Implementing an EVM System for the
      Constellation Program


               February 10, 2010

   Lisa McCann, Schedules Cost Estimating and
          Assessments Deputy Manager
                   SGT-Inc




                                                Used with Permission
Topics
         Program Overview
         EVM Implementation and Process Overview
         Integrated Baseline Reviews (IBRs)
         Going Forward
         Questions




2/10/10                     SGT-Inc, lisa.mccann@sgt-inc.com   2
Constellation Content Across the Nation
 Ames                                            Marshall                                               Glenn                                                          Goddard
 • Lead Thermal Protection System                • Home for Ares Project                                • Lead Service Module and Spacecraft Adapter                   • Lead program requirements for
   Advanced Development Program                  • Ares I and V development and integration lead          integration                                                    unpressurized cargo carriers
 • Ares mission operations simulation            • Support LAS and Service Module, Ares V EDS           • Flight Test Article “Pathfinder” fabrication                 • Subsystem lead for lunar
 • Software & Guidance, Navigation &               development, test and oversight                      • Ares I-X upper stage simulator lead                            lander avionics
   Control support                               • Core stage development, test and oversight           • Lead Ares V power, thrust vector control and                 • Lunar surface and surface
 • Lunar systems support                         • Altair decent stage and subsystem support              payload shroud development                                     telenet communications
                                 WA                                                                     • Lead EDS orbital environments testing at Plum Brook          • EVA tools and equipment
                                                                                                        • Lead lunar lander ascent stage propulsion, ascent and
                                                                                                          descent stage power generation
                                                                                                                                                                       Langley
                                                             MT                                         • Passive thermal systems and surface element
                                                                                                                                                                       • Lead Launch Abort System
                                                                                                          communications
                                                                                                        • J-2X altitude/in-space testing                                 integration
                                                                                                                                                                       • Ares I-X vehicle integration
                                                                                                       MN                                                              • Ares aerodynamics lead
                                                                                                                                                                       • Lead Ares V aerodynamics
                                                                                                                                                                       CT
                                                                                                                                                                       • Subsystem lead for lunar lander
                                                                                                                                                                         structures and mechanisms
                                        Alliant Techsystems, Inc.                                                                                            PA
                                                                                                            IA                                                           including ascent and descent
                                                                                                                                                                         stages
                                    NV                                                                                                                            MD   • Lunar lander and lunar surface
                                                  UT                     Lockheed Martin                                 IL                OH                            radiation protection

                          CA                                      CO                                                                                         VA
                                                                                                                MO      Boeing                                         Kennedy
                                                                                                                                                                       • Home for Ground Ops Project
                                                                                                                                                                       • Ground processing
 Dryden                         Pratt and Whitney                                                                                                                      • Launch operations
 • Lead Abort Flight Test     Rocketdyne        AZ                                                                                                                     • Recovery operations
   Integration/Operations                                       NM White Sands Test Facility                                                                           • Final assembly, ground
 • Abort Test Booster procurement                                                                                                                                        processing for human lunar
 • Flight Test Article                                                   • Orion Abort Test Booster test site
                                                                                                                                                                         lander
                                                                                                                         MS         AL                                 • Lead for lunar surface in-situ
                                                                                                                                                                         resource utilization systems
                                                                                                                 LA
                                                                                        TX                                                              FL
 Jet Propulsion Laboratory                       Johnson Space Center                              CSSS                                                                Stennis
 • Thermal protection system support             • Home for Program and Projects:                                                                                      • Rocket propulsion testing
 • Lunar lander support including spacecraft       Orion, MOP, EVA, Altair, Lunar Surface                                                                              • Lead Ares V liquid rocket
   design; guidance, navigation, and control;    • Element lead for lunar lander crew module/                                                                            systems and stage testing at
   life support systems, and avionics              ascent stage                                                                                                          sea level and altitude
 • Lead specific robotic surface mobility        • Lead lunar surface crew habitation, environmental    Michoud Assembly Facility                                      • Lead altitude development and
 • Environmental monitoring and control and        control /life support systems, human mobility        • Manufacturing of Ares I Upper Stage, Ares V                    certification testing for upper
   surface system local element                  • GFE projects management                                Stages and Orion Primary Structure                             stage engine
   communications                                • Flight Test Program
         2/10/10                                                                SGT-Inc, lisa.mccann@sgt-inc.com                                                                        Page 3
National Aeronautics and Space Administration
EVM Implementation and Process Overview
EVM Requirements Hierarchy
                                                                         ANSI 748 EVMS Criteria
       OMB Circular A-11            Federal             Organization (Guideline 1-5) - Define the authorized work by WBS and
                                                         assign a responsibility organization for work. Integrate all work for
                                                         effective internal management control.
NPD 7120.5D Policy for Flight and
   Ground Systems Projects                              Planning Scheduling, and Budgeting (Guideline 6-15) – Plan,
                                                         schedule, budget and authorize work. Establish interdependencies to
                                    Agency               meet the requirements and maintain a time-phased budget baseline.
       IPAO SOP on EVM
          October 2008
                                                        Accounting Considerations (Guideline 16-21) - Accumulate and record
                                                         costs of work performed consistent with budgets in a formal system
                                                         controlled by the general books of account.
      ESMD EVM Directive
        January 2005
                                                        Analysis and Management Reports (Guideline 22-27) – At lease
           ESMD EVM Policy                               monthly, compare and analyze planned, performance and actual cost
            December 2006                                and schedule variances. Identify managerial actions taken to support
                                                         horizontal and vertical communications and traceability.
 ESMD Integ. Prog. Mgmt. Letter     Directorate
        December 2007
                                                        Revisions and Data Maintenance (Guideline 28-32) – Incorporate,
 ESMD Integ. Prog Mgmt Letter
                                                         record authorize budget and schedule changes in a timely manner and
       November 2009                                     maintain traceability from original budgets. Prohibit retroactive changes.


    CxP 70070 Annex 9 EVM
      System Description


CxP EVM Management Directive -      Program
            038                                          The agency, directorate and program are behind
                                                         EVM and fully support through various policy
      CxP IBR Guidebook                                  documents in accordance with EVM Criteria.

 2/10/10                                          SGT-Inc, lisa.mccann@sgt-inc.com                                          5
Work Breakdown Structure
                                                                                                                     Constellation
                                                                                                                       Program
                                                                                                                      Constellation           234A




                                                                                                                                                                                          Space Comm                                         Lunar
  Ares 1                                                                                         Program
                           Orion             Mission Ops                 Ground Ops                                                   EVA                             Ares V              & Navigation                 Altair               Surface
                                                                                                Integration
                                                                                                                                                                                           Integration                                      Systems
        136905                      644423               282938                      292360             604746                                731384                           206518             141141                        182306           342806

Project Mgmt            Project Mgmt         Project Mgmt                Project Mgmt           Project Mgmt                      Project Mgmt                     Project Mgmt           Project Mgmt              Project Mgmt          Project Mgmt
136905.01               644423.01                                        292360.01              604746.01                         731384.01                                               141141.01                                       342806.01
                                             282938.01                                                                                                             206518.01                                        182306.01

Vehicle Integration     Sys. Engineering     SE&I                        SE&I                                                     SE&I                             Systems Engineering    Systems Engineering       Vehicle Integration   LSS Integration
136905.02
                        644423.02            282938.02                   292360.02                  Program Manager               731384.02                        206518.02              141141.02                 182306.02             342806.02
                                                                                                    604746.01.01
Safety & Mission        Safety & Mission     S&MA                        S&MA                                                     S&MA                             S&MA                   Safety & Mission          Safety & Mission      Safety & Mission
                                                                                                            Program Mgmt &
Assurance               Assurance            282938.03                   292360.03
                                                                                                            Administration
                                                                                                                                  731384.03                        206518.03              Assurance                 Assurance             Assurance
                        644423.03
136905.03                                    Science/Technology          Future Elements                    604746.01.01.01       Science/Technology               Spacecraft             141141.03                 182306.03             342806.03

