Software Design                                                                                       Motivation
                            Methodologies
Comp 6471




                                                           Comp 6471
                                COMP 6471/4 NN

                      Steven Winikoff                                     …with proper design, the features come
                                                                          cheaply. This approach is arduous, but
                  smw@alcor.concordia.ca                                  continues to succeed.
                          H-966-2                                                                    - Dennis Ritchie
                   514-848-2424, ext. 7619

                                                         Page 7




                      What This Course is About                                                  Software Engineering
                                                                   ca. 1968: Reasons for the software crisis were determined.
Comp 6471




            simple questions:                                      Software development should be treated as an engineering
                                                                   activity and not as an ad-hoc activity => software development
                                                                   should be a systematical activity.
                  What should go into a given piece of
                  software?                                            Definition provided by the IEEE:
                                                                         Software Engineering is the systematic approach to
                                                                         development , maintenance, organization of software
                  How do you put it there?                               systems.

                                                                   Starting point of the software crisis.
            ...with complex answers
                                                                             Acknowledgement: These slides are based on work originally created by
                                                                                            Dr. Juergen Rilling, CSE, Concordia

                                                                                                  Comp6471 Software Design Methodologies
Page 8                                                                             Page 9




            Goals of Software Engineering                                                                           Software Life Cycle
                                                                                   The phases of a software development cycle.
 Improve the productivity of the programming/development process                   Analysis:                                                             Software Engineering
 Improve the comprehension of the developed software system                        Specification
 Improve the maintainability of the systems                                                                                          70

 Improve the quality of the software system (software product)
                                                                                    Design                                           60
                                                                                                                                      50
 Improve the “quality” of the software system.                                     Implementation
                                                                                                                                      40                                              Without SE
          - Reliability




                                                                                                                             Effort
                                                                                    Testing                                          30                                              Applying SE
          - Efficiency (Speed, resource usage)
                                                                                    Delivery/Maintenance                             20
          - User-friendly (user acceptance)
                                                                                                                                      10
                                                                                                                                        0
 General goal:




                                                                                                                                                       n




                                                                                                                                                                          n
                                                                                                                                                             gn




                                                                                                                                                                                  g
                                                                                                                                            s


                                                                                                                                                     io




                                                                                                                                                                      t io


                                                                                                                                                                                in
                                                                                                                                            si
    Produce software which is useful for people




                                                                                                                                                             si
                                                                                                                                                  at




                                                                                                                                                                                st
                                                                                                                                           y




                                                                                                                                                                    ta
                                                                                                                                                           De
                                                                                                                                        al




                                                                                                                                                                              Te
                                                                                                                                                 f ic




                                                                                                                                                                  en
                                                                                                                                      An


                                                                                                                                                 i
                                                                                                                                              ec




                                                                                                                                                                 em
                                                                                                                                            Sp




                                                                                                                                                              pl
                                                                                                                                                            Im
                                                                                                                                                   Software Life Cycle Phase




                                          Comp6471 Software Design Methodologies                                            Comp6471 Software Design Methodologies

Page 10                                                                            Page 11




                                   Software Life Cycle                                       Goals of Software Engineering
                                                                                     Products:        External deliverables, internal products; software products: final
                                                                                                      code, test drivers
     Feasibility study – WHY? Cost benefit analysis (is                                              Paper documents: external: user manual, installation guide;
      it worth doing the project)                                                                     Internal: requirements document, specification document,
     Requirements analysis + specification: WHAT?                                                    design document, test plan
      What should the software do, produce a document.
     Design - How? How should the software do it.
      Architectural design (overall structures + organization                        Processes:       How the software is created, how its quality is evaluated and
      of objects/modules, choice of data structures, etc.                                             ensured
     Coding/Implementation: Realize ! components.                                   Tools:           CASE tools, editors, project management tools
      Code modules, prodcuts: software,
     Testing: Realize ! Test individual modules, test                               People:          Technical, social and managerial skills
      whether modules work together, test system as a
      whole, document test results.                                                  Principles       Providing permanency, guidelines and maturity in the software
     Delivery and maintenance: Evolve!                                                               development process.


                                          Comp6471 Software Design Methodologies                                            Comp6471 Software Design Methodologies
Page 12                                                                       Page 13




               Skills of a Software Engineer                                                    Skills of a Software Engineer

     Programming:                                                             Design
             data structures and algorithms                                            –   be familiar with several approaches
             programming languages                                                     –   be flexible and open to different application domains
             tools: compilers, debuggers, editors
                                                                                        –   be able to shift between several level of abstraction
     Communication:                                                                    –   application domain jargon
             spoken, written, presentations
             teamwork
                                                                                        –   requirements and specification: declarative model
             with external people (customers)                                          –   architectural design, high-level operational model
                                                                                        –   detailed coding




                                     Comp6471 Software Design Methodologies                                       Comp6471 Software Design Methodologies

Page 14                                                                       Page 15




                    Software Lifecycle Models
                                                                                            A lifecycle model provides a fixed generic
                                                                                            framework that can be tailored to a specific project.

                                                                                        Project specific parameters will include:
      Definition.                                                                        size (person-years),
      A (software/system) lifecycle model is a                                           budget,
      description of the sequence of activities carried                                  duration.
      out in a software engineering project, and the
      relative order of these activities.
                                                                                        project plan = lifecycle model + project parameters




                                     Comp6471 Software Design Methodologies                                       Comp6471 Software Design Methodologies
Page 16                                                                     Page 17




          There are many different lifecycle models to choose                         By changing the lifecycle model, we can
          from, e.g:
                                                                                      improve and/or trade off:
             waterfall,
             code-and-fix                                                               development speed (time to market)
             spiral                                                                     product quality
             rapid prototyping
             unified process (UP)
                                                                                         project visibility
             agile methods, extreme programming (XP)                                    administrative overhead
             COTS …                                                                     risk exposure
                                                                                         customer relations, etc, etc.
              but many are minor variations on a smaller number of
              basic models.


                                   Comp6471 Software Design Methodologies                                 Comp6471 Software Design Methodologies

Page 18                                                                     Page 19




          Normally, a lifecycle model covers the entire                               Note that we can sometimes combine
          lifetime of a product.                                                       lifecycle models
                                                                                      e.g. waterfall inside evolutionary – onboard
              From the birth of an idea to the final                                      shuttle software
              deinstallation of the last release
                                                                                      We can also change lifecycle model between
          i.e. The three main phases:                                                 releases as a product matures,
                  design,
                  build,                                                             e.g. rapid prototyping → waterfall
                  maintain.




                                   Comp6471 Software Design Methodologies                                 Comp6471 Software Design Methodologies
Page 20                                                                   Page 21
                                                                                                     phase
                                                                               User Requirements     output          User Requirements Document

                     The Waterfall Model
                                                                                     Software Requirements                    Software Requirements
                                                                                                                              Document
          • Classic lifecycle model – widely known,
            understood and (commonly?) used.                                                  Architecture Design                 Architectural Design
                                                                                                                                  Document
          • In some respect, waterfall is the "common
                                                                                     ”Swimming
            sense" approach                                                          upstream”
                                                                                                      Detailed design & Coding                   Detailed
                                                                                                                                                 Design
          (Introduced by Royce 1970)                                                                                                             & Code
                                                                               The Waterfall                   Testing
                                                                               Lifecycle Workflow
                                                                                                                           Delivery
                                                                                                   Time
                                 Comp6471 Software Design Methodologies                                 Comp6471 Software Design Methodologies

Page 22                                                                   Page 23




                                                   Advantages
                                                                                                        Disadvantages I
          1.   Easy to understand and implement.
          2.   Widely used and known (in theory!)
                                                                           ●   Idealized, doesn’t match reality well.
          3.   Reinforces good habits: define-before-design,               ●   Doesn’t reflect iterative nature of exploratory
               design-before-code                                              development.
          4.   Identifies deliverables and milestones                      ●   Unrealistic to expect accurate requirements so early
          5.   Document driven, URD, SRD, … etc. Published                     in project
               documentation standards, e.g. PSS-05.
                                                                           ●   Software is delivered late in project, delays
          6.   Works well on mature products and weak teams.
                                                                               discovery of serious errors.




