CHARLES MCDOWELL
CHARLES MCDOWELL
landscape architecture portfolio
design philosophy
“There is a love of wild nature in everybody, an ancient mother-love showing itself
whether recognized or no, and however covered by cares and duties.” - John Muir


In every person there is an appreciation and respect for the natural environment. This comes
from a primitive relationship with the environment that some may have forgotten, ignored, or
never experienced, but it is still rooted deep within us. Through design, it is possible to provide an
environment in which people can reconnect to that basic relationship with nature. Each project
has a unique opportunity to reveal and expose the local environmental and cultural conditions to
the users. In this way people can reconnect with nature through their own personal experience
and learn to appreciate and respect the natural environment in their own way.



An extended version of the portfolio can be accessed at:
http://www.wix.com/charlesmmcdowell/landscapearchitect
brush creek eco-park   1
       mks watershed plan       2
       north rainier t.o.d.     3
          colorado lights       4
sand turn scenic overlook       5
    construction drawings       6
              hand graphics     7
                  photography   8
The Brush Creek Corridor was the focus of a study to assess the impacts of
urbanization on stream systems and to explore what designers can do to mitigate
those impacts. Through research and precedent studies, the following four project
goals were determined for the Brush Creek Corridor: Improve local environmental
conditions through ecological design; Connect the corridor for improved pedestrian
use; Educate users to the environmental benefits of ecological design; Reveal
and interpret ecological processes and phenomena through design. The project
process included a corridor study which was used to determine the site for design
exploration and the design of the site addressing the project goals.

Proposed design solutions are represented by two different alternatives, each responding to the
same design concept but envisioned in unique ways. Alternative 1 is a more costly solution to the
design problem and would involve a greater amount of maintenance up front and over the long run. In
Alternative 1, the site is manipulated significantly to amplify the users experience. Alternative 2 is less
costly since the site is manipulated minimally and much is done to utilize vegetational changes within
the existing context. Material and maintenance estimates were provided as to compare and contrast
the two design ideas.

The report, in its entirety can be viewed at:
http://krex.k-state.edu/dspace/handle/2097/8761


media: ArcGIS, Google Sketchup, AutoCAD Civil 3D,
       Adobe Illustrator & Photoshop




brush creek eco-park




kansas city, missouri
REVEAL urban stream corridor   1
new ecologies for an
proj
          IMPROVE local environmental
          conditions through ecological
          design

          manage localized flooding to reduce flash flooding

          increase stormwater infiltration




urban
          improve water quality within brush creek




stream

                                      EX
                                                     DEFINE




                                        PL
                                          OR
                 experiences beliefs




                                                     opportunities
                                                      challenges
                                                      objectives
                  ethics biases family




                                            E
                 interests education




                                                        goals
                                           CH
                                         AR
dilemma
      a
                                       SE
                                     RE
               design process




                                                                     september
               project schedule                      description30 prece
                                                          intent      st
j
ject goals
                           CONNECT the corridor for                                                  EDUCATE users to the                                                                   REVEAL and interpret ecological
                           improved pedestrian use                                                   environmental benefits of                                                              processes and phenomena
                                                                                                     ecological design                                                                      through design

                           create a design language that can be implemented                          target selected user groups that could have a                                          promote environmental stewardship subconsciously
                           throughout the corridor                                                   potential association with the project                                                 through experience

                           improve access to the corridor                                            link up with existing environmental improvement                                        explore new means for conveying environmental
                                                                                                     goals and initiatives                                                                  education
                           link the existing corridor projects
                                                                                                     implement innovative strategies for environmental                                      allow users to create their own relationship with the
                                                                                                     education                                                                              natural world in a designed setting




                                                                                                                                    DEVELOP
                                                                                                                                     refine concepts
                                                                                                                                     explore solutions


                                                                                                                                                                                         PRODUCE
                                                                                                                                     diagram

                                                                               review
                                                                               expand
                                                                                                             CONCEPT
                                                                                                             site exploration
                                                                                                             conceptual design
                                                                                                                                                                                         presentation
                                                                                                                                                                                         document
                                                          case study




                                                                                                                                                                                         graphics
                                                                                refine                       document design                                                             text

                                                                                               PRELIMINARY                                                                                                      DEFEND
     INVENTORY . ANALYSIS
                                                                                               analysis
                                                                                               exploration
                                                                                               program
       corridor study
    case study




                       goals                                site study
                       stream reach classification          goals
                       key questions                        key questions
                       methodology                          methodology
                       site identification                  site potential
                                                            site program

            REFINE                                         APPLY
                                                                                                      competition      january 17 - 31                   finalist stage     febuary 21 - march 31


                                                                                                                             ULI                   COMPETITION
                                                     november




                                                                                    december




                                                                                                             january




                                                                                                                                    january
                 october




                                                                                                                                                                    march




                                                                                                                                                                                                        april




                                                                                                                                                                                                                             april
                                     inventory                               final                                                                                                           final                    final
edent                                  analysis                        document 07/ 17              story   document28                           annotated 11                            document 02            document11/ 25
tudies 11                             program15                          . review                  board 21    design                               outline                                   text               . defense
improve vulnerability analysis
                                 ¯   0   500 1,000   2,000
                                                      ,0 0
                                                       000   3,000         4,000

                                                             1 inch = 2500 feet
                                                                      25
                                                                       500
                                                                                0
                                                                              Feet
                                                                              Feeet



                                                                                             corridor




                                                                       corridor analysis
                                                                                                            2
connect suitability analysis
                                 ¯   0   500 1,000   2,000   3,000        4,000
                                                                              Feet
                                                             1 inch = 2500 feet




                                                                                         and s
                                                                                              ynthes



                                 ¯
                                                                                                    is



