   Phoenix IMS Users Group



Exploiting the Power of the Mainframe:
   The Latest News from System z

 Diane Goff
 IBM IMS ATS
 dgoff@us.ibm.com




                                 © 2012 IBM Corporation
Phoenix IMS Users Group


    Agenda

    Smarter Planet / Smarter Computing and the Role of IBM System z®

    IBM zEnterprise™ System
     A Smarter ‘System of Systems’ for a Smarter Planet
     – IBM zEnterprise EC12 (zEC12)
     – IBM zEnterprise 196 (z196)
     – IBM zEnterprise 114 (z114)


     – IBM zEnterprise BladeCenter®Extension (zBX)
     – IBM zEnterprsie Unified Resource Manager


    IBM zEnterprise Software




2                                                                      2
Phoenix IMS Users Group




                              Neonatal        Law
                              Care            Enforcement
    Several years
    ago we started
    describing the            Telecom
                                              Fraud
    Smarter Planet                            Prevention

    we saw emerging,
    fueling                   Resource        Traffic
    innovation                Management      Control
    across
    industries.
                              Manufacturing   Trading




3                                                           3
Phoenix IMS Users Group


The inefficiencies of traditional computing get in the way



                           Banks                               Healthcare
                 China online banking                       Asian insurance firm AIA
                 transactions tripled from                  Group, grew transactions
                 50b to 150b 2009 to 20111                  50% in 2011, while serving
                                                            20M+ policy holders


                   Government                                   Insurance
                 European Central                           $20B US Healthcare IT
                 Government System z                        outsourcing market nearly
                 workload growth rate                       doubled 2009 – 2011, annually
                 2007 – 2011: +25%                          transactions grew 35%+




      1.   According to PBOC (the People’s Bank of China)




                                                                                            4
Phoenix IMS Users Group



Today’s applications are increasing demands on data
systems

                          Banks                         Healthcare
               1.8 zettabytes of digital            NA hospital, ambulatory
               data in 2011, growing                data to quadruple to 665
               exponentially1                       terabytes by 20152


                   Government                           Insurance
               $1.2 billion saved                   At least 10% of property
               through tax compliance               casualty claims are
               in New York state                    inflated or fraudulent




     1.   IDC Predictions Report 2011
     2.   Enterprise Strategy Group, January 2011

                                                                               5
Phoenix IMS Users Group



The data system needs to be secure and trusted


                          Banks                                                        Healthcare
                                                                                   sharing health data requires
             2.7 billion people don’t
                                                                                   availability and privacy
             have access to banking1
                                                                                   standards compliance


                   Government                                                           Insurance
               has an increased                                                    90% of insurance CEOs
               dependency on IT                                                    picked getting closer to
               systems requiring better                                            customers as a top strategic
               availability and reliability                                        initiative in the next 5 years2




     1.   World Bank high level conference on Post-Crisis growth and development
     2.   IBM Institute for Business Value – Global CEO study, 2010

                                                                                                                     6
Phoenix IMS Users Group



Innovative clients are implementing new technologies to
…


  React to shorter product cycles   by delivering IT efficiency for
  and invest in new services …      core business transactions




  Deliver new business              by using actionable insight for
  opportunities …                   information-centric processes




  Capture new markets and drive     by strengthening the customer
  top-line revenue growth …         experience


                                                                      7
Phoenix IMS Users Group



On a Smarter Planet, there are no clear boundaries of IT



“All clients are experiencing the
 phenomena of what we call ‘front
 office transformation’— social
 media, devices, mobility– all
 reshaping the way they want to
 engage their customers, and how
 they capitalize on Big Data and
 analytics.”

              Ginni Rometty, President and CEO
                                            IBM




                                                           8
Phoenix IMS Users Group



CEOs believe technology will be at the forefront of driving
change through 2015*


                                                  Is your infrastructure optimized for
                                                  the greatest efficiency of all your
“71% of CEOs                                      applications and resources?
 identify technology
 change as the most                               Does your infrastructure enable you
 important external                               to provide rich, actionable insight?
 force impacting their
 organizations”*                                  Are you leveraging new
                                                  technologies—mobile, social, cloud—
                                                  to deliver an excellent customer
                                                  experience at every touch point?


                            * IBM, Leading Through Connections: Insights from the Global Chief Executive Officer Study, May 2012.

                                                                                                                                9
Phoenix IMS Users Group



The world is changing.
Is your infrastructure ready?

                                                              The time is now to…
             70% of IT budget is devoted to                   Leverage cloud to speed time to
             operations and maintenance1                      market and improve efficiency

             Connected devices will surge
             to 22 billion by 20202, with
             digital content rocketing to 8                   Unlock the power of Big Data to
             zettabytes by 2015 (90%                          deliver more actionable insight
             unstructured)3

             The average IT infrastructure is
                                                              Secure critical information to
             attacked nearly 60,000 times
                                                              comply, reduce risk and protect
             every day4

                                              1 IDC, Game Changing Virtual Technology: Major Shifts and Innovations that will Forever Change your IT Business
                                              2 Forrester, BT 2020: To Thrive In The Empowered Era, You’ll Need Software, Software Everywhere, Phil Murphy, January 30, 2012.
                                              3 IDC, IDC Predictions 2012: Competing for 2020, Doc #231720, December 2011,
                                              4 IBM X-Force Research




                                                                                                                                                                                10
Phoenix IMS Users Group



Organizations need to be able to make faster, better-
informed decisions to drive smarter business
outcomes.

  Data growth continues unabated, 25% to 50% a year.
  IT budgets flat or decreasing.
  Increased use of rich content and unstructured data.
  More security and compliance regulations impacting IT




CIOs are driving a strategic and planned approach to
building out the digital platform the business relies on, as
well as making corresponding investments to improve their
ability to manage it.
                                                               11
Phoenix IMS Users Group



            Smarter Computing: Tomorrow Ready.
            Smarter Computing is the IT infrastructure that
            enables a Smarter Planet.




                          Cloud Ready


                          Data Ready


                          Security Ready



                                                              12
Phoenix IMS Users Group


Smarter organizations are tapping into entirely new
capabilities for optimizing business processes,
collaborating and driving innovation simply by using
information to transform their business.
       Deliver IT              Strengthen the           Enable actionable
       efficiency           customer experience             insights



   Establish a scalable     Ensure data and system        Apply business
   foundation for your       integrity across your      analytics to optimize
       information               organization                decisions

      Manage critical       Redefine the customer         Unlock the value of
     information and        experience by delivering    operational data that
   business processes       personalized interactions   fuels a Smarter Planet
    while optimizing for        when and where           in an economy that is
    greater efficiency of      customers want to         rapidly evolving to be
        resources.               consume them              information-centric


                                                                                  13
Phoenix IMS Users Group


IBM zEnterprise can help you close the gaps in your
information-centric environment.




          Efficiency at                    Trusted                               Operational
          Scale                            Security and                          Analytics
                                           Resiliency
 EFFICIENCY                         INTEGRITY                        ACTIONABLE INSIGHT
 • Enables very large scale         • Delivers unmatched             • Integrated modeling of real time
   consolidation and the flexible     security and reliability for     data and consolidated corporate
   delivery of services through a     core business processes          data to deliver information and
   private enterprise cloud           and data                         insight across the enterprise
                                                                                                          14
Phoenix IMS Users Group



                Efficiency at the core
                State of the art technology above the rest

                            Superior security with high-speed cryptography
                            integrated as part of the chip

Leadership in performance with 5.5 GHz
6-Core Processor Chip
                            Extreme scalability and parallelism with
                            transactional execution facility

Accelerate application development with enhancements
to decimal format conversions and 2 GB page frames

                            Reduce application overhead with runtime
                            instrumentation facility

Optimized data serving with largest cache in
the industry
                                                                             15
Phoenix IMS Users Group



             Enable very large scale consolidation and the
             flexible delivery of services through a private
             enterprise cloud

             Organizations will now be able to make faster,
             better-informed decisions to drive smarter
             business outcomes because their systems are
             designed to operate that way.

“IBM has one of the most
comprehensive cloud portfolios.”
                          – Jeff Vance, Datamation


• Hybrid Cloud computing with zManager across
  the tiered architecture
• Optimized systems
• Efficient transaction processing
• Integrated application infrastructure
                                                               16
Phoenix IMS Users Group



The ideal private enterprise cloud
            zEnterprise brings together the benefits of enterprise
             computing and cloud computing in a single system
• Enterprise Computing capabilities
    – Extreme scale and leadership security
                                                                               A Virtual server on
                                                                               System z can be provisioned in
      and resiliency enabling delivery of critical                             minutes
      services
                                                                               System z servers
• Cloud computing capabilities                                                 often run consistently at 90%+
                                                                               utilization
    – Extreme flexibility and efficiency of fully
      virtualized resources across
      heterogeneous platforms                                                  zEnterprise can run
                                                                               hundreds or thousands of diverse
                                                                               workloads in a single system
• Centrally manages and controls a set of
 resources                                                                     A Private Cloud on
    – A single integrated system for rapid and                                 zEnterprise can lower server TCA
      efficient provisioning of services to                                    by up to 84%1
      accelerate time to market and reduce cost
                      1 (Source:   IBM SWG CPO – Internal testing)
                                                                                                                         17
                      2 (IBM   calculations of zEnterprise limits across maximum z196 configuration. Results may vary)
Phoenix IMS Users Group


             Why Deploy Cloud and Linux on System z?


 Increased Productivity
                                                                  More Efficient Data Center
   TCA of less than $0.70 per day per
   virtual server1                                                 U.S. Insurance Company uses
                                                                   80% less energy than existing
   79% less TCA vs. leading public                                 distributed servers
   cloud 2
                                                                   Less floor space
   More than 3,000 applications
   available on System z                                           Fewer physical servers to manage



  Higher Utilization                                                 Greater Reliability, Availability
    Most clients run consistently at                                      Most customers test backup of
    90%+ utilization1                                                     System z to 100% recovery
    “Shared everything” architecture                                      annually
    Manage up to 100,000 virtual                                          Built-in hardware redundancy
    servers1                                                              Capacity and Backup on Demand

                             1 IBM   calculations of zEnterprise limits across maximum z196 configuration. Results may vary. 5-Year Total IT Cost
                             2 The Edison Group: The Value of IBM zEnterprise for Deploying Heterogeneous Private Clouds, savings start at 250
                             virtual servers

                                                                                                                                                    18
Phoenix IMS Users Group



                       System z has the highest security rating or
                       classification for any commercially available
                       server

IBM zEnterprise…
 Offers fewer points of breach than a pure UNIX® or x86
 implementations.
 Helps identify fraud risks in real time and help stops them
 before they happen.
 Enables a reduction of risk and simplification of governance and
 compliance.
 Server images hosted on Linux on System z can
 benefit from legendary System z availability, security
 and systems management.1



  1IBM   design points, Internal studies and analysis.
                                                                       19
Phoenix IMS Users Group



              Secure resilience
              Delivering unmatched security and reliability for core
              business processes

                           • Conduct business with the highest level of
                             integrity
Surpass   EAL5+               ‒ Reduce risk of security and data breaches
highest level of              ‒ Secure sensitive data and identities
certification for
                              ‒ Uncover possible intrusion attempts
general purpose
servers                       ‒ Enforce policy compliance


                           • Continuous availability to increase growth
                              ‒ Reduce the impact to business by
                                eliminating outages which cost on
                                average >$500K
                              ‒ Eliminate the costs for an hour-long outage
                                which can vary from $225 to $89K an hour
                                and can affect millions of users
                                                                              20
Phoenix IMS Users Group



            System z stands alone with security hardened
            into the architecture


Availability plus the security provided by the zEC12 enables a
level of resiliency that allows businesses to be competitive day
in and day out in this global environment.




                                                                   21
Phoenix IMS Users Group



                          Apply operational analytics to optimize
                          decisions

Apply advanced analytics and industry expertise to a wealth of information
in order to more precisely predict—and continuously act on—risks and
opportunities.
REACTION                                      PREDICTION




                                       Goal                           Goal




           Unforeseen Decision Point
           Predicted Decision Point
                                                                             22
Phoenix IMS Users Group


Combining the best transaction system with
the best analytics system
Best in OLTP                 Best in data warehouse        Best in consolidation
Industry-recognized          Proven appliance leader in    Unprecedented mixed
leader in mission-critical   high-speed analytic systems   workload flexibility and
transaction systems                                        virtualization providing the
                                                           most options for cost-
                                                           effective consolidation


   Business insight
   integration
   IBM DB2 Analytics
   Accelerator is a new workload
   optimized, appliance add-on,
   that enables the integration of
   business insights into
   operational processes
   [Evolution of ISAO]

                                                                                          23
Phoenix IMS Users Group


The IBM DB2 Analytics Accelerator (IDAA)
Capitalizing on the best of both worlds – System z and Netezza

                               The IBM DB2 Analytics Accelerator is a
                               blending of System z and Netezza
                               technologies that delivers unparalleled
                               mixed workload performance for
                               addressing complex analytic business
                               needs.




                               Performance, availability and scalability

                               Extreme Performance for Complex Analytics

                               Breakthrough technologies - Hardware
                               acceleration

                               Transparent to DB2 applications



                                                                           24
Phoenix IMS Users Group



          Operational Analytics
          Integrating business insights when and where it matters


Real-
Real-Time Scoring offers new technology that ensures current, relevant
business insights within the time of a transaction


              Improve query response times by up to 30% when
              updating to IBM zEnterprise EC12


Advanced query management integrates operational, strategic,
and tactical decisions, while delivering response times up to 2000x faster, and
maintaining critical business priorities


              Enterprise-
              Enterprise-wide Data Warehousing leverages
              leading temporal and data governance capabilities, to deliver a
              single, consistent view of business


                                                                                  25
Phoenix IMS Users Group




                   With System z, even the most complex
                   queries can be processed within seconds

Deliver real-time insights that uncover new business opportunities,
and provide that information to the front lines of business, so that
they can take action when it can yield real business results.




                                                                       26
Phoenix IMS Users Group



zEnterprise EC12 parallel sysplex availability leads the pack

                                                Downtime Survey (400 participants in 20 countries)
                           3.5

                            3
 Downtime Hours Per Year




                           2.5                                                                                                            System z Parallel Sysplex
                                                                                                                                          with 99.999% availability
                            2

                                                                                                                                                      5 minutes
                           1.5

                            1

                           0.5

                            0
                                 Microsoft   Microsoft      Novell          HP          HP             Sun          Mandrake          Novell          IBM             IBM
                                 Win2003     Win2008       Linux on      HP-UX        HP-UX           Solaris         Linux          Linux on         AIX            z/OS
                                    on          on         Intel x86        on          on              on              on           Intel x86         on           Sysplex
                                 Intel x86   Intel x86   (unmodified) Intel Itanium HP PA-RISC      Sun SPARC       Intel x86       (modified)     IBM Power


       Source: ITIC: ITIC 2009 Global Server Hardware & Server OS Reliability Survey; July 2009; http://itic-corp.com/blog/2009/07/itic-2009-global-server-hardware-server-os-
       reliability-survey-results/; Results are measured in minutes per year.
       *Note: All operating systems included in the survey are not included in this chart. Fifteen operating systems on various processor architectures were included in the
       survey. The chart will be updated when the full report is available.

                                                                                                                                                                                 27
Phoenix IMS Users Group

IBM Software for zEnterprise solves key Business
Initiatives
            Cloud                                 Data                           Security
     Efficiency at Scale               Operational Analytics                 Ultimate Security
Delivering high value                Delivering predictive and          Providing advanced data
secured applications and             operational analysis of real-      security and audit
services to create the ideal         time enterprise data to deliver    capabilities for managing risk,
private cloud environment            insights                           data leaks, and compliance
                                                                        issues
                                                   NEW
IBM CICS Transaction Server for      IBM DB2 Analytics Accelerator V3    IBM Security zSecure Suite
z/OS® V5.1 and tools                 IBM zEnterprise Analytics System    V1.13.1
IBM OMEGAMON® Family V5.1            9700/9710                           IBM InfoSphere Guardium V9.0
IBM Continuous Integration for       Cognos BI 10.2
System z                             InfoSphere™ Optim™ 9.1
IBM Integrated solution for          DB2 for z/OS Tools
System z development                 IMS Enterprise Suite 2.2
IBM Sterling B2B Integrator V5.2.5   DB2 11 Beta ESP, IMS 13 QPP
IBM Sterling File Gateway V2.2.4     IBM Business Rules for z/OS V8.1
                                     IBM Operational Decision
                                     Management V8.1
                                                                                                          28
                                                                                                          28
Phoenix IMS Users Group


 zEnterprise provides the foundation for the “smart” infrastructure
 on which we can build the workloads of today and tomorrow


They are workloads that …                                                      … and / or …
 Rely on data serving and
 application components on                                                 Reside in low utilization /
 IBM System z®                                                             development environments

 Solutions that need to                                                    Can be made more
 leverage strengths of                                                     efficient through
 System z… Security,                                                       consolidation
 Reliability, Availability
                                                                           Can be optimized by using
 Have application                                                          the newest virtualization
 components on UNIX (HP,                                                   technology
 Sun, Power) or Linux (x86,
 System z) but require a
 higher level of integration
 capabilities and efficiency
                                        … but also may …
                               Reside in complex multi-platform IT environments
                               Require flexible development and test infrastructure
                               Require simplified, integrated policy and management
                                                                                                    29
Phoenix IMS Users Group



  Evolution of hybrid computing with IBM System z
                                                                                                                                 Announced
IBM zEnterprise® 196 (z196)                                                                                                      zEnterprise
  First ever multiplatform                                                                         Availability of
                                                                             Availability of                                  Analytics System
 computer – mainframe and                                                                       Microsoft® Windows®
                                                                             Linux® on IBM                                    9700 and IDAA V3
   distributed with single                                                                      on System x blades
        management            DataPower® XI50z                             System x® on HX5       in zBX and APIs
                                within the IBM                             blades in the zBX
                                 zEnterprise
                                BladeCenter®
                               Extension (zBX)
                                HTTP   MQ     JMS   FTP   IMS



                                                                CSV
                                                      COBOL
                                                XML
                                       SOAP




   July 2010    Nov 2010        Mar 2011                              Jul 2011   Sep 2011      Oct 2011     Dec 2011    Aug 2012    Oct 2012




        Availability of zBX with IBM                          Announce                                                 IBM zEnterprise EC12
                                                                                      IDAA – evolution of IBM
          POWER7® blades and                              IBM zEnterprise 114                                                 (zEC12)
                                                                                     Smart Analytics Optimizer –
      IBM Smart Analytics Optimizer                                                                                      Next generation of
                                                                                     coming out of the zBX and
                                                                                      into Netezza technology            hybrid computing

                                                                                                                                                 30
Phoenix IMS Users Group



 IBM zEnterprise System: The complete system of
 systems




 The integration of a shared pool of   Cloud Ready
      virtualized heterogeneous
   resources, managed as a single      Data Ready
            system, that is:           Security Ready

31                                                      31
Phoenix IMS Users Group



IBM zEnterprise EC12 System: The Next Generation in
Hybrid Computing



                                                                The foundation for a
                                                                secure cloud for data,
                                                                enabling enterprises to
                                                                improve service to their
                                                                customers.




  Efficiency at scale             Operational analytics         Ultimate security
  Provides a highly secure and    A secure and scalable         Delivering unmatched security for
  scalable enterprise cloud for   enterprise data repository    critical business processes,
  efficiently running multiple    that integrates operational   applications and data
  critical applications           analytics for accelerated
                                  insight                                                           32
Phoenix IMS Users Group

Introducing the newest members of the zEnterprise System
The zEnterprise EC12 and zEnterprise BladeCenter Extension
Model 003
         IBM zEnterprise EC12 (zEC12)

•   zEC12 has the industry’s fastest chip with each core at 5.5 GHz
•   New innovation to drive availability with IBM zAware and Flash Express
•   Optimized for the corporate data serving environment
•   Hardware functions boost software performance for Java™, PL/I, DB2®
                                                            IBM zEnterprise Unified Resource Manager
                                                           and zEnterprise BladeCenter Extension (zBX)
                                                                             Mod 003

                                                       •   Supports the new zEC12 platform
                                                       •   Hosts PS701 and HX5 blades
                                                       •   Provides workload-awareness resource optimization
                                                       •   Enhancements to System Director support zBX
                                                       •   System z will continue to expand hybrid computing



               Plus more flexibility and function by
            connecting IBM DB2 Analytics Accelerator
           • Deployment of business analytics on the same platform as operational applications --
             analytics and OLTP can be run as the same workload
           • IBM Data Analytics Accelerator V3 lowers the cost of analytics
                                                                                                               33
Phoenix IMS Users Group



    zEnterprise EC12 is the core of next generation of System z
                                                                                                                               zEC12
Up to           Performance improvement over z196
25%             uniprocessor1      Up to                                                                                Machine Type: 2827
                                         25%                                                                      Models: H20, H43, H66, H89, HA1
                                Faster engines1
                                                                                                       Advanced Technology 5.5 GHz 6-core
Up to
50%
                Total capacity improvement over z196
                M801
                                                                                                       processor chip delivers a performance boost
                                          Up to
                                                                                                       for all workloads
                                         50%
Up to                        More total capacity1
                Configurable cores for client use                                                      Innovation to drive availability to superior
101
                                                                                                       levels
60 subcapacity settings
          Up to 101 configurable cores                                                                 – IBM zAware offers snap-shot of the current
        60 subcapacity
Up to 3 TB RAIM memory               settings
                                                                                                          state of your business
          Up to 3 TB RAIM memory
                                                                                                       – FLASH Express and pageable large pages to
IFL, zIIP, zAAP, ICFs and optional SAPs
                                                                                                          drive availability and performance for critical
          IFL, zIIP, zAAP, ICFs and optional SAPs                                                         workloads
Environmental focus to improve data center
efficiencies including new non raised floor option
          Environmental focus
                                                                                                       Trusted resilience is a zEnterprise standard
       Upgradeable from IBM zEnterprise 196
Upgradeable from IBM zEnterprise 196®(z196) and
System z10® Enterprise Class (z10 EC™) Enterprise Class
       and IBM System z10



1 Based on preliminary internal measurements and projections against a z196. Official performance data will be available upon announce and can be obtained online at LSPR (Large Systems Performance Reference) website at:
    https://www.ibm.com/servers/resourcelink/lib03060.nsf/pages/lsprindex . Actual performance results may vary by customer based on individual workload, configuration and software levels.

                                                                                                                                                                                                                       34
Phoenix IMS Users Group


      zEnterprise EC12 is the core of next generation System z
             Up to
                           Performance                                                                   zEC12
             25            improvement over                                                       Machine Type: 2827
             %             z196 uniprocessor1
                                                                                            Models: H20, H43, H66, H89, HA1
                                                                                           Advanced Technology 5.5 GHz processor chip for performance
             Up to
                           Total capacity                                                  boost for all workloads
             50            improvement over                                                – Over 78,000 MIPS for large scale consolidation
             %             z196 M801                                                       – Larger cache for data serving
                                                                                           Processor chip optimized for software performance
             Up to                                                                         – Advanced performance functions exploited by Java, PL/I,
                           Configurable cores                                                compilers, DB2 and more
             101           for client use
                                                                                           Innovation to drive availability to superior levels
             60 subcapacity settings                                                       – IBM zAware with out-of-band analytics provide point in time
                                                                                             snap-shot of the current state of your business and can help
             Up to 3 TB RAIM memory                                                          you improve availability
             IFL, zIIP, zAAP, ICFs and optional                                            – FLASH Express and pageable large pages to drive
             SAPs                                                                            availability and performance for critical workloads
             Environmental focus to improve                                                Security and reliability are in our DNA
             data center efficiencies including
             new non raised floor option
                                                                                           – High speed cryptography integrated as part of the chip
                                                                                           – Enhanced support for applications requiring data encryption,
             Upgradeable from IBM zEnterprise                                                cryptographic keys and digital signing with new Crypto
             196 (z196) and System z10®                                                      Express4S
             Enterprise Class (z10 EC™)
                                                                                           – PR/SM designed for EAL5+ certification
1   Based on preliminary internal measurements and projections. Official performance data will be available upon announce and can be obtained online at LSPR (Large Systems Performance
      Reference) website at: https://www-304.ibm.com/servers/resourcelink/lib03060.nsf/pages/lsprindex?OpenDocument . Actual performance results may vary by customer based on individual   35
      workload, configuration and software levels.
Phoenix IMS Users Group



IBM zEnterprise EC12: An optimized system




                                                            Java




Semiconductor   Microprocessor   Systems   Virtualization   Compilers &    Optimized
Technology      Design           Design    & Operating      Java Virtual   Middleware
                                           Systems          Machine




                                                                                        36
Phoenix IMS Users Group



zEnterprise EC12: Freedom through Design
Enhanced performance and scalability for Smarter Computing

           Up to                          Up to                             Up to
           25%                            50%                               25%

    Core processor
     performance
                                    Total capacity              More configurable cores
   improvement over
                                improvement over z196           for client use over z196
  IBM zEnterprise® 196
        (z196)
• Faster processors and more capacity for economies of scale
• New processor chip optimized for software performance
     – Up to 45% improvement for Java™ workloads
     – Up to 27% improvement in compute-intensive and floating-
       point C/C++ applications
     – Up to 30% improvement in IMS™ workloads
     – More than 30% improvement for SAP workloads
• Larger caches to optimize data-serving environments             Upgradeable from:
                                                                  IBM zEnterprise 196 (z196)
• Hybrid computing capabilities to reduce cost and complexity     and IBM System z10® Enterprise Class (z10 EC™)

                                                                                                            37
Phoenix IMS Users Group


   Processor chip optimized for software performance
   Exploited by Java, PL/I, compilers, DB2, more

        Our leadership in microprocessor design
        supports a boost in performance for all                                                                                                       Excellent Results:
        workloads
        – Second generation out of order design                                                                                           Up to                                        Up to
        – Multi-level branch prediction supports complex                                                                                   45%                                         27%
          workloads                                                                                                                    Improvement                               Improvement in
                                                                                                                                         for Java                               CPU intensive int
        Larger caches to optimize data serving                                                                                          workloads1                                & float C/C++
        environments                                                                                                                                                              applications1
        – Almost 2x on chip and 2x additional on book
        New hardware functions optimized for                                                                                               Up to                                   More than
        software performance                                                                                                               30%                                        30%
        – Transactional Execution Facility for parallelism and                                                                       Improvement in                             Improvement in
          scalability                                                                                                                 throughput for                             throughput for
        – Runtime Instrumentation Facility is intended to help                                                                         DB2 for z/OS                             SAP workloads1
          reduce Java overhead                                                                                                          operational
        – 2 GB page frames are intended to offer performance                                                                             analytics2
          improvements for DB2 buffer pools and Java heaps
        – Up to 30% improvement in IMS throughput due to
          faster CPU and cache, compliers, and more1
        – New IBM Enterprise PL/I compiler is planned to exploit
          and get a performance boost from decimal format
          conversions facility
1 Based on preliminary internal measurements and projections
2 Aa measured by the IBM 9700 Solution Integration Center. The   measured operational BI workload consists of 56 concurrent users executing a fixed set of 160,860 Cognos reports . Compared DB2 v10 workload running on38
    IBM's z196 w/10 processors to an zEC12 w/10 processors
Phoenix IMS Users Group



zEC12 – Overall Attributes Highlights (compared to z196)
50% more cores in a CP chip
 – Up to 5.7% faster core running frequency
 – Up to 25% capacity improvement over z196 uni-processor
Bigger caches and shorter latency
 – Total L2 per core is 33% bigger
 – Total on-chip shared L3 is 100% bigger
 – Unique private L2 designed to reduce L1 miss latency by up to 45%
3rd Generation High Frequency, 2nd Generation Out of Order Design
 – Numerous pipeline improvements based on z10 and z196 designs
 – # of instructions in flight is increased by 25%
New 2nd level Branch Prediction Table for enterprise scale program footprint
 – 3.5x more branches
Dedicated Co-processor per core with improved performance and additional
capability
 – New hardware support for Unicode UTF8<>UTF16 bulk conversions
Multiple innovative architectural extensions for software exploitation
                                                                               39
Phoenix IMS Users Group

zEC12 Architecture Extensions
Transactional Execution (a/k/a Transactional Memory)
 – Software-defined sequence treated by hardware as atomic “transaction”
 – Enables significantly more efficient software
     • Highly-parallelized applications
     • Speculative code generation
     • Lock elision
 – Designed for exploitation by Java; longer-term opportunity for DB2, z/OS, others
Runtime instrumentation
 – Real-time information to software on dynamic program characteristics
 – Enables increased optimization in JVM/JIT recompilations
 – Additional exploitation opportunities in the works
2 GB page frames
 – Increased efficiency for DB2 buffer pools, Java heap, other large structures
Software directives to improve hardware performance
 – Data usage intent improves cache management
 – Branch pre-load improves branch prediction effectiveness
 – Block prefetch moves data closer to processor earlier, reducing access latency
Decimal format conversions
 – Enable broader exploitation of Decimal Floating Point facility by COBOL programs   40
Phoenix IMS Users Group


zEC12 Full and Sub-Capacity CP Offerings
CP Capacity
Relative to Full Capacity Uni               Subcapacity CPs, up to 20, may be ordered on ANY zEC12 model.
 7xx = 100% ~ 1514 PCI
               ~                            If 21 or more CPs are ordered all must be full 7xx capacity
 6xx ~ 63% ~ 947 PCI
      ~        ~                      7xx   All CPs on a zEC12 CPC must be the same capacity
 5xx ~ 42% ~ 631 PCI
      ~        ~
 4xx ~ 16% ~ 240 PCI
      ~        ~                            All specialty engines run at full capacity. The one for
 xx = 01 Through 20
                                            one entitlement to purchase one zAAP and one zIIP for
                                      6xx
                                            each CP purchased is the same for CPs of any capacity.
                                            Only 20 CPs can have granular capacity but
                                      5xx   other PU cores may be characterized
                                            as full capacity specialty engines
                                      4xx   For no CPs, the capacity
                                            setting is 400
                                            PVU for zEC12 is 120
            MSU Sub Capacity




                                H20             H43                H66                 H89       HA1 41
Phoenix IMS Users Group



  IBM System z:                          System I/O Bandwidth
                                             384 GB/Sec*
  Design Comparison
  for High End Systems                         288 GB/sec*
                                                                                      Balanced System
                                                                                     CPU, nWay, Memory,
                                                                                       I/O Bandwidth*
                                              172.8 GB/sec*


                                                  96 GB/sec

                                                       24 GB/sec                                       PCI for
Memory
                          1.5 TB**            256 64                                                    1-way
3 TB**                               512 GB                        300   450   600      920    1202
                                              GB GB
                                                                                                         1514
                                                   16-way

