This document summarizes a study that experimentally trawled plots of unconsolidated sandy sediments along the central California coast to examine the ecological effects of bottom trawling on fish habitat structure. The study applied low and high trawling intensity treatments based on historical fishing effort in the area. Video and photos collected before and after trawling showed scour marks from trawl doors persisted for a year, and some smoothing of the seafloor, though differences between trawled and untrawled plots were only statistically significant during one sampling period. There were no significant differences in structure-forming or mobile invertebrates between trawled and untrawled plots. The results indicate bottom trawling with small-footrope