                                     0   500 1,000   2,000   3,000        4,000
                                                                              Feet


educate suitability analysis                                 1 inch = 2500 feet

                                                                                                         historic stream alignment
study boundary
               1
                                           3
                                           site selection
                                        and prioritization




    terrain analysis   slope analysis       viewshed analysis
alternative one




                                                                                            hig
                                                                                        bu
                                                                                        bru
                                                                                        bru
                                                                                        bru
                                                                                        bru

                                                                                             igh
                                                                                             igh
                                                                                             igh
                                                                                               hwa
                                                                                               h a
1    parking area




                                                                                           ce
                                                                                            e r.
                                                                                            e r.
                                                                                            e r.
                                                                                            e r.
2    rain garden




                                                                                                 a
                                                                                                 a
                                                                                                 ay 7
                                                                                              r.
                 co
3    bioswale


                  on
                  on




                                                                                                   w
                                                                                                   w t
                                                                                                   w t
                                                                                                   w t
                                                                                                   wat
                   nc
                   nc
4    open green space




                                                                                                     1
                                                                                                     1
                                                                                                     1
                                                                                                     1/
                    co
                    co
5    primary walkway

                     o
                     or




                                                                                                       kins
                                                                                                        i
                                                                                                        in
                                                                                                        in
6    plaza
                       d
                       d
                       d
                       d
                         co
7    constructed wetland




                                                                                                            driv
8    elevated outlook area
                           ur
                           ur
                           ur
                           ur




                                                                                                             r e
                                                                                                             ri e
9    pedestrian bridge       t                        10




                                                                                                                e
                                                                                                                e
                                                                                                                e
10   deck overlook
11   wetlands
12   lowland area
                                                           11

                                              9                                     9



                                                               5

                                                                                8
                                                           7
                                     6                                                  9
                                          woodland




                             8   1                3
                                           oodland




                                                                        4
                                             dland
                                             dland
                                             dland
                                             dland
                                             dland
                                             dland
                                             dland
                                             dland
                                             dl d
                                             dla d
                                              l d
                                              l d
                                              l d
                                              l d
                                              l d
                                              l




                                     2
                                                               sw p parkwa
                                                               swope parkway
                                                                            3

                             9
                                         avenue
                                         aven
vegetation zones

em
  anu
     el c
         lea
            ver
                  II b
                      oul
                         eva
                            rd




            12
                                    area of flood inundation




                                 proposed stream alignment
proposed

existing
9




                                                                        3
                                     6




                                             2




                                                                        w
                                                                        w od
                                                                        wood
                                                                        wood
                                                                        wood
                                                                        woodl nd
                                                                        woodland
                                         1




                                                                                   aven
                                                                                   aven e
                                                                                   avenue
              t
              t
              t
              t
            ur
          co
          c
          c
          c
     rd
    or
    or
    or
  nc
co
c
c
                                                                            5




                                                                                        proposed stream alignment
                                             area of flood inundation
                  vegetation zones
alternative two




                    h
                    h
                    h
                    h
                    hig
                bru
                 r c
                 r c
                 r c


                       hw
                       hw
                       hw
                       hwa
                       h
                   ce
                                                    1        parking area




                      r.
                                                    2        rain garden




                          y7
                          y7
                          y7
                          y 71
                           w
                           w
                           w
                           wa
                           wat
                                                    3        bioswale
                                                    4        open green space




                               k
                               k
                               k s
                               kins

                               /
                               /
                               /
                               /
                               /
                                                    5        vegetated filter strip
                                                    6        plaza




                                    d v
                                    d v
                                    d v
                                    driv
                                                    7        constructed wetland
                                                    8        elevated outlook area




                                        e
                                                    9        pedestrian bridge
                                                    10       wetlands
                                                    11       stormwater collection area off of bridge
    10                                              12       lowland area

                                                 em
                                                   anu
                                                      el c
7                                                         lea
                                                             ver
                                                                      II b
                                                                          oul
                                                                             eva
                                                                                rd

            8                               11




                                                                               12
4
                                                         9

3
swop pa k a
swope parkway
rain garden



              bioswale
d
   lanes    up
upop       slo lan
 sl           pe d
                 s
                     bioswale




                                upland transit
                                              ional
                                                      brush creek
watershed plan




manhattan, kansas




Manhattan, Kansas will grow by over twenty thousand people in the next ten years due to the relocation of
the National Bio and Agro-Defense Facility and the initiation of the Base Realignment and Closure which
will effect the military base at Fort Riley. Currently Manhattan’s community plan and vision will not handle
this increase in population effectively. The current political boundaries are not consistent with watershed
boundaries. Existing zoning and subdivision boundaries cross watersheds, making it difficult to effectively
manage water resources. There is little evidence of environmental stewardship in the community, illustrated
by the inadequate protection of agricultural and open space areas. There is an extensive park and trail
network within the existing city but there is a lack of connectivity.

The solution to the design problem is a framework for planning by watershed which highlights
the concepts of preserving natural and cultural resources, including the prairie ecosystem and
agricultural lands, while promoting stewardship through community education. Through stream
setbacks, and land use proposals a set of typologies have been created to set the framework for
new development within the watersheds of Manhattan, Kansas.

The design team consisted of three landscape architecture graduate students.


media: ArcGIS, AutoCAD, Adobe Illustrator & Photoshop
2
I
MKS
food sources


                     stream classification




education




wildlife corridors




trails




land use
!
         !




                     !


              !             !




                            !

