Abstract
A job scheduling mathematical model was applied to a paint manufacturing company in Benin City area of Nigeria
with a view to develop a framework for the proper scheduling of jobs (orders) in the paint manufacturing company.
The problem is addressed by considering customers (n) to be served (where n is large); in what way should
customers’ order be processed such that the company’s profit is maximized while the customers are not
unnecessarily delayed? The paper addressed the problem by using makespan as a measure of performance while the
job orders were sequentially scheduled according to order of priority to achieve optimum results. The mean
makespan for the CDS heuristic is 35.99, for A1 is 36.08 while for the usual traditional serial order (USO) method is
40.91. The average gain with the application of CDS heuristic is 4.962 and for A1 is 4.912. The results show that
CDS and A1 heuristics are preferred to the usual method of USO. Accordingly, the CDS heuristic gives the best
makespan results, followed by A1 heuristic.
Keywords: Paint Manufacturing, Job Scheduling, Mathematical Model, Makespan, Customers’ Order.
1. Introdction
Paint is a substance used for decorating or protecting a surface. It is a liquid mixture, usually consisting of a solid
pigment suspended in a liquid, that when applied to a surface dries to form a hard thin decorative or protective
coating. It a fluid or semi–fluid material which may be applied to a surface in relative thin layers and which changes
to a solid, may or may not be reversible, and may occur by evaporation of solvent or by chemical reaction or by a
combination of the two. It usually consists of a binder or a pigment which contributes opacity, color, and hardness,
and a solvent or thinner which controls the consistency. In 1500 BC, the Egyptians developed the art of painting
using a wide number and variety of colors. They also discovered the present day vanishes using naturally occurring
resins as their film forming ingredient (Odior and Oyawale, 2009).
There are numerous types of paints available in the market many of which incorporate special additives to provide
decoration or protection for specific applications. The two basic types of paint available are either water-thinned or
turpentine-thinned. Water-thinned paints for example are usually used on interior walls and ceilings, primarily
because they dry quickly, brushes or rollers clean up easily in water, the paint is less smelly, and doesn't yellow with
age. Furthermore, they are available in a range of gloss levels to suit specific room requirements and are resistant to
the alkaline present in masonry. Turpentine-thinned paints on the other hand provide a hard durable surface, are
easily cleaned, and seal in tanning stains from timber. They also can give a very high gloss.

2 Paint Production Process
There are four major groups of raw materials which are compounded together to form paint and they include;
pigments, binder, solvent, and additives.
2.1 Pigments
Pigments are naturally occurring or synthetically produced fine powders which are dispersed or ground into a
binding medium to provide the color and covering power as their major function in paints. Most natural pigments
are inorganic in nature while others pigments are synthesized.
The organic pigments which make up the wide spectrum of bright colors available to the paint manufacturers are all
synthetically produced. Prime pigments are basically concerned with the main function of providing color and
opacity and they are either inorganic or organic in chemical structure.
2.2 Binder
The binder is a resin or polymer which is usually organic compound of high molecular weight, and each large
molecule can contain many repeating parts in its chemical structure. The binder or resin binds the component
pigments together into a cohesive, continuous film and provides the adhesive power for the paint to stick to a
substrate. There are natural and synthetic resins, A synthetic resin based on vegetable oils is the alkyd resin. This is a
polymer condensed from vegetable oil with a polyacid and a polyalcohol. The oil component provides the gloss,
drying ability, flexibility and exterior durability while the other ingredients give the hardness, resistance properties

                                                           18
Industrial Engineering Letters                                                                        www.iiste.org
ISSN 2224-6096 (print) ISSN 2225-0581 (online)
Vol 2, No.5, 2012


and speed of dry potential.
2.3 Solvent
This is the third major component of paint and has the major purpose of reducing or thinning paints to a suitable
handling consistency or "viscosity" for ease of manufacture and application. After the paint has been applied, the
solvent evaporates and leaves the dry paint film on the substrate. Solvents used are either organic compounds or
water. The major sources of organic solvents are petroleum refining, fermentation of vegetable matter, and chemical
synthesis. They are generally divided into two groups, hydrocarbon solvents made up of carbon and hydrogen
atoms, and oxygenated solvents which also contain oxygen atoms. Water is another important solvent used in paints.
This provides obvious advantages in cost, availability, flammability and toxicity. The widespread use of water in the
majority of today's house paints is one of the major reasons for the overwhelming popularity of vinyl and acrylic
latex paints.
2.4 Additives
This group of chemicals is comprised of a vast multitude of proprietary and in-house compounds which are
employed by paint makers at low levels (usually < 6.5%) in coatings to perform quite specific functions or to
counter adverse side-effects of other components. For example, turps-thinned paints contain drying agents which
speed up the drying process. They also contain anti-skinnning agents to prevent the paint forming into a tough skin-
like covering in the can.
3. Theory
In order to schedule the processing of customers’ orders such that maximum profit is obtained, the principles
guiding flow shop scheduling are adopted as presented in the mathematical frame work. In this case customers are
free to bring their jobs at any time. However, each customer’s order (paint) passes through the machines in the same
order. Since different quantities are brought for processing and the materials for paint making have the same surface
area characteristics, each order requires different amounts of processing time in hours as presented in the scheduling
frame work.
3.1 Single Machine Sequencing:
A single machine sequencing is a flow shop in which the jobs visit the machines in the same sequence. The shop
characteristics of a single machine shop is given as:

 n / m // F /   F
where n is the number of jobs in the shop
      m is the number of machines in the shop
      F is the flow shop

     F is the mean flow time.
n / m is referred to as the hardware and F /   F is referred to as the software of the system.
3.2 Johnson’s 2- Machine Algorithm
Johnson’s 2 – machine algorithm is a process in which the jobs are scheduled in the machines in such a sequence
that gives the minimum makespan. A typical case of Johnson’s 2-machine algorithm with n jobs is presented in




                                                            19
Industrial Engineering Letters                                                                            www.iiste.org
ISSN 2224-6096 (print) ISSN 2225-0581 (online)
Vol 2, No.5, 2012


Figure 1.




