1. Lean Six
Sigma
Define
Phase
Project
Charter
Template
2. Lean Six Sigma
DMAIC Tools and Activities
Review Project Charter Value Stream Map Flow Identify Root Causes Develop Potential Solutions Develop SOP‟s, Training
Validate High-Level Value Identify KeyInput, Process Reduce List of Potential Root Evaluate, Select, and Plan & Process Controls
Stream Map and Scope and Output Metrics Causes Optimize Best Solutions Implement Solution and
Validate Voice of the Develop Operational Confirm Root Cause to Develop „To-Be‟ Value Ongoing Process
Customer Definitions Output Relationship Stream Map(s) Measurements
& Voice of the Business Develop Data Collection Plan Estimate Impact of Root Develop and Implement Pilot Confirm Attainment of Project
Validate Problem Statement Validate Measurement Causes on Key Outputs Solution Goals
and Goals System Prioritize Root Causes Implement 5s Program Identify Project Replication
Validate Financial Benefits Collect Baseline Data Value-Add Analysis Develop Full Scale Opportunities
Create Communication Plan Determine Process Capability Takt Rate Analysis Implementation Plan Training
Select and Launch Team Complete Measure Tollgate Quick Wins Cost/Benefit Analysis Complete Control Tollgate
Develop Project Schedule Statistical Analysis Benchmarking Transition Project to Process
Complete Define Tollgate Complete Analyze Tollgate Complete Improve Tollgate Owner
Define Measure Analyze Improve Control
Project Charter Value Stream Mapping Process Constraint ID and Replenishment Pull/Kanban Mistake-Proofing/
Voice of the Customer and Process Cycle Takt Time Analysis Stocking Strategy Zero Defects
Kano Analysis Efficiency/Little‟s Law Cause & Effect Analysis Process Flow Improvement Standard Operating
SIPOC Map Operational Definitions FMEA Process Balancing Procedures (SOP‟s)
Project Valuation/ROIC Data Collection Plan Hypothesis Tests/Conf. Analytical Batch Sizing Process Control Plans
Analysis Tools Statistical Sampling Intervals Total Productive Maintenance Visual Process Control Tools
RACI and Quad Charts Measurement System Simple & Multiple Regression Design of Experiments (DOE) MGPP
Stakeholder Analysis Analysis (MSA) ANOVA Solution Selection Matrix Statistical Process Controls
Communication Plan Gage R&R Components of Variation Piloting and Simulation (SPC)
Effective Meeting Tools Kappa Studies Conquering Product and Work Control System Solution Replication
Inquiry and Advocacy Skills Control Charts Process Complexity Setup reduction Visual Workplace
Time Lines, Milestones, Spaghetti Diagrams Queuing Theory Pugh Matrix Metrics
and Gantt Charting Histograms Pull System Project Transition Model
Pareto Analysis Normality Test Team Feedback Session
Process Capability Analysis
Kaizen Events Targeted in Measure to Accelerate Results
International Standards for Lean Six Sigma 2
3. Team Charter: Business
Case & Project Description
Describe the project in non-technical terms
?
Define the project‟s scope and boundaries (locations, products,
operations, etc)
Is the scope reasonable?
Have key constraints and key assumptions been identified?
Where are you feeling the pain?
?
Enter Key Slide Take Away (Key Point) Here
International Standards for Lean Six Sigma 3
4. Project Charter
Problem/Goal Statement Financial Impact
State financial impact of project
Problem: Describe problem in non-technical terms
Expenses
Statement should explain why project is important; why
Investments (inventory, capital, A/R)
working on it is a priority
Revenues
Goal: Goals communicate “before” and “after” conditions
Shift mean, variance, or both? Separate “hard” from “soft” dollars
State financial impact of leverage opportunities (future
Should impact cost, time, quality dimensions
Express goals using SMART criteria
projects)
Specific, Measurable, Attainable, Resource
Requirements, Time Boundaries
Explain leverage and strategic implications (if any)
Team Tollgate Review Schedule
PES Name Project Executive Sponsor (if different from PS)
Tollgate Scheduled Revised Complete
PS Name Project Sponsor/Process Owner
DC Name Deployment Champion Define: XX/XX/XX - XX/XX/XX
GB/BB Name Green Belt/Black Belt Measure: XX/XX/XX XX/XX/XX XX/XX/XX
MBB Name Master Black Belt Analyze: XX/XX/XX XX/XX/XX XX/XX/XX
Core Team Role % Contrib. LSS Training Improve: XX/XX/XX XX/XX/XX XX/XX/XX
Team Member 1 SME XX YB
Control: XX/XX/XX XX/XX/XX XX/XX/XX
Team Member 2 TM XX GB
Team Member 3 SME XX PS Review high-level schedule milestones here:
Extended Team Phase Completions
Team Member 1 BFM XX Not Trained Tollgate Reviews
Team Member 2 IT XX Not Trained
Enter Key Slide Take Away (Key Point) Here
International Standards for Lean Six Sigma 4