                                   !


schools and parks                                     agricultural lands   flood prone areas




 big blue river          parkland
 buffer type 1           kansas state university
 buffer type 2           existing schools, food markets
 buffer type 3           existing trails
 conservation land       city proposed trails
 agricultural land       proposed trails
 urban land              existing city of manhattan




proposed
land use plan
trail
                                                                                          trail
                                                                                                  stream type 3
                            residential                                           stream                     stream                            residential
                            development                                           buffer                     buffer                            development
                            • native vegetation                                   50 ft. setback             50 ft. setback                    • stormwater retrofits
                            • stormwater best                                     • wildlife corridor        • native prairie grasses          • transitional buffer areas
                              management practices                                • trails                   • woodlands                       • pedestrian connectivity
                            • low impact development                              • healthy ecosystem        • wetlands                        • runoff managed in watershed




                                                                                                                                    trail
                                                                                         trail




                                                                                      stream type 2
           kansas state university                                             stream               stream                                  kansas state university
           agriculture land
              i l      l d                                                     buffer               buffer                                  agriculture land
                                                                                                                                               i l      l d
                                                                               100 ft. setback                100 ft. setback
                                                                               • wildlife corridor            • native prairie grasses
                                                                               • trails                       • woodlands
                                                                               • healthy ecosystem            • wetlands




                                                                                                                                               500 year floodplain
                                                                                                                                               100 year floodplain
           trail




                                                                                 trail




                                                                                                                            trail




                                                                                                                                                                                 trail




                                                                                                                                                                                                          trail
 natural           outdoor classroom                     community                         community
 area              and green space                       agriculture                       green space

                       riverfront                                                                              stream                                                          stream                        wetlands                  commercial
                       park                                                                                    buffer                                                          buffer                        • stormwater management   produce agriculture
                       • community events          • passive recreation                                           300 ft. setback           stream type 1                      300 ft. setback               • stormwater treatment    • highly fertile soil
                       • community celebrations    • active recreation                                         • wildlife corridor                                             • native prairie grasses      • restored ecosystem      • vegetable and fruit
                       • community center          • community involvement                                     • trails                                                        • woodlands                                              production
                       • agriculture education     • environmental education                                   • healthy ecosystem                                             • wetlands                                              • local employment


land use typology sections
output     buffer                 natural
function




                           output     buffer                 parkland
buffer




                           output     buffer                 agriculture
stream




                           output     buffer                 urbanization
                                                       bmp
                                       bmp




           residential
           development
           • native vegetation        • stormwater retrofits
           • stormwater best          • transitional buffer areas
             management practices     • pedestrian connectivity
           • low impact development   • runoff managed in watershed
The challenge for the 2011 Urban Land Institute/Gerald D. Hines Student Urban
Design Competition was to redevelop the 33.5 acre site as a transit oriented
development that is focused on improving multi-modal transportation, carbon
neutrality, stormwater management, cultural identity, and creating a profitable
market.

The interdisciplinary team was comprised of three landscape architecture graduate students,
one architecture graduate student, and a business graduate student who’s emphasis was in real
estate. The Competition Stage was a two week period where the team focused on a conceptual
strategy to address the project needs while creating a unique urban environment focused around
the Mount Baker Transit Station on Rainier Boulevard.

The concept for the Rainier Transit Oriented Development was based on the local and regional
juxtaposition between the city, the land, and the water. Through research, our team discovered that, in the
pre-developed history of the site, a large stream draining the valley, existed and was eventually piped into
an underground drainage network. The design proposal reconstructs and exposes the idea of the stream
that flows through the site. Although the proposal does not daylight the underground stream, the proposal
collects all on-site stormwater in a corridor which symbolizes the historical stream.


media: Marker, ArcGIS, Google Sketchup, AutoCAD,
       Adobe Illustrator & Photoshop




north rainier t.o.d.




seattle, washington
urban land institute                   3
gerald d. hines student urban design competition
design process d
process design p
sign process des
 design process
design
process
sign pro
                                                 7
                                                             7

                                    8




 design                                      8
                                                     9
                                                         5
                                                                 7




       1 mt. baker light rail station                            6
       2 elevated office campus -
         ground level bus transfer station
       3 iconic pedestrian bridge
       4 north rainier square                        4
       5 stormwater stream corridor
       6 rooftop agriculture plot
       7 residential tower
       8 residential node
       9 art studios and boardwalk


                                                         3



                                                 2
                                                     1
terrain analysis                                                    historic hydrology overlay                                                                                                 slope analysis


                                                                                                                                                                                                                                                                             10                    y


                                                                                                                                                                                                                                                                              0        75          150



                                                                                                         ArtSpace Collaboration                                                                                   Sustainable building typology
                                                                                                         creating housing opportunities                                                                           including balconies and setbacks for
                                                                                                         for artists in the Seattle region                                                                        shading, daylighting, and ventilation
                                                                                                                                                                                                                  while considering solar orientation

                           Greenroofs                                                                                                                               Rainier Boulevard                                                                                      Building atrium
                           vegetated roofs increase biodiversity,                                                                                 a green corridor connecting to downtown                                                                           provides natural ventilation
                                                                                                                                             Seattle, creating a pedestrian environment that
                           infiltrate water, and reduce the heat                                                                                                                                                                                                                  and sunlight
                                                                                                                                                        supports multi-modal transportation
                           island effect




      Site Section                                                                                                                                                        Linear greenway                Stormwater planter                               Stormwater cisterns
                                                                      Geo-exchange thermal systems                                                                        text                           structured network that collects                 collect stormwater runoff buildings
                                                                          uses ground source temperature to                                                                                                                                               for greywater use
sustainable initiatives
                                                                                                                                                                                                         stormwater runoff filtering and
      0   25    50   100          150                 200                  efficiently heat and cool structures
                                                                                                                                                                                                         infiltrating water
walking network analysis




300                   450                  600
                                                                                                                                transit times from north rainier t.o.d.