                                                  32-way
                                                                                              zEC12
                                                  54-way
                                                                                              z196
                                                  64-way
                                                                                              z10 EC
 * Servers exploit a subset of its
                                                  80-way                                      z9 EC
    designed I/O capability
 ** Up to 1 TB per LPAR                                                                       zSeries 990
 PCI – Processor Capacity Index                 101-way
                                                                                              zSeries 900
                                               Processors
                                                                                                            42
Phoenix IMS Users Group

           zEC12 performance and scalability
                       Balanced performance growth                                                     1.5X z196 total capacity
                        – Across broad range of workloads                                              – 27 or 30 cores per MCM

                        – Scalable from 1 to 101 processors                                            – 120 max cores (Model HA1)

                       LSPR: 1.25 x z196                                                               Continued full-stack performance focus
                        – 32nm SOI technology                                                          – New z/Architecture features

                        – Improved core and cache designs                                              – Compiler optimization for zEC12
                                                                                            • Hybrid Computing – POWER7 and System x blades
                                                                            • Linux on System x and Microsoft Windows                         IBM DB2 Analytics
                                                                                                                                              Accelerator (IDAA)
                                                             • DataPower XI50z                                                                     with Netezza


                                                         • Hybrid Computing – POWER7 & System x blades
                                                • Linux on System x and Microsoft Windows
                                                                                                                            zEC12
                                        • DataPower XI50z
Configurable Engines




                                                                                         z196
                               • Specialty engines

                                                     z10 EC

                                                                                                                                                   PureSystems

                                                                                                          • zArchitecture enhancements
                                                                      •   100 new instructions
                                                                      •   RAIM memory                     • Focus on core strengths –
                           •   Compute intensive                      •   PCIe I/O drawer                   scale, security, availability
                           •   Decimal Floating Point                 •   Optional offerings – water      • Compiler optimized for zEC12
                           •   zHPF                                       cooling or HV DC power
                           •   Preplanning enhancements

                                                                          Capacity
                                                                                                                                                                   43
Phoenix IMS Users Group



System z Servers Continue to Scale with zEC12                                                                                    120 engines
                                                           zEC12                                                                  101-way*
Each new range continues to
deliver:
                                                                                                                    96 engines
   • New function                                          z196                                                       80-way
   • Unprecedented capacity to meet
                                                                                                        77 engines
     consolidation needs




                                             Maximum PCI
                                                                                                          64-way
                                                           z10 EC
   • Improved efficiency to further reduce
                                                                                            64 engines
     energy consumption                                    z9 EC                              54-way
   • Continues to delivering flexible and
                                                                                48 engines
     simplified on demand capacity                         z990                   32-way
   • A mainframe that goes beyond the
     traditional paradigm
                                                                    20 engines
                                                           z900       16-way




                                            Minimum PCI




PCI - Processor Capacity Index                                         z900        z990       z9 EC       z10 EC       z196         zEC12
*z/OS supports up to a 100-way only                                  z/OS 1.6    z/OS 1.6    z/OS 1.6    z/OS 1.8    z/OS 1.11    z/OS 1.13
                                                                                                                                              44
Phoenix IMS Users Group


          zEC12 Continues the CMOS Mainframe Heritage Begun in
          1994                                5.2 GHz
                                                      5.5 GHz
      6000
        6000

                                                                  4.4 GHz
      5000 5000


      4000
        4000
MHz/GHz




      3000
        3000
                                                   1.7 GHz
                                      1.2 GHz
      2000
        2000
                     770 MHz

      1000
        1000



            00         2000            2003          2005            2008              2010                2012
                       z900            z990          z9 EC          z10 EC             z196               zEC12
                    z900
                    189 nm SOI       z990
                                    130 nm SOI     z9ec
                                                   90 nm SOI     z10ec
                                                                  65 nm SOI         z196
                                                                                    45 nm SOI           zxxx
                                                                                                        32 nm SOI
                     16 Cores        32 Cores       54 Cores       64 Cores          80 Cores           101 Cores
                     Full 64-bit    Superscalar   System level   High-freq core     OOO core         OOO and eDRAM
                   z/Architecture   Modular SMP      scaling     3-level cache    eDRAM cache       cache improvements
                                                                                  RAIM memory           PCIe Flash
                                                                                  zBX integration     Arch extensions
                                                                                                         for scaling



                                                                                                                         45
Phoenix IMS Users Group


Extending System z Availability with Flash Express
 and IBM zAware                                Highly resilient & available systems

                                                                                     Business
           Server                Systems             Operations Availability        Application
           Design               Availability                                        Availability


 Sparing                 HyperSwap™                  Capacity on Demand        IBM zAware
                         Concurrent Upgrade          Capacity Back Up          Flash Express
 Enhanced Book           Virtual networking          GDPS®/HyperSwap
 Availability            Data Sharing                Call home
 Hardware checks
 Redundant parts
 Parallel Sysplex®




  Designed to Prevent    Designed to Improve         Designed to improve       Designed to Improve
  Hard Failures          System SW Availability      Continuous Operations     Business Availability



                                  IBM Confidential                                                     46
Phoenix IMS Users Group


IBM Flash Express – Smarter Availability for Smarter
Systems
• Flash Express is an innovative solution designed to help you compete effectively in
  today’s market
     – Automatically improve availability for key workloads at critical processing times
     – Drive availability and performance for workloads that cannot tolerate paging spikes or inconsistent
       performance
     – Slash latency for critical application processing such as diagnostics collection
• Extends IBM’s expertise in memory management introducing a new tier of memory
  using Flash Express
• Provides a secured, resilient and immediately usable solution
• Planned Flash Express and pageable large page exploiters:
     – z/OS V1.13 Language Environment
     – Java SDK7 and by extension
          • WAS Liberty Profile v8.5
          • DB2
          • IMS 12
          • And a future release of CICS® Transaction Server
     – IMS 12 Common Queue Server




47                                                                                              © 2012 IBM Corporation
                                                                                                                     47
Phoenix IMS Users Group



Introducing Flash Express                                                              Time to Read
• Flash Express is intended to improve System z availability                           Data measured
   – Slash latency delays from paging                                                  in System z
        • Flash Memory is much faster than spinning disk                               Instructions
        • Flash Memory is much slower than main memory
        • Flash Memory takes less power than either
   – Make your start of day processing fast                                            Real Memory:
   – Designed to eliminate delays from SVC Dump processing                             (256B line)




                                                                        More Latency
                                                                                       ~100 Instructions
• zEC12 offers optional Flash Express memory cards
   – Supported in PCIe I/O drawer with other PCIe I/O cards
   – Installed in pairs for availability                                               Flash Memory
   – No HCD/IOCP definitions required                                                  (4K page)
                                                                                       ~100K
• Assign Flash Memory to partitions like main memory
                                                                                       Instructions
   – Assignment is by memory amount, not by feature
   – Each partition’s Flash Memory is isolated like main memory                        External Disk
   – Dynamically increase the partition maximum amount of Flash                        (4K page)
   – Dynamically configure Flash Memory into and out of the partition
                                                                                       ~5,000K
                                                                                       Instructions



                                                                                                       48
Phoenix IMS Users Group



Relative Access Times for different technologies
                                 Access time


                                    CPU
                                                < 20 ns
                                   Cache

                              Random Access          < 200 ns
                              Memory (RAM)
                                Flash Express             5-20 micro sec.


                      Solid State Drive (SSD) Storage           1-3 ms


                                                                    < 10 ms
                            Spinning Disk Drive

                            WORM, Tape Library                           seconds



                                                                                   49
Phoenix IMS Users Group



Flash Express Exploitation on zEC12                                                                                             IBM Flash Express


Flash Express will be exploited by z/OS
– z/OS V1.13 Flash Web Deliverable – GA December 14, 2012
  • Pagable Large Pages (1 MB)
– z/OS V1.13 enabling PTFs for RSM enhancements – 1Q2013
  • Flash Dynamic Reconfiguration
  • Optional PLPA and COMMON Page data sets

– DB2 for z/OS and JAVA SDK7 SR3 will support pageable Large Pages
  (SoD*)
– IBM is working with it’s Linux Distribution partners to include support in future
  Linux on System z distribution releases
– IMS* CQS will use pageable Large Pages when IMS runs on zEC12 –
  Availability targeted for end of 2013
    *All statements regarding IBM's future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.




                                                                                                                                                               50
Phoenix IMS Users Group



IBM zAware delivers smarter message monitoring
capabilities
 The complexity and rate of change of today’s IT infrastructures stress the limits
 of IT to resolve problems quickly and accurately–while preserving SLAs
 IT is challenged to diagnose system anomalies and restore service quickly
  –   Systems often experience problems which are difficult or unusual to detect
  –   Existing tools do little to quickly identify messages preceding system problems
  –   Some incidents begin with symptoms that remain undetected for long periods of
      time
  –   Manual log analysis is skills-intensive, and prone to errors
 IBM zAware with Expert System Diagnostics Gets it Right, Fast
  –   IBM zAware helps improve problem determination in near real time – helps
      rapidly and accurately identify problems and speed time to recovery
  –   Analyzes massive amounts of data to identify problematic messages, providing
      information to enable faster corrective action
  –   Analytics on log data provides a near real time view of current system state
  –   Cutting edge pattern recognition examines system behavior to help you pinpoint
      deviations
  –   Machine learning, modeling and historical data work to describe your unique
      environment


                                                                                        51
Phoenix IMS Users Group



IBM zAware - Identifies Unusual System Behavior
           IBM zAware contains sophisticated analytics, applies IBM insight,
               and machine learning to understand your unique system.

      Monitoring                                        Detection                                         Frequency                                           Reporting
• Supports IBM and non                     • Detects anomalies other                          • Samples every 2 minutes                            • Near real time analysis
  IBM middleware and                         solutions might miss                             • 10 minute interval                                 • Intuitive reporting – both
  applications                             • Can find the rare or                             • Uses 90 day rolling                                  high level and drill down
• Monitors OPERLOG in a                      infrequent message                                 baseline; a utility provided                       • Color coded browser
  sysplex or monoplex                      • Can detect an unusual                              to populate baseline;                                display
• Assigns a message                          number of normal                                   flexibility provided                               • XML output can feed
  anomaly score to help                      messages                                                                                                ISVs or processes
  identify potential issues                • Can detect messages                                                                                       – Tivoli® intends to
                                             issued out of context                                                                                       provide alert and
                                                                                                                                                         event notifications1




52                                                                                                                                                                   © 2012 IBM Corporation
                                                                                                                                                                                          52
           1 All statements regarding IBM future direction and intent are subject to change or withdrawal without notice and represents goals and objectives only.
Phoenix IMS Users Group



Sophisticated Detection and Diagnostic Capabilities
  IBM zAware - Cutting edge pattern recognition analytics looks at the health of a z/OS
  system
  – Perform machine learning, pattern recognition, and statistical analysis on streaming
    messages to look for unexpected patterns to give faster, more pinpointed recognition of
    problems

  IBM zAware - A ‘watch dog’ to detect unusual behavior of z/OS images in near real time –
  enabling you act on system issues sooner - pushes z/OS high availability even beyond
  what it is today.
  – Diagnose problems/ critical events/ outages while they are occurring in real time
  – Helps heighten awareness of small problems so they can be corrected quickly
  – Determine the cause of problems so the operation team can establish procedures to
    prevent a reoccurrence

  IBM zAware - can consume massive amounts of OPERLOG messages (anything with a
  well-formed message) and turn it into useful information
  – Works “out of the box” with relatively little customization (as compared to existing tools)
  – A single browser based view of the health of a Parallel Sysplex® via a relative weighting
    and color coding
  – Out of band – minimal effect on z/OS product workloads
  – Complementary to existing tools

                                                                                                  53
Phoenix IMS Users Group



IBM zAware –
IBM System z Advanced Workload Analysis Reporter
 Monitors z/OS OPERLOG messages including all
 z/OS console message, ISV and application
 generated messages
 Can monitor across a sysplex                     Expert              Machine
                                                Knowledge             Learning
 Samples every 2 minutes.
                                                              IBM
                                                              IBM
 Reports on 10 minute time slices.                           zAware
                                                             zAware
 Uses a 90 day baseline created from SYSLOG
                                                Integrated            Intuitive
 Detects anomalies monitoring systems miss:
  – Messages may be suppressed or rare
  – Messages may indicate a trend
 Reports on unique messages, and a “score”
 Color-coded, browser-based (IE 8, Firefox)
 XML Output consumable through published API,
 can drive ISV products

                                                                                  54
Phoenix IMS Users Group



    IBM zAware: Unmatched Resiliency by design


Self learning integrated expert solution   Reduce financial impact
                                           of down time


Simple graphical interface for easy        Gain visibility into
drill down                                 system behavior


Analyze system messages to identify        Increase operator
unusual system behavior                    effectiveness


Monitor all System z servers from a        Diagnose problems
single point                               and decrease risk



                                                                     55
Phoenix IMS Users Group



IBM System z Security as the Enterprise Standard




• Intrinsic platform security and privacy for transactions and sensitive data helps enable System z to
  be the secure enterprise application server and data vault
  – Hardware cryptography built into each general purpose CP and IFL, and via the
    new Crypto Express4S coprocessors
  – Secure your critical information assets (or data) throughout their life cycle
• Security capabilities that span the needs of multiple industries
  – Strong focus on security and crypto functions required by the Banking/Finance industries
  – Support for the payment card industry with solutions that leverage the zEC12 for compliance and security (i.e. EMV for
    American Express)
  – New IBM Enterprise PKCS #11 Coprocessor firmware and support from z/OS
    helps meets the requirements of the European Union and public sector clients
• Leveraging the strengths of operating system security and cryptographic capabilities
  – Qualities needed by enterprises adopting cloud application architectures
  – Wide range of cryptographic primitives exploited by operating system and middleware to help secure and accelerate
    workloads
• zEC12 supports the System z exclusive protected key processor based cryptography
  – Blends the speed of processor based crypto with the security of the
    Crypto Express coprocessor
• PR/SM™ designed for EAL 5+ certification

                                                                                                                             56
Phoenix IMS Users Group



Systems z delivers ultimate security to address your
challenges of cost, complexity and compliance



             People         • Encryption of critical data, at rest and in
                              flight

              Data          • Early detection of application
                              vulnerabilities and Isolation of workloads

          Application       • A fully secured virtual pool of resources as
                              a foundation for enterprise clouds

        Infrastructure      • Complete user authentication, access
                              control, audit and management

      Governance, Risk
                                      Build a strong foundation
      Management and
        compliance                          for IT security

                                                                             57
Phoenix IMS Users Group



                  Ultimate security by design

     High speed cryptography integrated on                           Protect corporate data
     tamper resistant hardware


     Enhanced digital signature capability for                        Meet regulatory
     smart passports, ID cards and banking                            requirements


     New credit card transaction verification                         Enable smart
     support for smart payment cards1                                 payment cards


     Mainframe security events integrated                             Enhance security
     with zSecure and QRadar                                          intelligence


1verification   of card security codes and support for PIN changes

                                                                                              58
Phoenix IMS Users Group



zEC12 – Supports efficiencies in the data center
• New non-raised floor option offers flexible possibilities
  for the data center
• Continuing to support options for better control of
  energy usage and improved efficiency in your data
  center
  – zEC12 has a new radiator-based air cooled system design for
    more efficient cooling and improved concurrent maintenance
  – Water cooled options on zEC12 allow for up to 9% additional data
    center energy savings1
  – Savings with optional HV DC power when implemented in a new
    data center could be on the order of 7-12% of server input power2
• More capacity but little change to the footprint in the data
  center
  – Identical floor cutouts for zEC12 as the z196 and z10 EC3 with no
    significant increase in weight
  – Depth of system with covers will increase by 64 mm / 2.52 inches
• Over 12 years experience in designing and building
  earthquake resistant servers

    1 Based  on internal measurements with average power usage effectiveness (PUE) of 2 with well configured zEC12 configuration.
    2
      Based on internal measurements and projections.
    3
      With the exception of water cooling and overhead cabling
                                                                                                                                    59
Phoenix IMS Users Group



zBX – A Uniquely Configured Extension of the zEnterprise

                                                              zBX
• zBX Model 003 supported by zEC12                     Machine Type: 2458
                                                          Model: 003
   – Investment protection – Model 002 upgrades to
     Model 003                                                   PS701 blades (112 max)


• No need to make changes to applications              Up to     HX5 (7873) blades (56
                                                       112
  and application certifications are inherited                   max)


  from blades                                                    DataPower XI50z (28
                                                                 max)


• Managed by Unified Resource Manager                  1-4 Racks based on number of
                                                       installed blades

   – Management of resources as defined by your
     business goals and objectives                     One zBX per zEC12


                                                       Optional Acoustic Doors
   – Integrated network for better security, control
     and faster time to value                          Optional Rear Door Heat
                                                       Exchanger

   – Programmable interfaces (APIs) to connect
                                                       Upgradeable from zBX Model 002
     with system management tools for total
     management capabilities - IBM Tivoli
     Monitoring (ITM) has been enhanced to use
     the APIs
                                                                                          60
Phoenix IMS Users Group


zEnterprise Hybrid Computing
The commitment to Hybrid Computing continues with new
enhancements
 Clients can use the same method to implement servers for AIX®, Linux® and
 Microsoft® Windows® to reduce costs with high quality of service

 Hybrid computing on IBM System z® keeps getting smarter
 • Enhancements to IBM zEnterprise Unified Resource manager (zManager) in support
   dynamic storage capabilities and additional Linux distributions
 • Improved image and energy management capabilities for IBM System x® and Power®
   blades
 • No charge migration to move to the current generation of IBM zEnterprise BladeCenter®
   Extension (zBX) and Unified Resource Manager

 What Clients are saying about zEnterprise Hybrid Computing
     …    same method for implementing new servers across AIX, Linux


“         and Microsoft Windows … simplify and integrate its diverse infrastructure to reduce costs
          and ensure high quality of service … BG-Phoenics




“
     …    The combination of IBM System z® with Intel® servers in an Ensemble configuration turns
          out to be the best solution for modernization… EUROCONTROL

     ….   a platform for all the services we need in the future …



“
          more computing resources for less money … Health Insurance Institute of Slovenia




                                                                                                      61
Phoenix IMS Users Group

IBM zEnterprise BladeCenter Extension (zBX)
Machine Type: 2458 Model 003

 zBX is built with integrated IBM certified components
 – Standard parts – TOR switch, BladeCenter Chassis, Power Distribution Units, Optional
   Acoustic Panels
 – Optional optimizer - IBM WebSphere DataPower Integration Appliance XI50 for zEnterprise
   (DataPower XI50z) ordered as a feature of zBX
 Up to 112 blades are supported on zBX
 – System x and POWER7 blades are acquired through existing channels
 – IBM System x Blades – up to 56 entitlements
   • IBM BladeCenter HX5 (7873) dual-socket 16-core blades
      Four supported memory configurations in zBX – 64 GB, 128 GB, 192 GB, 256 GB
 – IBM POWER7 Blades – up to 112 entitlements
   • IBM BladeCenter PS701 Express - 8-core processor 3.0GHz,
      Three supported memory configurations in zBX - 32 GB, 64 GB, 128 GB
   • AIX: AIX 5.3 Technology Level 12 or higher, AIX 6.1 Technology Level 5 or higher, AIX 7.1
 – Up to 28 DataPower XI50z blades (double wide)
 – Mix and match blades in the same chassis
 System z support -- Blades assume System z warranty and maintenance when installed in the
 zBX
 Investment protection
 – Upgrade Model 002 to Model 003
 – Model 002 managed only by z196 or z114 and Model 003 managed only by zEC12                    62
Phoenix IMS Users Group


Operating System Environments extend application
flexibility
 Operating Systems are customer acquired and installed
 Unified Resource Manager will install hypervisor on blades in the zBX
 – Integrated hypervisor (KVM-based) for System x blades
 – PowerVM Enterprise Edition for POWER7 blades
 Support for Linux and Windows environments on System x blades in zBX
 – 64-bit version support only
 – Linux: Red Hat RHEL 5.5, 5.6, 5.7, 6.0 6.1 & SUSE Linux Enterprise Server
   (SLES) 10 (SP4) and SLES 11 SP1
 – Microsoft Windows Server 2008 R2 and Microsoft Windows Server 2008 (SP2)
   (for either Windows we recommend Datacenter Edition)
 Support of AIX environments on POWER7 blades in zBX
 – AIX: AIX 5.3 Technology Level 12 or higher, AIX 6.1 Technology Level 5 or
   higher, AIX 7.1
 Certifications inherited from blades
 – SAP support for Linux and Windows on x86 blades in the zBX
 PowerHA SystemMirror Standard Edition for AIX supported for the zBX with
 PS701 blades



                                                                               63
Phoenix IMS Users Group


Unified Resource Manager optimizes system resources

 Bringing mainframe governance for System z resources
 Single view of virtualized resources across platforms
 Integrated network for better security, control and faster
 time to value
 Management of resources as defined by your business
 goals and objectives
  – IBM intends to deliver workload-aware optimization for
    System x blades (Statement of Direction)*
 Programmable interfaces (APIs) to connect with system
 management tools for total management capabilities
 New dynamic storage capabilities for System x blades




                  Unified Resource Manager transforms the way resources are
                                   managed and deployed
        * All statements regarding IBM future direction and intent are subject to change or withdrawal without notice and represents goals and objectives only.

                                                                                                                                                                  64
Phoenix IMS Users Group

Continuing Value using the Unified Resource
            Manager
     Simplified installation
     Simplified installation                                                    Simplified energy management
     of hypervisors
     of hypervisors
                                                                                Energy cost savings
     Gain significant time to
     Gain significant time to
     market with improved
     market with improved
     speed of deployment
     speed of deployment                                                          Allow critical workloads to
                                                                                  receive resources and priority
                                                                                  based on goal-oriented policies
                                           Hypervisors       Energy               established by business
Save time, cost and simplify asset
management                                                                        requirements

Decrease problem determination                   APIs allow                       Smart business adjustments
and resolution time for cross-         Operationssharing ofPerformance            based on workload insight
platform resources                              information
                                                                                  Load balancing to manage
Improve and simplify cross-                                                       traffic flow
platform availability procedures             Networks      Virtual
                                                           Servers                Provide deep insight into how IT
Enable broader and more                                                           resources are being used
granular view of resource
consumption                          HMC                 NEW! SAP
                                                         support for    Gain flexibility, consistency and uniformity
                                                          Linux and     of virtualization
                                                        Windows on
                                                        x86 blades!!!   Provide the business with faster time to
     Factory installed and configured network                           market

     Improved network security with lower latency, less                 Simplified network management for
     complexity, no encryption/decryption                               applications

     Monitor status and general health of network                       Bridging of internal HiperSockets network
65   resources                                                          to the entire ensemble                         65
Phoenix IMS Users Group

 Flexible Connectivity on zEC12
Improving bandwidth, granularity and options for connections
                                        Heterogeneous environments
  For Clustering
                                          zBX
   HCA-3 InfiniBand® Coupling                                                      HMC
   Links                                    – Intraensemble data network
                                              (IEDN)                                New IBM zAware partition
     – 12x InfiniBand                                                               managed from HMC
                                            – Intranode management network
     – 1x InfiniBand (4 ports)                (INMN)                                Location to run Unified Resource
       improved scalability
                                            – Increased 10 Gb Ethernet              Manager – including monitoring
   ISC-3 (peer mode only) 1                   connectivity within zBX               CPU, energy, workload
                                                                                    performance
   STP                                    To PureSystems
     – Improved broadband                                                           Host of the ensemble – controlling
                                            – 10 Gb Ethernet                        all functions of the ensemble
       security
                                                                                    Primary with Alternate needed for
                                                                                    DR
                                                                                     Within zEC12
                                                                                       PCIe I/O Infrastructure
                                                                                       I/O Drawer and I/O Cage
                                                                                       Flash Express

                                            HMC                To the Network

   To the Data                                                   OSA-Express4S PCIe based)        OSA-Express31
                                                                  – 10 Gb Ethernet LR and SR        – 10 Gb Ethernet
      FICON® Express8S           FICON Express41
      (PCIe-based)                                                – 1 Gb Ethernet SX and LX         – 1 Gb Ethernet
                                  – SX and 10 km LX
         – SX and 10KM LX                                         – 1000BASE-T Ethernet             – 1000BASE-T
                                 Enhanced channel                                                     Ethernet
      FICON Express81            subsystem
                                                                                                       1 Carry
         – SX and 10KM LX                                                                                        forward only   66
Phoenix IMS Users Group



IBM System Storage DS8800
     Unique performance, availability and scalability makes DS8800
               the ideal storage platform for zEnterprise
• Self-optimizing performance and cost for hybrid computing
  – Easy Tier can improve performance by up to 3x by moving only 3% of
    data to SSDs
  – Integrated QoS management aligns server and storage resources with
    application priorities
  – 8x faster query performance for operational analytics with special
    DS8000® List Prefetch Optimizer for High Performance FICON
• Designed for near-continuous operations with over six-nines
  availability
  – Fully-redundant design for near-continuous data access
  – Tight integration between DS8000 remote mirroring and GDPS
    HyperSwap is designed for over six-nines (99.9999%) availability
• Optimized for zEnterprise efficiency and scalability
  – Support for System z Discovery and Auto-Configuration simplifies
    configuration
  – Extended Address Volumes of up to 1 TB volumes simplifies
    management of large volumes
  – New support for System z load balancing algorithms can optimize
    throughput and response times between server and DS8000

                                                                         67
Phoenix IMS Users Group


Robust tape storage to protect your information
Helping our clients retain data securely and in compliance with regulatory
requirements

               Comprehensive tape storage product line for System z attachment

              TS1140       Offers high performance (250 MBps) and high native capacity (4 TB) for storage consolidation
           Tape Drive
                           Provides information security with support for encryption and key management
                           Supports Write Once Read Many (WORM) cartridges to help satisfy compliance requirements

              TS3500       Scalable, automated data retention with up to 2.7 EB capacity with 3:1 compression
         Tape Library
                           Offers enhanced data availability and reliability with optional dual library accessory
                           Provides data security and regulatory compliance via support for tape drive encryption and
                           WORM cartridges
               TS7700      Virtualization solution implements a fully integrated tiered storage hierarchy of disk and tape
         Virtualization
                           Reduces batch processing time, total cost of ownership and management overhead
               Engine
                           Disk-only models with up to 1.3 PB native tape volume cache
                           Grid configurations for information availability and business continuity

                                Tape is often cost effective versus disk

                          • Lower price per MB
                          • Lowest power and cooling storage option available today


                                                                                                                             68
Phoenix IMS Users Group


Synergy with zEC12 operating systems
z/OS                                               Linux on System z
Java exploitation of Transactional Execution       Improved consolidation ratio through new capacity performance
for increased parallelism and scalability          Improved I/O performance using High Performance FICON (zHPF)
Enhanced security support for digital              Application and Linux optimization enabled by full exploitation of
signatures                                         zArchitecture extensions
Faster problem determination with IBM zAware       Optimized system setup via Linux health checker
for improved availability                          FCP end-to-end data integrity checking for applications and storage
Improve availability and performance with          subsystems
Flash Express                                      Plus over 3,000 applications on System z
2 GB page support
Simpler Specialty Engine (zIIP) exploitation
z/OS v1.13 exploitation of new hardware
Plus over 4,100 applications enabled on z/OS®                                   z/TPF
                                                                                  Support for 86 CPUs
                                                                                  Hardware exploitation for performance
z/VM                                                                              improvements

z/VM® Compatibility support
Guest exploitation support for new encryption
                                                                                 z/VSE
technology                                                                        64-bit addressing with z/VSE® V5.1
Improved I/O performance using High Performance                                   Strong interoperability with Linux on
FICON (zHPF) for guest exploitation                                               System z
                                                                                  New CICS functionality (CICS Explorer)
                                    AND with blades on the zBX there are even more
                                    options with applications on AIX, Linux on
                                    System x or Microsoft Windows
                                                                                                                         69
Phoenix IMS Users Group



Operating System Support for zEC12




 The following are the minimum operating systems planned to run on zEC12:
   – z/OS
       • z/OS V1.12, V1.13
       • z/OS V1.11, V1.10 Lifecycle Extension
   – Linux on System z distributions:
       • SUSE Enterprise Server (SLES) SLES 10 and SLES 11
       • Red Hat Enterprise Linux (RHEL) 6 and RHEL 5
   – z/VM
       • VM V5.4, 6.1, 6.2 with PTFs
       • z/VM V6.1, 6.2 for zBX support
   – z/VSE
       • z/VSE V4.3, V5.1, with PTFs
       • z/VSE V5.1 with PTFs for Crypto Express4S toleration
   – z/TPF V1.1
 Using the general purpose application server blades we have:
   – Linux: Red Hat RHEL 5.5 and up, 6.0 and up and SUSE Linux Enterprise Server (SLES) 10 (SP4) and up and SLES
      11 SP1 and up
   – Microsoft Windows Server 2008 R2 and Microsoft Windows Server 2008 (SP2) (for either Windows we recommend
      Datacenter Edition)
   – AIX: AIX 5.3 Technology Level 12 or higher, AIX 6.1 Technology Level 5 or higher, AIX 7.1

                                                                                                                   70
Phoenix IMS Users Group


Evolution of Specialty Engines Plus . . .
Building on a strong track record of technology innovation
with specialty engines

  DB Compression, SORT,
  Encryption
  Transparent for applications                                                                2010

                                                                                           Optimizers,
                                                                                          Accelerators,
                                                                         2006
                                                                                             Hybrid
                                                                     IBM System z10        processing
                                                  2004           Integrated Information
                                                                  Processor (IBM zIIP)
                                               System z9
                                            Application Assist    Eligible workloads:
                                            Processor (zAAP)       IPSec encryption,
                            2001                                 HiperSockets™, XML,
                                                Eligible         ISV, some DB2, z/OS
                      Integrated Facility                          Global Mirror, IBM
                                            workloads: Java
                        for Linux (IFL)                              GBS Scalable
      1997                                     and XML
                                                                    Architecture for
                                                                  Financial Reporting
    Internal
   Coupling
  Facility (ICF)



                                                                                                          71
Phoenix IMS Users Group



Protecting your investment in IBM technology

• Designed to protect your investment                                 zBX
                                                        z196         Mod 002
   – Offering upgrades from z10 EC™ and z196
     to the zEC12
   – Upgrades from zBX Model 002 to zBX        z10 EC
     Model 003


• Full upgradeability within the zEC12
  family
                                               zEC12
   – Upgrade to Model HA1 will require a
     planned outage


• On demand offerings offer temporary
  or permanent growth when you need it


                                                                zBX
                                                               Mod 003


                                                                           72
Phoenix IMS Users Group

IBM zEnterprise EC12 – new for September 2012
              IBM zEnterprise EC12 (2827)                        IBM zEnterprise Blade
                                                                   Extension (2458)




