SlideShare a Scribd company logo
1 of 1
Download to read offline
Case Study
Madison County Schools
Building and Energy Solutions
“Without ABM’s
products and
service as well as
financial solutions,
it would have been
impossible for
us to accomplish
all that we have.
We look forward
to continuing a
long, extended
relationship with
ABM,” said Dr.
Allen McCannon,
Superintendent of
Madison County
Schools.
Madison County Schools is a public
school district located in Danielsville,
GA. Ensuring a comfortable learning
environment for their students is
critical.
ABM’s relationship with Madison
County Schools spans over a decade.
The school district first turned to ABM
in 2001 to provide solutions to address
aging infrastructure needs in Madison
County High School.
Madison County Schools were
experiencing major issues with
humidity, indoor air quality, and comfort
conditions while many of the HVAC
systems were beyond their lifespan.
With a very limited budget, they were
unsure all the necessary upgrades
could be made. After meeting with
ABM, they discovered the necessary
upgrades and repairs could be made
with no upfront cost and remain budget
neutral.
CHALLENGE
Madison County Schools needed to
make essential renovations to improve
efficiency and students’ overall learning
environment while dealing with a very
limited budget.
SOLUTION
• Comprehensive design engineering
• New high-efficiency HVAC systems
• High-performance T-8 lighting system
	upgrades
• 25% more efficient boiler for water
	 source heat pump loop
• Energy management system
	 upgrades to allow for county wide
	 facility control
BENEFIT
•	 Monitor energy consumption and
	 provide annual energy savings audit
• Improved indoor environmental
	 quality including comfort conditions, l
	 ighting levels, and increased fresh
	 air supplied and controlled humidity
• Over $5 million in savings of energy
	 and operational costs
• District-wide facility improvements
	 entirely self-funded
©2012 ABM Industries Inc.
All rights reserved.
ABM-02006-0112
866-678-0783
abm.com

More Related Content

Viewers also liked

联合国水锤泵综合利用Cdm项目
联合国水锤泵综合利用Cdm项目联合国水锤泵综合利用Cdm项目
联合国水锤泵综合利用Cdm项目Alldnnskins
 
October 24th 2012 Public presentation of the Achucarro Basque Center for Neur...
October 24th 2012 Public presentation of the Achucarro Basque Center for Neur...October 24th 2012 Public presentation of the Achucarro Basque Center for Neur...
October 24th 2012 Public presentation of the Achucarro Basque Center for Neur...Achucarro-Neuroscience
 
Himmat Samgir Resume
Himmat Samgir ResumeHimmat Samgir Resume
Himmat Samgir Resumehimmat samgir
 
privateuniversity-minnesota_8754
privateuniversity-minnesota_8754privateuniversity-minnesota_8754
privateuniversity-minnesota_8754Randy H Gehman
 
Motoruino 1 Assembly Instructions
Motoruino 1 Assembly InstructionsMotoruino 1 Assembly Instructions
Motoruino 1 Assembly InstructionsArticacc, Lda
 
Drosophila - Laboratory Report 1
Drosophila  - Laboratory Report 1Drosophila  - Laboratory Report 1
Drosophila - Laboratory Report 1Necla YÜCEL
 
Current Events
Current EventsCurrent Events
Current EventsPooja1126
 
Final project museum tepotzotlán
Final project museum tepotzotlánFinal project museum tepotzotlán
Final project museum tepotzotlánPacman Toxicore
 
Www benaissi avocat-fr
Www benaissi avocat-frWww benaissi avocat-fr
Www benaissi avocat-frDaryl Dewitt
 
Retail Store Locations - Retail Management
Retail Store Locations - Retail ManagementRetail Store Locations - Retail Management
Retail Store Locations - Retail Management'Nipun Jain'
 
Presentación cerofalta torre comunicaciones (1)
Presentación cerofalta torre comunicaciones (1)Presentación cerofalta torre comunicaciones (1)
Presentación cerofalta torre comunicaciones (1)Roxana Hernández Cruz
 

Viewers also liked (17)

联合国水锤泵综合利用Cdm项目
联合国水锤泵综合利用Cdm项目联合国水锤泵综合利用Cdm项目
联合国水锤泵综合利用Cdm项目
 
October 24th 2012 Public presentation of the Achucarro Basque Center for Neur...
October 24th 2012 Public presentation of the Achucarro Basque Center for Neur...October 24th 2012 Public presentation of the Achucarro Basque Center for Neur...
October 24th 2012 Public presentation of the Achucarro Basque Center for Neur...
 
Presentation2
Presentation2Presentation2
Presentation2
 
Acting
ActingActing
Acting
 
Kool Foam LLC
Kool Foam LLCKool Foam LLC
Kool Foam LLC
 
Himmat Samgir Resume
Himmat Samgir ResumeHimmat Samgir Resume
Himmat Samgir Resume
 
Happy Birth day.
Happy Birth day.Happy Birth day.
Happy Birth day.
 
