SlideShare a Scribd company logo
1 of 20
Analyze
Opportunity Part 1
Failure Modes Effect Analysis
(FMEA)
Learning Objectives
2
 To understand the use of Failure Modes Effect
Analysis (FMEA)
 To learn the steps to developing FMEAs
 To summarize the different types of FMEAs
 To learn how to link the FMEA to other
Process tools
Benefits
3
 Allows us to identify areas of our process that
most impact our customers
 Helps us identify how our process is most likely to
fail
 Points to process failures that are most difficult to
detect
Application Examples
4
 Manufacturing: A manager is responsible for moving a
manufacturing operation to a new facility. He/she
wants to be sure the move goes as smoothly as
possible and that there are no surprises.
 Design: A design engineer wants to think of all the
possible ways a product being designed could fail so
that robustness can be built into the product.
 Software: A software engineer wants to think of
possible problems a software product could fail when
scaled up to large databases. This is a core issue for
the Internet.
What Is A Failure Mode?
5
 A Failure Mode is:
 The way in which the component, subassembly,
product, input, or process could fail to perform its
intended function
 Failure modes may be the result of upstream
operations or may cause downstream operations
to fail
 Things that could go wrong
What Can Go
Wrong?
FMEA
6
 Why
 Methodology that facilitates process improvement
 Identifies and eliminates concerns early in the
development of a process or design
 Improve internal and external customer satisfaction
 Focuses on prevention
 FMEA may be a customer requirement (likely
contractual)
 FMEA may be required by an applicable
Quality Management System Standard (possibly
ISO)
FMEA
7
 A structured approach to:
 Identifying the ways in which a product or process
can fail
 Estimating risk associated with specific causes
 Prioritizing the actions that should be taken to
reduce risk
 Evaluating design validation plan (design FMEA) or
current control plan (process FMEA)
When to Conduct an FMEA
8
 Early in the process improvement investigation
 When new systems, products, and processes
are being designed
 When existing designs or processes are being
changed
 When carry-over designs are used in new
applications
 After system, product, or process functions are
defined, but before specific hardware is
selected or released to manufacturing
History of FMEA
9
 First used in the 1960’s in the Aerospace
industry during the Apollo missions
 In 1974, the Navy developed MIL-STD-1629
regarding the use of FMEA
 In the late 1970’s, the automotive industry
was driven by liability costs to use FMEA
 Later, the automotive industry saw the
advantages of using this tool to reduce risks
related to poor quality
Examples
The FMEA Form
10
Identify failure modes
and their effects
Identify causes of the
failure modes
and controls
Prioritize Determine and
assess actions
A Closer Look
Types of FMEAs
11
 Design
 Analyzes product design before release to
production, with a focus on product function
 Analyzes systems and subsystems in early
concept and design stages
 Process
 Used to analyze manufacturing and assembly
processes after they are implemented
Specialized
Uses
FMEA: A Team Tool
12
 A team approach is necessary.
 Team should be led by the Process Owner who is
the responsible manufacturing engineer or
technical person, or other similar individual
familiar with FMEA.
 The following should be considered for team
members:
– Design Engineers – Operators
– Process Engineers – Reliability
– Materials Suppliers – Suppliers
– Customers
Team Input
Required
FMEA Procedure
13
1. For each process input (start with high value inputs),
determine the ways in which the input can go wrong
(failure mode)
2. For each failure mode, determine effects
 Select a severity level for each effect
3. Identify potential causes of each failure mode
 Select an occurrence level for each cause
4. List current controls for each cause
 Select a detection level for each cause
Process Steps
FMEA Procedure (Cont.)
14
5. Calculate the Risk Priority Number (RPN)
6. Develop recommended actions, assign responsible
persons, and take actions
 Give priority to high RPNs
 MUST look at severities rated a 10
7. Assign the predicted severity, occurrence, and
detection levels and compare RPNs
Process Steps
FMEA Inputs and Outputs
15
FMEA
C&E Matrix
Process Map
Process History
Procedures
Knowledge
Experience
List of actions to
prevent causes or
detect failure
modes
History of actions
taken
Inputs Outputs
Information
Flow
Severity, Occurrence,
and Detection
16
 Severity
 Importance of the effect on customer requirements
 Occurrence
 Frequency with which a given cause occurs and
creates failure modes (obtain from past data if
possible)
 Detection
 The ability of the current control scheme to detect
(then prevent) a given cause (may be difficult to
estimate early in process operations).
Analyzing
Failure &
Effects
Rating Scales
17
 There are a wide variety of scoring “anchors”,
both quantitative or qualitative
 Two types of scales are 1-5 or 1-10
 The 1-5 scale makes it easier for the teams to
decide on scores
 The 1-10 scale may allow for better precision
in estimates and a wide variation in scores
(most common)
Assigning
Rating
Weights
Rating Scales
18
 Severity
 1 = Not Severe, 10 = Very Severe
 Occurrence
 1 = Not Likely, 10 = Very Likely
 Detection
 1 = Easy to Detect, 10 = Not easy to Detect
Assigning
Rating
Weights
Risk Priority Number (RPN)
19
 RPN is the product of the severity, occurrence,
and detection scores.
Severity Occurrence Detection RPN
X X =
Calculating a
Composite
Score
Summary
20
 An FMEA:
 Identifies the ways in which a product or process
can fail
 Estimates the risk associated with specific causes
 Prioritizes the actions that should be taken to
reduce risk
 FMEA is a team tool
 There are two different types of FMEAs:
 Design
 Process
 Inputs to the FMEA include several other Process
tools such as C&E Matrix and Process Map.
Key Points

