Contents
Introduction
Logic Networks
Services
 PC Hardware Maintenance
 Desktop & Network Application Support
 Network Analysis & Management Services
 Network Infrastructure Support
 Project Management & Software Development
 On-site & Off-site Disaster Recovery
 Managed services
 Cloud Computing
 Virtual Servers
 Virtual Applications
 Bespoke Software Development/Management
 Co Location Hosting
 Systems Relocation
 International Support
 Pay as you go support
Network Solutions
 Remote Access
 Smartphone Access
 LAN/WAN Infrastructure
 Internet & Intranet Connectivity
 Inter-Office Connectivity
 Digital Workflow and Imaging
 Virtual Private Networks
 Voice & Data Convergence
 Wireless Access
 Remote Back-up
Software Developments/Products (Apollo)
 Housing
 EDMS
 FMS
 PMS
 CMS
 SES
Conclusion
Page 3
The computer industry is very much application driven, as there are vast amounts of different
software packages that automate business functions. With the evolution of PC technology, this
functionality continues to be ameliorated and the computer network has emerged as a
fundamental business tool. A computer network is able to gather this substantial increase in
productivity and to lay the foundation for long-term business growth. Whilst growing a business is
a delicate task, resources have measurable capabilities resulting in restrictions on growth without
further capital investment. In today’s marketplace the computer network provides that competitive
advantage that business requires.
Logic Networks
“Logic n. a science or method of reasoning; correct reasoning”.
Logic Networks Limited (LNL) provides a comprehensive portfolio of integrated IT support
services and computer network solutions. Our strategic location in the heart of the City
incorporates several business units that provide specialist IT communication services. Working in
close collaboration within our departments not only enables the sharing of information but access
to specialist expertise. We occupy modern, secure premises with high-tech security systems.
Our company is divided into five departments covering technical services, sales, marketing,
accounts and administration. We dedicate one person from each department to look after each
client to ensure best practise in customer relations.
Founded in 1996, we currently service over 120 business customers from our City location and
anticipate continued steady growth. We aim to establish ourselves as one of the main competitors
in integrated technical service provisions within the Greater London area and throughout the
United Kingdom and Middle East.
The reason for our success is based on our consistent approach in providing high quality support
services that meet the business requirement, specifically tailored to the individual customer.
Services
Our technical services centre operates 24 x 7 for 365 days of the year and fulfils an important role
in our policy of providing continuous support to our clients. This provides flexibility to our clients
enabling peace of mind as your business needs grow. Our helpdesk analysts can interact directly,
from customer network systems solutions right down to the individual user PC if required.
We have devised one of the most comprehensive ranges of support services together with high-
quality service level agreement guarantees which consist of the following:
 PC Hardware Maintenance
 Desktop & Network Applications Support
 Network Analysis & Management Services
 Network Infrastructure Support
 Project Management & Software Development
 On-site & Off-site Disaster Recovery
 Remote Access
 Smartphone and Tablet Access
PC Hardware Maintenance
Page 4
PC Maintenance
As one of our core services we employ a full resource of technical service engineers to ensure we
meet customer demand. Our hardware engineering team is fully versed in the latest PC
technology. Under contract we provide comprehensive PC hardware maintenance for your
workstations. A call-out for service on a PC workstation will comprise: a guaranteed response
time with equivalent to fix or replacement, re-installation of the operating system or software
upgrade if necessary and reconfiguration of your network. At the same time you may also want to
add new hardware devices or memory to the system.
Server Maintenance
The most critical component of any Network is its server. It may be a single fileserver combined
with Integrated Server Applications and Network Operating System or a fully distributed
configuration incorporating an array of dedicated servers for communications, database, Web,
on-line transactions processing and/or other key application servers.
The requirements that need to be considered when developing any server strategy are the same
i.e. (Performance, Scalability, Fault Tolerance, Reliability, Security and Disaster Contingency).
We can provide Server technologies from the leading hardware manufacturers. Logic Networks
follows a philosophy for getting it right, we learn by our endeavours not at our customers’
expense!
Printer Maintenance
Your contract can even incorporate printers for which we hold a large stock holding of
replacement parts for many popular brands of printer including; Hewlett Packard, on which we
can perform troubleshooting failures to the failing Field Replaceable Unit (FRU). Our three-step
process includes the following;
Replacement of the failing unit
Perform any required adjustments or alignments
Verification of the correct printer operation
Desktop & Network Applications Support
LNL is, and will continue to be, totally vendor independent in order to allow us to recommend
impartial solutions that are based on a client’s requirements and without any manufacturer bias.
However, our industry has established certain manufacturers with a reputation for developing
and/or successfully producing intelligent, reliable and cost effective technologies. We naturally
focus our resources on providing the highest standards and skill levels which are an essential
element of support services for Novell, Microsoft, Hewlett Packard, 3Com and Cisco.
We are accredited with both Novell and Microsoft who are the clear leading vendors for network
applications software and we possess a high number of both CNE and MCSE qualified technical
support personnel.
As part of commitment to customer service we can provide expertise as part of a support contract
to provide on-site system administration and/or management on either a full or part time basis.
Network Infrastructure Support
Our proficiency in systems integration ranges from basic PC workstation installation and
customisation, through to server specification, design and configuration. We believe that in
Page 5
designing a system it should have the ability not only to meet your current needs but also to grow
with your future needs.
Structured Cabling Systems:
Cabling problems are the single biggest causes of network downtime, often caused by shortcuts
being taken during installation, on the assumption that merely the right cable will suffice.
Eliminating outages due to cable problems makes good business sense and proves cost effective
for the long-term operation of your network.
We can provide you with specialist technical assistance for specific projects with skills in both the
design and implementation of cable systems including: Category 5E and 6A copper and Single or
Multi-mode Fibre Optic.
As part of this service we discuss with you network topology and best location for your network
devices and wiring closets.
Our infrastructure technicians have many years experience in floor cabling for installation, testing
and certification of your new system.
We can guarantee you an absolutely trouble free network cabling plant that may be utilised for
many years.
Network Infrastructure Products:
Logic Networks builds upon the cabling infrastructure by providing all the necessary networking
equipment to assure your network is ready to handle the new converging technologies.
