Khatab Ahmed
● Address: House # BV-186, NishteerStreet#1, MuslimTown,Rawalpindi Pakistan
● E-mail: khatab.fccl@gmail.com/ khatabahmed65@hotmail.com
● Skype ID: khatab.fccl
● Contact No: 0306-5698832 / 0096891244674/0096894257033
Objective:
To Work in Challengingandhardworkingenvironmentinordertoachieve excellence andtoprove my
abilitiesandtalentforthe developmentof the organization.
Personal Details:
Father’sName : MehboobHussain
NIC# : 37403-4179412-5
Date of Birth : 25/10/1988
Domicile : Punjab.
Marital Status : Married
Sex : Male
Health : Excellent
Nationality : Pakistani
Religion : Islam
Passportno : ZB1154121
Education Background:
• B-Tech(Hon’s) ElectricalfromPrestonUniversity2011.
• DAEElectricalfromNWFPBoard2006.
• MatricfromRawalpindi Board 2003.
Computer Skill:
● ComputerSoftware &Hardware Coursesand InternetExplorer.
● MS Office,MSWindowsOperatingSystem, 98,2000, & XP
HSE Training:
 HSE inductionTraining.
 RAC 1 Training(workat height).
 RAC 4 Training(LOTO).
 RAC 11 Training(workwithelectricity).
Work Experience:
❖ Workingin ABB Oman Full Servicesas a ELECTRICAL Supervisor INAUTOMATION AND
PROCESS fromaugust 2013 to till now.
❖ Workingin Oman cementas a ELECTRACIAN from February2012 toaugust 2013.
❖ Junior officerinFauji CementCompany fromJanuary 2010 to February2012.
❖ Electrical Tech-1in Best WayCementCompany Limited fromMarch 2007 to January
2010.
❖ Electrical Sub EngineerinShah Industrial Services from August2006 to March 2007.
❖ Electrical TechnicianinCBMC fromJuly2004 to August2006. In line IBestWay Cement
CompanyLimited.
EXPERIENCE Details:
Work Experience with ABB Oman Full services:
• WorkinginABB OmanFull Servicesasa ELECTRICAL SUPERVISORIN AUTOMATION
and processfromaugust2013 to till now.
Responsibilities:
➢ Full Electrical maintenance of vale Omanpalletizingplant11000 tonper daycapacity twolines.
➢ Full maintenance of 132kvmainsubstationand 33kv substation.
➢ Troubleshootingand maintenance of 132kv, 33kv and 12 kV switchgear.
➢ Troubleshootingandmaintenance of SF6Circuitbreaker[HD4] , Vacuumcircuit breaker[VD4]
and air circuitbreaker ACB.
➢ Troubleshootingandprogrammingof FeederrelayREF 542Plus. SPAU and SPAD.
➢ Troubleshootingandmaintenance of MNS-issystemalsomake programmingof MNS-issystem.
➢ Troubleshooting, programmingandmaintenanceof frequencydrivesACS800and ACS550 upto
4000kw.
➢ Troubleshootingandmaintenance of shipunloadingandshiploadingmachines.
➢ Troubleshootingandmaintenance of stackerandreclaimer.
➢ Programmingandtroubleshootingof AC800MController.
OMAN CEMENT COMPANY;
● Workingas a ELECTRACIAN formFebruary2012 to august2013.
Training by Chinese in Oman cement.
● One weekTrainingof HICONICVVVFDrive 6.6kv.
● One weektrainingof REF542 plusfeederrelayprogramingandsoftware handling.
Responsibilities:
● Commissioningof 33kvgridstationwithABB Engineer.
● WorkingwithChinese atnewline 3commissioningof raw mill andkilncoolerarea.
● Workingwith Chinese atline 1up gradationof new EP and bag filtertestingandcommissionof
EP.
● Maintenance of MV motorsand transformer.
● Maintenance andtrouble shoutingof MCC.
● Maintenance andtrouble shoutingof MV penal.
● Maintenance of lowvoltage motor replacingof bearings.