Imagenia
ImageniaImagenia
Imagenia
 
Plagio
PlagioPlagio
Plagio
 
privateuniversity-minnesota_8754
privateuniversity-minnesota_8754privateuniversity-minnesota_8754
privateuniversity-minnesota_8754
 
Motoruino 1 Assembly Instructions
Motoruino 1 Assembly InstructionsMotoruino 1 Assembly Instructions
Motoruino 1 Assembly Instructions
 
Drosophila - Laboratory Report 1
Drosophila  - Laboratory Report 1Drosophila  - Laboratory Report 1
Drosophila - Laboratory Report 1
 
Current Events
Current EventsCurrent Events
Current Events
 
Final project museum tepotzotlán
Final project museum tepotzotlánFinal project museum tepotzotlán
Final project museum tepotzotlán
 
Www benaissi avocat-fr
Www benaissi avocat-frWww benaissi avocat-fr
Www benaissi avocat-fr
 
Retail Store Locations - Retail Management
Retail Store Locations - Retail ManagementRetail Store Locations - Retail Management
Retail Store Locations - Retail Management
 
Presentación cerofalta torre comunicaciones (1)
Presentación cerofalta torre comunicaciones (1)Presentación cerofalta torre comunicaciones (1)
Presentación cerofalta torre comunicaciones (1)
 

Similar to Madison County Schools

Medford School District Strategic Energy Management
Medford School District Strategic Energy ManagementMedford School District Strategic Energy Management
Medford School District Strategic Energy ManagementLief Hochendoner
 
Lake Mills Middle School LEED Project Profile | Miron Construction
Lake Mills Middle School LEED Project Profile | Miron ConstructionLake Mills Middle School LEED Project Profile | Miron Construction
Lake Mills Middle School LEED Project Profile | Miron ConstructionMiron Construction
 
Financing energy upgrades for k 12 schools - schneider electric
Financing energy upgrades for k 12 schools - schneider electricFinancing energy upgrades for k 12 schools - schneider electric
Financing energy upgrades for k 12 schools - schneider electricTNenergy
 
Anderson_SD2-3_CaseStudy
Anderson_SD2-3_CaseStudyAnderson_SD2-3_CaseStudy
Anderson_SD2-3_CaseStudyRandy H Gehman
 
Green Buildings in Massachusetts: State Policies and Regulations
Green Buildings in Massachusetts: State Policies and RegulationsGreen Buildings in Massachusetts: State Policies and Regulations
Green Buildings in Massachusetts: State Policies and RegulationsSustainable Performance Institute
 
tamikajacquesgcc2014
tamikajacquesgcc2014tamikajacquesgcc2014
tamikajacquesgcc2014GWT
 
Fmx Application2010
Fmx Application2010Fmx Application2010
Fmx Application2010RCHerrin
 
Primary school converting to Academy school, procurement issues
Primary school converting to Academy school, procurement issuesPrimary school converting to Academy school, procurement issues
Primary school converting to Academy school, procurement issuesSarah Revell
 
2010-2011 Annual Meeting Financials
2010-2011 Annual Meeting Financials2010-2011 Annual Meeting Financials
2010-2011 Annual Meeting FinancialsMichael McDermot
 
Solar Table Capital Improvement 2015
Solar Table Capital Improvement 2015Solar Table Capital Improvement 2015
Solar Table Capital Improvement 2015Victor Yongkun Liao
 
Facing Challenges with Creative Energy Solutions AV CS - School Business Affa...
Facing Challenges with Creative Energy Solutions AV CS - School Business Affa...Facing Challenges with Creative Energy Solutions AV CS - School Business Affa...
Facing Challenges with Creative Energy Solutions AV CS - School Business Affa...Dan Dowell
 
20/20 Vision: Green Building Megatrends
20/20 Vision: Green Building Megatrends20/20 Vision: Green Building Megatrends
20/20 Vision: Green Building MegatrendsJerry Yudelson
 
Hillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionHillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionMiron Construction
 
Green needham sustainable communities
Green needham sustainable communitiesGreen needham sustainable communities
Green needham sustainable communitiesGreen Needham
 
Managing Energy and Saving Money Through Your Facility
Managing Energy and Saving Money Through Your FacilityManaging Energy and Saving Money Through Your Facility
Managing Energy and Saving Money Through Your FacilityTNenergy
 

Similar to Madison County Schools (20)

Medford School District Strategic Energy Management
Medford School District Strategic Energy ManagementMedford School District Strategic Energy Management
Medford School District Strategic Energy Management
 