                        Science/Technology   282938.04                   Dev & Ops 292360.05                PP&C                  731384.04
                                                                                                                                                                   Module                 Science/Technology        Technology            Technology
Mission Operations      644423.04
                                             Mission Ops
                                                                                                            604746.01.01.02
                                                                                                                                  Aircraft/Spacecraft              206518.08              141141.04
                                                                                                                                                                                                                    Development           Development
136905.07                                                                Orion Dev Support
                        Spacecraft           282938.07
                                                                         & Ground Ops
                                                                                                                                  731384.06
                                                                                                                                                                                          Aircraft/Spacecraft       182306.04             342806.04
Launch Vehicle/         644423.06                                                               Systems Engineering                                                     Core Stage        141141.06
                                                                                                                                                                                                                    Payloads              Payloads
                                             Ground System Dev           292360.06
                                                                                                604746.02                                                               206518.08.01
Services                    Crew Module      282938.09                                                                                                                                    Mission Operations        182306.05             342806.05
                                                                         Integrated Ops                                               H/W Mgmt
                                                                                                                                                                        Core Stage
136905.08                   644423.06.01                                                        Safety & Mission                      731384.06.01                                        141141.07
                                                                                                                                                                                                                    Spacecraft            Spacecraft (LSS
                                             System Integration          292360.07                                                                                      Booster
                            Service Module                                                      Assurance                             Sustaining Engineering            206518.08.02      Ground Systems            Development           Elements)
    First Stage
                            64423.06.02      & Testing                   Launch Vehicle         604746.03                             731384.06.02
                                             282938.10                                                                                                                  Earth Departure   141141.09                 182306.06             342806.06
    136905.08.01            Launch Abort                                 Dev Supt & Ops                                               H/W Development                   Stage
    Upper Stage             System           Education &                 292360.08              Science/Technology                    731384.06.04                      206518.08.03      Systems Integration       Ops Integration       Mission Operations
                                                                                                604746.04                                                                                                                                 342806.07
    136905.08.02            644423.06.04
                                              Public Outreach            Ground Systems                                               H/W Processing &                  Earth Departure   & Testing                 182306.07
    Upper Stage
    Engine (SSME)
                            Software         282938.11
                                                                         Dev & Sustaining       Aircraft/Spacecraft                   Logistics                         Stage Engine
                                                                                                                                                                                          141141.10
                                                                                                                                                                                                                    Launch Vehicle        Ground Systems
                            644423.06.05                                                        604746.06
    136905.08.03                             Agency Cost                 292360.09                                                    731384.06.05                      206518.08.04      Agency Cost               Services              342806.09

    Upper Stage                              Assessment      282938.99   Integrated T&V         Mission Operations                                                                        Assessment    141141.99   182306.08             Test & Verification
                        Integ & Testing                                                         604746.07                                                          Flight Integration                                                     342806.10
    Engine – J2         644423.10                                        292360.10
                                                                                                                                  Sys Integ & Testing                                                               Ground Operations
    136905.08.04
                                                                                                Systems Integration                                                & Test                                           182306.09             Education & Public
    Upper Stage         Education &                                      Education & Public                                       731384.10
                                                                                                                                                                   206518.10
    136905.08.05         Public Outreach                                 Outreach               & Testing                         Education &                                                                       Test & Verification   Outreach
                                                                         292360.11              604746.10                                                                                                           182306.10             182306.11
                        644423.11
                                                                                                                                   Public Outreach
Ground System(s )                                                        Integrated Logistics   Education &                                                                                                         Education & Public
                        Construction of                                                                                           731384.11
136905.09                                                                292360.12               Public Outreach                                                                                                    Outreach
                        Facility 644423.98                                                      604746.11                         Agency Cost
Systems Integration                                                      Construction of                                          Assessment         731384.99
                                                                                                                                                                                                                    182306.11

& Testing               Agency Cost                                                             Agency Fee For
                        Assessment                                       Facility 292360.98
136905.10                                                                                       Service (FFS)
                        644423.99                                        Agency Cost            604746.90
Construction of
Facility 136905.98
                                                                         Assessment
                                                                         292360.99              Program Reserves
                                                                                                604746.99
                                                                                                                                                                  Projects provide monthly cost and
Agency Cost
Assessment
136905.99                                                                                                                                                         schedule variances at these levels per
                      CxP Projects EVM Directive WBS Reporting Areas                                                                                              these thresholds
      Projects                       Level 1  Level 2  Level 3  Level 4  Level 5  Level 6                                                Total
Ares                                        1                18       31                44                                                    94
Orion                                       1                36       21                                                                      58
EVA                                         1        6        5        3                                                                      15
Ground Ops                                  1       11        1        3                                                                      16
Mission Ops                                 1        6       26                                                                               33
                                                                                                                                                                 Thresholds for variance explanations
Program Int                                 1        5                                                                                         6                 5 largest cum cost variances exceeding +/- $250K and +/- 5%
Totals                                      6       28       86       58        0       44                                                  222                  5 largest cum schedule variances exceeding +/- $250K and +/- 5%

            2/10/10                                                                               SGT-Inc, lisa.mccann@sgt-inc.com                                                                                                                     6
Organization
 Dynamic
  organization
  across all centers
 Institutions such
  as Engineering
  are support to all
  programs and
  projects




  2/10/10               SGT-Inc, lisa.mccann@sgt-inc.com   7
CxP EVM Organization
   ESMD Assoc. Administrator

                    Program Manager

                                  PP&C Director

                                              SCEA Manager
                                                                                    CxP
                                                                              SCEA EVM/IMS Lead




CxP Project EVM Focals and Support

         Ares                    Orion                  EVA                           Ground Ops            Mission Ops              Program Integration      Lunar Projects


       35 CAMs                   17 CAMs               10 CAMs                          14 CAMs                 TBD                        8 CAMs




 HQ and Center EVM Focal CxP Support

Office of Chief Engineer       Headquarters            MSFC                              JSC                   KSC                        LARC

                                                       Institutional support office




    Strong collaboration is key to success:                                                                Organizational Interfaces                External Interfaces

    • Bi-monthly EVM Working Group meeting                                                                            Resources                      GAO            DCMA

      and telecoms (~23 participants)                                                                                 Scheduling                      IG           Industry

    • Quarterly HQ EVMWG meetings (~20
      participants                                                                                                   Assessments                      SRB


    • Training and monthly reviews (~100                                                                              JCL Analysis                   OMB

      NASA CAMs and upper Management)
        2/10/10                                                         SGT-Inc, lisa.mccann@sgt-inc.com                                                              8
How CxP implemented EVM
 Solid Communication with all involved
          • Face to face
          • Telecoms and WebEx
          • Website portals
 Developed process documentation
 Developed and maintain an implementation schedule
 Defined clear requirements and expectations between the Program
  and Projects
 Used existing industry tools, guidelines and experts (ANSI Standard,
  DCMA documents, EVM Implementation Guides, industry
  consultants)
 Implemented off the shelf software tools to mirror existing financial
  reporting systems prior to providing EVM data
 Understood existing cultures and slowly worked to change
  resistance to EVM and remained flexible
 Stayed optimistic each step of the way
 Demonstrated the benefits to key stakeholders
 Met implementation deadlines and delivered products and data


2/10/10                          SGT-Inc, lisa.mccann@sgt-inc.com     9
CxP EVM Implementation Timeline            PMR07                      PMR08                 PMR08 Rev 1                             PMR09

                  2006                                       2007                                    2008                                              2009                                           2010
Lifecycle Phase                                  PHASE A                                                                                      PHASE B                                                                    PHASE C


 Requirements          ESMD EVM Policy                NPR 7120.5D                            CxP EVM Directive -038                    CxP IBR Strategy


                                                              Gilbrecht IPM Letter                                           CxP IBR Guide




                                                        CxP EVM Sys Des                    CxP Report Generator Format              CxP IBR Guide and Toolkit                                        IBRs Complete
    Process
                                                                                           ATK, Boeing IBRs                                        PADs Released
                                                         PWR, Lockheed Martin
                                                                                                                                                                                                          EVM Healthcheck
                                                         IBRs
                                                                                                                                                                                                          Reviews


                      CxP EVM Working Group
                      Established                                                                                                   SRB EVM Status Provided
                                                         CxP EVM Summit                CxP EVM F2F        CxP EVM F2F

   Integration                                          HQ EVM Working Group
                                                        interface established

                                                                                       MPR Reporting Established                                                              Resume MPR Reporting




                  .xml Connect EVM Tool          Actuate Actuals Report                      Windchill and Wiki established           Pertmaster established                                             Cobra in Citrix environment

     Tools
                                                                                       Primavera established
                                                     wInsight in Citrix environment


                                                            Cobra project initiated




                  J-2X Prime EVM Reports                     Ares and Orion Prime            Early In-House EVM Reports               Some EVM reporting stops,                          PAD-based EVM Reporting
                                                             EVM Reports                                                              replanning underway
    EVM Data
                                                                                                          Level II EVM Metric Templates
                                                                                                          established




