIONING- QUALITY LAB, TESTING AND COMMISSIONING
COSTS PRIOR TO HANDOVER AT SUBSTANTIAL COMPLETION-ONLY OWN SCOPE.
11. STATUTORY-PROVIDENT FUND, ESI, INSURANCE, (IF NOT INCLUDED IN
LABOUR); BONDS, GUARANTEES & WARANTIES UNDER THE CONTRACT;
APPROVALS
12. SITE CLEARANCE-COSTS OF DISMANTLING/SITE CLEARANCE/DISPOSAL OF
WASTE
PART 3-SUB CONTRACTOR PACKAGE COSTS
SPECIAL ATTENDANCE
ALL SPECIFIC REQUIREMENTS FOR SUB CON INCLUDING:
• SPEC SCAFFOLDING
• UNLOADING
• HOISTING
• SPEC COVERED STORAGE
• SPEC LIGHTING
• POWER SUPPLY
• TEMP ACCESS ROADS & HARDSTANDINGS
[ALL THE ABOVE WOULD BE PROVIDED FROM SPACE/EQPT OTHER
THAN FOR MAIN WORK]
GENERAL ATTENDANCE
• USE OF TEMP WORKS, PATHS, PAVING
• USE OF STANDING SCAFFOLDING
• USE OF STANDING POWER OPERATED HOISTING PLANT
• USE OF MESS ROOMS, SANITARY, ACCOMODATION, WELFARE, TEMP
LIGHTING AND WATER SUPPLIES
• PROVN OF SPACE FOR SUBCON OFFICE ACCDN
• PROVN OF SPACE FOR STORAGE OF PLANT AND MATERIALS
• CLEARING AWAY-RUBBISH
[ALL THE ABOVE WOULD BE PROVIDED FROM SPACE/EQPT FOR MAIN
WORK]
SUB CONTRACTOR/SUPPLIERS
OVERVIEW: NEED FOR SUBCON? TYPES:
• LABOUR SUPPLY
• DOMESTIC SUB CON/SUPPLIERS: CONTRACTOR’S CHOICE SUBJECT TO
APPROVAL BY ENGINEER/CLIENT
• NAMED (PANEL TO CHOOSE FROM) AS GOOD AS DOMESTIC
• NOMINATED/DESIGNATED SUB CONTRCATORS-CLIENT SELECTS AND
NOMINATES. (NO CHOICE WITH CONTRACTOR). COST IMPLICATIONS?
• NOMINATED SUPPLIERS
• DOMESTIC HIRING AGENCY
• NOMINATED HIRING AGENCY
SUB CONTRACTOR/SUPPLIER COSTS
(A) MOBBILISATION/DEMOB COSTS
(B) LABOUR COSTS WITH TOOLS/TACKLES ONLY
(C) LABOUR COSTS WITH SHUTTERING
(D) WITH MATERIAL COSTS
(E) WITH MATERIALS/EQPT SUPPLIED BY CLIENT/OWNER
(F) WITH PLANT & EQPT COSTS
(G) GENERAL SITE OH
(H) HO OH
(I) PROFIT
COSTS TO MAIN CONTRACTOR
• SUBCON COSTS
• SPECIALISED EQPT OR SERVICE REQD BY SUBCON (SPEC ATTENDANCE)
• PROPORTION OF GENERAL SITE OH USED BY SUBCON (GEN
ATTENDANCE)?
• PROFIT THAT MAIN CONTRACTOR WOULD HAVE MADE ON SUB CON
WORK

More Related Content

Similar to Management of Commer Risks in construction.pptx

Strategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksStrategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksPankaj K Sinha
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputGaurav Singh Rajput
 
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Primila Edward
 
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Primila Edward
 
Limiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and LiabilitiesLimiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and LiabilitiesPrimila Edward
 
Presentation-PII Property& BI -Presentation.pdf
Presentation-PII Property& BI -Presentation.pdfPresentation-PII Property& BI -Presentation.pdf
Presentation-PII Property& BI -Presentation.pdfFarrukhKhan78316
 
1-Wind Energy RHDHV_Brochure
1-Wind Energy RHDHV_Brochure1-Wind Energy RHDHV_Brochure
1-Wind Energy RHDHV_BrochureHieu Phan Trung
 
Quantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficienciesQuantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficienciesMichael Pink
 
