BETA BUILD LOADLOCK
REDESIGNED LID TO
BE STIFFER
REDESIGNED STOP
EXISTING STANDARD DESIGN
WINDOWS INCORPORATED
WITH ADDITIONAL SAFETY
GUARD
HINGES ENLARGED
WITH ADDITIONAL
FIXINGS
REIFORCING
RIBS ADDED
OPTICAL DENSING ADDED FOR
POSITIVE VERIFICATION OF
EFFECTOR RETRACTED
FIXING POSITIONS
ADDED FOR ELECTRICAL
AND PNEUMATIC
COMPONENTS
NITROGEN
PURGE MOVED
INBD
PIVOT BLOCKS
NOW INTEGRAL
WITH CHAMBER
CF 32 Issue 11
3
BETA BUILD LOADLOCK
REDESIGNED END
EFFECTOR FULLY
EXTENDED
REDESIGNED END
EFFECTOR FULLY
RETRACTED
LID FULLY OPEN
CF 32 Issue 11
4
BETA BUILD L/L. CHAMBER FEA
Name Type Min Location Max Location
Displacement1
URES:
Resultant
displacement
0 mm
Node:
231
(235.75
mm,
-
2.60229e-
016 mm,
-4.5 mm)
0.0264306
mm
Node: 23722
(-
18.5156
mm,
-474.425
mm,
10.9278
mm)
Stress1
VON: von
Mises stress
4542.83
N/m^2
Node:
167218
(-122.125
mm,
20 mm,
-8.18061
mm)
5.21238e+007
N/m^2
Node: 118383
(-2.125
mm,
2.9654e-
005 mm,
-
0.819392
mm)
MAXIMUM DEFLECTION = 0.026mm
ADDITION OF LASER APATURE RESULTED VERY LITTLE INCREASE
CF 32 Issue 11
5
BETA BUILD L/L CHAMBER
CF 32 Issue 11
6
BETA BUILD L/L CHAMBER
CF 32 Issue 11
7
BETA BUILD L/L INTERNALS
SHORTENED,
LIGHTENED END
EFFECTOR
ADDITIONAL HOLES
FOR PLATTEN
REMOVAL
JACKING SCREWS
WITH LOCK NUTS
ADDED
REVISED BELT
SUPPORT BLOCK
FIXING TO CHAMBER
RAIL END STOPS NOW AT ALL
END POSITIONS TO PREVENT
ACCIDENTAL DISMOUNTING OF
CARRIAGES DURING
BUILD/MAINTENANCE NEW RAIL SUPPORTS
ADDED FIXED TO CHAMBER
AT EACH END
MACHINED SCREWS
ADDED TO PROVIDE
PRECISE LOCATION THIS
SIDE
SLOTTED HOLES IN CARRIAGE
STRUCTURE TO ALL FOR
DIFFERENTIAL THERMAL
EXPANSION IN ASSY
ACCESS HOLES
ADDED TO AID RAIL
ASSEMBLY
REDUCED HEIGHT POSN CAMS
CF 32 Issue 11
8
BETA BUILD L/L INTERNALS
BELT SUPPORT BLOCK & PULLEY REVISIONS
SCREW AND NUT
NOW M4
Ø5 x 0.5 HIGH
PLATTEN
SUPPORTS (x6)
RECESSES
FOR CAMS
REVISED BELT
SUPPORT BLOCK
CF 32 Issue 11
9
BETA BUILD L/L END EFFECTOR
CF 32 Issue 11
10
BETA BUILD L/L END EFFECTOR
PLATTEN SUPPORT PAD 0.5mm
ABOVE END EFFECTOR
LOCATING CAMS REDUCED TO
1.5mm THICK TO REDUCE
DISPLACEMENT EFFECTS OF
PLATTEN THERMAL EXPANSION
CF 32 Issue 11
11
BETA BUILD L/L
END EFFECTOR DETAILS
CF 32 Issue 11
12
BETA BUILD L/L
END EFFECTOR FEA
Name Type Min Location Max Location
Displacement1
URES:
Resultant
displacement
0 mm
Node:
