SlideShare a Scribd company logo
1
Surname
Names
Age
Gender
Race
DOB
ID no
Nationality
Address
Contact no
Marital Status
Religion
Dependents
Health
Criminal Record
License
NDBSC. National Diploma (2009). B-Tech (Quantity Surveying)
Tshwane University of Technology (2011)
(Full time)
Subjects:
Quantity Surveying I, II, III
Construction Technology I, II, III
Construction Management I, II, III
Structures III
Applied Building science I, III
Accounting I
Price analysis and Estimating
Site Surveying
Concrete and Structures
Construction Economics
Matric with Exemption Wem School Kabokweni
(2005)
Subjects:
English
SiSwati
Maths
Geography
Physical Science
Biology
Agricultural Science
Courses Attended
-Construction Claims
CURRICULUM VITAE OF
LUNGA PRIOR NXUMALO
PERSONAL DETAILS
Nxumalo
Lunga Prior
29
Male
Black
09 August 1986
860809 6105 087 South African
B12/15 Phoenix Regent II Estate Erand Gardens
Midrand
1687
Cell: 078 043 6321/ 082 749 5451 Tel: 011 067
1061
Single
Christian
None
Excellent None
C1 code 10 Drivers licence
EDUCATIONAL QUALIFICATIONS
2
Applications/Software Skills
 Microsoft Project
 MS Office
 MS Word
 MS Excel
 Candy Construction Software and WinQS
 Excellent interpersonal skills
 Excellent communication skills (written and verbal)
 Excellent Planning and organisational skills
 Strategic Focus
 Excellent project planning and management skills
Quantity Surveyor Liam-N 03/03/2012 to Date (Owner)
Quantity Surveyor COMU Properties 08 June 2011
30 September 2015
Internship programme Stefanutti Stocks, 05 October 2009
30 August 2010
As a quantity surveyor and Construction Mananger my duties are as
follows:
 Conducting feasibility studies to estimate materials, time and labour costs
 Preparing, negotiating and analysing costs for tenders and contracts
 Coordination of work effort
 Advising on a range of legal and contractual issues using (JBCC,GCC and NEC)
contracts
 Valuing completed work and arranging for payments
 Pricing of tender documents
 Attending site meetings for progress measurements
 Project Management
 Negotiating prices with material suppliers
COMPUTER LITERACY
SKILLS
CAREER CRONOLOGY
DUTIES AND RESPONSIBILITIES
3
As a project construction manager I work from the project office and Im responsible for
the overall planning, direction, organization, and budgeting of all construction or
maintenance work on the project to the highest safety and quality levels within time and
costs constraints. During FEL3, I participate in the conceptual development of a
construction project and oversees its organization, scheduling and implementation
strategy.
Duties
•Responsible, with support of the Project Manager and Safety Manager, for all safety
planning associated with the project construction execution methods selection.
•Responsible through the constructability coordinator to set up and oversee the
constructability process.
•Coordinates with the client, project management, and project services in identifying
required reporting procedures and formats for client and company management needs;
•Ensures Construction Work Packages (CWP) are defined to a level sufficient for a level3
schedule.
•Ensures CWPs are coordinated with Engineering and Procurement.
•Ensures corporate policies and procedures are fully implemented.
•Establishes project field procedures and objectives within corporate policies and
procedures as necessitated by jobsite conditions;
•Reviews and approves construction estimates, budgets, forecasts and schedules;
•Reviews construction/erection drawings and specifications prepared for the project for
economic constructability, develop strategies for erection interfaces, determine
appropriate construction methods, and pre-empt problem areas;
•Ensures the necessary permits and licenses (notice of project, insurance certificates,
worker’s compensation, environmental permits, etc.) are identified and obtained prior to
the start of construction activities on site;
•Coordinating role with the project manager, design engineers, procurement, planning
and scheduling and other personnel in setting priorities to ensure timely performance.
•development of site organization and staffing requirements required to execute
construction activities within project schedule and acceptable costs;
•I Direct, monitor and motivates subordinate construction specialists in their
performance and direct their activities as necessary to ensure project requirements are
achieved;
•I establish the construction requirements for pre-fabrication and modularization;
•I Provide construction technical support to other site functions as needed;
•I ensure that the Project Manager is always kept well informed of construction
concerns;
•I ensure adherence to all local regulations and statutory requirements in site activities
planning;
4
•I assist the Procurement team to review contractual agreements with clients, suppliers,
and contractors;
•I liaise with client representatives as required to ensure shutdowns, relocations, tie-ins,
etc. will be planned safely and in a timely manner with minimum disruption;
•Recommends the requirements for construction resources and strategies to meet the
schedule in each area;
•I play a supporting role participating in the labour studies, manpower sourcing exercise
and the establishment of the industrial relations strategy;
•Im able to Co-operate with the Commissioning Manager in the planning of transfer
packages.
• Im able to Co-ordinate the preparation and issue of the Construction Execution Plan.
Essential Requirements
•Im able to demonstrate a focus in construction phase of project delivery, and have
extensive knowledge of HS&E procedures, safe work practices, and applicable legislation;
•I have 5 years previous construction management experience.
•I pride myself with leadership skills, the ability to lead a team and fit into a team
environment;
•I have a working knowledge of MS office and MS project applications;
•Effective report writing skills, planning and organizational skills;
•Well developed communication, negotiation and interpersonal skills;
•Im able to communicate directly with the Client on key issues;
•I have extensive knowledge of all phases of construction operations relating to field
activities of all engineering disciplines, construction and maintenance practices,
procedures and techniques, and applicable codes and standards;
•Familiarity with a wide range of equipment, tools, and technologies used in
construction;
•Well developed business and management principles related to strategic planning,
resource allocation, production methods, leadership and coordination of people and
resources;
5
Mr Jansen Van Rensburg
TUT
H.O.D Building Science/ Civil Engineering
012 803 9658
Vanessa Ranjit
TUT
Senior Lecture
012 803 9658
Masha Mulaudzi
Comu Properties
Director Comu Properties
084 503 6715
masha@comuproperties.co.za
Lara Mulaudzi
Shotha Engineering
Director Shotha Engineering
078 256 3727
lara@shothaholdings.co.za
Aluwani Khameli
Kusile Civil Works Joint Venture
Site Engineer
072 565 8647
Aluwani.Khameli@kusilecivil.co.za
REFERENCES