The flow time for job J in the kth position is given by
                F(k) = P(1) + P(2) + P(3) + ……… + P(k)
                                    k
             ∴ F(k) =          ∑ P (i )
                                   i =1
                                                                      1

where P(i) is the processing time for the job in the ith position in the sequence.
This algorithm supposes that we have (n) jobs to be scheduled on two machines i.e. J1, J2, …, Jn,
Then n positions are possible.
                               n                    n        k
Total flow time FT =       ∑ F (k ) =
                           k =1
                                                ∑∑ P(i)
                                                k =1 i =1

                                        n   k

                                   ∑∑ P(i)
                                    k =1 i =1
Mean flow time    F =                                                         2
                                            n
Generally, for n position we have;
                           n

                      ∑ (n − i + 1) P(i)
                       i =1

                       n           k                     n

                    ∑∑ P(i)
                     k =1 i =1
                                                        ∑ (n − i + 1) P(i)
                                                        i =1
                                                =                                 3
                                    n                            n
The optimizing sequence can be obtained from the following process:
In this case we have (n) jobs to be scheduled on two machines i.e. J1, J2, …, Jn. The optimal solution by Johnson
algorithm is obtained as follows:
Step 1: Set k =1, l = n
Step 2: Set the list of unscheduled jobs = {J1, J2, ..., Jn}
Step 3: Find the smallest processing times on first and second machines for the currently unscheduled jobs
Step 4: If the smallest processing time obtained in step 3 for Ji is on the first machine then schedule Ji in kth position
of processing sequence. Then delete the Ji job from the list of unscheduled and decrease k by 1.
Step 5: If the smallest processing time obtained in step 3 for Ji is on the second machine then schedule Ji in the lth
position of processing sequence. Then delete the Ji job from the current list of unscheduled jobs and decrease l by


                                                                             20
Industrial Engineering Letters                                                                          www.iiste.org
ISSN 2224-6096 (print) ISSN 2225-0581 (online)
Vol 2, No.5, 2012


1.
Step 6: Repeat steps 3 to 5 for the remaining unscheduled jobs until all the J jobs are scheduled.
The main objective of this Johnson algorithm of sequentially scheduling the jobs to the two machines from step 1 to
step 6 is to achieve the minimum total makespan for optimum job scheduling, which is obtained by summing up the
various processing times obtained.
4. Material and Method
The study was conducted on a paint company located in Benin City area of Nigeria which specializes in the
production of different grades of paint. An important problem faced in the paint production system is that of
determining the time it takes to produce a unit product and meeting the customers’ orders on time at a minimum cost
without too much delay. The paint production process by the company could be broken down into eight basic
activities namely; material drying, weighing of materials, material mixing, dissolving of materials, material filtering,
material stirring, inspection and quality control and product packaging. These basic operational activities are
presented in Figure 2, while the key to the various unit operations is presented in Table 1.




                  Fig. 2: The Basic Activities in Paint Production Process
Table 1: Key to the various unit operations
Unit operation                       Purpose
Drying of raw materials              The raw materials are properly beneficiated and dried
Weighing of raw materials            To weigh the raw materials according to ratios for paint formulation
Material mixing                      The raw materials are properly mixed
Dissolving of materials              The mixture of the raw materials are properly dissolved in a solvent
Material filtering                   The dissolved materials are properly filtered
Material stirring                    The filtered materials are properly stirred.
Inspection and quality control       The produced paint materials are inspected for good quality control
Product packaging                    The inspected products are arranged in packages for customers.
Data were collected for a period of 24 different weeks for 24 jobs (orders). The processing time, which is the amount
of time (hours) required to process each customer’s order on each machine, is considered close to reality. The
scheduling period covers one week which implies that all customers’ orders for a week are considered and the
scheduling activities are prepared on Monday morning before processing of jobs commences. Normally the

                                                          21
Industrial Engineering Letters                                                                           www.iiste.org
ISSN 2224-6096 (print) ISSN 2225-0581 (online)
Vol 2, No.5, 2012


processing of customer’s orders (jobs) are on a first-come-first-serve basis. Therefore, the first customer to arrive for
service is given a serial order 1, the second customer is given serial order 2, while the third is given serial order 3,
etc. However, since it was discovered that the firm processes jobs using this serial order, we referred to this method
as usual serial order (USO). The method was included in the program so that it can be evaluated alongside the
solution methods. The principle here is to monitor the completion time of the last scheduled customer’s order. The
three methods are adopted and they include: the A1, CDS, and USO, which represent two developed methods
(Oluleye et al. 2007) and the traditional method used by the firm.
5 Results and Discussion
Table 2 shows the makespan obtained for the three methods (A1, CDS and USO) for the 24-week study period. For
all the three methods, the makespan obtained at the fourteenth period were the minimum, showing 33.40 hrs, 33.40
hrs, and 36.42hrs respectively for the A1, CDS and USO methods. Similarly, the makespan obtained for the three
methods at the eleventh week were the maximum, showing 40.00hrs, 38.42hrs, and 43.26hrs respectively. It is seen
that from the minimum makespan for instance, A1 and CDS methods performed equally, while the traditional
approach of USO performed poorly. This implies that if the old approach is continued the jobs for fourteenth week
would still stay for an excess of 3.02hrs in the process before being completed which is equivalent to about an extra
half a day wasted in a day of 8 working hours.
                   Table 2: Makespan results for 24 weeks.
                                  Makespan Results
                      Week      A1      CDE           USO
                      1         32.25   37.24         42.24
                      2         35.35   35.34         40.24
                      3         35.32   35.33         40.45
                      4         35.12   35.12         42.42
                      5         36.04   36.06         41.52
                      6         37.20   37.18         41.46
                      7         36.52   36.54         41.08
                      8         35.33   35.54         41.42
                      9         36.04   36.00         43.16
                      10        37.42   37.40         40.54
                      11        40.00   38.42         43.26
                      12        35.24   35.24         41.54
                      13        35.70   35.72         42.50
                      14        33.49   33.40         36.42
                      15        35.82   35.80         41.28
                      16        35.72   35.70         43.22
                      17        36.32   36.30         40.54
                      18        35.16   35.18         41.27
                      19        35.18   34.94         41.34
                      20        35.24   34.26         41.28
                      21        36.32   36.02         38.42
                      22        35.82   35.64         39.08
                      23        38.26   38.12         38.96
                      24        36.12   37.08         40.02




                                                           22
Industrial Engineering Letters                                                                       www.iiste.org
ISSN 2224-6096 (print) ISSN 2225-0581 (online)
Vol 2, No.5, 2012



                                   A1        CDE        USO
   Makespan




                                          week


Fig.3 Graph of makesapn from the three methods
Table 3 shows the gain in scheduling length when pair-wise comparison of (SO and A1) and (SO and CDS) are
made. A critically look through weekly gains reviews that on the average, the (SO – CDS) gains is more than (SO –
A1) gains. Table 4 shows the mean values and standard deviations of the makespan. Thus the method with the least
mean makespan is CDS, having a mean of 35.99hrs. This is closely followed by A1 with a mean makespan of 36.08
hrs. The worst method remains the traditional with a mean makespan of 40.91hrs. Thus, it is attractive to utilize the
CDS method of scheduling jobs on machines for the firm being considered. A further analysis was carried out to find
the number of times the various solution methods give the best result as presented in Table 5. It was found that in
none of the 24 occurrences did the SO method give the best result. The A1 method shows the best results in 6
occurrences, while for all the 24 occurrences, the CDS method showed the best results in 14 occurrences and this
gives credence to the CDS method.