254
(-
178.596
mm,
329.811
mm,
-3.5
mm)
0.183342
mm
Node:
122607
(-
107.761
mm,
-
74.8742
mm,
-
3.49999
mm)
CF 32 Issue 11
13
BETA BUILD L/L EXTERNALS
GEARBOX TO BE
REVISED AT BETA BUILD
COUPLING TO BE
REVISED AT BETA
BUILD
NEW SENSOR ASSEMBLY
ADDED TO REGISTER THAT
THE END EFFECTOR IS
RETRACTED. LASER OR
DEFUSED PHOTO CELL WILL
BE TESTED IN NEXT PHASE
CF 32 Issue 11
14
BETA BUILD L/L LID
REVISED HINGE HAS AN
ADDITIONAL FIXING AND THE
ABILITY TO REACT TORSIONAL
LOADS FRM THE LID
CIRCLIP
GLASS
SEAL
ADDITIONAL PYREX
PROTECTIVE SHIELD
LID ASSEMBLY MASS AND C OF G
VERTUALLY IDENTICAL TO ALPHA
BUILD UNIT BUT GREATLY
STIFFENED
EXISTING GAS STUTS CAN BE
UTILISED
ALPHA BUILD
SEAL RETAINED
CF 32 Issue 11
15
BETA BUILD L/L LID FEA
Name Type Min Location Max Location
Displacement1
URES:
Resultant
displacement
0 mm
Node:
1921
(251.979 mm,
-718.978 mm,
0 mm)
0.0559768 mm
Node: 4383
(-2.38662 mm,
-289.034 mm,
9.5 mm)
Stress1
VON: von
Mises stress
12737.7
N/m^2
Node:
123775
(339 mm,
4.08452 mm,
27.5 mm)
5.76537e+007
N/m^2
Node: 61052
(258.854 mm,
-366.546 mm,
17.8536 mm)
CF 32 Issue 11
16
BETA BUILD L/L LID
CF 32 Issue 11
17
BETA BUILD L/L
LID WINDOWS – VIEW AREA
CF 32 Issue 11
18
BETA BUILD L/L
LID WINDOWS – VIEW AREA
CF 32 Issue 11
19
BETA BUILD L/L ASSY
CF 32 Issue 11
20
BETA BUILD L/L ASSY
CF 32 Issue 11
21
BETA BUILD L/L ASSY
CF 32 Issue 11
22
BETA BUILD L/L ASSY
CF 32 Issue 11
23
BETA BUILD L/L ASSY
OUTSTANDING ISSUES
• INCORPORATION OF GEARBOX AS
TESTED ON ALPHA BUILD.
• SOURCE NEW DRIVE COUPLING TO
ELIMINATE BACKLASH
• TEST SENSORS FOR END EFFECTOR
RETRACTED INDICATION
• CONSIDER VAT VALVE OPTIONS AND
INTERFACING APATURE
• LOCKING SYSTEM FOR OPEN LID
CF 32 Issue 11
24
NGP-B LOADLOCK EXISTING
ALPHA BUILD MODIFICATIONS
• MODIFICATIONS TO ALPHA BUILD
CHAMBER.
• INTERNAL PART REVISIONS AND
ADDITIONS TO BE INCORPORATED.
(NEW END EFFECTOR ?)
• ALPHA BUILD LID RETAINED BUT WITH
NEW HINGES AND STOP.
CF 32 Issue 11
25
ALPA BUILD CHAMBER
INTERNAL MACHINING MODS
INCREASED CUTOUT
AT RAIL POSITIONS
TO INCORPORATE
RAIL SUPPORTS
ADDITIONAL HOLES
FOR REVISED BELT
FIXING BLOCK
CF 32 Issue 11
26
ALPA BUILD CHAMBER
STIFFENING MOD (UNDERSIDE)
INTERFACE FOR NEW
PROXIMITY SENSOR
(END EFFECTOR
RETRACTED)
FIXING HOLES FOR THE
ADDITION OF STIFFENING
RIBS
CF 32 Issue 11
27