Episode 28 : Project Management Contract
Episode 28 : Project Management ContractEpisode 28 : Project Management Contract
Episode 28 : Project Management ContractSAJJAD KHUDHUR ABBAS
 
Leading UK Commissioning Management Company
Leading UK Commissioning Management CompanyLeading UK Commissioning Management Company
Leading UK Commissioning Management CompanyOlivia Wilson
 
BERR Industry / MAIN Presentation
BERR Industry / MAIN PresentationBERR Industry / MAIN Presentation
BERR Industry / MAIN PresentationMurat Cengiz
 
Leading UK Commissioning Management Company
Leading UK Commissioning Management Company Leading UK Commissioning Management Company
Leading UK Commissioning Management Company Olivia Wilson
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Gregoire Lesecq
 
Final presentation
Final presentationFinal presentation
Final presentationjai vinayak
 
Safety in Public Works
Safety in Public WorksSafety in Public Works
Safety in Public WorksDr K M SONI
 
EAR and CAR Insurance in Construction
EAR and CAR Insurance in ConstructionEAR and CAR Insurance in Construction
EAR and CAR Insurance in ConstructionSarbesh Mishra
 

Similar to Management of Commer Risks in construction.pptx (20)

Cost accounting
Cost accountingCost accounting
Cost accounting
 
Strategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksStrategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract Risks
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
 
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
Limiting the Offshore EPC Contractor's Risks and Liabiltities, Busan korea 19...
 
Limiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and LiabilitiesLimiting the Offshore EPC Contractor's Risks and Liabilities
Limiting the Offshore EPC Contractor's Risks and Liabilities
 
Safety plan
Safety planSafety plan
Safety plan
 
CV BAIJU
CV  BAIJUCV  BAIJU
CV BAIJU
 
Presentation-PII Property& BI -Presentation.pdf
Presentation-PII Property& BI -Presentation.pdfPresentation-PII Property& BI -Presentation.pdf
Presentation-PII Property& BI -Presentation.pdf
 
1-Wind Energy RHDHV_Brochure
1-Wind Energy RHDHV_Brochure1-Wind Energy RHDHV_Brochure
1-Wind Energy RHDHV_Brochure
 
Quantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficienciesQuantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficiencies
 
Episode 28 : Project Management Contract
Episode 28 : Project Management ContractEpisode 28 : Project Management Contract
Episode 28 : Project Management Contract
 
Leading UK Commissioning Management Company
Leading UK Commissioning Management CompanyLeading UK Commissioning Management Company
Leading UK Commissioning Management Company
 
BERR Industry / MAIN Presentation
BERR Industry / MAIN PresentationBERR Industry / MAIN Presentation
BERR Industry / MAIN Presentation
 
Leading UK Commissioning Management Company
Leading UK Commissioning Management Company Leading UK Commissioning Management Company
Leading UK Commissioning Management Company
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Safety in Public Works
Safety in Public WorksSafety in Public Works
Safety in Public Works
 
EAR and CAR Insurance in Construction
EAR and CAR Insurance in ConstructionEAR and CAR Insurance in Construction
EAR and CAR Insurance in Construction
 
SCM metrics.pptx
SCM metrics.pptxSCM metrics.pptx
SCM metrics.pptx
 

Recently uploaded

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 

Recently uploaded (20)