           • Announced 08/12 – Server w/ up to 101 PU cores   • First Announced 7/10
           • 5 models – Up to 101-way                         • Model 003 for zEC12 – 08/12
           • Granular Offerings for up to 20 CPs
                                                              • zBX Racks with:
           • PU (Engine) Characterization                        –   BladeCenter Chassis
              – CP, SAP, IFL, ICF, zAAP, zIIP
                                                                 –   N + 1 components
           • On Demand Capabilities                              –   Blades
              – CoD, CIU, CBU, On/Off CoD, CPE, FoD
                                                                 –   Top of Rack Switches
           • Memory – up to 3 TB for Server and                  –   8 Gb FC Switches
             up to 1 TB per LPAR                                 –   Power Units
              – 32 GB Fixed HSA                                  –   Advance Management Modules
           • Channels
              –   PCIe bus                                    • Up to 112 Blades
              –   Four LCSSs                                      – POWER7 Blades
              –   3 Subchannel Sets                               – IBM System x Blades
              –   FICON Express8 and 8S                           – IBM WebSphere DataPower Integration
              –   zHPF                                              Appliance XI50 for zEnterprise (M/T
              –   OSA 10 GbE, GbE, 1000BASE-T                       2462-4BX)
              –   InfiniBand Coupling Links                   • Operating Systems
              –   Flash Express                                   – AIX 5.3 and higher
           • Configurable Crypto Express4S                        – Linux for Select IBM x Blades
           • Parallel Sysplex clustering                          – Microsoft Windows for x Blades
           • HiperSockets – up to 32                          • Hypervisors
           • Up to 60 logical partitions                          – PowerVM Enterprise Edition
           • Enhanced Availability                                – Integrated Hypervisor for System x
           • IBM zAware
           • Unified Resource Manager
           • Operating Systems
              – z/OS, z/VM, z/VSE, z/TPF, Linux on System z

                                                                                                          73
Phoenix IMS Users Group


IBM zEnterprise family
        IBM zEnterprise 196 (2817)                           IBM zEnterprise Blade                       IBM zEnterprise 114 (2818)
                                                               Extension (2458)




  • Announced 7/10 – Server w/ up to 96 PU cores      • Announced 7/10                            • Announced 07/11
  • 5 models – Up to 80-way                           • Model 002 for z196 or z114                • 2 models – M05 and M10
  • Granular Offerings for up to 15 CPs               • zBX Racks with:                              ‒   Up to 5 CPs
  • PU (Engine) Characterization                          – BladeCenter Chassis                   • High levels of Granularity available
      – CP, SAP, IFL, ICF, zAAP, zIIP                     – N + 1 components                          – 130 Capacity Indicators
  • On Demand Capabilities                                – Blades                                • PU (Engine) Characterization
      – CoD, CIU, CBU, On/Off CoD, CPE                    – Top of Rack Switches                      – CP, SAP, IFL, ICF, zAAP, zIIP
  • Memory – up to 3 TB for Server and                    – 8 Gb FC Switches                      • On Demand Capabilities
    up to 1 TB per LPAR                                   – Power Units                               – CoD, CIU, CBU, On/Off CoD. CPE
      – 16 GB Fixed HSA                                   – Advance Management Modules            • Memory – up to 256 GB for Server
  • Channels                                                                                          – 8 GB Fixed HSA
      – PCIe bus                                      • Up to 112 Blades                          • Channels
      – Four LCSSs                                        – POWER7 Blades                             – PCIe bus
      – 3 Subchannel Sets                                 – IBM System x Blades                       – Two LCSSs
      – MIDAW facility                                    – IBM WebSphere DataPower Integration       – 2 Subchannel Sets
      – Up to 240 ESCON channels                            Appliance XI50 for zEnterprise (M/T       – MIDAW facility
      – Up to 288 FICON channels                            2462-4BX)                                 – Up to 240 ESCON channels
      – FICON Express8 and 8S                         • Operating Systems                             – Up to 128 FICON channels
      – zHPF                                              – AIX 5.3 and higher                        – FICON Express8 and 8S
      – OSA 10 GbE, GbE, 1000BASE-T                                                                   – zHPF
                                                          – Linux for Select IBM x Blades
      – InfiniBand Coupling Links                                                                     – OSA 10 GbE, GbE, 1000BASE-T
                                                          – Microsoft Windows for x Blades            – InfiniBand Coupling Links
  • Configurable Crypto Express3                      • Hypervisors
  • Parallel Sysplex clustering                                                                   • Configurable Crypto Express3
                                                          – PowerVM Enterprise Edition            • Parallel Sysplex clustering
  • HiperSockets – up to 32                               – Integrated Hypervisor for System x
  • Up to 60 logical partitions                                                                   • HiperSockets – up to 32
  • Enhanced Availability                                                                         • Up to 30 logical partitions
  • Unified Resource Manager                                                                      • Unified Resource Manager
  • Operating Systems                                                                             • Operating Systems
      – z/OS, z/VM, z/VSE, z/TPF, Linux on System z                                                   – z/OS, z/VM, z/VSE, TPF, z/TPF, Linux on
                                                                                                         System z

                                                                                                                                                  74
Phoenix IMS Users Group


                           • Machine Type
zEC12 Overview                 – 2827
                           • 5 Models
                               – H20, H43, H66, H89 and HA1
                           • Processor Units (PUs)
                               – 27 (30 for HA1) PU cores per book
                               – Up to 16 SAPs per system, standard
                               – 2 spares designated per system
                               – Dependant on the H/W model - up to 20, 43, 66,89, 101 PU cores
                                 available for characterization
                                   • Central Processors (CPs), Internal Coupling Facility (ICFs),
                                     Integrated Facility for Linux (IFLs), System z Application Assist
                                     Processors (zAAPs), System z Integrated Information
                                     Processor (zIIP), optional - additional System Assist
                                     Processors (SAPs)
                               – Sub-capacity available for up to 20 CPs
                                   • 3 sub-capacity points
                           • Memory
                               – RAIM Memory design
                               – System Minimum of 32 GB
                               – Up to 768 GB per book
                               – Up to 3 TB for System and up to 1 TB per LPAR
                                   • 32 GB Fixed HSA, standard
                                   • 32/64/96/112/128/240/256 GB increments
                               - Flash Express
                           • I/O
                               – 6 GBps I/O Interconnects – carry forward only
                               – Up to 48 PCIe interconnects per System @ 8 GBps each
                               – Up to 4 Logical Channel Subsystems (LCSSs)
                                   – Up to 3 Sub-channel sets per LCSS
                           • STP - optional (No ETR)
                                                                                                    75
Phoenix IMS Users Group



zBX Overview               • Machine Type/Model 002458-003
                           • Racks – Up to 4 (B, C, D and E)
                              – 42U Enterprise, (36u height reduction option)
                              – 4 maximum, 2 chassis/rack
                              – 2-4 power line cords/rack
                              – Non-acoustic doors as standard
                              – Optional Acoustic Doors
                              – Optional Rear Door Heat Exchanger (conditioned water required)
          2458-003         • Chassis – Up to 2 per rack
                              – 9U BladeCenter
                              – Redundant Power, cooling and management modules
                              – Network Modules
                              – I/O Modules
                           • Blades (Maximum 112 single width blades in 4 racks)
                              – Customer supplied POWER7 Blades (0 to 112)
                              – Customer supplied IBM System x Blades (0 to 56)
                              – DataPower XI50z, M/T 2462-4BX (0 to 28 – double width)
                           • Management Firmware
                              – Unified Resource Manager
                           • Top of Rack (TOR) Switches - 4
                              – 1000BASE-T intranode management network (INMN)
                              – 10 GbE intraensemble data network (IEDN)
                              – GbE IEDN for customer network
                           • Network and I/O Modules in the BladeCenter
       Fibre Channel          – 1000BASE-T and 10 GbE modules
       Disk Storage
                              – 8 Gb Fibre Channel (FC) connected to customer supplied disks



                                                                                                 76
Phoenix IMS Users Group


 zEnterprise EC12 Functions and Features
 (GA Driver Level 12K – September, 2012)OSA-Express 4S 1000BASE-T
Five hardware models                            CFCC Level 18
Six core 32nm PU chip                           IBM zAware
Up to 101 processors configurable as            On Demand enhancements
CPs, zAAPs, zIIPs, IFLs, ICFs, or
optional SAPs                                   Non-Raised floor option for Air Cooled
                                                System only with overhead I/O and
Increased capacity processor (1.25 x    zEC12
                                                power cabling options
z196)                                           Raised floor option for Air and Water
Up to 20 sub capacity CPs at capacity           Cooled System with overhead I/O and
settings 4, 5, or 6                             power cabling options
z/Architecture Enhancements including           New ‘radiator’ design for Air Cooled
2 GB Pages, Transactional Execution             System
and Runtime Instrumentation
                                                Optional water cooling with Exhaust Air
2nd Generation out-of order design              Heat Exchanger & air backup
Enhanced processor cache design                 Cycle Steering for Power Save and
                                                back-up for radiator and water cooled
Dedicated data compression and
                                                systems
crypto coprocessor on each PU
                                                Optional High Voltage DC power
Up to 3 TB of Redundant Array of
Independent Memory (RAIM)                       Static Power Save Mode
Flask Express and pagable large page
support                                         Optional overhead Power and I/O
                                                cabling
Crypto Express4S and Cryptographic
enhancements                                    NTP Broadband Authentication

New Channel path selection algorithms           zBX Model 003 and Unified Resource
                                                Manager
                                                                                          77
Phoenix IMS Users Group



 zEnterprise zBX Functions and Features

One hardware model                                    Advance Management Module

zBX is controlled by one specific zEC12               1000BASE-T and 10 GbE TORs

Up to 4 Racks (B, C, D and E)                         Up to 112 Blades
                                            zBX
2 BladeCenters Chassis per rack                       POWER7 Blades
                                          Model 003
Non-acoustics doors standard                          IBM System x Blades
                                                      IBM WebSphere DataPower Integration
Optional Rear Door Heat Exchanger                     Appliance XI50 for zEnterprise
Optional Rear acoustic door                           Additional connectivity for SANs
Redundant Power, Cooling and
Management Modules                                    HMCs for Unified Resource Manager

10 GbE and 1 GbE Network Modules                      Upgraded Hypervisor levels

8 Gb FC modules                                       Unified Resource Manager support for
                                                      zEC12 and zBX Model 003
IEDN 10 GbE link aggregation between
the BladeCenter and TORs                              Unified Resource Manager support for
                                                      ensembles with zEC12, z196, z114, and
                                                      zBX Models 002 and 003




                                                                                              78
Phoenix IMS Users Group


zEnterprise was Introduced with the z196 at its Heart

                     Improvement for
                                                   zEnterprise 196 (z196)
     Up to
                      traditional z/OS              Machine Type: 2817
     40%                 workloads1
                                              Models: M15, M32, M49, M66, M80
                    Improvement in CPU       World’s fastest 5.2 GHz processor chip
     Up to an
     additional   intensive workloads via
                  compiler enhancements      – 100 new instructions, new out of order sequence,
     30%                                       more on chip cache
     Up to            Total capacity         Focus on the environment and data center
     60%              improvement1
                                             – Options to help eliminate hotspots and save on
     1 to 80 configurable cores for client     energy
     use
                                             Operating System Flexibility
     IFL, zIIP, zAAP, ICFs and optional
     SAPs                                    – z/OS, z/VM®, z/VSE®, z/TPF and Linux on System z
     45 subcapacity settings                 Security and reliability
     Up to 3 TB RAIM memory
                                             – Elliptic curve cryptography
     Cryptographic enhancements
                                             – Compliance and security improvements
     Designed for EAL5 certification
                                             – Crypto Express3 enhancements
     Upgradeable from IBM System z10®
     Enterprise Class (z10 EC™) and IBM
     System z9® Enterprise Class (z9®
     EC)
                                                                    1. For average LSPR workloads running z/OS 1.11.
79                                                                                                                79
Phoenix IMS Users Group

     z196 – IBM Leadership Technology At the Core

     New 5.2 GHz Quad Core Processor Chip boosts
     hardware price/performance
     – 100 new instructions – improvements for CPU
       intensive, Java™, and C++ applications
     – Over twice as much on-chip cache as System z10 to
       help optimize data serving environment
     – Out-of-order execution sequence gives significant
       performance boost for compute intensive applications
     – Significant improvement for floating point workloads
     Performance improvement for systems with large
     number of cores – improves MP ratio
     Data compression and cryptographic processors
     right on the chip




80                                                            80
Phoenix IMS Users Group


zEnterprise Technology Designed for Small and Mid-sized
Businesses - the z114
                                                                                                                                          Up to
                                                                                                                                                              Improvement for traditional
                                                                                                                                                   18%        z/OS workloads 1
                      zEnterprise 114 (z114)                                                                                              Up to an
                                                                                                                                          ADDITIONAL

                        Machine Type: 2818                                                                                                                    Improvement in CPU
                                                                                                                                                   25%        intensive workloads via
                       2 Models: M05 & M10                                                                                                                    compiler enhancements2
                                                                                                                                          Up to

     New technology in a new package                                                                                                               12% Total capacity improvement 1
        ►         Modular 2 drawer design for lower cost of entry                                                                         Scales


        ►         Granularity for right-sizing your system
                                                                                                                                          From
                                                                                                                                                   26 - 3100 MIPS
        ►         Additional Scale for consolidation and growth                                                                           Up to

                                                                                                                                                   130 available capacity settings
        ►         Improved data center efficiency
        ►         Same Qualities of Service as the z196                                                                                   From



        ►         Hybrid enabled to drive workload integration and
                                                                                                                                                   1-10 configurable cores for client
                                                                                                                                                   use includes CPs, IFL, zIIP, zAAP,
                  management                                                                                                                       and ICFs
     Improved Platform Economics                                                                                                          From


        ►         New Software Curve                                                                                                               0-2 IBM provided spare cores
        ►         Lower Hardware Maintenance                                                                                              Up to


        ►         Lower specialty engine and memory prices                                                                                         256 GB RAIM fault tolerant memory
        ►         Upgradeability for investment protection                                                                                   Fully Upgradeable from the IBM System z10
                                                                                                                                             Business Class™ (z10 BC) & IBM System z9®
                                                                                                                                             Business Class (z9 BC); and to the z196 M15
   1Relative   capacity and performance compares at equal software levels as measured by IBM Large System Performance Reference (LSPR) workloads using z/OS® 1.11, Results may vary
81 2The z114 will exhibit up to 25% increase for CPU intensive workload as provided by multiple C/C++ compiler level improvements when going from z/OS 1.09 to z/OS 1.12                    81
Phoenix IMS Users Group



 z114 – IBM Leadership Technology At the Core
     3.8 GHz Superscalar Processor Chip boosts hardware
     price/performance
     – 100 new instructions – improvements for CPU intensive,
       Java™, and C++ applications
     – New on-chip cache structure to help optimize data serving
       environment
     – Out-of-order execution sequence gives significant
       performance boost for compute intensive applications
     – Significant improvement for floating point workloads
     Data compression and cryptographic processors
     right on the chip
     Over 18 percent performance improvement per core
     and 12% improvement in total system scalability over
     the z10 BC.
     Compiler related enhancements help drive gains of
     up to 25% improvement in throughput for
     CPU/Numeric intensive workloads.




82                                                                 82
Phoenix IMS Users Group



 Blades Provide Added Flexibility for Workload
 Deployment and Integration
                                                                              IBM zEnterprise
     IBM System x Blades                                                BladeCenter Extension (zBX)
      – IBM BladeCenter HX5 7873 dual-socket 16-core blades             Machine Type: 2458 Mod 002
      – Four supported memory configurations for zBX – 64 GB, 128 GB,
        192 GB, 256 GB                                                   Optimizers
                                                                         • IBM WebSphere DataPower
     IBM POWER7 Blades                                                     Integration Appliance XI50z for
      – IBM BladeCenter PS701 8-core processor 3.0GHz                      zEnterprise

      – Three configurations supported in zBX - 32 GB, 64 GB, 128 GB
                                                                         Select IBM Blades
     Flexibility in ordering – acquired though existing                  • IBM BladeCenter PS701 Express
     channels, including IBM                                             • IBM BladeCenter HX5 (7873)

     Unified Resource Manager will install hypervisor on
                                                                         One to four – 42u racks –
     blades in the zBX                                                   capacity for up to 112 blades
      – Integrated hypervisor (KVM-based) for System x blades
      – PowerVM Enterprise Edition for POWER7 blades
                                                                         • Up to 112 PS701 Power blades
     Up to 112 Blades supported on zBX
                                                                         • Up to 56 HX5 System x blades
      – Ability to mix and match blades in the same chassis
                                                                         • Up to 28 DataPower XI50z
      – Number of blades supported varies by type                          blades (double-wide)
     Blades assume System x warranty and maintenance
     when installed in the zBX

83                                                                                                           83
Phoenix IMS Users Group


Service levels to match your business needs
Increased flexibility for your multi-architecture strategy when data is on z/OS
                                                                    zEnterprise System
                                                                                                    Extreme scalability and
                                                                                                    performance for
                                                                       Extreme consolidation of     transaction processing
                                                                       servers and networking       and data serving
                                                                       Superior levels of virtual   High availability and
                                       Expanded ISV support            server provisioning,         cross-system scalability
                                                                       monitoring and workload      with Parallel Sysplex® and
TCO                                    for enterprise
                                       applications
                                                                       management                   GDPS®
                                                                       Industry-best virtual I/O
Focus         Silo managed islands
              of computing                                             bandwidth and reliability
                                                                                                    Leading policy-based
                                       Targeted for                                                 capacity provisioning and
                                       applications that interact      Fewer components and
                                                                                                    workload management
              Less dynamic than z                                      reduced complexity
                                       with mainframe data                                          Pervasive, high-
              virtualization           and transactions                System z qualities of
                                                                       dynamic resource             performance security
                                                                       management and               support
              Minimal resource         Provisioned and
              sharing with z                                           capacity-on-demand
                                       managed by System z
              resources                                                Seamless integration with
                                                                       z/OS backup and disaster
                                                                       recovery solutions                  z/OS

                                                                      Linux on z/VM®
                                     Select IBM Blades
                                           in zBX
              Distributed
TCA            Systems
Focus



          LOWER                           SCALABILITY, SECURITY,                                                 HIGHER
                                      DYNAMIC WORKLOAD MANAGEMENT
                                                                                                                                 84
Phoenix IMS Users Group


Increasing your flexibility using zEnterprise Systems
Additional offerings can help to strengthen business innovation




                                                          Unified Resource
                          PureSystems
                                                              Manager

                            10 GbE                                           Select IBM Blades             Optimizers



                                                               10 GbE




                                                                                                                                DataPower XI50z
                                                                                                              DataPower XI50z
                                                                IEDN    Linux on   Windows        AIX on
                                                                        System x      on         POWER7
                                                                                   System x




                                                               1 GbE
                                                               INMN
                 10 GbE




                                              z196/z114                                       zBX
 IBM DB2 Analytics
 Accelerator (IDAA)                     HMC

85                                                                                                                                                85
Phoenix IMS Users Group



  Underpinned by a thriving System z ecosystem

          Thousands of ISVs                        Worldwide adoption of
          invest in System z                       mainframe curriculum
7,000+         1,200 new        120+ new   1067        43,825            SystemzJobs.com
applications   and              ISV        schools     students from     connects System
supported      upgraded         partners   enrolled    32 countries      z clients, partners
on z (3250+    applications     added to   with more   participated in   and businesses
Linux and      on System z      the        adding      Master the        with students and
4000+ z/OS)    in 2010          platform   curricula   Mainframe         professionals
                                                       contests          seeking z jobs




 86                                                                                       86
Phoenix IMS Users Group

Extensive ISV support for zEnterprise




87                                      87
Phoenix IMS Users Group


What is the IBM Academic Initiative?




     Membership in the IBM Academic Initiative is free and open to
     individual faculty members.
     A skills initiative – An IBM program that partners with academic institutions
     worldwide to build a pipeline of skilled students for the IT jobs of tomorrow
     and skills for a smarter planet.

     System z Mission (ibm.com/university/systemz):
       Assist clients world wide with z skills
       Demonstrate IBM’s commitment and continued investment in the
       mainframe
88                                                                                   88
Phoenix IMS Users Group

IBM System z courses
Foundational principles                 Tivoli security, systems, network, and storage    Application development
 Intro to the Mainframe: z/OS Basics*   management courses
                                                                                          WebSphere Application Server for z/OS
 Intro to the Mainframe: Networking*     IBM Tivoli License Compliance Manager for z/OS
                                                                                           Intro to IBM WebSphere Developer for z
                                        4.2 Implementation
 Intro to the Mainframe: Security*                                                        (Web based)
 Intro to the Mainframe: Large Scale     IBM Tivoli System Automation for z/OS 3.1         WebSphere MQ for z/OS System
Commercial Computing                    Introduction and Operations                       Administration
Operating systems                        IBM Tivoli System Automation for z/OS 3.1         Developing COBOL with IBM Rational
 Linux on System z                      Implementation and Administration                 Developer for System z
 Introduction to z/VM®                   IBM Tivoli Workload Scheduler 8.2 for zOS
 Introduction to z/VSE Basics           Scheduler's Workshop
                                        Information, data and transaction management      Diagnosis
 UNIX® System Services (Module)
                                         Enterprise Server Data Management                z/OS RAS and Diagnostics*
User interfaces
 ISPF: z/OS Basic Interfaces             DB2 for z/OS Fundamentals
Storage management                       DB2 Family Fundamentals (Cross product)
 VSAM                                    DB2 SQL Workshop (Cross product)                 eLearning resources
Programming languages                    DB2 for z/OS Database Admin Workshop, Part 1     Interactive e-Learning Module: z/OS Basics
 Assembler                               DB2 for z/OS Database Admin Workshop, Part 2      Flash Demo: Introduction to Rational
 COBOL                                   DB2 Programming Workshop for z/OS                Developer for System z
 JCL                                     DB2 for z/OS Application Development              Develop a batch DB2 for z/OS COBOL
Other                                    DB2 for z/OS Query Optimization and              application using RDz
                                        Performance Tuning                                 Developing and debugging a COBOL DB2
 Developing COBOL with Rational
                                         Intro to IMS*                                    application
Developer for System z V7.6
                                         IMS Fundamentals                                  Editing record-oriented programs with the
 z/OS Advanced Topics*
                                                                                          System z LPEX editor
 z/OS Emerging Technologies*             An Introduction to IMS (Textbook reference)
                                                                                          Learn about your future in Large Systems
 z/OS Installation                       Transaction Management
                                                                                          Careers in Mainframes
                                                            *available in audio version




                                                                                                                                       89
Phoenix IMS Users Group



Introducing SystemzJobs.com - The link to your future career
The IBM System z Job Board at SystemzJobs.com is a new resource that connects students
learning IBM Enterprise Systems with companies hiring talent.


Benefits of using SystemzJobs.com             Getting started
  Free, secure, and easy to use               Follow these steps at SystemzJobs.com to
  Fast access to the best jobs in the         get started:
  IT industry
                                              1. Create a secure account (optional)
  Global pool of available jobs
                                              2. Search for jobs with your preferences
                                              3. Connect with employers




                                              Sponsored by the
                                              IBM Academic Initiative, System z
                                              Visit: ibm.com/university/systemz


                                              Questions? Contact zSkills@us.ibm.com
                                                                                         90
Phoenix IMS Users Group

The new IBM zEnterprise is designed to help top
performing organizations transition from the process
centric, programmable era of IT to the information
centric, cognitive era of IT.
 Deliver significant cost      Provide protection and       Build intelligence in to
 savings for existing          24/7 availability for core   the business transaction
 operations while freeing      business operations and      to expand the value of the
 up resources to focus on      provides a secure and        transaction, create new
 new services to drive         stable information source    transactions and improve
 growth                        for new customer facing      customer service
                               services

          These core capabilities are strengthened through the delivery
                 of key technologies and continued innovation.




91                                                                         © 2012 IBM Corporation
                                                                                                91
Phoenix IMS Users Group



zEnterprise EC12: Operational Analytics
Delivering information and insight to enable intelligent
decisions

 zEnterprise EC12 increases throughput up to 30% for a DB2® for z/OS® operational
 analytics workloads as compared to z196
 With IBM DB2 Analytics Accelerator (IDAA) clients can deploy business analytics on the
 same platform as operational applications
 Integration of analytics scoring within an OLTP transaction enables faster decision making
 IDAA on zEnterprise EC12 can offer up 12X improvement in price / performance vs. the
 competition
 With Cognos® on System z customer queries that previously ranged from 25 seconds to
 90 minutes now take 8 seconds or less




                                                                                              92
Phoenix IMS Users Group

zEnterprise EC12: Superior availability by design
Delivering a resilient environment for core business processes
and data

  New operational diagnostics with IBM zAware
   – Analytics on log data provides a near real time view of current
     system state
   – Cutting edge pattern recognition helps pinpoint deviations in
     system behavior
   – Provides information to enable faster corrective action            24x7
                                                                        24x7
  New Flash Express Card to exploit Flash Memory
   – Automatically improve availability for key workloads at critical
     processing times
   – Reduces latency for critical application processing such as
     diagnostics collection
   – Improves availability for workloads that cannot tolerate paging
     spikes or inconsistent performance




                                                                               93
Phoenix IMS Users Group



zEnterprise EC12: Ultimate security by design
New and enhanced capabilities to improve customer trust and
confidence


 High speed cryptography integrated on the new Crypto Express4S chip to
 protect sensitive data from unauthorized users
 Enhanced digital signature capability with new Enterprise PKCS #11 to meet
 regulatory requirements
 New credit transaction verification support for smart payment cards
 Centrally protect multiple, mixed workloads running in separate partitions
 Integration of mainframe security events with IBM zSecure Suite and QRadar to
 enhance security intelligence




                                                                                 94
Phoenix IMS Users Group


IBM zEnterprise EC12 enables improved services for your
clients
Cloud ready
 • New 5.5 GHz 6-core processor chip and 50%
   increase in capacity enables flexible delivery of
   services though a private cloud.
 • Virtualization means fewer resources are required to
   meet peak demands with optimized interconnection.
Data ready
 • IBM zAware is a self-learning expert solution to
   reduce risk of downtime impacting data availability
   for critical business processes.
 • Connecting the most sophisticated data warehousing
   and analytics solutions with the fastest query
   performance in the market
Security ready
 • Most secure system with 99.999% reliability
 • Superior security with high-speed cryptography
   integrated as part of the chip protects customer
   privacy and reduces risk of breaches.




                                                          95
Phoenix IMS Users Group



 A “System of Systems” for Predictable Service Delivery
 IBM zEnterprise EC12 or 196 (z196) or
 IBM zEnterprise 114 (z114)
     Optimized to host transaction, and mission-critical
     applications
     The most efficient platform
     for large-scale Linux® consolidation
     Massive scale-up – 26 MIPS to over 78K MIPS

zEnterprise Unified Resource Manager
     Unifies management of resources, extending IBM
     System z® qualities of service end-to-end across
     workloads
     Provides platform, hardware and workload management

zEnterprise BladeCenter® Extension (zBX)
     Selected IBM POWER7® blades and IBM System x® blades for
     deploying applications in a multi-tier architecture
     High-performance optimizers and appliances to accelerate time to
     insight and reduce cost
     Dedicated high-performance private network


96                                                                      96
Phoenix IMS Users Group




                           What’s new with z/OS and z/OS
                           Management Facility Version 1 Release 13




97                                                                    97
Phoenix IMS Users Group


Agenda


     z/OS® and z/OS Management Facility
     function and value
                                          z/OS and
     Integration with IBM zEnterprise™    z/OS Management Facility R13
     System                               Available today




98                                                                       98
Phoenix IMS Users Group


z/OS – Smarter Operating System for Smarter Computing




     z/OS V1.13 – Performance, programming, and operations
     improvements help you to gain more value from your workloads.
     http://www.ibm.com/systems/z/os/zos/


     z/OSMF V1.13 - Streamlined processes and built-in guidance address
     a broad scope of z/OS activities and helps create a more integrated
     z/OS experience and improved productivity
     http://www-03.ibm.com/systems/z/os/zos/zosmf/




                                                                           99
Phoenix IMS Users Group


z/OS R13 – Smarter Operating System for Smarter Computing

     Improved performance, programming, and operations provide
     more value from your workloads.
     Enhancements in z/OS and z/OS Management Facility Version 1
     Release 13 help provide:

          Advantages for your organization. Autonomics and smart operations
          proactively avoid errors, reduce risk from outages, speed software
          deployment, simplify z/OS management, and make your organization more
          productive.

          Advantages to your business. Foundation for modern batch capability,
          industry leading security, resiliency, and data handling capability enables
          you to access and transform business data to business value more readily.

          Advantages to your operations. Improved performance and new
          technologies for Web-based and traditional workloads improves integration
          of core data in your enterprise and opens new opportunity for applications
          with affinity to z data.



                                                                                        100
Phoenix IMS Users Group


z/OS R13 – Smarter Operating System for Smarter Computing

    More value from your workloads with programming, performance, and
    operations improvements. Enhancements for release 13:
      Foundation for modern batch applications
             A new z/OS base component, z/OS Batch Runtime environment, provides the framework for Java-to-COBOL interoperability,
             for transactional updates to DB2, and for sharing database connections between Java and COBOL. *
             Simplified batch application programming and potentially shortened batch windows, with new JES2 JCL improvements, giving
             you more control of your batch applications.
             Leverage the strength of z/OS batch, a new web-based (REST) interface enables you to submit batch jobs and access batch
             data from non-z/OS systems**

      Improved performance for new and traditional workloads***:
             Between 50% and 150%* I/O performance improvement for workloads using shared zFS in a Parallel Sysplex.
             Up to 15% to 55%* IEBCOPY performance improvement for traditional workloads
             Potentially shorter batch windows using JES2 JCL improvements to free tape volumes more quickly

      Availability enhancements:
             Improve spool volume management by using new JES2 spool migration function and JES3 dynamic spool add capability
             Improved channel recovery - track errors and automatically remove failing paths (on a controller level) faster
             zFS internal restart - automatically recover disabled aggregates in Sysplex aware mode – avoiding lengthy manual system
             recovery process.
             Avoid planned outages - Concurrent service for DADSM and CVAF


* Prerequisites: IBM 31-bit SDK for z/OS, Java Technology Edition Version 6.0.1 (5655-R31), DB2 V9.1 for z/OS (5635-DB2) or later with PTFs, IBM Enterprise
COBOL for z/OS V4.1 (5655-S71) or later
** Prerequisite: RESTful API included in z/OSMF V1.13.
*** Based on IBM Lab results, your results will vary.
        I/O performance improvements measured for fully shared zFS ranged from very small to 900%, with the majority of workload conditions tested falling
        between 50% and 150%. The actual amount of improvement will depend on the environment (monoplex or Parallel Sysplex) and the type of file processing
        being done.
        IEBCOPY improvement will depend on conditions such as: the amount of data being copied, block size, and type of IEBCOPY operation
                                                                                                                                                               101
Phoenix IMS Users Group


z/OS Management Facility – the new face of z/OS



          Streamlined processes and built-in guidance address a broad scope of
          activities and helps create a more integrated z/OS experience.
           Configuration
                  Configuration Assistant for z/OS Communication Server (R11) – Simplified configuration and setup of TCP/IP policy-
                  based networking functions
           Performance
                  Capacity Provisioning (R13) - simplified monitoring of CP status for domains
                  Resource Monitoring and System Status (R12) – single view of sysplex and Linux® performance status and dynamic
                  real time resource metrics.
                  Workload Management – creation, editing, and activation of WLM policies (R12)
           Problem Determination
                  Incident Log (R11) – Simplified capture, packaging, sending of SVC dump diagnostic data
           Software
                  Deployment (R13) - Clone z/OS images, deploy software more easily and consistently
           z/OS Classic Interface
                  ISPF Task integrates existing ISPF into z/OSMF to launch to ISPF functions directly (R13)
           Base
                  A new web-based (REST) interface enables you to submit batch jobs and access batch data from non-z/OS systems
                  (R13)
                  Leverage System z Specialty engines
                  IBM Assistance available to help with pre-planning, early discovery, and readiness review for new z/OSMF
                  environment(s).