                                                                                                                                     Cobra Training
   People and           Multiple EVM Training                     wInsight Training      CxP Program Support Contract                                          IBR Training                                    APPEL CAM Training/Cert
                        courses initiated in                                             Start                                                                                                                      Course (TBD)
    Training            SATERN                  Multiple EVM Training                                                                KSC Cobra Pilot
                                                courses initiated at                                   Cobra Workshop                                               Ares Cobra Pilot
                                                various Centers
                                                                                                         wInsight Training           CAM Training Initiative
                                                                                                                                     Kickoff
      2/10/10                                                                     SGT-Inc, lisa.mccann@sgt-inc.com                                                               TIME NOW                                                10
EVM Implementation Process Flow
                                                          Constellation EVM System Overview


                           ESMD EVM                      Formulation
ESMD




                                                                                                                                      Review Program
                         Policy Guidance                Authorization                                                                  Performance
                                                       Documents (FAD)


                                              EVM Report                                                                                  Control Program
                          EVM SDD          Format/Reporting
Constellation Program




                                            Directive (038)

                                                                                                                                         Program Integrated
                                                                                                                                             EVM Data
                                                                                                                                          Analysis/Reports

                                                                                                                         wInsight
                                                           Project                                                      EVM data
                                                                                                                         storage          Analyze Project
                                                        Authorization
                                                                                                                                            EVM Data
                                                       Document (PAD)
                                                                                                       Conduct IBRs
                                                                                                       Validate PMB
                                                                                                                                            Project EVM
Constellation Projects




                                                                                                                      Load and                reports
                                                                                  Formulate
                                                                                   Schedule                           maintain
                           WBS                                                                                        EVM cost
                                                                                                                       engine                 Analyze
                              WBS
                                                                                                                                             EVM data
                           Dictionary        RAM              WAD                                        PMB
                                                                                Formulate CAP
                                                                                                                       Generate EVM        Control Project
                            OBS
                                                                                                                        performance
                                                                                 Bottoms-Up                            measurement
                                                                                  Planning                                  data


2/10/10                                                             SGT-Inc, lisa.mccann@sgt-inc.com                                                          11
CxP EVM Implementation Schedule




2/10/10              SGT-Inc, lisa.mccann@sgt-inc.com   12
EVM Components Process – Project Example
           Budgets               Earned Value                  Actuals                     Forecasts           Variances             Reports
                                    Collected monthly                                      Collected monthly   Collected monthly   • CxP Monthly
          PAD, WADs initiate                                 Collected monthly
                                    from CAMS and                                          from CAMs and       from CAMs and         wInsight Charts
          budget authorization                               from Resources
                                    Schedulers                                             Resource Analysts   Resource Analysts   • EVM Graphs and
                                        Primavera /MS               WebTADs                                                          Metrics
               PPBE /CAP
                                            Project                                                                                • Control Account
               Excel Plan             Schedule Performance
                                                                  Labor Collection

              Phasing Plans                                                                                                          Plan (CAP)
                                                                                                                                     Reports
                Internal Task                                     ALDS & SAP                                                       • Baseline Change
                 Agreements                                       Labor Processed
                                                                                                                                     Reports
             Phasing Plans                                                                                                         • CPRs 1-5
                                                                                                                                   • Variance
                                                                   Bus. Ware.                                                        Worksheets
                    CIRR
                                                                  SAP Report Tool
              Phasing Plans



      Rates, WBS, OBS                                                Actuate
      Codes, Cost Elements                                     Bus Ware Report Tool




                                                                Excel or .csv
                                                                  Flat files


                                                             Cobra or .xml Con.
                                                              EVM Cost Engine
                                                                            via XML file



                Prime .xml or X12                                  wInsight
                Deliverable
                                                                  EVM Analysis

                Prime Format 5
                Variance Analysis
2/10/10                                                       SGT-Inc, lisa.mccann@sgt-inc.com                                                  13
CxP Projects EVM Monthly Process Rhythm
                 Actuate                                                                                                                CAM
                                                     EVM
                 Actuals                                                                                                               Reports
                                                                                                                                                                          Similar monthly process used
                                                     Cost                   .xml file         wInsight
SAP/             Report
                                                    Engine
 BW

                                                                                                                                                                          by all projects for EVM
                              EVM Analyst loads
                               Actuals into EVM
                                                                     Schedule
                                                                      Status                                                                                              Reporting
                                 Cost Engine

             Week One


                                                                                                            Variance                    CAM
                                                                                                           Explanations
                                                                                                                                      EV Report
                                                                                                                                       Reviews

                                                                                                                                      Prime .xml
                                                                                                         Weeks 2 & 3                     files


             Week Four                                                                                                                             CAM’s determine
                                                               Load variance explanations/                                                      variance explanations
                                                                                             Var. explanations,
                                                                 EAC’s into Cost Engine            EAC’s                                         and new EAC’s and        $$ In Thousands                 BCWS          BCWP          ACWP        Schedule Variance                         Cost Variance                            Element Status
                                                                                                                                                                                                                                                                      G                                    Y 
                                                                        database                                                                  generate variance           Current Pd.
                                                                                                                                                                              Cumulative
                                                                                                                                                                                                              1,571
                                                                                                                                                                                                          22,510
                                                                                                                                                                                                                         1,571
                                                                                                                                                                                                                        22,510
                                                                                                                                                                                                                                      1,665
                                                                                                                                                                                                                                      21,246
                                                                                                                                                                                                                                                  0
                                                                                                                                                                                                                                                  0
                                                                                                                                                                                                                                                          0.0%
                                                                                                                                                                                                                                                          0.0%        G          1264
                                                                                                                                                                                                                                                                                      -93      -5.9%
                                                                                                                                                                                                                                                                                                5.6%        B          Overall variance
                                                                                                                                                   explanation form                                                                                                                                                     explanation to be
                                                                                                                                                                                                        CxP PROD
                                                                                                                                                                              Element: 604746.03         CPI & SPI                                                   Name: Safety & Missio
                                                                                                                                                                                         2008        2009                                                                                                               added




                                                                                                                                                                              Index of Dollars
                                                                                                                                                                                         OCT NOV DEC JAN
                                                                    EVM Report Updates                                                                                        1.080

                                                                                                                                                                                 1.070

                                                                                                                                                                                 1.060                                                                                                                                                  Performance


                    Upload to                                           Internal                   wInsight                                                                      1.050                                                                                                                                         BAC                54,681      
                                                                                                                                                                                                                                                                                                                               EAC                53,417      

                      ICE                 Final PI EV Report              MPR                                                                                                    1.040                                                                                                                                         VAC                 1264       



                                                                                                                                                      Output
                                                                                                                                                                                 1.030
                                                                        Review                                                                                                                                                                                                                                            EAC Forecast              Min.
                                                                                                                                                                                                                                                                                                                                                   51,323
                                                                                                                                                                                                                                                                                                                                                                   Max
                                                                                                                                                                                                                                                                                                                                                                  52,488
                                                                                                                                                                                 1.020
                                                                                                                                                                                                                                                                                                                                 Percent Scheduled                41.2%
                                                                                                                                                                                 1.010
                                                                                                                                                                                                                                                                                                                                   Percent Complete               41.2%
                                                                                                                                                                                 1.000                                                                                                                                                   Percent Spent            38.9%

                                                                                                Monthly EVM                                                                                                                                                                                                              SPI                 Current       1.00      
                        MPR                          CAM Briefing                                 Report                                                                                         TCPILRE 1.000
                                                                                                                                                                                                    1.000     1.0001.000
                                                                                                                                                                                                                                                                                                                                        Cumulative         1.00      
                                                                                                                                                                                                 CUM CPI 1.070
                                                                                                                                                                                                    1.058     1.0691.059                                                                                                 CPI                 Current       0.94      
                                                                                                                                                                                                 CUM SPI 1.000
                                                                                                                                                                                                    1.000     1.0001.000                                                                                                                Cumulative         1.06      


                                                                                                                                                                                                                                                                                                                           Improving
                                                                                                                                                                                                                                                                                                                                         
                                                                                                                                                                          R   Worse than -10%             Y    Between -10% and -5%     G Between -5% and 5%     B   Better than 5%            Change Threshold = 10%                        Worsening