Critical networks may also require support to cover the following areas:
Topologies & transport:
Local Area Network (LAN)
 Wireless Access Points
 Switches
 Routers
 Transceivers
Wide Area Network (WAN)
 Leased Line
 DSL
 FTTC Fibre to the cabinet .e.g. BT Infinity
 MPLS Multiprotocol Label Switching
Security applications:
 Proxies
 Firewalls
 AD Domains
 Virtual Private Networks (VPNs)
 Secure Sockets Layer Configuration
 Exchange Key & Encryption Management
We can supply you with Consultants for design and planning, Network Engineers for LAN, WAN,
Intranet/Internet support and Infrastructure Technicians for the network cabling and associated
Page 6
communications hardware such , switches and routers a well as: PC Technicians for User,
Workstation and Printer Hardware and Application Support.
Network Analysis & Management Services
With a fully qualified team of analysts, network technicians and engineers who are experienced in
all practical aspects of network management, we can carry out performance optimisation testing
within a client site, though much of our efforts are directed towards ensuring minimal client
disruption during the installation and/or maintenance process of the expansive network. Through
the analytical process we can assess your requirements, using sophisticated data modelling
techniques and provide you with an integrated management solution to incorporate the following:
 Desktop & Server hardware using the desktop management interface (DMI)
 Network Infrastructure Products using the simple network management protocol (SNMP)
 Desktop & Server applications using remote monitoring (RMON)
These are all standards-based technologies all of which are readily available which keeps the
cost of ownership down
Project Management
The first stage of any project is deciding what to do; you will need to consider all major factors for
a successful outcome. Implementation of new systems requires a high degree preparatory work
and planning, without it you risk an increase in the cost of support to your installations. Our
project management team takes a business approach, with a remit that will include the budgetary
constraints and risk assessment. The appointment of a project manager provides a focal point for
contact enabling a continual update on progress. To each project we apply PRINCE, a
government-sponsored method of project management, ensuring vital tasks are performed during
project execution. Given this level of responsibility our aim is to ensure that each project is
seamless in its execution and that customer expectations are met.
In addition to the above LNL has developed and maintained bespoke and off-the-shelf software
based on our clients requirement. Our software development teams has vast knowledge of .NET,
SQL, PHP and Oracle to develop, integrate, support or upgrade existing bespoke or develop a
new system.
On-site & Off-site Disaster Recovery
Data and Systems Restore and Server Replacement
In the event of data loss, you can quickly restore data from our on-site or offsite backups, in the
event of loss of one or more servers. You can fully restore from the onsite back-up (if selected) or
we can restore your systems and data to the standby servers in our data centre and provide you
with remote access.
Cloud Computing
Cloud computing allows you to work on systems that are hosted outside of your offices as if they
were in your offices. The advantage of this is that you do not need to invest in expensive IT
hardware or software or have to worry about upgrades or PC performance. As long as you have a
PC, Smart phone or tablet and internet access you will have access to your cloud. We will work
with you to customise your Cloud to meet your individual needs.
Page 7
Smartphone Technology
The Smartphone market is booming with countless devices that make it easy for you to check
email, sync your schedule, and keep track of contacts. We can help you find the best mobile
platform and device for your needs, and get you connected so no matter where you are, access
to your business is at your fingertips.
In today’s world, running a business is more than a full time job. Fortunately, the technology
exists so you can stay connected with your business, no matter where you are .From mobile
smart phones to remote access, there is a wide range of capabilities you can take advantage of,
and even give your staff the luxury of as well. Today it’s more cost effective than ever.
Connect From Anywhere
For our business, Remote Access has changed the way we work for our clients. It has increased
our productivity and has saved us and our clients on travel time. You and your staff can benefit
from remote access as well, whether you have staff that can work from home, we can work with
you to create a secure connection so you and your end-users can easily get to the files and
software they need.
Hosted Desktop
With Logic Networks Hosted Desktop, your entire office can be virtualised ,granting your
employees access to their desktop and applications. By centralising your desktop environment,
you can access your files and programs from anywhere on virtually any device with a web
browser, and the cost of management and the support is minimised.
Using Logic Networks Hosted Desktop Platform ,all of your applications and DATA are stored in
our Network Operations Centre. With unparalleled physical and technological security
mechanisms you will never have to worry about data security again.
Page 8
Virtualisation and Thin Client
Let Logic Networks worry about managing the software and updates for your office while reducing
your hardware expense at the same time.
Vitalising your office can drastically reduce the cost of operating your business. By moving to the
Cloud, you can outfit your entire operation with thin client terminals which only need the internet
and minimal hardware to access our service. The minimal hardware offers several cost saving
benefits. The cost of powering the thin clients is considerably less than a traditional workstation.
These power savings will reduce your company’s overhead expenses. The life cycle of thin
clients are longer than traditional PCs since they will not need to be upgraded to accommodate
the processor load from new applications.
Most of all, your company will save by not having to maintain an in house support team or spend
a considerable amount taking care of these PCs.
Server Replacement
Cloud backup is particularly effective at the platform-independent bare metal restores, and in the
event that one or more of your servers is permanently lost or destroyed, we will supply fully rebuilt
and restored replacement servers which are yours to keep at no additional cost .
Test Restores
For peace of mind this service includes regular test restores of your servers at least annually
.This comes with a full written report to ensure the service remains configured for optimal restore
capability .
Bespoke Software Development
Whatever the gap in your software needs, Logic Networks Software has a decade of experience
designing bespoke software which will improve the way your organisation runs. Our bespoke
software development services can make your business processes more efficient, less time
consuming and more cost effective. We supply bespoke software to a diverse client base, which
boasts some of the country’s most successful businesses. The competitive edge we have helped
them gain is a testament to the robust and user friendly nature of the software we develop.
Bespoke Software Development without the Hassle!
Here at Logic Networks we offer completely tailored bespoke software development and are on
hand at every stage of the process. How we can engage with your business:
 The first stage is often consultancy, which gives us an understanding of the resources at
your disposal and the internal processes involved in your operations
 We then go through the troubleshooting phase, where we identify any specific business
issues
 Project planning and timescales are then created
 The Logic team then develop bespoke software, tailored to the exact requirements of
your business
 We deliver the service and manage the implementation project plan
 Training is available so that when the system is live, your team are fully in control
 On-going support is then available to keep your new system working at its best
 Further software development and customisations can be created as your needs change
A Dedicated Bespoke Software Development Team
We provide user-friendly and highly targeted software development, complemented by a
dedication to customer service and backed by years of experience and firm guarantees. We have
a highly-skilled technical team who are passionate about delivering intuitive, easy-to-use
software, which adds value to your business.
Page 9
Not only do we develop the software from scratch, we also Our bespoke software development
and database design will deliver measurable benefits to your business, manage the
implementation process ensuring it is smoothly embedded within your company processes. We
offer on-site training as well as on-going UK based telephone support direct from our expert and
friendly team. Our in-depth understanding of web development and the Internet gives us a
significant head start when developing your software or website, allowing us to transfer our
competitive edge to you.