                                                                                                                                       102
Phoenix IMS Users Group


      z/OSMF Software Deployment (R13)
      New! - simplified deployment of installed software


       New task designed to make deployment of installed software simpler and safer.
       – Easy to follow checklist replaces manual and error prone procedures with a user friendly application
       – Incorporates IBM recommended best practices for software deployment.
       Software Deployment can clone software
       – Locally, single system or within a sysplex
       – Remotely, across a network, and multiple sysplexes.
       Software Deployment can also:
       – Identify, modify, delete software instances
       – Generate jobs to copy a software instance
       – Verify cross-system and cross-product requisites,
         verify fixes
       – Copy ALL parts of the software (SMP/E CSI
         inventory too)
       Clones all SMP/E installed software!
       – IBM, ISV, z/OS, stack or individual products
       – Service upgrades for all of the above (via complete replacement)
103                                                                                                             103
Phoenix IMS Users Group

z/OSMF Incident Log (R11)
Save hours of time when diagnosing incidents


      Respond to and manage
      incidents quickly and efficiently
       – View, sort, and act on incidents (identified
         by subsystem)
       – Package dump data for transmission in
                                                                               Many fields, set tracking IDs
         minutes
                                                                               Can identify which subsystem
      For z/OSMF R12
         Add additional comments and diagnostic         Select incident, get
         data                                           popup with actions
         Encrypted parallel FTP of the incident
         files, to IBM .
         Sending additional user-defined data with
         an incident


      For z/OSMF R13
         New APAR search
         View job status via SDSF launch
         Utilizes new Problem Documentation
         Upload utility in base of z/OS R13
         Also available as a download from
                                                                                   Note, screen capture from z/OSMF R12
         http://www14.software.ibm.com/webapp/set2/s
         as/f/zaids/pduf.html

104                                                                                                                       104
Phoenix IMS Users Group


Application Linking (R13)
Example, link Incident Log to SDSF in context

      A more seamless experience
      when working with z/OS.
      Make your own linkages
      between z/OSMF apps and even
      to any web-based apps




      Define an ‘event’ (such as “View
      Job Status”)
                                             A c tion from the Inc ident Log:
                                           Launc h to view job s tatus - S D S F



      Then define the ‘event handler’
      action and parameters (such as ‘go
      to ISPF’ with context of the job)




105                                                                                105
Phoenix IMS Users Group


Resource Monitoring (R12)
A snapshot of the performance of workloads running on your systems

 Sysplex status:
  – Instant snapshot of workload
    performance
  – RED, YELLOW GREEN status
    gives instant indication of WLM
    goals
  – Monitor z/OS AND Linux
  – Drill down to see RMF™ metrics
  – Renamed System Status (R13)


 Monitoring Desktops
  – GUI for RMF
  – Monitor most Resource
    Measurement Facility (RMF)
    Monitor III metrics, create and
    save custom views, and display
    real-time performance data as bar
    charts.
  – Renamed Dashboards (R13)

                                                        Note, screen captures from z/OSMF R12
Phoenix IMS Users Group

Integrated z/OS and Linux resource monitoring
A monitoring solution for multi-tier workloads



      Monitor the resources for z/OS
      and Linux workloads

      Ideal for use with System z
                                                                      Processor Utilization
      Enterprise System
                                                                      of Linux Processes


      For z/OSMF R12
       – Use separate as-is, no-charge
         web-download tool to gather
         resource information for Linux
         systems.


      For z/OSMF R13
       – New integrated performance data
         gatherers for Linux on System z,
         Linux on IBM System x®, and
         AIX® systems
       – Additional monitoring capabilities   Processor Utilization
                                              of z/OS Jobs
         for your zEnterprise System                                  Note, screen capture from z/OSMF R12



107                                                                                                     107
Phoenix IMS Users Group

New programmatic interface for z/OS batch
Function delivered with z/OSMF R13
A new REST API (HTTP(s)-based) interface to z/OS
Easy programmatic access to the power of z/OS batch capabilities
– REST API web services can be used by: web applications (javascript/AJAX, Flex(Flash), etc)
  and other web service clients, such as Java, PHP, Perl, etc
– The REST API web service will connect to both JES2 and JES3, as well as select secondary
  subsystems




   Today:                                                  New option today
   Complex programming                                     Any web-based, Java, PHP, Perl
    – Allocate and open internal reader
    – TSO/ISPF submit,
                                                           application, etc. supporting HTTP
    – FTP “interface-level2”                               New RESTful HTTPs based API
    – Java z/OS submit interface                           Highly secure, firewall friendly,
   Security protocol limitations                           Simplified text-like programming


                                                    Break the barriers of batch
                                              Submit JCL, get status, retrieve output
                                          files, change jobclass, cancel job, purge job

                                                           z/OS JES2 and z/OS JES3

                                                                                               108
Phoenix IMS Users Group



      z/OS R13 - The foundation for modern batch


      About 90% of customers consider batch mission critical*
      Challenge: Greater volumes of data and larger batch and on-line processing windows.
      Solution: Need to make batch more efficient.

       Expand existing COBOL applications with                 Shorter batch windows!
       Java!                                                   – New function in z/OS helps make batch processing
       – More choice for application development skills          more efficient
       – Leverage specialty engines!                           – “Pipe” data between two batch jobs to enable these
                                                                 jobs to perform concurrent reads and writes

       Simplified programming!
                                                               Real time batch!
       – Enhancements in z/OS simplify the development
         and maintenance of existing batch applications.       – WebSphere® Compute Grid delivers a batch
                                                                 environment capable of supporting 24x7 batch and
       – Enable distributed applications to access the power     OLTP processing, and parallel computing
         of z/OS batch




109
           * IBM Market Research                                                                                      109
Phoenix IMS Users Group


      z/OS R13 - The foundation for modern batch (detail)

      Expand existing COBOL applications!                                              Shorter batch windows
      – The z/OS Batch Runtime environment, provides Java-to-                          – Allow overlapping processing for multi-
        COBOL interoperability, for transactional updates to DB2®, and                   volume data sets (FREEVOL=EOV, R13)
        for sharing database connections between Java and COBOL
        (R13)*                                                                         – Avoid recalling migrated datasets, just to
        Ideal for processing for computationally intensive programs                      delete them (IEFBR14, R11)
        and extensions                                                                 – “Pipe” data between two batch jobs to
      – Use JZOS Batch Toolkit for z/OS for efficient use of z/OS                        enable these jobs to perform reads and
        System interfaces for Java batch (IBM Java SDKs for z/OS)                        writes concurrently (BatchPipes®, 5655-D45)

      – Leverage specialty engines!                                                    Real time batch

      Simplified programming!                                                          – WebSphere Compute Grid delivers a
                                                                                         resilient, highly available, secure, and
      – JES2 JCL enhancements provide in-stream data in catalogue                        scalable runtime with container-managed
        procedures, more options on setting job return codes, and the                    services for batch applications
        ability to stop and hold a job at the end of a step (not just at
        the end of the job) give much more granularity and control                     – Capable of supporting 24x7 batch and OLTP
        (z/OS R13)                                                                       processing, and parallel computing

      – An new REST API allows you to submit z/OS batch jobs and
        retrieve z/OS batch job information from distributed systems
        as well as z/OS systems; and is intended to make z/OS batch
        processing much more accessible to distributed systems and
        web-based processes (z/OS and z/OSMF R13)




                         * Prerequisites:
                                IBM 31-bit SDK for z/OS, Java Technology Edition, Version 6.0.1 (5655-R31)
110                             DB2 V9.1 for z/OS (5635-DB2) or later with PTFs                                                        110
                                IBM Enterprise COBOL for z/OS V4.1 (5655-S71) or later
Phoenix IMS Users Group


  Additional z/OS R13 simplification enhancements

      Health Checker Framework, updates
      – Greater ability to schedule health checks
      – Ability for checks to raise message severity as conditions change
      New health checks:
      – Two new checks for Allocation – intended to warn about potential Allocation deadlock
        conditions
      – Detects tape library initialization errors with suggestions on how to resolve.
      New Migration checks for:
      – zFS configuration options, new symbolic links, z/OS console mode of operation
      DFSMSrmm™, updates:
      – NEW automatic recovery for missing our out-of-sequence tape volumes. For multivolume
        data sets, DFSMSrmm will attempt to return the corrected list
      – New ability to specify data sets by expiration date or VRS policy management. Help simplify
        retention policies, avoid batch VRS policy management, and enable you to determine how
        long a tape data set will be retained
      DFSMSdfp™ updates:
      – New includes the explanatory text for Open, Close, and End of Volume error conditions along
        with the error message.
      SMF dump improvement for log streams (SMF dump to log stream introduced with z/OS R9)
111                                                                                                   111
Phoenix IMS Users Group

z/OS Availability Enhancements

      Availability enhancements (with R13)

      – Avoid JES2 re-starts with JES2 dynamic spool migration, rapidly
        discontinue and drain spool volumes quickly

      – Avoid JES3 re-starts with JES3 dynamic spool add

      – Improved channel recovery - track errors and automatically remove
        failing paths (on a controller level) faster                          Smart!
      – zFS internal restart - automatically recover disabled aggregates in
        Sysplex aware mode – avoiding lengthy manual system recovery
        process.

      – Automatic rerouting and recovery of z/OS system name server
        resolver

      – Concurrent service for DADSM and CVAF and DADSM dynamic
        exits – avoid planned outages




112                                                                                    112
Phoenix IMS Users Group


 z/OS Availability Enhancements
 Parallel Sysplex updates for R13
   Fully shared zFS in a sysplex!
   – Between 50% (1.5x) and 150% (2.5x)* I/O performance improvement for any z/OS UNIX workload
     using shared zFS in a Parallel Sysplex®. Applications that use zFS, such as z/OS UNIX System
     Services and WebSphere Application Server for z/OS, are expected to benefit
   – Also: Less-disruptive recovery from most internal zFS problems (for both single system and sysplex-
     aware systems)
   – Also: A new health check for zFS configuration files
   Simplified software deployment – clone z/OS and software in a sysplex (z/OSMF R13)
   Eliminate the need for WebSphere MQ for SDSF Sysplex environments.
   Automatic monitoring, takeover, and recovery to prevent CSM-constrained conditions
   NEW Easier to use XCF signaling protocol
   Updated volume information on all systems in the sysplex when DFSMSdss™ or
   DFSMShsm™ Fast Replication Backup and Recovery processing complete
   More responsive to VIPA changes
   Workload balancing of IPsec IKEv2 and IPv4.


* I/O performance improvements measured for fully shared zFS ranged from very small to 900%, with the majority of workload conditions
tested falling between 50% and 150%. The actual amount of improvement will depend on the environment (monoplex or Parallel Sysplex)
and the type of file processing being done.                                                                                             113
Phoenix IMS Users Group

NEW suite of GDPS solutions
IBM GDPS active/active continuous availability family of solutions is the
next generation of GDPS


                                  IBM Geographically Dispersed Parallel Sysplex (GDPS)


                                 GDPS/PPRC                                 GDPS/MGM
        GDPS/HyperSwap                                 GDPS/GM                                      GDPS
          ™ Manager               Continuous                               GDPS/MzGM
                                                       GDPS/XRC                                 active/active
           Continuous            availability or                             Continuous
                                                    Disaster recovery                         Near-continuous
        availability of data   disaster recovery            at                availability    availability across
          within a data             within a            extended            regionally and        unlimited
              center              metropolitan                            disaster recovery
                                                        distances                                 distances
                                    region                                extended distance



      GDPS/ A-A concept: two or more data centers
      running the same applications and data with
      cross-site workload balancing and replication
      • z/OS workload monitoring, management, and
      distribution
      • z/OS data and transaction replication
      • GDPS automation
      • First configuration is ‘Active Standby’


114                                                                                                                 114
Phoenix IMS Users Group


IBM GDPS active/active continuous availability family of solutions
The next generation of GDPS


        Challenge
        – Multi-site, global-distance solutions may take up to an hour to
          recover full application availability at the remote site.
        What’s New
        – GDPS/ Active-Active solution, Active Standby configuration*
        – Designed to provide continuous availability for two or more sites
          separated by global distances and achieve Recovery Time
          Objective of 1 minute or less**
        – Statement of Direction for Active Query configuration***
        Value
        – Automated recovery of z/OS applications means recovery can be
          faster and without human error
        – A complete solution for continuous availability (consulting, design,
          implementation, and maintenance) means piece of mind for you
        – Continuous availability over global distance sites helps meet more
          stringent audit and legislative compliance requirements
* Active Standby is the first configuration available under the GDPS/Active-Active family of solutions. Additional IBM software prerequisites required
** Recovery Time Objective (RTO) is a definition of the amount of time it takes from the initial disaster declaration to having critical business processes available to users.
Less than one hour RTO is based on use of IBM best practices and includes the time it takes to: IPL an LPAR, reconfigure disk, reconfigure coupling facility and CF
structure, apply System z Capacity Back Up, as well as switching network connections.
***All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.                          115
Phoenix IMS Users Group

  Risk Management
  Comprehensive security for a dynamic infrastructure

  NEW! GDPS/Active-Active - Two or more sites, separated
  by unlimited distances, running the same applications
  and having the same data to provide cross-site
  workload balancing and Continuous Availability /
  Disaster Recovery
      – Customer data at geographically dispersed sites kept in sync via
        replication
      – Shift from disaster recovery model to nearly continuous
        availability model
      – Integration of IBM products and GDPS control software through
        an IBM service engagement which includes project management
        throughout the implementation cycle
      – Active/Standby configuration released now, IBM plans to make
        available the Active/Query configuration which will provide the
        ability to selectively query data in either site.




         Minimizing risk for discovery and
         backup systems
116                                                                        116
Phoenix IMS Users Group


 Keep critical business applications up and running without data loss
 in case of disaster for System z platform
 IBM GDPS/Active-Active continuous availability


      Reduces application downtime to help lower costs,
      improve productivity and boost customer loyalty
      Continuous Availability
       – Provides continuous availability for two or more sites
         separated by unlimited distances, achieving Recovery Time
         Objective of 1 minute or less.
       – Shift from disaster recovery model to nearly continuous
         availability model
      Results
       – Planned workload switch - 20 seconds from active site to
         standby site
       – Unplanned workload switch - 120 seconds from active site to
         standby site
       – Planned site switch - (9 * CICS-DB2 and 1 * IMS workloads)
         20 seconds
       – Unplanned workload switch - 150 seconds

117                                                                     117
Phoenix IMS Users Group


z/OS R13 Performance for many key workloads

    Between 50% and 150%* I/O performance improvement for any z/OS UNIX workload using
    shared zFS in a Parallel Sysplex.
    – Applications that use zFS, such as z/OS UNIX System Services and WebSphere Application
      Server for z/OS, are expected to benefit
    Between 15% and 55%* IEBCOPY performance improvement for traditional workloads
    – Workloads copying PDS to PDS, copying PDS to sequential, or compressing a PDS are expected
      to benefit
    Potential for shorter batch windows *
    – New JCL FREEVOL=EOV parameter frees up a tape volume when the batch job is done with it.
    Network throughput Enterprise Extender can be improved
    – Using Inbound Workload Queuing (IWQ), available on OSA-Express3 and OSA-Express4S (July
      12, 2011)
    Foundation for extreme data handling and simplified storage management
    – Potentially improved I/O performance without the need for application changes for QSAM-,
      BPAM-, and BSAM-based workloads by leveraging High Performance FICON™. Also, existing
      EAV functionality is enhanced with support for larger, 1 TB Extended Address Volumes (EAVs).**
      - IBM statements of direction
* Based on IBM Lab results, your results will vary.
I/O performance improvements measured for fully shared zFS ranged from very small to 900%, with the majority of workload conditions tested falling between 50% and
150%. The actual amount of improvement will depend on the environment (monoplex or Parallel Sysplex) and the type of file processing being done.
IEBCOPY improvement will depend on conditions such as: the amount of data being copied, block size, and type of IEBCOPY operation
Batch concurrency for multi volume tape datasets and will depend on the amount of data being processed
                                                                                                                                                                     118
** All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.
Phoenix IMS Users Group
zOS R13 Enhancements in Security
      IKEv2
       – Initial support with z/OS R12 Communications Server. z/OS R13 adds Network Address Translation
         (NAT) traversal support for IKEv2 over IPv4.
      System SSL, ECC
       – z/OS R12 Communications Server added support for Elliptic Curve Cryptography (ECC), ECDSA
         (Elliptic Curve Digital Signature Algorithm).
       – z/OS R13 to extend System SSL ECC support for :
           •   Creating ECC-style certificates in key database files or ICSF PKCS#11 tokens
           •   Creating ECC-style certificates through the Certificate Management Services (CMS) API
           •   Enabling ECC for TLS V1.0 and TLS V1.1 handshakes (RFC4492)
           •   ECC certificate support with Crypto Express3 Coprocessor (on zEnterprise server)
      ICSF support for additional HMAC algorithms
       – Support for FIPS-198, support planned for SHA-1, SHA-224, SHA-256, SHA-384, and SHA-512
      TN3270 and FTP support for password phrases
      Ported tools
       – IBM Ported Tools for z/OS (5655-M23), a no-charge product, provides the sudo (su "do") open source
         tool that allows system administrators to delegate authority to users or groups while providing the
         RACF® (or equivalent) audit trail of the user and their commands. Already available on UNIX
         platforms, now available with z/OS UNIX System Services.



119                                                                                                            119
Phoenix IMS Users Group
z/OS Security Server – RACF
Helping to address security and compliance** guidelines


               Enhancements with z/OS R13
       RACF
      RACF
       ––RACF Remote Sharing Facility (RRSF) support for TCP/IP (in addition to SNA APPC)
          RACF Remote Sharing Facility (RRSF) support for TCP/IP (in addition to SNA APPC)
       ––Support for generating Elliptic Curve Cryptography (ECC) secure keys (using Crypto Express3
          Support for generating Elliptic Curve Cryptography (ECC) secure keys (using Crypto Express3
        Cryptographic Coprocessors (CEX3C) available with zEnterprise servers)
       Cryptographic Coprocessors (CEX3C) available with zEnterprise servers)
       Tivoli Directory Server for z/OS (LDAP)
      Tivoli Directory Server for z/OS (LDAP)
       ––Support for SHA-2 and salted SHA-2 hashing of user password attributes. Addresses:
          Support for SHA-2 and salted SHA-2 hashing of user password attributes. Addresses:
           –– Need for stronger hashing and cryptographic algorithms
             Need for stronger hashing and cryptographic algorithms
            – Enhanced interoperability with distributed IBM TDS, openLDAP, and other LDAP servers.
           – Enhanced interoperability with distributed IBM TDS, openLDAP, and other LDAP servers.
            – The National Institute of Standards and Technology (NIST) policy for the use of hash functions.
           – The National Institute of Standards and Technology (NIST) policy for the use of hash functions.
       ––Support for LDAP administrators to delegate LDAP administrative authority
          Support for LDAP administrators to delegate LDAP administrative authority
           –– Can improve LDAP administration flexibility, help improve auditability, and help improve security
            Can improve LDAP administration flexibility, help improve auditability, and help improve security
       ––Support for DB2 99for z/OS (5635-DB2) backend for scalability of large LDAP deployments
          Support for DB2 for z/OS (5635-DB2) backend for scalability of large LDAP deployments
       ––Improved interoperability between z/OS applications and Microsoft Active Directory environments for
          Improved interoperability between z/OS applications and Microsoft Active Directory environments for
        Kerberos
       Kerberos
       ––Support for RFC 2696 and RFC 2891 for improved LDAP sorted search performance
          Support for RFC 2696 and RFC 2891 for improved LDAP sorted search performance


            ** It is the customer's responsibility to identify, interpret, and comply with laws or regulatory requirements that affect its business.
            IBM does not represent that its products or services will ensure that the customer is in compliance with the law.


120                                                                                                                                                    120
Phoenix IMS Users Group
 z/OS and IPv6

      IPv4 address pool is exhausted February 3, 2011
      – http://www.ipv6news.info/2011/02/04/ipv4-address-pool-is-exhausted/
      – Now the IPv4 Internet only has the stock of IPv4 addresses held by the regional
        registrars and Internet Service Provides (ISPs) to keep it going.
      z/OS is IPv6 certified! (http://jitc.fhu.disa.mil/adv_ip/register/certs/ibmzosv110_dec08.pdf)
      z/OS Communications Server is adding function for IPv6 networks:
      – For z/OS R11
      – Support RFC4941 and RFC5095; and the AES-based AES-XCBC-MAC-96 and AES-XCBC-PRF-128
        algorithms - intended to meet new government IPv6 standards


      – For z/OS R12
      – Health checks for IPv4 and IPv6 routing
      – Support for DFSMSrmm, IKEv2, ability to Send DNS Queries over IPv6, support for security-related
        RFC3484 and RFC5014


      – For z/OS R13
      – Support for IPv6 intrusion detection security equivalent to that provided for IPv4, integrated with the
        Configuration Assistant (in z/OSMF)
      – Support for IPv6 checksum and segmentation offload enhancements and for LPAR-to-LPAR
        checksum offload for both IPv4 and IPv6 packets available with OSA-Express4S QDIO (announced
        July 12 2011)
         • TCP/IP segmentation and checksum processing on OSA card and not on CP
121                                                                                                               121
Phoenix IMS Users Group

Taking z/OS Storage Volumes to the Extreme

  Extended Address Volumes (EAVs) help address storage constraints
  Can help simplify storage management by enabling you to manage fewer, larger
  volumes, as opposed to many small volumes
  IDEAL for large datasets, may improve storage utilization!
  DS8000® exploitation rolled out over time, starting with 223 GB volumes:
   – With z/OS R10, support for VSAM
      – With z/OS R11, support for extended format sequential data sets
      – With z/OS R12, support extended to sequential (both basic and large)
        data sets, partitioned (PDS/PDSE) data sets, catalogs (ICF now
        larger than 4 GB), BDAM data sets, JES spool and checkpoint
        data sets, standalone Dump extended format dump data sets,
        DFSMSrmm data sets, generation data groups (GDGs) and VSAM
        volume data sets (VVDSs).
      – With z/OS R13 - Support extended to z/OS Communications Server FTP,
        SDSF extended format print files, VSAM volume data set (VVDS) scalability,
        ISPF to display data sets eligible for EAV.
      – SOD - support for larger extended address volumes (EAVs), up to 1 TB                                                                     EAV
        per volume, on IBM System Storage® DS8700 and DS8800 series,
                                                                                   EAV                                                          3390-A
        with new DS8000 licensed machine code.*
                                                                                                                                3390-A
                                                                                                                   3390-9
                                                                                                                    54GB        223GB
                                                                                                                  65,520 cyl   262,668 cyl   1TB SOD*
122                                                                                                                                                      122
      *All statements regarding IBM's plans, directions, and intent are subject to change or withdrawal without notice.
Phoenix IMS Users Group


z/OS Statement of Direction
  Software Announcement 212-086 – 4/11/2012

  IBM plans to introduce a new version of the z/OS operating system, z/OS Version 2, with
  z/OS V2.1 to be released in the second half of 2013 as part of a new two-year release
  cycle.
  IBM intends to make new z/OS and z/OSMF releases available approximately every two
  years.
  It is IBM's intent that z/OS V2 and z/OSMF V2 will continue to support coexistence,
  fallback, and migration rules similar to those for z/OS V1 and z/OSMF V1. IBM plans to
  support an n-2 approach, where three consecutive releases are planned to be supported
  for coexistence, fallback, and migration.
  Beginning with z/OS Version 2, IBM plans to provide five years of z/OS support, with
  three years of optional, fee-based extended service (5+3) as part of the new release
  cadence.
  IBM further plans to provide enhancements to current z/OS releases during the transition
  to the new support model as follows:
  – z/OS V1.12 support is planned to be increased from three years to four years. Thus,
     support for Version 1.12 is planned to be extended from September 30, 2013, to
     September 30, 2014.
  – z/OS V1.13 support is planned to be increased from three years to five years. Thus,
     support for Version 1.13 is planned to be extended from September 30, 2014, to
     September 30, 2016.


                                                                                             123
Support and Service Changes
      Transition Timing
         – Release 11 has three Years Support + 2 years LCE
         – Release 12 has four Years Support + optional fee based extended service
         – Release 13 has five Years Support + optional fee based extended service
      Migration and Support
         – Longer support lifecycles align with delivery cycles
         – Maintain N-2 release migration (accommodate a 2 or 4 year migration cycle)
         – Bridge migration to Version 2 from currently supported releases


           2008   2009    2010       2011       2012       2013        2014       2015    2016       2017        2018        2019     2020       2021      2022

R 1.10              3 Year Support             Life Cycle Ext.              Extended Service

R 1.11                        3 Year Support              Life Cycle Ext.             Extended Service

R1.12                                          4 Year Support                            Extended Service

R1.13                                                            5 Year Support                               Extended Service

V 2.1                                                                               5 Year Support                                  Extended Service

V 2.2                                                                                                       5 Year Support                      Extended Service

V 2.3                                                                                                                          5 Year Support                  Ext




124                                                                                                                                  © 2012 IBM Corporation
z/OS Version 2 Statement of Direction April 11th, 2012
Summary of Statement of Direction
  Version 2 of z/OS targeted to Availability 2H2013
  A Version 2 release is the next z/OS release; there is no release in 2012
  Release delivery cycle is planned to be every two years, in the second half of that
  calendar year.
  z/OSMF will be on the same cycle as z/OS
  N+1 or N+2 release migrations support two or four year migration cycle
  New five year support with optional fee based service extension
  IBM intends to offer interim updates, such as server support, through periodic small
  product enhancement PTFs (SPEs) and web deliverables
  Minimum supported HW levels (IBM System z9® server or later, and 3990-3 controller or
  later)
Changes to Current Releases:
  R12 Support extended to four years
  R13 Support extended to five years to bridge customers to Version 2 migration
  R13 orderable until Version 2 becomes available

125                                                                            © 2012 IBM Corporation
Phoenix IMS Users Group

IBM zEnterprise System: Freedom by Design
The broadest systems architecture – for integration and
management of multi-platform applications and data
IBM zEnterprise EC12 (zEC12)
IBM zEnterprise z196 (z196)
                             Unified Resource Manager                        BladeCenter Extension (zBX)
IBM zEnterprise z114 (z114)
                                        Extending zEnterprise qualities of   – AIX®, Linux®, and Microsoft®
Industry’s most robust design for       service and management across          Windows®* applications
keeping systems and data                the infrastructure                   – Appliance Blades - Smart
continuously accessible
                                                                               analytics, DataPower®




         1.   Meets the need of today’s heterogeneous data centers
         2.   Enables mixed workload business processes to be deployed and centrally managed
         3.   Allows optimized integration of data, applications, and web serving
         4.   Delivers dynamically responsive IT with lower acquisition and operating costs


126                                                                                                           126
Phoenix IMS Users Group



 A “System of Systems” for Predictable Service Delivery
 IBM zEnterprise EC12 or 196 (z196) or
 IBM zEnterprise 114 (z114)
      Optimized to host transaction, and mission-critical
      applications
      The most efficient platform
      for large-scale Linux® consolidation
      Massive scale-up – 26 MIPS to over 78K MIPS

zEnterprise Unified Resource Manager
      Unifies management of resources, extending IBM
      System z® qualities of service end-to-end across
      workloads
      Provides platform, hardware and workload management

zEnterprise BladeCenter® Extension (zBX)
      Selected IBM POWER7® blades and IBM System x® blades for
      deploying applications in a multi-tier architecture
      High-performance optimizers and appliances to accelerate time to
      insight and reduce cost
      Dedicated high-performance private network


127                                                                      © 2012 IBM Corporation   127
Phoenix IMS Users Group



zEnterprise software supports mission critical requirements
Efficiency at scale                Operational analytics          Ultimate Security
Transactional Processing
Millions of transactions per day   Data Warehousing               Security
Business Rules and Processes       Unique temporal capabilities   Advanced encryption
Create reusable services and                                      and decryption software
                                   Data Management
processes
                                   Governance through the         Social Business
Enterprise Modernization
                                   enterprise                     Integrating social business
Single platform for development                                   with enterprise computing
and test                           Operational Analytics
Integrated Appliances              Secured right-time
Packaged solutions for optimal     analysis
performance
 Cloud Computing
 Saas and Paas solutions
Integrated service management
Single point of control




                                                                                            128
 128
Phoenix IMS Users Group

IBM Software for zEnterprise solves key Business
Initiatives
            Cloud                                 Data                           Security
     Efficiency at Scale               Operational Analytics                 Ultimate Security
Delivering high value                Delivering predictive and          Providing advanced data
secured applications and             operational analysis of real-      security and audit
services to create the ideal         time enterprise data to deliver    capabilities for managing risk,
private cloud environment            insights                           data leaks, and compliance
                                                                        issues
                                                   NEW
IBM CICS Transaction Server for      IBM DB2 Analytics Accelerator V3    IBM Security zSecure Suite
z/OS® V5.1 and tools                 IBM zEnterprise Analytics System    V1.13.1
IBM OMEGAMON® Family V5.1            9700/9710                           IBM InfoSphere Guardium V9.0
IBM Continuous Integration for       Cognos BI 10.2
System z                             InfoSphere™ Optim™ 9.1
IBM Integrated solution for          DB2 for z/OS Tools
System z development                 IMS Enterprise Suite 2.2
IBM Sterling B2B Integrator V5.2.5   DB2 11 Beta ESP, IMS 13 QPP
IBM Sterling File Gateway V2.2.4     IBM Business Rules for z/OS V8.1
                                     IBM Operational Decision
                                     Management V8.1
                                                                                                        129
                                                                                                         129
Phoenix IMS Users Group



System z Analyst Quotes: IBM zEnterprise EC12
 "The new IBM zEnterprise EC12 showcases all of the major System z differentiators: powerful processing;
  "The new IBM zEnterprise EC12 showcases all of the major System z differentiators: powerful processing;
 advanced reliability, availability and serviceability; enhanced security; efficiency at scale; and most important,
  advanced reliability, availability and serviceability; enhanced security; efficiency at scale; and most important,
 the ability to optimally run and manage a wide range of workloads across System z and heterogeneous
  the ability to optimally run and manage a wide range of workloads across System z and heterogeneous
 environments.“
  environments.“
 -- Joe Clabby, President, Clabby Analytics
  -- Joe Clabby, President, Clabby Analytics

