SlideShare a Scribd company logo
115897_KS8306_Firesafe_Mailer_Layout 1 19/02/2013 15:02 Page 1




           Are health and safety concerns and insurance requirements ruling your working life?
           Do you need to minimise the risk of damage and devastation from fire on your site?
           Introducing the NEW Konstructa Fire-Safe building
115897_KS8306_Firesafe_Mailer_Layout 1 19/02/2013 15:02 Page 2




           The only high-quality, fire-rated, energy-efficient site        you even more reassurance that this building can really                                       Energy-use
                                                                                                                                                                                            Carbon           Running cost @ 10p/kWh
                                                                                                                                                   Building                                emissions
           building on the market to be backed up by a unique on           help to protect your site and deliver a tried and tested                                        kWh/yr1         kgCO2/yr1        Per year2      Per week2

           time delivery promise                                           fire-rated performance.                                                Typical
                                                                                                                                                                           9,032                             £809.11
                                                                                                                                                  site cabin                                4,669                            £15.56

                                                                                                                                                 Konstructa
           To protect your people and property from the ravages of         Plus, our unique on time delivery promise means you can               Fire-Safe                 6,529            3,375           £552.88         £10.63
           fire on site the NEW Konstructa Fire-Safe building offers the   have peace of mind that your building will definitely arrive          building

           highest levels of security and fire containment.                on time. In fact, in the unlikely event we are ever late you’ll       Overall saving
                                                                                                                                                                           28%               28%              32%             32%
                                                                                                                                                                          (2,503)           (1,294)         (£256.23)        (£4.93)
                                                                           receive a week’s free hire!   1

                                                                                                                                                 (i) U-Values; Walls 0.70 W/m2K; Roof 0.54; Floor slab 0.70; Windows 3.54; Doors 2.34
           The fire-rated design and manufacture fully complies with                                                                             (ii) Air-tightness 3m3/hr/m2@50Pa
                                                                                                                                                 (iii) Lighting; T8 high frequency with PIR control, LPD=2.99 W/m2/100-lux
           the ‘Joint Code of Practice on the Protection from Fire         In addition, the building’s energy-saving design can save             (v) Timeclock and thermostat for control of heating
                                                                                                                                                 (vi) Small power load 11.5W/m2
           on Construction Sites and Buildings Underground                 you up to 28% in energy usage and carbon emissions, as
           Renovation’. So you can rest assured that these buildings       well as up to £256 a year on running costs.                       1
                                                                                                                                                 Energy-use and carbon emissions per year for heating/climate control,
           will meet your health and safety requirements.                                                                                        lighting and small power.
                                                                                                                                             2
                                                                                                                                                 Running cost per week for heating/climate control and lighting only
                                                                           Konstructa Fire-Safe buildings retain all the high-quality,           (averaged over 52 weeks).
           The Konstructa Fire-Safe building is also independently         anti-vandal and low maintenance benefits associated with
           tested and certified by Warringtonfire. It gives half-hour      the standard range, whilst providing the highest levels of
           resistance in multi-storey mode when tested in                  protection against fire, theft and vandalism.
           accordance with BS 476 : Part 21, section 7. That gives
115897_KS8306_Firesafe_Mailer_Layout 1 19/02/2013 15:02 Page 3




