LOME
OUAGADOUGOU
Road Corridor and Transport
Facilitation Project
 The Lomé-Cinkansé-Ouagadougou Corridor is the backbone of Togo’s road
network, and the only road linking all the regions of the country. The corridor
is also very important for the sub-region’s landlocked countries (Mali,
Burkina, Niger), particularly Burkina Faso, because the Lomé Port Authority
(PAL) is currently one of the main transit port for its overseas trade.
 Total estimated project cost : 282.5 M EUR
PROJECT PRESENTATION
PROJECT PRESENTATION
 The main objective of Lomé-Ouagadougou transport corridor is, in addition to
improving the condition of the road and travel, to facilitate regional integration
between Burkina Faso and Togo, was well as within the WAEMU/ECOWAS zone.
 The road connects land-locked Burkina Faso, Mali, and Niger with the port of
Lomé. The project will rehabilitate about 300 km of road sections which are
currently in bad condition, between the two capitals, and key transport
facilitation measures along the Lomé-Ouagadougou corridor.
 The project consists in the rehabilitation of 303 km of road in very bad or bad
condition, with 150 km in Togo and 153 km in Burkina Faso, as well as the
improvement of transport facilitation along the corridor. The expected outcomes
are increased transit traffic and trade, reduced general transportation costs,
improved road safety, and the creation of jobs for youths and women.
 CONSTRUCTION RISK : Delay and overhead costs in the rehabilitation of the infrastructure.
ALLOCATED TO CONCESSIONAIRE / PRIVATE SECTOR
 DEMAND & REVENUE RISKS :Lower traffic than expected. Not enough revenue to repay CAPEX and
generate sufficient IRR.
ALLOCATED TO GOVERNMENT (Payment capacity or minimum guaranteed revenue)
 O&M RISKS : Operator will support expenses associated with O&M expenses which can be inflated
by large traffic or natural events (Rainy season).
ALLOCATED TO CONCESSIONAIRE / PRIVATE SECTOR.
 FINANCING & INTEREST RATE : Failure to reach financial close. Increase in interest rates in the
case of floating rates denominated debt.
ALLOCATED TO CONCESSIONAIRE / PRIVATE SECTOR. Can be mitigated by the involvement of DFIs
 LAND ACQUISISTION : Road is already existing. No risk.
Road PPP risk Matrix World Bank
PROJECT RISKS & ALLOCATION
PROJECT RISKS & ALLOCATION
 FOREIGN EXCHANGE RISK : Loans & Equity would likely be denominated in hard currency (USD /
EUR) whereas revenue will be collected in FCFA. Risk is particularly high for USD denominated debt
(USD not pegged to FCFA unlike EUR).
ALLOCATED TO CONCESSIONAIRE / PRIVATE SECTOR
 FOREIGN EXCHANGE POLICY : To service the debt & pay dividend, payments will be made outside
the WAEMU zone which will require the authorization of the BCEAO (West African Central bank). If
this CB authorization were to be denied or delayed risk of default on commercial debt is high.
ALLOCATED TO CONCESSIONAIRE / PRIVATE SECTOR
 REGULATORY RISKS : Change in tariff policy.
TARRIF SHOULD BE INSCRIBED IN CONCESSION AGREEMENT
 ENVIRONMENTAL RISKS : Mitigated by contractor track record + Brownfield project.
 POLITICAL & SOVEREIGN RISKS : West Africa is prone to political instability which can affect the
project profitability / feasibility.
ALLOCATED TO THIRD PARTY THROUGH PURCHASE OF AN INSURANCE
 FORCE MAJEURE
ALLOCATED TO THIRD PARTY THROUGH PURCHASE OF AN INSURANCE
 EPC COST REDUCTION : Construction contractors is usually incentivize to
terminate construction within time and budget.
 O&M EXPENSES OPTIMIZATION : Operators revenues depends on traffic which
itself depends on quality of infrastructure, creating an incentive for the
operator to invest in proper O&M expenses.
 REDUCING CONSTRAINT ON PUBLIC FINANCE : PPP will reduce the
immediate public spending in a context of constrained public budget.
 EFFICIENCY GAINS : More efficient maintenance & operation will decrease
transportation costs, increase traffic generating positive economic
externality and increasing regional trade. Operational efficiency can be
maximize through a capacity payment made by the governments of
Burkina & Togo, depending on pre-determined criteria.
RATIONALE FOR PPP
 Project Presentation (french)
 http://www.afdb.org/en/news-and-events/article/the-afdb-approves-road-
improvement-and-transport-facilitation-project-on-lome-ouagadougou-
corridor-9448/
 Financing Road Infrastructures
SOURCES