More Related Content

Similar to Lunga CV 2016

curriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieterscurriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pietersPieters (Paul)
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Singh
 
CVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi MCVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi MAli oreidi
 
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONPROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONDAVIDSON ECHIDIKE
 
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISOR
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISORPROJECT CONSTRUCTION SUPERVISION AND SUPER VISOR
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISORDAVIDSON ECHIDIKE
 
Ritwik resume- July
Ritwik resume- JulyRitwik resume- July
Ritwik resume- Julyritwik goud
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERAbd~el Hakim mohamed izran
 
Frans Fourie CV Current N 2015
Frans Fourie CV Current N 2015Frans Fourie CV Current N 2015
Frans Fourie CV Current N 2015loracfou
 
Peyman Zarrabi Construction_Facilities PM_Engineer (2)
Peyman Zarrabi Construction_Facilities PM_Engineer (2)Peyman Zarrabi Construction_Facilities PM_Engineer (2)
Peyman Zarrabi Construction_Facilities PM_Engineer (2)Peyman Zarrabi
 
CV Lilymer Calvo - Dec 2015
CV Lilymer Calvo - Dec 2015CV Lilymer Calvo - Dec 2015
CV Lilymer Calvo - Dec 2015Lilymer Calvo
 
Nunn Internship Summary - 2015
Nunn Internship Summary - 2015Nunn Internship Summary - 2015
Nunn Internship Summary - 2015Jim Whittaker
 
Graham Winsor Resume July 2015
Graham Winsor Resume July 2015Graham Winsor Resume July 2015
Graham Winsor Resume July 2015Graham Winsor
 