● Workingon Allen Bradley6.6kv vvvf drive commissioningwithChineseengineer.
● Workingon HICONIC6.6kv vvvf drive commissioningwithChinese engineer.
● Workingon MCU relayanddigital softstarter.
FAUJI CEMENT COMPANY LIMITED
7200 Ton per Day Cement Plant Project
Electrical Department 25th January 2010 to February 2012
Workingas “juniorofficerElectrical Project”onthe erection&commissioningof new cementplantof
capacity7200 TPD of POLYSIUS,GERMANY. Plantstartedits operationsuccessfullyon1stJuly2011.
HV/MV Trainings by ABB
• Programming& Handlingof HV/MV Bay Protection&Control ProtectionDevice Type
REF542+. (Course Code:ABBCH11506.2)
• Attended1Month trainingsessiononHV/MV Electrical Operation&Maintenance organized
by ABBin December2010.
Trainings by POLYSIUS
IncludesFiringInterlockingSystem,ELEXRAW & COOLER EP, CoolerHydraulicSystemor
coolerploytrack system,KilnPOLRO.
Responsibilities:
● Preparationof progressreportsonweeklybasis.
● ResolvingproblemsincoordinationwithPolysius&ABBduringerection&
commissioningphase.
● Electrical installationsaccordingtodrawings.
● Participatedintesting,start-upandcommissioningwithPolysius&ABB.
Work Experience with ABB Switzerland:
Worked withABB SwitzerlandTeamfromFauji CementSide onthe erection&commissioningof Liquid
Starters(4350 kW, 4150 kW, 2200kW etc.),132/6.3 kV Grid Station,LV Motors, MNS_is Software,SF6
CircuitBreakers,IsLimiter,PFC,REF542 PlusSoftware &Protectionetc.
ALSO WORKED ON:
HV System (Medium Voltage)
● HV Switchgear6300 V (ABBSF6 (HD4) CBs)
● Transformer40/50 MVA
● HV-Capacitorbanks,4,4,4 MVAR
● Frequency Drives:
▪ DanfossVLT AquaDrive
▪ Sewdrive
▪ Micro master410,420,430,440
▪ ABB ACS800
● Protection Relays:
▪ SPAU,SPAD
▪ SYMAP (Generator,Transformer&Motor Differential ProtectionRelay)
▪ REF 541,542
▪ REF 542 Plus
▪ SEPAM
Other Equipment:
I alsoworkedon
➢ LV Switchgear&LV Powerfactorcompensatingpanelshavingstaticcapacitors.
➢ Star Delta Panels
➢ LV Motor Control Panels
Work experienceinBestway cement company;
● Workingas a Electrical Tech-1in BestWay CementCompanyLimited fromMarch2007
to January2010.
Responsibilities:
• ErectionCommissioningof Raw mill Pre heaterandCoolerinBestWayCementinChinese
Plant6000 ton perday.
• Trouble Shootingof MCC,SoftStarter and InverteralsoParameterSettingof SoftStarter
and Inverter.
• Workingon Single Phase &Three Phase differentProjects.
• Workingon ABBFrequencyDrive ACS800 andACS 550.
• Workingon feederrelayREF542trouble shootingandparametersetting.
• Maintenance of LV motors bearingreplacement.
• Workingas a shiftincharge.
❖ Work experienceinShahindustrial services.
▪ Workingas Electrical SubEngineerinShahIndustrial ServicesfromAugust2006 to March
2007.
❖ Responsibilities:
➢ Making ATS[Autotransferpanel] penal forgenerator.
➢ Servicesof all type of generator.
➢ Workingon different single phase andthree phase project.
➢ Installationof generatorup to 500kva.
Work Experience with CBMC:
➢ Workingas a Electrical TechnicianinCBMC fromJuly2004 to August2006. In line IBestWay
CementCompanyLimited.
Responsibilities:
➢ Terminationof powercablesandcontrol cables.
➢ Loop testingof all cables.
➢ Magger testingof all powercable andmotors.
➢ Making HT kitting.
➢ Installationof cable tray.
➢ Commissioningof MCCwithChinese engineer.

