This document outlines various academic project ideas related to different fields such as banking management, bug tracking systems, e-commerce, and more. Each project is described with its main objectives, functionalities, and the technology used for implementation, emphasizing the automation and improvement of existing systems. The projects cater to a wide range of applications, from finance management to health center systems and online shopping platforms.
Mumbai Academics
Buy AnyProject At 3000Rs Only.
Send Your Enquiry To Mumbai.academics@gmail.com
•
Banking managment
Abstract:
•
The central concept of the application is to allow the customer(s) to service virtually using the
Internet with out going to bank and allow customers to open new account, withdraw, deposit, transfer,
close and getting balance using this banking service. The information pertaining to the customers stores
on an RDBMS at the server side (BANK). The Bank services the customers according to the customer’s
intention and it updates and backups of each customer transaction accordingly.
•
The end user of this service can access his account from anywhere provided by the bank. This
service is secure because of having each user his own userid and password provided by the bank and
one can’t access the bank’s database (hack), so it is full secure. All the data pertaining to the customer
will be stored in the database and it will be taken backups up to date.
•
Data entry into the application can be done through various screens designed for various
levels of users. Once the authorized personnel feed the relevant data into the system, several reports
could be generated as per the security.
•
Bug Tracking
2.
Abstract:
Bug Tracking forImproving Software Reliability (BTS) is an automated system that can be useful to
employees and the managers in any functional organization. Bug Tracking System gives the facility to
define the tasks in the organization and also allows the managers to track the bugs spent by the
employee for that particular task. A report generation facility is supported in BTS that allows the
managers to analyze which are those skills by employee are utilized and those which are not utilized.
This tool can help managers for Bug estimation per project or application. This tool helps employees to
document their Bugs and analyze
This project aims at creation of a Bug Tracking System. This project will be accessible to all developers
and its facility allows developers to focus on creating the database schema and while letting the
application server define table based on the fields in JSP and relationships between them. This system
provides the following facilities.
The objectives of this system are:
•
To keep track of employee skills and based on the skills assigning of the task is done to an
employee.
•
Employee does bugs capturing. It can be done on daily basis.
Various Reports are generated by this System for an employee and as well as to a manager.
•
Chat-Server-system
Abstract:
•
Like Internet, today Intranets are becoming more important for the purpose of communication
with in an organization, weather the organization is at one geographical point or at different geo-points.
Those intranets may be having different platforms. So there is a need to develop cross platform network
solution for better communication.
•
“ChatServer” is a cross platform network solution with in an organization that adapts Internet
technologies for better and easy communication. World wide, the most common Internet technologies
put to use within the organization. ChatServer is completely runs by Web’s hypertext system.
•
ChatServer is completely developed using the object-oriented, multiplatform programming
language Java, which is fully featured with network support. The ease of network programming in Java
makes ChatServer best of its kind.
3.
•
College Information System
Abstract:
•
Thisproject is being designed to provide the information about the colleges in AndhraPradesh.
AndhraPradesh is a state where there are more and more opportunities to those people who wishes to
join different courses of studies. This site is being designed to provide that information to those people
about the opportunities available in A.P comfortable fashion. The new education policy of Government
of AndhraPradesh provides with much more opportunities by increasing the number of seats per course
per college, which will provide the much larger opportunities for the education lovers.
•
This site not only gives the information about education opportunities available in ANDHARA
PRADESH but also the progress of the state in InformationTechnology.
•
Data entry into the application can be done through various screens designed for various users.
Once the authorized personnel feed the relevant data into the system, several reports could be
generated as per the security.
•
CourierInformationSystem
Abstract:
•
The Project entitled "COURIER SERVICE SYSTEM" is an intranet application developed to
maintain the transactions through net for Courier Service System in JAVA LANGUAGE using Java as front
end on Pentium machine.
•
The main aim of "COURIER SERVICE SYSTEM" is to improve the services of Customers. The
Headoffice will maintain the Central server. This Contains two major modules. which are Employee
Details and courier service.The Employee module maintains employee information which is having
Empinfo, Leavemaster, Leavetransactions, Loan and Salary details. The second module having
customer, branch, Dispatches, Receipts details.
4.
•
The primary featuresof the project entitled "COURIER SERVICE SYSTEM" are high accuracy,
design flexibility and easy availability. And also it uses database tables Representing entities and
relationships between entities.
•
CYBER_SHOPPING
Abstract:
The Cyber Shopping application is an Online Website for an Organization. It is a virtual showcase for
different types of products like Electronic, Automobile, Jewellery, Fashion, and Film etc. The main aim of
this project is to make Online shopping very easily. The Special thing about this project is it provides
different types of products to purchase.
The Functionalities provided by the Project are as follows.
•
web.
The Internet Appliances takes care of the requirements put forward by the customers through
•
Shows the information and description of the products.
•
Provides the searching facilities based on various factors.
•
Sells the Products online.
•
Keeps track of the Transaction.
•
It deals with monitoring the information and transactions.
•
Managing the suppliers of raw materials to the companies.
•
Provides the administrator facilities to update the list of products online without FTP.
•
Provides the Credit Card interface for accepting and validating various Credit Cards through the
Banks.
•
Take care Securities for the Credit Card information.
•
User trusted site.
•
Data Centric Knowledge Management System
5.
Abstract:
•
The purpose ofthe Data Centric Knowledge Management System (DCKMS) is to centralize
knowledge generated by employees working within and across functional areas, and to organize that
knowledge such that it can be easily accessed, searched, browsed, navigated, and curated.
•
DCKMS is a web based application which allows employees of a company to share their
knowledge with others in the company. Also it allows them to search for knowledge assets when in
need. It provides a facility for the employees to register themselves as ‘experts’ as well as search for
other ‘experts’ incase of any problem/requirement in their project. It is a one stop shop for finding
solutions for your problems.
•
Every employee needs some help at some point of time. To solve some issues or bugs or
problems employees has to depend upon many sources like internet. This is very difficult and time
consuming task. Also accurate solution may not be available. Data Centric Knowledge Management
System is a perfect solution to overcome the above mentioned problems. It provides a facility to share
your knowledge by submitting various knowledge assets and to search for assets when in need. It allows
users to search documents based on keywords as well as name of the author, topic, category etc.
•
This application allows users to register themselves as experts in their favorite areas. Also allows
users to find and contact experts in order to seek help from them. This application provides end to end
solution to maintain shared knowledge assets in a company. It allows K-Team and Experts to evaluate
the documents submitted by various employees before publishing them. Also based on this rating
various awards are being awarded to employees.
•
This application maintains the entire data in a centralized and secured database server
to maintain consistency in report generation and allows users to access from any location. This is an
online application that allows multi-user access of system and to track or manage the data
simultaneously. Various roles and authentications have been provided and access to various areas in the
tool is restricted according to the role given to users.
•
Distributed Cycle Minimization Protocol
Abstract:
•
In this project, we describe the Distributed Cycle Minimization Protocol (DCMP), a dynamic fully
decentralized protocol that significantly reduces the duplicate messages by eliminating unnecessary
cycles. As queries are transmitted through the peers, DCMP identifies the problematic paths and
attempts to break the cycles while maintaining the connectivity of the network. In order to preserve the
fault resilience and load balancing properties of unstructured P2P systems, DCMP avoids creating a
hierarchical organization. Instead, it applies cycle elimination symmetrically around some powerful
peers to keep the average path length small.
6.
•
The overall structureis constructed fast with very low overhead. With the
information collected during this process, distributed maintenance is performed efficiently even if peers
quit the system without notification. The experimental results from our simulator and the prototype
implementation on Planet Lab confirm that DCMP significantly improves the scalability of unstructured
P2P systems without sacrificing their desirable properties. Moreover, due to its simplicity, DCMP can be
easily implemented in various existing P2P systems and is orthogonal to the search algorithms.
•
E-COMMERCE Mechanism
Abstract:
This project is an e-commerce project. It is the development of a support site for Maruti Udyog Ltd. It
provides on- line booking for servicing of the car. The user of the sites could be a customer, corporate or
a dealer. There are five team members working on the project.
The general functionality of the site is:Customer or user can register by providing personal information,
dealer preference and car details (one/multiple).
•
After registration, Maruti Udyog Ltd. Will provide customer a password to logon.
•
User can be an individual or corporate.
•
Dealers can logon directly through the logon page.
•
For booking the site gives various ooption: ADD, RESCHEDULE, CANCEL, PREVIOUS BOOKING
DETAILS or MODIFICATION.
•
User can book the service with particular dealer for a particular date. This booking can be
modified later by rescheduling the service.
•
The user also has the option to swap two cars for a particular date or swap multiple cars and
date bookings.
•
The user has the option to cancel the bookings any time through the cancel option.
•
The site facilitates the user to view all the previous booking information details like type of
service etc.
•
Dealer has the option to modify the booking availability.
•
Dealer can upload or download the data in text format.
•
Dealer can take out the reports for his account.
•
Finance Managment
7.
Abstract:
•
The system mainlydeals with the automation of the activities performed at Andhra Pradesh
State Finance Corporation (APSFC), which issued various kinds of loans to their Customers and accepts
monthly installments from them.
All the master information is gathered pertaining to the employees working in the organization,
Industries to whom the loans are issued. Different types of loans available are designed and the interest
rates applicable are set in the master tables.
Initially after registering the customer, loan is sanctioned according to his requirement and eligibility.
Details of a particular loan are gathered such as loan number, customer number, loan code, amount,
interest, and number of months, monthly installment and date of sanction.