                                                         23
Industrial Engineering Letters                                                                www.iiste.org
ISSN 2224-6096 (print) ISSN 2225-0581 (online)
Vol 2, No.5, 2012


Table 3: Gains in scheduling operation
                                Scheduling Gains
                       Week     USO – A1       USO – CDS
                          1          4.99          5.00
                          2          4.89          4.90
                          3          5.13          5.12
                          4          7.30          7.30
                          5          5.48          5.46
                          6          4.26          4.28
                          7          4.56          4.54
                          8          6.09          5.88
                          9          7.12          7.16
                         10          3.12          3.14
                         11          3.26          4.84
                         12          6.30          6.30
                         13          6.80          6.78
                         14          3.02          3.02
                         15          5.46          5.48
                         16          7.50          7.52
                         17          4.22          4.24
                         18          6.22          6.09
                         19          6.16          6.40
                         20          6.04          6.02
                         21          2.10          2.40
                         22          3.26          3.44
                         23          0.70          0.84
                         24          3.90          2.94
                Scheduling Gain




                                                                                   USO – A1
                                                                                   USO – CDS




                                                             Week


                            Fig. 4 Graph of scheduling gains for the two methods




                                                             24
Industrial Engineering Letters                                                                       www.iiste.org
ISSN 2224-6096 (print) ISSN 2225-0581 (online)
Vol 2, No.5, 2012




         Table 4: Process mean and standard deviation.
            Method        Mean Makespan             Standard Deviation
              A1              36.07875                   1.28714
             CDS              35.98958                   1.15944
             SO               40.91333                 1.54473


           Table 5: The best solution method.
                          Methods     Number of Times
                            A1              6
                           CDS             14
                            SO              0
                         CDS = A1           4


6 Conclusion
Johnson 2-machine algorithm has been successfully applied to job scheduling in a paint manufacturing company. It
has been demonstrated that the conventional approach in scheduling customer orders for oil paint production
processing in paint manufacturing company based on the firm usual serial order method in which jobs are scheduled
as they arrive for processing fails to satisfy the profit maximization objective of the firm. Three methods were used
to analyse the data collected for the paint manufacturing firm. The three methods are A1, CDS, and USO, which
represent two methods (A1 and CDS) developed and the traditional method (USO) used by the firm. Evidently, CDS
performs best, followed by A1, while the worst performance was observed with USO. Therefore, adopting the CDS
method will increase the optimum performance of the firm and it was therefore recommended.



References
Campbell, H G; Dudek, R A; Smith, M L (1970). A heuristic algorithm for n-job, m-machine sequencing problem.
Journal of Management Science. 16: 630-637
Chen, J.C.; Cheng-Chun Wu; Chia-Wen Chen and Kou-Huang Chen (2012): Flexible job shop scheduling with
parallel machines using Genetic Algorithm and Grouping Genetic Algorithm. Journal of Expert Systems with
Applications, 39 (11): 10016–10021
Chen, Z L (1999). Simultaneous job scheduling and resource allocation on parallel machines. Department of
Systems Engineering, University of Pennsylvania, Philadelphia, PA 19104-6315..
Du, J (1993). Minimizing mean flow time in two-machine open shops and flow shops. J. Algorithms. 14: 24–44.
Jarvis, W. J. (1980). Maintenance planning and scheduling in petrochemical manufacturing environment. National
Petroleum Refineries Association, Wash. DC, MC 80: (2) 1-12.
Kanate P. and Mungwattana, A. (2010): Algorithm for Solving Job Shop Scheduling Problem Based on machine
availability constraint. International Journal on Computer Science and Engineering Vol. 2 (5): 1919-1925
Kesen, S.E. and Güngor, Z. (2012). Job scheduling in virtual manufacturing cells with lot-streaming strategy: a new
mathematical model formulation and a genetic algorithm approach. Journal of the Operational Research Society, 63:
683–695.
Liaw, C F (2008). An efficient simple metaheuristic for minimizing the makespan in two-machine no-wait job shops.
J. Computers and Operations Research. 35 (10): 3276-3283
Mignouna, H.D., Abang, M.M. and Asiedu, R. (2003) “Harnessing modern biotechnology for tropical tuber crop
improvement: yam (Dioscorea spp.) molecular breeding. African Journal of Biotechnology, 2(12): 478-485

Odior, A.O. and Oyawale, F.A. (2009) Application of Mathematical Model to Optimization of the Production
Capacity of Paint Manufacturing Company. Pacific Journal of Science and Technology, Vol 10, No.1 pp 178- 184

                                                         25
Industrial Engineering Letters                                                                     www.iiste.org
ISSN 2224-6096 (print) ISSN 2225-0581 (online)
Vol 2, No.5, 2012



Oladimeji, F O 1; Oke, S A; Oluwatoyin, P. P (2008). A multi-criteria model for maintenance job scheduling. Maejo
International J. Science and Technology. 2 (1): 1-12.

Oluleye, A E; Oyetunji, E; Ogunwolu, L; Oke, S A (2007). Job scheduling in a small scale gari processing firm in
Nigeria. Pacific J. Science and Technology. 8 (1): 137-143.




                                                       26
This academic article was published by The International Institute for Science,
Technology and Education (IISTE). The IISTE is a pioneer in the Open Access
Publishing service based in the U.S. and Europe. The aim of the institute is
Accelerating Global Knowledge Sharing.

More information about the publisher can be found in the IISTE’s homepage:
http://www.iiste.org


The IISTE is currently hosting more than 30 peer-reviewed academic journals and
collaborating with academic institutions around the world. Prospective authors of
IISTE journals can find the submission instruction on the following page:
http://www.iiste.org/Journals/

The IISTE editorial team promises to the review and publish all the qualified
submissions in a fast manner. All the journals articles are available online to the
readers all over the world without financial, legal, or technical barriers other than
those inseparable from gaining access to the internet itself. Printed version of the
journals is also available upon request of readers and authors.