Similar to Lunga CV 2016 (20)

curriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieterscurriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieters
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project Manager
 
ASHKAN ROHANIPOUR october
ASHKAN ROHANIPOUR octoberASHKAN ROHANIPOUR october
ASHKAN ROHANIPOUR october
 
CVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi MCVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi M
 
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONPROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
 
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISOR
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISORPROJECT CONSTRUCTION SUPERVISION AND SUPER VISOR
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISOR
 
Ritwik resume- July
Ritwik resume- JulyRitwik resume- July
Ritwik resume- July
 
ALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAHALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAH
 
IMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CVIMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CV
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
Frans Fourie CV Current N 2015
Frans Fourie CV Current N 2015Frans Fourie CV Current N 2015
Frans Fourie CV Current N 2015
 
County
CountyCounty
County
 
Peyman Zarrabi Construction_Facilities PM_Engineer (2)
Peyman Zarrabi Construction_Facilities PM_Engineer (2)Peyman Zarrabi Construction_Facilities PM_Engineer (2)
Peyman Zarrabi Construction_Facilities PM_Engineer (2)
 
. Gamal Aboul Hassan
. Gamal Aboul Hassan. Gamal Aboul Hassan
. Gamal Aboul Hassan
 
2014_BA_Resume
2014_BA_Resume2014_BA_Resume
2014_BA_Resume
 
CV Lilymer Calvo - Dec 2015
CV Lilymer Calvo - Dec 2015CV Lilymer Calvo - Dec 2015
CV Lilymer Calvo - Dec 2015
 
Nunn Internship Summary - 2015
Nunn Internship Summary - 2015Nunn Internship Summary - 2015
Nunn Internship Summary - 2015
 
Graham Winsor Resume July 2015
Graham Winsor Resume July 2015Graham Winsor Resume July 2015
Graham Winsor Resume July 2015
 
Resume to be printed
Resume to be printedResume to be printed
Resume to be printed
 
