Ken McConahy has over 26 years of experience in manufacturing engineering, most recently as a Senior Manager of Design and Test Engineering at New Sabina Industries. He received his Associate of Applied Science degree in Mechanical Engineering Technology from Muskingum Area Technical College in 1990. McConahy has extensive training in Lean Six Sigma, project management, and continuous improvement. At New Sabina Industries, he led a team of 14 engineers and oversaw the design and testing of electrical components for the automotive industry, focusing on error proofing and cost reduction through process improvement and automation.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
1. Ken McConahy
4721 Washington Waterloo Rd, Washington Court House, Oh 43160 | 937-725-4811 | ken.mcconahy@yahoo.com
Objective
Seeking a challenging job in manufacturing to utilize my skill set & 26 years of experience for our mutual benefit. I am a
dedicated, passionate and self-motivated individual who has a keen eye for process improvement, and knows what it takes to
successfully launch New Models into Mass Production. Experienced working with Honda, Chrysler, & GM.
Education
ASSOCIATE OF APPLIED SCIENCE | 1990 | MUSKINGUM AREA TECHNICAL COLLEGE
Major: Mechanical Engineering Technology
OTHER TRAINING
Villanova University - Lean Six Sigma
Villanova University- Six Sigma Green Belt
Villanova University - Project Management
Stephen Covey – 7 Habits of Highly Effective People
Kepner-Tragoe - Project Management
SeveralTrips to Benchmark & Train at Sister & Parent Companies (Japanese owned),12 trips to Japan,2 to Europe,2 to Mexico, 1 to China.
Work Experience
Sept 2008 ~ Present; Sr. Manager, Design & Test Engineering. New Sabina Industries, Inc.
Lead the Manufacturing Engineering Group (14 Engineers, 2 Managers), whose responsibility included designing the
Processes & Equipment for the Automated Assembly & Testing of Electrical Components (Instrument Clusters) for the
Automotive Industry. Heavy focus on error proofing (Poke-Yoke) through the use of Sensors, Vision Systems, and
Automated Testing. Focus also placed on Reduction of Labor Cost through Process Improvement, Line Balance,
Automation, and Continuous Improvement. Also Responsible for Justification & Implementation of Capital Equipment
for New Model and Improvement Projects.
Average of 8 New Model Launch’s per year during this period.
Use of AutoCAD (2D) to study Line & Plant Layout to optimize Efficiency.
Work Closely with Maintenance for Continual Downtime Reduction. Averaged 8% annual reduction over 5 year’s.
Responsible for Tracking $1M Capital Budget as well as $225K Annual Expense Budget. Projects rarely are over Budget.
1999 ~ 2008; Manager, Production Engineering. New Sabina Industries, Inc.
Manage the Manufacturing Engineering Group (10 Engineers). Engineering Disciplines included Mechanical, Industrial
(Process), & Electrical Engineers. Group was Responsible for All Processing & Testing.
Work Closely with QA & Production to Develop Root Cause & Countermeasures for Customer Rejects.
Use of Project Software (MS Project) to coordinate New Model & Improvement Activity.
1995 ~ 1999; Staff Engineer, Production Engineering. New Sabina Industries, Inc.
Design Jigs & Fixtures for New Model Launch.
Work in Cross-Function Teams to Develop Countermeasures for Customer Rejects.
Interface with the Customer during New Model Trials.
1992 ~ 1995; Engineering Coordinator. New Sabina Industries, Inc.
Shift Lead for 5 Technicians, responsible for Production Support.
Interface with QA & Production to Develop Root Cause & Countermeasures on Equipment & Process related Issues.
1990 ~1992; Engineering Technician. New Sabina Industries, Inc.
Support Automated Assembly Lines on Equipment & Process Related Issues.
Design Jigs & Fixtures on Equipment Designed by Japanese parent company for Re-tooling for New Model Launch’s.