IISTE Knowledge Sharing Partners

EBSCO, Index Copernicus, Ulrich's Periodicals Directory, JournalTOCS, PKP Open
Archives Harvester, Bielefeld Academic Search Engine, Elektronische
Zeitschriftenbibliothek EZB, Open J-Gate, OCLC WorldCat, Universe Digtial
Library , NewJour, Google Scholar

More Related Content

Viewers also liked

How to Close Period in Oracle Apps Inventory
How to Close Period in Oracle Apps Inventory How to Close Period in Oracle Apps Inventory
How to Close Period in Oracle Apps Inventory
Bizinsight Consulting Inc
 
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
videoaakash15
 
Opm inv user guide
Opm inv user guideOpm inv user guide
Opm inv user guide
Raaj Nagulapalli
 
Oracle Inventory – Inventory Controls
Oracle Inventory – Inventory ControlsOracle Inventory – Inventory Controls
Oracle Inventory – Inventory Controls
Boopathy CS
 
Oracle Process Manufacturing
Oracle Process ManufacturingOracle Process Manufacturing
Oracle Process Manufacturing
Blink Consulting
 
20150202.pdf
20150202.pdf20150202.pdf
20150202.pdf
Narendra Reddy
 
Elshayeb Expense Subinventory And Items Scenario
Elshayeb Expense Subinventory And Items ScenarioElshayeb Expense Subinventory And Items Scenario
Elshayeb Expense Subinventory And Items Scenario
Ahmed Elshayeb
 
Oracle Purchasing R12 Setup Steps
Oracle Purchasing R12 Setup StepsOracle Purchasing R12 Setup Steps
Oracle Purchasing R12 Setup Steps
Ahmed Elshayeb
 

Viewers also liked (8)

How to Close Period in Oracle Apps Inventory
How to Close Period in Oracle Apps Inventory How to Close Period in Oracle Apps Inventory
How to Close Period in Oracle Apps Inventory
 
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
 
Opm inv user guide
Opm inv user guideOpm inv user guide
Opm inv user guide
 
Oracle Inventory – Inventory Controls
Oracle Inventory – Inventory ControlsOracle Inventory – Inventory Controls
Oracle Inventory – Inventory Controls
 
Oracle Process Manufacturing
Oracle Process ManufacturingOracle Process Manufacturing
Oracle Process Manufacturing
 
20150202.pdf
20150202.pdf20150202.pdf
20150202.pdf
 
Elshayeb Expense Subinventory And Items Scenario
Elshayeb Expense Subinventory And Items ScenarioElshayeb Expense Subinventory And Items Scenario
Elshayeb Expense Subinventory And Items Scenario
 
Oracle Purchasing R12 Setup Steps
Oracle Purchasing R12 Setup StepsOracle Purchasing R12 Setup Steps
Oracle Purchasing R12 Setup Steps
 

Similar to Job scheduling in a paint manufacturing company in benin city

Linear Programming 1
Linear Programming 1Linear Programming 1
Linear Programming 1
irsa javed
 
11.branch and bound technique for three stage flow shop scheduling problem in...
11.branch and bound technique for three stage flow shop scheduling problem in...11.branch and bound technique for three stage flow shop scheduling problem in...
11.branch and bound technique for three stage flow shop scheduling problem in...
Alexander Decker
 
Branch and bound technique for three stage flow shop scheduling problem inclu...
Branch and bound technique for three stage flow shop scheduling problem inclu...Branch and bound technique for three stage flow shop scheduling problem inclu...
Branch and bound technique for three stage flow shop scheduling problem inclu...
Alexander Decker
 
Better Developers
Better DevelopersBetter Developers
Better Developers
Mike Donikian
 
Application of branch and bound method for optimal two stage flow shop schedu...
Application of branch and bound method for optimal two stage flow shop schedu...Application of branch and bound method for optimal two stage flow shop schedu...
Application of branch and bound method for optimal two stage flow shop schedu...
Alexander Decker
 
11.application of branch and bound method for optimal two stage flow shop sch...
11.application of branch and bound method for optimal two stage flow shop sch...11.application of branch and bound method for optimal two stage flow shop sch...
11.application of branch and bound method for optimal two stage flow shop sch...
Alexander Decker
 
Quantum Business in Japanese Market
Quantum Business in Japanese MarketQuantum Business in Japanese Market
Quantum Business in Japanese Market
Yuichiro MInato
 
Nonconvex separable programming problem for optimal raw material mix in flexi...
Nonconvex separable programming problem for optimal raw material mix in flexi...Nonconvex separable programming problem for optimal raw material mix in flexi...
Nonconvex separable programming problem for optimal raw material mix in flexi...
Alexander Decker
 
Bicriteria in n x 2 flow shop scheduling problem under specified rental polic...
Bicriteria in n x 2 flow shop scheduling problem under specified rental polic...Bicriteria in n x 2 flow shop scheduling problem under specified rental polic...
Bicriteria in n x 2 flow shop scheduling problem under specified rental polic...
Alexander Decker
 
11.bicriteria in n x 0002www.iiste.org call for paper flow shop scheduling pr...
11.bicriteria in n x 0002www.iiste.org call for paper flow shop scheduling pr...11.bicriteria in n x 0002www.iiste.org call for paper flow shop scheduling pr...
11.bicriteria in n x 0002www.iiste.org call for paper flow shop scheduling pr...
Alexander Decker
 
202003261537530756sanjeev_eco_Linear_Programming.pdf
202003261537530756sanjeev_eco_Linear_Programming.pdf202003261537530756sanjeev_eco_Linear_Programming.pdf
202003261537530756sanjeev_eco_Linear_Programming.pdf
AnshitTanwar
 
Bus 103 final 2014
Bus 103 final 2014Bus 103 final 2014
Bus 103 final 2014
Durrah Abdulaziz
 
Planning of Supply when lead time uncertain: trade-off between holding cost a...
Planning of Supply when lead time uncertain: trade-off between holding cost a...Planning of Supply when lead time uncertain: trade-off between holding cost a...
Planning of Supply when lead time uncertain: trade-off between holding cost a...
ijsrd.com
 
Manufacture of a Biodegradable Detergent on Small Scale
Manufacture of a Biodegradable Detergent on Small ScaleManufacture of a Biodegradable Detergent on Small Scale
Manufacture of a Biodegradable Detergent on Small Scale
CSCJournals
 