      Art space boardwalk
      main art space contianing studios,
      galleries, and exhibit spaces                                                                                           Photovoltaic panels
                                                                                                                              provides renewable energy to
                                                                                                                              powers electric charging station
                                                                                  Rooftop garden                              in carpark
                                                                                  provides produce to in-
                                                                                  building grocery store



                                                                                                                                                                                      5 minute walk with transit
                                                                                                                                                                                      10 minute walk with transit
                                                                                                                                                                                      5 minute bike with transit
                                                                                                                                                                                      10 minute bike with transit
                                                                                                                                                                                      light rail station
                                                                                                                                                                                      central link light rail line
                                                                                                                                                   Bioswale                           north rainier t.o.d.
                                                                                                                                                   collects stormwater runoff
                                                                                                                                                   filtering and infiltrating water   mount baker light rail station
                         Urban stream corridor                                                  Structured parking
                         increasing biodiversity, collect on-site stormwater
                                                                                                supporting residential and retail needs
                         runoff, filtering and infiltrating water, sequestering
                         carbon, and providing and urban aesthetic
colorado lights




   denver, colorado




Colorado Lights is an outdoor mall located within a mixed-use development at 9th Ave. and Colorado Blvd.
in downtown Denver, Colorado. This development encompasses approximately twelve blocks formerly the
site of the University of Colorado Health Sciences Center.

The project was broken into two phases, the first being to determine site potential by designing a
mixed-use development while retaining existing historical or iconic buildings for adaptive reuse. The
second phase of the project was to look at a specific site within the redevelopment to design in more
detail.

Colorado Lights is a linear outdoor mall surrounded by mixed-use retail and residential units.
The focal point of the space is a low wall that undulates both horizontally and vertically. The
wall is lit from within with LED lights that can be programed to change the lighting scheme
throughout the night. Running directly along side the wall is a bioswale which collects all
the water that runs off of the plaza. Water is also taken from the surrounding buildings and
channelled across the walkways through grates into the bioswale. The vibrancy and activity
of Colorado Lights makes it a unique place within downtown Denver and creates a new
sense of place for the entire development.


media: Colored Pencil, Google Sketchup, AutoCAD,
       Adobe Illustrator & Photoshop
4
bios ale developm nt s
            bioswale development s
            bi    l d    l     t k
      l and
     al a
    wall
                                  k
                                  k
                                  k
                                  ketch
                                    t e
                                    tc e
  d w
led
led                                     s
                                        s
detail plan
longitudinal section
LED wall concept sketches
detail section




materials section
The Sand Turn Scenic Overlook is the proposed location of the Highway 14 Forest
Portal for the northeast entry of Bighorn National Forest in Wyoming. The proposal
includes a pedestrian oriented overlook with interpretive signage, a trail head for a
proposed short loop trail, as well as the siting of a new toilette facility.

The pedestrian overlook responds to the lines and geographic formations of the surrounding
mountain landscape. Users can view informational signage as they drive up, from their cars, or
they can walk to the viewing area where they have a better view and can read more information
about the Powder River Basin and surrounding context. The overlook has three viewing areas
that can be directly accessed from the parking area. These areas support elevated viewing and
allow for access to a short trail. The viewing area located at the bottom of the ramp and stairs has
signage integrated into the barrier walls and allows users to move closer to the edge of the site for
unobstructed views.


media: ArcGIS, Google Sketchup, Pen & Ink




sand turn scenic overlook




bighorn national forest
5
concept sketches
construction drawings



manhattan, kansas
6
dimensioning and layout plan
Section                                                                                                       2+51.75
                                        Sub Cut Area(s) sq.ft.                                                                 Sub Fill Area(s) sq.ft.                       K (Cut in Fill Area)
                                         C1                                                  318.53                                 F1                      360.83          K1                          14.06
                                         C2                                                 3324.85                                 F2                      173.80          K2                           0.00
                                         C3
                                            Section
                                                                                            1535.38
                                                                                                  2+51.75
                                                                                                                                    F3                        0.00          K3                           0.00
                         TotalSub Cut Area(s)Area
                                    Sub Cut sq.ft.                           Sub Fill Area(s) sq.ft.                 Total Sub Fill Area
                                                                                                                     K (Cut in Fill Area)                              Total K Area
                                = C2
                                     C1
                                      C1..C10
                                                       318.53                   F1          5178.76
                                                                                                  360.83            K1
                                                                                                                           = F1..F10
                                                                                                                                          14.06             534.63      = K1..K10
                                                                                                                                                                                                        14.06
                                                      3324.85                   F2                     173.80       K2                     0.00
                                     C3               1535.38                   F3                       0.00        K3                 0.00
                             Total Sub Cut Area for K
                              Adjusted                                  Total Sub Fill Area                     Total K Area
                                                      5178.76                                          534.63                          14.06
                         Total C1..C10 K Cut Area
                                 =
                                    Sub
                               Adjusted for
                                                                           = F1..F10
                                                                                            5192.82              = K1..K10

                             Total Sub Cut Area       5192.82
                      =( C1..C10)+( K1..K10)
                          =( C1..C10)+( K1..K10)
                          Section Vertical Exaggeration    10.00 Section Vertical Exaggeration          10.00
                    Section VerticalArea
                          Corrected Sub Cut Exaggeration
                                       sq.ft.             519.28
                                                                     Corrected Sub Fill Area
                                                                             sq.ft.
                                                                                                  10.00 Section Vertical Exaggeration
                                                                                                      53.46
                                                                                                                                                             10.00
                               =Total Cut / Vert.Exag.                 =Total Cut / Vert.Exag.

                      Corrected Sub Cut Area                                                                    Corrected Sub Fill Area
                              sq.ft.                                                             519.28                 sq.ft.                               53.46
                          =Total Cut / Vert.Exag.                                                                    =Total Cut / Vert.Exag.




