Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...
Keros General Motors
1. Workplace Charging: Filling a Critical Infrastructure Gap
July 31, 2012
Alex Keros
Mngr, Advanced Vehicle and Infrastructure Policy
2. Electric Vehicle and Charging| General Motors
GM’s Line-up of Plug-in Vehicles:
Public
120V =
grid-friendly, easy
Workplace
240V =
Chevrolet Volt faster-charging
EREV (2010) Residential
GM Workplace Installation Examples
• GM Global Headquarters (Renaissance Center, Detroit)
• Detroit-Hamtramck Assembly Plant (includes Solar)
• Brownstown Battery Assembly Plant
• GM Tech Center
Chevrolet Spark o VEC (Solar)
o AEC (Solar)
BEV (2013) o Design Studios
o R&D
o Service Operations
o Company Vehicle Operations (Solar)
• Bowling Green Assembly Plant (Solar)
• Lordstown Complex (Solar)
• Parma Metal Center (Solar)
• Baltimore Transmission Plant (includes Solar)
• Milford Proving Grounds (includes Solar)
• Customer Care & Aftersales, Service Parts Organization
• Advanced Technical Centers
o Palo Alto, CA
o Torrance, CA
o Honolulu, HI
o Honeoye Falls, NY
Cadillac ELR EREV o Washington DC
(Timing to be announced)
3. PEV Charging Installations | GM Workplace
Detroit-Hamtramck (MI) Assembly Plant Company Vehicle Operations (MI) GM Headquarters
Warrant Tech Center (MI) Adv. Vehicle Center (VA) Dealerships
(including CA)
3
4. PEV Charging Installations | Torrance, CA
Advanced Technology Center & Advanced Technology Vehicle Center
4