                                                                                                                             Wbs                       Description        SV                     CV VAC        BCWS           BCWP             ACWP        SV SV%                 CV             CV%            BAC             EAC              CPI         SPI           VAC   CAM
                                                                                                                  1    604746.03        Safety & Mission Assurance        ↔                      ↓   ↔        22,509.8 22,509.8 21,245.9 0.0 0.00 1,263.8                                          5.61 54,680.7 53,416.9 1.059 1.000 1,263.8 SRQ
                                                                                                                  2    604746.03.00     Safety & Mission Assurance        ↔                      ↔    ↑       186.0              186.0                0.0 0.0 0.00               186.0 100.00                     558.0         372.0 0.000 1.000                          186.0 SRQ
                                                                                                                  3    604746.03.01     Management & Control              ↔                      ↓   ↔        2,680.0         2,680.0          2,203.3 0.0 0.00                  476.6           17.79        9,439.4          8,962.7 1.216 1.000                         476.6 SRQ
                                                                                                                  4    604746.03.02     System Safety                     ↔                      ↔   ↔        6,717.6         6,717.6          6,448.9 0.0 0.00                  268.7             4.00 18,325.7 18,057.1 1.042 1.000                                      268.7 SRQ
                                                                                                                  5    604746.03.03     Quality Assurance                 ↔                      ↑    ↑       1,927.1         1,927.1          1,590.6 0.0 0.00                  336.5           17.46        5,574.0          5,237.5 1.212 1.000                         336.5 SRQ
                                                                                                                  6    604746.03.05     Risk Management & Analysis        ↔                      ↓    ↓       4,135.0         4,135.0          4,351.9 0.0 0.00                 -216.9            -5.24       9,155.1          9,372.0 0.950 1.000                         -216.9 SRQ
                                                                                                                  7    604746.03.06     Software Safety and Quality       ↔                      ↓    ↓       1,810.7         1,810.7          1,731.8 0.0 0.00                       78.8         4.35       4,867.7          4,788.8 1.046 1.000                          78.8 SRQ
                                                                                                                  8    604746.03.07     SR&QA Infor Systems Development   ↔                      ↓    ↓       3,272.7         3,272.7          3,458.0 0.0 0.00                 -185.3            -5.66       3,429.7          3,615.0 0.946 1.000                         -185.3 SRQ
                                                                                                                  9    604746.03.08     JSC-SRQA Program Support          ↔                      ↓    ↓       1,095.0         1,095.0          1,144.0 0.0 0.00                   -49.0           -4.47       1,283.0          1,332.0 0.957 1.000                         -49.0 SRQ
                                                                                                                  10   604746.03.09     Reliability and Maintainability   ↔                      ↔    ↑       685.7              685.7          317.3 0.0 0.00                   368.4           53.72        2,048.2          1,679.8 2.161 1.000                         368.4 SRQ



       2/10/10                                                                               SGT-Inc, lisa.mccann@sgt-inc.com                                                                                                                                                                                                                 Page 14
EVM Data Integration
Prime                      Ares       Orion      Ground Ops               EVA         Mission Ops    Program Integration
Contractors              Provides     Provides                         Provides
with EVM                 .xml/X12     .xml/X12                         .xml/X12


In-House                   .xml        Cobra       .xml                   Cobra             Athena                                                        Cobra
                           Connect                 Connect
•includes institutional contractors
•civil servant labor and non-labor
•other procurement costs
(Primes with EVM reporting
excluded)

                                                                                                                                                                           NSAA
                                                                                                                            E m n CP
                                                                                                                             le e t: x                               C m u S I/C I
                                                                                                                                                                       u /C r P P             N m : C n lla n
                                                                                                                                                                                               a e o ste tio
                                                                                                                                                      20
                                                                                                                                                       08                 20
                                                                                                                                                                           09




                                                                                                                            Index of Dollars
                                                                                                                                                      0 /3 1 /3 1 /3 1 /3 0 /3 0 /2 0 /3 0 /3 0 /3 0 /3 0 /3 0 /3
                                                                                                                                                       9 0 0 1 1 0 2 1 1 1 2 8 3 1 4 0 5 1 6 0 7 1 8 1
                                                                                                                                        1 0
                                                                                                                                         .5

                                                                                                                                        1 0
                                                                                                                                         .4

                                                                                                                                        1 0
                                                                                                                                         .3

                                                                                                                                        1 0
                                                                                                                                         .2



                                                                     Data loaded in wInsight
                                                                                                                                        1 0
                                                                                                                                         .1

                                                                                                                                        1 0
                                                                                                                                         .0



                                                                        Project Sandbox
                                                                                                                                        0 0
                                                                                                                                         .9

                                                                                                                                        0 0
                                                                                                                                         .8

                                                                                                                                        0 0
                                                                                                                                         .7

                                                                                                                                        0 0
                                                                                                                                         .6
                                                                                                                                                                                                NS
                                                                                                                                                                                                 AA
                                                                                                                                                       E m n CP
                                                                                                                                                        le e t: x                           G u eS m le
                                                                                                                                                                                             ag a p                   N m : C n lla n
                                                                                                                                                                                                                       a e o ste tio
                                                                                                                                        0 0
                                                                                                                                         .5
                                                                                                                                                                        C IC M
                                                                                                                                                                         P U                                         S IC M
                                                                                                                                                                                                                      P U


  All EVM data collected is summarized at                                                                                                           0.9
                                                                                                                                                                    In e o D llas
                                                                                                                                                                      dx f o r
                                                                                                                                               C I C m 8 0 5 0 5 0 5 0 6 0.9 .9 4 0 6 0 6 0 6 0 5 0 6 0 5
                                                                                                                                                P u 9 .9 4 .9 9 .9 9 .9 1 0 6 .9 2 .9 5 .9 2 .9 1 .9 1 .90.9
                                                                                                                                                    0.9
                                                                                                                                               S I C m 4 0 7 0 8 0 8 0 7 0 8 0. 0 7 0 7 0 7 0 7 0 7 0 7 5
                                                                                                                                               C I C r 4 0 3 1 9 0 6 1 2 1 3 90 .0 2 0 7 0 81.10 0 2 1 2 0 9
                                                                                                                                                                                                            8
                                                                                                                                                P u 4 .9 7 .9 6 .9 4 .9 8 5.9 1 .9 7 .9 6 .9 9 .9 6 .9 7 .9 6
                                                                                                                                                P u 8 .9 1 1.10 1 .9 1 .0 9 .0 1 1 1 .9 7 .8 9 .5 4 .1 9 .8 4
                                                                                                                                                    0.8       .1
                                                                                                                                               S ICr 5 0 9 1 2 0 3 0 3 1 4 1 5 0 7 1 5 0 9 0 8 0 4
                                                                                                                                                P u 9 .9 6 .4 0 .9 3 .8 8 .0 1 .0 9 .9 4 .0 4 .7 5 .9 9 .9 6
                                                                                                                                                    1.0
                                                                                                                                                                                                                 In e o D llas
                                                                                                                                                                                                                   dx f o r

                                                                                                                                                                                                                                                  0.90




  the project level and loaded into wInsight                              Data Validation                                                                               0 /3 /0
                                                                                                                                                                         8 1 9
                                                                                                                                                                          0 5
                                                                                                                                                                           .9 8
                                                                                                                                                                                                                     0 /3 /0
                                                                                                                                                                                                                      8 1 9
                                                                                                                                                                                                                       0 7
                                                                                                                                                                                                                        .9 6



  for CxP review, analysis and reporting.                                                                                                                    1.10
                                                                                                                                                                        C IC R
                                                                                                                                                                         P U
                                                                                                                                                                    In e o D llas
                                                                                                                                                                      dx f o r
                                                                                                                                                                                    0 5
                                                                                                                                                                                     .9
                                                                                                                                                                                          0.90
                                                                                                                                                                                                          1.10
                                                                                                                                                                                                                     S IC R
                                                                                                                                                                                                                      P U
                                                                                                                                                                                                                 In e o D llas
                                                                                                                                                                                                                   dx f o r
                                                                                                                                                                                                                                            0 5
                                                                                                                                                                                                                                             .9
                                                                                                                                                                                                                                                  0.90


                                                                                                                                                                        NS
                                                                                                                                                                         AA
                                                                                                     E m n CP
                                                                                                      le e t: x                                                   D a A is S m le
                                                                                                                                                                   u l- x a p           N m : C n lla n
                                                                                                                                                                                          a e o ste tio
                                                                                                                                                   20
                                                                                                                                                    08              20
                                                                                                                                                                     09




                                                                                                     Dollars in Thousands




                                                                                                                                                                                                                         Index of Dollars
                                                                                                                                                   0 /3 0 11 /3 2 10 /3 2 80 /3 4 00 /3 6 00 /3 8 1
                                                                                                                                                    9 01 /3 1 01 /3 1 10 /2 3 10 /3 5 10 /3 7 10 /3


                                                                  Data loaded in CxP wInsight                                    50
                                                                                                                                                                        0 /3 /0
                                                                                                                                                                         8 1 9
                                                                                                                                                                          0 9
                                                                                                                                                                           .8 4
                                                                                                                                                                                                                     0 /3 /0
                                                                                                                                                                                                                      8 1 9
                                                                                                                                                                                                                      1.9 6
                                                                                                                                                                                                                       00
                                                                                                                                                                                                                        .14




