Sample content
American Education Survey
PSY/475
Abstract
Education is the medium to transfer the knowledge from one person (teacher) to another person (student). The method is simple but the application is hard to execute. Students are assorted in their mechanisms and abilities to grasp. Students may need different textbooks and other materials to study because of entire or fractional blindness. Some of them may collect more knowledge through physically collaborating with articles in the classroom. Other causes like dyslexia and ADHD can conflict with the student’s apprentice accomplished. Several things which block the educational methods are above the reach of this article; however, other applications admit quite areas, distance erudition and associate groups for study. There is not even a single method that can be perfect for the educational system. Trying to develop a standard is a detriment to the students and also to the teachers. Creativity is the only thing that caus
Common Ground is important to interact with people. It's the foundation of trustful relationships.
Follow this slideshow to find how to build common ground with people.
Sample content
American Education Survey
PSY/475
Abstract
Education is the medium to transfer the knowledge from one person (teacher) to another person (student). The method is simple but the application is hard to execute. Students are assorted in their mechanisms and abilities to grasp. Students may need different textbooks and other materials to study because of entire or fractional blindness. Some of them may collect more knowledge through physically collaborating with articles in the classroom. Other causes like dyslexia and ADHD can conflict with the student’s apprentice accomplished. Several things which block the educational methods are above the reach of this article; however, other applications admit quite areas, distance erudition and associate groups for study. There is not even a single method that can be perfect for the educational system. Trying to develop a standard is a detriment to the students and also to the teachers. Creativity is the only thing that caus
Common Ground is important to interact with people. It's the foundation of trustful relationships.
Follow this slideshow to find how to build common ground with people.
Sample content
American Education Survey
PSY/475
Abstract
Education is the medium to transfer the knowledge from one person (teacher) to another person (student). The method is simple but the application is hard to execute. Students are assorted in their mechanisms and abilities to grasp. Students may need different textbooks and other materials to study because of entire or fractional blindness. Some of them may collect more knowledge through physically collaborating with articles in the classroom. Other causes like dyslexia and ADHD can conflict with the student’s apprentice accomplished. Several things which block the educational methods are above the reach of this article; however, other applications admit quite areas, distance erudition and associate groups for study. There is not even a single method that can be perfect for the educational system. Trying to develop a standard is a detriment to the students and also to the teachers. Creativity is the only thing that caus
The Giving Gracefully Awards recognizes the outstanding achievements of athletes and entertainers who are dedicated to making an impact in their communities. Held annually during Superbowl weekend, the awards ceremony honors these committed, passionate individuals who exemplify a tremendous philanthropic spirit on and off the field.
We at Global IT Experts understand comprehensively the benefits you seek for your business. Keeping that in mind we ensure to convey the finest, fruitful and unique technology based business solutions, staffing solutions and software services across USA.
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...Vempi Satriya
Gondang dam is one of 49 dams built until 2019. Gondang dam was planned for completion by the end of 2017. It is expected to irrigate the fields in Sragen and Karanganyar with the total area of 4630 hectares and to fulfill the raw water needs of 0.2 m3/s. This research aimed to examine the inflow characteristic, water availability, and simulation model of reservoir operation in order to obtain optimal release target showing a percentage of irrigated area and its reliability. The inflow characteristic was analyzed using Mock model. The inflow data was generated over 20 years using Thomas-Fiering seasonal model. The generated data can be used for the simulation of reservoir operation determined using Standard Operating Rule method. The whole analysis was performed by Microsoft Excel software. The research result showed that inflow from Melikan watershed has an average value of 1.37 m3/s. The analysis of water availability showed that the average monthly water balance for multipurpose scenario has -5.16 MCM deficit and 1.225 MCM surplus in term of no release for raw water need. The simulation model of reservoir operation yielding an average percentage of irrigated area 100%, 90%, and 80% has respectively 26.83%, 63.83%, and 86.63% level of reliability. For fulfilling 100% irrigated area, the level of reliability obtained from simulation was 72.25%. Due to the simulation result in the case of no release for raw water, the percentage of irrigated area relatively increased 40.28%, 72.95%, and 94.27%, respectively, while the percentage of 100% irrigated area reliability gained an average of 76.5%. Thus in order to obtain 100% of reliability, it needs more water supply.