When the Industries pay the loan installments, details of loan number, payment id, amount and date of
payment are gathered and stored.
Simply choosing the appropriate menus such as Employee details report, Customer details report,
generates various reports, Loans detail report, Interest report, Customer-loan details report & Payment
details report.
The system security is taken care of by a login form, which is allows only authorized users to utilize the
system.
The main aim/objective is to develop an effective system, which is fast, accurate, consistent, reliable,
and flexible enough so that in can accommodate any further expansion.
•
Global intractive solutins
Abstract:
•
Honda Showroom Automation is an online software application which fulfills the requirement of
a typical Honda shop. It provides the interface to users in a graphical way to manage the daily
transactions as well as historical data. Also provides the management reports like monthly purchases
and monthly sales.
This application maintains the centralized database so that any changes done at
a location reflects immediately. This is an online tool so more than one user can login into system and
use the tool simultaneously.
8.
The aim ofthis application is to reduce the manual effort needed to manage
transactions and historical data used in Honda shop. Also this application provides an interface to users
to view the details like cost, description, image of all available models in the shop.
•
Health Center System
Abstract:
•
The main intention of introducing this system is to reduce the manual work at Health center
counters. Every sort of task is performed by the system,such as registering different types of persons (i.e
employees , students and others) ,enquiries, and complaints etc. reducing much paper work and burden
of file storage. Also the latest information is right available for the officials and executives wherever they
require. The system also facilitates the pharmacist to enquire about the drugs and about the stock to
be ordered and about the expiry date .
Where the system must be placed?
There are a lot of benefits to the Health center by placing the system at their registration and at
drug store office . At the same time the patients are also benefited using this system. They can get the
work done within no time.
How to use the system?
Using the system is as simple as using the personal computer. Since end user computing is
developing in our country, It is beneficial to both Health center and the patients. Every step is clearly
defined and help is provided through out the application to the user. Even the exceptions are handled
well to avoid confusion.
How is it beneficial to the Health Center?
The heath center can get much out of the system. The system is used to enter the patient details and
to enter the details about the health center and the details about the in-patient and out-patient in
detail and about the reports of the patients . This system represents the patient by the OP number and
this is main criteria how the patient is provided by the free services . The drug information and the
specifications is also provided in this Health Center Management System.
•
IntranetChatting
Abstract:
The aim of the project is to provide a way of efficient communication among the users (Clients) located
on different places within an Organization using Distributed Computing (Intranet). Any two users can
9.
communicate to eachother using the front en given to them. The user just start the client program and
registers him self with the server to start the communication.
The project contains distributed multithreaded server program, which receives the requests from
the clients for the following:
1.
The client registers himself with server for chatting.
2.
The client sends the message to any other clients.
3.
The client unregisters himself from the chatting.
The server program should take care of all these activities carefully. In the first activity the server should
store all the user names and client references in a hash table and the server uses this Hash table for
sending the messages to clients, registering and unregistering the user names. When any new clients
joins the chat group the information should be Immediately shown in the choice boxes of al the clients
as all as in their text areas.
In the second activity the server should invoke the respective method to find the target client from the
hash table and should sent the message to the target exactly.
When any client unregisters from the chat group this should be conveyed to al the remaining clients
present.
The server program should run continuously which keeps track of al the clients
The client is provided as an applet with the following front end.
There may be number of clients started simultaneously and can chat to each other through the server.
•
MobileService management
Abstract:
•
This project is aimed to automate the operations of Mobile Service Providers.
Customers/Company representatives logging in may also access/search any information of mobile
related services. This ambitious service uses state-of-the-art technology to attain global excellence and
leadership in business. Our entry into this sector has brought mobile service at an affordable cost to the
common man. All serving a single objective, to provide better communication to millions across India.
This Customer service leads to have a good response for services and it can make users enroll as
customers within months of launch this service.
•
NetConferening
10.
Abstract:
The main conceptof Net Conference is developing the conference on the net. We can compare the Net
conference with theTelephone Conference. Normally in Telephone Conference, there will be more than
two users connected at a time and all the users are able to here words from any one of the user. So
implementing the same concept on the Net is nothing but Net Conference.
This project is used to:
1.
Conduct conferences with their employees. So they can get online decisions from employees
from the different branches of the company.
1.
The another advantage is that the company is having branches throughout the country. So this
will help them to communicate business affairs of the company and live meetings and conferences
between their directors. They can conduct board of directors meeting.
1.
It will give On-line solutions from the superiors to the employees.
System Specification:
The system on which the project developed has the following configuration.
Hardware Specifications:
Main Memory
:
64MB.
MicroProcessor
:
Pentium –III.
Hard Disk Drive
:
4.3 GB.
Cache Memory
:
512KB.
Operating System
:
Windows 98/NT.
Front End
:
Java Using Servlets
Software Specifications:
Back End
:
Database Connectivity
Oracle 8i or SQL Server or Access.
:
JDBC,Microsoft ODBCDriver for Oracle.
• online order processing system with AJAX
enabled
11.
Abstract:
•
In the pastfew years, developers could choose between two approaches when building a web
application. The first approach was to create a screen based system with very rich interactions using a
sophisticated technology such as java or flash. The alternative approach was to create a page – based
system using easier to learn core web standards like XHTML and CSS whose more basic capabilities force
less-rich interactions. A new technological approach, dubbed Ajax, might just be the right mix between
the two.
Screen based applications offer users the ability to enter and manipulate information on a small
number of screens that instantly update with any submitted changes. Developers typically build these
applications, which mimic the sophistication of desktop applications developers who build page based
applications using standard web technologies are forced to deal with the load- reload effect of normal
web pages. As a result, users who enter and manipulate information in page based applications must sit
through a page refresh in order for their changes to take place.
While both approaches have proven successful, each has drawbacks. Screen based approaches,
for example, require significant development time and effort because they are built with difficult to
learn and often proprietary programming tools. While easier to build than their screen based counter
parts, page based approaches provide a less seamless experience.
Ajax is a new web approach that marries the benefits of both screen and page based approaches.
By allowing more sophisticated functionality using easier to implement web standards, Ajax is proving a
real alternative for creating powerful web applications.
•
OnLineExam process
Abstract:
•
Title : Online Examination
•
The application is developed for Core Software Pvt. Ltd, Hyderabad.
Core software Pvt. Ltd, Hyderabad is a 100% export oriented scheme for development and export of
Software. This is started to promote Software exports by helping Software Companies in terms of
providing high speed satellite links, giving all required government clearances at single point.
•
There is always a rising need to conduct tests to assess a person’s knowledge in a subject. As the
number of people taking the test is increasing it is becoming difficult to manually evaluate the results,
hence the system was developed. This was specifically developed to make it available globally on the
Internet.
12.
•
The system developedis designed such that it enables all the interested people to take the test
irrespective of the time. Whenever the User finds free times he can use the OnLine Exam and assess his
depth of knowledge.
•
The application starts by accessing the User name and Password form the User and allows the
User to select a subject in which he desires to take the exam. After selecting the subject in which he
desires to take the exam. After selecting the subject the instructions regarding the Time limit, Total
marks, Qualifying marks and percentage are displayed. Only if he accepts to the terms and regulations,
Questions screen is displayed to the User and is also represented in Graphics in order to give a clear
picture to the User.
•
The system is interactive and user friendly. The system is developed using Java, AWT, Applets,
Servlets, JDBC, HTML, & MS-Access.
•
web based Manufacturing
Abstract:
•
The system is a web based Manufacturing System that enables a Manufacturing company to
schedule its manufacturing operations based on the daily update of sales from its dealers. The system is
modeled to be used by a Manufacturing company, whose main activity is manufacturing different
products & then selling the finished goods through a network of Dealers.
•
To start with, the Stocks of all the Products manufactured by the company and held in the
company warehouse are stored in a Database. The details that are stored include the quantity of each
product held with the company dealers who hold the stocks of finished products for sale.
•
Once the sales figures of Products sold in the past week are entered by the Dealers over the
Internet along with the Orders for the next delivery, the schedule for the next week’s production will be
drawn up. A report of the required raw materials or parts will be drawn up with the approved suppliers
for each & the suppliers will be intimated about the part requirements over the Internet & asked to
quote their rates. The message asking for a Quotation will be sent as an e-mail message. Once the rates
are quoted, the Order will be placed with the required delivery schedules.
•
The system incorporates intelligent Order processing System that checks and intimates the
required Higher-ups in the Company about any discrepancies in the Orders that were placed. For
example if an Order is placed with a Supplier whose rates are not the least then an automatic Eventgeneration will send the details of the Order & the person who placed it to the Managers or Directors
who are supposed to oversee the process.
•
Once the parts are supplied the Part Stocks will be updated. Then a production plan will be
drawn up taking the Bill-of-materials into consideration. The Bill-of-Materials contains the details of
13.
each Product &the type & quantity of Parts required for manufacturing a single unit of the Product.
Once the Production plan is approved, the Part Stocks will be updated when the Parts are issued to the
Production Department. Once the finished products are available from the Production Department, the
Products will be dispatched based on the Orders placed by the Dealers. The stocks with the dealers will
also be maintained.
•
WEBREPORTING PROCESS
Abstract:
•
The project entitled "Web Reporting System" has been developed using Servlets and Jsp as
front end and Oracle8i as back end.
•
The main objective of this project is reporting application based on an existing client/database
application. The existing application gathers all the transaction data from diffterent ATM machine'’.
The goal of the application is to allow manager to view general reporting information through a web
browser and not require the installation of the client or exhaustive training.