More Related Content

Viewers also liked (13)

Consumo de arte
Consumo de arteConsumo de arte
Consumo de arte
 
İkinci el klima alanlar istanbul
İkinci el klima alanlar istanbulİkinci el klima alanlar istanbul
İkinci el klima alanlar istanbul
 
DEGUZMAN Clarence_GLOH 910 Scholarly Paper
DEGUZMAN Clarence_GLOH 910 Scholarly PaperDEGUZMAN Clarence_GLOH 910 Scholarly Paper
DEGUZMAN Clarence_GLOH 910 Scholarly Paper
 
Moviemakerescrito
MoviemakerescritoMoviemakerescrito
Moviemakerescrito
 
Презентация Куроповой Елены_ мастер-класс_
Презентация Куроповой Елены_ мастер-класс_Презентация Куроповой Елены_ мастер-класс_
Презентация Куроповой Елены_ мастер-класс_
 
MKT 405 FSG Presentation
MKT 405 FSG PresentationMKT 405 FSG Presentation
MKT 405 FSG Presentation
 
Proceso contable
Proceso contableProceso contable
Proceso contable
 
Wiki
WikiWiki
Wiki
 
PhysicalActivityFactSheetFinal
PhysicalActivityFactSheetFinalPhysicalActivityFactSheetFinal
PhysicalActivityFactSheetFinal
 
презентация морозова
презентация морозовапрезентация морозова
презентация морозова
 
Cuento la liebre y la tortuga
Cuento la liebre y la tortugaCuento la liebre y la tortuga
Cuento la liebre y la tortuga
 
Powtoon
PowtoonPowtoon
Powtoon
 
Taksim 2.El Yatak Odası Alım Satım
Taksim 2.El Yatak Odası Alım SatımTaksim 2.El Yatak Odası Alım Satım
Taksim 2.El Yatak Odası Alım Satım
 

Similar to Loadlock NGP-B Presentation EXTRACT

04 ec2 ws_walraven_ulssls
04 ec2 ws_walraven_ulssls04 ec2 ws_walraven_ulssls
04 ec2 ws_walraven_ulssls
luantvconst
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examples
Loren Davis
 
Drawing samples 1063, 1670, 1673, 1674 SolidWorks ACAD
Drawing samples 1063, 1670, 1673, 1674 SolidWorks ACADDrawing samples 1063, 1670, 1673, 1674 SolidWorks ACAD
Drawing samples 1063, 1670, 1673, 1674 SolidWorks ACAD
Gary mccoy
 
Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawings
bibimisael
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00
Mansoor Sakharkar
 

Similar to Loadlock NGP-B Presentation EXTRACT (20)

04 ec2 ws_walraven_ulssls
04 ec2 ws_walraven_ulssls04 ec2 ws_walraven_ulssls
04 ec2 ws_walraven_ulssls
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examples
 
M2 cv-rc-d-005(anchor bolt details)
M2 cv-rc-d-005(anchor bolt details)M2 cv-rc-d-005(anchor bolt details)
M2 cv-rc-d-005(anchor bolt details)
 
SMAC LCA6 010-XX-3-B Specs
SMAC LCA6 010-XX-3-B SpecsSMAC LCA6 010-XX-3-B Specs
SMAC LCA6 010-XX-3-B Specs
 
Orientation Frame Assembly
Orientation Frame AssemblyOrientation Frame Assembly
Orientation Frame Assembly
 
BSP Chamber Final 1
BSP Chamber Final 1BSP Chamber Final 1
BSP Chamber Final 1
 
2 n5401
2 n54012 n5401
2 n5401
 
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-OnNexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
Nexans Cable Terminations - Heat Shrink, Cold Shrink, Slip-On
 
Catalog DLMM 2019-Metalized composite 2mm pitch connector that meets Mil-8351...
Catalog DLMM 2019-Metalized composite 2mm pitch connector that meets Mil-8351...Catalog DLMM 2019-Metalized composite 2mm pitch connector that meets Mil-8351...
Catalog DLMM 2019-Metalized composite 2mm pitch connector that meets Mil-8351...
 
Drawing samples 1063, 1670, 1673, 1674 SolidWorks ACAD
Drawing samples 1063, 1670, 1673, 1674 SolidWorks ACADDrawing samples 1063, 1670, 1673, 1674 SolidWorks ACAD
Drawing samples 1063, 1670, 1673, 1674 SolidWorks ACAD
 
Panel h
Panel hPanel h
Panel h
 
Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawings
 
Por módulos manquiri
Por módulos manquiriPor módulos manquiri
Por módulos manquiri
 
Original Power MOSFET IRFBF30 IRFBF30PBF 900V 3.6A New Vishay Siliconix
Original Power MOSFET IRFBF30 IRFBF30PBF 900V 3.6A New Vishay SiliconixOriginal Power MOSFET IRFBF30 IRFBF30PBF 900V 3.6A New Vishay Siliconix
Original Power MOSFET IRFBF30 IRFBF30PBF 900V 3.6A New Vishay Siliconix
 
