SlideShare a Scribd company logo
1 of 2
Thomas W Spoerner
PSC 517 Box 2845
FPO AP 96517
+63-919-273-6900 (Philippines)
twspoerner1@yahoo.com
SUMMARY:
Offering experience in the planning, execution, management and analysis of:
 Large and dispersed public works and facility operations, maintenance and construction
 Supervision of large organizations staffed with US Army civilians and foreign nationals
 Large and complex construction programs and projects
 US government contracting activities
 Liaison with US Department of State officials for facility construction and maintenance
 Advisory and mentoring programs for foreign national officials
 Reconstruction and capacity development programs and projects in war zones
Professional experience in Asia includes Southwest Asia (Iran, Saudi Arabia, Iraq, Yemen and
Afghanistan), South Korea and the Philippines.
LAST SECURITY CLEARANCE HELD: Top Secret/Sensitive Compartmented Information
CITIZENSHIP: United States of America
PROFESSIONAL EXPERIENCE:
Self Employed (07/13/2013 – Present) Construction Program Manager; San Carlos City,
Philippines
Accomplishment:
 Provide maintenance and minor construction project management services to renovate a
residential building in a rural setting under primitive conditions
AC4S (07/25/2012 – 07/12/2013) – Project Manager/Director of Maintenance; Sana’a, Yemen
FOREWORD: The Sheraton hotel in Sana’a Yemen housed some 250 US Department of State
(DOS) employees and associates and a security detachment including 45 US Marines. On 1
January 2013 the hotel and associated facilities were leased to the US DOS as the Diplomatic
Transit Facility – Sana’a. Served as the AC4S Project Manager while the facilities were
operated by Sheraton and the AC4S Director of Maintenance for the leased facility.
Accomplishment:
 Vastly improved life support in 300 bed life support facility which was previously very
poorly maintained and operated
URS Corporation/General Dynamics (01/15/2012 – 07/31/12) – Project Manager and
Construction Manager, Kandahar and Camp Leatherneck, Afghanistan
Accomplishment:
 Provided project management expertise to the Expeditionary Prime Base Engineer
Emergency Force Squadron – Afghanistan and interfaced directly with customers
US Forces - Iraq (04/12/2009 – 07/31/2011) – Senior Security Infrastructure Construction
Program Manager, Baghdad, Iraq, GS - 0801 – 14
Accomplishments:
 Launched a large six multi-story building project that was floundering and closed project
on schedule and under budget
 Completed a large Ministry of Defense training complex with a full range of educational
and life support facilities
 Carried out duties in consultation with the US Department of State and Iraqi Ministries
 Created and managed systems and procedures for archive of 2,400 projects executed
over seven years and valued at $6.4 billion
Gulf Region Division, US Army Corps of Engineers (06/08/2008 - 04/11/2009) - Senior
Construction Program Manager and Divisional Contracting Officer Representative:
GS - 0340 – 14, Baghdad, Iraq
Accomplishments:
 Reconstructed or newly constructed multiple potable water plants, wastewater plants,
pump stations, weirs and drainage canals leading to reclamation of 155,000 hectares of
irrigated farmland and improvements in public health throughout Iraq
 Supervised a multi-national team of 25 Construction Engineers and QA Representatives
 Provided on-going Serve as Division Contracting Officer Representative
HQ FORSCOM, G-1 Engineer, Plans and Programs (11/01/2006 – 06/08/2008) - General
Engineer, Pay Grade: YD - 0801 – 2, Fort McPherson, Georgia, United States
Accomplishment:
 Worked with Army installation Senior Mission Commanders to prioritize construction
projects in accordance with Army Force Management (reduction of forces in Europe and
BRAC re-alignments) and installation missions
US Army Installation Management Agency - Korea, (01/20/2005 - 10/30/2006) - Director of
Public Works (Supervisory General Engineer), GS-0801 -13, Munsan City and Panmunjom in
the Demilitarized Zone (DMZ), Republic of Korea
Accomplishment:
 Served as Director of Public Works to prepare 800 buildings at six US Army installations
for turnover to the Republic of Korea
EDUCATION and TRAINING:
 International Business Management, GPA 4.0, Troy State University
 B.S., Chemistry, GPA 3.0, Arizona State University
 Army Management Staff College:
- Sustaining Installation Leadership and Management
- Personnel Management for Executives I, II and III
AWARDS:
 Joint Civilian Service Commendation, US Forces-Iraq, 2011
 Member of the United Nations Military Armistice Commission - 2005
 Special Act Awards – 2003 and 2005