           Purpose-designed, fire-rated site buildings for                  Many other excellent features including:                    • Anti-jemmy door strips and externally mounted anti-
           construction sites                                                                                                             jemmy window shutters to resist vandalism
                                                                            • Innovative new power ethernet sockets that can be
           Some protective security features of the NEW Konstructa            activated to provide a high-speed, secure network         • Safe and simple installation with an integrated low level
           Fire-Safe building include:                                                                                                    lifting system
                                                                            • Innovative energy-saving features including PIR lights
           • Walls and ceilings have Class ‘O’ rating in accordance with      which are turned off when not needed, exceptional         • High-performance, low maintenance, galvanised steel
             standard Building Regulations 2000 – achieving the               insulation and time-clock regulated heating as standard     construction offers protection against fire, extreme
             highest results in both spread of flame and fire propagation                                                                 weather and accidental damage
                                                                            • Bright, comfortable and practical working environments
           • Roofs FAA rated – the highest possible classification in         with natural ventilation                                  • Non-combustible materials are used for all external
             the fire safety category – when tested in accordance with                                                                    cladding and internal lining of walls and ceilings,
             BS 476 : Part 3                                                • Double-glazed windows designed for optimum light            minimising the potential fire load
                                                                              levels, white walls and heavy-duty flooring
           • Automatic fire curtains fitted to all windows to provide 30                                                                • All our buildings achieve ISO 14001 accreditation for
             minutes integrity                                              • Anti-vandal protection and high-security levels, with       control of environmental impact and can help you to
                                                                              heavy-gauge steel doors and 16-point locking system         achieve certification for the Considerate Constructors
                                                                                                                                          Scheme and gain your targeted BREEAM rating




                           Automatic drop-down fire               Unique on time delivery promise        Fire-rated, energy-saving                                             High-speed, secure network
                           curtains                                                                      site buildings
115897_KS8306_Firesafe_Mailer_Layout 1 19/02/2013 15:02 Page 4




           To hire the only high-quality, fire-rated, energy-efficient site buildings on the market to be backed
           by a unique on time delivery promise contact your local Hire Centre on 0845 201 6778 today or
           visit www.konstructa.co.uk/fire-safe




           The fire testing and certification has been independently conducted by Warringtonfire.
           1. Terms and Conditions apply. A copy is available on request.


           Konstructa Hire Limited Head Office Blackburn Road Townsend Farm Industrial Estate Houghton Regis Dunstable LU5 5BQ

           01582 690510 service@konstructa.co.uk www.konstructa.co.uk

           Konstructa, Konstructa Hire and Konstructa Fire-Safe are trade marks. © Konstructa Hire Limited 2013. Produced by the Konstructa Marketing Studio. KS8306/02/13.

More Related Content

What's hot

2012 electrofed bi q 2.0 update-dk1
2012 electrofed   bi q 2.0 update-dk12012 electrofed   bi q 2.0 update-dk1
2012 electrofed bi q 2.0 update-dk1David Katz
 
Brochure Flex Building Bali
Brochure Flex Building BaliBrochure Flex Building Bali
Brochure Flex Building Bali
2ndHomes International
 
Energy efficient home
Energy efficient homeEnergy efficient home
Energy efficient home
PlayersGuide
 
energy efficient melt shop operation
energy efficient melt shop operationenergy efficient melt shop operation
energy efficient melt shop operation
National Foundry Technology Network (NFTN)
 
Carbon exposure in supply chain
Carbon exposure in supply chainCarbon exposure in supply chain
Carbon exposure in supply chainmnewson
 
LED Lighting Florida
LED Lighting FloridaLED Lighting Florida
Energy saving audit project( mgtc)
Energy saving audit project( mgtc)Energy saving audit project( mgtc)
Energy saving audit project( mgtc)moffaz
 
SW CAN meeting 1 December 2011
SW CAN meeting 1 December 2011SW CAN meeting 1 December 2011
SW CAN meeting 1 December 2011
cjmcca
 
CHP plant for a leisure centre
CHP plant for a leisure centreCHP plant for a leisure centre
CHP plant for a leisure centre
Alejo Etchart Ortiz
 
Energy Focus LED Presentation
Energy Focus LED PresentationEnergy Focus LED Presentation
Energy Focus LED PresentationBryan Herity
 
Biomass Demonstration Project Tasca
Biomass Demonstration Project TascaBiomass Demonstration Project Tasca
Biomass Demonstration Project TascaElena Nechita
 
On-Farm Biomass Heating - Chris Miles (Econergy)
On-Farm Biomass Heating - Chris Miles (Econergy)On-Farm Biomass Heating - Chris Miles (Econergy)
On-Farm Biomass Heating - Chris Miles (Econergy)
Farming Futures
 