                                 Comp6471 Software Design Methodologies                                 Comp6471 Software Design Methodologies
Page 24                                                               Page 25




                            Disadvantages II                                                                   Code-and-Fix
      ● Difficult to integrate risk management                           This model starts with an informal general
      ● Difficult and expensive to make changes to                       product idea and just develops code until a
        documents, ”swimming upstream”.                                  product is ”ready” (or money or time runs out).
      ● Significant administrative overhead, costly for
                                                                         Work is in random order.
        small teams and projects.
                                                                          Corresponds with no plan!




                             Comp6471 Software Design Methodologies                                     Comp6471 Software Design Methodologies

Page 26                                                               Page 27




                                         Advantages                                                       Disadvantages
  ● No administrative overhead                                         1.       Dangerous!
  ● Signs of progress (code) early.                                             ●   No visibility/control
  ● Low expertise, anyone can use it!
                                                                                ●   No resource planning
  ● Useful for small “proof of concept” projects,
                                                                                ●   No deadlines
                                                                                ●   Mistakes hard to detect/correct
    e.g. as part of risk reduction.
                                                                       2. Impossible for large projects,
                                                                          communication breakdown, chaos.




                             Comp6471 Software Design Methodologies                                     Comp6471 Software Design Methodologies
Page 28                                                                               Page 29




                                                                                                This loop approach gives rise to structured
                                           Spiral Model
                                                                                                          iterative lifecycle models.
 Since end-user requirements are hard to
 obtain/define, it is natural to develop software                                               In 1988 Boehm developed the spiral model as
 in an experimental way: e.g.                                                                   an iterative model which includes risk
                                                                                                analysis and risk management.
     1. Build some software
     2. See if it meets customer requirements                                                   Key idea: on each iteration identify and solve
     3. If no goto 1 else stop.                                                                 the sub-problems with the highest risk.



                                 Comp6471 Software Design Methodologies                                               Comp6471 Software Design Methodologies

Page 30                                                                               Page 31
                            Cumulative cost
  Determine objectives,                                 Evaluate alternatives,
  alternatives & constraints                            Identify & resolve risks
                                                                                                Each cycle follows a waterfall model by:
                                                                                                  1.   Determining objectives
                                                                                                  2.   Specifying constraints
                                   Prototypes                    Operational
 Review &                    Start P1      P2          P3        Prototype                        3.   Generating alternatives
 commitment           Requirements Concept
                                                       Design,                                    4.   Identifying risks
                      plan                                         Detailed design
                                   Of Operation
                 Development
                                                       Validation                                 5.   Resolving risks
                                                       & Verification
                 plan              Requirements                                                   6.   Developing next-level product
                                  validation                       Coding
          Integration &                                                                           7.   Planning next cycle
          Test plan                                       Unit & Integration
                                                          Testing
                           End      Acceptance
   Plan next phase                  Testing                      Develop & verify
                                                                 next-level product
                                 Comp6471 Software Design Methodologies                                               Comp6471 Software Design Methodologies
Page 32                                                                Page 33




                                          Advantages                                                       Disadvantages
   1. Realism: the model accurately reflects the                            Needs technical expertise in risk analysis to really
      iterative nature of software development on                            work
      projects with unclear requirements                                    Model is poorly understood by non-technical
   2. Flexible: incorporates the advantages of the                           management, hence not so widely used
      waterfall and rapid prototyping methods                               Complicated model, needs competent professional
                                                                             management. High administrative overhead.
   3. Comprehensive model decreases risk
   4. Good project visibility.




                              Comp6471 Software Design Methodologies                                     Comp6471 Software Design Methodologies

Page 34                                                                Page 35




                                                                                 Requirements Capture
                          Rapid Prototyping
                                                                                                                                     Iterate
                                                                                       Quick Design
          Key idea: Customers are non-technical and
          usually don’t know what they want/can have.
                                                                                                 Build Prototype
          Rapid prototyping emphasises requirements
                                                                                                         Customer Evaluation of
          analysis and validation, also called:                                                          Prototype
           customer oriented development,
           evolutionary prototyping
                                                                                 The Rapid                           Engineer Final
                                                                                 Prototype Workflow                  Product


                              Comp6471 Software Design Methodologies                                     Comp6471 Software Design Methodologies
Page 36                                                               Page 37




                                         Advantages                                                          Disadvantages I
          1. Reduces risk of incorrect user requirements                         1. An unstable/badly implemented prototype
          2. Good where requirements are                                            often becomes the final product.
             changing/uncommitted                                                2. Requires extensive customer collaboration
          3. Regular visible progress aids management                                    –   Costs customers money
          4. Supports early product marketing                                            –   Needs committed customers
                                                                                         –   Difficult to finish if customer withdraws
                                                                                         –   May be too customer specific, no broad market




                             Comp6471 Software Design Methodologies                                          Comp6471 Software Design Methodologies

Page 38                                                               Page 39




                            Disadvantages II                                                        Agile (XP) Manifesto
   3. Difficult to know how long project will last                              XP = Extreme Programming emphasizes:
   4. Easy to fall back into code-and-fix without                                Individuals and interactions
      proper requirements analysis, design,                                         –   Over processes and tools
      customer evaluation and feedback.                                            Working software
                                                                                    –   Over documentation
                                                                                   Customer collaboration
                                                                                    –   Over contract negotiation
                                                                                   Responding to change
                                                                                    –   Over following a plan




                             Comp6471 Software Design Methodologies                                          Comp6471 Software Design Methodologies
Page 40                                                             Page 41




          Agile Principles (Summary)                                               XP Practices (Summary)
     Continuous delivery of software                                    Programming in pairs
     Continuous collaboration with customer                             Test driven development
     Continuous update according to changes                             Continuous planning, change , delivery
     Value participants and their interaction                           Shared project metaphors, coding standards and
     Simplicity in code, satisfy the spec                                ownership of code
                                                                         No overtime! (Yeah right!)




                           Comp6471 Software Design Methodologies                               Comp6471 Software Design Methodologies

Page 42                                                             Page 43




                                       Advantages                                                 Disadvantages
     Lightweight methods suit small-medium size                         Difficult to scale up to large projects where
      projects                                                            documentation is essential
     Produces good team cohesion                                        Needs experience and skill if not to degenerate
     Emphasizes final product                                            into code-and-fix
     Iterative                                                          Programming pairs is costly
     Test-based approach to requirements and quality                    Test case construction is a difficult and specialized
      assurance                                                           skill.