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 

Management of Commer Risks in construction.pptx

  • 1. Management of Commercial Risks in Construction Projects
  • 2. COMMERCIAL RISKS OR PROJECT RISKS Inherent in the project itself, or the market in which it operates: QS in Risk-analysis process can be summarized as: • Commercial viability: does the project make overall commercial sense for all parties. • Construction risks: can the project be built on time and on budget? • Revenue risks: will its operating revenues be as projected? • Operating risks: is the project capable of operating at the projected performance level and cost? • Input supply risks: can raw materials or other inputs be obtained at the projected costs? • Force majeure risks: how can the project cope with force majeure ...
  • 3. EXAMPLES-KEY COMMER DECISIONS • MOVEMENT OF RESOURCES AND ASSOCIATED SUMS, BETWEEN ITEMS THAT ARE CONSIDERED OVER- OR UNDER-MEASURED • POTENTIAL EFFICIENCIES OR INEFFICIENCIES, SUCH AS THE SHARING OF PRELIMS OR OTHER OVERHEAD COSTS, WITH OTHER CONTRACTS SECURED • VALUE ENGINEERING AND ALTERNATIVE METHODS, SUCH AS OFF-SITE FABRICATION
  • 4. KEY COMMER DECISIONS-ADJUSTMENTS • TO PARTICULAR PACKAGES OR ACTIVITIES • FOR FORECAST BUYING GAINS OR LOSSES, POST-CONTRACT • TO PEOPLE OR EQUIPMENT RATES • FOR THE RECOVERY OF SUMS FROM THIRD PARTIES OR SERVICES THAT CAN BE OBTAINED AT NO COST OR PAID FOR ELSEWHERE • FOR OMISSIONS IN THE CONTRACT DOCUMENTS • FOR AMBIGUITIES OR GAPS BETWEEN THE METHOD OF MEASUREMENT, THE SPECIFICATION, THE DRAWINGS AND ANY BOQ OR SCHEDULES OF RATES (SOR) • BOTTOM-LINE ADJUSTMENTS TO THE MARGIN ADDED TO THE NET ESTIMATE
  • 5. CONTINGENCY SUMS-VARIABLE COSTS? 1. RISK-IDENTIFIED FROM TENDER DOCUMENTS- QUANTITIES/ITEMS. 2. ESTIMATED PRICE ESCALATION ALLOWANCES FOR PROJECTED INCREASES-INFLATION/OTHER EXTERNAL FACTORS. 3. ESTIMATED ADJUSTMENTS FOR FOREIGN- EXCHANGE
  • 6. HOW RISK IDENTIFIED IN THE TENDER DOCUMENTS? • QUANTIFIABLE RISKS: AN APPROPRIATE INCLUSION MADE, DEPENDENT ON EXPOSURE TO RISK. • UNQUANTIFIABLE RISKS: AMOUNTS BASED ON MANAGEMENT PERCEPTION OF SITUATION. RESULT- QUALIFICATION OR EXCLUSION?
  • 7. DEALING WITH RISKS? • IN EXTREME CIRCUMSTANCES, CONTRACTING ORGANISATION WITHDRAWS FROM TENDER PROCESS • A COMMERCIAL VIEW TAKEN-ON THE MONETARY VALUE OF RISKS AND • APPROPRIATE ADJUSTMENT MADE BASED ON CONTRACTUAL PROVISIONS-PRICE ADJUSTMENT FORMULA, FOREIGN EXCH FLUCTUATIONS ETC. & • HIGHER MANAGEMENT PERCEPTION OF COMETITION & STRATEGY.
  • 8. ESTIMATED ADJUSTMENTS FOR FOREIGN-EXCHANGE FLUCTUATIONS • WORK IN A COUNTRY/PACKAGES-DIFFERENT CURRENCY OR • IN LARGER ORGANISATIONS-A VARIABLE THAT IS SOMETIMES MANAGED OUTSIDE OF THE PROJECT ITSELF INCL CORPORATE OVERHEADS • HOW TO MITIGATE RISK? HEDGING CURRENCY: EG. BY FORWARD-BUYING FOREIGN CURRENCY AT CURRENT OR OTHER AGREED RATES.