Sample content
American Education Survey
PSY/475
Abstract
Education is the medium to transfer the knowledge from one person (teacher) to another person (student). The method is simple but the application is hard to execute. Students are assorted in their mechanisms and abilities to grasp. Students may need different textbooks and other materials to study because of entire or fractional blindness. Some of them may collect more knowledge through physically collaborating with articles in the classroom. Other causes like dyslexia and ADHD can conflict with the student’s apprentice accomplished. Several things which block the educational methods are above the reach of this article; however, other applications admit quite areas, distance erudition and associate groups for study. There is not even a single method that can be perfect for the educational system. Trying to develop a standard is a detriment to the students and also to the teachers. Creativity is the only thing that caus
The Giving Gracefully Awards recognizes the outstanding achievements of athletes and entertainers who are dedicated to making an impact in their communities. Held annually during Superbowl weekend, the awards ceremony honors these committed, passionate individuals who exemplify a tremendous philanthropic spirit on and off the field.
We at Global IT Experts understand comprehensively the benefits you seek for your business. Keeping that in mind we ensure to convey the finest, fruitful and unique technology based business solutions, staffing solutions and software services across USA.
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...Vempi Satriya
Gondang dam is one of 49 dams built until 2019. Gondang dam was planned for completion by the end of 2017. It is expected to irrigate the fields in Sragen and Karanganyar with the total area of 4630 hectares and to fulfill the raw water needs of 0.2 m3/s. This research aimed to examine the inflow characteristic, water availability, and simulation model of reservoir operation in order to obtain optimal release target showing a percentage of irrigated area and its reliability. The inflow characteristic was analyzed using Mock model. The inflow data was generated over 20 years using Thomas-Fiering seasonal model. The generated data can be used for the simulation of reservoir operation determined using Standard Operating Rule method. The whole analysis was performed by Microsoft Excel software. The research result showed that inflow from Melikan watershed has an average value of 1.37 m3/s. The analysis of water availability showed that the average monthly water balance for multipurpose scenario has -5.16 MCM deficit and 1.225 MCM surplus in term of no release for raw water need. The simulation model of reservoir operation yielding an average percentage of irrigated area 100%, 90%, and 80% has respectively 26.83%, 63.83%, and 86.63% level of reliability. For fulfilling 100% irrigated area, the level of reliability obtained from simulation was 72.25%. Due to the simulation result in the case of no release for raw water, the percentage of irrigated area relatively increased 40.28%, 72.95%, and 94.27%, respectively, while the percentage of 100% irrigated area reliability gained an average of 76.5%. Thus in order to obtain 100% of reliability, it needs more water supply.