Co-Location & Hosting
Co-location and server hosting are similar services with the distinction between the two reflected
in the level of support extended by Logic Networks.
Companies looking to maintain their own equipment opt for a co-location package, whereas
organisations who want to be completely free from all duties and responsibilities prefer to have
their server hosted and managed by us.
At the point co-location and server hosting lays the promise of server safety. The optimum
conditions provided by a data centre help to prolong the life of a server, in addition to protecting it
from an array of emergencies which could occur in an environment.
Network Solutions
The network solutions we provide include business analysis, design, implementation and support
of your Local and Wide Area Networks. We supply services for the development of new networks,
or enhancements to your existing networks.
As part of a solutions house our objective is very clear, we aim to provide a fully integrated
support solution for end-to-end communication installations, whereby we take on the full
responsibility for servicing and supporting our clients in what is becoming a very complex arena.
Creative solutions should enable you to add services, expand into new markets, balance
workload, and increase capacity utilisation through resource sharing.
Our service offerings range from Tele-commuting through to Enterprise-wide management
services and consist of the following:
 Remote Access
 LAN/WAN Infrastructure
 Internet & Intranet Connectivity
 Inter-Office Connectivity
 Digital Workflow and Imaging
 Wireless Access
Remote Access
To be successful, small and medium-sized businesses require more flexible remote-access
solutions. These businesses must find new strategies for increasing the amount of time their
mobile sales representatives can spend with customers. They must provide remote access to e-
mail, Smartphone and other network resources to key employees who travel or telecommute.
They must ensure that representatives can access the most up-to-date pricing, product and
inventory information in order to improve customer service. They must also quickly collect time-
sensitive data from field personnel to more efficiently manage their resources and services. We
can design, set-up and install complete remote access solutions to enable your sales force to
generate quotes, commit to schedules, and check on job status from the field.
Page 10
Remote Backup
Data backups are an essential element of any IT function .The impact on your business if you
were to lose all, or even just some, of your data is almost unthinkable. 60% of businesses do not
survive beyond six months when it does happen and those who do endure have a phenomenal
cost to shoulder attempting to recreate the missing data. Replacing just 20MB of lost data is
estimated to take 21 days and a lot of money. Thanks to advances in technology, computers hold
somewhere in the region of 500 more times data than they did ten years ago, making 20MB a
drop in the ocean .
Why back up remotely
Remote backups involve encryption and transfer of all your data over the internet to a safe
location within the Logic Networks data centre .The frequency at which data is backed up is set to
reflect the needs of the business. Alternatively, real time data replication is selected by
organisations for which the loss of even one day’s data would be too busy.
The reliability ,security and easy automation of online backups has led to them becoming the
ideal means of safeguarding data and the optimum replacement for companies still reliant on tape
backups.
LAN/WAN Infrastructure
In today's fast-paced business environment, immediate access to critical data is key for small and
medium-sized businesses to be successful. Bandwidth-intensive applications, more powerful PCs
and servers, and large files downloaded from the Internet, however, are all contributing to an
increase in LAN traffic. These factors along with the additional demands placed by branch offices
and mobile users accessing main LAN services are challenging the performance of 10Gigabit
networks, slowing response times and productivity.
High-performance LAN solutions such as Ethernet switches and 10GB Ethernet switches can
minimise this network congestion, substantially improving performance to the desktop, server and
backbone. Switched Ethernet and Fast Ethernet are easily implemented. These standards-based
technologies will leverage your existing investment in Ethernet equipment and training.
High-performance LAN Considerations:
In the past, 10GbE was neither necessary nor affordable. As with most burgeoning
Technologies, those dynamics are changing. Technological advancements have resulted
In higher performance at lower costs. As such, gigabit and 10GbE bandwidth has
Become affordable for most companies.
Regardless of cost, there is also a distinct need. An increasing number of applications
Require considerable bandwidth to support the transfer and streaming of large data,
Video and audio files. As bandwidth-intensive applications and latency sensitive traffic
Types become ubiquitous, so does the need to support and transport them.
In addition, many companies are seeking to “future proof” their network to ensure they
Can support emerging technologies and preserve their initial investments. In the past,
Fibre and wire cabling systems were installed with a 10-year lifespan in mind. However,
With the rapid, ongoing evolution of network technologies, companies must be
Concerned with their current infrastructure’s ability to keep pace.
Costs associated with re-cabling a network can be exorbitant and organizations should
Take precautions to ensure their cabling systems can last well into the future. 10GbE
Provides the very best assurance for being able to support forthcoming technologies
And delivers utmost investment protection.
Page 11
Internet & Intranet Connectivity
Innovative companies have turned to the World Wide Web as an alternative method of reaching
new customers, a medium for online customer service, as well as for transacting everyday
business. The more successful companies are now seeking ways to continue providing excellent
and timely service to a customer and prospect base that is increasing exponentially.
In providing this Internet connectivity, a company faces the challenge of keeping pace with the
demands and costs of integrating multiple systems and tools from different vendors. This
complexity is increasing continuously with the rapid growth in new technology and products,
prompting small and medium-sized businesses to seek highly integrated end-to-end solutions.
At the same time, these solutions must also ensure that the security of the company's data and
applications is not compromised. The chosen product or products must allow the business to
control access to its information resources, as well as the network path over which it flows.
We can even help you set up Web-sites that provide your customers with self-serve estimates
and status reports, while protecting the security of your network.
Inter-Office connectivity
Communication becomes challenging for small and medium-sized companies with branch offices,
warehouses, or business partners located in various geographical areas. They frequently need to
share customer information, check inventory, and look up sales data, transfer files, process
invoices, and exchange e-mail. Yet a dispersed organisation cannot communicate effectively and
efficiently without the right technology.
To increase productivity and stay competitive, companies require cost-effective interoffice
connectivity solutions that combine applications availability with fast and timely access to
business information. Using infrastructure products that will present low cost of ownership. As this
controls wide area connection and ongoing management costs with scalability to protect
investments and allow for expansion.
Digital Workflow and Imaging
There are lots of improvements arriving in networking technology, major telecommunication
carriers and Inter
net service providers will continue to offer new services.
For example, would you be interested in sending information over the Internet in a secure "tunnel"
with a guaranteed quality of service that ensures data integrity? How about super-high-speed
connections that work over regular telephone wire?
To compete aggressively, you'll need to be able to take advantage of these emerging
opportunities to continuously improve the way you do business.