                                                                     Production database
                                                                                                                                          0                                                                           1 0
                                                                                                                                                                                                                       .0

                                                                                                                            -0
                                                                                                                            5                                                                                         0 0
                                                                                                                                                                                                                       .9

                                                                                                                   -0
                                                                                                                   10                                                                                                 0 0
                                                                                                                                                                                                                       .8

                                                                                                                   -5
                                                                                                                   10                                                                                                 0 0
                                                                                                                                                                                                                       .7

                                                                                                                   -0
                                                                                                                   20                                                                                                 0 0
                                                                                                                                                                                                                       .6

                                                                                                                   -5
                                                                                                                   20                                                                                                 0 0
                                                                                                                                                                                                                       .5


                                                                                                                                 C C M .97 .11 4 - 6 .91 7 - 5 .61 4 - 7 .41 9 - 6 .62 2 - 4 .0
                                                                                                                                  V U - - 1 - 5 .81 0 - 5 .41 1 - 5 .31 6 - 9 .22 3 - 2 .82 4
                                                                                                                                         11
                                                                                                                                 C C R0- 6 .3 1 .3 - .1 3
                                                                                                                                  V U4 .2 91     6   6      .5 5 - .7- 2 - 2 - 4 4 .8- 1
                                                                                                                                                                 .8 2 2 .1 2 .8 6 .4 0 2 .2
                                                                                                                                 C I C .9 80 5 0 5 0 5 0 6 0 6 0 6 0 6 0 6 0 5 0 6 0 5
                                                                                                                                  P 0M .9 4 .9 9 .9 9 .9 1 .9 4 .9 2 .9 5 .9 2 .9 1 .9 1 .9 8
                                                                                                                                      U9
                                                                                                                                 C I C .8 80 3 1 9 0 6 1 2 1 3 1 1 0 7 0 8 0 2 1 2 0 9
                                                                                                                                  P 0R .9 1 .1 1 .9 1 .0 9 .0 1 .0 2 .9 7 .8 9 .5 4 .1 9 .8 4
                                                                                                                                      U4



   2/10/10                                         SGT-Inc, lisa.mccann@sgt-inc.com                                                                                                               Page 15
EVM Wiki and Windchill Sites
         Wiki is a one-stop-shop for
          all CxP EVM related
          guidance, references,
          example products,
          meetings, etc.
         Windchill will house the
          monthly EVM MPR Charts
          and will serve as the
          location for the electronic
          CAM Notebooks




2/10/10                                 SGT-Inc, lisa.mccann@sgt-inc.com   16
Cobra Implementation Process – Program Integration
                         1                           2                                                                3                     4
       Fully                    Create core                •Work Breakdown Structure (WBS)                                 Import core
       understand               Cobra Tables in            •Organizational Breakdown Structure (OBS)                       files to Cobra
       and determine            Excel                      •Resource Breakdown Structure (RBS)
       reporting                                           •Fiscal Calendar
       requirements                                        •Rates
                                                           •Budget Element
Planning and Development



                         5                       6                      7                        8                         9                          10
       Create Cobra          Prepare CAPs            Load budget             Load actuals              Load earned value       Calculate forecast
       Program and                                   into Cobra via
       link core files                               Integration
                                                     Wizard
Execution


                      11                        12                 13                       14                        15
       Load                  Export .xml file        Load .xml              Prepare                  Post EVM
       variance                                      file into              EVM                      reports to
       explanations                                  wInsight               reports                  Windchill/Wiki


Analysis and Reporting

                                                                                                      Monthly Process noted in Red

   2/10/10                                               SGT-Inc, lisa.mccann@sgt-inc.com                                                   Page 17
Cobra Reporting Requirements
Things to consider…

 WBS Level Reporting requirements per EVM
  Management Directive (3rd Level WBS 604746.01.01)
 Department/Organization Numbers (ZB211, EA311)
 Charge Number Structure (604746.01.01.22.10)
 Hierarchies (Level of detail for reporting)
 Organization Chart Structure
 Resource/Budget Element Titles (Eng I, JSC EA, 22)
 .xml outputs to wInsight
 Code Fields for additional reports (PPBE Phases, CAM
  Names)

2/10/10               SGT-Inc, lisa.mccann@sgt-inc.com   Page 18
Cobra Set up Example – Program Integ.


Schedule EVM data
  loaded in Cobra




  2/10/10                        SGT-Inc, lisa.mccann@sgt-inc.com   19
Integrated Baseline Reviews (IBRs)
Why IBR?
•      CxP Requirement: IBRs are required on all Contracts, Projects, and In-House
       efforts that have an EVM requirement
•      Purpose of an IBR
       – Aim to cover 80-85% of the Project, Sub-Project, Prime Contract, or In-House
         effort value.
       – Include all high-risk areas of the project.
       – Include all activities on or near the critical path.
       – Include at least some LOE, Material, and Sub-Contract Control Accounts in
         order to provide insight into how these aspects of the project are planned.
       – The Constellation Program and the Project Office or Prime Contractor as
         applicable should agree on what is to be reviewed prior to IBR.
•      Objectives of an IBR
       − The technical scope of work is fully included in the WBS and Control Account
         Plans and is consistent with authorizing documents (PAD/Contract).
       − The technical scope of work can be accomplished within baseline cost and
         schedule constraints.
       − Key schedule milestones are identified and are consistent with Constellation
         Program requirements.
       − Supporting schedules reflect a logical flow to accomplish the technical work
         scope.
       − Resources (budgets, facilities, personnel, skills, etc.) are adequate and
         available to support the scope and schedule.
       − Control Account Plans and underlying PMB rationales and estimates are
         reasonable.
       − Tasks are planned and can be measured objectively, relative to technical
         progress and that Earned Value measurement methods are reasonable given
         the nature of the work.
       − Key Candidate Risks have been identified and the cost and schedule
         implications of those risks have been incorporated into the PMB.
       − Managers have appropriately implemented required management processes.

          IBRs will provide confidence in the Earned Value information that is reported and its use as a
          predictor of future performance
    2/10/10                                       SGT-Inc, lisa.mccann@sgt-inc.com                         21
Lisa mc cann
Lisa mc cann

More Related Content

Similar to Lisa mc cann

Chris.hardcastle
Chris.hardcastleChris.hardcastle
Chris.hardcastleNASAPMC
 
Standing cxp.panel
Standing cxp.panelStanding cxp.panel
Standing cxp.panelNASAPMC
 
Aircraft Modification Services
Aircraft Modification ServicesAircraft Modification Services
Aircraft Modification Servicespwynns
 
Fred.ouellette
Fred.ouelletteFred.ouellette
Fred.ouelletteNASAPMC
 
Introduction To Sonalysts Engineering
Introduction To Sonalysts EngineeringIntroduction To Sonalysts Engineering
Introduction To Sonalysts EngineeringArmandHalter
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Doug.mclennan
Doug.mclennanDoug.mclennan
Doug.mclennanNASAPMC
 
Turner.john
Turner.johnTurner.john
Turner.johnNASAPMC
 

Similar to Lisa mc cann (10)

Chris.hardcastle
Chris.hardcastleChris.hardcastle
Chris.hardcastle
 
Standing cxp.panel
Standing cxp.panelStanding cxp.panel
Standing cxp.panel
 
Aircraft Modification Services
Aircraft Modification ServicesAircraft Modification Services
Aircraft Modification Services
 
Fred.ouellette
Fred.ouelletteFred.ouellette
Fred.ouellette
 
Introduction To Sonalysts Engineering
Introduction To Sonalysts EngineeringIntroduction To Sonalysts Engineering
Introduction To Sonalysts Engineering
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Small Spacecraft Mission Enterprise
Small Spacecraft Mission EnterpriseSmall Spacecraft Mission Enterprise
Small Spacecraft Mission Enterprise
 
Doug.mclennan
Doug.mclennanDoug.mclennan
Doug.mclennan
 
Patel Work Skills
Patel Work SkillsPatel Work Skills
Patel Work Skills
 
Turner.john
Turner.johnTurner.john
Turner.john
 

More from NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerryNASAPMC
 

More from NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
 

Recently uploaded

Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 

Recently uploaded (20)

Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 

Lisa mc cann

  • 1. Implementing an EVM System for the Constellation Program February 10, 2010 Lisa McCann, Schedules Cost Estimating and Assessments Deputy Manager SGT-Inc Used with Permission
  • 2. Topics  Program Overview  EVM Implementation and Process Overview  Integrated Baseline Reviews (IBRs)  Going Forward  Questions 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com 2
  • 3. Constellation Content Across the Nation Ames Marshall Glenn Goddard • Lead Thermal Protection System • Home for Ares Project • Lead Service Module and Spacecraft Adapter • Lead program requirements for Advanced Development Program • Ares I and V development and integration lead integration unpressurized cargo carriers • Ares mission operations simulation • Support LAS and Service Module, Ares V EDS • Flight Test Article “Pathfinder” fabrication • Subsystem lead for lunar • Software & Guidance, Navigation & development, test and oversight • Ares I-X upper stage simulator lead lander avionics Control support • Core stage development, test and oversight • Lead Ares V power, thrust vector control and • Lunar surface and surface • Lunar systems support • Altair decent stage and subsystem support payload shroud development telenet communications WA • Lead EDS orbital environments testing at Plum Brook • EVA tools and equipment • Lead lunar lander ascent stage propulsion, ascent and descent stage power generation Langley MT • Passive thermal systems and surface element • Lead Launch Abort System communications • J-2X altitude/in-space testing integration • Ares I-X vehicle integration MN • Ares aerodynamics lead • Lead Ares V aerodynamics CT • Subsystem lead for lunar lander structures and mechanisms Alliant Techsystems, Inc. PA IA including ascent and descent stages NV MD • Lunar lander and lunar surface UT Lockheed Martin IL OH radiation protection CA CO VA MO Boeing Kennedy • Home for Ground Ops Project • Ground processing Dryden Pratt and Whitney • Launch operations • Lead Abort Flight Test Rocketdyne AZ • Recovery operations Integration/Operations NM White Sands Test Facility • Final assembly, ground • Abort Test Booster procurement processing for human lunar • Flight Test Article • Orion Abort Test Booster test site lander MS AL • Lead for lunar surface in-situ resource utilization systems LA TX FL Jet Propulsion Laboratory Johnson Space Center CSSS Stennis • Thermal protection system support • Home for Program and Projects: • Rocket propulsion testing • Lunar lander support including spacecraft Orion, MOP, EVA, Altair, Lunar Surface • Lead Ares V liquid rocket design; guidance, navigation, and control; • Element lead for lunar lander crew module/ systems and stage testing at life support systems, and avionics ascent stage sea level and altitude • Lead specific robotic surface mobility • Lead lunar surface crew habitation, environmental Michoud Assembly Facility • Lead altitude development and • Environmental monitoring and control and control /life support systems, human mobility • Manufacturing of Ares I Upper Stage, Ares V certification testing for upper surface system local element • GFE projects management Stages and Orion Primary Structure stage engine communications • Flight Test Program 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com Page 3 National Aeronautics and Space Administration
  • 4. EVM Implementation and Process Overview
  • 5. EVM Requirements Hierarchy ANSI 748 EVMS Criteria OMB Circular A-11 Federal  Organization (Guideline 1-5) - Define the authorized work by WBS and assign a responsibility organization for work. Integrate all work for effective internal management control. NPD 7120.5D Policy for Flight and Ground Systems Projects  Planning Scheduling, and Budgeting (Guideline 6-15) – Plan, schedule, budget and authorize work. Establish interdependencies to Agency meet the requirements and maintain a time-phased budget baseline. IPAO SOP on EVM October 2008  Accounting Considerations (Guideline 16-21) - Accumulate and record costs of work performed consistent with budgets in a formal system controlled by the general books of account. ESMD EVM Directive January 2005  Analysis and Management Reports (Guideline 22-27) – At lease ESMD EVM Policy monthly, compare and analyze planned, performance and actual cost December 2006 and schedule variances. Identify managerial actions taken to support horizontal and vertical communications and traceability. ESMD Integ. Prog. Mgmt. Letter Directorate December 2007  Revisions and Data Maintenance (Guideline 28-32) – Incorporate, ESMD Integ. Prog Mgmt Letter record authorize budget and schedule changes in a timely manner and November 2009 maintain traceability from original budgets. Prohibit retroactive changes. CxP 70070 Annex 9 EVM System Description CxP EVM Management Directive - Program 038 The agency, directorate and program are behind EVM and fully support through various policy CxP IBR Guidebook documents in accordance with EVM Criteria. 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com 5
  • 6. Work Breakdown Structure Constellation Program Constellation 234A Space Comm Lunar Ares 1 Program Orion Mission Ops Ground Ops EVA Ares V & Navigation Altair Surface Integration Integration Systems 136905 644423 282938 292360 604746 731384 206518 141141 182306 342806 Project Mgmt Project Mgmt Project Mgmt Project Mgmt Project Mgmt Project Mgmt Project Mgmt Project Mgmt Project Mgmt Project Mgmt 136905.01 644423.01 292360.01 604746.01 731384.01 141141.01 342806.01 282938.01 206518.01 182306.01 Vehicle Integration Sys. Engineering SE&I SE&I SE&I Systems Engineering Systems Engineering Vehicle Integration LSS Integration 136905.02 644423.02 282938.02 292360.02 Program Manager 731384.02 206518.02 141141.02 182306.02 342806.02 604746.01.01 Safety & Mission Safety & Mission S&MA S&MA S&MA S&MA Safety & Mission Safety & Mission Safety & Mission Program Mgmt & Assurance Assurance 282938.03 292360.03 Administration 731384.03 206518.03 Assurance Assurance Assurance 644423.03 136905.03 Science/Technology Future Elements 604746.01.01.01 Science/Technology Spacecraft 141141.03 182306.03 342806.03 Science/Technology 282938.04 Dev & Ops 292360.05 PP&C 731384.04 Module Science/Technology Technology Technology Mission Operations 644423.04 Mission Ops 604746.01.01.02 Aircraft/Spacecraft 206518.08 141141.04 Development Development 136905.07 Orion Dev Support Spacecraft 282938.07 & Ground Ops 731384.06 Aircraft/Spacecraft 182306.04 342806.04 Launch Vehicle/ 644423.06 Systems Engineering Core Stage 141141.06 Payloads Payloads Ground System Dev 292360.06 604746.02 206518.08.01 Services Crew Module 282938.09 Mission Operations 182306.05 342806.05 Integrated Ops H/W Mgmt Core Stage 136905.08 644423.06.01 Safety & Mission 731384.06.01 141141.07 Spacecraft Spacecraft (LSS System Integration 292360.07 Booster Service Module Assurance Sustaining Engineering 206518.08.02 Ground Systems Development Elements) First Stage 64423.06.02 & Testing Launch Vehicle 604746.03 731384.06.02 282938.10 Earth Departure 141141.09 182306.06 342806.06 136905.08.01 Launch Abort Dev Supt & Ops H/W Development Stage Upper Stage System Education & 292360.08 Science/Technology 731384.06.04 206518.08.03 Systems Integration Ops Integration Mission Operations 604746.04 342806.07 136905.08.02 644423.06.04 Public Outreach Ground Systems H/W Processing & Earth Departure & Testing 182306.07 Upper Stage Engine (SSME) Software 282938.11 Dev & Sustaining Aircraft/Spacecraft Logistics Stage Engine 141141.10 Launch Vehicle Ground Systems 644423.06.05 604746.06 136905.08.03 Agency Cost 292360.09 731384.06.05 206518.08.04 Agency Cost Services 342806.09 Upper Stage Assessment 282938.99 Integrated T&V Mission Operations Assessment 