More Related Content

Similar to Lome – Ouagadougou transport corridor PPP

Financiang Infrastructural Development in Zimbabwe
Financiang Infrastructural Development in ZimbabweFinanciang Infrastructural Development in Zimbabwe
Financiang Infrastructural Development in Zimbabwe
Vincent Mutsvene
 
ENTRO-Executive-Summary-final
ENTRO-Executive-Summary-finalENTRO-Executive-Summary-final
ENTRO-Executive-Summary-final
Philippe Lebreton
 
Dig out port presentation
Dig out port presentationDig out port presentation
Dig out port presentation
Durban Chamber of Commerce and Industry
 
Business Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfBusiness Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdf
Tristan Wiggill
 
Successfully Delivering PPP Tolled Bridges and Highway Projects
Successfully Delivering PPP Tolled Bridges and Highway ProjectsSuccessfully Delivering PPP Tolled Bridges and Highway Projects
Successfully Delivering PPP Tolled Bridges and Highway Projects
Loay Ghazaleh MBA, BSc Civil Eng.
 
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
Tambe John Bita
 
Target audience
Target audienceTarget audience
Target audience
BossGee
 
Chad cameroon pipeline project
Chad cameroon pipeline projectChad cameroon pipeline project
Chad cameroon pipeline project
Ujjwal Joshi
 
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Micheal Le Havre
 
AJC Case Analysis
AJC Case AnalysisAJC Case Analysis
AJC Case Analysis
Neeraj Mehra, CFA
 
Tema motorway
Tema motorway Tema motorway
Tema motorway
Frederick Senanu Ahiabor
 
Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends
Nhi Nguyen (Katherine)
 
Verde Valley SkyTram
Verde Valley SkyTramVerde Valley SkyTram
Verde Valley SkyTram
Jerry Wicks
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
Seshukumar53
 
Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)
M. Asim U Khan
 
PPP in Modal Transport
PPP in Modal TransportPPP in Modal Transport
PPP in Modal Transport
Loay Ghazaleh MBA, BSc Civil Eng.
 
risk management
risk managementrisk management
risk management
Anand Kumar
 
Private sector solution for South African transport dilemma
Private sector solution for South African transport dilemmaPrivate sector solution for South African transport dilemma
Private sector solution for South African transport dilemma
Maciek Szymanski
 
Infrastructure Development in South Africa, Stephen Labson slEconomics
Infrastructure Development in South Africa, Stephen Labson slEconomicsInfrastructure Development in South Africa, Stephen Labson slEconomics
Infrastructure Development in South Africa, Stephen Labson slEconomics
Stephen Labson
 
MENA Region PPP Development Strategy and Success Framework
MENA Region PPP Development Strategy and Success FrameworkMENA Region PPP Development Strategy and Success Framework
MENA Region PPP Development Strategy and Success Framework
Loay Ghazaleh MBA, BSc Civil Eng.
 