The scope of this application is 4 graphical reports, a security module. Which are ATM
availability,Transaction types and volume, On-us and Not On-us transactions,Average withdrawl
amounts etc., The reports will primarily be accessing data in the transaction log which contains most of
the prevalent information for managers.
•
Classifieds
Abstract:
This project entitled “CLASSIFIEDS” is developed for those who want to place the advertisements online
and also those who want to view the information about various advertisements.
These days advertisements plays very important role in bringing the information about various areas in
front of the people.
The basic objective of this project to enable the registered users to post the advertisements regarding
properties, education, rentals, jobs.computers, automobiles, travels etc…, online at free of cost. Also
enables any user to view the information regarding all this advertisements at free of cost.
14.
This project isdeveloped with net technology to enable client/server communication easier in the
Internet. The developed project can be extended easily by adding extra features or incorporating
additional requirements and integrating with other functions.
This project is developed using HTML and JAVA SCRIPT as front end tools, JSP for server side scripting
and Oracle 8.0as back end tool.
Requirement Specification
The minimum configuration to use this proposed system is as follows:
Hardware Specification:
Processor
RAM
:- Intel Celeron class processor with 233 MHz
:- 32 MB
Hard Disk :- 2GB
Monitor
:- Color monitor
Keyboard
:- 101 keys
Mouse
:- Any pointing device
Software Specification:
Platform
:- Windows 98,ME,2000,XP
Software
:- Internet explorer 5.0, Java Webserver2.0,JSP, Oracle 8.0.
About the Project
The basic intension of this project is to provide classifieds information. For instance , user who wants to
sale his property will enter into the site and put related information on net so that this user will be
contacted by another user of the site who wish to buy that property. This internet application is used as
platform for not only buying and selling but also provide
information like rentals, computers, jobs, travels, education , automotive etc..,
The software system is sub divided into following various functional modules.
•
Login Module
•
Rental Module
•
Education Module
•
Real Estate Module
15.
•
Computers Module
•
Jobs Module
•
AutomotiveModule
•
Travels Module
The user should register to utilize the site. Each user will be given UserId and password. Using that Id
and password user can enter in to the site and can put the ads. Those who wants to view the
information they can with out registration. The Login Module provides this facility.
The remaining modules Rental Module, Education Module, Real Estate Module, Computers Module,
Jobs Module, Automotive Module, Travels Module allows the users to put respective information in the
site. Those who wants the information they can see the information through search.
• Customer Relationship Management for
AIRLINE Industry
Abstract:
Purpose
The purpose of the Development of a CRM Airlines Industry is to provide the world-class offshore and
onshore services using IT-enabled services. CRM (Customer Relationship Management), sometimes it is
called customer management, customer value management, customer centricity, and customer-centric
management.
Scope
The scope of the CRM Airlines Industry is as follows:
The overall strategic business objective of CRM is to build loyal profitable customer relationships.
Customer acquisition, development and retention are main points to consider. Customer relationship
management is a new concept to many organizations. The most forward-thinking organizations devote
lot of energy and resources to the set up and management of a Customer Relationship Management
capability.
Following is a list of functionalities to be supported by the CRM Airlines Industry. More functionality can
be added to this list. And, in places where the description of functionality is not adequate, you can make
appropriate assumptions and proceed.
16.
•
High quality output
•
Costcompetitiveness, simply because of abundance of intellectual capital.
•
Effective turn-around-time
•
Provision for creating and managing folder hierarchy for managing clients and their documents.
•
Comprehensive security with various permissions like Read Only, Write, Delete, Full Control,
Owner etc.,
•
DataMart Management Software
Abstract:
This DataMart Management Software project mainly deals with automating the tasks of maintaining and
transacting the goods.In the Warehouse System inventory management is the key process.This process
includes the activities such as maintenance of stock details, maintenance of receipts and items etc. It is a
tedious job to maintain all these details manually. Hence we opted to automate the Warehouse
Management System.
DataMart Management Systemautomates the job of warehouse system. It mainly includes five
members .
1.
Administrator
2.
Sub-Location In-charge
3.
Retailer
1.
Supplier
2.
Customer
The Administrator has the priviligies to maintain different types of Products, Suppliers, Sub Location
Incharges Databases in the warehouse.He is concerned with registration of Suppliers, Sub-Location Incharge, and Addition of Products.
The Sub location Incharges has privilige to maintain Products which are transformed from Administrator
and registration of Retailers and all operations on these two databases .
The Retailer has priviligies to maintain Products at the corrosponding Retailer
The supplier has priviligies to maintain parts Database and he can add parts and delete parts
17.
In this DataMartManagement Software has 5 Modules
These are
1.
Master maintenance
2.
Receiving
3
Shipment
4.
Billing
5.
•
Reports
E Procurement System
Abstract:
•
The basic function of this system is to available the tender documents online to the customers
and download the application forms. Daily many tenders will be released and the new tenders are
updated so that customers can view them and if they are interested they can download the tender
form. Customers will have to register themselves and will get a permanent user ID and password. By
this ID and password he can download the tender forms in future also.
•
The tender documents will be supplied to the user. This system can also handle multiple tender
documents at one time i.e. the user can access various tenders from the company at onetime and can
download the required forms. The user can submit the details along with quotation to the department
through online . Then the department people evaluate all the tenders submitted by users on evaluation
date and they allocate that work to the user who is eligible and quoted for less amount.
•
e-Classifieds
Abstract:
•
The main aim of the application is to build a Classifieds website. The website has to provide
different kinds of facilities to the users like Education, Rental, Real estate, Situations vacant, Sunday
cinema, Wheels used cars, Matrimonial, Mailing, Job Searching facility.
Another important reason for the popularity of Internet Users is the advent of Online Job opportunities,
Matrimonial and Rental. Now the people are able to do search without wasting their precious time. This
make searching flexible.
18.
As online jobsearching is a popular way for getting jobs easily, we are implementing it. This project
report includes Resume posting, Searching of jobs, Posting of jobs and searching of Resumes.
As Online matrimonial is a popular way for searching suitable bride and bridegroom and posting your
bio-data.
As Online rental is a popular way of searching for the apartments and rooms available for monthly
rental. This module gives you brief idea about rooms available and area where it is located.
•
Ecommerce shopping cart
Abstract:
•
E-Commerce Shopping Cart is Software designed for customers to order food online.
The main aim of the project is to provide service smart security to the customers. This
system provides good and efficient information and thus making the service smarter. It is
an interface for customers to browse the catalogue and order the food online. Using the
power of Internet multiple interest parties can order with complete security and control.
ESC system maintains and processes all sort of information pertaining to the order type
options control the life cycle of an order. It provides an end to end solution to sell and
manage.
By following this new approach the information can be accessed from anywhere just
with a mouse click. This helps the users by saving lot of time and providing the user with
up to date information.
This developed package provides a good interface between the user and the database.
This new approach will guide the user if at all any invalid entries are made and provide
feedback to the users.
This will sustain reasonable amount of traffic and provide the user with the required
information without any delay.
This project provides a very good user interface such that any one can easily
19.
understand and canaccess the information with least effort.
•
Elearn
Abstract:
Advances in technology and the growth of e-learning to provide educators and trainers with unique
opportunities to enhance learning and teaching in corporate, government, healthcare, and higher
education. This application serves as a forum to facilitate the exchange of information on the current
research, development, and practice of e-learning in the sectors.
It includes the research, development, and practice of e-learning related to the following multidimensional topics and sub-topics.
E-learning comes in different configurations that dictate the depth of a needs assessment. The simple elearning implementations, such as those following an application service provider (ASP) model, won't
necessarily look any different from a resource requirement perspective than traditional classroom
training. That's e-learning.
E-learning can be an enormous undertaking and, require significantly more preparation due to its
increased scope, higher interdependence, and visibility. These factors--described below--are the reason
a needs assessment for an e-learning initiative looks different from one for a traditional classroom
program.
•
Scope. Developing an e-learning initiative is a typically much larger endeavor than that of an
instructor-led training (ILT) program. Consider the increased expenses, number of people involved,
development time, technological requirements, and delivery options.
•
Interdependence. It's possible, even common, for an ILT program to be conducted without the
knowledge of anyone but the participants, their immediate managers, and the training provider. In
contrast, even the smallest e-learning program requires a wider group of people. Ranging from (at a
minimum) representatives from the IT and HR departments to (more commonly) an organization-wide
task force, the scope of the project often dictates that there are more decision makers, more
stakeholders, and more links between previously unrelated departments.
•
Visibility. When a traditional training program goes bad, a participant's dissatisfaction is usually
voiced by word of mouth. And the people who express dissatisfaction, in most cases, are the
participants and, maybe later, the people directly affected by their work. Again, due to the scope of the
undertaking (especially the high budget and number of resources required), the efficacy of an e-learning
program will be delivered to a larger group of people and through a wider variety of channels than an
ILT program. Typically, a CEO can tap into a training database and view participants' course comments,
20.
exam results, andthe courses taken. It's easier to determine whether an e-learning program is
unpopular or ineffective than to rely on word of mouth about a questionable ILT program.
•
Employee Resource Info sys
Abstract:
•
ENTERPRISE RESOURCE INFORMATION SYSTEM(ERIS) is a compurised solution for recruiting
angencies and software consultants. This application maintains electronic database comprising of job
applicants, clients and employers. User of this system can create and access details of all the information
using advanced GUI screens. This is an application,which is used by a consultant to maintain his clients
and employees status and shedule interviews for applicants.