More Related Content

Similar to khatab ahmed

Nadeem Naseem CV
Nadeem Naseem CVNadeem Naseem CV
Nadeem Naseem CV
Nadeem Naseem
 
Engr kashif cv
Engr kashif cvEngr kashif cv
Engr kashif cv
Muhammad kashif Rafiq
 
Rajesh Resume ....
Rajesh Resume ....Rajesh Resume ....
Rajesh Resume ....
Rajesh Ahdu
 
Restoration after Blackout IME.pdf
Restoration after Blackout IME.pdfRestoration after Blackout IME.pdf
Restoration after Blackout IME.pdf
IzharKhan472377
 
syed jaffer aafaq Resume
syed jaffer aafaq Resumesyed jaffer aafaq Resume
syed jaffer aafaq Resume
Aafaq Syed Jaffer
 
Resume_Gopala
Resume_GopalaResume_Gopala
Resume_Gopala
Gopala Balaraman
 
MY CV
MY CVMY CV
Raju cv
Raju cv Raju cv
resume
resumeresume
GA_CV
GA_CVGA_CV
tahir
tahirtahir
rashgggg
rashggggrashgggg
rashgggg
Muhammad Rashid
 
Resume
ResumeResume
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
asish jana
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Sanil Balakrishnan
 
NIKHIL-RESUME
NIKHIL-RESUMENIKHIL-RESUME
NIKHIL-RESUME
Nikhil Dhaka
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
T.N. Sathish
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
MOHAMMAD KHALID MUSTAFA
 
Nazar Abbas CV
Nazar Abbas CVNazar Abbas CV
Nazar Abbas CV
Nazar Abbas
 
Ramesh up dated CV
Ramesh up dated CVRamesh up dated CV
Ramesh up dated CV
ramesh rathakrishnan
 

Similar to khatab ahmed (20)

Nadeem Naseem CV
Nadeem Naseem CVNadeem Naseem CV
Nadeem Naseem CV
 
Engr kashif cv
Engr kashif cvEngr kashif cv
Engr kashif cv
 
Rajesh Resume ....
Rajesh Resume ....Rajesh Resume ....
Rajesh Resume ....
 
Restoration after Blackout IME.pdf
Restoration after Blackout IME.pdfRestoration after Blackout IME.pdf
Restoration after Blackout IME.pdf
 
syed jaffer aafaq Resume
syed jaffer aafaq Resumesyed jaffer aafaq Resume
syed jaffer aafaq Resume
 
Resume_Gopala
Resume_GopalaResume_Gopala
Resume_Gopala
 
MY CV
MY CVMY CV
MY CV
 
Raju cv
Raju cv Raju cv
Raju cv
 
resume
resumeresume
resume
 
GA_CV
GA_CVGA_CV
GA_CV
 
tahir
tahirtahir
tahir
 
rashgggg
rashggggrashgggg
rashgggg
 
Resume
ResumeResume
Resume
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
NIKHIL-RESUME
NIKHIL-RESUMENIKHIL-RESUME
NIKHIL-RESUME
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
 