Contoh Perhitungan Nilai Perolehan Air Tanah (NPA) untuk Pengambilan dan Pema...R. Ferro Aviyanto
Presentasi rapat konsolidasi dengan kabupaten/kota se NTB rencana penyusunan peraturan gubernur ntb tentang penetapan nilai perolean air tanah ntb berdasarkan permen esdm no 20 tahun 2017
Desain Rekayasa II FIXED JACKET PLATFORM 70.000 BOPD by Muhammad Azka Bintang...MuhammadAzkaBintangA
This PPT is made for my Seminar Desain Rekayasa II on 6th Semester as Ocean engineering student in Hasanuddin Universtity. Hope this Reference, may help you guys.
Kampung Keluarga Berkualitas merupakan salah satu wadah yang sangat strategis untuk mengimplementasikan kegiatan-kegiatan prioritas Program Bangga Kencana secara utuh di lini
lapangan dalam rangka menyelaraskan pelaksanaan program-program yang dilaksanakan Desa
2. KELOMPOK 5
RANDY ARIE BASTIAN (20151334029)
RIFQI FARIZAL FAHRUR ROZI (20151334034)
BUNADI (20151334035)
DEDDY ARIES SETIAWAN (20151334036)
3. REPAIR LIST
1. DATA SURVEY DAN INSPEKSI;
A. PIHAK DAN KEPENTINGAN
B. REVIEW DAN VERIFIKASI
2. PENYUSUNAN LIST DATA HASIL SURVEY;
A. JENIS PEKERJAAN
B. DETIL PEKERJAAN
9. MOBILISASI DAN MANUVER
VOLUME HARGA ( Rp. )
Jumlah Satuan Satuan Total
I MOBILISASI DARI PANGKALAN KE TEMPAT DOCK DAN PENYEBERANGAN KE PANGKALAN KEMBALI :
1 Biaya mobilisasi kapal dari pangkalanmenujugalangan 1 Kali 54,600,000Rp 54,600,000Rp 7.24%
2 Biaya demobilisasi kapal dari galangan kembali menuju ke pangkalan 1 Kali 54,600,000Rp 54,600,000Rp 7.24%
SUB-TOTAL : 109,200,000Rp 14.48%
NO. URAIAN PEKERJAAN BOBOT
10. PELAYANAN UMUM & DOCKING
II PELAYANAN UMUM DAN PENGEDOCKAN :
1 Pelayanan Tug Boat untuk keluar masuk perairan galangan 2 kali 2,000,000Rp 4,000,000Rp 0.53%
2 Sandar dan lepas kade di dermaga / kade galangan :
- Sandar di kade / dermaga galangan 25 hari 450,000Rp 11,250,000Rp 1.49%
3 Docking Undocking :
a. Docking undocking beserta segala fasilitasnya 1 kali 8,000,000Rp 8,000,000Rp 1.06%
b. Docking untuk inspeksi dan perbaikan under water line 20 hari 1,200,000Rp 24,000,000Rp 3.18%
c. Laporan Docking / Docking Report 1 Ls 2,700,000Rp 2,700,000Rp 0.36%
4 Supply tenaga listrik dari galangan selama kapal repair
a. Sambung dan lepas saluran kabel listrik dari galangan 1 kali 275,000Rp 275,000Rp 0.04%
b. Supply tenaga listrik ( 30 A - 380 V AC - 3 phase ) 45 hari 335,000Rp 15,075,000Rp 2.00%
5 Penjagaan keamanan selama kapal docking/floating (Min. 2 org/ hari) 45 hari 210,000Rp 9,450,000Rp 1.25%
6 Fasilitas dan tenaga pembuangan sampah (± 3 m3) 45 hari 210,000Rp 9,450,000Rp 1.25%
7 Fasilitas tenaga penjaga bahaya kebakaran selama kapal Docking
a. Pelayanan sambung dan lepas selang pemadam dari darat 1 kali 210,000Rp 210,000Rp 0.03%
b. Fasilitas dan tenaga penjaga bahaya kebakaran (Min. 2 org/ hari) 20 hari 175,000Rp 3,500,000Rp 0.46%
8 Pelayanan dan Supply air tawar untuk keperluan ABK
a. Pelayanan sambung dan lepas selang air dari darat 1 kali 210,000Rp 210,000Rp 0.03%
b. Supply air tawar untuk keperluan ABK selama di galangan 45 tons 50,000Rp 2,250,000Rp 0.30%
9 Akomodasi untuk ABK (4 org) selama kapal docking 45 hari 400,000Rp 18,000,000Rp 2.39%
10 Pelayanan Crane ( minimal charge 8 jam ) 8 jam 160,000Rp 1,280,000Rp 0.17%
SUB-TOTAL : 109,650,000Rp 14.54%
11. SISTEM PROPULSI DAN KEMUDI
III SISTEM PROPULSI DAN KEMUDI :
1 Propeller
a. Bongkar pasang propeller dan dibawa ke bengkel 2 unit 4,800,000Rp 9,600,000Rp 1.27%