141141.99 182306.08 Test & Verification Integ & Testing 604746.07 Flight Integration 342806.10 Engine – J2 644423.10 292360.10 Sys Integ & Testing Ground Operations 136905.08.04 Systems Integration & Test 182306.09 Education & Public Upper Stage Education & Education & Public 731384.10 206518.10 136905.08.05 Public Outreach Outreach & Testing Education & Test & Verification Outreach 292360.11 604746.10 182306.10 182306.11 644423.11 Public Outreach Ground System(s ) Integrated Logistics Education & Education & Public Construction of 731384.11 136905.09 292360.12 Public Outreach Outreach Facility 644423.98 604746.11 Agency Cost Systems Integration Construction of Assessment 731384.99 182306.11 & Testing Agency Cost Agency Fee For Assessment Facility 292360.98 136905.10 Service (FFS) 644423.99 Agency Cost 604746.90 Construction of Facility 136905.98 Assessment 292360.99 Program Reserves 604746.99 Projects provide monthly cost and Agency Cost Assessment 136905.99 schedule variances at these levels per CxP Projects EVM Directive WBS Reporting Areas these thresholds Projects Level 1 Level 2 Level 3 Level 4 Level 5 Level 6 Total Ares 1 18 31 44 94 Orion 1 36 21 58 EVA 1 6 5 3 15 Ground Ops 1 11 1 3 16 Mission Ops 1 6 26 33 Thresholds for variance explanations Program Int 1 5 6 5 largest cum cost variances exceeding +/- $250K and +/- 5% Totals 6 28 86 58 0 44 222 5 largest cum schedule variances exceeding +/- $250K and +/- 5% 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com 6
  • 7. Organization  Dynamic organization across all centers  Institutions such as Engineering are support to all programs and projects 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com 7
  • 8. CxP EVM Organization ESMD Assoc. Administrator Program Manager PP&C Director SCEA Manager CxP SCEA EVM/IMS Lead CxP Project EVM Focals and Support Ares Orion EVA Ground Ops Mission Ops Program Integration Lunar Projects 35 CAMs 17 CAMs 10 CAMs 14 CAMs TBD 8 CAMs HQ and Center EVM Focal CxP Support Office of Chief Engineer Headquarters MSFC JSC KSC LARC Institutional support office Strong collaboration is key to success: Organizational Interfaces External Interfaces • Bi-monthly EVM Working Group meeting Resources GAO DCMA and telecoms (~23 participants) Scheduling IG Industry • Quarterly HQ EVMWG meetings (~20 participants Assessments SRB • Training and monthly reviews (~100 JCL Analysis OMB NASA CAMs and upper Management) 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com 8
  • 9. How CxP implemented EVM  Solid Communication with all involved • Face to face • Telecoms and WebEx • Website portals  Developed process documentation  Developed and maintain an implementation schedule  Defined clear requirements and expectations between the Program and Projects  Used existing industry tools, guidelines and experts (ANSI Standard, DCMA documents, EVM Implementation Guides, industry consultants)  Implemented off the shelf software tools to mirror existing financial reporting systems prior to providing EVM data  Understood existing cultures and slowly worked to change resistance to EVM and remained flexible  Stayed optimistic each step of the way  Demonstrated the benefits to key stakeholders  Met implementation deadlines and delivered products and data 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com 9
  • 10. CxP EVM Implementation Timeline PMR07 PMR08 PMR08 Rev 1 PMR09 2006 2007 2008 2009 2010 Lifecycle Phase PHASE A PHASE B PHASE C Requirements ESMD EVM Policy NPR 7120.5D CxP EVM Directive -038 CxP IBR Strategy Gilbrecht IPM Letter CxP IBR Guide CxP EVM Sys Des CxP Report Generator Format CxP IBR Guide and Toolkit IBRs Complete Process ATK, Boeing IBRs PADs Released PWR, Lockheed Martin EVM Healthcheck IBRs Reviews CxP EVM Working Group Established SRB EVM Status Provided CxP EVM Summit CxP EVM F2F CxP EVM F2F Integration HQ EVM Working Group interface established MPR Reporting Established Resume MPR Reporting .xml Connect EVM Tool Actuate Actuals Report Windchill and Wiki established Pertmaster established Cobra in Citrix environment Tools Primavera established wInsight in Citrix environment Cobra project initiated J-2X Prime EVM Reports Ares and Orion Prime Early In-House EVM Reports Some EVM reporting stops, PAD-based EVM Reporting EVM Reports replanning underway EVM Data Level II EVM Metric Templates established Cobra Training People and Multiple EVM Training wInsight Training CxP Program Support Contract IBR Training APPEL CAM Training/Cert courses initiated in Start Course (TBD) Training SATERN Multiple EVM Training KSC Cobra Pilot courses initiated at Cobra Workshop Ares Cobra Pilot various Centers wInsight Training CAM Training Initiative Kickoff 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com TIME NOW 10
  • 11. EVM Implementation Process Flow Constellation EVM System Overview ESMD EVM Formulation ESMD Review Program Policy Guidance Authorization Performance Documents (FAD) EVM Report Control Program EVM SDD Format/Reporting Constellation Program Directive (038) Program Integrated EVM Data Analysis/Reports wInsight Project EVM data storage Analyze Project Authorization EVM Data Document (PAD) Conduct IBRs Validate PMB Project EVM Constellation Projects Load and reports Formulate Schedule maintain WBS EVM cost engine Analyze WBS EVM data Dictionary RAM WAD PMB Formulate CAP Generate EVM Control Project OBS performance Bottoms-Up measurement Planning data 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com 11
  • 12. CxP EVM Implementation Schedule 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com 12
  • 13. EVM Components Process – Project Example Budgets Earned Value Actuals Forecasts Variances Reports Collected monthly Collected monthly Collected monthly • CxP Monthly PAD, WADs initiate Collected monthly from CAMS and from CAMs and from CAMs and wInsight Charts budget authorization from Resources Schedulers Resource Analysts Resource Analysts • EVM Graphs and Primavera /MS WebTADs Metrics PPBE /CAP Project • Control Account Excel Plan Schedule Performance Labor Collection Phasing Plans Plan (CAP) Reports Internal Task ALDS & SAP • Baseline Change Agreements Labor Processed Reports Phasing Plans • CPRs 1-5 • Variance Bus. Ware. Worksheets CIRR SAP Report Tool Phasing Plans Rates, WBS, OBS Actuate Codes, Cost Elements Bus Ware Report Tool Excel or .csv Flat files Cobra or .xml Con. EVM Cost Engine via XML file Prime .xml or X12 wInsight Deliverable EVM Analysis Prime Format 5 Variance Analysis 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com 13
  • 14. CxP Projects EVM Monthly Process Rhythm Actuate CAM EVM Actuals Reports Similar monthly process used Cost .xml file wInsight SAP/ Report Engine BW by all projects for EVM EVM Analyst loads Actuals into EVM Schedule Status Reporting Cost Engine Week One Variance CAM Explanations EV Report Reviews Prime .xml Weeks 2 & 3 files Week Four CAM’s determine Load variance explanations/ variance explanations Var. explanations, EAC’s into Cost Engine EAC’s and new EAC’s and $$ In Thousands BCWS BCWP ACWP Schedule Variance Cost Variance Element Status G  Y  database generate variance Current Pd. Cumulative 1,571 22,510 1,571 22,510 1,665 21,246 0 0 0.0% 0.0% G  1264 -93 -5.9% 5.6% B  Overall variance explanation form explanation to be CxP PROD Element: 604746.03 CPI & SPI Name: Safety & Missio 2008 2009 added Index of Dollars OCT NOV DEC JAN EVM Report Updates 1.080 1.070 1.060 Performance Upload to Internal wInsight 1.050 BAC 54,681  EAC 53,417  ICE Final PI EV Report MPR 1.040 VAC 1264  Output 1.030 Review EAC Forecast Min. 51,323 Max 52,488 1.020 Percent Scheduled 41.2% 1.010 Percent Complete 41.2% 1.000 Percent Spent 38.9% Monthly EVM SPI Current 1.00  MPR CAM Briefing Report TCPILRE 1.000 1.000 1.0001.000 