                                                                                                                                                                Corrected Sub Cut     Average SubSub Cut Area for
                                                                                                                                                                                                    Cut Volume                       Distance sq.ft.Cut AreaSub Cut VolumeVolume Sub Cut Volume
                                                                                                                                                                                                                          Corrected Sub Cut
                                                                                                                                                                                                                                          Average Sub              Distance  Sub Cut     Sub Cut Volume
                                                                                                                                    Sub Cut Volume for                                                Sections
                                                                                                                                                                                                                                Areas                              Between        cu.ft.     cu.yds.
                                                                                                                                                                      Areas                   sq.ft. 2+51.75                         Between
                                                                                                                                                                                                                                sq.ft.
                                                                                                                                                                                                                                    519.28
                                                                                                                                                                                                                                            = (Sta1+Sta2) / 2      Sections
                                                                                                                                                                                                                                                                     cu.ft.       =Avg Cut Area * Dist.
                                                                                                                                                                                                                                                                                                   cu.yds.
                                                                                                                                                                                                                                                                                                           =Cut Volume / 27


                                                                                                                                         Sections                     sq.ft.            = (Sta1+Sta2)2+90.60
                                                                                                                                                                                                       /2                           706.57
                                                                                                                                                                                                                                                 612.93
                                                                                                                                                                                                                                     Sections Sub Fill Area
                                                                                                                                                                                                                                                                    38.85      23812.17
                                                                                                                                                                                                                                                              =Avg Cut Area * Dist.
                                                                                                                                                                                                                                                                                             881.93
                                                                                                                                                                                                                                                                                            =Cut Volume / 27
                                                                                                                                                                                                    Sub Fill Volume for   Corrected Sub Fill
                                                                                                                                                                                                                                          Average                  Distance               Sub Fill Volume
                                                                                                                                                                                                                                                                                  Sub Fill Volume
                                                                                                                                                  2+51.75                 519.28                        Sections
                                                                                                                                                                                                                               Areas                 sq.ft.            Between
                                                                                                                                                                                                                                                                                       cu.ft.
                                                                                                                                                                                                                                                                                                                cu.yds.

                                                                                                                                                                                             612.93      2+51.75
                                                                                                                                                                                                                                sq.ft.
                                                                                                                                                                                                                                       38.85
                                                                                                                                                                                                                                     53.46
                                                                                                                                                                                                                                               = (Sta1+Sta2) / 2
                                                                                                                                                                                                                                                                     23812.171105.91
                                                                                                                                                                                                                                                                       Sections
                                                                                                                                                                                                                                                                                                                   881.93
                                                                                                                                                                                                                                                                                                          =Fill Volume / 27

                                                                                                                                                  2+90.60                 706.57                         2+90.60                      3.47
                                                                                                                                                                                                                                                    28.47              38.85                                   40.96



                                                                                                                                     Sub Fill Volume for        Corrected Sub Fill    Average Sub Fill Area                          Distance                                                             Sub Fill Volume
                                                                                                                                                                                                                                                                   Sub Fill Volume
                                                                                                                                                                     Areas                    sq.ft.                                 Between                                                                    cu.yds.
                                                                                                                                         Sections                                                                                                                       cu.ft.
                                                                                                                                                                      sq.ft.            = (Sta1+Sta2) / 2                            Sections                                                             =Fill Volume / 27
                                                                                                                                                  2+51.75                  53.46
                                                                                                                                                                                              28.47                                    38.85                          1105.91                                        40.96
                                                                                                                                                  2+90.60                   3.47




grading plan   earthwork estimation
hand graphics
7
photography
8
professional projects
grand boulevard streetscape plan . kansas city, missouri
tuscaloosa forward - detail area planning and design . tuscaloosa, alabama
rebuildspringfield - final document production . springfield, massachusetts
sand turn scenic overlook . bighorn national forest, wyoming
ranger creek campground . bighorn national forest, wyoming
CHARLES MCDOWELL
          7305 nw tomahawk ln • platte woods, mo 64151 • usa
  phone. 816.878.3965 • e-mail. charlesmmcdowell@gmail.com
website. http://www.wix.com/charlesmmcdowell/landscapearchitect
CHARLES MCDOWELL
7305 nw tomahawk ln • platte woods, mo 64151 • usa
phone. 816.878.3965 • e-mail. charlesmmcdowell@gmail.com
website. http://www.wix.com/charlesmmcdowell/landscapearchitect