                           Comp6471 Software Design Methodologies                               Comp6471 Software Design Methodologies
Page 44                                                                                  Page 45



                                                                                                   Advantages
                                                                       COTS                         Fast, cheap solution
                                                                                                    May give all the basic functionality
     COTS = Commercial Off-The-Shelf software                                                      Well defined project, easy to run
     Engineer together a solution from existing
      commercial software packages using minimal                                                   Disadvantages
      software "glue".                                                                              Limited functionality
     E.g. using databases, spread sheets, word                                                     Licensing problems, freeware, shareware, etc.
      proccessors, graphics software, web browsers,
                                                                                                    License fees, maintainance fees, upgrade
      etc.
                                                                                                     compatibility problems




                                         Comp6471 Software Design Methodologies                                             Comp6471 Software Design Methodologies

                                                                                         Page 47




                                                                                                                   Unified Process (UP)
                                                                                              Booch, Jacobson, Rumbaugh 1999.
  Comp 6471




              Iterative Development and the                                                   Lifetime of a software product in cycles:
                      Unified Process                                                     
                                                                                                   –   Birth, childhood, adulthood, old-age, death.
                                                                                               Product maturity stages
                                                                                              Each cycle has phases, culminating in a new
                                                                                               release (c.f. Spiral model)


              Acknowledgement: These slides for the Iterative Development process were
                 originally created by Dr. Constantinos Constantinides, CSE, Concordia


                                                                                                                            Comp6471 Software Design Methodologies
Page 48                                                              Page 49




                     Iterative Development                                                     Iterative Development
                                                                         [iteration N]
                                                                         Requirements – Analysis - Design- Implementation - Testing
     The iterative lifecycle is based on the
      successive enlargement and refinement of a
      system though multiple iterations with
      feedback and adaptation.                                           [iteration N+1]
     The system grows incrementally over time,                          Requirements – Analysis - Design- Implementation - Testing

      iteration by iteration.
     The system may not be eligible for production                       Feedback from iteration N leads to
                                                                          refinement and adaptation of the                       The system grows
      deployment until after many iterations.                             requirements and design in iteration                   incrementally.
                                                                          N+1.



                            Comp6471 Software Design Methodologies                                       Comp6471 Software Design Methodologies

Page 50                                                              Page 51




                     Iterative Development                                                          Embracing Change
     The output of an iteration is not an                                Stakeholders usually have changing
      experimental prototype but a production                              requirements.
      subset of the final system.                                         Each iteration involves choosing a small
     Each iteration tackles new requirements and                          subset of the requirements and quickly
      incrementally extends the system.                                    design, implement and testing them.
     An iteration may occasionally revisit existing                      This leads to rapid feedback, and an
      software and improve it.                                             opportunity to modify or adapt understanding
                                                                           of the requirements or design.



                            Comp6471 Software Design Methodologies                                       Comp6471 Software Design Methodologies
Page 52                                                                                         Page 53




     Iteration Length and Timeboxing                                                                         Phases of the Unified Process
                                                                                                                 Inception         Elaboration             Construction                     Transition


                                                                                                          time
     The UP recommends short iteration lengths
      to allow for rapid feedback and adaptation.                                                  A UP project organizes the work and iterations
     Long iterations increase project risk.                                                         across four major phases:
     Iterations are fixed in length (timeboxed).If                                                   – Inception - Define the scope of project.
      meeting deadline seems to be difficult, then                                                    – Elaboration - Plan project, specify features,
      remove tasks or requirements from the                                                             baseline architecture.
      iteration and include them in a future iteration.
     The UP recommends that an iteration should                                                      – Construction - Build the product
      be between two and six weeks in duration.                                                       – Transition - Transition the product into end
                                                                                                        user community

                                              Comp6471 Software Design Methodologies                                                          Comp6471 Software Design Methodologies

Page 54                                                                                         Page 55




                          Iterations and Milestones                                                         The UP Disciplines
                                                                                                                                                                           Phases
                                                                                                 Process Disciplines                        Inception Elaboration            Construction          Transition
           Inception       Elaboration            Construction                   Transition
                                                                                                                    Business Modeling
                                                                                                                             Requirements
          Preliminary   Iter. #1   Iter. #2
           Iteration                                                                                                 Analysis & Design
                                                                                                                        Implementation
                              Milestone             Release                  Final production                                        Test
                                                                             release
                                                                                                                              Deployment

     Each phase and iteration has some risk mitigation focus, and                               Supporting Disciplines
      concludes with a well-defined milestone.                                                                       Configuration Mgmt
     The milestone review provides a point in time to assess how                                                          Management
      well key goals have been met and whether the project needs to
      be restructured in any way to proceed.                                                                                  Environment
     The end of each iteration is a minor release, a stable executable                                                                     Preliminary
                                                                                                                                            Iteration(s)
                                                                                                                                                           Iter.
                                                                                                                                                            #1
                                                                                                                                                                   Iter.
                                                                                                                                                                    #2
                                                                                                                                                                            Iter.
                                                                                                                                                                             #n
                                                                                                                                                                                     Iter. Iter.
                                                                                                                                                                                    #n+1 #n+2
                                                                                                                                                                                                   Iter.
                                                                                                                                                                                                   #m
                                                                                                                                                                                                            Iter.
                                                                                                                                                                                                           #m+1
      subset of the final product.
                                                                                                                                                                       Iterations

                                              Comp6471 Software Design Methodologies                                                          Comp6471 Software Design Methodologies
Page 56                                                                                                      Page 57



          The UP Disciplines                                                         In an iteration you
                                                                                     walk through all                      The UP Disciplines                                                    Focus of this
                                                                                                                                                                                                 course.
                                                                    Phases           disciplines.                                                                                     Phases
 Process Disciplines                 Inception Elaboration            Construction          Transition        Process Disciplines                      Inception Elaboration            Construction          Transition

                Business Modeling                                                                                                Business Modeling
                     Requirements                                                                                                     Requirements
                 Analysis & Design                                                                                                Analysis & Design
                   Implementation                                                                                                   Implementation
                              Test                                                                                                              Test
                       Deployment                                                                                                       Deployment
 Supporting Disciplines                                                                                       Supporting Disciplines
                Configuration Mgmt                                                                                               Configuration Mgmt
                      Management                                                                                                       Management
                       Environment                                                                                                      Environment
                                     Preliminary    Iter.   Iter.    Iter.    Iter. Iter.   Iter.    Iter.                                             Preliminary    Iter.   Iter.    Iter.    Iter. Iter.   Iter.    Iter.
                                     Iteration(s)    #1      #2       #n     #n+1 #n+2      #m      #m+1                                               Iteration(s)    #1      #2       #n     #n+1 #n+2      #m      #m+1

                                                                Iterations                                                                                                        Iterations

                                       Comp6471 Software Design Methodologies                                                                            Comp6471 Software Design Methodologies

Page 58                                                                                                      Page 59




                                                                                                                                                                      Advantages of an
                         Disciplines and Phases
                                                                                                                                                                      Iterative Process
     Although an iteration includes work in most
                                                                                                                          Reduce risks
      disciplines, the relative effort and emphasis change                                                                 –   Risks are identified early, progress is easier to see.
      over time.                                                                                                          Get a robust architecture
      –   Early iterations tend to apply greater emphasis to                                                               –   Architecture can be assessed and improve early.
          requirements and design, and later ones less so.                                                                Handle evolving requirements
      –   Figure illustrations are suggestive, not literal.                                                                –   Users provide feedback to operational systems.
                                                                                                                           –   Responding to feedback is an incremental change.
     Note that activities and artifacts are optional (except                                                             Allow for changes
      code!)                                                                                                               –   System can adapt to problems
      –   Developers select those artifacts that address their particular
          needs.
                                                                                                                          Attain early learning
                                                                                                                           –   Everyone obtains an understanding of the different workflows
                                                                                                                               early on.