Henry CV
Henry CVHenry CV
Henry CV
 

Lunga CV 2016

  • 1. 1 Surname Names Age Gender Race DOB ID no Nationality Address Contact no Marital Status Religion Dependents Health Criminal Record License NDBSC. National Diploma (2009). B-Tech (Quantity Surveying) Tshwane University of Technology (2011) (Full time) Subjects: Quantity Surveying I, II, III Construction Technology I, II, III Construction Management I, II, III Structures III Applied Building science I, III Accounting I Price analysis and Estimating Site Surveying Concrete and Structures Construction Economics Matric with Exemption Wem School Kabokweni (2005) Subjects: English SiSwati Maths Geography Physical Science Biology Agricultural Science Courses Attended -Construction Claims CURRICULUM VITAE OF LUNGA PRIOR NXUMALO PERSONAL DETAILS Nxumalo Lunga Prior 29 Male Black 09 August 1986 860809 6105 087 South African B12/15 Phoenix Regent II Estate Erand Gardens Midrand 1687 Cell: 078 043 6321/ 082 749 5451 Tel: 011 067 1061 Single Christian None Excellent None C1 code 10 Drivers licence EDUCATIONAL QUALIFICATIONS
  • 2. 2 Applications/Software Skills  Microsoft Project  MS Office  MS Word  MS Excel  Candy Construction Software and WinQS  Excellent interpersonal skills  Excellent communication skills (written and verbal)  Excellent Planning and organisational skills  Strategic Focus  Excellent project planning and management skills Quantity Surveyor Liam-N 03/03/2012 to Date (Owner) Quantity Surveyor COMU Properties 08 June 2011 30 September 2015 Internship programme Stefanutti Stocks, 05 October 2009 30 August 2010 As a quantity surveyor and Construction Mananger my duties are as follows:  Conducting feasibility studies to estimate materials, time and labour costs  Preparing, negotiating and analysing costs for tenders and contracts  Coordination of work effort  Advising on a range of legal and contractual issues using (JBCC,GCC and NEC) contracts  Valuing completed work and arranging for payments  Pricing of tender documents  Attending site meetings for progress measurements  Project Management  Negotiating prices with material suppliers COMPUTER LITERACY SKILLS CAREER CRONOLOGY DUTIES AND RESPONSIBILITIES
  • 3. 3 As a project construction manager I work from the project office and Im responsible for the overall planning, direction, organization, and budgeting of all construction or maintenance work on the project to the highest safety and quality levels within time and costs constraints. During FEL3, I participate in the conceptual development of a construction project and oversees its organization, scheduling and implementation strategy. Duties •Responsible, with support of the Project Manager and Safety Manager, for all safety planning associated with the project construction execution methods selection. •Responsible through the constructability coordinator to set up and oversee the constructability process. •Coordinates with the client, project management, and project services in identifying required reporting procedures and formats for client and company management needs; •Ensures Construction Work Packages (CWP) are defined to a level sufficient for a level3 schedule. •Ensures CWPs are coordinated with Engineering and Procurement. •Ensures corporate policies and procedures are fully implemented. •Establishes project field procedures and objectives within corporate policies and procedures as necessitated by jobsite conditions; •Reviews and approves construction estimates, budgets, forecasts and schedules; •Reviews construction/erection drawings and specifications prepared for the project for economic constructability, develop strategies for erection interfaces, determine appropriate construction methods, and pre-empt problem areas; •Ensures the necessary permits and licenses (notice of project, insurance certificates, worker’s compensation, environmental permits, etc.) are identified and obtained prior to the start of construction activities on site; •Coordinating role with the project manager, design engineers, procurement, planning and scheduling and other personnel in setting priorities to ensure timely performance. •development of site organization and staffing requirements required to execute construction activities within project schedule and acceptable costs; •I Direct, monitor and motivates subordinate construction specialists in their performance and direct their activities as necessary to ensure project requirements are achieved; •I establish the construction requirements for pre-fabrication and modularization; •I Provide construction technical support to other site functions as needed; •I ensure that the Project Manager is always kept well informed of construction concerns; •I ensure adherence to all local regulations and statutory requirements in site activities planning;
  • 4. 4 •I assist the Procurement team to review contractual agreements with clients, suppliers, and contractors; •I liaise with client representatives as required to ensure shutdowns, relocations, tie-ins, etc. will be planned safely and in a timely manner with minimum disruption; •Recommends the requirements for construction resources and strategies to meet the schedule in each area; •I play a supporting role participating in the labour studies, manpower sourcing exercise and the establishment of the industrial relations strategy; •Im able to Co-operate with the Commissioning Manager in the planning of transfer packages. • Im able to Co-ordinate the preparation and issue of the Construction Execution Plan. Essential Requirements •Im able to demonstrate a focus in construction phase of project delivery, and have extensive knowledge of HS&E procedures, safe work practices, and applicable legislation; •I have 5 years previous construction management experience. •I pride myself with leadership skills, the ability to lead a team and fit into a team environment; •I have a working knowledge of MS office and MS project applications; •Effective report writing skills, planning and organizational skills; •Well developed communication, negotiation and interpersonal skills; •Im able to communicate directly with the Client on key issues; •I have extensive knowledge of all phases of construction operations relating to field activities of all engineering disciplines, construction and maintenance practices, procedures and techniques, and applicable codes and standards; •Familiarity with a wide range of equipment, tools, and technologies used in construction; •Well developed business and management principles related to strategic planning, resource allocation, production methods, leadership and coordination of people and resources;
  • 5. 5 Mr Jansen Van Rensburg TUT H.O.D Building Science/ Civil Engineering 012 803 9658 Vanessa Ranjit TUT Senior Lecture 012 803 9658 Masha Mulaudzi Comu Properties Director Comu Properties 084 503 6715 masha@comuproperties.co.za Lara Mulaudzi Shotha Engineering Director Shotha Engineering 078 256 3727 lara@shothaholdings.co.za Aluwani Khameli Kusile Civil Works Joint Venture Site Engineer 072 565 8647 Aluwani.Khameli@kusilecivil.co.za REFERENCES