More Related Content

Similar to IT 381_Chap hubybybybybybybytggyguh7h7_7.ppt

Similar to IT 381_Chap hubybybybybybybytggyguh7h7_7.ppt (20)

Failure Modes and Effects Analysis (FMEA).ppt
Failure Modes and Effects Analysis (FMEA).pptFailure Modes and Effects Analysis (FMEA).ppt
Failure Modes and Effects Analysis (FMEA).ppt
 
Pfmea training 1111.pptx
Pfmea training 1111.pptxPfmea training 1111.pptx
Pfmea training 1111.pptx
 
failure modes and effects analysis (fmea)
failure modes and effects analysis (fmea)failure modes and effects analysis (fmea)
failure modes and effects analysis (fmea)
 
Failure modes effect analysis
Failure modes effect analysisFailure modes effect analysis
Failure modes effect analysis
 
Fmea
FmeaFmea
Fmea
 
FMEA
FMEAFMEA
FMEA
 
Fmea
FmeaFmea
Fmea
 
FMEA failure-mode-and-effect-analysis_Occupational safety and health
FMEA failure-mode-and-effect-analysis_Occupational safety and healthFMEA failure-mode-and-effect-analysis_Occupational safety and health
FMEA failure-mode-and-effect-analysis_Occupational safety and health
 
Fmea handout
Fmea handoutFmea handout
Fmea handout
 
Mahi2
Mahi2Mahi2
Mahi2
 
Mahi2
Mahi2Mahi2
Mahi2
 
Failure mode effect_analysis_fmea
Failure mode effect_analysis_fmeaFailure mode effect_analysis_fmea
Failure mode effect_analysis_fmea
 
FMEA new.pptx
FMEA new.pptxFMEA new.pptx
FMEA new.pptx
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect Analysis
 
Failure modes effect analysis
Failure modes effect analysisFailure modes effect analysis
Failure modes effect analysis
 
Unit 3
Unit 3Unit 3
Unit 3
 
PFMEA
PFMEAPFMEA
PFMEA
 
Failure mode and effect analysis
Failure mode and effect analysisFailure mode and effect analysis
Failure mode and effect analysis
 
FMEA-Training.pptx
FMEA-Training.pptxFMEA-Training.pptx
FMEA-Training.pptx
 
Yale FMEA Introduction Lecture Full Slides
Yale FMEA Introduction Lecture Full SlidesYale FMEA Introduction Lecture Full Slides
Yale FMEA Introduction Lecture Full Slides
 

Recently uploaded

React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaHanief Utama
 
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...soniya singh
 
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdfGOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdfAlina Yurenko
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEOrtus Solutions, Corp
 
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackVICTOR MAESTRE RAMIREZ
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxTier1 app
 
software engineering Chapter 5 System modeling.pptx
software engineering Chapter 5 System modeling.pptxsoftware engineering Chapter 5 System modeling.pptx
software engineering Chapter 5 System modeling.pptxnada99848
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWave PLM
 
Asset Management Software - Infographic
Asset Management Software - InfographicAsset Management Software - Infographic
Asset Management Software - InfographicHr365.us smith
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...gurkirankumar98700
 
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer DataAdobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer DataBradBedford3
 
chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptkotipi9215
 
Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...OnePlan Solutions
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...MyIntelliSource, Inc.
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideChristina Lin
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024StefanoLambiase
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesPhilip Schwarz
 
Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Andreas Granig
 

Recently uploaded (20)

React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief Utama
 
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
 
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdfGOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
 
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
 
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStack
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
 
software engineering Chapter 5 System modeling.pptx
software engineering Chapter 5 System modeling.pptxsoftware engineering Chapter 5 System modeling.pptx
software engineering Chapter 5 System modeling.pptx
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need It
 
Asset Management Software - Infographic
Asset Management Software - InfographicAsset Management Software - Infographic
Asset Management Software - Infographic
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
 
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer DataAdobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
 
chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.ppt
 
Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...
 