Cumulative 1.00  CUM CPI 1.070 1.058 1.0691.059 CPI Current 0.94  CUM SPI 1.000 1.000 1.0001.000 Cumulative 1.06   Improving  R Worse than -10% Y Between -10% and -5% G Between -5% and 5% B Better than 5% Change Threshold = 10% Worsening Wbs Description SV CV VAC BCWS BCWP ACWP SV SV% CV CV% BAC EAC CPI SPI VAC CAM 1 604746.03 Safety & Mission Assurance ↔ ↓ ↔ 22,509.8 22,509.8 21,245.9 0.0 0.00 1,263.8 5.61 54,680.7 53,416.9 1.059 1.000 1,263.8 SRQ 2 604746.03.00 Safety & Mission Assurance ↔ ↔ ↑ 186.0 186.0 0.0 0.0 0.00 186.0 100.00 558.0 372.0 0.000 1.000 186.0 SRQ 3 604746.03.01 Management & Control ↔ ↓ ↔ 2,680.0 2,680.0 2,203.3 0.0 0.00 476.6 17.79 9,439.4 8,962.7 1.216 1.000 476.6 SRQ 4 604746.03.02 System Safety ↔ ↔ ↔ 6,717.6 6,717.6 6,448.9 0.0 0.00 268.7 4.00 18,325.7 18,057.1 1.042 1.000 268.7 SRQ 5 604746.03.03 Quality Assurance ↔ ↑ ↑ 1,927.1 1,927.1 1,590.6 0.0 0.00 336.5 17.46 5,574.0 5,237.5 1.212 1.000 336.5 SRQ 6 604746.03.05 Risk Management & Analysis ↔ ↓ ↓ 4,135.0 4,135.0 4,351.9 0.0 0.00 -216.9 -5.24 9,155.1 9,372.0 0.950 1.000 -216.9 SRQ 7 604746.03.06 Software Safety and Quality ↔ ↓ ↓ 1,810.7 1,810.7 1,731.8 0.0 0.00 78.8 4.35 4,867.7 4,788.8 1.046 1.000 78.8 SRQ 8 604746.03.07 SR&QA Infor Systems Development ↔ ↓ ↓ 3,272.7 3,272.7 3,458.0 0.0 0.00 -185.3 -5.66 3,429.7 3,615.0 0.946 1.000 -185.3 SRQ 9 604746.03.08 JSC-SRQA Program Support ↔ ↓ ↓ 1,095.0 1,095.0 1,144.0 0.0 0.00 -49.0 -4.47 1,283.0 1,332.0 0.957 1.000 -49.0 SRQ 10 604746.03.09 Reliability and Maintainability ↔ ↔ ↑ 685.7 685.7 317.3 0.0 0.00 368.4 53.72 2,048.2 1,679.8 2.161 1.000 368.4 SRQ 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com Page 14
  • 15. EVM Data Integration Prime Ares Orion Ground Ops EVA Mission Ops Program Integration Contractors Provides Provides Provides with EVM .xml/X12 .xml/X12 .xml/X12 In-House .xml Cobra .xml Cobra Athena Cobra Connect Connect •includes institutional contractors •civil servant labor and non-labor •other procurement costs (Primes with EVM reporting excluded) NSAA E m n CP le e t: x C m u S I/C I u /C r P P N m : C n lla n a e o ste tio 20 08 20 09 Index of Dollars 0 /3 1 /3 1 /3 1 /3 0 /3 0 /2 0 /3 0 /3 0 /3 0 /3 0 /3 0 /3 9 0 0 1 1 0 2 1 1 1 2 8 3 1 4 0 5 1 6 0 7 1 8 1 1 0 .5 1 0 .4 1 0 .3 1 0 .2 Data loaded in wInsight 1 0 .1 1 0 .0 Project Sandbox 0 0 .9 0 0 .8 0 0 .7 0 0 .6 NS AA E m n CP le e t: x G u eS m le ag a p N m : C n lla n a e o ste tio 0 0 .5 C IC M P U S IC M P U All EVM data collected is summarized at 0.9 In e o D llas dx f o r C I C m 8 0 5 0 5 0 5 0 6 0.9 .9 4 0 6 0 6 0 6 0 5 0 6 0 5 P u 9 .9 4 .9 9 .9 9 .9 1 0 6 .9 2 .9 5 .9 2 .9 1 .9 1 .90.9 0.9 S I C m 4 0 7 0 8 0 8 0 7 0 8 0. 0 7 0 7 0 7 0 7 0 7 0 7 5 C I C r 4 0 3 1 9 0 6 1 2 1 3 90 .0 2 0 7 0 81.10 0 2 1 2 0 9 8 P u 4 .9 7 .9 6 .9 4 .9 8 5.9 1 .9 7 .9 6 .9 9 .9 6 .9 7 .9 6 P u 8 .9 1 1.10 1 .9 1 .0 9 .0 1 1 1 .9 7 .8 9 .5 4 .1 9 .8 4 0.8 .1 S ICr 5 0 9 1 2 0 3 0 3 1 4 1 5 0 7 1 5 0 9 0 8 0 4 P u 9 .9 6 .4 0 .9 3 .8 8 .0 1 .0 9 .9 4 .0 4 .7 5 .9 9 .9 6 1.0 In e o D llas dx f o r 0.90 the project level and loaded into wInsight Data Validation 0 /3 /0 8 1 9 0 5 .9 8 0 /3 /0 8 1 9 0 7 .9 6 for CxP review, analysis and reporting. 1.10 C IC R P U In e o D llas dx f o r 0 5 .9 0.90 1.10 S IC R P U In e o D llas dx f o r 0 5 .9 0.90 NS AA E m n CP le e t: x D a A is S m le u l- x a p N m : C n lla n a e o ste tio 20 08 20 09 Dollars in Thousands Index of Dollars 0 /3 0 11 /3 2 10 /3 2 80 /3 4 00 /3 6 00 /3 8 1 9 01 /3 1 01 /3 1 10 /2 3 10 /3 5 10 /3 7 10 /3 Data loaded in CxP wInsight 50 0 /3 /0 8 1 9 0 9 .8 4 0 /3 /0 8 1 9 1.9 6 00 .14 Production database 0 1 0 .0 -0 5 0 0 .9 -0 10 0 0 .8 -5 10 0 0 .7 -0 20 0 0 .6 -5 20 0 0 .5 C C M .97 .11 4 - 6 .91 7 - 5 .61 4 - 7 .41 9 - 6 .62 2 - 4 .0 V U - - 1 - 5 .81 0 - 5 .41 1 - 5 .31 6 - 9 .22 3 - 2 .82 4 11 C C R0- 6 .3 1 .3 - .1 3 V U4 .2 91 6 6 .5 5 - .7- 2 - 2 - 4 4 .8- 1 .8 2 2 .1 2 .8 6 .4 0 2 .2 C I C .9 80 5 0 5 0 5 0 6 0 6 0 6 0 6 0 6 0 5 0 6 0 5 P 0M .9 4 .9 9 .9 9 .9 1 .9 4 .9 2 .9 5 .9 2 .9 1 .9 1 .9 8 U9 C I C .8 80 3 1 9 0 6 1 2 1 3 1 1 0 7 0 8 0 2 1 2 0 9 P 0R .9 1 .1 1 .9 1 .0 9 .0 1 .0 2 .9 7 .8 9 .5 4 .1 9 .8 4 U4 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com Page 15
  • 16. EVM Wiki and Windchill Sites  Wiki is a one-stop-shop for all CxP EVM related guidance, references, example products, meetings, etc.  Windchill will house the monthly EVM MPR Charts and will serve as the location for the electronic CAM Notebooks 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com 16
  • 17. Cobra Implementation Process – Program Integration 1 2 3 4 Fully Create core •Work Breakdown Structure (WBS) Import core understand Cobra Tables in •Organizational Breakdown Structure (OBS) files to Cobra and determine Excel •Resource Breakdown Structure (RBS) reporting •Fiscal Calendar requirements •Rates •Budget Element Planning and Development 5 6 7 8 9 10 Create Cobra Prepare CAPs Load budget Load actuals Load earned value Calculate forecast Program and into Cobra via link core files Integration Wizard Execution 11 12 13 14 15 Load Export .xml file Load .xml Prepare Post EVM variance file into EVM reports to explanations wInsight reports Windchill/Wiki Analysis and Reporting Monthly Process noted in Red 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com Page 17
  • 18. Cobra Reporting Requirements Things to consider…  WBS Level Reporting requirements per EVM Management Directive (3rd Level WBS 604746.01.01)  Department/Organization Numbers (ZB211, EA311)  Charge Number Structure (604746.01.01.22.10)  Hierarchies (Level of detail for reporting)  Organization Chart Structure  Resource/Budget Element Titles (Eng I, JSC EA, 22)  .xml outputs to wInsight  Code Fields for additional reports (PPBE Phases, CAM Names) 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com Page 18
  • 19. Cobra Set up Example – Program Integ. Schedule EVM data loaded in Cobra 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com 19
  • 21. Why IBR? • CxP Requirement: IBRs are required on all Contracts, Projects, and In-House efforts that have an EVM requirement • Purpose of an IBR – Aim to cover 80-85% of the Project, Sub-Project, Prime Contract, or In-House effort value. – Include all high-risk areas of the project. – Include all activities on or near the critical path. – Include at least some LOE, Material, and Sub-Contract Control Accounts in order to provide insight into how these aspects of the project are planned. – The Constellation Program and the Project Office or Prime Contractor as applicable should agree on what is to be reviewed prior to IBR. • Objectives of an IBR − The technical scope of work is fully included in the WBS and Control Account Plans and is consistent with authorizing documents (PAD/Contract). − The technical scope of work can be accomplished within baseline cost and schedule constraints. − Key schedule milestones are identified and are consistent with Constellation Program requirements. − Supporting schedules reflect a logical flow to accomplish the technical work scope. − Resources (budgets, facilities, personnel, skills, etc.) are adequate and available to support the scope and schedule. − Control Account Plans and underlying PMB rationales and estimates are reasonable. − Tasks are planned and can be measured objectively, relative to technical progress and that Earned Value measurement methods are reasonable given the nature of the work. − Key Candidate Risks have been identified and the cost and schedule implications of those risks have been incorporated into the PMB. − Managers have appropriately implemented required management processes. IBRs will provide confidence in the Earned Value information that is reported and its use as a predictor of future performance 2/10/10 SGT-Inc, lisa.mccann@sgt-inc.com 21