b. Rekondisi propeller kalau terdapat keropos / fitting, dipopok las kuningan. 2 unit 5,600,000Rp 11,200,000Rp 1.49%
c. Polishing dan ballancing propeller 2 unit 2,600,000Rp 5,200,000Rp 0.69%
2 Shaft Propeller
a. Chek clearance shaft propeller dengan bantalannya dan dibuatkan record 2 unit 1,200,000Rp 2,400,000Rp 0.32%
b. Cabut shaft propeller, jika hasil Clearance jelek. 2 unit 8,000,000Rp 16,000,000Rp 2.12%
c. Penggantian reamers packing shaft propeller ( supply galangan ) 2 set 1,300,000Rp 2,600,000Rp 0.34%
Penghalang :
- Bongkar pasang skerm shaft propeller 2 unit 800,000Rp 1,600,000Rp 0.21%
3 Kemudi
a. Chek clearance bantalan tongkat kemudi dan dibuatkan record 2 unit 1,150,000Rp 2,300,000Rp 0.30%
b. Bongkar pasang kemudi & tongkat kemudi, jika hasil Clearance melebihi batas toleransi2 unit 12,000,000Rp 24,000,000Rp 3.18%
c. Penggantian reamers packing rudderstock ( supply galangan ) 2 set 1,390,000Rp 2,780,000Rp 0.37%
d. Pengecatan primer jumlah lapis : 6 m² 40,000Rp 240,000Rp 0.03%
e. Pengecatan AC jumlah lapis : 6 m² 40,000Rp 240,000Rp 0.03%
f. Pengecatan AF jumlah lapis : 6 m² 72,000Rp 432,000Rp 0.06%
( material cat supply galangan )
SUB-TOTAL : 78,592,000Rp 10.42%
12. KONTRUKSI BADAN KAPAL & LAMBUNG
IV KONSTRUKSI BADAN KAPAL :
A. BAWAH GARIS AIR (BGA) :
1 Pembersihan dan pengecatan lambung BGA
Lambung kapal dari lunas sampai batas garis air maximum :
a. Pembersihan dengan scrapping 450 m² 14,000Rp 6,300,000Rp 0.84%
b. Cuci air tawar dengan water jet tekanan rendah 450 m² 11,000Rp 4,950,000Rp 0.66%
c. Sandblasting 450 m² 61,000Rp 27,450,000Rp 3.64%
d. Pengecatan primer jumlah lapis : 450 m² 40,000Rp 18,000,000Rp 2.39%
e. Pengecatan AC jumlah lapis : 450 m² 40,000Rp 18,000,000Rp 2.39%
f. Pengecatan AF jumlah lapis : 450 m² 72,000Rp 32,400,000Rp 4.30%
( material cat supply galangan )
2 Pengecatan draft mark dan plimsoll mark, nama kapal dan pelabuhan ( cat supply galangan ) 1 Ls 1,250,000Rp 1,250,000Rp 0.17%
3 Pengukuran ketebalan plat dengan Ultrasonic Test ( min 100 titik ) pada area 300 titik 25,500Rp 7,650,000Rp 1.01%
( BGA, top deck, boat deck, winch deck, main deck dan under main deck )
4 Dibuatkan gambar bukaan kulit disertai hasil UT dan replating 1 Ls 1,000,000Rp 1,000,000Rp 0.13%
5 Penggantian baru zinc anode ( material ZA supply galangan )
a. S - 8 pada lambung 50 buah 700,000Rp 35,000,000Rp 4.64%
b. S - 4 pada sea chest induk 4 buah 325,000Rp 1,300,000Rp 0.17%
6 Penggantian plat BGA berdasarkan hasil UT dan Rekom BKI ( plat supply galangan ) estimasi :
a. Plat lambung bawah garis air 2000 Kg 29,750Rp 59,500,000Rp 7.89%
b. Plat internal bawah garis air 1500 Kg 30,000Rp 45,000,000Rp 5.97%
B. ATAS GARIS AIR ( AGA ) :
7 Pembersihan dan pengecatan lambung AGA
Lambung kapal dari batas garis air maximum sampai batas main deck :
a. Cuci air tawar dengan water jet tekanan rendah 110 m² 12,500Rp 1,375,000Rp 0.18%
b. Sandblasting 110 m² 58,000Rp 6,380,000Rp 0.85%
c. Pengecatan AC 110 m² 7,000Rp 770,000Rp 0.10%
d. Pengecatan finishing coat 110 m² 7,000Rp 770,000Rp 0.10%
( material cat supply galangan )
8 Pembersihan geladak-geladak cuaca : Main D, F'castle D, D sekoci, D anjungan buritan,
Upper Deck, Top Deck
a. Cuci air tawar dengan water jet tekanan rendah 335 m² 12,500Rp 4,187,500Rp 0.56%
b. Sandblasting 335 m² 58,000Rp 19,430,000Rp 2.58%
c. Pengecatan AC 335 m² 7,000Rp 2,345,000Rp 0.31%