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a series
 
Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024
 

IT 381_Chap hubybybybybybybytggyguh7h7_7.ppt

  • 1. Analyze Opportunity Part 1 Failure Modes Effect Analysis (FMEA)
  • 2. Learning Objectives 2  To understand the use of Failure Modes Effect Analysis (FMEA)  To learn the steps to developing FMEAs  To summarize the different types of FMEAs  To learn how to link the FMEA to other Process tools
  • 3. Benefits 3  Allows us to identify areas of our process that most impact our customers  Helps us identify how our process is most likely to fail  Points to process failures that are most difficult to detect
  • 4. Application Examples 4  Manufacturing: A manager is responsible for moving a manufacturing operation to a new facility. He/she wants to be sure the move goes as smoothly as possible and that there are no surprises.  Design: A design engineer wants to think of all the possible ways a product being designed could fail so that robustness can be built into the product.  Software: A software engineer wants to think of possible problems a software product could fail when scaled up to large databases. This is a core issue for the Internet.
  • 5. What Is A Failure Mode? 5  A Failure Mode is:  The way in which the component, subassembly, product, input, or process could fail to perform its intended function  Failure modes may be the result of upstream operations or may cause downstream operations to fail  Things that could go wrong What Can Go Wrong?
  • 6. FMEA 6  Why  Methodology that facilitates process improvement  Identifies and eliminates concerns early in the development of a process or design  Improve internal and external customer satisfaction  Focuses on prevention  FMEA may be a customer requirement (likely contractual)  FMEA may be required by an applicable Quality Management System Standard (possibly ISO)
  • 7. FMEA 7  A structured approach to:  Identifying the ways in which a product or process can fail  Estimating risk associated with specific causes  Prioritizing the actions that should be taken to reduce risk  Evaluating design validation plan (design FMEA) or current control plan (process FMEA)
  • 8. When to Conduct an FMEA 8  Early in the process improvement investigation  When new systems, products, and processes are being designed  When existing designs or processes are being changed  When carry-over designs are used in new applications  After system, product, or process functions are defined, but before specific hardware is selected or released to manufacturing
  • 9. History of FMEA 9  First used in the 1960’s in the Aerospace industry during the Apollo missions  In 1974, the Navy developed MIL-STD-1629 regarding the use of FMEA  In the late 1970’s, the automotive industry was driven by liability costs to use FMEA  Later, the automotive industry saw the advantages of using this tool to reduce risks related to poor quality Examples
  • 10. The FMEA Form 10 Identify failure modes and their effects Identify causes of the failure modes and controls Prioritize Determine and assess actions A Closer Look
  • 11. Types of FMEAs 11  Design  Analyzes product design before release to production, with a focus on product function  Analyzes systems and subsystems in early concept and design stages  Process  Used to analyze manufacturing and assembly processes after they are implemented Specialized Uses
  • 12. FMEA: A Team Tool 12  A team approach is necessary.  Team should be led by the Process Owner who is the responsible manufacturing engineer or technical person, or other similar individual familiar with FMEA.  The following should be considered for team members: – Design Engineers – Operators – Process Engineers – Reliability – Materials Suppliers – Suppliers – Customers Team Input Required
  • 13. FMEA Procedure 13 1. For each process input (start with high value inputs), determine the ways in which the input can go wrong (failure mode) 2. For each failure mode, determine effects  Select a severity level for each effect 3. Identify potential causes of each failure mode  Select an occurrence level for each cause 4. List current controls for each cause  Select a detection level for each cause Process Steps
  • 14. FMEA Procedure (Cont.) 14 5. Calculate the Risk Priority Number (RPN) 6. Develop recommended actions, assign responsible persons, and take actions  Give priority to high RPNs  MUST look at severities rated a 10 7. Assign the predicted severity, occurrence, and detection levels and compare RPNs Process Steps
  • 15. FMEA Inputs and Outputs 15 FMEA C&E Matrix Process Map Process History Procedures Knowledge Experience List of actions to prevent causes or detect failure modes History of actions taken Inputs Outputs Information Flow
  • 16. Severity, Occurrence, and Detection 16  Severity  Importance of the effect on customer requirements  Occurrence  Frequency with which a given cause occurs and creates failure modes (obtain from past data if possible)  Detection  The ability of the current control scheme to detect (then prevent) a given cause (may be difficult to estimate early in process operations). Analyzing Failure & Effects
  • 17. Rating Scales 17  There are a wide variety of scoring “anchors”, both quantitative or qualitative  Two types of scales are 1-5 or 1-10  The 1-5 scale makes it easier for the teams to decide on scores  The 1-10 scale may allow for better precision in estimates and a wide variation in scores (most common) Assigning Rating Weights
  • 18. Rating Scales 18  Severity  1 = Not Severe, 10 = Very Severe  Occurrence  1 = Not Likely, 10 = Very Likely  Detection  1 = Easy to Detect, 10 = Not easy to Detect Assigning Rating Weights
  • 19. Risk Priority Number (RPN) 19  RPN is the product of the severity, occurrence, and detection scores. Severity Occurrence Detection RPN X X = Calculating a Composite Score
  • 20. Summary 20  An FMEA:  Identifies the ways in which a product or process can fail  Estimates the risk associated with specific causes  Prioritizes the actions that should be taken to reduce risk  FMEA is a team tool  There are two different types of FMEAs:  Design  Process  Inputs to the FMEA include several other Process tools such as C&E Matrix and Process Map. Key Points