Lecture27 linear programming
Lecture27 linear programmingLecture27 linear programming
Lecture27 linear programming
Dr Sandeep Kumar Poonia
 
dynamic-programming
dynamic-programmingdynamic-programming
dynamic-programming
MuhammadSheraz836877
 
11.flow shop scheduling problem, processing time associated with probabilitie...
11.flow shop scheduling problem, processing time associated with probabilitie...11.flow shop scheduling problem, processing time associated with probabilitie...
11.flow shop scheduling problem, processing time associated with probabilitie...
Alexander Decker
 
Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...
Alexander Decker
 
memory_allocation_use1.ppt
memory_allocation_use1.pptmemory_allocation_use1.ppt
memory_allocation_use1.ppt
KanchanTiwari45
 
Vcs slides on or 2014
Vcs slides on or 2014Vcs slides on or 2014
Vcs slides on or 2014
Shakti Ranjan
 

Similar to Job scheduling in a paint manufacturing company in benin city (20)

Linear Programming 1
Linear Programming 1Linear Programming 1
Linear Programming 1
 
11.branch and bound technique for three stage flow shop scheduling problem in...
11.branch and bound technique for three stage flow shop scheduling problem in...11.branch and bound technique for three stage flow shop scheduling problem in...
11.branch and bound technique for three stage flow shop scheduling problem in...
 
Branch and bound technique for three stage flow shop scheduling problem inclu...
Branch and bound technique for three stage flow shop scheduling problem inclu...Branch and bound technique for three stage flow shop scheduling problem inclu...
Branch and bound technique for three stage flow shop scheduling problem inclu...
 
Better Developers
Better DevelopersBetter Developers
Better Developers
 
Application of branch and bound method for optimal two stage flow shop schedu...
Application of branch and bound method for optimal two stage flow shop schedu...Application of branch and bound method for optimal two stage flow shop schedu...
Application of branch and bound method for optimal two stage flow shop schedu...
 
11.application of branch and bound method for optimal two stage flow shop sch...
11.application of branch and bound method for optimal two stage flow shop sch...11.application of branch and bound method for optimal two stage flow shop sch...
11.application of branch and bound method for optimal two stage flow shop sch...
 
Quantum Business in Japanese Market
Quantum Business in Japanese MarketQuantum Business in Japanese Market
Quantum Business in Japanese Market
 
Nonconvex separable programming problem for optimal raw material mix in flexi...
Nonconvex separable programming problem for optimal raw material mix in flexi...Nonconvex separable programming problem for optimal raw material mix in flexi...
Nonconvex separable programming problem for optimal raw material mix in flexi...
 
Bicriteria in n x 2 flow shop scheduling problem under specified rental polic...
Bicriteria in n x 2 flow shop scheduling problem under specified rental polic...Bicriteria in n x 2 flow shop scheduling problem under specified rental polic...
Bicriteria in n x 2 flow shop scheduling problem under specified rental polic...
 
11.bicriteria in n x 0002www.iiste.org call for paper flow shop scheduling pr...
11.bicriteria in n x 0002www.iiste.org call for paper flow shop scheduling pr...11.bicriteria in n x 0002www.iiste.org call for paper flow shop scheduling pr...
11.bicriteria in n x 0002www.iiste.org call for paper flow shop scheduling pr...
 
202003261537530756sanjeev_eco_Linear_Programming.pdf
202003261537530756sanjeev_eco_Linear_Programming.pdf202003261537530756sanjeev_eco_Linear_Programming.pdf
202003261537530756sanjeev_eco_Linear_Programming.pdf
 
Bus 103 final 2014
Bus 103 final 2014Bus 103 final 2014
Bus 103 final 2014
 
Planning of Supply when lead time uncertain: trade-off between holding cost a...
Planning of Supply when lead time uncertain: trade-off between holding cost a...Planning of Supply when lead time uncertain: trade-off between holding cost a...
Planning of Supply when lead time uncertain: trade-off between holding cost a...
 
Manufacture of a Biodegradable Detergent on Small Scale
Manufacture of a Biodegradable Detergent on Small ScaleManufacture of a Biodegradable Detergent on Small Scale
Manufacture of a Biodegradable Detergent on Small Scale
 
Lecture27 linear programming
Lecture27 linear programmingLecture27 linear programming
Lecture27 linear programming
 
dynamic-programming
dynamic-programmingdynamic-programming
dynamic-programming
 
11.flow shop scheduling problem, processing time associated with probabilitie...
11.flow shop scheduling problem, processing time associated with probabilitie...11.flow shop scheduling problem, processing time associated with probabilitie...
11.flow shop scheduling problem, processing time associated with probabilitie...
 
Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...
 
memory_allocation_use1.ppt
memory_allocation_use1.pptmemory_allocation_use1.ppt
memory_allocation_use1.ppt
 
Vcs slides on or 2014
Vcs slides on or 2014Vcs slides on or 2014
Vcs slides on or 2014
 

More from Alexander Decker

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...
Alexander Decker
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale in
Alexander Decker
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websites
Alexander Decker
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banks
Alexander Decker
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized d
Alexander Decker
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistance
Alexander Decker
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifham
Alexander Decker
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibia
Alexander Decker
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school children
Alexander Decker
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banks
Alexander Decker
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget for
Alexander Decker
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjab
Alexander Decker
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...
Alexander Decker
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incremental
Alexander Decker
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniques
Alexander Decker
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo db
Alexander Decker
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloud
Alexander Decker
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveraged
Alexander Decker
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenya
Alexander Decker
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health of
Alexander Decker
 

More from Alexander Decker (20)

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale in
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websites
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banks
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized d
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistance
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifham
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibia
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school children
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banks
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget for
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjab
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incremental
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniques
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo db
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloud
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveraged
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenya
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health of
 

Recently uploaded

How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
MJ Global
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Kalyan Satta Matka Guessing Matka Result Main Bazar chart
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
my Pandit
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
AnnySerafinaLove
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
katiejasper96
 
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdfHOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
46adnanshahzad
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
list of states and organizations .pdf
list of  states  and  organizations .pdflist of  states  and  organizations .pdf
list of states and organizations .pdf
Rbc Rbcua
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
Lacey Max
 
Top 10 Free Accounting and Bookkeeping Apps for Small Businesses
Top 10 Free Accounting and Bookkeeping Apps for Small BusinessesTop 10 Free Accounting and Bookkeeping Apps for Small Businesses
Top 10 Free Accounting and Bookkeeping Apps for Small Businesses
YourLegal Accounting
 
Profiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdfProfiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdf
TTop Threads
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
my Pandit
 
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Lviv Startup Club
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
thesiliconleaders
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
Alexandra Fulford
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
JoeYangGreatMachiner
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Neil Horowitz
 

Recently uploaded (20)

How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
 
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdfHOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
list of states and organizations .pdf
list of  states  and  organizations .pdflist of  states  and  organizations .pdf
list of states and organizations .pdf
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
 
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
 
Top 10 Free Accounting and Bookkeeping Apps for Small Businesses
Top 10 Free Accounting and Bookkeeping Apps for Small BusinessesTop 10 Free Accounting and Bookkeeping Apps for Small Businesses
Top 10 Free Accounting and Bookkeeping Apps for Small Businesses
 
Profiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdfProfiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdf
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
 
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
 

Job scheduling in a paint manufacturing company in benin city

  • 1. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (print) ISSN 2225-0581 (online) Vol 2, No.5, 2012 Job Scheduling in A Paint Manufacturing Company in Benin City Andrew O. Odior Production Engineering Department, University of Benin, Nigeria E-mail: waddnis@yahoo.com Abstract A job scheduling mathematical model was applied to a paint manufacturing company in Benin City area of Nigeria with a view to develop a framework for the proper scheduling of jobs (orders) in the paint manufacturing company. The problem is addressed by considering customers (n) to be served (where n is large); in what way should customers’ order be processed such that the company’s profit is maximized while the customers are not unnecessarily delayed? The paper addressed the problem by using makespan as a measure of performance while the job orders were sequentially scheduled according to order of priority to achieve optimum results. The mean makespan for the CDS heuristic is 35.99, for A1 is 36.08 while for the usual traditional serial order (USO) method is 40.91. The average gain with the application of CDS heuristic is 4.962 and for A1 is 4.912. The results show that CDS and A1 heuristics are preferred to the usual method of USO. Accordingly, the CDS heuristic gives the best makespan results, followed by A1 heuristic. Keywords: Paint Manufacturing, Job Scheduling, Mathematical Model, Makespan, Customers’ Order. 1. Introdction Paint is a substance used for decorating or protecting a surface. It is a liquid mixture, usually consisting of a solid pigment suspended in a liquid, that when applied to a surface dries to form a hard thin decorative or protective coating. It a fluid or semi–fluid material which may be applied to a surface in relative thin layers and which changes to a solid, may or may not be reversible, and may occur by evaporation of solvent or by chemical reaction or by a combination of the two. It usually consists of a binder or a pigment which contributes opacity, color, and hardness, and a solvent or thinner which controls the consistency. In 1500 BC, the Egyptians developed the art of painting using a wide number and variety of colors. They also discovered the present day vanishes using naturally occurring resins as their film forming ingredient (Odior and Oyawale, 2009). There are numerous types of paints available in the market many of which incorporate special additives to provide decoration or protection for specific applications. The two basic types of paint available are either water-thinned or turpentine-thinned. Water-thinned paints for example are usually used on interior walls and ceilings, primarily because they dry quickly, brushes or rollers clean up easily in water, the paint is less smelly, and doesn't yellow with age. Furthermore, they are available in a range of gloss levels to suit specific room requirements and are resistant to the alkaline present in masonry. Turpentine-thinned paints on the other hand provide a hard durable surface, are easily cleaned, and seal in tanning stains from timber. They also can give a very high gloss. 2 Paint Production Process There are four major groups of raw materials which are compounded together to form paint and they include; pigments, binder, solvent, and additives. 2.1 Pigments Pigments are naturally occurring or synthetically produced fine powders which are dispersed or ground into a binding medium to provide the color and covering power as their major function in paints. Most natural pigments are inorganic in nature while others pigments are synthesized. The organic pigments which make up the wide spectrum of bright colors available to the paint manufacturers are all synthetically produced. Prime pigments are basically concerned with the main function of providing color and opacity and they are either inorganic or organic in chemical structure. 2.2 Binder The binder is a resin or polymer which is usually organic compound of high molecular weight, and each large molecule can contain many repeating parts in its chemical structure. The binder or resin binds the component pigments together into a cohesive, continuous film and provides the adhesive power for the paint to stick to a substrate. There are natural and synthetic resins, A synthetic resin based on vegetable oils is the alkyd resin. This is a polymer condensed from vegetable oil with a polyacid and a polyalcohol. The oil component provides the gloss, drying ability, flexibility and exterior durability while the other ingredients give the hardness, resistance properties 18
  • 2. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (print) ISSN 2225-0581 (online) Vol 2, No.5, 2012 and speed of dry potential. 2.3 Solvent This is the third major component of paint and has the major purpose of reducing or thinning paints to a suitable handling consistency or "viscosity" for ease of manufacture and application. After the paint has been applied, the solvent evaporates and leaves the dry paint film on the substrate. Solvents used are either organic compounds or water. The major sources of organic solvents are petroleum refining, fermentation of vegetable matter, and chemical synthesis. They are generally divided into two groups, hydrocarbon solvents made up of carbon and hydrogen atoms, and oxygenated solvents which also contain oxygen atoms. Water is another important solvent used in paints. This provides obvious advantages in cost, availability, flammability and toxicity. The widespread use of water in the majority of today's house paints is one of the major reasons for the overwhelming popularity of vinyl and acrylic latex paints. 