d. Pengecatan finishing coat 335 m² 7,000Rp 2,345,000Rp 0.31%
( material cat supply galangan )
`
SUB-TOTAL : 295,402,500Rp 39.17%
13. PERALATAN TAMBAT & BONGKAR MUAT
V PERALATAN TAMBAT DAN BONGKAR MUAT KAPAL :
1 Jangkar dan rantai jangkar :
a. Jangkar dan rantai jangkar diturunkan, direntangkan, diketok, disikat dg sikat kawat baja,2 unit 8,350,000Rp 16,700,000Rp 2.21%
dibersihkan diukur diameternya, dicat dg coalter, diberi tanda, diperiksakan Klass
(dibuatkan laporan hasil pengukuran), segel dan swievel dilancarkan ( cat supply galangan )
b. Bak rantai dibersihkan dan dicat bituminous ( cat supply galangan ) 2 unit 4,530,000Rp 9,060,000Rp 1.20%
SUB-TOTAL : 25,760,000Rp 3.42%
14. SISTEM PIPA & TANGKI
VI SISTEM PERPIPAAN, KRAN, POMPA DAN TANGKI-TANGKI :
1 Sea chest dan sea valves :
a. Sea chest beserta kisi - kisinya dibuka, dibersihkan, kemudian dicat AC & AF 2 unit 1,856,000Rp 3,712,000Rp 0.49%
( cat supply galangan ). Saringan/strainer dibersihkan dan ganti baru packing karet
( material packing ex. galangan )
b. Sea valves dibuka, dibersihkan, disekur, dicat AC dan reamers packing yang rusak diganti baru,2 unit 1,240,000Rp 2,480,000Rp 0.33%
diperiksakan klass. Setelah selesai dipasang kembali. Ukuran sea valve :
- Globe Valve diameter :4"
SUB-TOTAL : 6,192,000Rp 0.82%
15. LAIN-LAIN
VII LAIN - LAIN :
1 Biaya survey BKI untuk perpanjangan Klass :
a. Survey Perpanjangan Klass 1 kali 46,700,000Rp 46,700,000Rp 6.19%
b. Survey Pengedokan 1 kali 4,500,000Rp 4,500,000Rp 0.60%
c. Survey Load Line 1 kali 3,400,000Rp 3,400,000Rp 0.45%
d. Survey Poros Baling - Baling 1 kali 3,300,000Rp 3,300,000Rp 0.44%
e. Transportasi 1 kali 700,000Rp 700,000Rp 0.09%
2 Biaya Administrasi Kesyahbandaran
a. Pembuatan Surat Ijin Gerak 1 kali 3,150,000Rp 3,150,000Rp 0.42%
b. Pembuatan Surat Ijin Naik Dok 1 kali 3,150,000Rp 3,150,000Rp 0.42%
c. Pembuatan Surat Ijin Sea Trial 1 kali 3,150,000Rp 3,150,000Rp 0.42%
d. Pembuatan Surat Ijin Sea Trial dan Compaseren 1 kali 3,150,000Rp 3,150,000Rp 0.42%
e. Pembuatan Sertifikat Keselamatan Kapal 1 kali 9,500,000Rp 9,500,000Rp 1.26%
f. Pembuatan Surat Clearence In & Out 1 kali 3,150,000Rp 3,150,000Rp 0.42%
3 Biaya Sea Trial dan Compaseren
a. Biaya Sea Trial 1 Ls 27,500,000Rp 27,500,000Rp 3.65%
b. Biaya Compaseren 1 Ls 18,000,000Rp 18,000,000Rp 2.39%
SUB-TOTAL : 129,350,000Rp 17.15%
16.
17. TOTAL BIAYA PEKERJAAN REPAIR LIST
120,960,000.0PPN 10%
HARGA HASIL LELANG - PPN 1,088,640,000Rp
KEUNTUNGAN : 334,493,500Rp
HARGA HASIL LELANG : 1,209,600,000Rp
% KEUNTUNGAN : 28%
TOTAL I - VII : 754,146,500Rp 100.00%
18.
19.
20. PROGRES PEKERJAAN REPAIR LIST
DALAM MINGGU
WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%) WEEK (%)
1 2 3 4 5 6 7 8 9
22% 35% 48% 61% 73% 78% 81% 84% 100%
SISTEM PERPIPAAN, KRAN, POMPA DAN TANGKI-TANGKI :
TOTAL
VII
91% 100% 100%
MOBILISASI DARI PANGKALAN KETEMPAT DOCK DAN PENYEBERANGAN KE PANGKALAN KEMBALI :
IV KONSTRUKSI BADAN KAPAL : 21% 45%
NO. DESCRIPTION
PROGRESS NOP 2015
54% 67% 79%
I 50% 50% 50%
13% 26% 38%III SISTEM PROPULSI DAN KEMUDI :
89% 100%
50% 50% 50% 50% 50% 100%
II PELAYANAN UMUM DAN PENGEDOCKAN : 8% 26% 32% 49% 57% 70% 79%
100% 100%
100%
67% 82% 100% 100% 100% 100% 100%
V PERALATAN TAMBAT DAN BONGKAR MUAT KAPAL : 17% 34% 53% 69% 85% 100%
50% 50% 50% 50% 100%
23% 43% 76% 100% 100% 100% 100% 100% 100%
I LAIN - LAIN :
20% 20% 20% 20%