Landscape Architecture Portfolio

  • 1.
  • 2.
    design philosophy “There isa love of wild nature in everybody, an ancient mother-love showing itself whether recognized or no, and however covered by cares and duties.” - John Muir In every person there is an appreciation and respect for the natural environment. This comes from a primitive relationship with the environment that some may have forgotten, ignored, or never experienced, but it is still rooted deep within us. Through design, it is possible to provide an environment in which people can reconnect to that basic relationship with nature. Each project has a unique opportunity to reveal and expose the local environmental and cultural conditions to the users. In this way people can reconnect with nature through their own personal experience and learn to appreciate and respect the natural environment in their own way. An extended version of the portfolio can be accessed at: http://www.wix.com/charlesmmcdowell/landscapearchitect
  • 3.
    brush creek eco-park 1 mks watershed plan 2 north rainier t.o.d. 3 colorado lights 4 sand turn scenic overlook 5 construction drawings 6 hand graphics 7 photography 8
  • 4.
    The Brush CreekCorridor was the focus of a study to assess the impacts of urbanization on stream systems and to explore what designers can do to mitigate those impacts. Through research and precedent studies, the following four project goals were determined for the Brush Creek Corridor: Improve local environmental conditions through ecological design; Connect the corridor for improved pedestrian use; Educate users to the environmental benefits of ecological design; Reveal and interpret ecological processes and phenomena through design. The project process included a corridor study which was used to determine the site for design exploration and the design of the site addressing the project goals. Proposed design solutions are represented by two different alternatives, each responding to the same design concept but envisioned in unique ways. Alternative 1 is a more costly solution to the design problem and would involve a greater amount of maintenance up front and over the long run. In Alternative 1, the site is manipulated significantly to amplify the users experience. Alternative 2 is less costly since the site is manipulated minimally and much is done to utilize vegetational changes within the existing context. Material and maintenance estimates were provided as to compare and contrast the two design ideas. The report, in its entirety can be viewed at: http://krex.k-state.edu/dspace/handle/2097/8761 media: ArcGIS, Google Sketchup, AutoCAD Civil 3D, Adobe Illustrator & Photoshop brush creek eco-park kansas city, missouri
  • 5.
    REVEAL urban streamcorridor 1 new ecologies for an
  • 6.
    proj IMPROVE local environmental conditions through ecological design manage localized flooding to reduce flash flooding increase stormwater infiltration urban improve water quality within brush creek stream EX DEFINE PL OR experiences beliefs opportunities challenges objectives ethics biases family E interests education goals CH AR dilemma a SE RE design process september project schedule description30 prece intent st
  • 7.
    j ject goals CONNECT the corridor for EDUCATE users to the REVEAL and interpret ecological improved pedestrian use environmental benefits of processes and phenomena ecological design through design create a design language that can be implemented target selected user groups that could have a promote environmental stewardship subconsciously throughout the corridor potential association with the project through experience improve access to the corridor link up with existing environmental improvement explore new means for conveying environmental goals and initiatives education link the existing corridor projects implement innovative strategies for environmental allow users to create their own relationship with the education natural world in a designed setting DEVELOP refine concepts explore solutions PRODUCE diagram review expand CONCEPT site exploration conceptual design presentation document case study graphics refine document design text PRELIMINARY DEFEND INVENTORY . ANALYSIS analysis exploration program corridor study case study goals site study stream reach classification goals key questions key questions methodology methodology site identification site potential site program REFINE APPLY competition january 17 - 31 finalist stage febuary 21 - march 31 ULI COMPETITION november december january january october march april april inventory final final final edent analysis document 07/ 17 story document28 annotated 11 document 02 document11/ 25 tudies 11 program15 . review board 21 design outline text . defense
  • 8.
    improve vulnerability analysis ¯ 0 500 1,000 2,000 ,0 0 000 3,000 4,000 1 inch = 2500 feet 25 500 0 Feet Feeet corridor corridor analysis 2 connect suitability analysis ¯ 0 500 1,000 2,000 3,000 4,000 Feet 1 inch = 2500 feet and s ynthes ¯ is 0 500 1,000 2,000 3,000 4,000 Feet educate suitability analysis 1 inch = 2500 feet historic stream alignment
  • 9.
    study boundary 1 3 site selection and prioritization terrain analysis slope analysis viewshed analysis
  • 10.
    alternative one hig bu bru bru bru bru igh igh igh hwa h a 1 parking area ce e r. e r. e r. e r. 2 rain garden a a ay 7 r. co 3 bioswale on on w w t w t w t wat nc nc 4 open green space 1 1 1 1/ co co 5 primary walkway o or kins i in in 6 plaza d d d d co 7 constructed wetland driv 8 elevated outlook area ur ur ur ur r e ri e 9 pedestrian bridge t 10 e e e 10 deck overlook 11 wetlands 12 lowland area 11 9 9 5 8 7 6 9 woodland 8 1 3 oodland 4 dland dland dland dland dland dland dland dland dl d dla d l d l d l d l d l d l 2 sw p parkwa swope parkway 3 9 avenue aven
  • 11.
    vegetation zones em anu el c lea ver II b oul eva rd 12 area of flood inundation proposed stream alignment
  • 13.
  • 14.
    9 3 6 2 w w od wood wood wood woodl nd woodland 1 aven aven e avenue t t t t ur co c c c rd or or or nc co c c 5 proposed stream alignment area of flood inundation vegetation zones
  • 15.
    alternative two h h h h hig bru r c r c r c hw hw hw hwa h ce 1 parking area r. 2 rain garden y7 y7 y7 y 71 w w w wa wat 3 bioswale 4 open green space k k k s kins / / / / / 5 vegetated filter strip 6 plaza d v d v d v driv 7 constructed wetland 8 elevated outlook area e 9 pedestrian bridge 10 wetlands 11 stormwater collection area off of bridge 10 12 lowland area em anu el c 7 lea ver II b oul eva rd 8 11 12 4 9 3 swop pa k a swope parkway