Ieguldījumi energoefektivitātes risinājumos un to atmaksāšanās laiks
Ieguldījumi energoefektivitātes risinājumos un to atmaksāšanās laiks Ieguldījumi energoefektivitātes risinājumos un to atmaksāšanās laiks
Ieguldījumi energoefektivitātes risinājumos un to atmaksāšanās laiks
Ekonomikas ministrija/ Dzīvo siltāk
 
Future of Renewables Cyprus - Poullikkas_CyI_14Oct2011
Future of Renewables Cyprus - Poullikkas_CyI_14Oct2011Future of Renewables Cyprus - Poullikkas_CyI_14Oct2011
Future of Renewables Cyprus - Poullikkas_CyI_14Oct2011
Seanergies
 
Velan 2013
Velan 2013Velan 2013
Velan 2013
Evgeny Morozov
 

What's hot (16)

2012 electrofed bi q 2.0 update-dk1
2012 electrofed   bi q 2.0 update-dk12012 electrofed   bi q 2.0 update-dk1
2012 electrofed bi q 2.0 update-dk1
 
Brochure Flex Building Bali
Brochure Flex Building BaliBrochure Flex Building Bali
Brochure Flex Building Bali
 
Energy efficient home
Energy efficient homeEnergy efficient home
Energy efficient home
 
energy efficient melt shop operation
energy efficient melt shop operationenergy efficient melt shop operation
energy efficient melt shop operation
 
Carbon exposure in supply chain
Carbon exposure in supply chainCarbon exposure in supply chain
Carbon exposure in supply chain
 
LED Lighting Florida
LED Lighting FloridaLED Lighting Florida
LED Lighting Florida
 
Energy saving audit project( mgtc)
Energy saving audit project( mgtc)Energy saving audit project( mgtc)
Energy saving audit project( mgtc)
 
SW CAN meeting 1 December 2011
SW CAN meeting 1 December 2011SW CAN meeting 1 December 2011
SW CAN meeting 1 December 2011
 
CHP plant for a leisure centre
CHP plant for a leisure centreCHP plant for a leisure centre
CHP plant for a leisure centre
 
Energy Focus LED Presentation
Energy Focus LED PresentationEnergy Focus LED Presentation
Energy Focus LED Presentation
 
Biomass Demonstration Project Tasca
Biomass Demonstration Project TascaBiomass Demonstration Project Tasca
Biomass Demonstration Project Tasca
 
On-Farm Biomass Heating - Chris Miles (Econergy)
On-Farm Biomass Heating - Chris Miles (Econergy)On-Farm Biomass Heating - Chris Miles (Econergy)
On-Farm Biomass Heating - Chris Miles (Econergy)
 
Case Study_Trident Group
Case Study_Trident GroupCase Study_Trident Group
Case Study_Trident Group
 
Ieguldījumi energoefektivitātes risinājumos un to atmaksāšanās laiks
Ieguldījumi energoefektivitātes risinājumos un to atmaksāšanās laiks Ieguldījumi energoefektivitātes risinājumos un to atmaksāšanās laiks
Ieguldījumi energoefektivitātes risinājumos un to atmaksāšanās laiks
 
Future of Renewables Cyprus - Poullikkas_CyI_14Oct2011
Future of Renewables Cyprus - Poullikkas_CyI_14Oct2011Future of Renewables Cyprus - Poullikkas_CyI_14Oct2011
Future of Renewables Cyprus - Poullikkas_CyI_14Oct2011
 
Velan 2013
Velan 2013Velan 2013
Velan 2013
 

Viewers also liked

Kbk sma 15. t i & k
Kbk sma 15. t i & kKbk sma 15. t i & k
Kbk sma 15. t i & kJasmin Jasin
 
Kbk sma e. pendidikan agama buddha
Kbk sma e. pendidikan agama buddhaKbk sma e. pendidikan agama buddha
Kbk sma e. pendidikan agama buddhaJasmin Jasin
 
Kbk sma 16. keterampilan
Kbk sma 16. keterampilanKbk sma 16. keterampilan
Kbk sma 16. keterampilanJasmin Jasin
 