                                       Comp6471 Software Design Methodologies                                                                            Comp6471 Software Design Methodologies
Page 60                                                                                         Page 61

                                          Unified Process
                                                                                   Product                                                                               UML class diagram!
 Management                               Software Lifecycle
                                                                                                                              Use Case Model


 Environment                        *                   *                 releases                        specified by




                                                                                                                                   by
                                                                                                                              ed
                         Workflow                 Cycle




                                                                                                                                        deployed by
                                                                                                                             lis
                                                                                                                              a
                                                                                                  Analysis Model




                                                                                                                           re
 Requirements




                                                                                                                                                         im
                                                                                 Inception




                                                                                                                                                           ple
                                                        4




                                                                                                                                                            me
 Design                                                                                                             Design Model




                                                                                                                                                             n te
                                                  Phase                          Elaboration




                                                                                                                                                                 db
                                                                                                                               Deployment Model                                verified by




                                                                                                                                                                  y
 Implementation
                                                                                 Construction
                                                        *
                                                                                                                                                      Implementation Model
 Assessment                                     Iteration
                                                                                 Transition        All models are interdepedent
                                                                                                   but this only shown for use                                                 Test Model
 Deployment                                             *
                                                                                                   case model
                                                Artifact
                                        Comp6471 Software Design Methodologies                                                                Comp6471 Software Design Methodologies

Page 62                                                                                         Page 63




                                                                                                                    What artifacts may start in
                                                              Inception
                                                                                                                                    inception?
     A number of questions need to be explored:                                                     Vision and business case
      –   What is the vision and business case for this project?                                      –    Describes high-level goals and constraints.
      –   Is it feasible?                                                                            Use Case model
      –   Buy and/or build?                                                                           –    Describes functional requirements and related non-functional
      –   Rough estimate of cost.                                                                          requirements.
      –   Should we proceed or stop?
                                                                                                     Supplementary specification
                                                                                                      –    Describes other requirements
                                                                                                     Glossary
     The intent is to establish some initial common vision                                           –    Key domain terminology
      for the objectives of the project, determine if it is
      feasible and decide if it is worth some serious
                                                                                                     Risk list and Risk Management Plan
                                                                                                      –    Describes business, technical, resource and schedule risks
      investigation in elaboration.                                                                        and ideas for their mitigation or response.



                                        Comp6471 Software Design Methodologies                                                                Comp6471 Software Design Methodologies
Page 64                                                                         Page 65




                   What artifacts may start in                                                          Requirements Engineering:
                                   inception?                                                                        An Overview
     Prototypes and proof-of-concepts                                               Basic goal: To understand the problem as
     Iteration plan                                                                  perceived by the user.
      –   Describes what to do in the first elaboration iteration
     Phase Plan & Software development Plan
                                                                                     Activities of RE are problem oriented.
      –   Guess for elaboration phase duration. Tools, people,                            –   Focus on what, not how
          education and other resources.                                                  –   Don’t cloud the RD with unnecessary detail
     Development Case                                                                    –   Don’t pre-constrain design.
      –   Description of the customized UP steps and artifacts for this
          project.                                                                   After RE is done, do software design:
     Artifacts will be partially completed in this phase and                             –   solution oriented
      will be refined in later iterations.
                                                                                          –   how to implement the what


                                       Comp6471 Software Design Methodologies                                       Comp6471 Software Design Methodologies

Page 66                                                                         Page 67




                       Requirements Engineering:                                                    Requirements Engineering
                                    An Overview

                                                                                      The process of determining and establishing
     Key to RE is good communication between                                         the precise expectations of the customer
      customer and developers.                                                        about the proposed software system.

     Work from Requirements Document as guide.




                                       Comp6471 Software Design Methodologies                                       Comp6471 Software Design Methodologies
Page 68                                                                                  Page 69




      The Two Kinds of Requirements                                                                                             The Purpose of RE
                                                                                                  Raw user requirements are often:
     Functional: The precise tasks or functions                                                    –   vague
      the system is to perform.                                                                     –   contradictory
          –   e.g., details of a flight reservation system                                          –   impractical or impossible to implement
                                                                                                    –   overly concrete
     Non-functional: Usually, a constraint of                                                      –   just plain wrong
      some kind on the system or its construction                                                 The purpose of RE is to get a usable set of
          –   e.g., expected performance and memory                                                requirements from which the system may be
              requirements, process model used,                                                    designed and implemented, with minimal
              implementation language and platform,                                                surprises.
              compatibility with other tools, deadlines, ...

                                       Comp6471 Software Design Methodologies                                               Comp6471 Software Design Methodologies

Page 70                                                                                  Page 71

               Requirements
                 Analysis
                                  leads to             The RE Process
                                                                                                              The Requirements Document
                               Requirements
          produces
                                Definition
                                                                                                  The official statement of what is required of
                System                            Requirements                                     the system developers.
                Models                            Specification
                                                                                                   –    Includes system models, requirements definition,
                                                                                                        and requirements specification.
                          Requirements                                                             –    Not a design document.
                                                                          Software
                           Definition
                                                                         Specification             –    States functional and non-functional requirements.
     included in
                                             Requirements
                                             Specification                                        Serves as a reference document for
                                                                                                   maintenance.
              Requirements
                                                                         Software
               Document
                                                                        Specification
                                       Comp6471 Software Design Methodologies                                               Comp6471 Software Design Methodologies
Page 72                                                                Page 73




                       Requirements Document                                                 The Requirements Document
                               “Requirements”                                                            Should State ...
                                                                            Foreseen problems:
                                                                                 –   “won’t support Win-3.x apps”

         Should be easy to change as requirements                          Expected evolution:
          evolve.                                                                –   “will port to MacOS in next version”

         Must be kept up-to-date as system changes.                        Response to unexpected events/usage:
                                                                                 –   “if input data in old format, will auto-convert”



                              Comp6471 Software Design Methodologies                                         Comp6471 Software Design Methodologies

Page 74                                                                Page 75




                        Requirements Document                                                                                    A Story ...
                                      Structure
                                                                            Dear Mr. Architect,
         Introduction (describe need for system)
         Functional Requirements                                           Please design and build me a house. I am not quite sure of what
                                                                            I need, so you should use your discretion.
         Non-Functional Requirements
         System Evolution (describe anticipated changes)                   My house should have between two and forty-five bedrooms.
                                                                            Just make sure the plans are such that bedrooms can be easily
         Glossary (technical and/or new jargon)                            added or deleted. When you bring the blueprints to me, I will
         Appendices                                                        make the final decision of what I want. Also bring me the cost
                                                                            breakdown for each configuration so that I can arbitrarily pick
         Index                                                             one.


                              Comp6471 Software Design Methodologies                                         Comp6471 Software Design Methodologies
Page 76                                                                       Page 77




                                 A Story … (Cont’d)                                                         A Story … (Cont’d)
                                                                                   Please take care that modern design practices and the latest
          Keep in mind that the house I ultimately choose must cost                materials are used in construction of the house, as I want it to be a
          less than the one I am currently living in. Make sure,                   showplace for the most up-to-date ideas and methods. Be alerted,
          however, that you correct all the deficiencies that exist in my          however, that kitchen should be designed to accommodate, among
          current house (the floor of my kitchen vibrates when I walk              other things, my 1952 Gibson refrigerator.
          across it, and the walls don’t have nearly enough insulation in
          them).                                                                   To insure that you are building the correct house for our entire
                                                                                   family, make certain that you contact each of our children, and
          As you design, also keep in mind that I want to keep yearly              also our in-laws. My mother-in-law will have very strong feelings
          maintenance costs as low as possible. This should mean the               about how the house should be designed, since she visits us at
          incorporation of extra-cost features like aluminum, vinyl, or            least once a year. Make sure that you weigh all of these options
                                                                                   carefully and come to the right decision. I, however, retain the
          composite siding. (If you choose not to specify aluminum, be             right to overrule any choices that you make.
          prepared to explain your decision in detail.)