More and more of your customers want to communicate, send and receive proofs electronically
but not everyone wants to use the same method. Maybe one customer wants to send you layouts
with FPO images over the Internet. Maybe another customer wants to send high-resolution using
FTTC. Maybe you have customers who need to send really large files, such as imposition flats,
and whose volume of work justifies
An ultra high-speed connection between their office and yours. How do you say "yes" to all the
business you can handle?
Page 12
An increasing number of reprographic houses are offering direct to plate or press services. Some
companies are even putting RIPs and digital proofing systems in the offices of their customers,
who then transmit files directly into production. Some are establishing multiple digital printing
facilities or partnering with other companies to offer on-demand output at the customers' choice of
locations. If you're thinking along these lines we can provide high-speed LANs for moving files
from your electronic Pre-press workstations to digital output devices. We can also help you set up
wide area network connections capable of transmitting large press-ready files over long
distances.
Open standards-based networks also let you link to any type of output device and use your
choice of job ticketing, workflow management, and proofing software.
Choosing right networking devices in digital workflow systems can lead to acceleration on the
return of your investment. There is no reason why the same devices that connect you with your
customers for file exchange and remote proofing, shouldn’t also be able to connect your Web site
or the Internet. Another factor that affects how fast you see a return on your investment is the
ease with which you can set up and manage connections.
We can demonstrate a vast range of networking options that can provide you with solutions,
which incorporate all the latest networking capabilities including:
 Wireless access points
 Switches
 Routers
 Transceivers
You may have already automated the process of archiving jobs to CD-ROM or even a USB stick.
We can provide you with a solution that will offer remote digital asset management, with
automated archiving and retrieval.
When getting closer to your customers in this way, bytes and bandwidth, ports and protocols
aren't the most important things to consider. You also need to consider standards-based software
that will allow remote digital-proofing devices on either side which will help reduce cycle times,
whilst saving money on delivery services. If you decide to set up digital workflow, with digital file
transfer and remote proofing, we can provide you and your customers a network solution
convenient for submitting jobs that may require the transfer of full-colour images. This can be
done over DSL or something faster, providing for swift turnarounds that increase throughput to
high-speed digital presses and other big-ticket investments.
Overall it will be important that you are able to meet future demands of your customers. Our
solutions can include high-speed LANs to connect everyone in the workflow to centralised file
servers that provide
Managed access to jobs in progress, which perform other functions such as spooling to output
devices and OPI high-resolution picture replacement.
For example, some organisations are setting up storefronts in new geographic markets, from
which they take in jobs and transmit them to any one of their facilities that has available capacity.
We can explain what this new technology has to offer and help you always make the right
decisions for your business.
Page 13
Software Developments/Products (Apollo)
Apollo 
Housing 
Housing Management System based on Microsoft .Net Technologies. 
Properties management, tenant management, customer queries, rent 
accounting, repair & maintenance, waiting & allocations and many other 
features are included. 
EDMS  Electronic Documents Management System based on MS .Net 
Technologies 
Manage all of your documents in cloud, access anywhere in the word. 
Various file formats like doc, docx, xls, xlsx, pdf, jpg, gif, png, zip and many 
more. document versioning, email documents, restrict access to 
documents based on user roles. 
FMS  Funeral Management System based on MS .Net Technology 
Starts from taking funeral arrangement request in from next to kin and 
ends at final invoice. Takes all dates, arrangements process in database. 
Prints several reports for each step. Fast and easy search function saves a 
lot of time when you are busy. 
PMS  Properties Management System (Web based) 
Estate agents can upload their properties on our popular properties portal 
and receive a lot of serious inquiries in minutes. There are different 
packages to select as per number of properties you are managing either to 
sale or rent.  
PMS  Properties Management System (Desktop Version) 
Estate managers can manage their properties, can print window cards. 
They can also manage all different kind of contract, letters in shape of 
unlimited custom templates. This software is available on monthly 
subscription starts from £30 per month. 
CMS  Contact Management System 
Manage unlimited contacts and templates, easily search and update 
contacts, send email to single or multiple contacts by selecting 
predesigned templates. Keeps log of all communication. 
SES  Shipbrokers Education System (MS .Net based) 
Manage Qualifications, Subjects, Exams, Students, Members. Login as 
admin to manage website, or student to register for exams, view your 
profile as student or member. 
Page 14
Conclusion
New technological innovations will continue to emerge and evolve, making business
considerations ever more difficult. It will be important that organisations begin preparing for the
adoption of these technologies, as it will prove vital for business success. Key-personnel as well
as management will need to be fully conversant with their working environments, to maximise the
full potential of technological or organisational change. Information Technology is and will
continue to become a more diverse industry; business should no longer expect a one-stop shop
solution to solve business problems. Therefore, it will be essential that business elects
assistance from professional IT service organisations through strategic partnerships, in order to
achieve long-term aspirations.
Page 15
Multi function Printers
Firewall
WWW Internet
Mail Server File server Database Server
Secure email
Gateway
Router
HP 24 Port 100/1000 Switch
Various laser
pinters
Wireless
Access point
Various HP PC’s
Smartphone Tablet
HP Laptop
Page 16
Approved Partners
Around the world, the communications industry is changing the way people live and work.
Communications today mean much more than using the phone - and BT is proving much more
than a phone company. Getting in touch, and staying in touch, increasingly depends on new
technologies and BT aim to show people the world of possibilities in these new ways of
communicating.
Hewlett Packard or HP is an American multinational information technology company based in
California USA .Founded in 1939 Hewlett Packard have become market leaders in desktop,
laptop , server and printer technologies .Logic Networks has been a Hewlett Packard reseller and
approved partner for over a decade and will continue to work alongside HP with regards to new
technology roll outs .
Cisco Systems, Inc. is the world-wide leader in networking for the Internet. Cisco routers are the
basis for over 80% of the Internet infrastructure, and Cisco supplies 60% of the access solutions
used by companies to provide connectivity for remote users and connectivity to the Internet.
Page 17
QNAP Systems, Inc., as its brand promise "Quality Network Appliance Provider", aims to deliver
comprehensive offerings of cutting edge network attached storage (NAS) and network video
recorder (NVR) solutions featured with ease-of-use, robust operation, large storage capacity, and
trustworthy reliability. QNAP integrates technologies and designs to bring forth quality products
that effectively improve business efficiency on file sharing, virtualization applications, storage
management and surveillance in the business environments, as well as enrich entertainment life
for home users with the offering of a fun multimedia centre experience. Headquartered in Taipei,
QNAP delivers its solutions to the global market with nonstop innovation and passion.