Kbk sd 08. t i & k
Kbk sd 08. t i & kKbk sd 08. t i & k
Kbk sd 08. t i & kJasmin Jasin
 
KBK standar kompetensi bahan kajian
KBK   standar kompetensi bahan kajianKBK   standar kompetensi bahan kajian
KBK standar kompetensi bahan kajianJasmin Jasin
 
Parts of speech to teach children
Parts of speech to teach childrenParts of speech to teach children
Parts of speech to teach children
Eunice Juárez
 
Kbk sma a. ekonomi
Kbk sma a. ekonomiKbk sma a. ekonomi
Kbk sma a. ekonomiJasmin Jasin
 
Kbk smp d. pendidikan agama hindu
Kbk smp d. pendidikan agama hinduKbk smp d. pendidikan agama hindu
Kbk smp d. pendidikan agama hinduJasmin Jasin
 
Kbk 02. sistem penyampaian kurikulum
Kbk 02. sistem penyampaian kurikulumKbk 02. sistem penyampaian kurikulum
Kbk 02. sistem penyampaian kurikulumJasmin Jasin
 
Kbk smp 06. pengetahuan alam
Kbk smp 06. pengetahuan alamKbk smp 06. pengetahuan alam
Kbk smp 06. pengetahuan alamJasmin Jasin
 
Kbk smp 09. keterampilan
Kbk smp 09. keterampilanKbk smp 09. keterampilan
Kbk smp 09. keterampilanJasmin Jasin
 
The parts of speech
The parts of speechThe parts of speech
The parts of speech
Eunice Juárez
 
Kbk sd 06. kerajinan tangan & kesenian
Kbk sd 06. kerajinan tangan & kesenianKbk sd 06. kerajinan tangan & kesenian
Kbk sd 06. kerajinan tangan & kesenianJasmin Jasin
 
Kbk sma c. pendidikan agama kristen
Kbk sma c. pendidikan agama kristenKbk sma c. pendidikan agama kristen
Kbk sma c. pendidikan agama kristenJasmin Jasin
 
J.k rowling Biography
J.k rowling BiographyJ.k rowling Biography
J.k rowling Biography
Eunice Juárez
 

Viewers also liked (18)

Kbk sma 15. t i & k
Kbk sma 15. t i & kKbk sma 15. t i & k
Kbk sma 15. t i & k
 
Kbk sma e. pendidikan agama buddha
Kbk sma e. pendidikan agama buddhaKbk sma e. pendidikan agama buddha
Kbk sma e. pendidikan agama buddha
 
Kbk sma 16. keterampilan
Kbk sma 16. keterampilanKbk sma 16. keterampilan
Kbk sma 16. keterampilan
 
Kbk sd 08. t i & k
Kbk sd 08. t i & kKbk sd 08. t i & k
Kbk sd 08. t i & k
 
KBK standar kompetensi bahan kajian
KBK   standar kompetensi bahan kajianKBK   standar kompetensi bahan kajian
KBK standar kompetensi bahan kajian
 
Statuti della federazione santa caterina da siena
Statuti della federazione santa caterina da sienaStatuti della federazione santa caterina da siena
Statuti della federazione santa caterina da siena
 
Parts of speech to teach children
Parts of speech to teach childrenParts of speech to teach children
Parts of speech to teach children
 
Latihan
LatihanLatihan
Latihan
 
Prima parte cronache monastero
Prima parte cronache monasteroPrima parte cronache monastero
Prima parte cronache monastero
 
Kbk sma a. ekonomi
Kbk sma a. ekonomiKbk sma a. ekonomi
Kbk sma a. ekonomi
 
Kbk smp d. pendidikan agama hindu
Kbk smp d. pendidikan agama hinduKbk smp d. pendidikan agama hindu
Kbk smp d. pendidikan agama hindu
 
Kbk 02. sistem penyampaian kurikulum
Kbk 02. sistem penyampaian kurikulumKbk 02. sistem penyampaian kurikulum
Kbk 02. sistem penyampaian kurikulum
 