  • 16.
    rain garden bioswale
  • 17.
    d lanes up upop slo lan sl pe d s bioswale upland transit ional brush creek
  • 18.
    watershed plan manhattan, kansas Manhattan,Kansas will grow by over twenty thousand people in the next ten years due to the relocation of the National Bio and Agro-Defense Facility and the initiation of the Base Realignment and Closure which will effect the military base at Fort Riley. Currently Manhattan’s community plan and vision will not handle this increase in population effectively. The current political boundaries are not consistent with watershed boundaries. Existing zoning and subdivision boundaries cross watersheds, making it difficult to effectively manage water resources. There is little evidence of environmental stewardship in the community, illustrated by the inadequate protection of agricultural and open space areas. There is an extensive park and trail network within the existing city but there is a lack of connectivity. The solution to the design problem is a framework for planning by watershed which highlights the concepts of preserving natural and cultural resources, including the prairie ecosystem and agricultural lands, while promoting stewardship through community education. Through stream setbacks, and land use proposals a set of typologies have been created to set the framework for new development within the watersheds of Manhattan, Kansas. The design team consisted of three landscape architecture graduate students. media: ArcGIS, AutoCAD, Adobe Illustrator & Photoshop
  • 19.
  • 20.
    food sources stream classification education wildlife corridors trails land use
  • 21.
    ! ! ! ! ! ! ! schools and parks agricultural lands flood prone areas big blue river parkland buffer type 1 kansas state university buffer type 2 existing schools, food markets buffer type 3 existing trails conservation land city proposed trails agricultural land proposed trails urban land existing city of manhattan proposed land use plan
  • 22.
    trail trail stream type 3 residential stream stream residential development buffer buffer development • native vegetation 50 ft. setback 50 ft. setback • stormwater retrofits • stormwater best • wildlife corridor • native prairie grasses • transitional buffer areas management practices • trails • woodlands • pedestrian connectivity • low impact development • healthy ecosystem • wetlands • runoff managed in watershed trail trail stream type 2 kansas state university stream stream kansas state university agriculture land i l l d buffer buffer agriculture land i l l d 100 ft. setback 100 ft. setback • wildlife corridor • native prairie grasses • trails • woodlands • healthy ecosystem • wetlands 500 year floodplain 100 year floodplain trail trail trail trail trail natural outdoor classroom community community area and green space agriculture green space riverfront stream stream wetlands commercial park buffer buffer • stormwater management produce agriculture • community events • passive recreation 300 ft. setback stream type 1 300 ft. setback • stormwater treatment • highly fertile soil • community celebrations • active recreation • wildlife corridor • native prairie grasses • restored ecosystem • vegetable and fruit • community center • community involvement • trails • woodlands production • agriculture education • environmental education • healthy ecosystem • wetlands • local employment land use typology sections
  • 23.
    output buffer natural function output buffer parkland buffer output buffer agriculture stream output buffer urbanization bmp bmp residential development • native vegetation • stormwater retrofits • stormwater best • transitional buffer areas management practices • pedestrian connectivity • low impact development • runoff managed in watershed
  • 24.
    The challenge forthe 2011 Urban Land Institute/Gerald D. Hines Student Urban Design Competition was to redevelop the 33.5 acre site as a transit oriented development that is focused on improving multi-modal transportation, carbon neutrality, stormwater management, cultural identity, and creating a profitable market. The interdisciplinary team was comprised of three landscape architecture graduate students, one architecture graduate student, and a business graduate student who’s emphasis was in real estate. The Competition Stage was a two week period where the team focused on a conceptual strategy to address the project needs while creating a unique urban environment focused around the Mount Baker Transit Station on Rainier Boulevard. The concept for the Rainier Transit Oriented Development was based on the local and regional juxtaposition between the city, the land, and the water. Through research, our team discovered that, in the pre-developed history of the site, a large stream draining the valley, existed and was eventually piped into an underground drainage network. The design proposal reconstructs and exposes the idea of the stream that flows through the site. Although the proposal does not daylight the underground stream, the proposal collects all on-site stormwater in a corridor which symbolizes the historical stream. media: Marker, ArcGIS, Google Sketchup, AutoCAD, Adobe Illustrator & Photoshop north rainier t.o.d. seattle, washington
  • 25.
    urban land institute 3 gerald d. hines student urban design competition
  • 26.
    design process d processdesign p sign process des design process
  • 27.
    design process sign pro 7 7 8 design 8 9 5 7 1 mt. baker light rail station 6 2 elevated office campus - ground level bus transfer station 3 iconic pedestrian bridge 4 north rainier square 4 5 stormwater stream corridor 6 rooftop agriculture plot 7 residential tower 8 residential node 9 art studios and boardwalk 3 2 1
  • 28.
    terrain analysis historic hydrology overlay slope analysis 10 y 0 75 150 ArtSpace Collaboration Sustainable building typology creating housing opportunities including balconies and setbacks for for artists in the Seattle region shading, daylighting, and ventilation while considering solar orientation Greenroofs Rainier Boulevard Building atrium vegetated roofs increase biodiversity, a green corridor connecting to downtown provides natural ventilation Seattle, creating a pedestrian environment that infiltrate water, and reduce the heat and sunlight supports multi-modal transportation island effect Site Section Linear greenway Stormwater planter Stormwater cisterns Geo-exchange thermal systems text structured network that collects collect stormwater runoff buildings uses ground source temperature to for greywater use sustainable initiatives stormwater runoff filtering and 0 25 50 100 150 200 efficiently heat and cool structures infiltrating water