SonicWall security systems solutions enable organisations of all sizes to secure their network,
system, users and data with a deep level of protection that want compromise network
performance.
SonicWall wired and wireless solutions are deployed in small and medium organisations as well
as distributed enterprise environments, government, retail point of sale, healthcare and service
providers.
Page 18

LNL Company Profile-NEW

  • 1.
    Logic Networks Limited Anew definition in network support services Company Profile www.logicnetworks.co.uk Logic Networks Limited Unit C3 Matchmakers Wharf Homerton Road London E8 5BG Tel: +44 (0) 20 8986 2596 Fax: +44 (0) 20 3222 5268
  • 2.
    Page 2 Contents Introduction Logic Networks Services PC Hardware Maintenance  Desktop & Network Application Support  Network Analysis & Management Services  Network Infrastructure Support  Project Management & Software Development  On-site & Off-site Disaster Recovery  Managed services  Cloud Computing  Virtual Servers  Virtual Applications  Bespoke Software Development/Management  Co Location Hosting  Systems Relocation  International Support  Pay as you go support Network Solutions  Remote Access  Smartphone Access  LAN/WAN Infrastructure  Internet & Intranet Connectivity  Inter-Office Connectivity  Digital Workflow and Imaging  Virtual Private Networks  Voice & Data Convergence  Wireless Access  Remote Back-up Software Developments/Products (Apollo)  Housing  EDMS  FMS  PMS  CMS  SES Conclusion
  • 3.
    Page 3 The computerindustry is very much application driven, as there are vast amounts of different software packages that automate business functions. With the evolution of PC technology, this functionality continues to be ameliorated and the computer network has emerged as a fundamental business tool. A computer network is able to gather this substantial increase in productivity and to lay the foundation for long-term business growth. Whilst growing a business is a delicate task, resources have measurable capabilities resulting in restrictions on growth without further capital investment. In today’s marketplace the computer network provides that competitive advantage that business requires. Logic Networks “Logic n. a science or method of reasoning; correct reasoning”. Logic Networks Limited (LNL) provides a comprehensive portfolio of integrated IT support services and computer network solutions. Our strategic location in the heart of the City incorporates several business units that provide specialist IT communication services. Working in close collaboration within our departments not only enables the sharing of information but access to specialist expertise. We occupy modern, secure premises with high-tech security systems. Our company is divided into five departments covering technical services, sales, marketing, accounts and administration. We dedicate one person from each department to look after each client to ensure best practise in customer relations. Founded in 1996, we currently service over 120 business customers from our City location and anticipate continued steady growth. We aim to establish ourselves as one of the main competitors in integrated technical service provisions within the Greater London area and throughout the United Kingdom and Middle East. The reason for our success is based on our consistent approach in providing high quality support services that meet the business requirement, specifically tailored to the individual customer. Services Our technical services centre operates 24 x 7 for 365 days of the year and fulfils an important role in our policy of providing continuous support to our clients. This provides flexibility to our clients enabling peace of mind as your business needs grow. Our helpdesk analysts can interact directly, from customer network systems solutions right down to the individual user PC if required. We have devised one of the most comprehensive ranges of support services together with high- quality service level agreement guarantees which consist of the following:  PC Hardware Maintenance  Desktop & Network Applications Support  Network Analysis & Management Services  Network Infrastructure Support  Project Management & Software Development  On-site & Off-site Disaster Recovery  Remote Access  Smartphone and Tablet Access PC Hardware Maintenance
  • 4.
    Page 4 PC Maintenance Asone of our core services we employ a full resource of technical service engineers to ensure we meet customer demand. Our hardware engineering team is fully versed in the latest PC technology. Under contract we provide comprehensive PC hardware maintenance for your workstations. A call-out for service on a PC workstation will comprise: a guaranteed response time with equivalent to fix or replacement, re-installation of the operating system or software upgrade if necessary and reconfiguration of your network. At the same time you may also want to add new hardware devices or memory to the system. Server Maintenance The most critical component of any Network is its server. It may be a single fileserver combined with Integrated Server Applications and Network Operating System or a fully distributed configuration incorporating an array of dedicated servers for communications, database, Web, on-line transactions processing and/or other key application servers. The requirements that need to be considered when developing any server strategy are the same i.e. (Performance, Scalability, Fault Tolerance, Reliability, Security and Disaster Contingency). We can provide Server technologies from the leading hardware manufacturers. Logic Networks follows a philosophy for getting it right, we learn by our endeavours not at our customers’ expense! Printer Maintenance Your contract can even incorporate printers for which we hold a large stock holding of replacement parts for many popular brands of printer including; Hewlett Packard, on which we can perform troubleshooting failures to the failing Field Replaceable Unit (FRU). Our three-step process includes the following; Replacement of the failing unit Perform any required adjustments or alignments Verification of the correct printer operation Desktop & Network Applications Support LNL is, and will continue to be, totally vendor independent in order to allow us to recommend impartial solutions that are based on a client’s requirements and without any manufacturer bias. However, our industry has established certain manufacturers with a reputation for developing and/or successfully producing intelligent, reliable and cost effective technologies. We naturally focus our resources on providing the highest standards and skill levels which are an essential element of support services for Novell, Microsoft, Hewlett Packard, 3Com and Cisco. We are accredited with both Novell and Microsoft who are the clear leading vendors for network applications software and we possess a high number of both CNE and MCSE qualified technical support personnel. As part of commitment to customer service we can provide expertise as part of a support contract to provide on-site system administration and/or management on either a full or part time basis. Network Infrastructure Support Our proficiency in systems integration ranges from basic PC workstation installation and customisation, through to server specification, design and configuration. We believe that in
  • 5.
    Page 5 designing asystem it should have the ability not only to meet your current needs but also to grow with your future needs. Structured Cabling Systems: Cabling problems are the single biggest causes of network downtime, often caused by shortcuts being taken during installation, on the assumption that merely the right cable will suffice. Eliminating outages due to cable problems makes good business sense and proves cost effective for the long-term operation of your network. We can provide you with specialist technical assistance for specific projects with skills in both the design and implementation of cable systems including: Category 5E and 6A copper and Single or Multi-mode Fibre Optic. As part of this service we discuss with you network topology and best location for your network devices and wiring closets. Our infrastructure technicians have many years experience in floor cabling for installation, testing and certification of your new system. We can guarantee you an absolutely trouble free network cabling plant that may be utilised for many years. Network Infrastructure Products: Logic Networks builds upon the cabling infrastructure by providing all the necessary networking equipment to assure your network is ready to handle the new converging technologies. Critical networks may also require support to cover the following areas: Topologies & transport: Local Area Network (LAN)  Wireless Access Points  Switches  Routers  Transceivers Wide Area Network (WAN)  Leased Line  DSL  FTTC Fibre to the cabinet .e.g. BT Infinity  MPLS Multiprotocol Label Switching Security applications:  Proxies  Firewalls  AD Domains  Virtual Private Networks (VPNs)  Secure Sockets Layer Configuration  Exchange Key & Encryption Management We can supply you with Consultants for design and planning, Network Engineers for LAN, WAN, Intranet/Internet support and Infrastructure Technicians for the network cabling and associated
  • 6.