"Organizations are looking for newer and better ways to make information available, and actionable, to
 "Organizations are looking for newer and better ways to make information available, and actionable, to
business customers -- and to do so rapidly and securely. The challenge for many organizations is to transform
 business customers -- and to do so rapidly and securely. The challenge for many organizations is to transform
the transactional data they already have into new business insights that will guide the business to new
 the transactional data they already have into new business insights that will guide the business to new
opportunities and revenue growth. To do that, analytics systems must be capable of handling high data
 opportunities and revenue growth. To do that, analytics systems must be capable of handling high data
volumes. The IBM zEnterprise EC12 was designed with these goals, providing an analytics platform that is
 volumes. The IBM zEnterprise EC12 was designed with these goals, providing an analytics platform that is
highly secure, efficient and resilient -- and links to other systems to support end-to-end computing. It supports
 highly secure, efficient and resilient -- and links to other systems to support end-to-end computing. It supports
analytics workloads that transform massive amounts of data into actionable information, allowing
 analytics workloads that transform massive amounts of data into actionable information, allowing
organizations to improve business performance and to gain competitive advantage."
 organizations to improve business performance and to gain competitive advantage."
-- Jean S. Bozman, Research Vice President, IDC Enterprise Platforms
 -- Jean S. Bozman, Research Vice President, IDC Enterprise Platforms


"Once again, IBM has demonstrated why the mainframe is the ultimate platform for enterprise computing. On
 "Once again, IBM has demonstrated why the mainframe is the ultimate platform for enterprise computing. On
a capacity basis, the new IBM zEnterprise EC12 is 55% larger than its predecessor, which is especially
 a capacity basis, the new IBM zEnterprise EC12 is 55% larger than its predecessor, which is especially
important for the largest enterprises. With a clock speed of 5.5 GHz, it is the world's fastest commercial
 important for the largest enterprises. With a clock speed of 5.5 GHz, it is the world's fastest commercial
processor, allowing much more work to be done than with competitive x86-based servers. With its new Flash
 processor, allowing much more work to be done than with competitive x86-based servers. With its new Flash
Express, availability of key workloads will be improved automatically by reducing latency. With IBM zAware,
 Express, availability of key workloads will be improved automatically by reducing latency. With IBM zAware,
also new, data center staff will be alerted more quickly to difficult-to-detect operating anomalies and can act
 also new, data center staff will be alerted more quickly to difficult-to-detect operating anomalies and can act
sooner to mitigate them. In summary, the zEC12 offers a well-balanced collection of improvements for existing
 sooner to mitigate them. In summary, the zEC12 offers a well-balanced collection of improvements for existing
mainframe customers and even more reasons for a new customer to consider System z for critical workloads."
 mainframe customers and even more reasons for a new customer to consider System z for critical workloads."
-- Mike Kahn, Managing Director, The Clipper Group
 -- Mike Kahn, Managing Director, The Clipper Group

                                                                                                                       130
Phoenix IMS Users Group



System z Analyst Quotes: IBM zEnterprise EC12
 "IBM's latest System z model clearly demonstrates the mainframe is very much alive and kicking ... the new
  "IBM's latest System z model clearly demonstrates the mainframe is very much alive and kicking ... the new
 System z supports and speeds achieving competitive advantage with the most sophisticated data
  System z supports and speeds achieving competitive advantage with the most sophisticated data
 warehousing and analytics coupled with the fasted performing query functions in the market. It provides
  warehousing and analytics coupled with the fasted performing query functions in the market. It provides
 unequaled security along with 99.999% reliability on a unified platform that helps accelerate the development
  unequaled security along with 99.999% reliability on a unified platform that helps accelerate the development
 of secure applications. The hybrid architecture speeds cloud deployment of mission critical workloads on
  of secure applications. The hybrid architecture speeds cloud deployment of mission critical workloads on
 systems designed to be the fastest and most efficient available to the market. This increased operating
  systems designed to be the fastest and most efficient available to the market. This increased operating
 efficiency frees IT resources to focus on developing and delivering services that drive growth by meeting
  efficiency frees IT resources to focus on developing and delivering services that drive growth by meeting
 customer demands. With this combination, we anticipate success for the new models along with a very long
  customer demands. With this combination, we anticipate success for the new models along with a very long
 life for the whole family."
  life for the whole family."
 -- Ptak, Noel & Associates: “IBM’s Latest Mainframe, Another Winner”
  -- Ptak, Noel & Associates: “IBM’s Latest Mainframe, Another Winner”


"IBM’s latest zEnterprise EC12 multiplatform mainframe systems provide current and prospective Big Blue
"IBM’s latest zEnterprise EC12 multiplatform mainframe systems provide current and prospective Big Blue
customers with the processing power, performance and near-flawless reliability and security necessary for the
customers with the processing power, performance and near-flawless reliability and security necessary for the
most demanding workloads. The new zEnterprise EC12 multiplatform servers solidify and extend IBM’s stake in
most demanding workloads. The new zEnterprise EC12 multiplatform servers solidify and extend IBM’s stake in
high-end enterprises.“
high-end enterprises.“
-- Laura DiDio, ITIC: “IBM zEnterprise EC12 Servers Deliver Near-Flawless Reliability, Security”
-- Laura DiDio, ITIC: “IBM zEnterprise EC12 Servers Deliver Near-Flawless Reliability, Security”


"IT executives should insist on an evaluation that addresses the financial facts and ignores the religious platform
"IT executives should insist on an evaluation that addresses the financial facts and ignores the religious platform
wars. In today's environment IT must deliver processing services at a least cost or be exposed; thus internal
wars. In today's environment IT must deliver processing services at a least cost or be exposed; thus internal
wars must be put aside and the best target platforms must be selected and put into service as soon as possible.
wars must be put aside and the best target platforms must be selected and put into service as soon as possible.
Bottom line: the zEnterprise as a database server is a killer application.“
Bottom line: the zEnterprise as a database server is a killer application.“
-- Cal Braunstein, Robert Frances Group: “IBM System z -- The Lowest Cost Database Server Solution”
-- Cal Braunstein, Robert Frances Group: “IBM System z The Lowest Cost Database Server Solution”




                                                                                                                      131
Phoenix IMS Users Group


Service levels to match your business needs
Increased flexibility for your multi-architecture strategy when data is on z/OS
                                                                    zEnterprise System
                                                                                                    Extreme scalability and
                                                                                                    performance for
                                                                       Extreme consolidation of     transaction processing
                                                                       servers and networking       and data serving
                                                                       Superior levels of virtual   High availability and
                                       Expanded ISV support            server provisioning,         cross-system scalability
                                                                       monitoring and workload      with Parallel Sysplex® and
TCO                                    for enterprise
                                       applications
                                                                       management                   GDPS®
                                                                       Industry-best virtual I/O
Focus         Silo managed islands
              of computing                                             bandwidth and reliability
                                                                                                    Leading policy-based
                                       Targeted for                                                 capacity provisioning and
                                       applications that interact      Fewer components and
                                                                                                    workload management
              Less dynamic than z                                      reduced complexity
                                       with mainframe data                                          Pervasive, high-
              virtualization           and transactions                System z qualities of
                                                                       dynamic resource             performance security
                                                                       management and               support
              Minimal resource         Provisioned and
              sharing with z                                           capacity-on-demand
                                       managed by System z
              resources                                                Seamless integration with
                                                                       z/OS backup and disaster
                                                                       recovery solutions                  z/OS

                                                                      Linux on z/VM®
                                     Select IBM Blades
                                           in zBX
              Distributed
TCA            Systems
Focus



          LOWER                           SCALABILITY, SECURITY,                                                 HIGHER
                                      DYNAMIC WORKLOAD MANAGEMENT
                                                                                                                                 132
Phoenix IMS Users Group

zEnterprise EC12: An optimized design which delivers
unique value
Comprehensive integration enabling information – centric
computing



                                                                            ®




                                                            Java




                                                            Compilers,
Semiconductor   Microprocessor   Systems   Virtualization                  Optimized
                                                            Tools & Java
Technology      Design           Design    & Operating                     Middleware
                                                            Virtual
                                           Systems
                                                            Machine




                                                                                        133
Phoenix IMS Users Group

The IBM zEnterprise EC12 (zEC12)


          Efficiency at scale
          • Most efficient and fastest system for
            mission critical workloads
          • Increased efficiency will free up IT
            resources to focus on new services to
            drive growth
          Operational analytics to enable
          business opportunities
          • Most sophisticated data warehousing
          and analytics solutions with the fastest
          query performance in the market
          • Leverage your data to build
          competitive advantage

          Ultimate security strengthens the
          customer experience
          • Most secure system with 99.999%
          reliability
          • Unified platform for rapid development
          of secure applications end-to-end

                                                     134
Phoenix IMS Users Group


Summary: IBM zEnterprise EC12 (zEC12)
   The secure cloud for data, enabling enterprises to improve service to
                            their customers…




 zEC12: A Smarter Computing infrastructure that is Cloud Ready, Data Ready and Security Ready,
                     enabling a Smarter Planet™ for today and tomorrow

                                                                                                 135
Phoenix IMS Users Group



What is IBM zEnterprise System?


Re-write the rulebook and set new
standards for business-centric IT
with IBM System z, to be the
world’s premier workload-optimized
platform for enterprise applications.




  Our Vision:
  Deliver the best of all worlds - Mainframe, UNIX®, x86 and single
  function processors - integrated in a single system for ultimate flexibility
  and simplicity to optimize service, risk, and cost across multiple
  heterogeneous workloads.