More Related Content

What's hot (10)

ResumeBOBFIELD 2
ResumeBOBFIELD 2ResumeBOBFIELD 2
ResumeBOBFIELD 2
 
Burke resume 4 a ver 1
Burke resume 4 a ver 1Burke resume 4 a ver 1
Burke resume 4 a ver 1
 
CIRRICULUM VATAE
CIRRICULUM VATAECIRRICULUM VATAE
CIRRICULUM VATAE
 
Professional Resume Final, Juano
Professional Resume Final, JuanoProfessional Resume Final, Juano
Professional Resume Final, Juano
 
Philip Kwiatkowski Resume
Philip Kwiatkowski ResumePhilip Kwiatkowski Resume
Philip Kwiatkowski Resume
 
Burke resume 4 a ver 1
Burke resume 4 a ver 1Burke resume 4 a ver 1
Burke resume 4 a ver 1
 
Ahmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-BakyAhmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-Baky
 
Civil Engineering by Engr. Shahzaib Farooq
Civil Engineering by Engr. Shahzaib FarooqCivil Engineering by Engr. Shahzaib Farooq
Civil Engineering by Engr. Shahzaib Farooq
 
Wicker-B resume
Wicker-B resumeWicker-B resume
Wicker-B resume
 
Joel Cummings Resume
Joel Cummings ResumeJoel Cummings Resume
Joel Cummings Resume
 

Similar to Jul 2015 - Spoerner

Fore_Paul Federal Resume 4Nov2015
Fore_Paul Federal Resume 4Nov2015 Fore_Paul Federal Resume 4Nov2015
Fore_Paul Federal Resume 4Nov2015
Paul Fore
 
Fore_Paul Resume 26Jan2016
Fore_Paul Resume 26Jan2016 Fore_Paul Resume 26Jan2016
Fore_Paul Resume 26Jan2016
Paul Fore
 
Resume - March 2016
Resume - March 2016Resume - March 2016
Resume - March 2016
Brad Keck
 
Jasamine Pettie-Project Manager Resume
Jasamine Pettie-Project Manager ResumeJasamine Pettie-Project Manager Resume
Jasamine Pettie-Project Manager Resume
Jasamine Pettie
 
COL Baker Current Resume
COL Baker Current ResumeCOL Baker Current Resume
COL Baker Current Resume
Steven Baker
 
Bolton_Resume_October_ 2015
Bolton_Resume_October_ 2015Bolton_Resume_October_ 2015
Bolton_Resume_October_ 2015
Joseph Bolton
 
LTC Brian P Loftus Military Bio 21DEC2015
LTC Brian P Loftus Military Bio 21DEC2015LTC Brian P Loftus Military Bio 21DEC2015
LTC Brian P Loftus Military Bio 21DEC2015
Brian Loftus
 
Col Irvin B Lee Resume 9-29-2016
Col Irvin B Lee Resume 9-29-2016Col Irvin B Lee Resume 9-29-2016
Col Irvin B Lee Resume 9-29-2016
Irvin Lee
 
Derek E. Enslow's Résumé UPDATED
Derek E. Enslow's Résumé UPDATEDDerek E. Enslow's Résumé UPDATED
Derek E. Enslow's Résumé UPDATED
Derek Enslow
 
DeNardo James Cyber ORSA
DeNardo James Cyber ORSADeNardo James Cyber ORSA
DeNardo James Cyber ORSA
James DeNardo
 