• ENTERPRISE REOURCE PLANNING
MANAGEMENT
Abstract:
•
Enterprise Resource Planning Management is online system with Personal and general
administration activities fully automated, like Recruitment, Employee establishment and personal
information, Medical Reimbursement, Leave and Attendance, Payroll, Training etc... The existing
RECRUITMENT SYSTEM in Nagarjuna Group is currently being used in FoxPro.
•
Module Description
In this project ERPM we concentrated all the problems what ever we discussed in the above
existing system. We are providing solution to the management with respect to time and cost value. We
are providing different authentication and authorization facility for each management levels.
•
THIS PROJECT IS DIVIDED INTO THREE MODULES.
1) REGISTRATION
2) JUNIOR LEVEL MANAGEMENT
3) SENIOR LEVEL MANAGEMENT
21.
•
Registration Module:
In organizationthey will get applicant details from different sources, such as by post, by email and by
hand. This registration module deal the procedure to store these applicant details in database .In this
module we can generate two reports one for applicant details and second one for skill set details.
•
Junior Level Management:
In this module junior level management conduct the different tests for the applicants, after technical
written test, these tests are psychological tests organizational awareness tests and so on...
Senior Level Management:
In this module senior level management interact with the database for applicant details. They will go
through the applicant details and their Skill-sets reports. They will select the applicants for technical
written test and they will send intimation letters to applicants.
•
SOFTWARE AND HARDWARE REQUIREMENTS
•
Software requirements:
•
Operating system :
Windows 98, MS-DOS.
Backend
:
ORACLE 8.0.
Front end
:
HTML.
Language
:
Servlets.
Driver
:
ODBC for oracle.
•
•
Hardware Requirements :
CPU
Ram
:
:
Pentium III.
64 MB.
Hard disk
:
10.2 GB.
Monitor
:
SVGA color monitor.
Keyboard
:
105 standard mouse.
•
•
e-Shopping
22.
Abstract:
E-shopping Management wasapproached by a Very big Shop to develop a web based
application to be accessed by the users over the web. The central concept of the application is to allow
the customers to shop virtually using the internet and allow customers to buy the items and and articles
of their desire from the store. The information pertaining to the products are stored on an RDBMS at the
server side (store).The server processes the customers requests and the items are shipped to the
address submitted by them.
Existing System
In existing system everything is manual like customer will go to shop manually and he/she selects
items which are available in shop and the marchant will calculate the bill for products selected by the
customer and then shipping process will take place.
Existing System is manual, everything we have to do manually
i.e.
1. Displaying items
2. Selecting items
3. Billing process
4. Shipping
Proposed System
The proposed system should be in the way, the customer need not to enter into the shop to purchase
items. He can purchase the items through the internet. The items should be shifted to the customer
address specified when he register his details at the sight.
The end user of this product is a departmental store where the application is hosted on the
web and administrator maintains database. This application which is deployed at the departmental store
will automate the following process.
•
The customer details are appended to the customer database.
•
The details of the items are brought forward from the database for customer’s view based on
the selection through the menu.
•
Database of all the products are products are updated at the end of the each transaction.
23.
•
E-TRANSACTION_Totalproj
Abstract:
•
The e-Transaction Interfaceis the designed targeted at the future banking solution for the users
who is having multiple bank accounts at the multiple banks. This interface integrates all existing banks
and provide business solutions for both retail and corporate.
This system acts as a standard interface between the clients and all the banks that register with
the system and clients who maintains accounts in various banks don’t have to visit individual bank’s
website to make money transactions instead he can directly log on to E-Transaction Interface and make
any kind of request and get his work fulfilled and in the backend the system will take care of all the
obligation required in order to carry on transaction smoothly
The main Vision of this project is to eliminate all the diversities amongst banks, which
generally client faces at the time of any transaction. By doing so Client will used to only one Systematic
Standard way of banking and there by they will be at ease using this interface.
The kind of functionality it’s capable of providing also reveals the kind of banking facilities that a
customer could get online. Of course, the bank that implements this solution decides the features
available to customers.
•
EWheelz
Abstract:
•
Journey became part and parcel of a human being’s life. Without moving around, people cannot
communicate and share the moments with others. In this busy world, especially when more and more
population is seen in the developing nations, it is highly essential to have a comfortable and safe
journey. When a passenger wants to go on a journey, he wants to first reserve some seat in a bus and
for the intended date. This becomes easy with EWheelz software which helps in obtaining reservations
of seats in a bus well before and take the tickets also online by staying at home.
EWheelz software is a globally deployable, integrated, workflow based end-to-end system starting from
searching bus routes to book them online. This is a complete application for travelers as well as venders.
Vendors provide the information like, available routes, timings, price, etc. Customers can book a ticket
which is a five step process that includes Search Bus, Select Bus, Select Seats, Provide Customer
Information and Make Payment. This application also provides facility to cancel a booked ticket online.
There is also scope to measure the user satisfaction regarding the entire booking process. He can
express his views or grievances through testimonial option in the application so that it reflects the
goodwill of the travel company and helps other users to have trust in the company.
24.
•
EzeeMail system
Abstract:
This EzeeMail System is designed to provide a communication channel inside an organization between
different clients (Organization staff) on the network. The main objective of the project is to develop a
fully functional Ezee Mail System that enhances communications among the members of the
organization in a reliable, cost-effective and secure way. Thus it helps the organization to improve the
performance of its teams in the corporate sector. This system design shall be able to provide the
following facilities to the users:
System shall accept the mails from authorized users providing security. Submitted messages will be
delivered to appropriate person only. Provides the facility to review messages from the respective
folders. Effective Communication has become an integral part of organizations today. The rapid
development of intranets may provide construction and design teams with an innovative tool for
meeting these growing communication challenges.
A project specific intranet uses a database server to store mails information and the organizational
information such as users details including the personal information and information requests. Teams
members can be then access this information using the Ezee Mail System. As information changes, the
server content can be easily updated with new or revised data. This flexible approach allows
geographically remote project teams to access timely, consistent and accurate information without
expensive typesetting, printing, distribution and mailing charges.
•
Foresty management system
Abstract:
•
Iggesund Paperboard is one of the largest manufacturers of virgin fibre paperboard in Europe.
The UK based operation is centred at a medium sized paper mill based at Workington in Cumbria. A key
part of the Workington plants success is that it maintains and manages its own forests in Dumfries and
Galloway, Perthshire and the Highlands. However, Iggesund only use the top two thirds of the Douglas
fir and the Scots Pines which are grown in its Scottish forests. The remaining third is used to produce
25.
timber that issold to local and national companies for use in construction and carpentry. It is this
particular aspect of the company’s business process on which I would like to concentrate.
•
Each forest has its own manager who is responsible for the timber sales operation. For several
years the managers of the forests have been wishing to upgrade their paper based filing system to a
computerized system. This system is outlined below. Unfortunately, due to staff shortages in the
company I.T. department they have been unable to find the time to develop a new system. Regrettably,
the forestry manager’s budget is limited and he cannot afford to purchase an off-the-shelf package.
•
After brief discussions with a member of the I.T. department, and with the manager of the
Forest of Ae (near Dumfries) I decided that I would to like to try and implement a system that would
help the manager of the Forest of Ae keep track of his customers, contracts, orders, products and
haulers. Due to the recent staff cut backs and existing projects the I.T. department have been unable to
offer me any type of support or spend anytime with me to develop the system. However, they agreed it
might be beneficial for me to develop a prototype system that then could be modified by them to suit
the specific needs of the forest manager in the future.
•
The forestry manager only has basic I.T. knowledge as the company offers no formal I.T.
training, but regularly uses a company laptop for word processing. He also has access to the company
intranet, email system and the internet over a secure ISDN connection and he is familiar with online
form systems used for ordering over the internet. He currently uses a paper based filing system to look
after customer details, orders, contracts, product and hauler information. This system has become
increasingly difficult to maintain, and become a burden on the manager’s time.
The Forest of Ae is over two hours drive from the Workington based I.T. department. It would be
impractical to expect the forestry manager to maintain his own databases, as supporting users at this
distance is a tricky business for the company I.T. department. Therefore, it was suggested by a member
of the I.T. department that it would be sensible for the database to be located centrally, and maintained
by the I.T. department.
•
Fuji Distribution
Abstract:
•
This project will give you full information about the company and it’s products. The system also
is an interactive and user friendly one. The system is flexible enough to cope up with the changing
trends of the company.
•
The system provides an easy way of selecting a particular transmitter and is able to give
an easy way of selecting the properties from the specifications of a particular type of transmitter. There
should be no difficulty for the user to generate the Quotation for the selected code or filling up the
26.
order form. Thesystem provides the interface for the database backup i.e. the company wants to
change, modify and update any information.
•
The entire system is made available around the world through internet. The system is
generated with the MVC architecture using Servlets, JSP concepts in java. Servlets are most powerful
concept of java using which we can make the system global; also we can directly access the database
from servlets.
•
One of the advantage of the servlet is that we can use HTML and JAVASCRIPT to the maximum extent.
Using HTML we can make the front end look beautiful and attractive, we need to use the backend as
ORACLE server , which in possible with JDBC
•
One of the major products of the company are transmitters , pressure
transmitters are widely used in the industrial sector . They are one of the leading companies in Asia in
manufacturing these transmitters and have a wide market around the world .
There are seven different types of pressure transmitters:
Absolute pressure transmitter.
Pressure transmitter.
Remote seal type transmitter.
Differential pressure transmitter.
Remote seal type differential pressure transmitter.
Flow transmitter.
Level transmitter.