                                     Comp6471 Software Design Methodologies                                     Comp6471 Software Design Methodologies

Page 78                                                                       Page 79




                                 A Story … (Cont’d)                                                         A Story … (Cont’d)
                                                                                While you are designing this house specifically for me, keep in mind
                                                                                that sooner or later I will have to sell it to someone else. It therefore
    Please don't bother me with small details right now. Your job is to         should have appeal to a wide variety of potential buyers. Please
    develop the overall plans for the house: get the big picture. At this       make sure before you finalize the plans that there is a consensus of
    time, for example, it is not appropriate to be choosing the color of        the population in my area that they like the features this house has.
    the carpet. However, keep in mind that my wife likes blue.
                                                                                I advise you to run up and look at my neighbor's house he
    Also, do not worry at this time about acquiring the resources to            constructed last year. We like it a great deal. It has many features
    build the house itself. Your first priority is to develop detailed          that we would also like in our new home, particularly the 75-foot
    plans and specifications. Once I approve these plans, however, I            swimming pool. With careful engineering, I believe that you can
    would expect the house to be under roof within 48 hours.                    design this into our new house without impacting the final cost.


                                     Comp6471 Software Design Methodologies                                     Comp6471 Software Design Methodologies
Page 80                                                                       Page 81




                               A Story … (Cont’d)                                                               A Story … (Cont’d)
      Please prepare a complete set of blueprints. It is not necessary at      P.S. My wife has just told me that she disagrees with many on the
      this time to do the real design, since they will be used only for             instructions I’ve given you in this letter. As architect it is
      construction bids. Be advised, however, that you will be held                 your responsibility to resolve these issues. I have tried in the
      accountable for any increase of construction costs as a result of             past and have been unable to accomplish this. If you can’t handle
      later design changes.                                                         this, I will have to find a new architect.

      You must be thrilled to be working on as an interesting project as       P.P.S. Perhaps what I need is not a house at all, but a travel trailer.
      this! To be able to use the latest techniques and materials and to be           Please advise me as soon as possible if that is the case.
      given such freedom in your designs is something that can't happen
      very often. Contact me as soon as possible with your complete
      ideas and plans.                                                                           (originally posted to the rec.humor.funny newsgroup
                                                                                                  in January 1993 -- but some things never change!)

                                   Comp6471 Software Design Methodologies                                          Comp6471 Software Design Methodologies

Page 82                                                                       Page 83




                                             RE Summary                                                   RE Summary (Cont’d)
     RE focuses on determining what the                                           The customer often doesn’t have good grasp
      customer wants, and not how it will be                                        of what he wants.
      implemented.                                                                 Errors made at the requirements stage are
     RE is hard to get correct; it requires good                                   very expensive to fix later.
      communication skills.                                                             –   You might well implement the stated requirements
     Requirements may change over time.                                                    correctly, but it won’t be the system the customer
                                                                                            really wants.
     RE requires iteration.




                                   Comp6471 Software Design Methodologies                                          Comp6471 Software Design Methodologies
Page 84                                                                            Page 85




                                Object-Oriented Analysis                                              Back to Software Design ...

         An investigation of the problem (rather than
          how a solution is defined)

         During OO analysis, there is an emphasis on
          finding and describing the objects (or
          concepts) in the problem domain.
          –   For example, concepts in a Library Information
              System include Book and Library.


                                          Comp6471 Software Design Methodologies                                       Comp6471 Software Design Methodologies

Page 86                                                                            Page 87
                          Software
                         architecture


                          Subsystem
                         decomposition
                                               High-Level                               Top-Down vs Bottom-Up Design
                                               (abstract)
                          Subsystem
                         dependencies            design                                 Top-down Design:
                          Subsystem                                                          –   Start with a coarsely-grained view of system, and
                          interfaces
                                                                                                 repeatedly refine components until you have
                        module or class                                                          concrete sub-components.
                         decomposition


                        module or class
                         dependencies
                                                                                        Bottom-up Design:
                                                                                             –   Start with existing components and “glue” them
                        module or class
                          interfaces
                                                Low-Level                                        together to get what you want.
                                                (detailed)
                        Data structures
                                                  design

                          Algorithms
                                          Comp6471 Software Design Methodologies                                       Comp6471 Software Design Methodologies
Page 88                                                                            Page 89



               Top-Down vs Bottom-Up Design
                                    (Cont’d)                                                                                Design Quality
                                                                                         Software design “quality”, as with other ideas
    Top-down is the “ideal” of most design                                              on quality, is an elusive concept: it depends
     methods, but it’s rarely followed absolutely:                                       on priorities of your company and the
          –   some branches of development are expanded                                  customers:
              before others are even started                                                  –   fastest to implement
          –   doesn’t adequately account for reuse of existing                                –   easiest to implement
              components:                                                                     –   easiest to maintain, “evolve”, port
                  COTS products, libraries, previous versions of the same
                   system.                                                                    –   most efficient/reliable/robust end-product.




                                          Comp6471 Software Design Methodologies                                      Comp6471 Software Design Methodologies

Page 90                                                                            Page 91




                                                           Discussion                                     Object-Oriented Design
 What does “quality” mean to:                                                           Emphasizes a conceptual solution that fulfils
          –    IBM?                                                                      the requirements.
          –   Microsoft?                                                                Need to define software objects and how they
          –   Mozilla?                                                                   collaborate to fulfill the requirements.
          –   FAA?                                                                       –   For example, in the Library Information System, a
                                                                                             Book software object may have a title attribute and
          –   IRS?                                                                           a getChapter method.
          –   Intel?                                                                    Designs are implemented in a programming
          –   ...                                                                        language.
                                                                                         –   In the example, we will have a Book class in Java.


                                          Comp6471 Software Design Methodologies                                      Comp6471 Software Design Methodologies
Page 92                                                                        Page 93




                                                                                                From Design to Implementation
                                       Software Design
                                                                                     Analysis
                                                                                                                 Design                            Construction
    Knowing an object-oriented language and having                                investigation
                                                                                                             logical solution                         code
     access to a library is necessary but not sufficient in                       of the problem
     order to create object software.
    In between a nice idea and a working software, there
     is much more than programming.                                                                               Book                       public class Book {
    Analysis and design provide software “blueprints”,                           Book                                                          public void print();
     illustrated by a modeling language, like the Unified                         (concept)                       title                         private String title;
     Modeling Language (UML).                                                                                     print()                    }
    Blueprints serve as a tool for thought and as a form of                                                                                 Representation in an
                                                                                  Domain concept            Representation in
     communication with others.                                                                                                              object-oriented
                                                                                                            analysis of concepts
                                                                                                                                             programming language.

                                      Comp6471 Software Design Methodologies                                      Comp6471 Software Design Methodologies

Page 94                                                                        Page 95




                                       Software Design                                              Software Design (Cont’d)

             How to implement the what.                                                Some consider software design to be a “black
             Requirements Document (RD) is starting point.                              art”:
             Software design is a highly-creative activity.                             –   difficult to prescribe how to do it
             Good designers are worth their weight in gold!                             –   hard to measure a good design objectively
              –   Highly sought after, head-hunted, well-paid.                           –   “I know a good design when I see it.”
             Experience alone is not enough:
              –   creativity, “vision”, all-around brilliance required.