Similar to Lome – Ouagadougou transport corridor PPP (20)

Financiang Infrastructural Development in Zimbabwe
Financiang Infrastructural Development in ZimbabweFinanciang Infrastructural Development in Zimbabwe
Financiang Infrastructural Development in Zimbabwe
 
ENTRO-Executive-Summary-final
ENTRO-Executive-Summary-finalENTRO-Executive-Summary-final
ENTRO-Executive-Summary-final
 
Dig out port presentation
Dig out port presentationDig out port presentation
Dig out port presentation
 
Business Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfBusiness Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdf
 
Successfully Delivering PPP Tolled Bridges and Highway Projects
Successfully Delivering PPP Tolled Bridges and Highway ProjectsSuccessfully Delivering PPP Tolled Bridges and Highway Projects
Successfully Delivering PPP Tolled Bridges and Highway Projects
 
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
 
Target audience
Target audienceTarget audience
Target audience
 
Chad cameroon pipeline project
Chad cameroon pipeline projectChad cameroon pipeline project
Chad cameroon pipeline project
 
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...Executive Summary  2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
Executive Summary 2015 - Deep Sea Port by Broad Spectrum Ind Serv Ltd (Autos...
 
AJC Case Analysis
AJC Case AnalysisAJC Case Analysis
AJC Case Analysis
 
Tema motorway
Tema motorway Tema motorway
Tema motorway
 
Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends
 
Verde Valley SkyTram
Verde Valley SkyTramVerde Valley SkyTram
Verde Valley SkyTram
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
 
Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)
 
PPP in Modal Transport
PPP in Modal TransportPPP in Modal Transport
PPP in Modal Transport
 
risk management
risk managementrisk management
risk management
 
Private sector solution for South African transport dilemma
Private sector solution for South African transport dilemmaPrivate sector solution for South African transport dilemma
Private sector solution for South African transport dilemma
 
Infrastructure Development in South Africa, Stephen Labson slEconomics
Infrastructure Development in South Africa, Stephen Labson slEconomicsInfrastructure Development in South Africa, Stephen Labson slEconomics
Infrastructure Development in South Africa, Stephen Labson slEconomics
 
MENA Region PPP Development Strategy and Success Framework
MENA Region PPP Development Strategy and Success FrameworkMENA Region PPP Development Strategy and Success Framework
MENA Region PPP Development Strategy and Success Framework
 

Recently uploaded

一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
CA Dr. Prithvi Ranjan Parhi
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
my Pandit
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
GraceKohler1
 
Negotiation & Presentation Skills regarding steps in business communication, ...
Negotiation & Presentation Skills regarding steps in business communication, ...Negotiation & Presentation Skills regarding steps in business communication, ...
Negotiation & Presentation Skills regarding steps in business communication, ...
UdayaShankarS1
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
msthrill
 
Profiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdfProfiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdf
TTop Threads
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Neil Horowitz
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
HajeJanKamps
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
Top Forex Brokers Review
 
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
taqyea
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
my Pandit
 
How to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptxHow to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptx
Charleston Alexander
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
Innovative Uses of Revit in Urban Planning and Design
Innovative Uses of Revit in Urban Planning and DesignInnovative Uses of Revit in Urban Planning and Design
Innovative Uses of Revit in Urban Planning and Design
Chandresh Chudasama
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
JoeYangGreatMachiner
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
APCO
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
Operational Excellence Consulting
 

Recently uploaded (20)

一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
 
Negotiation & Presentation Skills regarding steps in business communication, ...
Negotiation & Presentation Skills regarding steps in business communication, ...Negotiation & Presentation Skills regarding steps in business communication, ...
Negotiation & Presentation Skills regarding steps in business communication, ...
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
 
Profiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdfProfiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdf
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
 
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
 
How to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptxHow to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptx
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
Innovative Uses of Revit in Urban Planning and Design
Innovative Uses of Revit in Urban Planning and DesignInnovative Uses of Revit in Urban Planning and Design
Innovative Uses of Revit in Urban Planning and Design
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
 