Each of these seven transmitters is further divided into two different transmitters
is further divided into two different transmitters. Based in the type of the transmitter , they are named
as ‘A-series’ or ‘C-series ‘. For each of A-series or C-series there are fifteen set of specifications and each
specification contains set of properties .
Combination of properties that are derived from each specification defines the actual
transmitter . Each property in a specification corresponds to a particular code . The code corresponding
to the property from each specification is taken into a table . After generation of the entire code the
quotation is prepared .
The entire process is very complicated lengthy and tedious .Moreover marketing
personnel need to carry a hefty manual to refer to the code .
27.
Due to theincreasing demand for the product around the world through manual approach of the
company was unable to satisfy all the customers. So that they can satisfy all the customers and also
meet the increasing global demand for their products. The system developed had to be available
through out the world in Internet.
•
Global communication
Abstract:
The main concept of Global Communication Media is developing the communication with all persons of
the same organization on the net. We can compare the Global Communication Media with the
Telephonic Communication. Normally in Telephone Conference, there will be more than two users
connected at a time and all the users are able to here word from any one of the users. So implementing
the same concept on the Net is nothing but Global Communication Media.
This project is used to:
1.
Conduct conferences with their employees. So they can get online decisions from employees
from the different branches of the company.
1.
The another advantage is that the company is having branches throughout the country. So this
will help them to communicate business affairs of the company and live meetings and conferences
between their directors. They can conduct board of directors meeting.
1.
It will give On-line solutions from the superiors to the employees.
System Specification:
The system on which the project developed has the following configuration.
Hardware Specifications:
Main Memory
:
64MB.
MicroProcessor
:
Pentium –III.
Hard Disk Drive
Cache Memory
Software Specifications:
:
4.3 GB.
:
512KB.
28.
Operating System
Front End
BackEnd
:
:
:
Java Using Servlets
Oracle 8i or SQL Server or Access.
Database Connectivity :
•
Windows 98/NT.
JDBC,Microsoft ODBCDriver for Oracle.
GLOBAL COMMUNICATION MEDIA
Abstract:
The main concept of Global Communication Media is developing the communication with all persons of
the same organization on the net. We can compare the Global Communication Media with the
Telephonic Communication. Normally in Telephone Conference, there will be more than two users
connected at a time and all the users are able to here word from any one of the users. So implementing
the same concept on the Net is nothing but Global Communication Media.
This project is used to:
1.
Conduct conferences with their employees. So they can get online decisions from employees
from the different branches of the company.
1.
The another advantage is that the company is having branches throughout the country. So this
will help them to communicate business affairs of the company and live meetings and conferences
between their directors. They can conduct board of directors meeting.
1.
It will give On-line solutions from the superiors to the employees.
Introduction
Communication is very much essential and the importance of it is increasing from time to time
along with the evolution of human needs. Developing Global Communication for an Organization.
The main concept of Global Communication is developing the conference on the net. We can
compare the Global Communication with the Telephone Conference. Normally in Telephone
Conference, there will be more than two users connected at a time and all the users are able to here
29.
words from anyone of the user. So implementing the same concept on the Net is nothing but Global
Communication
Proposed System:
The proposed system is to maintain the conferences, live meetings, general body meetings on the net.
This system is to develop in a client/server environment. It aims to do the following.
1.
Grouping: Grouping of selected users
2.
Support of multi conference
3.
By selecting the single user from the list, Talk can be achieved
4.
By selecting all the users in the list, Chat can be achieved
Admin Features:
1.
Create Edit, and Delete Conference Rooms.
2.
Create, Edit, and Delete Users.
3.
Moderator Privileges.
4.
View and Delete Message Archives.
5.
View Statistics.
6.
Ban Users.
Client Features:
1.
User Registration
2.
Private Messaging
3.
Create Room
4.
Moderator
5.
Lists all Users in Conference Room
6.
View profiles
30.
Software Details:
Server OperationSystem: Windows 2000 Professional.
Client Operating System: Windows 2000 Professional.
Software Used:
j2sdk1.4.2_04, Internet Explorer 5.0.
Web server Used:
Tomcat 5.0.
Languages Used:
JSP, Servlets, JDBC, Java Script, CSS and HTML.
Database:
Oracle 8i (8.1.5.0.0).
Hardware Details:
Server
PENTIUM IV 2.4GHz, With Dual Processor
128MB RAM
256 KB EXTERNAL CACHE MEMORY
20 GB HARD DISK
•
Google map-wc
Abstract:
It would be very convenient if the common man gets the information of all the events taking place at
various locations on a single portal:
•
With location information
•
Event informationGoogle map-wc
To provide a Google Map Based Event Management Portal using which the user can register for the
various desired events happening at any location from anywhere, which saves time and cost, thus makes
the system more interactive, dynamic and flexible.
31.
The project usesFlex based Google Maps as the front-end. As soon as the application is launched, one
can identify a particular location. Whenever the user clicks over the location, it gets a list of all the
events that take place on a particular day. By clicking on the name in the list, one can register for that
event. When the registration process is completed, one will come to know about the number of
members, at what time the events are scheduled, and also ready to have open chat with the members.
•
GovtSchemes-wc
Abstract:
•
Most of the schemes introduced by the Government go into dustbin just because the officials
who implement the schemes could not make them available to suitable people. So there is a secured
and transparent system needed which enable an ordinary person to directly apply for a scheme and
track the status from time to time and know whether he is entitled to receive the fruit or his application
is rejected by the officials. In any case, the applicant should be able to know the reason for rejection
openly. This catches trust in the Government from the people and avoids mis-utilization of funds.
•
Government Scheme Management System is a software application to automate the process for
utilization of various schemes provided by government for various panchayats. Government Scheme
Management System Software takes care of the activities related to the schemes provided by the
government. The major responsibility is to take care of the proper utilization of different schemes in a
transparent way.
•
This system clearly keeps track of the status of user’s application by tracking the actual activities
that are under process within the panchayat or at higher level at any point of time, by the
administrators. This system provides effective way to manage the important information in a very
secure manner by authenticating users at various levels.
•
This system design is modularized into various categories covering the internal official
management concepts associated with the information of the panchayats and user applications with
different levels of abstraction.
•
This system has very good GUI so that a novice user did not feel any operational difficulties. This
system mainly concentrated in designing various reports requested by the users as well as higher
authorities such as Scheme wise details report, Panchayat wise details report, User wise report etc.
•
When the user applies for a scheme, his details will be stored in the database and sent to the
panchayat for verification. Panchayat people conduct a physical verification and sends their remarks to
the DDO who would write his comments. These details are sent to final approving authority and help
him to approve or disapprove the person for the scheme. The same details can be viewed by the user so
that the user would get a clear picture of what is happening from time to time.
32.
•
Technologies used: J2SE,Servlets, JSP, JDBC and Java Script.
•
Human resource management system
Abstract:
•
The main of the project is to develop a Human Resource Management system for the Intranet
Automation of HR Software .HR system provides the information regarding the employees I the
company. The system has been to facilitate good Interaction/ communication facilities between the
employees and HR Administration.
•
The web pages about an employee are created dynamically based on the user id and password
and links are provided to web pages containing information about employee General details , Contact
details ,skill details etc., he also has the facility of viewing a summary report of all the projects done by a
particular employee. A list of all employees is provided along with employee’s Designation and
Department.
•
Info ware Services
•
Abstract:
•
This project will be designed and developed for university of Pittsburgh about FAQ’s posted to
various departments. The University examination branch wants to maintain all the frequently asked
questions in the database subject wise, to avail them to all the students. And they will update the
questions as and when required. The primary goal of a InfowareServices is to provide an environment
that is both convenient and efficient to use in retrieving and storing database information.
The database system must provide for the safety of the information stored, despite system
crashes or attempts at unauthorized access. If data are to be shared among several users, the system
must avoid possible anomalous results.
•
Insurance
Abstract:
33.
•
Insurance system automatesthe management of insurance activities, which involves Defining
Policies, Schemes, Policy Specifications, Policy Terms and Conditions, Policies registrations by the
customers, Facilitates the Premiums Flexi-Pay modes, Policy Bonus in Flexible periods.
The Agents are involved in the process of the Customer Policy registration and the Commissions are
based on the targets achieved by the Agents.
•
Insurance System also maintains the database of the Branch Managers who deals with the
Agents which in turn deals with the Customers.
•
Intranet Mailing System
Abstract:
•
This system facilitates mailing among users of an Intranet. Now-a-days organizations are
growing fast and are increasing in size also. So these organizations are divided into departments. In the
fast growing world the information is needed as fast as possible. This can be accomplished by passing
the information quickly. Quick passing of mails is not possible in manual systems. This is because the
information is passed through persons of one department to another department. This leads to the
inconsistency and delay in delivering information. So we need a system which is both quick and
accurate. This can be achieved by developing a web-based Intranet Mailing System.
•
EXISTING SYSTEM
Present System is manually providing services to employees of departments of an Organization.
Employees have to go departments to know some particular information. Sometimes information is
passed by manually between departments. This manual system will take time to pass the information
and sometimes it causes loss of information also. There by causing loss of employee time also. Thus the
present system stated is time taking, insecure and costly.
•
PROPOSED SYSTEM
As organization grows in size in terms of departments and functionalities, it requires a quick and
efficient system to achieve instant communication b/w employees of same department or b/w
departments. The proposed system “Intranet Mailing System” serves organization’s needs in a
consistent and transparent manner. It should cater the needs of information sharing. It allows the users
to exchange their views thru mails and send electronic files thru attachments. It should have all
traditional things such as sent items, inbox, drafts etc. The users are allows to send mails to multiple
users using to, cc and bcc too. Thus the system caters spontaneous needs of the organization.