                                                                                 136

Latest news phoenix

  • 1.
    ® Phoenix IMS Users Group Exploiting the Power of the Mainframe: The Latest News from System z Diane Goff IBM IMS ATS dgoff@us.ibm.com © 2012 IBM Corporation
  • 2.
    Phoenix IMS UsersGroup Agenda Smarter Planet / Smarter Computing and the Role of IBM System z® IBM zEnterprise™ System A Smarter ‘System of Systems’ for a Smarter Planet – IBM zEnterprise EC12 (zEC12) – IBM zEnterprise 196 (z196) – IBM zEnterprise 114 (z114) – IBM zEnterprise BladeCenter®Extension (zBX) – IBM zEnterprsie Unified Resource Manager IBM zEnterprise Software 2 2
  • 3.
    Phoenix IMS UsersGroup Neonatal Law Care Enforcement Several years ago we started describing the Telecom Fraud Smarter Planet Prevention we saw emerging, fueling Resource Traffic innovation Management Control across industries. Manufacturing Trading 3 3
  • 4.
    Phoenix IMS UsersGroup The inefficiencies of traditional computing get in the way Banks Healthcare China online banking Asian insurance firm AIA transactions tripled from Group, grew transactions 50b to 150b 2009 to 20111 50% in 2011, while serving 20M+ policy holders Government Insurance European Central $20B US Healthcare IT Government System z outsourcing market nearly workload growth rate doubled 2009 – 2011, annually 2007 – 2011: +25% transactions grew 35%+ 1. According to PBOC (the People’s Bank of China) 4
  • 5.
    Phoenix IMS UsersGroup Today’s applications are increasing demands on data systems Banks Healthcare 1.8 zettabytes of digital NA hospital, ambulatory data in 2011, growing data to quadruple to 665 exponentially1 terabytes by 20152 Government Insurance $1.2 billion saved At least 10% of property through tax compliance casualty claims are in New York state inflated or fraudulent 1. IDC Predictions Report 2011 2. Enterprise Strategy Group, January 2011 5
  • 6.
    Phoenix IMS UsersGroup The data system needs to be secure and trusted Banks Healthcare sharing health data requires 2.7 billion people don’t availability and privacy have access to banking1 standards compliance Government Insurance has an increased 90% of insurance CEOs dependency on IT picked getting closer to systems requiring better customers as a top strategic availability and reliability initiative in the next 5 years2 1. World Bank high level conference on Post-Crisis growth and development 2. IBM Institute for Business Value – Global CEO study, 2010 6
  • 7.
    Phoenix IMS UsersGroup Innovative clients are implementing new technologies to … React to shorter product cycles by delivering IT efficiency for and invest in new services … core business transactions Deliver new business by using actionable insight for opportunities … information-centric processes Capture new markets and drive by strengthening the customer top-line revenue growth … experience 7
  • 8.
    Phoenix IMS UsersGroup On a Smarter Planet, there are no clear boundaries of IT “All clients are experiencing the phenomena of what we call ‘front office transformation’— social media, devices, mobility– all reshaping the way they want to engage their customers, and how they capitalize on Big Data and analytics.” Ginni Rometty, President and CEO IBM 8
  • 9.
    Phoenix IMS UsersGroup CEOs believe technology will be at the forefront of driving change through 2015* Is your infrastructure optimized for the greatest efficiency of all your “71% of CEOs applications and resources? identify technology change as the most Does your infrastructure enable you important external to provide rich, actionable insight? force impacting their organizations”* Are you leveraging new technologies—mobile, social, cloud— to deliver an excellent customer experience at every touch point? * IBM, Leading Through Connections: Insights from the Global Chief Executive Officer Study, May 2012. 9
  • 10.
    Phoenix IMS UsersGroup The world is changing. Is your infrastructure ready? The time is now to… 70% of IT budget is devoted to Leverage cloud to speed time to operations and maintenance1 market and improve efficiency Connected devices will surge to 22 billion by 20202, with digital content rocketing to 8 Unlock the power of Big Data to zettabytes by 2015 (90% deliver more actionable insight unstructured)3 The average IT infrastructure is Secure critical information to attacked nearly 60,000 times comply, reduce risk and protect every day4 1 IDC, Game Changing Virtual Technology: Major Shifts and Innovations that will Forever Change your IT Business 2 Forrester, BT 2020: To Thrive In The Empowered Era, You’ll Need Software, Software Everywhere, Phil Murphy, January 30, 2012. 3 IDC, IDC Predictions 2012: Competing for 2020, Doc #231720, December 2011, 4 IBM X-Force Research 10
  • 11.
    Phoenix IMS UsersGroup Organizations need to be able to make faster, better- informed decisions to drive smarter business outcomes. Data growth continues unabated, 25% to 50% a year. IT budgets flat or decreasing. Increased use of rich content and unstructured data. More security and compliance regulations impacting IT CIOs are driving a strategic and planned approach to building out the digital platform the business relies on, as well as making corresponding investments to improve their ability to manage it. 11
  • 12.
    Phoenix IMS UsersGroup Smarter Computing: Tomorrow Ready. Smarter Computing is the IT infrastructure that enables a Smarter Planet. Cloud Ready Data Ready Security Ready 12
  • 13.
    Phoenix IMS UsersGroup Smarter organizations are tapping into entirely new capabilities for optimizing business processes, collaborating and driving innovation simply by using information to transform their business. Deliver IT Strengthen the Enable actionable efficiency customer experience insights Establish a scalable Ensure data and system Apply business foundation for your integrity across your analytics to optimize information organization decisions Manage critical Redefine the customer Unlock the value of information and experience by delivering operational data that business processes personalized interactions fuels a Smarter Planet while optimizing for when and where in an economy that is greater efficiency of customers want to rapidly evolving to be resources. consume them information-centric 13
  • 14.
    Phoenix IMS UsersGroup IBM zEnterprise can help you close the gaps in your information-centric environment. Efficiency at Trusted Operational Scale Security and Analytics Resiliency EFFICIENCY INTEGRITY ACTIONABLE INSIGHT • Enables very large scale • Delivers unmatched • Integrated modeling of real time consolidation and the flexible security and reliability for data and consolidated corporate delivery of services through a core business processes data to deliver information and private enterprise cloud and data insight across the enterprise 14
  • 15.
    Phoenix IMS UsersGroup Efficiency at the core State of the art technology above the rest Superior security with high-speed cryptography integrated as part of the chip Leadership in performance with 5.5 GHz 6-Core Processor Chip Extreme scalability and parallelism with transactional execution facility Accelerate application development with enhancements to decimal format conversions and 2 GB page frames Reduce application overhead with runtime instrumentation facility Optimized data serving with largest cache in the industry 15
  • 16.
    Phoenix IMS UsersGroup Enable very large scale consolidation and the flexible delivery of services through a private enterprise cloud Organizations will now be able to make faster, better-informed decisions to drive smarter business outcomes because their systems are designed to operate that way. “IBM has one of the most comprehensive cloud portfolios.” – Jeff Vance, Datamation • Hybrid Cloud computing with zManager across the tiered architecture • Optimized systems • Efficient transaction processing • Integrated application infrastructure 16
  • 17.
    Phoenix IMS UsersGroup The ideal private enterprise cloud zEnterprise brings together the benefits of enterprise computing and cloud computing in a single system • Enterprise Computing capabilities – Extreme scale and leadership security A Virtual server on System z can be provisioned in and resiliency enabling delivery of critical minutes services System z servers • Cloud computing capabilities often run consistently at 90%+ utilization – Extreme flexibility and efficiency of fully virtualized resources across heterogeneous platforms zEnterprise can run hundreds or thousands of diverse workloads in a single system • Centrally manages and controls a set of resources A Private Cloud on – A single integrated system for rapid and zEnterprise can lower server TCA efficient provisioning of services to by up to 84%1 accelerate time to market and reduce cost 1 (Source: IBM SWG CPO – Internal testing) 17 2 (IBM calculations of zEnterprise limits across maximum z196 configuration. Results may vary)
  • 18.
    Phoenix IMS UsersGroup Why Deploy Cloud and Linux on System z? Increased Productivity More Efficient Data Center TCA of less than $0.70 per day per virtual server1 U.S. Insurance Company uses 80% less energy than existing 79% less TCA vs. leading public distributed servers cloud 2 Less floor space More than 3,000 applications available on System z Fewer physical servers to manage Higher Utilization Greater Reliability, Availability Most clients run consistently at Most customers test backup of 90%+ utilization1 System z to 100% recovery “Shared everything” architecture annually Manage up to 100,000 virtual Built-in hardware redundancy servers1 Capacity and Backup on Demand 1 IBM calculations of zEnterprise limits across maximum z196 configuration. Results may vary. 5-Year Total IT Cost 2 The Edison Group: The Value of IBM zEnterprise for Deploying Heterogeneous Private Clouds, savings start at 250 virtual servers 18
  • 19.
    Phoenix IMS UsersGroup System z has the highest security rating or classification for any commercially available server IBM zEnterprise… Offers fewer points of breach than a pure UNIX® or x86 implementations. Helps identify fraud risks in real time and help stops them before they happen. Enables a reduction of risk and simplification of governance and compliance. Server images hosted on Linux on System z can benefit from legendary System z availability, security and systems management.1 1IBM design points, Internal studies and analysis. 19
  • 20.
    Phoenix IMS UsersGroup Secure resilience Delivering unmatched security and reliability for core business processes • Conduct business with the highest level of integrity Surpass EAL5+ ‒ Reduce risk of security and data breaches highest level of ‒ Secure sensitive data and identities certification for ‒ Uncover possible intrusion attempts general purpose servers ‒ Enforce policy compliance • Continuous availability to increase growth ‒ Reduce the impact to business by eliminating outages which cost on average >$500K ‒ Eliminate the costs for an hour-long outage which can vary from $225 to $89K an hour and can affect millions of users 20
  • 21.
    Phoenix IMS UsersGroup System z stands alone with security hardened into the architecture Availability plus the security provided by the zEC12 enables a level of resiliency that allows businesses to be competitive day in and day out in this global environment. 21
  • 22.
    Phoenix IMS UsersGroup Apply operational analytics to optimize decisions Apply advanced analytics and industry expertise to a wealth of information in order to more precisely predict—and continuously act on—risks and opportunities. REACTION PREDICTION Goal Goal Unforeseen Decision Point Predicted Decision Point 22
  • 23.
    Phoenix IMS UsersGroup Combining the best transaction system with the best analytics system Best in OLTP Best in data warehouse Best in consolidation Industry-recognized Proven appliance leader in Unprecedented mixed leader in mission-critical high-speed analytic systems workload flexibility and transaction systems virtualization providing the most options for cost- effective consolidation Business insight integration IBM DB2 Analytics Accelerator is a new workload optimized, appliance add-on, that enables the integration of business insights into operational processes [Evolution of ISAO] 23
  • 24.
    Phoenix IMS UsersGroup The IBM DB2 Analytics Accelerator (IDAA) Capitalizing on the best of both worlds – System z and Netezza The IBM DB2 Analytics Accelerator is a blending of System z and Netezza technologies that delivers unparalleled mixed workload performance for addressing complex analytic business needs. Performance, availability and scalability Extreme Performance for Complex Analytics Breakthrough technologies - Hardware acceleration Transparent to DB2 applications 24
  • 25.
    Phoenix IMS UsersGroup Operational Analytics Integrating business insights when and where it matters Real- Real-Time Scoring offers new technology that ensures current, relevant business insights within the time of a transaction Improve query response times by up to 30% when updating to IBM zEnterprise EC12 Advanced query management integrates operational, strategic, and tactical decisions, while delivering response times up to 2000x faster, and maintaining critical business priorities Enterprise- Enterprise-wide Data Warehousing leverages leading temporal and data governance capabilities, to deliver a single, consistent view of business 25
  • 26.
    Phoenix IMS UsersGroup With System z, even the most complex queries can be processed within seconds Deliver real-time insights that uncover new business opportunities, and provide that information to the front lines of business, so that they can take action when it can yield real business results. 26
  • 27.
    Phoenix IMS UsersGroup zEnterprise EC12 parallel sysplex availability leads the pack Downtime Survey (400 participants in 20 countries) 3.5 3 Downtime Hours Per Year 2.5 System z Parallel Sysplex with 99.999% availability 2 5 minutes 1.5 1 0.5 0 Microsoft Microsoft Novell HP HP Sun Mandrake Novell IBM IBM Win2003 Win2008 Linux on HP-UX HP-UX Solaris Linux Linux on AIX z/OS on on Intel x86 on on on on Intel x86 on Sysplex Intel x86 Intel x86 (unmodified) Intel Itanium HP PA-RISC Sun SPARC Intel x86 (modified) IBM Power Source: ITIC: ITIC 2009 Global Server Hardware & Server OS Reliability Survey; July 2009; http://itic-corp.com/blog/2009/07/itic-2009-global-server-hardware-server-os- reliability-survey-results/; Results are measured in minutes per year. *Note: All operating systems included in the survey are not included in this chart. Fifteen operating systems on various processor architectures were included in the survey. The chart will be updated when the full report is available. 27
  • 28.
    Phoenix IMS UsersGroup IBM Software for zEnterprise solves key Business Initiatives Cloud Data Security Efficiency at Scale Operational Analytics Ultimate Security Delivering high value Delivering predictive and Providing advanced data secured applications and operational analysis of real- security and audit services to create the ideal time enterprise data to deliver capabilities for managing risk, private cloud environment insights data leaks, and compliance issues NEW IBM CICS Transaction Server for IBM DB2 Analytics Accelerator V3 IBM Security zSecure Suite z/OS® V5.1 and tools IBM zEnterprise Analytics System V1.13.1 IBM OMEGAMON® Family V5.1 9700/9710 IBM InfoSphere Guardium V9.0 IBM Continuous Integration for Cognos BI 10.2 System z InfoSphere™ Optim™ 9.1 IBM Integrated solution for DB2 for z/OS Tools System z development IMS Enterprise Suite 2.2 IBM Sterling B2B Integrator V5.2.5 DB2 11 Beta ESP, IMS 13 QPP IBM Sterling File Gateway V2.2.4 IBM Business Rules for z/OS V8.1 IBM Operational Decision Management V8.1 28 28
  • 29.
    Phoenix IMS UsersGroup zEnterprise provides the foundation for the “smart” infrastructure on which we can build the workloads of today and tomorrow They are workloads that … … and / or … Rely on data serving and application components on Reside in low utilization / IBM System z® development environments Solutions that need to Can be made more leverage strengths of efficient through System z… Security, consolidation Reliability, Availability Can be optimized by using Have application the newest virtualization components on UNIX (HP, technology Sun, Power) or Linux (x86, System z) but require a higher level of integration capabilities and efficiency … but also may … Reside in complex multi-platform IT environments Require flexible development and test infrastructure Require simplified, integrated policy and management 29
  • 30.
    Phoenix IMS UsersGroup Evolution of hybrid computing with IBM System z Announced IBM zEnterprise® 196 (z196) zEnterprise First ever multiplatform Availability of Availability of Analytics System computer – mainframe and Microsoft® Windows® Linux® on IBM 9700 and IDAA V3 distributed with single on System x blades management DataPower® XI50z System x® on HX5 in zBX and APIs within the IBM blades in the zBX zEnterprise BladeCenter® Extension (zBX) HTTP MQ JMS FTP IMS CSV COBOL XML SOAP July 2010 Nov 2010 Mar 2011 Jul 2011 Sep 2011 Oct 2011 Dec 2011 Aug 2012 Oct 2012 Availability of zBX with IBM Announce IBM zEnterprise EC12 IDAA – evolution of IBM POWER7® blades and IBM zEnterprise 114 (zEC12) Smart Analytics Optimizer – IBM Smart Analytics Optimizer Next generation of coming out of the zBX and into Netezza technology hybrid computing 30
  • 31.
    Phoenix IMS UsersGroup IBM zEnterprise System: The complete system of systems The integration of a shared pool of Cloud Ready virtualized heterogeneous resources, managed as a single Data Ready system, that is: Security Ready 31 31
  • 32.
    Phoenix IMS UsersGroup IBM zEnterprise EC12 System: The Next Generation in Hybrid Computing The foundation for a secure cloud for data, enabling enterprises to improve service to their customers. Efficiency at scale Operational analytics Ultimate security Provides a highly secure and A secure and scalable Delivering unmatched security for scalable enterprise cloud for enterprise data repository critical business processes, efficiently running multiple that integrates operational applications and data critical applications analytics for accelerated insight 32
  • 33.
    Phoenix IMS UsersGroup Introducing the newest members of the zEnterprise System The zEnterprise EC12 and zEnterprise BladeCenter Extension Model 003 IBM zEnterprise EC12 (zEC12) • zEC12 has the industry’s fastest chip with each core at 5.5 GHz • New innovation to drive availability with IBM zAware and Flash Express • Optimized for the corporate data serving environment • Hardware functions boost software performance for Java™, PL/I, DB2® IBM zEnterprise Unified Resource Manager and zEnterprise BladeCenter Extension (zBX) Mod 003 • Supports the new zEC12 platform • Hosts PS701 and HX5 blades • Provides workload-awareness resource optimization • Enhancements to System Director support zBX • System z will continue to expand hybrid computing Plus more flexibility and function by connecting IBM DB2 Analytics Accelerator • Deployment of business analytics on the same platform as operational applications -- analytics and OLTP can be run as the same workload • IBM Data Analytics Accelerator V3 lowers the cost of analytics 33
  • 34.
    Phoenix IMS UsersGroup zEnterprise EC12 is the core of next generation of System z zEC12 Up to Performance improvement over z196 25% uniprocessor1 Up to Machine Type: 2827 25% Models: H20, H43, H66, H89, HA1 Faster engines1 Advanced Technology 5.5 GHz 6-core Up to 50% Total capacity improvement over z196 M801 processor chip delivers a performance boost Up to for all workloads 50% Up to More total capacity1 Configurable cores for client use Innovation to drive availability to superior 101 levels 60 subcapacity settings Up to 101 configurable cores – IBM zAware offers snap-shot of the current 60 subcapacity Up to 3 TB RAIM memory settings state of your business Up to 3 TB RAIM memory – FLASH Express and pageable large pages to IFL, zIIP, zAAP, ICFs and optional SAPs drive availability and performance for critical IFL, zIIP, zAAP, ICFs and optional SAPs workloads Environmental focus to improve data center efficiencies including new non raised floor option Environmental focus Trusted resilience is a zEnterprise standard Upgradeable from IBM zEnterprise 196 Upgradeable from IBM zEnterprise 196®(z196) and System z10® Enterprise Class (z10 EC™) Enterprise Class and IBM System z10 1 Based on preliminary internal measurements and projections against a z196. Official performance data will be available upon announce and can be obtained online at LSPR (Large Systems Performance Reference) website at: https://www.ibm.com/servers/resourcelink/lib03060.nsf/pages/lsprindex . Actual performance results may vary by customer based on individual workload, configuration and software levels. 34
  • 35.
    Phoenix IMS UsersGroup zEnterprise EC12 is the core of next generation System z Up to Performance zEC12 25 improvement over Machine Type: 2827 % z196 uniprocessor1 Models: H20, H43, H66, H89, HA1 Advanced Technology 5.5 GHz processor chip for performance Up to Total capacity boost for all workloads 50 improvement over – Over 78,000 MIPS for large scale consolidation % z196 M801 – Larger cache for data serving Processor chip optimized for software performance Up to – Advanced performance functions exploited by Java, PL/I, Configurable cores compilers, DB2 and more 101 for client use Innovation to drive availability to superior levels 60 subcapacity settings – IBM zAware with out-of-band analytics provide point in time snap-shot of the current state of your business and can help Up to 3 TB RAIM memory you improve availability IFL, zIIP, zAAP, ICFs and optional – FLASH Express and pageable large pages to drive SAPs availability and performance for critical workloads Environmental focus to improve Security and reliability are in our DNA data center efficiencies including new non raised floor option – High speed cryptography integrated as part of the chip – Enhanced support for applications requiring data encryption, Upgradeable from IBM zEnterprise cryptographic keys and digital signing with new Crypto 196 (z196) and System z10® Express4S Enterprise Class (z10 EC™) – PR/SM designed for EAL5+ certification 1 Based on preliminary internal measurements and projections. Official performance data will be available upon announce and can be obtained online at LSPR (Large Systems Performance Reference) website at: https://www-304.ibm.com/servers/resourcelink/lib03060.nsf/pages/lsprindex?OpenDocument . Actual performance results may vary by customer based on individual 35 workload, configuration and software levels.
  • 36.
    Phoenix IMS UsersGroup IBM zEnterprise EC12: An optimized system Java Semiconductor Microprocessor Systems Virtualization Compilers & Optimized Technology Design Design & Operating Java Virtual Middleware Systems Machine 36
  • 37.
    Phoenix IMS UsersGroup zEnterprise EC12: Freedom through Design Enhanced performance and scalability for Smarter Computing Up to Up to Up to 25% 50% 25% Core processor performance Total capacity More configurable cores improvement over improvement over z196 for client use over z196 IBM zEnterprise® 196 (z196) • Faster processors and more capacity for economies of scale • New processor chip optimized for software performance – Up to 45% improvement for Java™ workloads – Up to 27% improvement in compute-intensive and floating- point C/C++ applications – Up to 30% improvement in IMS™ workloads – More than 30% improvement for SAP workloads • Larger caches to optimize data-serving environments Upgradeable from: IBM zEnterprise 196 (z196) • Hybrid computing capabilities to reduce cost and complexity and IBM System z10® Enterprise Class (z10 EC™) 37
  • 38.
    Phoenix IMS UsersGroup Processor chip optimized for software performance Exploited by Java, PL/I, compilers, DB2, more Our leadership in microprocessor design supports a boost in performance for all Excellent Results: workloads – Second generation out of order design Up to Up to – Multi-level branch prediction supports complex 45% 27% workloads Improvement Improvement in for Java CPU intensive int Larger caches to optimize data serving workloads1 & float C/C++ environments applications1 – Almost 2x on chip and 2x additional on book New hardware functions optimized for Up to More than software performance 30% 30% – Transactional Execution Facility for parallelism and Improvement in Improvement in scalability throughput for throughput for – Runtime Instrumentation Facility is intended to help DB2 for z/OS SAP workloads1 reduce Java overhead operational – 2 GB page frames are intended to offer performance analytics2 improvements for DB2 buffer pools and Java heaps – Up to 30% improvement in IMS throughput due to faster CPU and cache, compliers, and more1 – New IBM Enterprise PL/I compiler is planned to exploit and get a performance boost from decimal format conversions facility 1 Based on preliminary internal measurements and projections 2 Aa measured by the IBM 9700 Solution Integration Center. The measured operational BI workload consists of 56 concurrent users executing a fixed set of 160,860 Cognos reports . Compared DB2 v10 workload running on38 IBM's z196 w/10 processors to an zEC12 w/10 processors
  • 39.
    Phoenix IMS UsersGroup zEC12 – Overall Attributes Highlights (compared to z196) 50% more cores in a CP chip – Up to 5.7% faster core running frequency – Up to 25% capacity improvement over z196 uni-processor Bigger caches and shorter latency – Total L2 per core is 33% bigger – Total on-chip shared L3 is 100% bigger – Unique private L2 designed to reduce L1 miss latency by up to 45% 3rd Generation High Frequency, 2nd Generation Out of Order Design – Numerous pipeline improvements based on z10 and z196 designs – # of instructions in flight is increased by 25% New 2nd level Branch Prediction Table for enterprise scale program footprint – 3.5x more branches Dedicated Co-processor per core with improved performance and additional capability – New hardware support for Unicode UTF8<>UTF16 bulk conversions Multiple innovative architectural extensions for software exploitation 39
  • 40.
    Phoenix IMS UsersGroup zEC12 Architecture Extensions Transactional Execution (a/k/a Transactional Memory) – Software-defined sequence treated by hardware as atomic “transaction” – Enables significantly more efficient software • Highly-parallelized applications • Speculative code generation • Lock elision – Designed for exploitation by Java; longer-term opportunity for DB2, z/OS, others Runtime instrumentation – Real-time information to software on dynamic program characteristics – Enables increased optimization in JVM/JIT recompilations – Additional exploitation opportunities in the works 2 GB page frames – Increased efficiency for DB2 buffer pools, Java heap, other large structures Software directives to improve hardware performance – Data usage intent improves cache management – Branch pre-load improves branch prediction effectiveness – Block prefetch moves data closer to processor earlier, reducing access latency Decimal format conversions – Enable broader exploitation of Decimal Floating Point facility by COBOL programs 40
  • 41.
    Phoenix IMS UsersGroup zEC12 Full and Sub-Capacity CP Offerings CP Capacity Relative to Full Capacity Uni Subcapacity CPs, up to 20, may be ordered on ANY zEC12 model. 7xx = 100% ~ 1514 PCI ~ If 21 or more CPs are ordered all must be full 7xx capacity 6xx ~ 63% ~ 947 PCI ~ ~ 7xx All CPs on a zEC12 CPC must be the same capacity 5xx ~ 42% ~ 631 PCI ~ ~ 4xx ~ 16% ~ 240 PCI ~ ~ All specialty engines run at full capacity. The one for xx = 01 Through 20 one entitlement to purchase one zAAP and one zIIP for 6xx each CP purchased is the same for CPs of any capacity. Only 20 CPs can have granular capacity but 5xx other PU cores may be characterized as full capacity specialty engines 4xx For no CPs, the capacity setting is 400 PVU for zEC12 is 120 MSU Sub Capacity H20 H43 H66 H89 HA1 41
  • 42.
    Phoenix IMS UsersGroup IBM System z: System I/O Bandwidth 384 GB/Sec* Design Comparison for High End Systems 288 GB/sec* Balanced System CPU, nWay, Memory, I/O Bandwidth* 172.8 GB/sec* 96 GB/sec 24 GB/sec PCI for Memory 1.5 TB** 256 64 1-way 3 TB** 512 GB 300 450 600 920 1202 GB GB 1514 16-way 32-way zEC12 54-way z196 64-way z10 EC * Servers exploit a subset of its 80-way z9 EC designed I/O capability ** Up to 1 TB per LPAR zSeries 990 PCI – Processor Capacity Index 101-way zSeries 900 Processors 42
  • 43.
    Phoenix IMS UsersGroup zEC12 performance and scalability Balanced performance growth 1.5X z196 total capacity – Across broad range of workloads – 27 or 30 cores per MCM – Scalable from 1 to 101 processors – 120 max cores (Model HA1) LSPR: 1.25 x z196 Continued full-stack performance focus – 32nm SOI technology – New z/Architecture features – Improved core and cache designs – Compiler optimization for zEC12 • Hybrid Computing – POWER7 and System x blades • Linux on System x and Microsoft Windows IBM DB2 Analytics Accelerator (IDAA) • DataPower XI50z with Netezza • Hybrid Computing – POWER7 & System x blades • Linux on System x and Microsoft Windows zEC12 • DataPower XI50z Configurable Engines z196 • Specialty engines z10 EC PureSystems • zArchitecture enhancements • 100 new instructions • RAIM memory • Focus on core strengths – • Compute intensive • PCIe I/O drawer scale, security, availability • Decimal Floating Point • Optional offerings – water • Compiler optimized for zEC12 • zHPF cooling or HV DC power • Preplanning enhancements Capacity 43
  • 44.
    Phoenix IMS UsersGroup System z Servers Continue to Scale with zEC12 120 engines zEC12 101-way* Each new range continues to deliver: 96 engines • New function z196 80-way • Unprecedented capacity to meet 77 engines consolidation needs Maximum PCI 64-way z10 EC • Improved efficiency to further reduce 64 engines energy consumption z9 EC 54-way • Continues to delivering flexible and 48 engines simplified on demand capacity z990 32-way • A mainframe that goes beyond the traditional paradigm 20 engines z900 16-way Minimum PCI PCI - Processor Capacity Index z900 z990 z9 EC z10 EC z196 zEC12 *z/OS supports up to a 100-way only z/OS 1.6 z/OS 1.6 z/OS 1.6 z/OS 1.8 z/OS 1.11 z/OS 1.13 44
  • 45.
    Phoenix IMS UsersGroup zEC12 Continues the CMOS Mainframe Heritage Begun in 1994 5.2 GHz 5.5 GHz 6000 6000 4.4 GHz 5000 5000 4000 4000 MHz/GHz 3000 3000 1.7 GHz 1.2 GHz 2000 2000 770 MHz 1000 1000 00 2000 2003 2005 2008 2010 2012 z900 z990 z9 EC z10 EC z196 zEC12 z900 189 nm SOI z990 130 nm SOI z9ec 90 nm SOI z10ec 65 nm SOI z196 45 nm SOI zxxx 32 nm SOI 16 Cores 32 Cores 54 Cores 64 Cores 80 Cores 101 Cores Full 64-bit Superscalar System level High-freq core OOO core OOO and eDRAM z/Architecture Modular SMP scaling 3-level cache eDRAM cache cache improvements RAIM memory PCIe Flash zBX integration Arch extensions for scaling 45
  • 46.
    Phoenix IMS UsersGroup Extending System z Availability with Flash Express and IBM zAware Highly resilient & available systems Business Server Systems Operations Availability Application Design Availability Availability Sparing HyperSwap™ Capacity on Demand IBM zAware Concurrent Upgrade Capacity Back Up Flash Express Enhanced Book Virtual networking GDPS®/HyperSwap Availability Data Sharing Call home Hardware checks Redundant parts Parallel Sysplex® Designed to Prevent Designed to Improve Designed to improve Designed to Improve Hard Failures System SW Availability Continuous Operations Business Availability IBM Confidential 46
  • 47.
    Phoenix IMS UsersGroup IBM Flash Express – Smarter Availability for Smarter Systems • Flash Express is an innovative solution designed to help you compete effectively in today’s market – Automatically improve availability for key workloads at critical processing times – Drive availability and performance for workloads that cannot tolerate paging spikes or inconsistent performance – Slash latency for critical application processing such as diagnostics collection • Extends IBM’s expertise in memory management introducing a new tier of memory using Flash Express • Provides a secured, resilient and immediately usable solution • Planned Flash Express and pageable large page exploiters: – z/OS V1.13 Language Environment – Java SDK7 and by extension • WAS Liberty Profile v8.5 • DB2 • IMS 12 • And a future release of CICS® Transaction Server – IMS 12 Common Queue Server 47 © 2012 IBM Corporation 47
  • 48.
    Phoenix IMS UsersGroup Introducing Flash Express Time to Read • Flash Express is intended to improve System z availability Data measured – Slash latency delays from paging in System z • Flash Memory is much faster than spinning disk Instructions • Flash Memory is much slower than main memory • Flash Memory takes less power than either – Make your start of day processing fast Real Memory: – Designed to eliminate delays from SVC Dump processing (256B line) More Latency ~100 Instructions • zEC12 offers optional Flash Express memory cards – Supported in PCIe I/O drawer with other PCIe I/O cards – Installed in pairs for availability Flash Memory – No HCD/IOCP definitions required (4K page) ~100K • Assign Flash Memory to partitions like main memory Instructions – Assignment is by memory amount, not by feature – Each partition’s Flash Memory is isolated like main memory External Disk – Dynamically increase the partition maximum amount of Flash (4K page) – Dynamically configure Flash Memory into and out of the partition ~5,000K Instructions 48
  • 49.
    Phoenix IMS UsersGroup Relative Access Times for different technologies Access time CPU < 20 ns Cache Random Access < 200 ns Memory (RAM) Flash Express 5-20 micro sec. Solid State Drive (SSD) Storage 1-3 ms < 10 ms Spinning Disk Drive WORM, Tape Library seconds 49
  • 50.
    Phoenix IMS UsersGroup Flash Express Exploitation on zEC12 IBM Flash Express Flash Express will be exploited by z/OS – z/OS V1.13 Flash Web Deliverable – GA December 14, 2012 • Pagable Large Pages (1 MB) – z/OS V1.13 enabling PTFs for RSM enhancements – 1Q2013 • Flash Dynamic Reconfiguration • Optional PLPA and COMMON Page data sets – DB2 for z/OS and JAVA SDK7 SR3 will support pageable Large Pages (SoD*) – IBM is working with it’s Linux Distribution partners to include support in future Linux on System z distribution releases – IMS* CQS will use pageable Large Pages when IMS runs on zEC12 – Availability targeted for end of 2013 *All statements regarding IBM's future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only. 50
  • 51.
    Phoenix IMS UsersGroup IBM zAware delivers smarter message monitoring capabilities The complexity and rate of change of today’s IT infrastructures stress the limits of IT to resolve problems quickly and accurately–while preserving SLAs IT is challenged to diagnose system anomalies and restore service quickly – Systems often experience problems which are difficult or unusual to detect – Existing tools do little to quickly identify messages preceding system problems – Some incidents begin with symptoms that remain undetected for long periods of time – Manual log analysis is skills-intensive, and prone to errors IBM zAware with Expert System Diagnostics Gets it Right, Fast – IBM zAware helps improve problem determination in near real time – helps rapidly and accurately identify problems and speed time to recovery – Analyzes massive amounts of data to identify problematic messages, providing information to enable faster corrective action – Analytics on log data provides a near real time view of current system state – Cutting edge pattern recognition examines system behavior to help you pinpoint deviations – Machine learning, modeling and historical data work to describe your unique environment 51
  • 52.
    Phoenix IMS UsersGroup IBM zAware - Identifies Unusual System Behavior IBM zAware contains sophisticated analytics, applies IBM insight, and machine learning to understand your unique system. Monitoring Detection Frequency Reporting • Supports IBM and non • Detects anomalies other • Samples every 2 minutes • Near real time analysis IBM middleware and solutions might miss • 10 minute interval • Intuitive reporting – both applications • Can find the rare or • Uses 90 day rolling high level and drill down • Monitors OPERLOG in a infrequent message baseline; a utility provided • Color coded browser sysplex or monoplex • Can detect an unusual to populate baseline; display • Assigns a message number of normal flexibility provided • XML output can feed anomaly score to help messages ISVs or processes identify potential issues • Can detect messages – Tivoli® intends to issued out of context provide alert and event notifications1 52 © 2012 IBM Corporation 52 1 All statements regarding IBM future direction and intent are subject to change or withdrawal without notice and represents goals and objectives only.
  • 53.
    Phoenix IMS UsersGroup Sophisticated Detection and Diagnostic Capabilities IBM zAware - Cutting edge pattern recognition analytics looks at the health of a z/OS system – Perform machine learning, pattern recognition, and statistical analysis on streaming messages to look for unexpected patterns to give faster, more pinpointed recognition of problems IBM zAware - A ‘watch dog’ to detect unusual behavior of z/OS images in near real time – enabling you act on system issues sooner - pushes z/OS high availability even beyond what it is today. – Diagnose problems/ critical events/ outages while they are occurring in real time – Helps heighten awareness of small problems so they can be corrected quickly – Determine the cause of problems so the operation team can establish procedures to prevent a reoccurrence IBM zAware - can consume massive amounts of OPERLOG messages (anything with a well-formed message) and turn it into useful information – Works “out of the box” with relatively little customization (as compared to existing tools) – A single browser based view of the health of a Parallel Sysplex® via a relative weighting and color coding – Out of band – minimal effect on z/OS product workloads – Complementary to existing tools 53
  • 54.
    Phoenix IMS UsersGroup IBM zAware – IBM System z Advanced Workload Analysis Reporter Monitors z/OS OPERLOG messages including all z/OS console message, ISV and application generated messages Can monitor across a sysplex Expert Machine Knowledge Learning Samples every 2 minutes. IBM IBM Reports on 10 minute time slices. zAware zAware Uses a 90 day baseline created from SYSLOG Integrated Intuitive Detects anomalies monitoring systems miss: – Messages may be suppressed or rare – Messages may indicate a trend Reports on unique messages, and a “score” Color-coded, browser-based (IE 8, Firefox) XML Output consumable through published API, can drive ISV products 54
  • 55.
    Phoenix IMS UsersGroup IBM zAware: Unmatched Resiliency by design Self learning integrated expert solution Reduce financial impact of down time Simple graphical interface for easy Gain visibility into drill down system behavior Analyze system messages to identify Increase operator unusual system behavior effectiveness Monitor all System z servers from a Diagnose problems single point and decrease risk 55
  • 56.
    Phoenix IMS UsersGroup IBM System z Security as the Enterprise Standard • Intrinsic platform security and privacy for transactions and sensitive data helps enable System z to be the secure enterprise application server and data vault – Hardware cryptography built into each general purpose CP and IFL, and via the new Crypto Express4S coprocessors – Secure your critical information assets (or data) throughout their life cycle • Security capabilities that span the needs of multiple industries – Strong focus on security and crypto functions required by the Banking/Finance industries – Support for the payment card industry with solutions that leverage the zEC12 for compliance and security (i.e. EMV for American Express) – New IBM Enterprise PKCS #11 Coprocessor firmware and support from z/OS helps meets the requirements of the European Union and public sector clients • Leveraging the strengths of operating system security and cryptographic capabilities – Qualities needed by enterprises adopting cloud application architectures – Wide range of cryptographic primitives exploited by operating system and middleware to help secure and accelerate workloads • zEC12 supports the System z exclusive protected key processor based cryptography – Blends the speed of processor based crypto with the security of the Crypto Express coprocessor • PR/SM™ designed for EAL 5+ certification 56
  • 57.
    Phoenix IMS UsersGroup Systems z delivers ultimate security to address your challenges of cost, complexity and compliance People • Encryption of critical data, at rest and in flight Data • Early detection of application vulnerabilities and Isolation of workloads Application • A fully secured virtual pool of resources as a foundation for enterprise clouds Infrastructure • Complete user authentication, access control, audit and management Governance, Risk Build a strong foundation Management and compliance for IT security 57
  • 58.
    Phoenix IMS UsersGroup Ultimate security by design High speed cryptography integrated on Protect corporate data tamper resistant hardware Enhanced digital signature capability for Meet regulatory smart passports, ID cards and banking requirements New credit card transaction verification Enable smart support for smart payment cards1 payment cards Mainframe security events integrated Enhance security with zSecure and QRadar intelligence 1verification of card security codes and support for PIN changes 58
  • 59.