Kbk smp 06. pengetahuan alam
Kbk smp 06. pengetahuan alamKbk smp 06. pengetahuan alam
Kbk smp 06. pengetahuan alam
 
Kbk smp 09. keterampilan
Kbk smp 09. keterampilanKbk smp 09. keterampilan
Kbk smp 09. keterampilan
 
The parts of speech
The parts of speechThe parts of speech
The parts of speech
 
Kbk sd 06. kerajinan tangan & kesenian
Kbk sd 06. kerajinan tangan & kesenianKbk sd 06. kerajinan tangan & kesenian
Kbk sd 06. kerajinan tangan & kesenian
 
Kbk sma c. pendidikan agama kristen
Kbk sma c. pendidikan agama kristenKbk sma c. pendidikan agama kristen
Kbk sma c. pendidikan agama kristen
 
J.k rowling Biography
J.k rowling BiographyJ.k rowling Biography
J.k rowling Biography
 

Similar to Konstructa fire safe mailer

ZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATIONZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATION
IRJET Journal
 
Energy Assignments
Energy AssignmentsEnergy Assignments
Energy AssignmentsEamon Healy
 
Ecoport Inc - Net Zero Modular Spaces to Work, Learn and Live - www.ecoportmo...
Ecoport Inc - Net Zero Modular Spaces to Work, Learn and Live - www.ecoportmo...Ecoport Inc - Net Zero Modular Spaces to Work, Learn and Live - www.ecoportmo...
Ecoport Inc - Net Zero Modular Spaces to Work, Learn and Live - www.ecoportmo...
Carlos Flores
 
Home Information Pack
Home Information PackHome Information Pack
Home Information Pack
philipjg
 
Energy efficiency naoise f
Energy efficiency naoise fEnergy efficiency naoise f
Energy efficiency naoise fCKMCforstudents
 
Energy Efficiency Methods And Techniques V.2
Energy Efficiency Methods And Techniques V.2Energy Efficiency Methods And Techniques V.2
Energy Efficiency Methods And Techniques V.2
patmcmmc
 
Paul Ciniglio presentation for South Coast green breakfast - 22 May
Paul Ciniglio presentation for South Coast green breakfast - 22 MayPaul Ciniglio presentation for South Coast green breakfast - 22 May
Paul Ciniglio presentation for South Coast green breakfast - 22 May
Blake Morgan
 
Quantum
QuantumQuantum
Pili abis input2012
Pili abis   input2012Pili abis   input2012
Pili abis input2012
INPUT 2012
 
LifeCrete EcoMasonry
LifeCrete EcoMasonryLifeCrete EcoMasonry
LifeCrete EcoMasonry
rbessette
 
PoleCo Presentation
PoleCo PresentationPoleCo Presentation
PoleCo PresentationPoleCo
 
Regenerco_Brochure [email] 2016
Regenerco_Brochure [email] 2016Regenerco_Brochure [email] 2016
Regenerco_Brochure [email] 2016Nigel Price
 
REMOURBAN Information package n2 - Energiesprong 2050 project
REMOURBAN Information package n2 - Energiesprong 2050 project REMOURBAN Information package n2 - Energiesprong 2050 project
REMOURBAN Information package n2 - Energiesprong 2050 project
REMOURBAN
 
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - ENBCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
ARDOR
 
Mo Ti Presentation
Mo Ti PresentationMo Ti Presentation
Mo Ti Presentation
xingjun78
 
Fermacell EfW Case Study - PJS Solutions
Fermacell EfW Case Study - PJS SolutionsFermacell EfW Case Study - PJS Solutions
Fermacell EfW Case Study - PJS Solutions
PJS Solutions Ltd
 
Prismatic Skylights, Industrial Lighting
Prismatic Skylights, Industrial LightingPrismatic Skylights, Industrial Lighting
Prismatic Skylights, Industrial Lighting
Skyshade Daylights
 
3. roland streng
3. roland streng3. roland streng
3. roland streng
Plastindustrien
 

Similar to Konstructa fire safe mailer (20)

ZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATIONZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATION
 
Energy Assignments
Energy AssignmentsEnergy Assignments
Energy Assignments
 
Ecoport Inc - Net Zero Modular Spaces to Work, Learn and Live - www.ecoportmo...
Ecoport Inc - Net Zero Modular Spaces to Work, Learn and Live - www.ecoportmo...Ecoport Inc - Net Zero Modular Spaces to Work, Learn and Live - www.ecoportmo...
Ecoport Inc - Net Zero Modular Spaces to Work, Learn and Live - www.ecoportmo...
 