                                      Comp6471 Software Design Methodologies                                      Comp6471 Software Design Methodologies

L01web 2x2

  • 1.
    Software Design Motivation Methodologies Comp 6471 Comp 6471 COMP 6471/4 NN Steven Winikoff …with proper design, the features come cheaply. This approach is arduous, but smw@alcor.concordia.ca continues to succeed. H-966-2 - Dennis Ritchie 514-848-2424, ext. 7619 Page 7 What This Course is About Software Engineering ca. 1968: Reasons for the software crisis were determined. Comp 6471 simple questions: Software development should be treated as an engineering activity and not as an ad-hoc activity => software development should be a systematical activity. What should go into a given piece of software? Definition provided by the IEEE: Software Engineering is the systematic approach to development , maintenance, organization of software How do you put it there? systems. Starting point of the software crisis. ...with complex answers Acknowledgement: These slides are based on work originally created by Dr. Juergen Rilling, CSE, Concordia Comp6471 Software Design Methodologies
  • 2.
    Page 8 Page 9 Goals of Software Engineering Software Life Cycle The phases of a software development cycle. Improve the productivity of the programming/development process  Analysis: Software Engineering Improve the comprehension of the developed software system  Specification Improve the maintainability of the systems 70 Improve the quality of the software system (software product)  Design 60 50 Improve the “quality” of the software system.  Implementation 40 Without SE - Reliability Effort  Testing 30 Applying SE - Efficiency (Speed, resource usage)  Delivery/Maintenance 20 - User-friendly (user acceptance) 10 0 General goal: n n gn g s io t io in si Produce software which is useful for people si at st y ta De al Te f ic en An i ec em Sp pl Im Software Life Cycle Phase Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 10 Page 11 Software Life Cycle Goals of Software Engineering Products: External deliverables, internal products; software products: final code, test drivers  Feasibility study – WHY? Cost benefit analysis (is Paper documents: external: user manual, installation guide; it worth doing the project) Internal: requirements document, specification document,  Requirements analysis + specification: WHAT? design document, test plan What should the software do, produce a document.  Design - How? How should the software do it. Architectural design (overall structures + organization Processes: How the software is created, how its quality is evaluated and of objects/modules, choice of data structures, etc. ensured  Coding/Implementation: Realize ! components. Tools: CASE tools, editors, project management tools Code modules, prodcuts: software,  Testing: Realize ! Test individual modules, test People: Technical, social and managerial skills whether modules work together, test system as a whole, document test results. Principles Providing permanency, guidelines and maturity in the software  Delivery and maintenance: Evolve! development process. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 3.
    Page 12 Page 13 Skills of a Software Engineer Skills of a Software Engineer  Programming: Design  data structures and algorithms – be familiar with several approaches  programming languages – be flexible and open to different application domains  tools: compilers, debuggers, editors – be able to shift between several level of abstraction  Communication: – application domain jargon  spoken, written, presentations  teamwork – requirements and specification: declarative model  with external people (customers) – architectural design, high-level operational model – detailed coding Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 14 Page 15 Software Lifecycle Models A lifecycle model provides a fixed generic framework that can be tailored to a specific project. Project specific parameters will include: Definition.  size (person-years), A (software/system) lifecycle model is a  budget, description of the sequence of activities carried  duration. out in a software engineering project, and the relative order of these activities. project plan = lifecycle model + project parameters Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 4.
    Page 16 Page 17 There are many different lifecycle models to choose By changing the lifecycle model, we can from, e.g: improve and/or trade off:  waterfall,  code-and-fix  development speed (time to market)  spiral  product quality  rapid prototyping  unified process (UP)  project visibility  agile methods, extreme programming (XP)  administrative overhead  COTS …  risk exposure  customer relations, etc, etc. but many are minor variations on a smaller number of basic models. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 18 Page 19 Normally, a lifecycle model covers the entire Note that we can sometimes combine lifetime of a product. lifecycle models e.g. waterfall inside evolutionary – onboard From the birth of an idea to the final shuttle software deinstallation of the last release We can also change lifecycle model between i.e. The three main phases: releases as a product matures,  design,  build, e.g. rapid prototyping → waterfall  maintain. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 5.
    Page 20 Page 21 phase User Requirements output User Requirements Document The Waterfall Model Software Requirements Software Requirements Document • Classic lifecycle model – widely known, understood and (commonly?) used. Architecture Design Architectural Design Document • In some respect, waterfall is the "common ”Swimming sense" approach upstream” Detailed design & Coding Detailed Design (Introduced by Royce 1970) & Code The Waterfall Testing Lifecycle Workflow Delivery Time Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 22 Page 23 Advantages Disadvantages I 1. Easy to understand and implement. 2. Widely used and known (in theory!) ● Idealized, doesn’t match reality well. 3. Reinforces good habits: define-before-design, ● Doesn’t reflect iterative nature of exploratory design-before-code development. 4. Identifies deliverables and milestones ● Unrealistic to expect accurate requirements so early 5. Document driven, URD, SRD, … etc. Published in project documentation standards, e.g. PSS-05. ● Software is delivered late in project, delays 6. Works well on mature products and weak teams. discovery of serious errors. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 6.
    Page 24 Page 25 Disadvantages II Code-and-Fix ● Difficult to integrate risk management This model starts with an informal general ● Difficult and expensive to make changes to product idea and just develops code until a documents, ”swimming upstream”. product is ”ready” (or money or time runs out). ● Significant administrative overhead, costly for Work is in random order. small teams and projects. Corresponds with no plan! Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 26 Page 27 Advantages Disadvantages ● No administrative overhead 1. Dangerous! ● Signs of progress (code) early. ● No visibility/control ● Low expertise, anyone can use it! ● No resource planning ● Useful for small “proof of concept” projects, ● No deadlines ● Mistakes hard to detect/correct e.g. as part of risk reduction. 2. Impossible for large projects, communication breakdown, chaos. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 7.
    Page 28 Page 29 This loop approach gives rise to structured Spiral Model iterative lifecycle models. Since end-user requirements are hard to obtain/define, it is natural to develop software In 1988 Boehm developed the spiral model as in an experimental way: e.g. an iterative model which includes risk analysis and risk management. 1. Build some software 2. See if it meets customer requirements Key idea: on each iteration identify and solve 3. If no goto 1 else stop. the sub-problems with the highest risk. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 30 Page 31 Cumulative cost Determine objectives, Evaluate alternatives, alternatives & constraints Identify & resolve risks Each cycle follows a waterfall model by: 1. Determining objectives 2. Specifying constraints Prototypes Operational Review & Start P1 P2 P3 Prototype 3. Generating alternatives commitment Requirements Concept Design, 4. Identifying risks plan Detailed design Of Operation Development Validation 5. Resolving risks & Verification plan Requirements 6. Developing next-level product validation Coding Integration & 7. Planning next cycle Test plan Unit & Integration Testing End Acceptance Plan next phase Testing Develop & verify next-level product Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 8.
    Page 32 Page 33 Advantages Disadvantages 1. Realism: the model accurately reflects the  Needs technical expertise in risk analysis to really iterative nature of software development on work projects with unclear requirements  Model is poorly understood by non-technical 2. Flexible: incorporates the advantages of the management, hence not so widely used waterfall and rapid prototyping methods  Complicated model, needs competent professional management. High administrative overhead. 3. Comprehensive model decreases risk 4. Good project visibility. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 34 Page 35 Requirements Capture Rapid Prototyping Iterate Quick Design Key idea: Customers are non-technical and usually don’t know what they want/can have. Build Prototype Rapid prototyping emphasises requirements Customer Evaluation of analysis and validation, also called: Prototype  customer oriented development,  evolutionary prototyping The Rapid Engineer Final Prototype Workflow Product Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 9.
    Page 36 Page 37 Advantages Disadvantages I 1. Reduces risk of incorrect user requirements 1. An unstable/badly implemented prototype 2. Good where requirements are often becomes the final product. changing/uncommitted 2. Requires extensive customer collaboration 3. Regular visible progress aids management – Costs customers money 4. Supports early product marketing – Needs committed customers – Difficult to finish if customer withdraws – May be too customer specific, no broad market Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 38 Page 39 Disadvantages II Agile (XP) Manifesto 3. Difficult to know how long project will last XP = Extreme Programming emphasizes: 4. Easy to fall back into code-and-fix without  Individuals and interactions proper requirements analysis, design, – Over processes and tools customer evaluation and feedback.  Working software – Over documentation  Customer collaboration – Over contract negotiation  Responding to change – Over following a plan Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 10.