•
SCOPE OF THE SYSTEM
34.
The proposed systemscope is limited to Intranet only. It can be enhanced to be a global communication
medium for multinational companies. We can also implement internationalization (i18n) to support user
interface in various/local languages.
• Intrusion Detection System over Abnormal
Internet Sequence
Abstract:
•
This paper reports the design principles and evaluation results of a new experimental Intrusion
Detection System Over Abnormal Internet Sequence . This Intrusion Detection System combines the
advantages of low false-positive rate of signature-based intrusion detection system (IDS) and the ability
of anomaly detection system (ADS) to detect novel unknown attacks. By mining anomalous traffic
episodes from Internet connections, we build an ADS that detects anomalies beyond the capabilities of
signature-based SNORT or Bro systems. A weighted signature generation scheme is developed to
integrate ADS with SNORT by extracting signatures from anomalies detected. Intrusion Detection System
extracts signatures from the output of ADS and adds them into the SNORT signature database for fast
and accurate intrusion detection. By testing our HIDS scheme over real-life Internet trace data mixed
with 10 days of Massachusetts Institute of Technology/ Lincoln Laboratory (MIT/LL) attack data set, our
experimental results show a 60 percent detection rate of the Intrusion Detection System, compared
with 30 percent and 22 percent in using the SNORT and Bro systems, respectively. This sharp increase in
detection rate is obtained with less than 3 percent false alarms. The signatures generated by ADS
upgrade the SNORT performance by 33 percent.
•
The Intrusion Detection System approach proves the vitality of detecting intrusions and
anomalies, simultaneously, by automated data mining and signature generation over Internet
connection episodes.
•
Lending Tree
Abstract:
Most of the bank out-sources pre-loan process to loan agencies to reduce the burden and let the
agencies pickup the information from customers and verify it before it is being forwarded to the actual
bank for approval of loan.
35.
Lending Tree isan interface which facilitates a customer to apply for a loan from on-line and to track the
status from time-to-time along with aiding the loan approval agency to verify and accept/reject the
customer file. Lending Tree is unique in such a way, it not only helps the customers but also the loan
agency to check the pending, assign it to a departments, complete the formalities and procedures
between the departments and arrive at decisions to very fact in addition to providing a transparency
system for every one.
The customer can directly apply for a loan by selecting a bank and loan type from the list available. The
application is received by loan agency that will have three departments- PickUp, Verifiaction and Legal.
This system can be controlled by the administrator. First he will look at the application received and allot
the application for a particular employee of pickup department. The employee will go and make a
physical verification of the documents at the customers and receives the documents necessary for the
loan. Then he logs into this system and forwards the application to the verification department which
will verify the whereabouts of the person, his organization, his salary particulars etc. and then forwards
the application with a status verified. Then application reaches the legal department. The legal
department people will verify the builder details and when satisfied sends their report to the
administrator.
The administrator or final approving authority views both types of reports, Viz, the reports from
verification department and the report legal department. This will help him to take a decision regarding
whether to forward it to the bank or not. The same is communicated to the customer.
The customer can at any time view the status of his application and can send any messages to the
administrator and can get clarifications from him. Thus the lending tree s/w helps to simplify the loan
system along with making the work easy.
There are 5 types of users who can get immense benefits from system:
•
The customer - seeking the loan and information related to banks and loans
•
The administrator of loan agency who will take track the decision of bank to approve or
disapprove and also controls the overall system functionality
•
The PickUp department users who picks up the details and documents from customers
•
The verification department user who make a physical verification of the details submitted by
the customer
•
The legal department user who verifies the legality of the documents of the builder and
construction.
Technologies Used: J2Se, Servlets, JSP, JDBC and Java Script.
36.
•
Master and ScienceResearch Center
Abstract:
•
This system allows the student into the center with scratch card id. Whenever the student
scratch his card the id will be checked whether existing or not. If it is existed then allows otherwise the
door will not opened, this entire thing will be done by some ports with the help of Java API. The actual
intention of this project is take the login time and store it in the database, enter the logout time of the
student into database and take for which course (n number of courses) the student is coming. This
project gives the reports to the admin module by course, date and student.
•
Matrimony.com
Abstract:
•
Matrimony.com is a virtual marriage bureau, providing free service to bride and bride grooms
world-wide. One can place his / her profile with photograph without any charge. Not only this, it has
listing of businesses related to matrimonials or marriages, like florists, banquet halls, etc.
Matrimony.com is the Matrimony Portal, providing a well-integrated platform for millions worldwide
seeking a marriage alliance
Not yet a Member ? Register Free
With a registered membership of more than millions of brides and grooms and over lakhs of successful
marriages,Matrimony.com is undoubtedly the most trusted name in matrimonial portals.
Matrimony.com blends the sanctity of traditionally arranged marriages, with the interactivity of Internet
technology.
Matrimony.com uses a secure online environment and the latest technology, to provide members with
fast, relevant and best matching results in strict confidence. We fulfill the needs of today's singles who
are searching for convenient and effective ways to meet other eligible.
The technology used is the latest technology in order to meet the requirements of the people.
•
MediTracker
Abstract:
37.
Every hospital needsan online system where by it can accommodate the patients comfortably and avoid
any confusion to the doctors regarding their work. There should be a system where the patients are
categorized under insurance policy and non policy holders and the system helps the hospital
management to claim the bills from concerned insurance companies. All these needs and much more
are fulfilled in MediTracker.
MediTracker is useful to record patient’s details along with the compliant. It also records the inpatient
details and outpatient details and arranges the appointment of doctors. MediTracker also provides the
management reports like schedules, appointments of doctors, inpatients, insurances and discharges.
And also used to generate bills dynamically for the discharged patients etc.
The administrative user can create new users and change their passwords. He can add the doctor’s
information as well as new doctor’s details. He can add information related to inpatients, outpatients,
rooms availability, billing and insurance information. The administrator can view the management
reports.
The doctors can change their own passwords. He can view his own appointments and information of
inpatients and outpatients for any day.
Manager is another person who manages the activities in the hospital. He can add a new doctor to the
list. He can also add new room information. He can view the information of doctors, rooms and patients.
An accountant can add the information related to patient insurances and view all the reports. He can
view the details of inpatients, outpatients and discharged patient’s information. He also collects the bill
amount from the patient and enters it into the system. MediTracker thus ensures smooth operation of
the hospital management tasks as well as offering facility to the patients.
•
MingleSpot
Abstract:
•
MingleSpot is an online community designed to make your social life more active and
stimulating. It’s social network can help you maintain existing relationships with pictures and messages,
and establish new ones by reaching out to people you've never met before. It will become the fastest
growing travel and lifestyle social networking community portal in future and discover how easy it is for
you to keep in touch, meet people from around the world and keep your friends and family informed of
your whereabouts movements and activities. Use messaging capabilities to keep in touch simply, quickly
and cheaply!
38.
MingleSpot makes iteasy to find people who share your hobbies and interests, look for romantic
connections or establish new business contacts. You can also create and join a wide variety of online
communities to discuss current events, reconnect with old school mates or even exchange your favorite
recipes.
•
MingleSpot is a flagship example of the next generation of internet companies born out of the
world with global potential. By sharing tips and introductions with likeminded travellers, it’s members
can get more out of their leisure time. This brand will have massive growth potential and we will be
delighted to be involed .The System after careful analysis has been identified to present with the
following modules. The following functionalities are incorporated in this application
•
Net-banking
Abstract:
•
The main objective of the proposed solution is to be automated the various functions and
activities of the bank through Internet. The solution will facilitate to the bank employees and the
account holders with the different modules. This solution is very much necessary for the private sector
banks and the corporate sector. The banking industry will take a new shape and explore like never
before. Using the solution the bankers and account holders can generate various kinds of reports.
To develop net banking project we used the software html, java script, are used to develop front page
.jsp and servlets are used to develop front end. Oracle is used to store the details of customer in
database. Jdbc drivers is used to connect the java with oracle.
•
On-line java compiler with security editor
Abstract:
•
As it is a competitive world and very fast world, every thing in the universes is to be internet. In
this internet world all the things are on-line. So we created software called “On-line java compiler with
security editor”.
The main aim of this project we can easily to write a java program and compile it and debug in
on-line. The client machine doesn’t having java development kit .The client machine only connected to
the server. The server having java compiler .so server executes the java code and produce the error
message to the appropriate client machine.
39.
In this projectis also creating a security editor. This editor performs Encrypt and decrypts the
file. Encryption and decryption process perform using RSA Algorithms. There is lot of security algorithms
are there, but RSA algorithm is very efficient to encrypt and decrypt the file.
In this project is used to view all type of java API .It is very useful for writing the java program
easily, for example if any error in the format of API means we can able to view API throw this modules.
•
ONLINE_EXAMS_POJECT
Abstract:
•
Internet is the means for people to communicate, fulfil their needs and exchanging ideas.
Applications on Internet is playing very vital role now a days. Internet made this world into a global ville.
Now a days Internet is means to full-fill your desire at mouse click and roam around the world sitting in
front of your computer.
•
This Website gives information about the Libraaa Computer Education, which provides
certificate courses in computers. It has branches all over the city.
The main screen appears which consist information about how to follow through the application. Once
the client selects his option from the homepage, he will be forwarded into the details. If the user wants
to know about the history of institution he can click on ABOUT-US and the details of the courses
available in this institution can click on COURSE DETAILS. If the user is the new person he can register his
User-id by using student registration form. If the student already registered can write the examination.
