This document provides instructions for a quantity surveying project assignment. The student has been appointed as a quantity surveying consultant to prepare bills of quantities for single storey bungalows. Specifically, the student must prepare BQs for external walls, internal walls, external and internal wall finishes, and external and internal floor finishes, excluding staircases. Specifications for painting, wall tiles, and floor tiles are provided. The submission must follow a specified order and be submitted by November 26th for grading. Late submissions will be penalized.