Home Information Pack
Home Information PackHome Information Pack
Home Information Pack
 
Energy efficiency naoise f
Energy efficiency naoise fEnergy efficiency naoise f
Energy efficiency naoise f
 
The Spencer Pavillion 100152598
The Spencer Pavillion 100152598The Spencer Pavillion 100152598
The Spencer Pavillion 100152598
 
Energy Efficiency Methods And Techniques V.2
Energy Efficiency Methods And Techniques V.2Energy Efficiency Methods And Techniques V.2
Energy Efficiency Methods And Techniques V.2
 
Paul Ciniglio presentation for South Coast green breakfast - 22 May
Paul Ciniglio presentation for South Coast green breakfast - 22 MayPaul Ciniglio presentation for South Coast green breakfast - 22 May
Paul Ciniglio presentation for South Coast green breakfast - 22 May
 
Quantum
QuantumQuantum
Quantum
 
Pili abis input2012
Pili abis   input2012Pili abis   input2012
Pili abis input2012
 
LifeCrete EcoMasonry
LifeCrete EcoMasonryLifeCrete EcoMasonry
LifeCrete EcoMasonry
 
PoleCo Presentation
PoleCo PresentationPoleCo Presentation
PoleCo Presentation
 
Regenerco_Brochure [email] 2016
Regenerco_Brochure [email] 2016Regenerco_Brochure [email] 2016
Regenerco_Brochure [email] 2016
 
REMOURBAN Information package n2 - Energiesprong 2050 project
REMOURBAN Information package n2 - Energiesprong 2050 project REMOURBAN Information package n2 - Energiesprong 2050 project
REMOURBAN Information package n2 - Energiesprong 2050 project
 
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - ENBCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
 
Mo Ti Presentation
Mo Ti PresentationMo Ti Presentation
Mo Ti Presentation
 
Fermacell EfW Case Study - PJS Solutions
Fermacell EfW Case Study - PJS SolutionsFermacell EfW Case Study - PJS Solutions
Fermacell EfW Case Study - PJS Solutions
 
Prismatic Skylights, Industrial Lighting
Prismatic Skylights, Industrial LightingPrismatic Skylights, Industrial Lighting
Prismatic Skylights, Industrial Lighting
 