Nazar Abbas CV
Nazar Abbas CVNazar Abbas CV
Nazar Abbas CV
 
Ramesh up dated CV
Ramesh up dated CVRamesh up dated CV
Ramesh up dated CV
 

khatab ahmed

  • 1. Khatab Ahmed ● Address: House # BV-186, NishteerStreet#1, MuslimTown,Rawalpindi Pakistan ● E-mail: khatab.fccl@gmail.com/ khatabahmed65@hotmail.com ● Skype ID: khatab.fccl ● Contact No: 0306-5698832 / 0096891244674/0096894257033 Objective: To Work in Challengingandhardworkingenvironmentinordertoachieve excellence andtoprove my abilitiesandtalentforthe developmentof the organization. Personal Details: Father’sName : MehboobHussain NIC# : 37403-4179412-5 Date of Birth : 25/10/1988 Domicile : Punjab. Marital Status : Married Sex : Male Health : Excellent Nationality : Pakistani Religion : Islam Passportno : ZB1154121 Education Background: • B-Tech(Hon’s) ElectricalfromPrestonUniversity2011. • DAEElectricalfromNWFPBoard2006. • MatricfromRawalpindi Board 2003.
  • 2. Computer Skill: ● ComputerSoftware &Hardware Coursesand InternetExplorer. ● MS Office,MSWindowsOperatingSystem, 98,2000, & XP HSE Training:  HSE inductionTraining.  RAC 1 Training(workat height).  RAC 4 Training(LOTO).  RAC 11 Training(workwithelectricity). Work Experience: ❖ Workingin ABB Oman Full Servicesas a ELECTRICAL Supervisor INAUTOMATION AND PROCESS fromaugust 2013 to till now. ❖ Workingin Oman cementas a ELECTRACIAN from February2012 toaugust 2013. ❖ Junior officerinFauji CementCompany fromJanuary 2010 to February2012. ❖ Electrical Tech-1in Best WayCementCompany Limited fromMarch 2007 to January 2010. ❖ Electrical Sub EngineerinShah Industrial Services from August2006 to March 2007. ❖ Electrical TechnicianinCBMC fromJuly2004 to August2006. In line IBestWay Cement CompanyLimited. EXPERIENCE Details: Work Experience with ABB Oman Full services: • WorkinginABB OmanFull Servicesasa ELECTRICAL SUPERVISORIN AUTOMATION and processfromaugust2013 to till now. Responsibilities: ➢ Full Electrical maintenance of vale Omanpalletizingplant11000 tonper daycapacity twolines. ➢ Full maintenance of 132kvmainsubstationand 33kv substation. ➢ Troubleshootingand maintenance of 132kv, 33kv and 12 kV switchgear. ➢ Troubleshootingandmaintenance of SF6Circuitbreaker[HD4] , Vacuumcircuit breaker[VD4] and air circuitbreaker ACB. ➢ Troubleshootingandprogrammingof FeederrelayREF 542Plus. SPAU and SPAD.
  • 3. ➢ Troubleshootingandmaintenance of MNS-issystemalsomake programmingof MNS-issystem. ➢ Troubleshooting, programmingandmaintenanceof frequencydrivesACS800and ACS550 upto 4000kw. ➢ Troubleshootingandmaintenance of shipunloadingandshiploadingmachines. ➢ Troubleshootingandmaintenance of stackerandreclaimer. ➢ Programmingandtroubleshootingof AC800MController. OMAN CEMENT COMPANY; ● Workingas a ELECTRACIAN formFebruary2012 to august2013. Training by Chinese in Oman cement. ● One weekTrainingof HICONICVVVFDrive 6.6kv. ● One weektrainingof REF542 plusfeederrelayprogramingandsoftware handling. Responsibilities: ● Commissioningof 33kvgridstationwithABB Engineer. ● WorkingwithChinese atnewline 3commissioningof raw mill andkilncoolerarea. ● Workingwith Chinese atline 1up gradationof new EP and bag filtertestingandcommissionof EP. ● Maintenance of MV motorsand transformer. ● Maintenance andtrouble shoutingof MCC. ● Maintenance andtrouble shoutingof MV penal. ● Maintenance