The document provides equipment usage data for a construction water networks project over 32 months. It shows the number of excavators, shovels, tippers, JCBs, rollers, and other equipment used each month. The total number of pieces of equipment grows from 11 in the first month to 214 in the peak month, then tapers back down to 24 by the 32nd month, with a total of 4,501 pieces of equipment used over the course of the project.