Lake Mills Middle School LEED Project Profile | Miron Construction
Lake Mills Middle School LEED Project Profile | Miron ConstructionLake Mills Middle School LEED Project Profile | Miron Construction
Lake Mills Middle School LEED Project Profile | Miron Construction
 
Financing energy upgrades for k 12 schools - schneider electric
Financing energy upgrades for k 12 schools - schneider electricFinancing energy upgrades for k 12 schools - schneider electric
Financing energy upgrades for k 12 schools - schneider electric
 
Anderson_SD2-3_CaseStudy
Anderson_SD2-3_CaseStudyAnderson_SD2-3_CaseStudy
Anderson_SD2-3_CaseStudy
 
Green Buildings in Massachusetts: State Policies and Regulations
Green Buildings in Massachusetts: State Policies and RegulationsGreen Buildings in Massachusetts: State Policies and Regulations
Green Buildings in Massachusetts: State Policies and Regulations
 
tamikajacquesgcc2014
tamikajacquesgcc2014tamikajacquesgcc2014
tamikajacquesgcc2014
 
Project Proposal.pptx
Project Proposal.pptxProject Proposal.pptx
Project Proposal.pptx
 
Fmx Application2010
Fmx Application2010Fmx Application2010
Fmx Application2010
 
Primary school converting to Academy school, procurement issues
Primary school converting to Academy school, procurement issuesPrimary school converting to Academy school, procurement issues
Primary school converting to Academy school, procurement issues
 
2010-2011 Annual Meeting Financials
2010-2011 Annual Meeting Financials2010-2011 Annual Meeting Financials
2010-2011 Annual Meeting Financials
 
Solar Table Capital Improvement 2015
Solar Table Capital Improvement 2015Solar Table Capital Improvement 2015
Solar Table Capital Improvement 2015
 
Facing Challenges with Creative Energy Solutions AV CS - School Business Affa...
Facing Challenges with Creative Energy Solutions AV CS - School Business Affa...Facing Challenges with Creative Energy Solutions AV CS - School Business Affa...
Facing Challenges with Creative Energy Solutions AV CS - School Business Affa...
 
20/20 Vision: Green Building Megatrends
20/20 Vision: Green Building Megatrends20/20 Vision: Green Building Megatrends
20/20 Vision: Green Building Megatrends
 
Hillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionHillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron Construction
 
Green needham sustainable communities
Green needham sustainable communitiesGreen needham sustainable communities
Green needham sustainable communities
 
31013 nrcsd nyssba_pres_9-6-11
31013 nrcsd nyssba_pres_9-6-1131013 nrcsd nyssba_pres_9-6-11
31013 nrcsd nyssba_pres_9-6-11
 
Green needham mma
Green needham mmaGreen needham mma
Green needham mma
 
Cherry Creek Schools
Cherry Creek SchoolsCherry Creek Schools
Cherry Creek Schools
 
Campus training center is a marvel of efficiency
Campus training center is a marvel of efficiencyCampus training center is a marvel of efficiency
Campus training center is a marvel of efficiency
 
Managing Energy and Saving Money Through Your Facility
Managing Energy and Saving Money Through Your FacilityManaging Energy and Saving Money Through Your Facility
Managing Energy and Saving Money Through Your Facility
 

Madison County Schools

  • 1. Case Study Madison County Schools Building and Energy Solutions “Without ABM’s products and service as well as financial solutions, it would have been impossible for us to accomplish all that we have. We look forward to continuing a long, extended relationship with ABM,” said Dr. Allen McCannon, Superintendent of Madison County Schools. Madison County Schools is a public school district located in Danielsville, GA. Ensuring a comfortable learning environment for their students is critical. ABM’s relationship with Madison County Schools spans over a decade. The school district first turned to ABM in 2001 to provide solutions to address aging infrastructure needs in Madison County High School. Madison County Schools were experiencing major issues with humidity, indoor air quality, and comfort conditions while many of the HVAC systems were beyond their lifespan. With a very limited budget, they were unsure all the necessary upgrades could be made. After meeting with ABM, they discovered the necessary upgrades and repairs could be made with no upfront cost and remain budget neutral. CHALLENGE Madison County Schools needed to make essential renovations to improve efficiency and students’ overall learning environment while dealing with a very limited budget. SOLUTION • Comprehensive design engineering • New high-efficiency HVAC systems • High-performance T-8 lighting system upgrades • 25% more efficient boiler for water source heat pump loop • Energy management system upgrades to allow for county wide facility control BENEFIT • Monitor energy consumption and provide annual energy savings audit • Improved indoor environmental quality including comfort conditions, l ighting levels, and increased fresh air supplied and controlled humidity • Over $5 million in savings of energy and operational costs • District-wide facility improvements entirely self-funded ©2012 ABM Industries Inc. All rights reserved. ABM-02006-0112 866-678-0783 abm.com