    Page 40 Page 41 Agile Principles (Summary) XP Practices (Summary)  Continuous delivery of software  Programming in pairs  Continuous collaboration with customer  Test driven development  Continuous update according to changes  Continuous planning, change , delivery  Value participants and their interaction  Shared project metaphors, coding standards and  Simplicity in code, satisfy the spec ownership of code  No overtime! (Yeah right!) Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 42 Page 43 Advantages Disadvantages  Lightweight methods suit small-medium size  Difficult to scale up to large projects where projects documentation is essential  Produces good team cohesion  Needs experience and skill if not to degenerate  Emphasizes final product into code-and-fix  Iterative  Programming pairs is costly  Test-based approach to requirements and quality  Test case construction is a difficult and specialized assurance skill. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 11.
    Page 44 Page 45 Advantages COTS  Fast, cheap solution  May give all the basic functionality  COTS = Commercial Off-The-Shelf software  Well defined project, easy to run  Engineer together a solution from existing commercial software packages using minimal Disadvantages software "glue".  Limited functionality  E.g. using databases, spread sheets, word  Licensing problems, freeware, shareware, etc. proccessors, graphics software, web browsers,  License fees, maintainance fees, upgrade etc. compatibility problems Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 47 Unified Process (UP)  Booch, Jacobson, Rumbaugh 1999. Comp 6471 Iterative Development and the  Lifetime of a software product in cycles: Unified Process  – Birth, childhood, adulthood, old-age, death. Product maturity stages  Each cycle has phases, culminating in a new release (c.f. Spiral model) Acknowledgement: These slides for the Iterative Development process were originally created by Dr. Constantinos Constantinides, CSE, Concordia Comp6471 Software Design Methodologies
  • 12.
    Page 48 Page 49 Iterative Development Iterative Development [iteration N] Requirements – Analysis - Design- Implementation - Testing  The iterative lifecycle is based on the successive enlargement and refinement of a system though multiple iterations with feedback and adaptation. [iteration N+1]  The system grows incrementally over time, Requirements – Analysis - Design- Implementation - Testing iteration by iteration.  The system may not be eligible for production Feedback from iteration N leads to refinement and adaptation of the The system grows deployment until after many iterations. requirements and design in iteration incrementally. N+1. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 50 Page 51 Iterative Development Embracing Change  The output of an iteration is not an  Stakeholders usually have changing experimental prototype but a production requirements. subset of the final system.  Each iteration involves choosing a small  Each iteration tackles new requirements and subset of the requirements and quickly incrementally extends the system. design, implement and testing them.  An iteration may occasionally revisit existing  This leads to rapid feedback, and an software and improve it. opportunity to modify or adapt understanding of the requirements or design. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 13.
    Page 52 Page 53 Iteration Length and Timeboxing Phases of the Unified Process Inception Elaboration Construction Transition time  The UP recommends short iteration lengths to allow for rapid feedback and adaptation. A UP project organizes the work and iterations  Long iterations increase project risk. across four major phases:  Iterations are fixed in length (timeboxed).If – Inception - Define the scope of project. meeting deadline seems to be difficult, then – Elaboration - Plan project, specify features, remove tasks or requirements from the baseline architecture. iteration and include them in a future iteration.  The UP recommends that an iteration should – Construction - Build the product be between two and six weeks in duration. – Transition - Transition the product into end user community Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 54 Page 55 Iterations and Milestones The UP Disciplines Phases Process Disciplines Inception Elaboration Construction Transition Inception Elaboration Construction Transition Business Modeling Requirements Preliminary Iter. #1 Iter. #2 Iteration Analysis & Design Implementation Milestone Release Final production Test release Deployment  Each phase and iteration has some risk mitigation focus, and Supporting Disciplines concludes with a well-defined milestone. Configuration Mgmt  The milestone review provides a point in time to assess how Management well key goals have been met and whether the project needs to be restructured in any way to proceed. Environment  The end of each iteration is a minor release, a stable executable Preliminary Iteration(s) Iter. #1 Iter. #2 Iter. #n Iter. Iter. #n+1 #n+2 Iter. #m Iter. #m+1 subset of the final product. Iterations Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 14.
    Page 56 Page 57 The UP Disciplines In an iteration you walk through all The UP Disciplines Focus of this course. Phases disciplines. Phases Process Disciplines Inception Elaboration Construction Transition Process Disciplines Inception Elaboration Construction Transition Business Modeling Business Modeling Requirements Requirements Analysis & Design Analysis & Design Implementation Implementation Test Test Deployment Deployment Supporting Disciplines Supporting Disciplines Configuration Mgmt Configuration Mgmt Management Management Environment Environment Preliminary Iter. Iter. Iter. Iter. Iter. Iter. Iter. Preliminary Iter. Iter. Iter. Iter. Iter. Iter. Iter. Iteration(s) #1 #2 #n #n+1 #n+2 #m #m+1 Iteration(s) #1 #2 #n #n+1 #n+2 #m #m+1 Iterations Iterations Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 58 Page 59 Advantages of an Disciplines and Phases Iterative Process  Although an iteration includes work in most  Reduce risks disciplines, the relative effort and emphasis change – Risks are identified early, progress is easier to see. over time.  Get a robust architecture – Early iterations tend to apply greater emphasis to – Architecture can be assessed and improve early. requirements and design, and later ones less so.  Handle evolving requirements – Figure illustrations are suggestive, not literal. – Users provide feedback to operational systems. – Responding to feedback is an incremental change.  Note that activities and artifacts are optional (except  Allow for changes code!) – System can adapt to problems – Developers select those artifacts that address their particular needs.  Attain early learning – Everyone obtains an understanding of the different workflows early on. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 15.
    Page 60 Page 61 Unified Process Product UML class diagram! Management Software Lifecycle Use Case Model Environment * * releases specified by by ed Workflow Cycle deployed by lis a Analysis Model re Requirements im Inception ple 4 me Design Design Model n te Phase Elaboration db Deployment Model verified by y Implementation Construction * Implementation Model Assessment Iteration Transition All models are interdepedent but this only shown for use Test Model Deployment * case model Artifact Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 62 Page 63 What artifacts may start in Inception inception?  A number of questions need to be explored:  Vision and business case – What is the vision and business case for this project? – Describes high-level goals and constraints. – Is it feasible?  Use Case model – Buy and/or build? – Describes functional requirements and related non-functional – Rough estimate of cost. requirements. – Should we proceed or stop?  Supplementary specification – Describes other requirements  Glossary  The intent is to establish some initial common vision – Key domain terminology for the objectives of the project, determine if it is feasible and decide if it is worth some serious  Risk list and Risk Management Plan – Describes business, technical, resource and schedule risks investigation in elaboration. and ideas for their mitigation or response. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 16.
    Page 64 Page 65 What artifacts may start in Requirements Engineering: inception? An Overview  Prototypes and proof-of-concepts  Basic goal: To understand the problem as  Iteration plan perceived by the user. – Describes what to do in the first elaboration iteration  Phase Plan & Software development Plan  Activities of RE are problem oriented. – Guess for elaboration phase duration. Tools, people, – Focus on what, not how education and other resources. – Don’t cloud the RD with unnecessary detail  Development Case – Don’t pre-constrain design. – Description of the customized UP steps and artifacts for this project.  After RE is done, do software design:  Artifacts will be partially completed in this phase and – solution oriented will be refined in later iterations. – how to implement the what Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 66 Page 67 Requirements Engineering: Requirements Engineering An Overview The process of determining and establishing  Key to RE is good communication between the precise expectations of the customer customer and developers. about the proposed software system.  Work from Requirements Document as guide. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 17.