    Page 6 communications hardwaresuch , switches and routers a well as: PC Technicians for User, Workstation and Printer Hardware and Application Support. Network Analysis & Management Services With a fully qualified team of analysts, network technicians and engineers who are experienced in all practical aspects of network management, we can carry out performance optimisation testing within a client site, though much of our efforts are directed towards ensuring minimal client disruption during the installation and/or maintenance process of the expansive network. Through the analytical process we can assess your requirements, using sophisticated data modelling techniques and provide you with an integrated management solution to incorporate the following:  Desktop & Server hardware using the desktop management interface (DMI)  Network Infrastructure Products using the simple network management protocol (SNMP)  Desktop & Server applications using remote monitoring (RMON) These are all standards-based technologies all of which are readily available which keeps the cost of ownership down Project Management The first stage of any project is deciding what to do; you will need to consider all major factors for a successful outcome. Implementation of new systems requires a high degree preparatory work and planning, without it you risk an increase in the cost of support to your installations. Our project management team takes a business approach, with a remit that will include the budgetary constraints and risk assessment. The appointment of a project manager provides a focal point for contact enabling a continual update on progress. To each project we apply PRINCE, a government-sponsored method of project management, ensuring vital tasks are performed during project execution. Given this level of responsibility our aim is to ensure that each project is seamless in its execution and that customer expectations are met. In addition to the above LNL has developed and maintained bespoke and off-the-shelf software based on our clients requirement. Our software development teams has vast knowledge of .NET, SQL, PHP and Oracle to develop, integrate, support or upgrade existing bespoke or develop a new system. On-site & Off-site Disaster Recovery Data and Systems Restore and Server Replacement In the event of data loss, you can quickly restore data from our on-site or offsite backups, in the event of loss of one or more servers. You can fully restore from the onsite back-up (if selected) or we can restore your systems and data to the standby servers in our data centre and provide you with remote access. Cloud Computing Cloud computing allows you to work on systems that are hosted outside of your offices as if they were in your offices. The advantage of this is that you do not need to invest in expensive IT hardware or software or have to worry about upgrades or PC performance. As long as you have a PC, Smart phone or tablet and internet access you will have access to your cloud. We will work with you to customise your Cloud to meet your individual needs.
  • 7.
    Page 7 Smartphone Technology TheSmartphone market is booming with countless devices that make it easy for you to check email, sync your schedule, and keep track of contacts. We can help you find the best mobile platform and device for your needs, and get you connected so no matter where you are, access to your business is at your fingertips. In today’s world, running a business is more than a full time job. Fortunately, the technology exists so you can stay connected with your business, no matter where you are .From mobile smart phones to remote access, there is a wide range of capabilities you can take advantage of, and even give your staff the luxury of as well. Today it’s more cost effective than ever. Connect From Anywhere For our business, Remote Access has changed the way we work for our clients. It has increased our productivity and has saved us and our clients on travel time. You and your staff can benefit from remote access as well, whether you have staff that can work from home, we can work with you to create a secure connection so you and your end-users can easily get to the files and software they need. Hosted Desktop With Logic Networks Hosted Desktop, your entire office can be virtualised ,granting your employees access to their desktop and applications. By centralising your desktop environment, you can access your files and programs from anywhere on virtually any device with a web browser, and the cost of management and the support is minimised. Using Logic Networks Hosted Desktop Platform ,all of your applications and DATA are stored in our Network Operations Centre. With unparalleled physical and technological security mechanisms you will never have to worry about data security again.
  • 8.
    Page 8 Virtualisation andThin Client Let Logic Networks worry about managing the software and updates for your office while reducing your hardware expense at the same time. Vitalising your office can drastically reduce the cost of operating your business. By moving to the Cloud, you can outfit your entire operation with thin client terminals which only need the internet and minimal hardware to access our service. The minimal hardware offers several cost saving benefits. The cost of powering the thin clients is considerably less than a traditional workstation. These power savings will reduce your company’s overhead expenses. The life cycle of thin clients are longer than traditional PCs since they will not need to be upgraded to accommodate the processor load from new applications. Most of all, your company will save by not having to maintain an in house support team or spend a considerable amount taking care of these PCs. Server Replacement Cloud backup is particularly effective at the platform-independent bare metal restores, and in the event that one or more of your servers is permanently lost or destroyed, we will supply fully rebuilt and restored replacement servers which are yours to keep at no additional cost . Test Restores For peace of mind this service includes regular test restores of your servers at least annually .This comes with a full written report to ensure the service remains configured for optimal restore capability . Bespoke Software Development Whatever the gap in your software needs, Logic Networks Software has a decade of experience designing bespoke software which will improve the way your organisation runs. Our bespoke software development services can make your business processes more efficient, less time consuming and more cost effective. We supply bespoke software to a diverse client base, which boasts some of the country’s most successful businesses. The competitive edge we have helped them gain is a testament to the robust and user friendly nature of the software we develop. Bespoke Software Development without the Hassle! Here at Logic Networks we offer completely tailored bespoke software development and are on hand at every stage of the process. How we can engage with your business:  The first stage is often consultancy, which gives us an understanding of the resources at your disposal and the internal processes involved in your operations  We then go through the troubleshooting phase, where we identify any specific business issues  Project planning and timescales are then created  The Logic team then develop bespoke software, tailored to the exact requirements of your business  We deliver the service and manage the implementation project plan  Training is available so that when the system is live, your team are fully in control  On-going support is then available to keep your new system working at its best  Further software development and customisations can be created as your needs change A Dedicated Bespoke Software Development Team We provide user-friendly and highly targeted software development, complemented by a dedication to customer service and backed by years of experience and firm guarantees. We have a highly-skilled technical team who are passionate about delivering intuitive, easy-to-use software, which adds value to your business.
  • 9.