Nexans Euromold 900 Series Interface F Asymmetrical Cable Connectors HV
Nexans Euromold 900 Series Interface F Asymmetrical Cable Connectors HVNexans Euromold 900 Series Interface F Asymmetrical Cable Connectors HV
Nexans Euromold 900 Series Interface F Asymmetrical Cable Connectors HV
 
1_5umNMOS
1_5umNMOS1_5umNMOS
1_5umNMOS
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00
 
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
 
Original N-Channel Mosfet IRFZ14PBF TO-220 New Vishay Semiconductors
Original N-Channel Mosfet IRFZ14PBF TO-220 New Vishay SemiconductorsOriginal N-Channel Mosfet IRFZ14PBF TO-220 New Vishay Semiconductors
Original N-Channel Mosfet IRFZ14PBF TO-220 New Vishay Semiconductors
 
Design of security room
Design of security roomDesign of security room
Design of security room
 

Loadlock NGP-B Presentation EXTRACT

  • 1. CF 32 Issue 11 1
  • 2. CF 32 Issue 11 2 BETA BUILD LOADLOCK REDESIGNED LID TO BE STIFFER REDESIGNED STOP EXISTING STANDARD DESIGN WINDOWS INCORPORATED WITH ADDITIONAL SAFETY GUARD HINGES ENLARGED WITH ADDITIONAL FIXINGS REIFORCING RIBS ADDED OPTICAL DENSING ADDED FOR POSITIVE VERIFICATION OF EFFECTOR RETRACTED FIXING POSITIONS ADDED FOR ELECTRICAL AND PNEUMATIC COMPONENTS NITROGEN PURGE MOVED INBD PIVOT BLOCKS NOW INTEGRAL WITH CHAMBER
  • 3. CF 32 Issue 11 3 BETA BUILD LOADLOCK REDESIGNED END EFFECTOR FULLY EXTENDED REDESIGNED END EFFECTOR FULLY RETRACTED LID FULLY OPEN
  • 4. CF 32 Issue 11 4 BETA BUILD L/L. CHAMBER FEA Name Type Min Location Max Location Displacement1 URES: Resultant displacement 0 mm Node: 231 (235.75 mm, - 2.60229e- 016 mm, -4.5 mm) 0.0264306 mm Node: 23722 (- 18.5156 mm, -474.425 mm, 10.9278 mm) Stress1 VON: von Mises stress 4542.83 N/m^2 Node: 167218 (-122.125 mm, 20 mm, -8.18061 mm) 5.21238e+007 N/m^2 Node: 118383 (-2.125 mm, 2.9654e- 005 mm, - 0.819392 mm) MAXIMUM DEFLECTION = 0.026mm ADDITION OF LASER APATURE RESULTED VERY LITTLE INCREASE
  • 5. CF 32 Issue 11 5 BETA BUILD L/L CHAMBER
  • 6. CF 32 Issue 11 6 BETA BUILD L/L CHAMBER
  • 7. CF 32 Issue 11 7 BETA BUILD L/L INTERNALS SHORTENED, LIGHTENED END EFFECTOR ADDITIONAL HOLES FOR PLATTEN REMOVAL JACKING SCREWS WITH LOCK NUTS ADDED REVISED BELT SUPPORT BLOCK FIXING TO CHAMBER RAIL END STOPS NOW AT ALL END POSITIONS TO PREVENT ACCIDENTAL DISMOUNTING OF CARRIAGES DURING BUILD/MAINTENANCE NEW RAIL SUPPORTS ADDED FIXED TO CHAMBER AT EACH END MACHINED SCREWS ADDED TO PROVIDE PRECISE LOCATION THIS SIDE SLOTTED HOLES IN CARRIAGE STRUCTURE TO ALL FOR DIFFERENTIAL THERMAL EXPANSION IN ASSY ACCESS HOLES ADDED TO AID RAIL ASSEMBLY REDUCED HEIGHT POSN CAMS
  • 8. CF 32 Issue 11 8 BETA BUILD L/L INTERNALS BELT SUPPORT BLOCK & PULLEY REVISIONS SCREW AND NUT NOW M4 Ø5 x 0.5 HIGH PLATTEN SUPPORTS (x6) RECESSES FOR CAMS REVISED BELT SUPPORT BLOCK
  • 9. CF 32 Issue 11 9 BETA BUILD L/L END EFFECTOR