Information regarding the details of the student will be displayed in the browser and a client can fulfil
the details and can register in the institute that the management will keep in touch with him. Details of
the course will be displayed from the course information module.
•
OnlineBanking
Abstract:
The purpose of the program is to simulate a networked Banking System or Bank Account Management
System. The primary facilities and capabilities which the program offers include:
40.
•
Creating new accounts
•
Accessingexisting accounts
•
Depositing and withdrawing money
•
Setting overdraft limits
The program simulates, and allows for the manipulation of three types of bank account:
•
Current Accounts
•
Savings Accounts (called “Platinum” Accounts)
•
Student Accounts
Current Accounts do not support an overdraft limit. Platinum and Student Accounts do support an
overdraft limit. The program does not facilitate interest rates and does not calculate interest.
The program does not implement any account security (such as a PIN number) to prevent access to
existing accounts. The program allows access to accounts, given a valid and existing account number.
•
OnlineLibrary
Abstract:
Name of the Project
Online Library
Vision System is a system, which maintains the information about the books present in the library,
their authors, the members of library to whom books are issued, library staff and all.
Deliverables / Functional Specifications Online Library Management System is a system which maintains
the information about the books present in the library, their authors, the members of library to whom
books are issued, library staff and all. This is very difficult to organize manually. Maintenance of all this
information manually is a very complex task. Owing to the advancement of technology, organization of
an Online Library becomes much simple.
The Online Library Management has been designed to computerize and automate the operations
performed over the information about the members, book issues and returns and all other operations.
This computerization of library helps in many instances of its maintenances. It reduces the workload of
management as most of the manual work done is reduced.
41.
User Interface Requirements
Browserbased
Database Requirements Centralized
Integration Requirements
Web based Interface
Preferred Technologies J2EE Technologies i.e JSP, Servlets
Front End :- Html, JavaScript
BackEnd :- Oracle 8i
Hardware Requirement Pentium 4 processor with 256 MB RAM, 40 GB Hard disk
•
PayRoll
Abstract:
•
The actual problem is to maintain different database for an organization whose main purpose is
to issue pay-slips for their employees every month working in various departments of the organization,
and maintain details of all the departments, employees with various grades, their designations and
address details.
In the manual system it is difficult to maintain data and generating different reports according to
requesting transaction. In the present system it is becoming difficult to issue pay-slip for all the
employee every month by manually going through the various record of the organization. i.e the manger
have to go through all the records of the organization of various departments of the and find out the
employee working in a particular department and go through his grade, and he have to check the
employee leaves of that month, his earnings and his deductions along with his pf and all other
deduction including his IT and savings. So, to perform all these activities it is becoming difficult the
admin/manager every month.
Hence in order to overcome the difficulties of the organization the present system is automated to
perform all the activities of the organization.
•
Pharmacy system
Abstract:
•
This Project “ Pharmacy System” is a solution to Aurobindo Pharma to take the orders from its
distributors who are geographically distributed. This new system not only takes the orders from
42.
distributors for AurobindoPharma but it also facilities. The administration, as well as the report
generation for the firm. The basic structure of the system as follows.
This project is a web-based project, and no doubt to say this is a Client-Server System. Each user of
this system is given a unique id and password along with some Information for our report generation,
and administration. Later the user id will be used for his identification. The system maintains vendors,
category of products they are supplying, products under each category, discount, and payment modes
such as DD, Cheque, and online payment mode Credit Card. This system also maintains the order
details, to provide the valuable reports regarding sales to the organization whenever they want. Here
we are providing the administration part too for the organization.
This system provides information entered but also analyzes data. Each user’s details are kept
private and no other body can tinker with them.
•
Some people express their view that where is the actual need for this kind of system.
Ordering systems on isolated computers and personal
•
Product service management system
Abstract:
•
The system is a web based Manufacturing System that enables a Manufacturing company to
schedule its manufacturing operations based on the daily update of sales from its dealers. The system is
modeled to be used by a Manufacturing company, whose main activity is manufacturing different
products & then selling the finished goods through a network of Dealers.
To start with, the Stocks of all the Products manufactured by the company and held in the company
ware-house are stored in a Database. The details that are stored include the quantity of each product
held with the company dealers who hold the stocks of finished products for sale.
Once the sales figures of Products sold in the past week are entered by the Dealers over the internet
along with the Orders for the next delivery, the schedule for the next week’s production will be drawn
up. A report of the required raw materials or parts will be drawn up with the approved suppliers for
each & the suppliers will be intimated about the part requirements over the internet & asked to quote
their rates. The message asking for a Quotation will be sent as an e-mail message. Once the rates are
quoted, the Order will be placed with the required delivery schedules.
The system incorporates intelligent Order processing System which checks and intimates the required
Higher-ups in the Company about any discrepancies in the Orders that were placed. For example if an
Order is placed with a Supplier whose rates are not the least then an automatic Event-generation will
send the details of the Order & the person who placed it to the Managers or Directors who are
supposed to oversee the process.
43.
Once the partsare supplied the Part Stocks will be updated. Then a production plan will be drawn up
taking the Bill-of-materials into consideration. The Bill-of-Materials contains the details of each Product
& the type & quantity of Parts required for manufacturing a single unit of the Product. Once the
Production plan is approved, the Part Stocks will be updated when the Parts are issued to the
Production Department. Once the finished products are available from the Production Department, the
Products will be dispatched based on the Orders placed by the Dealers. The stocks with the dealers will
also be maintained.
•
Project online music application
Abstract:
The E-Music World application is an Online Website for an Organization. It is a virtual showcase for
different types of products like FILM, GHAZHAL, POP, DEVOTIONAL, and ROCK, CLASSICAL, FOLK etc. The
main aim of this project is to make Online shopping very easily. The Special thing about this project is it
provides different types of CDs to purchase.
A leading music show room spanning across the twin cities of Hyderabad is targeting towards smooth
internal communication and functioning for the customers along with other useful information. This
document serves as the base for the project requirements. It captures the requirements for the project.
It contains a broad overview and purpose of the Internet CD shopping summary plan and detailed design
of all the pages. The template that gives the detailed requirements of the Internet CD shopping for each
module is as follows:
The purpose of this project is as follows:
•
To present the variety of items category wise to the customer.
•
To get member information
•
To collect order information from the customer
•
To display the list of ordered items to the administrator.
•
project status info system
Abstract:
44.
•
The Project entitled"Project Management Information System (PMIS)" deals with the various
levels of project development and will account for time used in analysis, design programming, testing
and verification etc.
Information systems development projects range from one-person projects that take very little time and
effort to multiple person, multi year efforts costing millions of dollars. The goal of Project Management
Information System (PMIS) is to prevent projects from coming in late and going over budget.
Project Management Information System (PMIS) gives the management a clear picture of the usage of
time by various projects i.e. utilized time and unutilized time. Every activity, no matter how small or
large, requires use of the commodity called time. There is no substitute for time as there are substitutes
for other resources. As such it is one of the most precious of resources. By analyzing the results provided
by the software they might rectify the defects in utilizing time and take remedial actions.
Project Management Information System (PMIS) takes time sheet as input. The input may be in nonstandard format differing from project to project.
Project Management Information System (PMIS) produces output in the form of reports. This output
gives a clear picture of the time used at various levels of the project.
•
In Project Management Information System (PMIS) new project information is entered by the
technical manager, based on the project information project manager will assign activities to employees
who are working under him.
•
Project status information system
Abstract:
•
The Project entitled "Project Status Information System (PSIS)" deals with the various levels of
project development and will account for time used in analysis, design programming, testing and
verification etc. Information systems development projects range from one-person projects that take
very little time and effort to multiple person, multi year efforts costing millions of dollars. The goal of
Project Status Information System (PSIS) is to prevent projects from coming in late and going over
budget. Project Status Information System (PSIS) gives the management a clear picture of the usage of
time by various projects i.e. utilized time and unutilized time. Every activity, no matter how small or
large, requires use of the commodity called time. There is no substitute for time as there are substitutes
for other resources. As such it is one of the most precious of resources. By analyzing the results provided
by the software they might rectify the defects in utilizing time and take remedial actions. Project Status
Information System (PSIS) takes time sheet as input. The input may be in non-standard format differing
from project to project. Project Status Information System (PSIS) produces output in the form of reports.
This output gives a clear picture of the time used at various levels of the project. In Project Status
45.
Information System (PSIS)new project information is entered by the technical manager, based on the
project information project manager will assign activities to employees who are working under him.
•
Resource out Sourcing
Abstract:
•
Resource outsourcing is developed for creating an interactive job vacancy for candidates. This
web application is to be conceived in its current form as a dynamic site-requiring constant updates both
from the seekers as well as the companies. On the whole the objective of the project is to enable
jobseekers to place their resumes and companies to publish their vacancies. It enables jobseekers to
post their resume, search for jobs, view personal job listings. It will provide various companies to place
their vacancy profile on the site and also have an option to search candidate resumes. Apart from this
there will be an admin module for the customer to make changes to the database content.
•
ResourcePlanner
Abstract:
•
When a software development company wants to achieve its goals on time and efficiently use
its staff on the projects, it is necessary for the company to have hands on information related to number
of employees working on various projects along with their skill set and the number of employees still
needed to complete the projects on time. Resource Planner is a convenient tool to handle various
projects in a software company efficiently.