3. roland streng
3. roland streng3. roland streng
3. roland streng
 
A Facade Odyssey
A Facade OdysseyA Facade Odyssey
A Facade Odyssey
 

Konstructa fire safe mailer

  • 1. 115897_KS8306_Firesafe_Mailer_Layout 1 19/02/2013 15:02 Page 1 Are health and safety concerns and insurance requirements ruling your working life? Do you need to minimise the risk of damage and devastation from fire on your site? Introducing the NEW Konstructa Fire-Safe building
  • 2. 115897_KS8306_Firesafe_Mailer_Layout 1 19/02/2013 15:02 Page 2 The only high-quality, fire-rated, energy-efficient site you even more reassurance that this building can really Energy-use Carbon Running cost @ 10p/kWh Building emissions building on the market to be backed up by a unique on help to protect your site and deliver a tried and tested kWh/yr1 kgCO2/yr1 Per year2 Per week2 time delivery promise fire-rated performance. Typical 9,032 £809.11 site cabin 4,669 £15.56 Konstructa To protect your people and property from the ravages of Plus, our unique on time delivery promise means you can Fire-Safe 6,529 3,375 £552.88 £10.63 fire on site the NEW Konstructa Fire-Safe building offers the have peace of mind that your building will definitely arrive building highest levels of security and fire containment. on time. In fact, in the unlikely event we are ever late you’ll Overall saving 28% 28% 32% 32% (2,503) (1,294) (£256.23) (£4.93) receive a week’s free hire! 1 (i) U-Values; Walls 0.70 W/m2K; Roof 0.54; Floor slab 0.70; Windows 3.54; Doors 2.34 The fire-rated design and manufacture fully complies with (ii) Air-tightness 3m3/hr/m2@50Pa (iii) Lighting; T8 high frequency with PIR control, LPD=2.99 W/m2/100-lux the ‘Joint Code of Practice on the Protection from Fire In addition, the building’s energy-saving design can save (v) Timeclock and thermostat for control of heating (vi) Small power load 11.5W/m2 on Construction Sites and Buildings Underground you up to 28% in energy usage and carbon emissions, as Renovation’. So you can rest assured that these buildings well as up to £256 a year on running costs. 1 Energy-use and carbon emissions per year for heating/climate control, will meet your health and safety requirements. lighting and small power. 2 Running cost per week for heating/climate control and lighting only Konstructa Fire-Safe buildings retain all the high-quality, (averaged over 52 weeks). The Konstructa Fire-Safe building is also independently anti-vandal and low maintenance benefits associated with tested and certified by Warringtonfire. It gives half-hour the standard range, whilst providing the highest levels of resistance in multi-storey mode when tested in protection against fire, theft and vandalism. accordance with BS 476 : Part 21, section 7. That gives
  • 3. 115897_KS8306_Firesafe_Mailer_Layout 1 19/02/2013 15:02 Page 3 Purpose-designed, fire-rated site buildings for Many other excellent features including: • Anti-jemmy door strips and externally mounted anti- construction sites jemmy window shutters to resist vandalism • Innovative new power ethernet sockets that can be Some protective security features of the NEW Konstructa activated to provide a high-speed, secure network • Safe and simple installation with an integrated low level Fire-Safe building include: lifting system • Innovative energy-saving features including PIR lights • Walls and ceilings have Class ‘O’ rating in accordance with which are turned off when not needed, exceptional • High-performance, low maintenance, galvanised steel standard Building Regulations 2000 – achieving the insulation and time-clock regulated heating as standard construction offers protection against fire, extreme highest results in both spread of flame and fire propagation weather and accidental damage • Bright, comfortable and practical working environments • Roofs FAA rated – the highest possible classification in with natural ventilation • Non-combustible materials are used for all external the fire safety category – when tested in accordance with cladding and internal lining of walls and ceilings, BS 476 : Part 3 • Double-glazed windows designed for optimum light minimising the potential fire load levels, white walls and heavy-duty flooring • Automatic fire curtains fitted to all windows to provide 30 • All our buildings achieve ISO 14001 accreditation for minutes integrity • Anti-vandal protection and high-security levels, with control of environmental impact and can help you to heavy-gauge steel doors and 16-point locking system achieve certification for the Considerate Constructors Scheme and gain your targeted BREEAM rating Automatic drop-down fire Unique on time delivery promise Fire-rated, energy-saving High-speed, secure network curtains site buildings
  • 4. 115897_KS8306_Firesafe_Mailer_Layout 1 19/02/2013 15:02 Page 4 To hire the only high-quality, fire-rated, energy-efficient site buildings on the market to be backed by a unique on time delivery promise contact your local Hire Centre on 0845 201 6778 today or visit www.konstructa.co.uk/fire-safe The fire testing and certification has been independently conducted by Warringtonfire. 1. Terms and Conditions apply. A copy is available on request. Konstructa Hire Limited Head Office Blackburn Road Townsend Farm Industrial Estate Houghton Regis Dunstable LU5 5BQ 01582 690510 service@konstructa.co.uk www.konstructa.co.uk Konstructa, Konstructa Hire and Konstructa Fire-Safe are trade marks. © Konstructa Hire Limited 2013. Produced by the Konstructa Marketing Studio. KS8306/02/13.