  • 9. PEER REVIEW PURPOSE? • REVIEW/FINALISE PROGRAMME AND • PRELIMINARIES AND TO FINALISE THE PRICE (FIXED, GUARANTEED MAXIMUM OR TARGET) • TO CARRY OUT THE WORKS, BASED FURTHER ADJUSTMENTS TO THE NET COST, AND • NOTING OTHER VARIABLES, INCLUDING THE RISKS AND OPPORTUNITIES DETAILED ABOVE.
  • 11. PRELIMINARIES & SITE/HO OVERHEADS OVERHEADS RICS NEW RULES OF MEASUREMENT: PRELIMS INTO ?? PARTS: •PART 1-PROJECT INFO & EMPLOYER’S REQMNT •PART 2-MAIN CONTRACTOR’S COST ITEMS •PART 3-WORK PACKAGE CONTRACTOR’S PRELIMINARIES
  • 12. PRELIMINARIES & SITE OVERHEADS • PRICING OF ITEMS CAN BE “QUANTITY” RELATED OR “TIME” RELATED • WHAT ARE PRELIMINARIES SECTION OF A BOQ MEANT FOR? PRICING OF ITEMS WHICH ARE “FIXED CHARGES” NOT QUANTITY RELATED….I.E. IRRESPECTIVE OF QTY OF WORK BEING CARRIED OUT  MAIN CONTRCATOR’S COST ITEMS “TIME” RELATED  NORMALLY “ONE OFF” PAYMENTS (FIXED) OR REGULAR PAYMENTS “TIME” RELATED DURING THE COURSE OF CONTRACT
  • 13. PRELIMS-CLASSIFY FIXED &/OR TIME RELATED EXPENSES DESCRIPTION TIME RELATED FIXED START END 1. PRE COMMENCEMENT CHARGES 2. MANAGEMENT AND STAFF 3. INITIAL SITE ESTABLISHMENT & MAIN CONTRACTOR 4. TEMP SERVICES 5. TEMP WORKS 6. SECURITY 7. EMPLOYER’S REQUIREMENTS 8. CONTRACT CONDITIONS 9. FEES AND CHARGES 10.INSURANCE, WARRANTIES, GUARANTEES
  • 14. PRELIMS-CLASSIFY FIXED &/OR TIME RELATED EXPENSES DESCRIPTION TIME RELATED FIXED START END 11. HEALTH, SAFETY AND ENVIRON PROTECTION 12. QUALITY ASSURRANCE 13. SURVEY, CONTROL & PROTECTION 14. HOUSEKEEPING & WASHING 15. SITE RECORDS 16. NON MECHANICAL PLANTS 17. MECH PLANT MAJOR 18. MECH PLANT-MINOR 19. POST COMPLETION REQUIREMENTS/AS BUILT DRAWINGS/SITE CLEARANCE/DEMOB 20. DEFECT LIABILITY REQUIREMENTS
  • 15. PART 1-PROJECT INFO & EMPLOYER’S REQMNT
  • 16. PART 1-PROJECT INFO: TENDERING CONTRACTORS GIVEN GEN DESCRIPTION OF PROJECT, WHICH MAY AFFECT THEIR BID PRICE • DRAWINGS & PRE CONSTRUCTION INFO USED TO PREPARE BILLS OF QTYS IF PROVIDED • QUALITY ASSURANCE PLAN, SAFETY MANUAL • ANY DESIGN RESPONSIBILITY • IDENTIFICATION/SUPPORT OF EXISTING UTILITIES REQUIRING SHIFTING/RELOCATION OF UTILITIES • TRAFFIC DIVERSION, BARRICADING, TOPO/ALIGNMENT SURVEY • ANY FOLLOW UP ACTIONS ON BEHALF OF EMPLOYER? • ANY OTHER WORKS ON GOING AT SITE • AS BUILT DRAWINGS, VIDEO RECORDING • O&M MANUAL, SPARES AND TRAINING BEFORE TESTING AND COMMISSIONING • DISPOSAL OF DEMOLITION WASTE, EXCESS SOIL
  • 17. • HOW PROJECT WILL BE MANAGED BY PMC OR CLIENT DIRECTLY FOR SUPERVISION, PROGRESS MONITORING AND SHE REQUIREMENTS REQMNTS OF SITE OFFICES, ACs FOR EMPLOYER, CONSULTANTS: • TRANSPORT REQUIREMENT • FURNITURE, IT AND OTHER OFFICE SUPPORT • POWER, BACK UP DG, WATER SUP, OPERATIONS AND MAINTENANCE • ANY STAFF/OPERATORS? • ARE THESE REIMBURSABLE BASIS OR DEEMED TO BE INCLUDED IN RATES? PART 1-EMPLOYER’S REQMNT:
  • 19. 1. STAFF: CONTRACTOR’S MANAGEMENT OF STAFF- RELATED TO “THE” PROJECT BUT NOT INCLUDED IN CONTAINED IN UNIT RATES OF ITEMS OF MEASURED WORK. INCLUDING HSE 2. SITE ACCOMODATION: ALL 3. SITE SECURITY-STAFF, EQPT, HOARDINGS, FENCING. EFFECT ON INSURANCE PREMIUMS 4. TEMP WORKS: DRAINAGE, SITE ROADS, HARDSTANDINGS, CAR PARKS, STORAGE, OFFICE, QUALITY LABORATORY 5. FFE-FURNITURE, FITTINGS AND EQPT OF TEMP WORKS INCL MAINT 6. TEMP UTILITY SUPPLIES- BACK UP, IT/COMNS INCLUDING MAINT & CONSUMABLES
  • 20. 7. MECH PLANT & EQPT-USED ACROSS SITE (NOT SPECIFIC TO A SPECIFIC ITEM OF MEASURED WORK): TOWER CRANES, HOISTS, TMs, DUMPERS, EXCAVATORS, MOBILE CRANES, CONCRETE BATCHING PLANT ETC. COSTS.. REFURBISMENT OF USED PLANT BY OTHER PROJECTS, TRANSPORTATION, INSURANCE, INCL RTO (FIXED), TRANSFER FROM OTHER STATES ETC. 8. SCAFFOLDINGS & TEMP WORKS- REQD FOR PERMNT WORKS: ERECTION & DISMANTLING COSTS (FIXED), WEEKLY HIRE CHARGES (TIME RELATED); INCLUDING DESIGN OF TEMP WORKS. 9. SPECIALISED ENGG DESIGN & CONSTR OF CAISSONS/COFFER DAMS/ (SIGNIFICANT COSTS) IF NOT INCLUDED IN MEASURED WORKS 1 0. TESTING & COMMISSIONING- QUALITY LAB, TESTING AND COMMISSIONING COSTS PRIOR TO HANDOVER AT SUBSTANTIAL COMPLETION-ONLY OWN SCOPE. 11. STATUTORY-PROVIDENT FUND, ESI, INSURANCE, (IF NOT INCLUDED IN LABOUR); BONDS, GUARANTEES & WARANTIES UNDER THE CONTRACT; APPROVALS 12. SITE CLEARANCE-COSTS OF DISMANTLING/SITE CLEARANCE/DISPOSAL OF WASTE
  • 21. PART 3-SUB CONTRACTOR PACKAGE COSTS
  • 22. SPECIAL ATTENDANCE ALL SPECIFIC REQUIREMENTS FOR SUB CON INCLUDING: • SPEC SCAFFOLDING • UNLOADING • HOISTING • SPEC COVERED STORAGE • SPEC LIGHTING • POWER SUPPLY • TEMP ACCESS ROADS & HARDSTANDINGS [ALL THE ABOVE WOULD BE PROVIDED FROM SPACE/EQPT OTHER THAN FOR MAIN WORK]
  • 23. GENERAL ATTENDANCE • USE OF TEMP WORKS, PATHS, PAVING • USE OF STANDING SCAFFOLDING • USE OF STANDING POWER OPERATED HOISTING PLANT • USE OF MESS ROOMS, SANITARY, ACCOMODATION, WELFARE, TEMP LIGHTING AND WATER SUPPLIES • PROVN OF SPACE FOR SUBCON OFFICE ACCDN • PROVN OF SPACE FOR STORAGE OF PLANT AND MATERIALS • CLEARING AWAY-RUBBISH [ALL THE ABOVE WOULD BE PROVIDED FROM SPACE/EQPT FOR MAIN WORK]
  • 24. SUB CONTRACTOR/SUPPLIERS OVERVIEW: NEED FOR SUBCON? TYPES: • LABOUR SUPPLY • DOMESTIC SUB CON/SUPPLIERS: CONTRACTOR’S CHOICE SUBJECT TO APPROVAL BY ENGINEER/CLIENT • NAMED (PANEL TO CHOOSE FROM) AS GOOD AS DOMESTIC • NOMINATED/DESIGNATED SUB CONTRCATORS-CLIENT SELECTS AND NOMINATES. (NO CHOICE WITH CONTRACTOR). COST IMPLICATIONS? • NOMINATED SUPPLIERS • DOMESTIC HIRING AGENCY • NOMINATED HIRING AGENCY
  • 25. SUB CONTRACTOR/SUPPLIER COSTS (A) MOBBILISATION/DEMOB COSTS (B) LABOUR COSTS WITH TOOLS/TACKLES ONLY (C) LABOUR COSTS WITH SHUTTERING (D) WITH MATERIAL COSTS (E) WITH MATERIALS/EQPT SUPPLIED BY CLIENT/OWNER (F) WITH PLANT & EQPT COSTS (G) GENERAL SITE OH (H) HO OH (I) PROFIT
  • 26. COSTS TO MAIN CONTRACTOR • SUBCON COSTS • SPECIALISED EQPT OR SERVICE REQD BY SUBCON (SPEC ATTENDANCE) • PROPORTION OF GENERAL SITE OH USED BY SUBCON (GEN ATTENDANCE)? • PROFIT THAT MAIN CONTRACTOR WOULD HAVE MADE ON SUB CON WORK