DBoone Resume - Dec 2015
DBoone Resume - Dec 2015DBoone Resume - Dec 2015
DBoone Resume - Dec 2015
Don Boone
 
Ryan Abel Posting Resume
Ryan Abel Posting ResumeRyan Abel Posting Resume
Ryan Abel Posting Resume
Ryan Abel
 
hewett resume 2016
hewett resume 2016hewett resume 2016
hewett resume 2016
Curt Hewett
 

Similar to Jul 2015 - Spoerner (20)

Resume
ResumeResume
Resume
 
David M Lowry [Resume]
David M Lowry [Resume]David M Lowry [Resume]
David M Lowry [Resume]
 
Steindl Resume PM
Steindl Resume PMSteindl Resume PM
Steindl Resume PM
 
Fore_Paul Federal Resume 4Nov2015
Fore_Paul Federal Resume 4Nov2015 Fore_Paul Federal Resume 4Nov2015
Fore_Paul Federal Resume 4Nov2015
 
Fore_Paul Resume 26Jan2016
Fore_Paul Resume 26Jan2016 Fore_Paul Resume 26Jan2016
Fore_Paul Resume 26Jan2016
 
Resume - March 2016
Resume - March 2016Resume - March 2016
Resume - March 2016
 
Jasamine Pettie-Project Manager Resume
Jasamine Pettie-Project Manager ResumeJasamine Pettie-Project Manager Resume
Jasamine Pettie-Project Manager Resume
 
Daniel Wolfrum Resume
Daniel Wolfrum ResumeDaniel Wolfrum Resume
Daniel Wolfrum Resume
 
COL Baker Current Resume
COL Baker Current ResumeCOL Baker Current Resume
COL Baker Current Resume
 
Bolton_Resume_October_ 2015
Bolton_Resume_October_ 2015Bolton_Resume_October_ 2015
Bolton_Resume_October_ 2015
 
RESUME-M. WILLIAMS
RESUME-M. WILLIAMSRESUME-M. WILLIAMS
RESUME-M. WILLIAMS
 
LTC Brian P Loftus Military Bio 21DEC2015
LTC Brian P Loftus Military Bio 21DEC2015LTC Brian P Loftus Military Bio 21DEC2015
LTC Brian P Loftus Military Bio 21DEC2015
 
Col Irvin B Lee Resume 9-29-2016
Col Irvin B Lee Resume 9-29-2016Col Irvin B Lee Resume 9-29-2016
Col Irvin B Lee Resume 9-29-2016
 
Derek E. Enslow's Résumé UPDATED
Derek E. Enslow's Résumé UPDATEDDerek E. Enslow's Résumé UPDATED
Derek E. Enslow's Résumé UPDATED
 
DeNardo James Cyber ORSA
DeNardo James Cyber ORSADeNardo James Cyber ORSA
DeNardo James Cyber ORSA
 
DBoone Resume - Dec 2015
DBoone Resume - Dec 2015DBoone Resume - Dec 2015
DBoone Resume - Dec 2015
 
GERALD ROMINGER RESUME
GERALD ROMINGER RESUMEGERALD ROMINGER RESUME
GERALD ROMINGER RESUME
 
Ryan Abel Posting Resume
Ryan Abel Posting ResumeRyan Abel Posting Resume
Ryan Abel Posting Resume
 