  • 29.
    walking network analysis 300 450 600 transit times from north rainier t.o.d. Art space boardwalk main art space contianing studios, galleries, and exhibit spaces Photovoltaic panels provides renewable energy to powers electric charging station Rooftop garden in carpark provides produce to in- building grocery store 5 minute walk with transit 10 minute walk with transit 5 minute bike with transit 10 minute bike with transit light rail station central link light rail line Bioswale north rainier t.o.d. collects stormwater runoff filtering and infiltrating water mount baker light rail station Urban stream corridor Structured parking increasing biodiversity, collect on-site stormwater supporting residential and retail needs runoff, filtering and infiltrating water, sequestering carbon, and providing and urban aesthetic
  • 30.
    colorado lights denver, colorado Colorado Lights is an outdoor mall located within a mixed-use development at 9th Ave. and Colorado Blvd. in downtown Denver, Colorado. This development encompasses approximately twelve blocks formerly the site of the University of Colorado Health Sciences Center. The project was broken into two phases, the first being to determine site potential by designing a mixed-use development while retaining existing historical or iconic buildings for adaptive reuse. The second phase of the project was to look at a specific site within the redevelopment to design in more detail. Colorado Lights is a linear outdoor mall surrounded by mixed-use retail and residential units. The focal point of the space is a low wall that undulates both horizontally and vertically. The wall is lit from within with LED lights that can be programed to change the lighting scheme throughout the night. Running directly along side the wall is a bioswale which collects all the water that runs off of the plaza. Water is also taken from the surrounding buildings and channelled across the walkways through grates into the bioswale. The vibrancy and activity of Colorado Lights makes it a unique place within downtown Denver and creates a new sense of place for the entire development. media: Colored Pencil, Google Sketchup, AutoCAD, Adobe Illustrator & Photoshop
  • 31.
  • 32.
    bios ale developmnt s bioswale development s bi l d l t k l and al a wall k k k ketch t e tc e d w led led s s
  • 33.
  • 34.
  • 35.
  • 36.
    The Sand TurnScenic Overlook is the proposed location of the Highway 14 Forest Portal for the northeast entry of Bighorn National Forest in Wyoming. The proposal includes a pedestrian oriented overlook with interpretive signage, a trail head for a proposed short loop trail, as well as the siting of a new toilette facility. The pedestrian overlook responds to the lines and geographic formations of the surrounding mountain landscape. Users can view informational signage as they drive up, from their cars, or they can walk to the viewing area where they have a better view and can read more information about the Powder River Basin and surrounding context. The overlook has three viewing areas that can be directly accessed from the parking area. These areas support elevated viewing and allow for access to a short trail. The viewing area located at the bottom of the ramp and stairs has signage integrated into the barrier walls and allows users to move closer to the edge of the site for unobstructed views. media: ArcGIS, Google Sketchup, Pen & Ink sand turn scenic overlook bighorn national forest
  • 37.
  • 38.
  • 42.
  • 43.
  • 44.
  • 45.
    Section 2+51.75 Sub Cut Area(s) sq.ft. Sub Fill Area(s) sq.ft. K (Cut in Fill Area) C1 318.53 F1 360.83 K1 14.06 C2 3324.85 F2 173.80 K2 0.00 C3 Section 1535.38 2+51.75 F3 0.00 K3 0.00 TotalSub Cut Area(s)Area Sub Cut sq.ft. Sub Fill Area(s) sq.ft. Total Sub Fill Area K (Cut in Fill Area) Total K Area = C2 C1 C1..C10 318.53 F1 5178.76 360.83 K1 = F1..F10 14.06 534.63 = K1..K10 14.06 3324.85 F2 173.80 K2 0.00 C3 1535.38 F3 0.00 K3 0.00 Total Sub Cut Area for K Adjusted Total Sub Fill Area Total K Area 5178.76 534.63 14.06 Total C1..C10 K Cut Area = Sub Adjusted for = F1..F10 5192.82 = K1..K10 Total Sub Cut Area 5192.82 =( C1..C10)+( K1..K10) =( C1..C10)+( K1..K10) Section Vertical Exaggeration 10.00 Section Vertical Exaggeration 10.00 Section VerticalArea Corrected Sub Cut Exaggeration sq.ft. 519.28 Corrected Sub Fill Area sq.ft. 10.00 Section Vertical Exaggeration 53.46 10.00 =Total Cut / Vert.Exag. =Total Cut / Vert.Exag. Corrected Sub Cut Area Corrected Sub Fill Area sq.ft. 519.28 sq.ft. 53.46 =Total Cut / Vert.Exag. =Total Cut / Vert.Exag. Corrected Sub Cut Average SubSub Cut Area for Cut Volume Distance sq.ft.Cut AreaSub Cut VolumeVolume Sub Cut Volume Corrected Sub Cut Average Sub Distance Sub Cut Sub Cut Volume Sub Cut Volume for Sections Areas Between cu.ft. cu.yds. Areas sq.ft. 2+51.75 Between sq.ft. 519.28 = (Sta1+Sta2) / 2 Sections cu.ft. =Avg Cut Area * Dist. cu.yds. =Cut Volume / 27 Sections sq.ft. = (Sta1+Sta2)2+90.60 /2 706.57 612.93 Sections Sub Fill Area 38.85 23812.17 =Avg Cut Area * Dist. 881.93 =Cut Volume / 27 Sub Fill Volume for Corrected Sub Fill Average Distance Sub Fill Volume Sub Fill Volume 2+51.75 519.28 Sections Areas sq.ft. Between cu.ft. cu.yds. 612.93 2+51.75 sq.ft. 38.85 53.46 = (Sta1+Sta2) / 2 23812.171105.91 Sections 881.93 =Fill Volume / 27 2+90.60 706.57 2+90.60 3.47 28.47 38.85 40.96 Sub Fill Volume for Corrected Sub Fill Average Sub Fill Area Distance Sub Fill Volume Sub Fill Volume Areas sq.ft. Between cu.yds. Sections cu.ft. sq.ft. = (Sta1+Sta2) / 2 Sections =Fill Volume / 27 2+51.75 53.46 28.47 38.85 1105.91 40.96 2+90.60 3.47 grading plan earthwork estimation
  • 46.
  • 47.
  • 54.
  • 55.
  • 60.
    professional projects grand boulevardstreetscape plan . kansas city, missouri tuscaloosa forward - detail area planning and design . tuscaloosa, alabama rebuildspringfield - final document production . springfield, massachusetts sand turn scenic overlook . bighorn national forest, wyoming ranger creek campground . bighorn national forest, wyoming
  • 61.
    CHARLES MCDOWELL 7305 nw tomahawk ln • platte woods, mo 64151 • usa phone. 816.878.3965 • e-mail. charlesmmcdowell@gmail.com website. http://www.wix.com/charlesmmcdowell/landscapearchitect
  • 62.
    CHARLES MCDOWELL 7305 nwtomahawk ln • platte woods, mo 64151 • usa phone. 816.878.3965 • e-mail. charlesmmcdowell@gmail.com website. http://www.wix.com/charlesmmcdowell/landscapearchitect