    Page 68 Page 69 The Two Kinds of Requirements The Purpose of RE  Raw user requirements are often:  Functional: The precise tasks or functions – vague the system is to perform. – contradictory – e.g., details of a flight reservation system – impractical or impossible to implement – overly concrete  Non-functional: Usually, a constraint of – just plain wrong some kind on the system or its construction  The purpose of RE is to get a usable set of – e.g., expected performance and memory requirements from which the system may be requirements, process model used, designed and implemented, with minimal implementation language and platform, surprises. compatibility with other tools, deadlines, ... Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 70 Page 71 Requirements Analysis leads to The RE Process The Requirements Document Requirements produces Definition  The official statement of what is required of System Requirements the system developers. Models Specification – Includes system models, requirements definition, and requirements specification. Requirements – Not a design document. Software Definition Specification – States functional and non-functional requirements. included in Requirements Specification  Serves as a reference document for maintenance. Requirements Software Document Specification Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 18.
    Page 72 Page 73 Requirements Document The Requirements Document “Requirements” Should State ...  Foreseen problems: – “won’t support Win-3.x apps”  Should be easy to change as requirements  Expected evolution: evolve. – “will port to MacOS in next version”  Must be kept up-to-date as system changes.  Response to unexpected events/usage: – “if input data in old format, will auto-convert” Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 74 Page 75 Requirements Document A Story ... Structure Dear Mr. Architect,  Introduction (describe need for system)  Functional Requirements Please design and build me a house. I am not quite sure of what I need, so you should use your discretion.  Non-Functional Requirements  System Evolution (describe anticipated changes) My house should have between two and forty-five bedrooms. Just make sure the plans are such that bedrooms can be easily  Glossary (technical and/or new jargon) added or deleted. When you bring the blueprints to me, I will  Appendices make the final decision of what I want. Also bring me the cost breakdown for each configuration so that I can arbitrarily pick  Index one. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 19.
    Page 76 Page 77 A Story … (Cont’d) A Story … (Cont’d) Please take care that modern design practices and the latest Keep in mind that the house I ultimately choose must cost materials are used in construction of the house, as I want it to be a less than the one I am currently living in. Make sure, showplace for the most up-to-date ideas and methods. Be alerted, however, that you correct all the deficiencies that exist in my however, that kitchen should be designed to accommodate, among current house (the floor of my kitchen vibrates when I walk other things, my 1952 Gibson refrigerator. across it, and the walls don’t have nearly enough insulation in them). To insure that you are building the correct house for our entire family, make certain that you contact each of our children, and As you design, also keep in mind that I want to keep yearly also our in-laws. My mother-in-law will have very strong feelings maintenance costs as low as possible. This should mean the about how the house should be designed, since she visits us at incorporation of extra-cost features like aluminum, vinyl, or least once a year. Make sure that you weigh all of these options carefully and come to the right decision. I, however, retain the composite siding. (If you choose not to specify aluminum, be right to overrule any choices that you make. prepared to explain your decision in detail.) Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 78 Page 79 A Story … (Cont’d) A Story … (Cont’d) While you are designing this house specifically for me, keep in mind that sooner or later I will have to sell it to someone else. It therefore Please don't bother me with small details right now. Your job is to should have appeal to a wide variety of potential buyers. Please develop the overall plans for the house: get the big picture. At this make sure before you finalize the plans that there is a consensus of time, for example, it is not appropriate to be choosing the color of the population in my area that they like the features this house has. the carpet. However, keep in mind that my wife likes blue. I advise you to run up and look at my neighbor's house he Also, do not worry at this time about acquiring the resources to constructed last year. We like it a great deal. It has many features build the house itself. Your first priority is to develop detailed that we would also like in our new home, particularly the 75-foot plans and specifications. Once I approve these plans, however, I swimming pool. With careful engineering, I believe that you can would expect the house to be under roof within 48 hours. design this into our new house without impacting the final cost. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 20.
    Page 80 Page 81 A Story … (Cont’d) A Story … (Cont’d) Please prepare a complete set of blueprints. It is not necessary at P.S. My wife has just told me that she disagrees with many on the this time to do the real design, since they will be used only for instructions I’ve given you in this letter. As architect it is construction bids. Be advised, however, that you will be held your responsibility to resolve these issues. I have tried in the accountable for any increase of construction costs as a result of past and have been unable to accomplish this. If you can’t handle later design changes. this, I will have to find a new architect. You must be thrilled to be working on as an interesting project as P.P.S. Perhaps what I need is not a house at all, but a travel trailer. this! To be able to use the latest techniques and materials and to be Please advise me as soon as possible if that is the case. given such freedom in your designs is something that can't happen very often. Contact me as soon as possible with your complete ideas and plans. (originally posted to the rec.humor.funny newsgroup in January 1993 -- but some things never change!) Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 82 Page 83 RE Summary RE Summary (Cont’d)  RE focuses on determining what the  The customer often doesn’t have good grasp customer wants, and not how it will be of what he wants. implemented.  Errors made at the requirements stage are  RE is hard to get correct; it requires good very expensive to fix later. communication skills. – You might well implement the stated requirements  Requirements may change over time. correctly, but it won’t be the system the customer really wants.  RE requires iteration. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 21.
    Page 84 Page 85 Object-Oriented Analysis Back to Software Design ...  An investigation of the problem (rather than how a solution is defined)  During OO analysis, there is an emphasis on finding and describing the objects (or concepts) in the problem domain. – For example, concepts in a Library Information System include Book and Library. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 86 Page 87 Software architecture Subsystem decomposition High-Level Top-Down vs Bottom-Up Design (abstract) Subsystem dependencies design  Top-down Design: Subsystem – Start with a coarsely-grained view of system, and interfaces repeatedly refine components until you have module or class concrete sub-components. decomposition module or class dependencies  Bottom-up Design: – Start with existing components and “glue” them module or class interfaces Low-Level together to get what you want. (detailed) Data structures design Algorithms Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 22.
    Page 88 Page 89 Top-Down vs Bottom-Up Design (Cont’d) Design Quality Software design “quality”, as with other ideas  Top-down is the “ideal” of most design on quality, is an elusive concept: it depends methods, but it’s rarely followed absolutely: on priorities of your company and the – some branches of development are expanded customers: before others are even started – fastest to implement – doesn’t adequately account for reuse of existing – easiest to implement components: – easiest to maintain, “evolve”, port  COTS products, libraries, previous versions of the same system. – most efficient/reliable/robust end-product. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 90 Page 91 Discussion Object-Oriented Design What does “quality” mean to:  Emphasizes a conceptual solution that fulfils – IBM? the requirements. – Microsoft?  Need to define software objects and how they – Mozilla? collaborate to fulfill the requirements. – FAA? – For example, in the Library Information System, a Book software object may have a title attribute and – IRS? a getChapter method. – Intel?  Designs are implemented in a programming – ... language. – In the example, we will have a Book class in Java. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies
  • 23.
    Page 92 Page 93 From Design to Implementation Software Design Analysis Design Construction  Knowing an object-oriented language and having investigation logical solution code access to a library is necessary but not sufficient in of the problem order to create object software.  In between a nice idea and a working software, there is much more than programming. Book public class Book {  Analysis and design provide software “blueprints”, Book public void print(); illustrated by a modeling language, like the Unified (concept) title private String title; Modeling Language (UML). print() }  Blueprints serve as a tool for thought and as a form of Representation in an Domain concept Representation in communication with others. object-oriented analysis of concepts programming language. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies Page 94 Page 95 Software Design Software Design (Cont’d)  How to implement the what.  Some consider software design to be a “black  Requirements Document (RD) is starting point. art”:  Software design is a highly-creative activity. – difficult to prescribe how to do it  Good designers are worth their weight in gold! – hard to measure a good design objectively – Highly sought after, head-hunted, well-paid. – “I know a good design when I see it.”  Experience alone is not enough: – creativity, “vision”, all-around brilliance required. Comp6471 Software Design Methodologies Comp6471 Software Design Methodologies