    Page 9 Not onlydo we develop the software from scratch, we also Our bespoke software development and database design will deliver measurable benefits to your business, manage the implementation process ensuring it is smoothly embedded within your company processes. We offer on-site training as well as on-going UK based telephone support direct from our expert and friendly team. Our in-depth understanding of web development and the Internet gives us a significant head start when developing your software or website, allowing us to transfer our competitive edge to you. Co-Location & Hosting Co-location and server hosting are similar services with the distinction between the two reflected in the level of support extended by Logic Networks. Companies looking to maintain their own equipment opt for a co-location package, whereas organisations who want to be completely free from all duties and responsibilities prefer to have their server hosted and managed by us. At the point co-location and server hosting lays the promise of server safety. The optimum conditions provided by a data centre help to prolong the life of a server, in addition to protecting it from an array of emergencies which could occur in an environment. Network Solutions The network solutions we provide include business analysis, design, implementation and support of your Local and Wide Area Networks. We supply services for the development of new networks, or enhancements to your existing networks. As part of a solutions house our objective is very clear, we aim to provide a fully integrated support solution for end-to-end communication installations, whereby we take on the full responsibility for servicing and supporting our clients in what is becoming a very complex arena. Creative solutions should enable you to add services, expand into new markets, balance workload, and increase capacity utilisation through resource sharing. Our service offerings range from Tele-commuting through to Enterprise-wide management services and consist of the following:  Remote Access  LAN/WAN Infrastructure  Internet & Intranet Connectivity  Inter-Office Connectivity  Digital Workflow and Imaging  Wireless Access Remote Access To be successful, small and medium-sized businesses require more flexible remote-access solutions. These businesses must find new strategies for increasing the amount of time their mobile sales representatives can spend with customers. They must provide remote access to e- mail, Smartphone and other network resources to key employees who travel or telecommute. They must ensure that representatives can access the most up-to-date pricing, product and inventory information in order to improve customer service. They must also quickly collect time- sensitive data from field personnel to more efficiently manage their resources and services. We can design, set-up and install complete remote access solutions to enable your sales force to generate quotes, commit to schedules, and check on job status from the field.
  • 10.
    Page 10 Remote Backup Databackups are an essential element of any IT function .The impact on your business if you were to lose all, or even just some, of your data is almost unthinkable. 60% of businesses do not survive beyond six months when it does happen and those who do endure have a phenomenal cost to shoulder attempting to recreate the missing data. Replacing just 20MB of lost data is estimated to take 21 days and a lot of money. Thanks to advances in technology, computers hold somewhere in the region of 500 more times data than they did ten years ago, making 20MB a drop in the ocean . Why back up remotely Remote backups involve encryption and transfer of all your data over the internet to a safe location within the Logic Networks data centre .The frequency at which data is backed up is set to reflect the needs of the business. Alternatively, real time data replication is selected by organisations for which the loss of even one day’s data would be too busy. The reliability ,security and easy automation of online backups has led to them becoming the ideal means of safeguarding data and the optimum replacement for companies still reliant on tape backups. LAN/WAN Infrastructure In today's fast-paced business environment, immediate access to critical data is key for small and medium-sized businesses to be successful. Bandwidth-intensive applications, more powerful PCs and servers, and large files downloaded from the Internet, however, are all contributing to an increase in LAN traffic. These factors along with the additional demands placed by branch offices and mobile users accessing main LAN services are challenging the performance of 10Gigabit networks, slowing response times and productivity. High-performance LAN solutions such as Ethernet switches and 10GB Ethernet switches can minimise this network congestion, substantially improving performance to the desktop, server and backbone. Switched Ethernet and Fast Ethernet are easily implemented. These standards-based technologies will leverage your existing investment in Ethernet equipment and training. High-performance LAN Considerations: In the past, 10GbE was neither necessary nor affordable. As with most burgeoning Technologies, those dynamics are changing. Technological advancements have resulted In higher performance at lower costs. As such, gigabit and 10GbE bandwidth has Become affordable for most companies. Regardless of cost, there is also a distinct need. An increasing number of applications Require considerable bandwidth to support the transfer and streaming of large data, Video and audio files. As bandwidth-intensive applications and latency sensitive traffic Types become ubiquitous, so does the need to support and transport them. In addition, many companies are seeking to “future proof” their network to ensure they Can support emerging technologies and preserve their initial investments. In the past, Fibre and wire cabling systems were installed with a 10-year lifespan in mind. However, With the rapid, ongoing evolution of network technologies, companies must be Concerned with their current infrastructure’s ability to keep pace. Costs associated with re-cabling a network can be exorbitant and organizations should Take precautions to ensure their cabling systems can last well into the future. 10GbE Provides the very best assurance for being able to support forthcoming technologies And delivers utmost investment protection.
  • 11.
    Page 11 Internet &Intranet Connectivity Innovative companies have turned to the World Wide Web as an alternative method of reaching new customers, a medium for online customer service, as well as for transacting everyday business. The more successful companies are now seeking ways to continue providing excellent and timely service to a customer and prospect base that is increasing exponentially. In providing this Internet connectivity, a company faces the challenge of keeping pace with the demands and costs of integrating multiple systems and tools from different vendors. This complexity is increasing continuously with the rapid growth in new technology and products, prompting small and medium-sized businesses to seek highly integrated end-to-end solutions. At the same time, these solutions must also ensure that the security of the company's data and applications is not compromised. The chosen product or products must allow the business to control access to its information resources, as well as the network path over which it flows. We can even help you set up Web-sites that provide your customers with self-serve estimates and status reports, while protecting the security of your network. Inter-Office connectivity Communication becomes challenging for small and medium-sized companies with branch offices, warehouses, or business partners located in various geographical areas. They frequently need to share customer information, check inventory, and look up sales data, transfer files, process invoices, and exchange e-mail. Yet a dispersed organisation cannot communicate effectively and efficiently without the right technology. To increase productivity and stay competitive, companies require cost-effective interoffice connectivity solutions that combine applications availability with fast and timely access to business information. Using infrastructure products that will present low cost of ownership. As this controls wide area connection and ongoing management costs with scalability to protect investments and allow for expansion. Digital Workflow and Imaging There are lots of improvements arriving in networking technology, major telecommunication carriers and Inter net service providers will continue to offer new services. For example, would you be interested in sending information over the Internet in a secure "tunnel" with a guaranteed quality of service that ensures data integrity? How about super-high-speed connections that work over regular telephone wire? To compete aggressively, you'll need to be able to take advantage of these emerging opportunities to continuously improve the way you do business. More and more of your customers want to communicate, send and receive proofs electronically but not everyone wants to use the same method. Maybe one customer wants to send you layouts with FPO images over the Internet. Maybe another customer wants to send high-resolution using FTTC. Maybe you have customers who need to send really large files, such as imposition flats, and whose volume of work justifies An ultra high-speed connection between their office and yours. How do you say "yes" to all the business you can handle?