2.4 Additives This group of chemicals is comprised of a vast multitude of proprietary and in-house compounds which are employed by paint makers at low levels (usually < 6.5%) in coatings to perform quite specific functions or to counter adverse side-effects of other components. For example, turps-thinned paints contain drying agents which speed up the drying process. They also contain anti-skinnning agents to prevent the paint forming into a tough skin- like covering in the can. 3. Theory In order to schedule the processing of customers’ orders such that maximum profit is obtained, the principles guiding flow shop scheduling are adopted as presented in the mathematical frame work. In this case customers are free to bring their jobs at any time. However, each customer’s order (paint) passes through the machines in the same order. Since different quantities are brought for processing and the materials for paint making have the same surface area characteristics, each order requires different amounts of processing time in hours as presented in the scheduling frame work. 3.1 Single Machine Sequencing: A single machine sequencing is a flow shop in which the jobs visit the machines in the same sequence. The shop characteristics of a single machine shop is given as: n / m // F / F where n is the number of jobs in the shop m is the number of machines in the shop F is the flow shop F is the mean flow time. n / m is referred to as the hardware and F / F is referred to as the software of the system. 3.2 Johnson’s 2- Machine Algorithm Johnson’s 2 – machine algorithm is a process in which the jobs are scheduled in the machines in such a sequence that gives the minimum makespan. A typical case of Johnson’s 2-machine algorithm with n jobs is presented in 19
  • 3. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (print) ISSN 2225-0581 (online) Vol 2, No.5, 2012 Figure 1. The flow time for job J in the kth position is given by F(k) = P(1) + P(2) + P(3) + ……… + P(k) k ∴ F(k) = ∑ P (i ) i =1 1 where P(i) is the processing time for the job in the ith position in the sequence. This algorithm supposes that we have (n) jobs to be scheduled on two machines i.e. J1, J2, …, Jn, Then n positions are possible. n n k Total flow time FT = ∑ F (k ) = k =1 ∑∑ P(i) k =1 i =1 n k ∑∑ P(i) k =1 i =1 Mean flow time F = 2 n Generally, for n position we have; n ∑ (n − i + 1) P(i) i =1 n k n ∑∑ P(i) k =1 i =1 ∑ (n − i + 1) P(i) i =1 = 3 n n The optimizing sequence can be obtained from the following process: In this case we have (n) jobs to be scheduled on two machines i.e. J1, J2, …, Jn. The optimal solution by Johnson algorithm is obtained as follows: Step 1: Set k =1, l = n Step 2: Set the list of unscheduled jobs = {J1, J2, ..., Jn} Step 3: Find the smallest processing times on first and second machines for the currently unscheduled jobs Step 4: If the smallest processing time obtained in step 3 for Ji is on the first machine then schedule Ji in kth position of processing sequence. Then delete the Ji job from the list of unscheduled and decrease k by 1. Step 5: If the smallest processing time obtained in step 3 for Ji is on the second machine then schedule Ji in the lth position of processing sequence. Then delete the Ji job from the current list of unscheduled jobs and decrease l by 20
  • 4. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (print) ISSN 2225-0581 (online) Vol 2, No.5, 2012 1. Step 6: Repeat steps 3 to 5 for the remaining unscheduled jobs until all the J jobs are scheduled. The main objective of this Johnson algorithm of sequentially scheduling the jobs to the two machines from step 1 to step 6 is to achieve the minimum total makespan for optimum job scheduling, which is obtained by summing up the various processing times obtained. 4. Material and Method The study was conducted on a paint company located in Benin City area of Nigeria which specializes in the production of different grades of paint. An important problem faced in the paint production system is that of determining the time it takes to produce a unit product and meeting the customers’ orders on time at a minimum cost without too much delay. The paint production process by the company could be broken down into eight basic activities namely; material drying, weighing of materials, material mixing, dissolving of materials, material filtering, material stirring, inspection and quality control and product packaging. These basic operational activities are presented in Figure 2, while the key to the various unit operations is presented in Table 1. Fig. 2: The Basic Activities in Paint Production Process Table 1: Key to the various unit operations Unit operation Purpose Drying of raw materials The raw materials are properly beneficiated and dried Weighing of raw materials To weigh the raw materials according to ratios for paint formulation Material mixing The raw materials are properly mixed Dissolving of materials The mixture of the raw materials are properly dissolved in a solvent Material filtering The dissolved materials are properly filtered Material stirring The filtered materials are properly stirred. Inspection and quality control The produced paint materials are inspected for good quality control Product packaging The inspected products are arranged in packages for customers. Data were collected for a period of 24 different weeks for 24 jobs (orders). The processing time, which is the amount of time (hours) required to process each customer’s order on each machine, is considered close to reality. The scheduling period covers one week which implies that all customers’ orders for a week are considered and the scheduling activities are prepared on Monday morning before processing of jobs commences. Normally the 21
  • 5. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (print) ISSN 2225-0581 (online) Vol 2, No.5, 2012 processing of customer’s orders (jobs) are on a first-come-first-serve basis. Therefore, the first customer to arrive for service is given a serial order 1, the second customer is given serial order 2, while the third is given serial order 3, etc. However, since it was discovered that the firm processes jobs using this serial order, we referred to this method as usual serial order (USO). The method was included in the program so that it can be evaluated alongside the solution methods. The principle here is to monitor the completion time of the last scheduled customer’s order. The three methods are adopted and they include: the A1, CDS, and USO, which represent two developed methods (Oluleye et al. 2007) and the traditional method used by the firm. 5 Results and Discussion Table 2 shows the makespan obtained for the three methods (A1, CDS and USO) for the 24-week study period. For all the three methods, the makespan obtained at the fourteenth period were the minimum, showing 33.40 hrs, 33.40 hrs, and 36.42hrs respectively for the A1, CDS and USO methods. Similarly, the makespan obtained for the three methods at the eleventh week were the maximum, showing 40.00hrs, 38.42hrs, and 43.26hrs respectively. It is seen that from the minimum makespan for instance, A1 and CDS methods performed equally, while the traditional approach of USO performed poorly. This implies that if the old approach is continued the jobs for fourteenth week would still stay for an excess of 3.02hrs in the process before being completed which is equivalent to about an extra half a day wasted in a day of 8 working hours. Table 2: Makespan results for 24 weeks. Makespan Results Week A1 CDE USO 1 32.25 37.24 42.24 2 35.35 35.34 40.24 3 35.32 35.33 40.45 4 35.12 35.12 42.42 5 36.04 36.06 41.52 6 37.20 37.18 41.46 7 36.52 36.54 41.08 8 35.33 35.54 41.42 9 36.04 36.00 43.16 10 37.42 37.40 40.54 11 40.00 38.42 43.26 12 35.24 35.24 41.54 13 35.70 35.72 42.50 14 33.49 33.40 36.42 15 35.82 35.80 41.28 16 35.72 35.70 43.22 17 36.32 36.30 40.54 18 35.16 35.18 41.27 19 35.18 34.94 41.34 20 35.24 34.26 41.28 21 36.32 36.02 38.42 22 35.82 35.64 39.08 23 38.26 38.12 38.96 24 36.12 37.08 40.02 22