  • 10. CF 32 Issue 11 10 BETA BUILD L/L END EFFECTOR PLATTEN SUPPORT PAD 0.5mm ABOVE END EFFECTOR LOCATING CAMS REDUCED TO 1.5mm THICK TO REDUCE DISPLACEMENT EFFECTS OF PLATTEN THERMAL EXPANSION
  • 11. CF 32 Issue 11 11 BETA BUILD L/L END EFFECTOR DETAILS
  • 12. CF 32 Issue 11 12 BETA BUILD L/L END EFFECTOR FEA Name Type Min Location Max Location Displacement1 URES: Resultant displacement 0 mm Node: 254 (- 178.596 mm, 329.811 mm, -3.5 mm) 0.183342 mm Node: 122607 (- 107.761 mm, - 74.8742 mm, - 3.49999 mm)
  • 13. CF 32 Issue 11 13 BETA BUILD L/L EXTERNALS GEARBOX TO BE REVISED AT BETA BUILD COUPLING TO BE REVISED AT BETA BUILD NEW SENSOR ASSEMBLY ADDED TO REGISTER THAT THE END EFFECTOR IS RETRACTED. LASER OR DEFUSED PHOTO CELL WILL BE TESTED IN NEXT PHASE
  • 14. CF 32 Issue 11 14 BETA BUILD L/L LID REVISED HINGE HAS AN ADDITIONAL FIXING AND THE ABILITY TO REACT TORSIONAL LOADS FRM THE LID CIRCLIP GLASS SEAL ADDITIONAL PYREX PROTECTIVE SHIELD LID ASSEMBLY MASS AND C OF G VERTUALLY IDENTICAL TO ALPHA BUILD UNIT BUT GREATLY STIFFENED EXISTING GAS STUTS CAN BE UTILISED ALPHA BUILD SEAL RETAINED
  • 15. CF 32 Issue 11 15 BETA BUILD L/L LID FEA Name Type Min Location Max Location Displacement1 URES: Resultant displacement 0 mm Node: 1921 (251.979 mm, -718.978 mm, 0 mm) 0.0559768 mm Node: 4383 (-2.38662 mm, -289.034 mm, 9.5 mm) Stress1 VON: von Mises stress 12737.7 N/m^2 Node: 123775 (339 mm, 4.08452 mm, 27.5 mm) 5.76537e+007 N/m^2 Node: 61052 (258.854 mm, -366.546 mm, 17.8536 mm)
  • 16. CF 32 Issue 11 16 BETA BUILD L/L LID
  • 17. CF 32 Issue 11 17 BETA BUILD L/L LID WINDOWS – VIEW AREA
  • 18. CF 32 Issue 11 18 BETA BUILD L/L LID WINDOWS – VIEW AREA
  • 19. CF 32 Issue 11 19 BETA BUILD L/L ASSY
  • 20. CF 32 Issue 11 20 BETA BUILD L/L ASSY
  • 21. CF 32 Issue 11 21 BETA BUILD L/L ASSY
  • 22. CF 32 Issue 11 22 BETA BUILD L/L ASSY
  • 23. CF 32 Issue 11 23 BETA BUILD L/L ASSY OUTSTANDING ISSUES • INCORPORATION OF GEARBOX AS TESTED ON ALPHA BUILD. • SOURCE NEW DRIVE COUPLING TO ELIMINATE BACKLASH • TEST SENSORS FOR END EFFECTOR RETRACTED INDICATION • CONSIDER VAT VALVE OPTIONS AND INTERFACING APATURE • LOCKING SYSTEM FOR OPEN LID
  • 24. CF 32 Issue 11 24 NGP-B LOADLOCK EXISTING ALPHA BUILD MODIFICATIONS • MODIFICATIONS TO ALPHA BUILD CHAMBER. • INTERNAL PART REVISIONS AND ADDITIONS TO BE INCORPORATED. (NEW END EFFECTOR ?) • ALPHA BUILD LID RETAINED BUT WITH NEW HINGES AND STOP.
  • 25. CF 32 Issue 11 25 ALPA BUILD CHAMBER INTERNAL MACHINING MODS INCREASED CUTOUT AT RAIL POSITIONS TO INCORPORATE RAIL SUPPORTS ADDITIONAL HOLES FOR REVISED BELT FIXING BLOCK
  • 26. CF 32 Issue 11 26 ALPA BUILD CHAMBER STIFFENING MOD (UNDERSIDE) INTERFACE FOR NEW PROXIMITY SENSOR (END EFFECTOR RETRACTED) FIXING HOLES FOR THE ADDITION OF STIFFENING RIBS
  • 27. CF 32 Issue 11 27