hewett resume 2016
hewett resume 2016hewett resume 2016
hewett resume 2016
 
Mathews Ian-CMS-
Mathews Ian-CMS-Mathews Ian-CMS-
Mathews Ian-CMS-
 

Jul 2015 - Spoerner

  • 1. Thomas W Spoerner PSC 517 Box 2845 FPO AP 96517 +63-919-273-6900 (Philippines) twspoerner1@yahoo.com SUMMARY: Offering experience in the planning, execution, management and analysis of:  Large and dispersed public works and facility operations, maintenance and construction  Supervision of large organizations staffed with US Army civilians and foreign nationals  Large and complex construction programs and projects  US government contracting activities  Liaison with US Department of State officials for facility construction and maintenance  Advisory and mentoring programs for foreign national officials  Reconstruction and capacity development programs and projects in war zones Professional experience in Asia includes Southwest Asia (Iran, Saudi Arabia, Iraq, Yemen and Afghanistan), South Korea and the Philippines. LAST SECURITY CLEARANCE HELD: Top Secret/Sensitive Compartmented Information CITIZENSHIP: United States of America PROFESSIONAL EXPERIENCE: Self Employed (07/13/2013 – Present) Construction Program Manager; San Carlos City, Philippines Accomplishment:  Provide maintenance and minor construction project management services to renovate a residential building in a rural setting under primitive conditions AC4S (07/25/2012 – 07/12/2013) – Project Manager/Director of Maintenance; Sana’a, Yemen FOREWORD: The Sheraton hotel in Sana’a Yemen housed some 250 US Department of State (DOS) employees and associates and a security detachment including 45 US Marines. On 1 January 2013 the hotel and associated facilities were leased to the US DOS as the Diplomatic Transit Facility – Sana’a. Served as the AC4S Project Manager while the facilities were operated by Sheraton and the AC4S Director of Maintenance for the leased facility. Accomplishment:  Vastly improved life support in 300 bed life support facility which was previously very poorly maintained and operated URS Corporation/General Dynamics (01/15/2012 – 07/31/12) – Project Manager and Construction Manager, Kandahar and Camp Leatherneck, Afghanistan Accomplishment:  Provided project management expertise to the Expeditionary Prime Base Engineer Emergency Force Squadron – Afghanistan and interfaced directly with customers
  • 2. US Forces - Iraq (04/12/2009 – 07/31/2011) – Senior Security Infrastructure Construction Program Manager, Baghdad, Iraq, GS - 0801 – 14 Accomplishments:  Launched a large six multi-story building project that was floundering and closed project on schedule and under budget  Completed a large Ministry of Defense training complex with a full range of educational and life support facilities  Carried out duties in consultation with the US Department of State and Iraqi Ministries  Created and managed systems and procedures for archive of 2,400 projects executed over seven years and valued at $6.4 billion Gulf Region Division, US Army Corps of Engineers (06/08/2008 - 04/11/2009) - Senior Construction Program Manager and Divisional Contracting Officer Representative: GS - 0340 – 14, Baghdad, Iraq Accomplishments:  Reconstructed or newly constructed multiple potable water plants, wastewater plants, pump stations, weirs and drainage canals leading to reclamation of 155,000 hectares of irrigated farmland and improvements in public health throughout Iraq  Supervised a multi-national team of 25 Construction Engineers and QA Representatives  Provided on-going Serve as Division Contracting Officer Representative HQ FORSCOM, G-1 Engineer, Plans and Programs (11/01/2006 – 06/08/2008) - General Engineer, Pay Grade: YD - 0801 – 2, Fort McPherson, Georgia, United States Accomplishment:  Worked with Army installation Senior Mission Commanders to prioritize construction projects in accordance with Army Force Management (reduction of forces in Europe and BRAC re-alignments) and installation missions US Army Installation Management Agency - Korea, (01/20/2005 - 10/30/2006) - Director of Public Works (Supervisory General Engineer), GS-0801 -13, Munsan City and Panmunjom in the Demilitarized Zone (DMZ), Republic of Korea Accomplishment:  Served as Director of Public Works to prepare 800 buildings at six US Army installations for turnover to the Republic of Korea EDUCATION and TRAINING:  International Business Management, GPA 4.0, Troy State University  B.S., Chemistry, GPA 3.0, Arizona State University  Army Management Staff College: - Sustaining Installation Leadership and Management - Personnel Management for Executives I, II and III AWARDS:  Joint Civilian Service Commendation, US Forces-Iraq, 2011  Member of the United Nations Military Armistice Commission - 2005  Special Act Awards – 2003 and 2005