    Phoenix IMS UsersGroup zEC12 – Supports efficiencies in the data center • New non-raised floor option offers flexible possibilities for the data center • Continuing to support options for better control of energy usage and improved efficiency in your data center – zEC12 has a new radiator-based air cooled system design for more efficient cooling and improved concurrent maintenance – Water cooled options on zEC12 allow for up to 9% additional data center energy savings1 – Savings with optional HV DC power when implemented in a new data center could be on the order of 7-12% of server input power2 • More capacity but little change to the footprint in the data center – Identical floor cutouts for zEC12 as the z196 and z10 EC3 with no significant increase in weight – Depth of system with covers will increase by 64 mm / 2.52 inches • Over 12 years experience in designing and building earthquake resistant servers 1 Based on internal measurements with average power usage effectiveness (PUE) of 2 with well configured zEC12 configuration. 2 Based on internal measurements and projections. 3 With the exception of water cooling and overhead cabling 59
  • 60.
    Phoenix IMS UsersGroup zBX – A Uniquely Configured Extension of the zEnterprise zBX • zBX Model 003 supported by zEC12 Machine Type: 2458 Model: 003 – Investment protection – Model 002 upgrades to Model 003 PS701 blades (112 max) • No need to make changes to applications Up to HX5 (7873) blades (56 112 and application certifications are inherited max) from blades DataPower XI50z (28 max) • Managed by Unified Resource Manager 1-4 Racks based on number of installed blades – Management of resources as defined by your business goals and objectives One zBX per zEC12 Optional Acoustic Doors – Integrated network for better security, control and faster time to value Optional Rear Door Heat Exchanger – Programmable interfaces (APIs) to connect Upgradeable from zBX Model 002 with system management tools for total management capabilities - IBM Tivoli Monitoring (ITM) has been enhanced to use the APIs 60
  • 61.
    Phoenix IMS UsersGroup zEnterprise Hybrid Computing The commitment to Hybrid Computing continues with new enhancements Clients can use the same method to implement servers for AIX®, Linux® and Microsoft® Windows® to reduce costs with high quality of service Hybrid computing on IBM System z® keeps getting smarter • Enhancements to IBM zEnterprise Unified Resource manager (zManager) in support dynamic storage capabilities and additional Linux distributions • Improved image and energy management capabilities for IBM System x® and Power® blades • No charge migration to move to the current generation of IBM zEnterprise BladeCenter® Extension (zBX) and Unified Resource Manager What Clients are saying about zEnterprise Hybrid Computing … same method for implementing new servers across AIX, Linux “ and Microsoft Windows … simplify and integrate its diverse infrastructure to reduce costs and ensure high quality of service … BG-Phoenics “ … The combination of IBM System z® with Intel® servers in an Ensemble configuration turns out to be the best solution for modernization… EUROCONTROL …. a platform for all the services we need in the future … “ more computing resources for less money … Health Insurance Institute of Slovenia 61
  • 62.
    Phoenix IMS UsersGroup IBM zEnterprise BladeCenter Extension (zBX) Machine Type: 2458 Model 003 zBX is built with integrated IBM certified components – Standard parts – TOR switch, BladeCenter Chassis, Power Distribution Units, Optional Acoustic Panels – Optional optimizer - IBM WebSphere DataPower Integration Appliance XI50 for zEnterprise (DataPower XI50z) ordered as a feature of zBX Up to 112 blades are supported on zBX – System x and POWER7 blades are acquired through existing channels – IBM System x Blades – up to 56 entitlements • IBM BladeCenter HX5 (7873) dual-socket 16-core blades Four supported memory configurations in zBX – 64 GB, 128 GB, 192 GB, 256 GB – IBM POWER7 Blades – up to 112 entitlements • IBM BladeCenter PS701 Express - 8-core processor 3.0GHz, Three supported memory configurations in zBX - 32 GB, 64 GB, 128 GB • AIX: AIX 5.3 Technology Level 12 or higher, AIX 6.1 Technology Level 5 or higher, AIX 7.1 – Up to 28 DataPower XI50z blades (double wide) – Mix and match blades in the same chassis System z support -- Blades assume System z warranty and maintenance when installed in the zBX Investment protection – Upgrade Model 002 to Model 003 – Model 002 managed only by z196 or z114 and Model 003 managed only by zEC12 62
  • 63.
    Phoenix IMS UsersGroup Operating System Environments extend application flexibility Operating Systems are customer acquired and installed Unified Resource Manager will install hypervisor on blades in the zBX – Integrated hypervisor (KVM-based) for System x blades – PowerVM Enterprise Edition for POWER7 blades Support for Linux and Windows environments on System x blades in zBX – 64-bit version support only – Linux: Red Hat RHEL 5.5, 5.6, 5.7, 6.0 6.1 & SUSE Linux Enterprise Server (SLES) 10 (SP4) and SLES 11 SP1 – Microsoft Windows Server 2008 R2 and Microsoft Windows Server 2008 (SP2) (for either Windows we recommend Datacenter Edition) Support of AIX environments on POWER7 blades in zBX – AIX: AIX 5.3 Technology Level 12 or higher, AIX 6.1 Technology Level 5 or higher, AIX 7.1 Certifications inherited from blades – SAP support for Linux and Windows on x86 blades in the zBX PowerHA SystemMirror Standard Edition for AIX supported for the zBX with PS701 blades 63
  • 64.
    Phoenix IMS UsersGroup Unified Resource Manager optimizes system resources Bringing mainframe governance for System z resources Single view of virtualized resources across platforms Integrated network for better security, control and faster time to value Management of resources as defined by your business goals and objectives – IBM intends to deliver workload-aware optimization for System x blades (Statement of Direction)* Programmable interfaces (APIs) to connect with system management tools for total management capabilities New dynamic storage capabilities for System x blades Unified Resource Manager transforms the way resources are managed and deployed * All statements regarding IBM future direction and intent are subject to change or withdrawal without notice and represents goals and objectives only. 64
  • 65.
    Phoenix IMS UsersGroup Continuing Value using the Unified Resource Manager Simplified installation Simplified installation Simplified energy management of hypervisors of hypervisors Energy cost savings Gain significant time to Gain significant time to market with improved market with improved speed of deployment speed of deployment Allow critical workloads to receive resources and priority based on goal-oriented policies Hypervisors Energy established by business Save time, cost and simplify asset management requirements Decrease problem determination APIs allow Smart business adjustments and resolution time for cross- Operationssharing ofPerformance based on workload insight platform resources information Load balancing to manage Improve and simplify cross- traffic flow platform availability procedures Networks Virtual Servers Provide deep insight into how IT Enable broader and more resources are being used granular view of resource consumption HMC NEW! SAP support for Gain flexibility, consistency and uniformity Linux and of virtualization Windows on x86 blades!!! Provide the business with faster time to Factory installed and configured network market Improved network security with lower latency, less Simplified network management for complexity, no encryption/decryption applications Monitor status and general health of network Bridging of internal HiperSockets network 65 resources to the entire ensemble 65
  • 66.
    Phoenix IMS UsersGroup Flexible Connectivity on zEC12 Improving bandwidth, granularity and options for connections Heterogeneous environments For Clustering zBX HCA-3 InfiniBand® Coupling HMC Links – Intraensemble data network (IEDN) New IBM zAware partition – 12x InfiniBand managed from HMC – Intranode management network – 1x InfiniBand (4 ports) (INMN) Location to run Unified Resource improved scalability – Increased 10 Gb Ethernet Manager – including monitoring ISC-3 (peer mode only) 1 connectivity within zBX CPU, energy, workload performance STP To PureSystems – Improved broadband Host of the ensemble – controlling – 10 Gb Ethernet all functions of the ensemble security Primary with Alternate needed for DR Within zEC12 PCIe I/O Infrastructure I/O Drawer and I/O Cage Flash Express HMC To the Network To the Data OSA-Express4S PCIe based) OSA-Express31 – 10 Gb Ethernet LR and SR – 10 Gb Ethernet FICON® Express8S FICON Express41 (PCIe-based) – 1 Gb Ethernet SX and LX – 1 Gb Ethernet – SX and 10 km LX – SX and 10KM LX – 1000BASE-T Ethernet – 1000BASE-T Enhanced channel Ethernet FICON Express81 subsystem 1 Carry – SX and 10KM LX forward only 66
  • 67.
    Phoenix IMS UsersGroup IBM System Storage DS8800 Unique performance, availability and scalability makes DS8800 the ideal storage platform for zEnterprise • Self-optimizing performance and cost for hybrid computing – Easy Tier can improve performance by up to 3x by moving only 3% of data to SSDs – Integrated QoS management aligns server and storage resources with application priorities – 8x faster query performance for operational analytics with special DS8000® List Prefetch Optimizer for High Performance FICON • Designed for near-continuous operations with over six-nines availability – Fully-redundant design for near-continuous data access – Tight integration between DS8000 remote mirroring and GDPS HyperSwap is designed for over six-nines (99.9999%) availability • Optimized for zEnterprise efficiency and scalability – Support for System z Discovery and Auto-Configuration simplifies configuration – Extended Address Volumes of up to 1 TB volumes simplifies management of large volumes – New support for System z load balancing algorithms can optimize throughput and response times between server and DS8000 67
  • 68.
    Phoenix IMS UsersGroup Robust tape storage to protect your information Helping our clients retain data securely and in compliance with regulatory requirements Comprehensive tape storage product line for System z attachment TS1140 Offers high performance (250 MBps) and high native capacity (4 TB) for storage consolidation Tape Drive Provides information security with support for encryption and key management Supports Write Once Read Many (WORM) cartridges to help satisfy compliance requirements TS3500 Scalable, automated data retention with up to 2.7 EB capacity with 3:1 compression Tape Library Offers enhanced data availability and reliability with optional dual library accessory Provides data security and regulatory compliance via support for tape drive encryption and WORM cartridges TS7700 Virtualization solution implements a fully integrated tiered storage hierarchy of disk and tape Virtualization Reduces batch processing time, total cost of ownership and management overhead Engine Disk-only models with up to 1.3 PB native tape volume cache Grid configurations for information availability and business continuity Tape is often cost effective versus disk • Lower price per MB • Lowest power and cooling storage option available today 68
  • 69.
    Phoenix IMS UsersGroup Synergy with zEC12 operating systems z/OS Linux on System z Java exploitation of Transactional Execution Improved consolidation ratio through new capacity performance for increased parallelism and scalability Improved I/O performance using High Performance FICON (zHPF) Enhanced security support for digital Application and Linux optimization enabled by full exploitation of signatures zArchitecture extensions Faster problem determination with IBM zAware Optimized system setup via Linux health checker for improved availability FCP end-to-end data integrity checking for applications and storage Improve availability and performance with subsystems Flash Express Plus over 3,000 applications on System z 2 GB page support Simpler Specialty Engine (zIIP) exploitation z/OS v1.13 exploitation of new hardware Plus over 4,100 applications enabled on z/OS® z/TPF Support for 86 CPUs Hardware exploitation for performance z/VM improvements z/VM® Compatibility support Guest exploitation support for new encryption z/VSE technology 64-bit addressing with z/VSE® V5.1 Improved I/O performance using High Performance Strong interoperability with Linux on FICON (zHPF) for guest exploitation System z New CICS functionality (CICS Explorer) AND with blades on the zBX there are even more options with applications on AIX, Linux on System x or Microsoft Windows 69
  • 70.
    Phoenix IMS UsersGroup Operating System Support for zEC12 The following are the minimum operating systems planned to run on zEC12: – z/OS • z/OS V1.12, V1.13 • z/OS V1.11, V1.10 Lifecycle Extension – Linux on System z distributions: • SUSE Enterprise Server (SLES) SLES 10 and SLES 11 • Red Hat Enterprise Linux (RHEL) 6 and RHEL 5 – z/VM • VM V5.4, 6.1, 6.2 with PTFs • z/VM V6.1, 6.2 for zBX support – z/VSE • z/VSE V4.3, V5.1, with PTFs • z/VSE V5.1 with PTFs for Crypto Express4S toleration – z/TPF V1.1 Using the general purpose application server blades we have: – Linux: Red Hat RHEL 5.5 and up, 6.0 and up and SUSE Linux Enterprise Server (SLES) 10 (SP4) and up and SLES 11 SP1 and up – Microsoft Windows Server 2008 R2 and Microsoft Windows Server 2008 (SP2) (for either Windows we recommend Datacenter Edition) – AIX: AIX 5.3 Technology Level 12 or higher, AIX 6.1 Technology Level 5 or higher, AIX 7.1 70
  • 71.
    Phoenix IMS UsersGroup Evolution of Specialty Engines Plus . . . Building on a strong track record of technology innovation with specialty engines DB Compression, SORT, Encryption Transparent for applications 2010 Optimizers, Accelerators, 2006 Hybrid IBM System z10 processing 2004 Integrated Information Processor (IBM zIIP) System z9 Application Assist Eligible workloads: Processor (zAAP) IPSec encryption, 2001 HiperSockets™, XML, Eligible ISV, some DB2, z/OS Integrated Facility Global Mirror, IBM workloads: Java for Linux (IFL) GBS Scalable 1997 and XML Architecture for Financial Reporting Internal Coupling Facility (ICF) 71
  • 72.
    Phoenix IMS UsersGroup Protecting your investment in IBM technology • Designed to protect your investment zBX z196 Mod 002 – Offering upgrades from z10 EC™ and z196 to the zEC12 – Upgrades from zBX Model 002 to zBX z10 EC Model 003 • Full upgradeability within the zEC12 family zEC12 – Upgrade to Model HA1 will require a planned outage • On demand offerings offer temporary or permanent growth when you need it zBX Mod 003 72
  • 73.
    Phoenix IMS UsersGroup IBM zEnterprise EC12 – new for September 2012 IBM zEnterprise EC12 (2827) IBM zEnterprise Blade Extension (2458) • Announced 08/12 – Server w/ up to 101 PU cores • First Announced 7/10 • 5 models – Up to 101-way • Model 003 for zEC12 – 08/12 • Granular Offerings for up to 20 CPs • zBX Racks with: • PU (Engine) Characterization – BladeCenter Chassis – CP, SAP, IFL, ICF, zAAP, zIIP – N + 1 components • On Demand Capabilities – Blades – CoD, CIU, CBU, On/Off CoD, CPE, FoD – Top of Rack Switches • Memory – up to 3 TB for Server and – 8 Gb FC Switches up to 1 TB per LPAR – Power Units – 32 GB Fixed HSA – Advance Management Modules • Channels – PCIe bus • Up to 112 Blades – Four LCSSs – POWER7 Blades – 3 Subchannel Sets – IBM System x Blades – FICON Express8 and 8S – IBM WebSphere DataPower Integration – zHPF Appliance XI50 for zEnterprise (M/T – OSA 10 GbE, GbE, 1000BASE-T 2462-4BX) – InfiniBand Coupling Links • Operating Systems – Flash Express – AIX 5.3 and higher • Configurable Crypto Express4S – Linux for Select IBM x Blades • Parallel Sysplex clustering – Microsoft Windows for x Blades • HiperSockets – up to 32 • Hypervisors • Up to 60 logical partitions – PowerVM Enterprise Edition • Enhanced Availability – Integrated Hypervisor for System x • IBM zAware • Unified Resource Manager • Operating Systems – z/OS, z/VM, z/VSE, z/TPF, Linux on System z 73
  • 74.
    Phoenix IMS UsersGroup IBM zEnterprise family IBM zEnterprise 196 (2817) IBM zEnterprise Blade IBM zEnterprise 114 (2818) Extension (2458) • Announced 7/10 – Server w/ up to 96 PU cores • Announced 7/10 • Announced 07/11 • 5 models – Up to 80-way • Model 002 for z196 or z114 • 2 models – M05 and M10 • Granular Offerings for up to 15 CPs • zBX Racks with: ‒ Up to 5 CPs • PU (Engine) Characterization – BladeCenter Chassis • High levels of Granularity available – CP, SAP, IFL, ICF, zAAP, zIIP – N + 1 components – 130 Capacity Indicators • On Demand Capabilities – Blades • PU (Engine) Characterization – CoD, CIU, CBU, On/Off CoD, CPE – Top of Rack Switches – CP, SAP, IFL, ICF, zAAP, zIIP • Memory – up to 3 TB for Server and – 8 Gb FC Switches • On Demand Capabilities up to 1 TB per LPAR – Power Units – CoD, CIU, CBU, On/Off CoD. CPE – 16 GB Fixed HSA – Advance Management Modules • Memory – up to 256 GB for Server • Channels – 8 GB Fixed HSA – PCIe bus • Up to 112 Blades • Channels – Four LCSSs – POWER7 Blades – PCIe bus – 3 Subchannel Sets – IBM System x Blades – Two LCSSs – MIDAW facility – IBM WebSphere DataPower Integration – 2 Subchannel Sets – Up to 240 ESCON channels Appliance XI50 for zEnterprise (M/T – MIDAW facility – Up to 288 FICON channels 2462-4BX) – Up to 240 ESCON channels – FICON Express8 and 8S • Operating Systems – Up to 128 FICON channels – zHPF – AIX 5.3 and higher – FICON Express8 and 8S – OSA 10 GbE, GbE, 1000BASE-T – zHPF – Linux for Select IBM x Blades – InfiniBand Coupling Links – OSA 10 GbE, GbE, 1000BASE-T – Microsoft Windows for x Blades – InfiniBand Coupling Links • Configurable Crypto Express3 • Hypervisors • Parallel Sysplex clustering • Configurable Crypto Express3 – PowerVM Enterprise Edition • Parallel Sysplex clustering • HiperSockets – up to 32 – Integrated Hypervisor for System x • Up to 60 logical partitions • HiperSockets – up to 32 • Enhanced Availability • Up to 30 logical partitions • Unified Resource Manager • Unified Resource Manager • Operating Systems • Operating Systems – z/OS, z/VM, z/VSE, z/TPF, Linux on System z – z/OS, z/VM, z/VSE, TPF, z/TPF, Linux on System z 74
  • 75.
    Phoenix IMS UsersGroup • Machine Type zEC12 Overview – 2827 • 5 Models – H20, H43, H66, H89 and HA1 • Processor Units (PUs) – 27 (30 for HA1) PU cores per book – Up to 16 SAPs per system, standard – 2 spares designated per system – Dependant on the H/W model - up to 20, 43, 66,89, 101 PU cores available for characterization • Central Processors (CPs), Internal Coupling Facility (ICFs), Integrated Facility for Linux (IFLs), System z Application Assist Processors (zAAPs), System z Integrated Information Processor (zIIP), optional - additional System Assist Processors (SAPs) – Sub-capacity available for up to 20 CPs • 3 sub-capacity points • Memory – RAIM Memory design – System Minimum of 32 GB – Up to 768 GB per book – Up to 3 TB for System and up to 1 TB per LPAR • 32 GB Fixed HSA, standard • 32/64/96/112/128/240/256 GB increments - Flash Express • I/O – 6 GBps I/O Interconnects – carry forward only – Up to 48 PCIe interconnects per System @ 8 GBps each – Up to 4 Logical Channel Subsystems (LCSSs) – Up to 3 Sub-channel sets per LCSS • STP - optional (No ETR) 75
  • 76.
    Phoenix IMS UsersGroup zBX Overview • Machine Type/Model 002458-003 • Racks – Up to 4 (B, C, D and E) – 42U Enterprise, (36u height reduction option) – 4 maximum, 2 chassis/rack – 2-4 power line cords/rack – Non-acoustic doors as standard – Optional Acoustic Doors – Optional Rear Door Heat Exchanger (conditioned water required) 2458-003 • Chassis – Up to 2 per rack – 9U BladeCenter – Redundant Power, cooling and management modules – Network Modules – I/O Modules • Blades (Maximum 112 single width blades in 4 racks) – Customer supplied POWER7 Blades (0 to 112) – Customer supplied IBM System x Blades (0 to 56) – DataPower XI50z, M/T 2462-4BX (0 to 28 – double width) • Management Firmware – Unified Resource Manager • Top of Rack (TOR) Switches - 4 – 1000BASE-T intranode management network (INMN) – 10 GbE intraensemble data network (IEDN) – GbE IEDN for customer network • Network and I/O Modules in the BladeCenter Fibre Channel – 1000BASE-T and 10 GbE modules Disk Storage – 8 Gb Fibre Channel (FC) connected to customer supplied disks 76
  • 77.
    Phoenix IMS UsersGroup zEnterprise EC12 Functions and Features (GA Driver Level 12K – September, 2012)OSA-Express 4S 1000BASE-T Five hardware models CFCC Level 18 Six core 32nm PU chip IBM zAware Up to 101 processors configurable as On Demand enhancements CPs, zAAPs, zIIPs, IFLs, ICFs, or optional SAPs Non-Raised floor option for Air Cooled System only with overhead I/O and Increased capacity processor (1.25 x zEC12 power cabling options z196) Raised floor option for Air and Water Up to 20 sub capacity CPs at capacity Cooled System with overhead I/O and settings 4, 5, or 6 power cabling options z/Architecture Enhancements including New ‘radiator’ design for Air Cooled 2 GB Pages, Transactional Execution System and Runtime Instrumentation Optional water cooling with Exhaust Air 2nd Generation out-of order design Heat Exchanger & air backup Enhanced processor cache design Cycle Steering for Power Save and back-up for radiator and water cooled Dedicated data compression and systems crypto coprocessor on each PU Optional High Voltage DC power Up to 3 TB of Redundant Array of Independent Memory (RAIM) Static Power Save Mode Flask Express and pagable large page support Optional overhead Power and I/O cabling Crypto Express4S and Cryptographic enhancements NTP Broadband Authentication New Channel path selection algorithms zBX Model 003 and Unified Resource Manager 77
  • 78.
    Phoenix IMS UsersGroup zEnterprise zBX Functions and Features One hardware model Advance Management Module zBX is controlled by one specific zEC12 1000BASE-T and 10 GbE TORs Up to 4 Racks (B, C, D and E) Up to 112 Blades zBX 2 BladeCenters Chassis per rack POWER7 Blades Model 003 Non-acoustics doors standard IBM System x Blades IBM WebSphere DataPower Integration Optional Rear Door Heat Exchanger Appliance XI50 for zEnterprise Optional Rear acoustic door Additional connectivity for SANs Redundant Power, Cooling and Management Modules HMCs for Unified Resource Manager 10 GbE and 1 GbE Network Modules Upgraded Hypervisor levels 8 Gb FC modules Unified Resource Manager support for zEC12 and zBX Model 003 IEDN 10 GbE link aggregation between the BladeCenter and TORs Unified Resource Manager support for ensembles with zEC12, z196, z114, and zBX Models 002 and 003 78
  • 79.
    Phoenix IMS UsersGroup zEnterprise was Introduced with the z196 at its Heart Improvement for zEnterprise 196 (z196) Up to traditional z/OS Machine Type: 2817 40% workloads1 Models: M15, M32, M49, M66, M80 Improvement in CPU World’s fastest 5.2 GHz processor chip Up to an additional intensive workloads via compiler enhancements – 100 new instructions, new out of order sequence, 30% more on chip cache Up to Total capacity Focus on the environment and data center 60% improvement1 – Options to help eliminate hotspots and save on 1 to 80 configurable cores for client energy use Operating System Flexibility IFL, zIIP, zAAP, ICFs and optional SAPs – z/OS, z/VM®, z/VSE®, z/TPF and Linux on System z 45 subcapacity settings Security and reliability Up to 3 TB RAIM memory – Elliptic curve cryptography Cryptographic enhancements – Compliance and security improvements Designed for EAL5 certification – Crypto Express3 enhancements Upgradeable from IBM System z10® Enterprise Class (z10 EC™) and IBM System z9® Enterprise Class (z9® EC) 1. For average LSPR workloads running z/OS 1.11. 79 79
  • 80.
    Phoenix IMS UsersGroup z196 – IBM Leadership Technology At the Core New 5.2 GHz Quad Core Processor Chip boosts hardware price/performance – 100 new instructions – improvements for CPU intensive, Java™, and C++ applications – Over twice as much on-chip cache as System z10 to help optimize data serving environment – Out-of-order execution sequence gives significant performance boost for compute intensive applications – Significant improvement for floating point workloads Performance improvement for systems with large number of cores – improves MP ratio Data compression and cryptographic processors right on the chip 80 80
  • 81.
    Phoenix IMS UsersGroup zEnterprise Technology Designed for Small and Mid-sized Businesses - the z114 Up to Improvement for traditional 18% z/OS workloads 1 zEnterprise 114 (z114) Up to an ADDITIONAL Machine Type: 2818 Improvement in CPU 25% intensive workloads via 2 Models: M05 & M10 compiler enhancements2 Up to New technology in a new package 12% Total capacity improvement 1 ► Modular 2 drawer design for lower cost of entry Scales ► Granularity for right-sizing your system From 26 - 3100 MIPS ► Additional Scale for consolidation and growth Up to 130 available capacity settings ► Improved data center efficiency ► Same Qualities of Service as the z196 From ► Hybrid enabled to drive workload integration and 1-10 configurable cores for client use includes CPs, IFL, zIIP, zAAP, management and ICFs Improved Platform Economics From ► New Software Curve 0-2 IBM provided spare cores ► Lower Hardware Maintenance Up to ► Lower specialty engine and memory prices 256 GB RAIM fault tolerant memory ► Upgradeability for investment protection Fully Upgradeable from the IBM System z10 Business Class™ (z10 BC) & IBM System z9® Business Class (z9 BC); and to the z196 M15 1Relative capacity and performance compares at equal software levels as measured by IBM Large System Performance Reference (LSPR) workloads using z/OS® 1.11, Results may vary 81 2The z114 will exhibit up to 25% increase for CPU intensive workload as provided by multiple C/C++ compiler level improvements when going from z/OS 1.09 to z/OS 1.12 81
  • 82.
    Phoenix IMS UsersGroup z114 – IBM Leadership Technology At the Core 3.8 GHz Superscalar Processor Chip boosts hardware price/performance – 100 new instructions – improvements for CPU intensive, Java™, and C++ applications – New on-chip cache structure to help optimize data serving environment – Out-of-order execution sequence gives significant performance boost for compute intensive applications – Significant improvement for floating point workloads Data compression and cryptographic processors right on the chip Over 18 percent performance improvement per core and 12% improvement in total system scalability over the z10 BC. Compiler related enhancements help drive gains of up to 25% improvement in throughput for CPU/Numeric intensive workloads. 82 82
  • 83.
    Phoenix IMS UsersGroup Blades Provide Added Flexibility for Workload Deployment and Integration IBM zEnterprise IBM System x Blades BladeCenter Extension (zBX) – IBM BladeCenter HX5 7873 dual-socket 16-core blades Machine Type: 2458 Mod 002 – Four supported memory configurations for zBX – 64 GB, 128 GB, 192 GB, 256 GB Optimizers • IBM WebSphere DataPower IBM POWER7 Blades Integration Appliance XI50z for – IBM BladeCenter PS701 8-core processor 3.0GHz zEnterprise – Three configurations supported in zBX - 32 GB, 64 GB, 128 GB Select IBM Blades Flexibility in ordering – acquired though existing • IBM BladeCenter PS701 Express channels, including IBM • IBM BladeCenter HX5 (7873) Unified Resource Manager will install hypervisor on One to four – 42u racks – blades in the zBX capacity for up to 112 blades – Integrated hypervisor (KVM-based) for System x blades – PowerVM Enterprise Edition for POWER7 blades • Up to 112 PS701 Power blades Up to 112 Blades supported on zBX • Up to 56 HX5 System x blades – Ability to mix and match blades in the same chassis • Up to 28 DataPower XI50z – Number of blades supported varies by type blades (double-wide) Blades assume System x warranty and maintenance when installed in the zBX 83 83
  • 84.
    Phoenix IMS UsersGroup Service levels to match your business needs Increased flexibility for your multi-architecture strategy when data is on z/OS zEnterprise System Extreme scalability and performance for Extreme consolidation of transaction processing servers and networking and data serving Superior levels of virtual High availability and Expanded ISV support server provisioning, cross-system scalability monitoring and workload with Parallel Sysplex® and TCO for enterprise applications management GDPS® Industry-best virtual I/O Focus Silo managed islands of computing bandwidth and reliability Leading policy-based Targeted for capacity provisioning and applications that interact Fewer components and workload management Less dynamic than z reduced complexity with mainframe data Pervasive, high- virtualization and transactions System z qualities of dynamic resource performance security management and support Minimal resource Provisioned and sharing with z capacity-on-demand managed by System z resources Seamless integration with z/OS backup and disaster recovery solutions z/OS Linux on z/VM® Select IBM Blades in zBX Distributed TCA Systems Focus LOWER SCALABILITY, SECURITY, HIGHER DYNAMIC WORKLOAD MANAGEMENT 84
  • 85.
    Phoenix IMS UsersGroup Increasing your flexibility using zEnterprise Systems Additional offerings can help to strengthen business innovation Unified Resource PureSystems Manager 10 GbE Select IBM Blades Optimizers 10 GbE DataPower XI50z DataPower XI50z IEDN Linux on Windows AIX on System x on POWER7 System x 1 GbE INMN 10 GbE z196/z114 zBX IBM DB2 Analytics Accelerator (IDAA) HMC 85 85
  • 86.
    Phoenix IMS UsersGroup Underpinned by a thriving System z ecosystem Thousands of ISVs Worldwide adoption of invest in System z mainframe curriculum 7,000+ 1,200 new 120+ new 1067 43,825 SystemzJobs.com applications and ISV schools students from connects System supported upgraded partners enrolled 32 countries z clients, partners on z (3250+ applications added to with more participated in and businesses Linux and on System z the adding Master the with students and 4000+ z/OS) in 2010 platform curricula Mainframe professionals contests seeking z jobs 86 86
  • 87.
    Phoenix IMS UsersGroup Extensive ISV support for zEnterprise 87 87
  • 88.
    Phoenix IMS UsersGroup What is the IBM Academic Initiative? Membership in the IBM Academic Initiative is free and open to individual faculty members. A skills initiative – An IBM program that partners with academic institutions worldwide to build a pipeline of skilled students for the IT jobs of tomorrow and skills for a smarter planet. System z Mission (ibm.com/university/systemz): Assist clients world wide with z skills Demonstrate IBM’s commitment and continued investment in the mainframe 88 88
  • 89.
    Phoenix IMS UsersGroup IBM System z courses Foundational principles Tivoli security, systems, network, and storage Application development Intro to the Mainframe: z/OS Basics* management courses WebSphere Application Server for z/OS Intro to the Mainframe: Networking* IBM Tivoli License Compliance Manager for z/OS Intro to IBM WebSphere Developer for z 4.2 Implementation Intro to the Mainframe: Security* (Web based) Intro to the Mainframe: Large Scale IBM Tivoli System Automation for z/OS 3.1 WebSphere MQ for z/OS System Commercial Computing Introduction and Operations Administration Operating systems IBM Tivoli System Automation for z/OS 3.1 Developing COBOL with IBM Rational Linux on System z Implementation and Administration Developer for System z Introduction to z/VM® IBM Tivoli Workload Scheduler 8.2 for zOS Introduction to z/VSE Basics Scheduler's Workshop Information, data and transaction management Diagnosis UNIX® System Services (Module) Enterprise Server Data Management z/OS RAS and Diagnostics* User interfaces ISPF: z/OS Basic Interfaces DB2 for z/OS Fundamentals Storage management DB2 Family Fundamentals (Cross product) VSAM DB2 SQL Workshop (Cross product) eLearning resources Programming languages DB2 for z/OS Database Admin Workshop, Part 1 Interactive e-Learning Module: z/OS Basics Assembler DB2 for z/OS Database Admin Workshop, Part 2 Flash Demo: Introduction to Rational COBOL DB2 Programming Workshop for z/OS Developer for System z JCL DB2 for z/OS Application Development Develop a batch DB2 for z/OS COBOL Other DB2 for z/OS Query Optimization and application using RDz Performance Tuning Developing and debugging a COBOL DB2 Developing COBOL with Rational Intro to IMS* application Developer for System z V7.6 IMS Fundamentals Editing record-oriented programs with the z/OS Advanced Topics* System z LPEX editor z/OS Emerging Technologies* An Introduction to IMS (Textbook reference) Learn about your future in Large Systems z/OS Installation Transaction Management Careers in Mainframes *available in audio version 89
  • 90.
    Phoenix IMS UsersGroup Introducing SystemzJobs.com - The link to your future career The IBM System z Job Board at SystemzJobs.com is a new resource that connects students learning IBM Enterprise Systems with companies hiring talent. Benefits of using SystemzJobs.com Getting started Free, secure, and easy to use Follow these steps at SystemzJobs.com to Fast access to the best jobs in the get started: IT industry 1. Create a secure account (optional) Global pool of available jobs 2. Search for jobs with your preferences 3. Connect with employers Sponsored by the IBM Academic Initiative, System z Visit: ibm.com/university/systemz Questions? Contact zSkills@us.ibm.com 90
  • 91.
    Phoenix IMS UsersGroup The new IBM zEnterprise is designed to help top performing organizations transition from the process centric, programmable era of IT to the information centric, cognitive era of IT. Deliver significant cost Provide protection and Build intelligence in to savings for existing 24/7 availability for core the business transaction operations while freeing business operations and to expand the value of the up resources to focus on provides a secure and transaction, create new new services to drive stable information source transactions and improve growth for new customer facing customer service services These core capabilities are strengthened through the delivery of key technologies and continued innovation. 91 © 2012 IBM Corporation 91
  • 92.
    Phoenix IMS UsersGroup zEnterprise EC12: Operational Analytics Delivering information and insight to enable intelligent decisions zEnterprise EC12 increases throughput up to 30% for a DB2® for z/OS® operational analytics workloads as compared to z196 With IBM DB2 Analytics Accelerator (IDAA) clients can deploy business analytics on the same platform as operational applications Integration of analytics scoring within an OLTP transaction enables faster decision making IDAA on zEnterprise EC12 can offer up 12X improvement in price / performance vs. the competition With Cognos® on System z customer queries that previously ranged from 25 seconds to 90 minutes now take 8 seconds or less 92
  • 93.
    Phoenix IMS UsersGroup zEnterprise EC12: Superior availability by design Delivering a resilient environment for core business processes and data New operational diagnostics with IBM zAware – Analytics on log data provides a near real time view of current system state – Cutting edge pattern recognition helps pinpoint deviations in system behavior – Provides information to enable faster corrective action 24x7 24x7 New Flash Express Card to exploit Flash Memory – Automatically improve availability for key workloads at critical processing times – Reduces latency for critical application processing such as diagnostics collection – Improves availability for workloads that cannot tolerate paging spikes or inconsistent performance 93
  • 94.
    Phoenix IMS UsersGroup zEnterprise EC12: Ultimate security by design New and enhanced capabilities to improve customer trust and confidence High speed cryptography integrated on the new Crypto Express4S chip to protect sensitive data from unauthorized users Enhanced digital signature capability with new Enterprise PKCS #11 to meet regulatory requirements New credit transaction verification support for smart payment cards Centrally protect multiple, mixed workloads running in separate partitions Integration of mainframe security events with IBM zSecure Suite and QRadar to enhance security intelligence 94
  • 95.
    Phoenix IMS UsersGroup IBM zEnterprise EC12 enables improved services for your clients Cloud ready • New 5.5 GHz 6-core processor chip and 50% increase in capacity enables flexible delivery of services though a private cloud. • Virtualization means fewer resources are required to meet peak demands with optimized interconnection. Data ready • IBM zAware is a self-learning expert solution to reduce risk of downtime impacting data availability for critical business processes. • Connecting the most sophisticated data warehousing and analytics solutions with the fastest query performance in the market Security ready • Most secure system with 99.999% reliability • Superior security with high-speed cryptography integrated as part of the chip protects customer privacy and reduces risk of breaches. 95
  • 96.
    Phoenix IMS UsersGroup A “System of Systems” for Predictable Service Delivery IBM zEnterprise EC12 or 196 (z196) or IBM zEnterprise 114 (z114) Optimized to host transaction, and mission-critical applications The most efficient platform for large-scale Linux® consolidation Massive scale-up – 26 MIPS to over 78K MIPS zEnterprise Unified Resource Manager Unifies management of resources, extending IBM System z® qualities of service end-to-end across workloads Provides platform, hardware and workload management zEnterprise BladeCenter® Extension (zBX) Selected IBM POWER7® blades and IBM System x® blades for deploying applications in a multi-tier architecture High-performance optimizers and appliances to accelerate time to insight and reduce cost Dedicated high-performance private network 96 96
  • 97.
    Phoenix IMS UsersGroup What’s new with z/OS and z/OS Management Facility Version 1 Release 13 97 97
  • 98.
    Phoenix IMS UsersGroup Agenda z/OS® and z/OS Management Facility function and value z/OS and Integration with IBM zEnterprise™ z/OS Management Facility R13 System Available today 98 98
  • 99.
    Phoenix IMS UsersGroup z/OS – Smarter Operating System for Smarter Computing z/OS V1.13 – Performance, programming, and operations improvements help you to gain more value from your workloads. http://www.ibm.com/systems/z/os/zos/ z/OSMF V1.13 - Streamlined processes and built-in guidance address a broad scope of z/OS activities and helps create a more integrated z/OS experience and improved productivity http://www-03.ibm.com/systems/z/os/zos/zosmf/ 99
  • 100.
    Phoenix IMS UsersGroup z/OS R13 – Smarter Operating System for Smarter Computing Improved performance, programming, and operations provide more value from your workloads. Enhancements in z/OS and z/OS Management Facility Version 1 Release 13 help provide: Advantages for your organization. Autonomics and smart operations proactively avoid errors, reduce risk from outages, speed software deployment, simplify z/OS management, and make your organization more productive. Advantages to your business. Foundation for modern batch capability, industry leading security, resiliency, and data handling capability enables you to access and transform business data to business value more readily. Advantages to your operations. Improved performance and new technologies for Web-based and traditional workloads improves integration of core data in your enterprise and opens new opportunity for applications with affinity to z data. 100
  • 101.
    Phoenix IMS UsersGroup z/OS R13 – Smarter Operating System for Smarter Computing More value from your workloads with programming, performance, and operations improvements. Enhancements for release 13: Foundation for modern batch applications A new z/OS base component, z/OS Batch Runtime environment, provides the framework for Java-to-COBOL interoperability, for transactional updates to DB2, and for sharing database connections between Java and COBOL. * Simplified batch application programming and potentially shortened batch windows, with new JES2 JCL improvements, giving you more control of your batch applications. Leverage the strength of z/OS batch, a new web-based (REST) interface enables you to submit batch jobs and access batch data from non-z/OS systems** Improved performance for new and traditional workloads***: Between 50% and 150%* I/O performance improvement for workloads using shared zFS in a Parallel Sysplex. Up to 15% to 55%* IEBCOPY performance improvement for traditional workloads Potentially shorter batch windows using JES2 JCL improvements to free tape volumes more quickly Availability enhancements: Improve spool volume management by using new JES2 spool migration function and JES3 dynamic spool add capability Improved channel recovery - track errors and automatically remove failing paths (on a controller level) faster zFS internal restart - automatically recover disabled aggregates in Sysplex aware mode – avoiding lengthy manual system recovery process. Avoid planned outages - Concurrent service for DADSM and CVAF * Prerequisites: IBM 31-bit SDK for z/OS, Java Technology Edition Version 6.0.1 (5655-R31), DB2 V9.1 for z/OS (5635-DB2) or later with PTFs, IBM Enterprise COBOL for z/OS V4.1 (5655-S71) or later ** Prerequisite: RESTful API included in z/OSMF V1.13. *** Based on IBM Lab results, your results will vary. I/O performance improvements measured for fully shared zFS ranged from very small to 900%, with the majority of workload conditions tested falling between 50% and 150%. The actual amount of improvement will depend on the environment (monoplex or Parallel Sysplex) and the type of file processing being done. IEBCOPY improvement will depend on conditions such as: the amount of data being copied, block size, and type of IEBCOPY operation 101