  • 12.
    Page 12 An increasingnumber of reprographic houses are offering direct to plate or press services. Some companies are even putting RIPs and digital proofing systems in the offices of their customers, who then transmit files directly into production. Some are establishing multiple digital printing facilities or partnering with other companies to offer on-demand output at the customers' choice of locations. If you're thinking along these lines we can provide high-speed LANs for moving files from your electronic Pre-press workstations to digital output devices. We can also help you set up wide area network connections capable of transmitting large press-ready files over long distances. Open standards-based networks also let you link to any type of output device and use your choice of job ticketing, workflow management, and proofing software. Choosing right networking devices in digital workflow systems can lead to acceleration on the return of your investment. There is no reason why the same devices that connect you with your customers for file exchange and remote proofing, shouldn’t also be able to connect your Web site or the Internet. Another factor that affects how fast you see a return on your investment is the ease with which you can set up and manage connections. We can demonstrate a vast range of networking options that can provide you with solutions, which incorporate all the latest networking capabilities including:  Wireless access points  Switches  Routers  Transceivers You may have already automated the process of archiving jobs to CD-ROM or even a USB stick. We can provide you with a solution that will offer remote digital asset management, with automated archiving and retrieval. When getting closer to your customers in this way, bytes and bandwidth, ports and protocols aren't the most important things to consider. You also need to consider standards-based software that will allow remote digital-proofing devices on either side which will help reduce cycle times, whilst saving money on delivery services. If you decide to set up digital workflow, with digital file transfer and remote proofing, we can provide you and your customers a network solution convenient for submitting jobs that may require the transfer of full-colour images. This can be done over DSL or something faster, providing for swift turnarounds that increase throughput to high-speed digital presses and other big-ticket investments. Overall it will be important that you are able to meet future demands of your customers. Our solutions can include high-speed LANs to connect everyone in the workflow to centralised file servers that provide Managed access to jobs in progress, which perform other functions such as spooling to output devices and OPI high-resolution picture replacement. For example, some organisations are setting up storefronts in new geographic markets, from which they take in jobs and transmit them to any one of their facilities that has available capacity. We can explain what this new technology has to offer and help you always make the right decisions for your business.
  • 13.
    Page 13 Software Developments/Products(Apollo) Apollo  Housing  Housing Management System based on Microsoft .Net Technologies.  Properties management, tenant management, customer queries, rent  accounting, repair & maintenance, waiting & allocations and many other  features are included.  EDMS  Electronic Documents Management System based on MS .Net  Technologies  Manage all of your documents in cloud, access anywhere in the word.  Various file formats like doc, docx, xls, xlsx, pdf, jpg, gif, png, zip and many  more. document versioning, email documents, restrict access to  documents based on user roles.  FMS  Funeral Management System based on MS .Net Technology  Starts from taking funeral arrangement request in from next to kin and  ends at final invoice. Takes all dates, arrangements process in database.  Prints several reports for each step. Fast and easy search function saves a  lot of time when you are busy.  PMS  Properties Management System (Web based)  Estate agents can upload their properties on our popular properties portal  and receive a lot of serious inquiries in minutes. There are different  packages to select as per number of properties you are managing either to  sale or rent.   PMS  Properties Management System (Desktop Version)  Estate managers can manage their properties, can print window cards.  They can also manage all different kind of contract, letters in shape of  unlimited custom templates. This software is available on monthly  subscription starts from £30 per month.  CMS  Contact Management System  Manage unlimited contacts and templates, easily search and update  contacts, send email to single or multiple contacts by selecting  predesigned templates. Keeps log of all communication.  SES  Shipbrokers Education System (MS .Net based)  Manage Qualifications, Subjects, Exams, Students, Members. Login as  admin to manage website, or student to register for exams, view your  profile as student or member. 
  • 14.
    Page 14 Conclusion New technologicalinnovations will continue to emerge and evolve, making business considerations ever more difficult. It will be important that organisations begin preparing for the adoption of these technologies, as it will prove vital for business success. Key-personnel as well as management will need to be fully conversant with their working environments, to maximise the full potential of technological or organisational change. Information Technology is and will continue to become a more diverse industry; business should no longer expect a one-stop shop solution to solve business problems. Therefore, it will be essential that business elects assistance from professional IT service organisations through strategic partnerships, in order to achieve long-term aspirations.
  • 15.
    Page 15 Multi functionPrinters Firewall WWW Internet Mail Server File server Database Server Secure email Gateway Router HP 24 Port 100/1000 Switch Various laser pinters Wireless Access point Various HP PC’s Smartphone Tablet HP Laptop
  • 16.
    Page 16 Approved Partners Aroundthe world, the communications industry is changing the way people live and work. Communications today mean much more than using the phone - and BT is proving much more than a phone company. Getting in touch, and staying in touch, increasingly depends on new technologies and BT aim to show people the world of possibilities in these new ways of communicating. Hewlett Packard or HP is an American multinational information technology company based in California USA .Founded in 1939 Hewlett Packard have become market leaders in desktop, laptop , server and printer technologies .Logic Networks has been a Hewlett Packard reseller and approved partner for over a decade and will continue to work alongside HP with regards to new technology roll outs . Cisco Systems, Inc. is the world-wide leader in networking for the Internet. Cisco routers are the basis for over 80% of the Internet infrastructure, and Cisco supplies 60% of the access solutions used by companies to provide connectivity for remote users and connectivity to the Internet.
  • 17.
    Page 17 QNAP Systems,Inc., as its brand promise "Quality Network Appliance Provider", aims to deliver comprehensive offerings of cutting edge network attached storage (NAS) and network video recorder (NVR) solutions featured with ease-of-use, robust operation, large storage capacity, and trustworthy reliability. QNAP integrates technologies and designs to bring forth quality products that effectively improve business efficiency on file sharing, virtualization applications, storage management and surveillance in the business environments, as well as enrich entertainment life for home users with the offering of a fun multimedia centre experience. Headquartered in Taipei, QNAP delivers its solutions to the global market with nonstop innovation and passion. SonicWall security systems solutions enable organisations of all sizes to secure their network, system, users and data with a deep level of protection that want compromise network performance. SonicWall wired and wireless solutions are deployed in small and medium organisations as well as distributed enterprise environments, government, retail point of sale, healthcare and service providers.