INFRASTRUCTURE
Contents
1.	 MEINHARDT	PROFILE
2.	 INFRASTRUCTURE	INTRODUCTION
3.	 INFRASTRUCTURE	COMPLETED	PROJECTS
4.	 INFRASTRUCTURE	CURRENT/ONGOING	PROJECTS
5.	 INFRASTRUCTURE	KEY	PERSONNEL
6.	 SUPPORTING	DOCUMENTS
1
MEINHARDT
  PROFILE
Global Expertise,
Local Knowledge
Our vision
To be the leading global provider of engineering,
technology and management services, with the long term
focus of building a sustainable future.


Our Mission
To deliever the highest level of professional excellence
through dynamic, innovative and cost-effective solutions
that will enhance the sustainability of the environment
and create exceptional value for our clients, users and
community at lare. In doing so, we set new industry
benchmarks that will transform the next generation of
engineering.
Introduction




One of few engineering firms in the world that truly        Leveraging on our strong international presence, each
offers a comprehensive range of services, Meinhardt         of our offices operates as an integral part of the Group
Group has been a pioneering force in the engineering        to support our clients across the continental borders.
industry since its beginnings in 1955.                      Our geographical reach and diverse expertise allow us
                                                            to identify opportunities and deliver highly innovative
Known for its best-in-class expertise and a successful      engineering services globally.
history of project delivery, Meinhardt Singapore is part
of the Meinhardt Group, a global multi-disciplinary firm    With a distinguished track record, Meinhardt continues
that provides a full spectrum of integrated engineering,    to lead the way for its forward thinking and creative
infrastructure and project management services across a     solutions, and building a reputation as one of the most
wide range of market sectors. Both the International        trusted and respected engineering firms in the world
and Asian headquarters for the Group are incorporated       today.
in Singapore.

Today, the Group maintains 33 offices throughout 17
countries and employs more than 3,000 professional staff.
In Singapore, Meinhardt is a 400-person organization,
making it one of the largest integrated engineering firms
locally.




3,000+
Professional Staff
Middle East and North Africa




Since 1997, Meinhardt Singapore has been managing          Through the years, Meinhardt has evolved to play a
and providing key integrated engineering services in the   greater role in serving our clients by offering specialist
Middle East and North Africa regions, covering projects    skills in the areas of project management, facade,
in the United Arab Emirates, Bahrain, Saudi Arabia,        lighting design, environmental, aviation, infrastructure
Kuwait, Qatar and Libya.                                   as well as other specific capabilities such as geotechnical
                                                           and seismic engineering. In working with our specialist
Harnessed with a wealth of experience and resources,       business units, we are able to further streamline our
we have in the last decade become one of the fastest       processes and translate tangible benefits to the clients.
growing companies in the region, employing over 120
staff in the Middle East. Our offices are strategically    Our holistic approach ensures our clients benefit from a
located, with the capabilities to lead and undertake       fully coordinated and seamless integration throughout
super-scale buildings and infrastructure projects in the   all stages of the project.
region and beyond.

In expanding our reach in a significant way, Meinhardt
has not only demonstrated resilience and flexibility in
adapting to a new environment and the needs of our
clients, but also our professional excellence through
strong and reliable performance.
Our Services




   Infrastructure

   •   Water Engineering
   •   Waste Water Engineering
   •   Rail Engineering
   •   Aviation Planning
   •   Roads & Highways Engineering
   •   Bridge Engineering
   •   Marine Engineering
   •   Power Distribution
   •   Environment Engineering
   •   Infrastructure Master Planning
   •   Implementation
   •   Downstream Oil & Gas Services




   PM/CM Services                                                     Built Environment