of lowvoltage motor replacingof bearings. ● Workingon Allen Bradley6.6kv vvvf drive commissioningwithChineseengineer. ● Workingon HICONIC6.6kv vvvf drive commissioningwithChinese engineer. ● Workingon MCU relayanddigital softstarter. FAUJI CEMENT COMPANY LIMITED 7200 Ton per Day Cement Plant Project Electrical Department 25th January 2010 to February 2012 Workingas “juniorofficerElectrical Project”onthe erection&commissioningof new cementplantof capacity7200 TPD of POLYSIUS,GERMANY. Plantstartedits operationsuccessfullyon1stJuly2011. HV/MV Trainings by ABB
  • 4. • Programming& Handlingof HV/MV Bay Protection&Control ProtectionDevice Type REF542+. (Course Code:ABBCH11506.2) • Attended1Month trainingsessiononHV/MV Electrical Operation&Maintenance organized by ABBin December2010. Trainings by POLYSIUS IncludesFiringInterlockingSystem,ELEXRAW & COOLER EP, CoolerHydraulicSystemor coolerploytrack system,KilnPOLRO. Responsibilities: ● Preparationof progressreportsonweeklybasis. ● ResolvingproblemsincoordinationwithPolysius&ABBduringerection& commissioningphase. ● Electrical installationsaccordingtodrawings. ● Participatedintesting,start-upandcommissioningwithPolysius&ABB. Work Experience with ABB Switzerland: Worked withABB SwitzerlandTeamfromFauji CementSide onthe erection&commissioningof Liquid Starters(4350 kW, 4150 kW, 2200kW etc.),132/6.3 kV Grid Station,LV Motors, MNS_is Software,SF6 CircuitBreakers,IsLimiter,PFC,REF542 PlusSoftware &Protectionetc. ALSO WORKED ON: HV System (Medium Voltage) ● HV Switchgear6300 V (ABBSF6 (HD4) CBs) ● Transformer40/50 MVA ● HV-Capacitorbanks,4,4,4 MVAR ● Frequency Drives: ▪ DanfossVLT AquaDrive ▪ Sewdrive ▪ Micro master410,420,430,440 ▪ ABB ACS800 ● Protection Relays: ▪ SPAU,SPAD ▪ SYMAP (Generator,Transformer&Motor Differential ProtectionRelay) ▪ REF 541,542 ▪ REF 542 Plus
  • 5. ▪ SEPAM Other Equipment: I alsoworkedon ➢ LV Switchgear&LV Powerfactorcompensatingpanelshavingstaticcapacitors. ➢ Star Delta Panels ➢ LV Motor Control Panels Work experienceinBestway cement company; ● Workingas a Electrical Tech-1in BestWay CementCompanyLimited fromMarch2007 to January2010. Responsibilities: • ErectionCommissioningof Raw mill Pre heaterandCoolerinBestWayCementinChinese Plant6000 ton perday. • Trouble Shootingof MCC,SoftStarter and InverteralsoParameterSettingof SoftStarter and Inverter. • Workingon Single Phase &Three Phase differentProjects. • Workingon ABBFrequencyDrive ACS800 andACS 550. • Workingon feederrelayREF542trouble shootingandparametersetting. • Maintenance of LV motors bearingreplacement. • Workingas a shiftincharge. ❖ Work experienceinShahindustrial services. ▪ Workingas Electrical SubEngineerinShahIndustrial ServicesfromAugust2006 to March 2007. ❖ Responsibilities: ➢ Making ATS[Autotransferpanel] penal forgenerator. ➢ Servicesof all type of generator. ➢ Workingon different single phase andthree phase project. ➢ Installationof generatorup to 500kva. Work Experience with CBMC: ➢ Workingas a Electrical TechnicianinCBMC fromJuly2004 to August2006. In line IBestWay CementCompanyLimited. Responsibilities:
  • 6. ➢ Terminationof powercablesandcontrol cables. ➢ Loop testingof all cables. ➢ Magger testingof all powercable andmotors. ➢ Making HT kitting. ➢ Installationof cable tray. ➢ Commissioningof MCCwithChinese engineer.