  • 6. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (print) ISSN 2225-0581 (online) Vol 2, No.5, 2012 A1 CDE USO Makespan week Fig.3 Graph of makesapn from the three methods Table 3 shows the gain in scheduling length when pair-wise comparison of (SO and A1) and (SO and CDS) are made. A critically look through weekly gains reviews that on the average, the (SO – CDS) gains is more than (SO – A1) gains. Table 4 shows the mean values and standard deviations of the makespan. Thus the method with the least mean makespan is CDS, having a mean of 35.99hrs. This is closely followed by A1 with a mean makespan of 36.08 hrs. The worst method remains the traditional with a mean makespan of 40.91hrs. Thus, it is attractive to utilize the CDS method of scheduling jobs on machines for the firm being considered. A further analysis was carried out to find the number of times the various solution methods give the best result as presented in Table 5. It was found that in none of the 24 occurrences did the SO method give the best result. The A1 method shows the best results in 6 occurrences, while for all the 24 occurrences, the CDS method showed the best results in 14 occurrences and this gives credence to the CDS method. 23
  • 7. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (print) ISSN 2225-0581 (online) Vol 2, No.5, 2012 Table 3: Gains in scheduling operation Scheduling Gains Week USO – A1 USO – CDS 1 4.99 5.00 2 4.89 4.90 3 5.13 5.12 4 7.30 7.30 5 5.48 5.46 6 4.26 4.28 7 4.56 4.54 8 6.09 5.88 9 7.12 7.16 10 3.12 3.14 11 3.26 4.84 12 6.30 6.30 13 6.80 6.78 14 3.02 3.02 15 5.46 5.48 16 7.50 7.52 17 4.22 4.24 18 6.22 6.09 19 6.16 6.40 20 6.04 6.02 21 2.10 2.40 22 3.26 3.44 23 0.70 0.84 24 3.90 2.94 Scheduling Gain USO – A1 USO – CDS Week Fig. 4 Graph of scheduling gains for the two methods 24
  • 8. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (print) ISSN 2225-0581 (online) Vol 2, No.5, 2012 Table 4: Process mean and standard deviation. Method Mean Makespan Standard Deviation A1 36.07875 1.28714 CDS 35.98958 1.15944 SO 40.91333 1.54473 Table 5: The best solution method. Methods Number of Times A1 6 CDS 14 SO 0 CDS = A1 4 6 Conclusion Johnson 2-machine algorithm has been successfully applied to job scheduling in a paint manufacturing company. It has been demonstrated that the conventional approach in scheduling customer orders for oil paint production processing in paint manufacturing company based on the firm usual serial order method in which jobs are scheduled as they arrive for processing fails to satisfy the profit maximization objective of the firm. Three methods were used to analyse the data collected for the paint manufacturing firm. The three methods are A1, CDS, and USO, which represent two methods (A1 and CDS) developed and the traditional method (USO) used by the firm. Evidently, CDS performs best, followed by A1, while the worst performance was observed with USO. Therefore, adopting the CDS method will increase the optimum performance of the firm and it was therefore recommended. References Campbell, H G; Dudek, R A; Smith, M L (1970). A heuristic algorithm for n-job, m-machine sequencing problem. Journal of Management Science. 16: 630-637 Chen, J.C.; Cheng-Chun Wu; Chia-Wen Chen and Kou-Huang Chen (2012): Flexible job shop scheduling with parallel machines using Genetic Algorithm and Grouping Genetic Algorithm. Journal of Expert Systems with Applications, 39 (11): 10016–10021 Chen, Z L (1999). Simultaneous job scheduling and resource allocation on parallel machines. Department of Systems Engineering, University of Pennsylvania, Philadelphia, PA 19104-6315.. Du, J (1993). Minimizing mean flow time in two-machine open shops and flow shops. J. Algorithms. 14: 24–44. Jarvis, W. J. (1980). Maintenance planning and scheduling in petrochemical manufacturing environment. National Petroleum Refineries Association, Wash. DC, MC 80: (2) 1-12. Kanate P. and Mungwattana, A. (2010): Algorithm for Solving Job Shop Scheduling Problem Based on machine availability constraint. International Journal on Computer Science and Engineering Vol. 2 (5): 1919-1925 Kesen, S.E. and Güngor, Z. (2012). Job scheduling in virtual manufacturing cells with lot-streaming strategy: a new mathematical model formulation and a genetic algorithm approach. Journal of the Operational Research Society, 63: 683–695. Liaw, C F (2008). An efficient simple metaheuristic for minimizing the makespan in two-machine no-wait job shops. J. Computers and Operations Research. 35 (10): 3276-3283 Mignouna, H.D., Abang, M.M. and Asiedu, R. (2003) “Harnessing modern biotechnology for tropical tuber crop improvement: yam (Dioscorea spp.) molecular breeding. African Journal of Biotechnology, 2(12): 478-485 Odior, A.O. and Oyawale, F.A. (2009) Application of Mathematical Model to Optimization of the Production Capacity of Paint Manufacturing Company. Pacific Journal of Science and Technology, Vol 10, No.1 pp 178- 184 25
  • 9. Industrial Engineering Letters www.iiste.org ISSN 2224-6096 (print) ISSN 2225-0581 (online) Vol 2, No.5, 2012 Oladimeji, F O 1; Oke, S A; Oluwatoyin, P. P (2008). A multi-criteria model for maintenance job scheduling. Maejo International J. Science and Technology. 2 (1): 1-12. Oluleye, A E; Oyetunji, E; Ogunwolu, L; Oke, S A (2007). Job scheduling in a small scale gari processing firm in Nigeria. Pacific J. Science and Technology. 8 (1): 137-143. 26
  • 10. This academic article was published by The International Institute for Science, Technology and Education (IISTE). The IISTE is a pioneer in the Open Access Publishing service based in the U.S. and Europe. The aim of the institute is Accelerating Global Knowledge Sharing. More information about the publisher can be found in the IISTE’s homepage: http://www.iiste.org The IISTE is currently hosting more than 30 peer-reviewed academic journals and collaborating with academic institutions around the world. Prospective authors of IISTE journals can find the submission instruction on the following page: http://www.iiste.org/Journals/ The IISTE editorial team promises to the review and publish all the qualified submissions in a fast manner. All the journals articles are available online to the readers all over the world without financial, legal, or technical barriers other than those inseparable from gaining access to the internet itself. Printed version of the journals is also available upon request of readers and authors. IISTE Knowledge Sharing Partners EBSCO, Index Copernicus, Ulrich's Periodicals Directory, JournalTOCS, PKP Open Archives Harvester, Bielefeld Academic Search Engine, Elektronische Zeitschriftenbibliothek EZB, Open J-Gate, OCLC WorldCat, Universe Digtial Library , NewJour, Google Scholar