  • 102.
    Phoenix IMS UsersGroup z/OS Management Facility – the new face of z/OS Streamlined processes and built-in guidance address a broad scope of activities and helps create a more integrated z/OS experience. Configuration Configuration Assistant for z/OS Communication Server (R11) – Simplified configuration and setup of TCP/IP policy- based networking functions Performance Capacity Provisioning (R13) - simplified monitoring of CP status for domains Resource Monitoring and System Status (R12) – single view of sysplex and Linux® performance status and dynamic real time resource metrics. Workload Management – creation, editing, and activation of WLM policies (R12) Problem Determination Incident Log (R11) – Simplified capture, packaging, sending of SVC dump diagnostic data Software Deployment (R13) - Clone z/OS images, deploy software more easily and consistently z/OS Classic Interface ISPF Task integrates existing ISPF into z/OSMF to launch to ISPF functions directly (R13) Base A new web-based (REST) interface enables you to submit batch jobs and access batch data from non-z/OS systems (R13) Leverage System z Specialty engines IBM Assistance available to help with pre-planning, early discovery, and readiness review for new z/OSMF environment(s). 102
  • 103.
    Phoenix IMS UsersGroup z/OSMF Software Deployment (R13) New! - simplified deployment of installed software New task designed to make deployment of installed software simpler and safer. – Easy to follow checklist replaces manual and error prone procedures with a user friendly application – Incorporates IBM recommended best practices for software deployment. Software Deployment can clone software – Locally, single system or within a sysplex – Remotely, across a network, and multiple sysplexes. Software Deployment can also: – Identify, modify, delete software instances – Generate jobs to copy a software instance – Verify cross-system and cross-product requisites, verify fixes – Copy ALL parts of the software (SMP/E CSI inventory too) Clones all SMP/E installed software! – IBM, ISV, z/OS, stack or individual products – Service upgrades for all of the above (via complete replacement) 103 103
  • 104.
    Phoenix IMS UsersGroup z/OSMF Incident Log (R11) Save hours of time when diagnosing incidents Respond to and manage incidents quickly and efficiently – View, sort, and act on incidents (identified by subsystem) – Package dump data for transmission in Many fields, set tracking IDs minutes Can identify which subsystem For z/OSMF R12 Add additional comments and diagnostic Select incident, get data popup with actions Encrypted parallel FTP of the incident files, to IBM . Sending additional user-defined data with an incident For z/OSMF R13 New APAR search View job status via SDSF launch Utilizes new Problem Documentation Upload utility in base of z/OS R13 Also available as a download from Note, screen capture from z/OSMF R12 http://www14.software.ibm.com/webapp/set2/s as/f/zaids/pduf.html 104 104
  • 105.
    Phoenix IMS UsersGroup Application Linking (R13) Example, link Incident Log to SDSF in context A more seamless experience when working with z/OS. Make your own linkages between z/OSMF apps and even to any web-based apps Define an ‘event’ (such as “View Job Status”) A c tion from the Inc ident Log: Launc h to view job s tatus - S D S F Then define the ‘event handler’ action and parameters (such as ‘go to ISPF’ with context of the job) 105 105
  • 106.
    Phoenix IMS UsersGroup Resource Monitoring (R12) A snapshot of the performance of workloads running on your systems Sysplex status: – Instant snapshot of workload performance – RED, YELLOW GREEN status gives instant indication of WLM goals – Monitor z/OS AND Linux – Drill down to see RMF™ metrics – Renamed System Status (R13) Monitoring Desktops – GUI for RMF – Monitor most Resource Measurement Facility (RMF) Monitor III metrics, create and save custom views, and display real-time performance data as bar charts. – Renamed Dashboards (R13) Note, screen captures from z/OSMF R12
  • 107.
    Phoenix IMS UsersGroup Integrated z/OS and Linux resource monitoring A monitoring solution for multi-tier workloads Monitor the resources for z/OS and Linux workloads Ideal for use with System z Processor Utilization Enterprise System of Linux Processes For z/OSMF R12 – Use separate as-is, no-charge web-download tool to gather resource information for Linux systems. For z/OSMF R13 – New integrated performance data gatherers for Linux on System z, Linux on IBM System x®, and AIX® systems – Additional monitoring capabilities Processor Utilization of z/OS Jobs for your zEnterprise System Note, screen capture from z/OSMF R12 107 107
  • 108.
    Phoenix IMS UsersGroup New programmatic interface for z/OS batch Function delivered with z/OSMF R13 A new REST API (HTTP(s)-based) interface to z/OS Easy programmatic access to the power of z/OS batch capabilities – REST API web services can be used by: web applications (javascript/AJAX, Flex(Flash), etc) and other web service clients, such as Java, PHP, Perl, etc – The REST API web service will connect to both JES2 and JES3, as well as select secondary subsystems Today: New option today Complex programming Any web-based, Java, PHP, Perl – Allocate and open internal reader – TSO/ISPF submit, application, etc. supporting HTTP – FTP “interface-level2” New RESTful HTTPs based API – Java z/OS submit interface Highly secure, firewall friendly, Security protocol limitations Simplified text-like programming Break the barriers of batch Submit JCL, get status, retrieve output files, change jobclass, cancel job, purge job z/OS JES2 and z/OS JES3 108
  • 109.
    Phoenix IMS UsersGroup z/OS R13 - The foundation for modern batch About 90% of customers consider batch mission critical* Challenge: Greater volumes of data and larger batch and on-line processing windows. Solution: Need to make batch more efficient. Expand existing COBOL applications with Shorter batch windows! Java! – New function in z/OS helps make batch processing – More choice for application development skills more efficient – Leverage specialty engines! – “Pipe” data between two batch jobs to enable these jobs to perform concurrent reads and writes Simplified programming! Real time batch! – Enhancements in z/OS simplify the development and maintenance of existing batch applications. – WebSphere® Compute Grid delivers a batch environment capable of supporting 24x7 batch and – Enable distributed applications to access the power OLTP processing, and parallel computing of z/OS batch 109 * IBM Market Research 109
  • 110.
    Phoenix IMS UsersGroup z/OS R13 - The foundation for modern batch (detail) Expand existing COBOL applications! Shorter batch windows – The z/OS Batch Runtime environment, provides Java-to- – Allow overlapping processing for multi- COBOL interoperability, for transactional updates to DB2®, and volume data sets (FREEVOL=EOV, R13) for sharing database connections between Java and COBOL (R13)* – Avoid recalling migrated datasets, just to Ideal for processing for computationally intensive programs delete them (IEFBR14, R11) and extensions – “Pipe” data between two batch jobs to – Use JZOS Batch Toolkit for z/OS for efficient use of z/OS enable these jobs to perform reads and System interfaces for Java batch (IBM Java SDKs for z/OS) writes concurrently (BatchPipes®, 5655-D45) – Leverage specialty engines! Real time batch Simplified programming! – WebSphere Compute Grid delivers a resilient, highly available, secure, and – JES2 JCL enhancements provide in-stream data in catalogue scalable runtime with container-managed procedures, more options on setting job return codes, and the services for batch applications ability to stop and hold a job at the end of a step (not just at the end of the job) give much more granularity and control – Capable of supporting 24x7 batch and OLTP (z/OS R13) processing, and parallel computing – An new REST API allows you to submit z/OS batch jobs and retrieve z/OS batch job information from distributed systems as well as z/OS systems; and is intended to make z/OS batch processing much more accessible to distributed systems and web-based processes (z/OS and z/OSMF R13) * Prerequisites: IBM 31-bit SDK for z/OS, Java Technology Edition, Version 6.0.1 (5655-R31) 110 DB2 V9.1 for z/OS (5635-DB2) or later with PTFs 110 IBM Enterprise COBOL for z/OS V4.1 (5655-S71) or later
  • 111.
    Phoenix IMS UsersGroup Additional z/OS R13 simplification enhancements Health Checker Framework, updates – Greater ability to schedule health checks – Ability for checks to raise message severity as conditions change New health checks: – Two new checks for Allocation – intended to warn about potential Allocation deadlock conditions – Detects tape library initialization errors with suggestions on how to resolve. New Migration checks for: – zFS configuration options, new symbolic links, z/OS console mode of operation DFSMSrmm™, updates: – NEW automatic recovery for missing our out-of-sequence tape volumes. For multivolume data sets, DFSMSrmm will attempt to return the corrected list – New ability to specify data sets by expiration date or VRS policy management. Help simplify retention policies, avoid batch VRS policy management, and enable you to determine how long a tape data set will be retained DFSMSdfp™ updates: – New includes the explanatory text for Open, Close, and End of Volume error conditions along with the error message. SMF dump improvement for log streams (SMF dump to log stream introduced with z/OS R9) 111 111
  • 112.
    Phoenix IMS UsersGroup z/OS Availability Enhancements Availability enhancements (with R13) – Avoid JES2 re-starts with JES2 dynamic spool migration, rapidly discontinue and drain spool volumes quickly – Avoid JES3 re-starts with JES3 dynamic spool add – Improved channel recovery - track errors and automatically remove failing paths (on a controller level) faster Smart! – zFS internal restart - automatically recover disabled aggregates in Sysplex aware mode – avoiding lengthy manual system recovery process. – Automatic rerouting and recovery of z/OS system name server resolver – Concurrent service for DADSM and CVAF and DADSM dynamic exits – avoid planned outages 112 112
  • 113.
    Phoenix IMS UsersGroup z/OS Availability Enhancements Parallel Sysplex updates for R13 Fully shared zFS in a sysplex! – Between 50% (1.5x) and 150% (2.5x)* I/O performance improvement for any z/OS UNIX workload using shared zFS in a Parallel Sysplex®. Applications that use zFS, such as z/OS UNIX System Services and WebSphere Application Server for z/OS, are expected to benefit – Also: Less-disruptive recovery from most internal zFS problems (for both single system and sysplex- aware systems) – Also: A new health check for zFS configuration files Simplified software deployment – clone z/OS and software in a sysplex (z/OSMF R13) Eliminate the need for WebSphere MQ for SDSF Sysplex environments. Automatic monitoring, takeover, and recovery to prevent CSM-constrained conditions NEW Easier to use XCF signaling protocol Updated volume information on all systems in the sysplex when DFSMSdss™ or DFSMShsm™ Fast Replication Backup and Recovery processing complete More responsive to VIPA changes Workload balancing of IPsec IKEv2 and IPv4. * I/O performance improvements measured for fully shared zFS ranged from very small to 900%, with the majority of workload conditions tested falling between 50% and 150%. The actual amount of improvement will depend on the environment (monoplex or Parallel Sysplex) and the type of file processing being done. 113
  • 114.
    Phoenix IMS UsersGroup NEW suite of GDPS solutions IBM GDPS active/active continuous availability family of solutions is the next generation of GDPS IBM Geographically Dispersed Parallel Sysplex (GDPS) GDPS/PPRC GDPS/MGM GDPS/HyperSwap GDPS/GM GDPS ™ Manager Continuous GDPS/MzGM GDPS/XRC active/active Continuous availability or Continuous Disaster recovery Near-continuous availability of data disaster recovery at availability availability across within a data within a extended regionally and unlimited center metropolitan disaster recovery distances distances region extended distance GDPS/ A-A concept: two or more data centers running the same applications and data with cross-site workload balancing and replication • z/OS workload monitoring, management, and distribution • z/OS data and transaction replication • GDPS automation • First configuration is ‘Active Standby’ 114 114
  • 115.
    Phoenix IMS UsersGroup IBM GDPS active/active continuous availability family of solutions The next generation of GDPS Challenge – Multi-site, global-distance solutions may take up to an hour to recover full application availability at the remote site. What’s New – GDPS/ Active-Active solution, Active Standby configuration* – Designed to provide continuous availability for two or more sites separated by global distances and achieve Recovery Time Objective of 1 minute or less** – Statement of Direction for Active Query configuration*** Value – Automated recovery of z/OS applications means recovery can be faster and without human error – A complete solution for continuous availability (consulting, design, implementation, and maintenance) means piece of mind for you – Continuous availability over global distance sites helps meet more stringent audit and legislative compliance requirements * Active Standby is the first configuration available under the GDPS/Active-Active family of solutions. Additional IBM software prerequisites required ** Recovery Time Objective (RTO) is a definition of the amount of time it takes from the initial disaster declaration to having critical business processes available to users. Less than one hour RTO is based on use of IBM best practices and includes the time it takes to: IPL an LPAR, reconfigure disk, reconfigure coupling facility and CF structure, apply System z Capacity Back Up, as well as switching network connections. ***All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only. 115
  • 116.
    Phoenix IMS UsersGroup Risk Management Comprehensive security for a dynamic infrastructure NEW! GDPS/Active-Active - Two or more sites, separated by unlimited distances, running the same applications and having the same data to provide cross-site workload balancing and Continuous Availability / Disaster Recovery – Customer data at geographically dispersed sites kept in sync via replication – Shift from disaster recovery model to nearly continuous availability model – Integration of IBM products and GDPS control software through an IBM service engagement which includes project management throughout the implementation cycle – Active/Standby configuration released now, IBM plans to make available the Active/Query configuration which will provide the ability to selectively query data in either site. Minimizing risk for discovery and backup systems 116 116
  • 117.
    Phoenix IMS UsersGroup Keep critical business applications up and running without data loss in case of disaster for System z platform IBM GDPS/Active-Active continuous availability Reduces application downtime to help lower costs, improve productivity and boost customer loyalty Continuous Availability – Provides continuous availability for two or more sites separated by unlimited distances, achieving Recovery Time Objective of 1 minute or less. – Shift from disaster recovery model to nearly continuous availability model Results – Planned workload switch - 20 seconds from active site to standby site – Unplanned workload switch - 120 seconds from active site to standby site – Planned site switch - (9 * CICS-DB2 and 1 * IMS workloads) 20 seconds – Unplanned workload switch - 150 seconds 117 117
  • 118.
    Phoenix IMS UsersGroup z/OS R13 Performance for many key workloads Between 50% and 150%* I/O performance improvement for any z/OS UNIX workload using shared zFS in a Parallel Sysplex. – Applications that use zFS, such as z/OS UNIX System Services and WebSphere Application Server for z/OS, are expected to benefit Between 15% and 55%* IEBCOPY performance improvement for traditional workloads – Workloads copying PDS to PDS, copying PDS to sequential, or compressing a PDS are expected to benefit Potential for shorter batch windows * – New JCL FREEVOL=EOV parameter frees up a tape volume when the batch job is done with it. Network throughput Enterprise Extender can be improved – Using Inbound Workload Queuing (IWQ), available on OSA-Express3 and OSA-Express4S (July 12, 2011) Foundation for extreme data handling and simplified storage management – Potentially improved I/O performance without the need for application changes for QSAM-, BPAM-, and BSAM-based workloads by leveraging High Performance FICON™. Also, existing EAV functionality is enhanced with support for larger, 1 TB Extended Address Volumes (EAVs).** - IBM statements of direction * Based on IBM Lab results, your results will vary. I/O performance improvements measured for fully shared zFS ranged from very small to 900%, with the majority of workload conditions tested falling between 50% and 150%. The actual amount of improvement will depend on the environment (monoplex or Parallel Sysplex) and the type of file processing being done. IEBCOPY improvement will depend on conditions such as: the amount of data being copied, block size, and type of IEBCOPY operation Batch concurrency for multi volume tape datasets and will depend on the amount of data being processed 118 ** All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.
  • 119.
    Phoenix IMS UsersGroup zOS R13 Enhancements in Security IKEv2 – Initial support with z/OS R12 Communications Server. z/OS R13 adds Network Address Translation (NAT) traversal support for IKEv2 over IPv4. System SSL, ECC – z/OS R12 Communications Server added support for Elliptic Curve Cryptography (ECC), ECDSA (Elliptic Curve Digital Signature Algorithm). – z/OS R13 to extend System SSL ECC support for : • Creating ECC-style certificates in key database files or ICSF PKCS#11 tokens • Creating ECC-style certificates through the Certificate Management Services (CMS) API • Enabling ECC for TLS V1.0 and TLS V1.1 handshakes (RFC4492) • ECC certificate support with Crypto Express3 Coprocessor (on zEnterprise server) ICSF support for additional HMAC algorithms – Support for FIPS-198, support planned for SHA-1, SHA-224, SHA-256, SHA-384, and SHA-512 TN3270 and FTP support for password phrases Ported tools – IBM Ported Tools for z/OS (5655-M23), a no-charge product, provides the sudo (su "do") open source tool that allows system administrators to delegate authority to users or groups while providing the RACF® (or equivalent) audit trail of the user and their commands. Already available on UNIX platforms, now available with z/OS UNIX System Services. 119 119
  • 120.
    Phoenix IMS UsersGroup z/OS Security Server – RACF Helping to address security and compliance** guidelines Enhancements with z/OS R13 RACF RACF ––RACF Remote Sharing Facility (RRSF) support for TCP/IP (in addition to SNA APPC) RACF Remote Sharing Facility (RRSF) support for TCP/IP (in addition to SNA APPC) ––Support for generating Elliptic Curve Cryptography (ECC) secure keys (using Crypto Express3 Support for generating Elliptic Curve Cryptography (ECC) secure keys (using Crypto Express3 Cryptographic Coprocessors (CEX3C) available with zEnterprise servers) Cryptographic Coprocessors (CEX3C) available with zEnterprise servers) Tivoli Directory Server for z/OS (LDAP) Tivoli Directory Server for z/OS (LDAP) ––Support for SHA-2 and salted SHA-2 hashing of user password attributes. Addresses: Support for SHA-2 and salted SHA-2 hashing of user password attributes. Addresses: –– Need for stronger hashing and cryptographic algorithms Need for stronger hashing and cryptographic algorithms – Enhanced interoperability with distributed IBM TDS, openLDAP, and other LDAP servers. – Enhanced interoperability with distributed IBM TDS, openLDAP, and other LDAP servers. – The National Institute of Standards and Technology (NIST) policy for the use of hash functions. – The National Institute of Standards and Technology (NIST) policy for the use of hash functions. ––Support for LDAP administrators to delegate LDAP administrative authority Support for LDAP administrators to delegate LDAP administrative authority –– Can improve LDAP administration flexibility, help improve auditability, and help improve security Can improve LDAP administration flexibility, help improve auditability, and help improve security ––Support for DB2 99for z/OS (5635-DB2) backend for scalability of large LDAP deployments Support for DB2 for z/OS (5635-DB2) backend for scalability of large LDAP deployments ––Improved interoperability between z/OS applications and Microsoft Active Directory environments for Improved interoperability between z/OS applications and Microsoft Active Directory environments for Kerberos Kerberos ––Support for RFC 2696 and RFC 2891 for improved LDAP sorted search performance Support for RFC 2696 and RFC 2891 for improved LDAP sorted search performance ** It is the customer's responsibility to identify, interpret, and comply with laws or regulatory requirements that affect its business. IBM does not represent that its products or services will ensure that the customer is in compliance with the law. 120 120
  • 121.
    Phoenix IMS UsersGroup z/OS and IPv6 IPv4 address pool is exhausted February 3, 2011 – http://www.ipv6news.info/2011/02/04/ipv4-address-pool-is-exhausted/ – Now the IPv4 Internet only has the stock of IPv4 addresses held by the regional registrars and Internet Service Provides (ISPs) to keep it going. z/OS is IPv6 certified! (http://jitc.fhu.disa.mil/adv_ip/register/certs/ibmzosv110_dec08.pdf) z/OS Communications Server is adding function for IPv6 networks: – For z/OS R11 – Support RFC4941 and RFC5095; and the AES-based AES-XCBC-MAC-96 and AES-XCBC-PRF-128 algorithms - intended to meet new government IPv6 standards – For z/OS R12 – Health checks for IPv4 and IPv6 routing – Support for DFSMSrmm, IKEv2, ability to Send DNS Queries over IPv6, support for security-related RFC3484 and RFC5014 – For z/OS R13 – Support for IPv6 intrusion detection security equivalent to that provided for IPv4, integrated with the Configuration Assistant (in z/OSMF) – Support for IPv6 checksum and segmentation offload enhancements and for LPAR-to-LPAR checksum offload for both IPv4 and IPv6 packets available with OSA-Express4S QDIO (announced July 12 2011) • TCP/IP segmentation and checksum processing on OSA card and not on CP 121 121
  • 122.
    Phoenix IMS UsersGroup Taking z/OS Storage Volumes to the Extreme Extended Address Volumes (EAVs) help address storage constraints Can help simplify storage management by enabling you to manage fewer, larger volumes, as opposed to many small volumes IDEAL for large datasets, may improve storage utilization! DS8000® exploitation rolled out over time, starting with 223 GB volumes: – With z/OS R10, support for VSAM – With z/OS R11, support for extended format sequential data sets – With z/OS R12, support extended to sequential (both basic and large) data sets, partitioned (PDS/PDSE) data sets, catalogs (ICF now larger than 4 GB), BDAM data sets, JES spool and checkpoint data sets, standalone Dump extended format dump data sets, DFSMSrmm data sets, generation data groups (GDGs) and VSAM volume data sets (VVDSs). – With z/OS R13 - Support extended to z/OS Communications Server FTP, SDSF extended format print files, VSAM volume data set (VVDS) scalability, ISPF to display data sets eligible for EAV. – SOD - support for larger extended address volumes (EAVs), up to 1 TB EAV per volume, on IBM System Storage® DS8700 and DS8800 series, EAV 3390-A with new DS8000 licensed machine code.* 3390-A 3390-9 54GB 223GB 65,520 cyl 262,668 cyl 1TB SOD* 122 122 *All statements regarding IBM's plans, directions, and intent are subject to change or withdrawal without notice.
  • 123.
    Phoenix IMS UsersGroup z/OS Statement of Direction Software Announcement 212-086 – 4/11/2012 IBM plans to introduce a new version of the z/OS operating system, z/OS Version 2, with z/OS V2.1 to be released in the second half of 2013 as part of a new two-year release cycle. IBM intends to make new z/OS and z/OSMF releases available approximately every two years. It is IBM's intent that z/OS V2 and z/OSMF V2 will continue to support coexistence, fallback, and migration rules similar to those for z/OS V1 and z/OSMF V1. IBM plans to support an n-2 approach, where three consecutive releases are planned to be supported for coexistence, fallback, and migration. Beginning with z/OS Version 2, IBM plans to provide five years of z/OS support, with three years of optional, fee-based extended service (5+3) as part of the new release cadence. IBM further plans to provide enhancements to current z/OS releases during the transition to the new support model as follows: – z/OS V1.12 support is planned to be increased from three years to four years. Thus, support for Version 1.12 is planned to be extended from September 30, 2013, to September 30, 2014. – z/OS V1.13 support is planned to be increased from three years to five years. Thus, support for Version 1.13 is planned to be extended from September 30, 2014, to September 30, 2016. 123
  • 124.
    Support and ServiceChanges Transition Timing – Release 11 has three Years Support + 2 years LCE – Release 12 has four Years Support + optional fee based extended service – Release 13 has five Years Support + optional fee based extended service Migration and Support – Longer support lifecycles align with delivery cycles – Maintain N-2 release migration (accommodate a 2 or 4 year migration cycle) – Bridge migration to Version 2 from currently supported releases 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 R 1.10 3 Year Support Life Cycle Ext. Extended Service R 1.11 3 Year Support Life Cycle Ext. Extended Service R1.12 4 Year Support Extended Service R1.13 5 Year Support Extended Service V 2.1 5 Year Support Extended Service V 2.2 5 Year Support Extended Service V 2.3 5 Year Support Ext 124 © 2012 IBM Corporation
  • 125.
    z/OS Version 2Statement of Direction April 11th, 2012 Summary of Statement of Direction Version 2 of z/OS targeted to Availability 2H2013 A Version 2 release is the next z/OS release; there is no release in 2012 Release delivery cycle is planned to be every two years, in the second half of that calendar year. z/OSMF will be on the same cycle as z/OS N+1 or N+2 release migrations support two or four year migration cycle New five year support with optional fee based service extension IBM intends to offer interim updates, such as server support, through periodic small product enhancement PTFs (SPEs) and web deliverables Minimum supported HW levels (IBM System z9® server or later, and 3990-3 controller or later) Changes to Current Releases: R12 Support extended to four years R13 Support extended to five years to bridge customers to Version 2 migration R13 orderable until Version 2 becomes available 125 © 2012 IBM Corporation
  • 126.
    Phoenix IMS UsersGroup IBM zEnterprise System: Freedom by Design The broadest systems architecture – for integration and management of multi-platform applications and data IBM zEnterprise EC12 (zEC12) IBM zEnterprise z196 (z196) Unified Resource Manager BladeCenter Extension (zBX) IBM zEnterprise z114 (z114) Extending zEnterprise qualities of – AIX®, Linux®, and Microsoft® Industry’s most robust design for service and management across Windows®* applications keeping systems and data the infrastructure – Appliance Blades - Smart continuously accessible analytics, DataPower® 1. Meets the need of today’s heterogeneous data centers 2. Enables mixed workload business processes to be deployed and centrally managed 3. Allows optimized integration of data, applications, and web serving 4. Delivers dynamically responsive IT with lower acquisition and operating costs 126 126
  • 127.
    Phoenix IMS UsersGroup A “System of Systems” for Predictable Service Delivery IBM zEnterprise EC12 or 196 (z196) or IBM zEnterprise 114 (z114) Optimized to host transaction, and mission-critical applications The most efficient platform for large-scale Linux® consolidation Massive scale-up – 26 MIPS to over 78K MIPS zEnterprise Unified Resource Manager Unifies management of resources, extending IBM System z® qualities of service end-to-end across workloads Provides platform, hardware and workload management zEnterprise BladeCenter® Extension (zBX) Selected IBM POWER7® blades and IBM System x® blades for deploying applications in a multi-tier architecture High-performance optimizers and appliances to accelerate time to insight and reduce cost Dedicated high-performance private network 127 © 2012 IBM Corporation 127
  • 128.
    Phoenix IMS UsersGroup zEnterprise software supports mission critical requirements Efficiency at scale Operational analytics Ultimate Security Transactional Processing Millions of transactions per day Data Warehousing Security Business Rules and Processes Unique temporal capabilities Advanced encryption Create reusable services and and decryption software Data Management processes Governance through the Social Business Enterprise Modernization enterprise Integrating social business Single platform for development with enterprise computing and test Operational Analytics Integrated Appliances Secured right-time Packaged solutions for optimal analysis performance Cloud Computing Saas and Paas solutions Integrated service management Single point of control 128 128
  • 129.
    Phoenix IMS UsersGroup IBM Software for zEnterprise solves key Business Initiatives Cloud Data Security Efficiency at Scale Operational Analytics Ultimate Security Delivering high value Delivering predictive and Providing advanced data secured applications and operational analysis of real- security and audit services to create the ideal time enterprise data to deliver capabilities for managing risk, private cloud environment insights data leaks, and compliance issues NEW IBM CICS Transaction Server for IBM DB2 Analytics Accelerator V3 IBM Security zSecure Suite z/OS® V5.1 and tools IBM zEnterprise Analytics System V1.13.1 IBM OMEGAMON® Family V5.1 9700/9710 IBM InfoSphere Guardium V9.0 IBM Continuous Integration for Cognos BI 10.2 System z InfoSphere™ Optim™ 9.1 IBM Integrated solution for DB2 for z/OS Tools System z development IMS Enterprise Suite 2.2 IBM Sterling B2B Integrator V5.2.5 DB2 11 Beta ESP, IMS 13 QPP IBM Sterling File Gateway V2.2.4 IBM Business Rules for z/OS V8.1 IBM Operational Decision Management V8.1 129 129
  • 130.
    Phoenix IMS UsersGroup System z Analyst Quotes: IBM zEnterprise EC12 "The new IBM zEnterprise EC12 showcases all of the major System z differentiators: powerful processing; "The new IBM zEnterprise EC12 showcases all of the major System z differentiators: powerful processing; advanced reliability, availability and serviceability; enhanced security; efficiency at scale; and most important, advanced reliability, availability and serviceability; enhanced security; efficiency at scale; and most important, the ability to optimally run and manage a wide range of workloads across System z and heterogeneous the ability to optimally run and manage a wide range of workloads across System z and heterogeneous environments.“ environments.“ -- Joe Clabby, President, Clabby Analytics -- Joe Clabby, President, Clabby Analytics "Organizations are looking for newer and better ways to make information available, and actionable, to "Organizations are looking for newer and better ways to make information available, and actionable, to business customers -- and to do so rapidly and securely. The challenge for many organizations is to transform business customers -- and to do so rapidly and securely. The challenge for many organizations is to transform the transactional data they already have into new business insights that will guide the business to new the transactional data they already have into new business insights that will guide the business to new opportunities and revenue growth. To do that, analytics systems must be capable of handling high data opportunities and revenue growth. To do that, analytics systems must be capable of handling high data volumes. The IBM zEnterprise EC12 was designed with these goals, providing an analytics platform that is volumes. The IBM zEnterprise EC12 was designed with these goals, providing an analytics platform that is highly secure, efficient and resilient -- and links to other systems to support end-to-end computing. It supports highly secure, efficient and resilient -- and links to other systems to support end-to-end computing. It supports analytics workloads that transform massive amounts of data into actionable information, allowing analytics workloads that transform massive amounts of data into actionable information, allowing organizations to improve business performance and to gain competitive advantage." organizations to improve business performance and to gain competitive advantage." -- Jean S. Bozman, Research Vice President, IDC Enterprise Platforms -- Jean S. Bozman, Research Vice President, IDC Enterprise Platforms "Once again, IBM has demonstrated why the mainframe is the ultimate platform for enterprise computing. On "Once again, IBM has demonstrated why the mainframe is the ultimate platform for enterprise computing. On a capacity basis, the new IBM zEnterprise EC12 is 55% larger than its predecessor, which is especially a capacity basis, the new IBM zEnterprise EC12 is 55% larger than its predecessor, which is especially important for the largest enterprises. With a clock speed of 5.5 GHz, it is the world's fastest commercial important for the largest enterprises. With a clock speed of 5.5 GHz, it is the world's fastest commercial processor, allowing much more work to be done than with competitive x86-based servers. With its new Flash processor, allowing much more work to be done than with competitive x86-based servers. With its new Flash Express, availability of key workloads will be improved automatically by reducing latency. With IBM zAware, Express, availability of key workloads will be improved automatically by reducing latency. With IBM zAware, also new, data center staff will be alerted more quickly to difficult-to-detect operating anomalies and can act also new, data center staff will be alerted more quickly to difficult-to-detect operating anomalies and can act sooner to mitigate them. In summary, the zEC12 offers a well-balanced collection of improvements for existing sooner to mitigate them. In summary, the zEC12 offers a well-balanced collection of improvements for existing mainframe customers and even more reasons for a new customer to consider System z for critical workloads." mainframe customers and even more reasons for a new customer to consider System z for critical workloads." -- Mike Kahn, Managing Director, The Clipper Group -- Mike Kahn, Managing Director, The Clipper Group 130
  • 131.
    Phoenix IMS UsersGroup System z Analyst Quotes: IBM zEnterprise EC12 "IBM's latest System z model clearly demonstrates the mainframe is very much alive and kicking ... the new "IBM's latest System z model clearly demonstrates the mainframe is very much alive and kicking ... the new System z supports and speeds achieving competitive advantage with the most sophisticated data System z supports and speeds achieving competitive advantage with the most sophisticated data warehousing and analytics coupled with the fasted performing query functions in the market. It provides warehousing and analytics coupled with the fasted performing query functions in the market. It provides unequaled security along with 99.999% reliability on a unified platform that helps accelerate the development unequaled security along with 99.999% reliability on a unified platform that helps accelerate the development of secure applications. The hybrid architecture speeds cloud deployment of mission critical workloads on of secure applications. The hybrid architecture speeds cloud deployment of mission critical workloads on systems designed to be the fastest and most efficient available to the market. This increased operating systems designed to be the fastest and most efficient available to the market. This increased operating efficiency frees IT resources to focus on developing and delivering services that drive growth by meeting efficiency frees IT resources to focus on developing and delivering services that drive growth by meeting customer demands. With this combination, we anticipate success for the new models along with a very long customer demands. With this combination, we anticipate success for the new models along with a very long life for the whole family." life for the whole family." -- Ptak, Noel & Associates: “IBM’s Latest Mainframe, Another Winner” -- Ptak, Noel & Associates: “IBM’s Latest Mainframe, Another Winner” "IBM’s latest zEnterprise EC12 multiplatform mainframe systems provide current and prospective Big Blue "IBM’s latest zEnterprise EC12 multiplatform mainframe systems provide current and prospective Big Blue customers with the processing power, performance and near-flawless reliability and security necessary for the customers with the processing power, performance and near-flawless reliability and security necessary for the most demanding workloads. The new zEnterprise EC12 multiplatform servers solidify and extend IBM’s stake in most demanding workloads. The new zEnterprise EC12 multiplatform servers solidify and extend IBM’s stake in high-end enterprises.“ high-end enterprises.“ -- Laura DiDio, ITIC: “IBM zEnterprise EC12 Servers Deliver Near-Flawless Reliability, Security” -- Laura DiDio, ITIC: “IBM zEnterprise EC12 Servers Deliver Near-Flawless Reliability, Security” "IT executives should insist on an evaluation that addresses the financial facts and ignores the religious platform "IT executives should insist on an evaluation that addresses the financial facts and ignores the religious platform wars. In today's environment IT must deliver processing services at a least cost or be exposed; thus internal wars. In today's environment IT must deliver processing services at a least cost or be exposed; thus internal wars must be put aside and the best target platforms must be selected and put into service as soon as possible. wars must be put aside and the best target platforms must be selected and put into service as soon as possible. Bottom line: the zEnterprise as a database server is a killer application.“ Bottom line: the zEnterprise as a database server is a killer application.“ -- Cal Braunstein, Robert Frances Group: “IBM System z -- The Lowest Cost Database Server Solution” -- Cal Braunstein, Robert Frances Group: “IBM System z The Lowest Cost Database Server Solution” 131
  • 132.
    Phoenix IMS UsersGroup Service levels to match your business needs Increased flexibility for your multi-architecture strategy when data is on z/OS zEnterprise System Extreme scalability and performance for Extreme consolidation of transaction processing servers and networking and data serving Superior levels of virtual High availability and Expanded ISV support server provisioning, cross-system scalability monitoring and workload with Parallel Sysplex® and TCO for enterprise applications management GDPS® Industry-best virtual I/O Focus Silo managed islands of computing bandwidth and reliability Leading policy-based Targeted for capacity provisioning and applications that interact Fewer components and workload management Less dynamic than z reduced complexity with mainframe data Pervasive, high- virtualization and transactions System z qualities of dynamic resource performance security management and support Minimal resource Provisioned and sharing with z capacity-on-demand managed by System z resources Seamless integration with z/OS backup and disaster recovery solutions z/OS Linux on z/VM® Select IBM Blades in zBX Distributed TCA Systems Focus LOWER SCALABILITY, SECURITY, HIGHER DYNAMIC WORKLOAD MANAGEMENT 132
  • 133.
    Phoenix IMS UsersGroup zEnterprise EC12: An optimized design which delivers unique value Comprehensive integration enabling information – centric computing ® Java Compilers, Semiconductor Microprocessor Systems Virtualization Optimized Tools & Java Technology Design Design & Operating Middleware Virtual Systems Machine 133
  • 134.
    Phoenix IMS UsersGroup The IBM zEnterprise EC12 (zEC12) Efficiency at scale • Most efficient and fastest system for mission critical workloads • Increased efficiency will free up IT resources to focus on new services to drive growth Operational analytics to enable business opportunities • Most sophisticated data warehousing and analytics solutions with the fastest query performance in the market • Leverage your data to build competitive advantage Ultimate security strengthens the customer experience • Most secure system with 99.999% reliability • Unified platform for rapid development of secure applications end-to-end 134
  • 135.
    Phoenix IMS UsersGroup Summary: IBM zEnterprise EC12 (zEC12) The secure cloud for data, enabling enterprises to improve service to their customers… zEC12: A Smarter Computing infrastructure that is Cloud Ready, Data Ready and Security Ready, enabling a Smarter Planet™ for today and tomorrow 135
  • 136.
    Phoenix IMS UsersGroup What is IBM zEnterprise System? Re-write the rulebook and set new standards for business-centric IT with IBM System z, to be the world’s premier workload-optimized platform for enterprise applications. Our Vision: Deliver the best of all worlds - Mainframe, UNIX®, x86 and single function processors - integrated in a single system for ultimate flexibility and simplicity to optimize service, risk, and cost across multiple heterogeneous workloads. 136