•
Resource Planner is an online tool to manage projects currently running with the company as
well as future projects. This tool tracks the employees working for the existing projects and details of
new projects like no. of employees required, location, etc. This tool is very useful in estimating revenue,
etc which helps higher management to know the status of the various projects and work force. With this
tool HR can estimate the requirement of employees for the new projects and hence can recruit exact
number of employees.
•
This application maintains the centralized database so that any changes done at a location
reflects immediately. This is an online tool so more than one user can login into system and use the tool
simultaneously.
46.
•
The administrator ofthis software will be able to create new users and remove any user. He
allots passwords and changes them. He can view the details of all employees in the company. He can
also view the management reports where the information is presented project wise and location wise.
•
HR manager should take a decision regarding whether to recruit any employees and whether
there is dearth of any resources in a project. The project manager can view the details of the employees
in the company and the employees in his projects. He can also get the information of how many
employees are there in a particular project and their skill set. When he wants employees for a particular
project, he can add that information mentioning how many are working on the project and how many
employees are totally needed for the project. This information can be had both for online and offline
projects. This information is used in generating a special report called GAP summary.
•
SecuredNetAuction
Abstract:
•
Auctions are among the oldest economic institutions in place. They have been used since
antiquity to sell a wide variety of goods, and their basic form has remained unchanged. In this
dissertation, we explore the efficiency of common auctions when values are interdependent- the value
to a particular bidder may depend on information available only to others-and asymmetric. In this
setting, it is well known that sealed-bid auctions do not achieve efficient allocations in general since they
do not allow the information held by different bidders to be shared.
•
ShoutBox
Abstract:
•
As it is a competitive world and very fast world, every thing in the universes is to be internet. In
this internet world all the things are on-line. So we created software called “On-line java compiler with
security editor”. The main aim of this project we can easily to write a java program and compile it and
debug in on-line. The client machine doesn’t having java development kit .The client machine only
connected to the server. The server having java compiler .so server executes the java code and produce
the error message to the appropriate client machine. In this project is also creating a security editor.
This editor performs Encrypt and decrypts the file. Encryption and decryption process perform using RSA
Algorithms. There is lot of security algorithms are there, but RSA algorithm is very efficient to encrypt
and decrypt the file. In this project is used to view all type of java API .It is very useful for writing the java
program easily, for example if any error in the format of API means we can able to view API throw this
modules.
47.
•
SpeedAge
Abstract:
•
Speed Age CourierSystem will be the best ecommerce solution for courier business. If you need
to setup a new courier business then this system is your quickest solution. Very easy to setup and
manage powerful administration. Provide online tracking system of consignment and shipping detail for
any time of shipping.
•
Speed Age is a comprehensive courier software system designed to manage all aspects of a
delivery business. Order entry, deliveries, dispatches, receivables, corporate accounts and reporting are
some of the much functionality with the application. It is an application which aids to oversee the
operations of a courier company at a full-fledged managerial as well as user operational levels.
•
Status Information System
Abstract:
•
The Project entitled "Project Status Information System (PSIS)" deals with the various levels of
project development and will account for time used in analysis, design programming, testing and
verification etc.
Information systems development projects range from one-person projects that take very little time and
effort to multiple person, multi year efforts costing millions of dollars. The goal of Project Status
Information System (PSIS) is to prevent projects from coming in late and going over budget.
Project Status Information System (PSIS) gives the management a clear picture of the usage of time by
various projects i.e. utilized time and unutilized time. Every activity, no matter how small or large,
requires use of the commodity called time. There is no substitute for time as there are substitutes for
other resources. As such it is one of the most precious of resources. By analyzing the results provided by
the software they might rectify the defects in utilizing time and take remedial actions.
Project Status Information System (PSIS) takes time sheet as input. The input may be in non-standard
format differing from project to project.
Project Status Information System (PSIS) produces output in the form of reports. This output gives a
clear picture of the time used at various levels of the project.
48.
In Project StatusInformation System (PSIS) new project information is entered by the technical
manager, based on the project information project manager will assign activities to employees who are
working under him.
•
StockAnalyzer
Abstract:
•
StockAnalyzer is an online software application which fulfills the requirement of a typical Stock
Analysis in various godowns. It provides the interface to users in a graphical way to manage the daily
transactions as well as historical data. Also provides the management reports like monthly inwards,
monthly deliveries and monthly returns.
This application maintains the centralized database so that any changes done at a location
reflects immediately. This is an online tool so more than one user can login into system and use the tool
simultaneously.
The aim of this application is to reduce the manual effort needed to manage transactions and
historical data used in various godowns. Also this application provides an interface to users to view the
details like the daily Stock Statements of all godowns.
•
Stores management system
Abstract:
The system creates a web based manufacturing system that enables a manufacturing industry to
schedule its manufacturing operations based on the daily update of sales from its dealers. Once the
sales figures of items for the past week are entered by the dealers over the internet along with the
orders for the next delivery, the schedule for the next week’s production will be drawn up. A report of
the required raw materials or parts will be drawn up with the product requirements over the internet &
asked to quote their rates.
Once the rates are quoted, the order will be placed with the required delivery schedules. Once the parts
the parts are supplied the stocks will be updated. Then a production plan will be drawn up taking the bill
of materials into consideration. Once the production plan is approved, the stock will be updated when
the material is issued. Once the finished products are available the delivery schedules will be drawn up
based on the orders placed by the Dealers. The stocks with the dealers will also be maintained.
49.
The Benefits ofthe Stores Management System is
•
It is used as an intranet Application.
•
Providing High-Security.
•
Easy Business Solutions.
•
TelecomConnectionSystem-wc
Abstract:
The project entitled “Telecom connection system” deals with fully automated system used by the
Telecom department.
Telecom industry is one of the major sectors, which provides so many services to their customers
such as request for a new connection, change of number, billing etc.
Maintaining all these
services manually is complicated process.
The main objective of this project is to automate the services provided by telecom companies, by which
customer can use all the services online.
The project has been divided into four modules.
•
Applications
•
Entries
•
Enquiries
•
Complaints
The Applications module provides following services.
•
A customer can apply for a new telephone connection by filling the form.
•
He can request for transferring phone connection to another location.
•
He can modify the mode of bill payment details.
•
He can also cancel his phone connection.
The Entries module provides following services.
50.
•
If the customerrequested for change of telephone number, here if we enter the old number, it
will display the new number.
The Enquiries module provides following services.
•
The customer can make a request about his bill.
•
He can also know the information about changed numbers.
•
He can also ask about the status of his applications.
The Complaints module provides following services.
•
The customers can complaint regarding the service and all other issues.
•
Univesity Admission System
Abstract:
•
University wants to computerize its admission process for higher education courses.
Basic objectives are to extend their reach to geographically scattered students, reducing time in
activities, centralized data handling and paperless admission with reduced manpower. Cost cutting,
operational efficiency, consist view of data and integration with other institutions are other factors.
Main challenges are effectively sync internal and external operations in such a manner that job can be
finished within time limit and integration with different agencies on an agreed upon common data
format.
•
Web-Based Library
Abstract:
It is rightly said, “Knowledge is Power”. Knowledge achieved from reading Books. Hence LIBRARY is an
area where collection of books is done. Therefore Library is one of the most key components of an
education Institution. An excellent Library, stocked with varied reference books from basics to advanced
study helps the Students to enrich their knowledge. The Library must be constantly updated with the
Latest books of knowledge. The library should guide the following values: Knowledge, Service, Quality,
Integrity, Respect, and Communication.
51.
The most importantdepartment in and across the departments of an Educational institution is Library
department. It holds immense potential in terms of effectively and efficiently learning information
through various resources available. The main purpose of the Library management system is to reduce
the work of the Librarian. Library management system is being maintained manually till now, through
this application it can be maintained in the database.
This is an Intranet based application that can be accessed throughout the web. This system can be used
to search for all books, search books based on author, search books based on title and reserve books,
find out book is in available state or not. This is one integrated system that contains both the user
component and the librarian component.
The Librarian is granted administrative powers and can perform all the actions such as adding new books
to the library, updating existing books, deleting books, see the students requests and issuing books,
renewal & returning of books and managing all the accounts. Librarian can access the account of any
user and modify it.
In this Web-Based Library project there are mainly 2 modules
1.
Student.
2.
Librarian.
Student search all the books, books based on title and based on author Not only see the books details
can also reserve the book if the status of the book is Available by using this system the reduce the
librarian work.
Librarian can add the new book details, update existing book details, if Books are old then deleting
books into database, issue and renewal books. Librarian Can see the list of all reservation forms, list of
issued books, list of renewal books, List of reservation forms, list all books, list books based on title, list
books based on Author, list of all students and also see the inventory details.
In Student module students are first enter into the site by using user id and Password if these are
correct then entered into site other wise rejects the request. In This site students are first search all
books, search books based on title and search Books based on author in this students are seen the
status of the book if is available or not if it is available then see the book id for reservation purpose and
finally Reserving the book through web.
In Librarian module librarian add new book details into database if books are
Referenced once then keep the status as not available ate the time of adding new Book details. If
librarian wants to modify the book details then update book details Option is available. If book are old
then librarian can delete the book into database.
52.
Librarian can alsosee the search the all books, search books based on title and search books based on
author. And issue the books to students. Student’s request forms are stored into reservation table.
Librarian can see those forms by clicking the option of list of reservation forms then issue the books to
those students who are requesting for what books. Librarian can see the inventory of all books, list of
issued books, list of renewal books, list of all students. If librarian wants to send messages to students
then see the student’s details and send messages to their mail ids or call to their mobile numbers.
Librarian can issue books to students’ maximum of four.