Lome – Ouagadougou transport corridor PPP

  • 1. LOME OUAGADOUGOU Road Corridor and Transport Facilitation Project
  • 2.  The Lomé-Cinkansé-Ouagadougou Corridor is the backbone of Togo’s road network, and the only road linking all the regions of the country. The corridor is also very important for the sub-region’s landlocked countries (Mali, Burkina, Niger), particularly Burkina Faso, because the Lomé Port Authority (PAL) is currently one of the main transit port for its overseas trade.  Total estimated project cost : 282.5 M EUR PROJECT PRESENTATION
  • 3.
  • 4. PROJECT PRESENTATION  The main objective of Lomé-Ouagadougou transport corridor is, in addition to improving the condition of the road and travel, to facilitate regional integration between Burkina Faso and Togo, was well as within the WAEMU/ECOWAS zone.  The road connects land-locked Burkina Faso, Mali, and Niger with the port of Lomé. The project will rehabilitate about 300 km of road sections which are currently in bad condition, between the two capitals, and key transport facilitation measures along the Lomé-Ouagadougou corridor.  The project consists in the rehabilitation of 303 km of road in very bad or bad condition, with 150 km in Togo and 153 km in Burkina Faso, as well as the improvement of transport facilitation along the corridor. The expected outcomes are increased transit traffic and trade, reduced general transportation costs, improved road safety, and the creation of jobs for youths and women.
  • 5.  CONSTRUCTION RISK : Delay and overhead costs in the rehabilitation of the infrastructure. ALLOCATED TO CONCESSIONAIRE / PRIVATE SECTOR  DEMAND & REVENUE RISKS :Lower traffic than expected. Not enough revenue to repay CAPEX and generate sufficient IRR. ALLOCATED TO GOVERNMENT (Payment capacity or minimum guaranteed revenue)  O&M RISKS : Operator will support expenses associated with O&M expenses which can be inflated by large traffic or natural events (Rainy season). ALLOCATED TO CONCESSIONAIRE / PRIVATE SECTOR.  FINANCING & INTEREST RATE : Failure to reach financial close. Increase in interest rates in the case of floating rates denominated debt. ALLOCATED TO CONCESSIONAIRE / PRIVATE SECTOR. Can be mitigated by the involvement of DFIs  LAND ACQUISISTION : Road is already existing. No risk. Road PPP risk Matrix World Bank PROJECT RISKS & ALLOCATION
  • 6. PROJECT RISKS & ALLOCATION  FOREIGN EXCHANGE RISK : Loans & Equity would likely be denominated in hard currency (USD / EUR) whereas revenue will be collected in FCFA. Risk is particularly high for USD denominated debt (USD not pegged to FCFA unlike EUR). ALLOCATED TO CONCESSIONAIRE / PRIVATE SECTOR  FOREIGN EXCHANGE POLICY : To service the debt & pay dividend, payments will be made outside the WAEMU zone which will require the authorization of the BCEAO (West African Central bank). If this CB authorization were to be denied or delayed risk of default on commercial debt is high. ALLOCATED TO CONCESSIONAIRE / PRIVATE SECTOR  REGULATORY RISKS : Change in tariff policy. TARRIF SHOULD BE INSCRIBED IN CONCESSION AGREEMENT  ENVIRONMENTAL RISKS : Mitigated by contractor track record + Brownfield project.  POLITICAL & SOVEREIGN RISKS : West Africa is prone to political instability which can affect the project profitability / feasibility. ALLOCATED TO THIRD PARTY THROUGH PURCHASE OF AN INSURANCE  FORCE MAJEURE ALLOCATED TO THIRD PARTY THROUGH PURCHASE OF AN INSURANCE
  • 7.  EPC COST REDUCTION : Construction contractors is usually incentivize to terminate construction within time and budget.  O&M EXPENSES OPTIMIZATION : Operators revenues depends on traffic which itself depends on quality of infrastructure, creating an incentive for the operator to invest in proper O&M expenses.  REDUCING CONSTRAINT ON PUBLIC FINANCE : PPP will reduce the immediate public spending in a context of constrained public budget.  EFFICIENCY GAINS : More efficient maintenance & operation will decrease transportation costs, increase traffic generating positive economic externality and increasing regional trade. Operational efficiency can be maximize through a capacity payment made by the governments of Burkina & Togo, depending on pre-determined criteria. RATIONALE FOR PPP
  • 8.  Project Presentation (french)  http://www.afdb.org/en/news-and-events/article/the-afdb-approves-road- improvement-and-transport-facilitation-project-on-lome-ouagadougou- corridor-9448/  Financing Road Infrastructures SOURCES