   •   Project Management                                             •   Principal / Lead Consultancy
   •   Construction Management                                        •   Master Planning & Land-Use Planning
   •   Site Supervision and QA/QC                                     •   Landscape & Interior Design
   •   Value Engineering                                              •   Environmental Sustainability
   •   Contracts and Cost Control                                     •   Structural / Civil Engineering
   •   Planning and Programming                                       •   Electrical Engineering
   •   Communication Management                                       •   Mechanical Engineering
   •   Appointment of Consultants                                     •   Architectural Engineering
   •   Site Identification                                            •   Fire Performance Engineering
   •   Due Diligence and Feasibility Studies                          •   Hydraulic Engineering
   •   Project Brief                                                  •   Communications Engineering
   •   Project Design and Documentation                               •   Specialist Lighting Design
   •   Appointment of Contractors/Subcontractors                      •   Vertical Transportation Engineering
   •   Tender Management                                              •   Geotechnical Engineering
   •   Contract Administration                                        •   Seismic Engineering
   •   Variation Order Assessment and Recommendation
   •   Certification of Payments and Final Accounts
   •   Defects Identification/Rectification Assessment and Sign-Off
   •   Handover to Tenants/Buyers
   •   Operations and Maintenance
Our Locations




     Abu Dhabi   Brisbane   Hanoi       Jakarta   Lahore      Miami       Singapore
     Adelaide    Chennai    Ho Chi      Jeddah    London      New Delhi   Sydney
     Bahrain     Dallas     Minh City   Karachi   Macau       Riyadh      Tripoli
     Bangkok     Doha       Hong Kong   Kuala     Manila      Shanghai
     Beijing     Dubai      Islamabad   Lumpur    Melbourne   Shenzhen
Engineering a Green Future




Meinhardt is one of the leading firms with highest        Our Environmentally Sustainable Design team comprises
number of BCA’s Green Mark Platinum and Gold Plus         of accredited Green Mark professionals who are able
awards in Singapore. These awards demonstrate our         to assist our clients in designing and constructing
excellence and leadership in green practices.             greener buildings. We participate in and promote early
                                                          in environmentally beneficial solutions and technologies
As the foremost, globally integrated specialist in        that optimize energy and resources.
environmental consultancy, our unwavering commitment
towards sustainability embraces all project phases from   Through environmentally responsible and financially
initial concept and feasibility, to implementation and    sustainable solutions, we offer clients a pragmatic
post operations.                                          approach to integrating sustainability to their operations,
                                                          with the aim of bringing a high-quality built environment.
Meinhardt Organization Chart




                                         MEINHARDT GROUP PTY LTD
                                          (Incorporated in Australia)



                                 MEINHARDT INTERNATIONAL PTE LTD
                                          (Incorporated in Singapore)




                        Meinhardt Façade
      Meinhardt                                                Meinhardt Asia Pte Ltd       Meinhardt Australia Pty Ltd
                        Technology Pty Ltd
      USA & UK                                                (Incorporated in Singapore)    (Incorporated in Australia)
                      (Incorporated in Australia)


   Meinhardt London         MFT Australia                        Meinhardt Singapore              Meinhardt (VIC)


                                                                  Meinhardt MENA                  Meinhardt (NSW)
   Meinhardt Dallas        MFT Singapore
                                                              Bahrain, Dubai, Abu Dhabi,
                                                                    Qatar & Libya

   Meinhardt Miami           MFT Dubai                                                            Meinhardt (QLD)
                                                                  Meinhardt Arabia

                                                                                                   Meinhardt (SA)
                             MFT China                             Meinhardt India
                         Hong Kong, Beijing,                       (Delhi & Chennai)
                              Shanghai
                                                                                              Meinhardt Infrastructure
                                                                    Meinhardt China               & Environment
                                                                Hong Kong, Shanghai,
                                                                            -
                             MFT London                        Beijing, Shenzhen, Macau
                                                                Meinhardt Infrastructure
                                                                            -                    Meinhardt Aviation
                                                                     & Environment
                                                                    Meinhardt Mgt Ltd
                                                                            -
                                                                                             Asset Management Pty Ltd

                                                                  Meinhardt Thailand
                                                                                                 Meinhardt Light Art

                                                                 Meinhardt Indonesia


                                                                  Meinhardt Malaysia


                                                                Meinhardt Philippines


                                                                  Meinhardt Vietnam
                                                                  Ho Chi Minh, Hanoi

                                                                  Meinhardt Pakistan
                                                                  Karachi, Islamabad,
                                                                       Lahore
Meinhardt Human Capital




Middle	East                            Singapore	                  Australia



120 570 380         Total Staff                      Total Staff               Total Staff




Other	Countries



1,975                             Total Staff




Resources and Equipment

•   33 Offices
•   State of the art technology
•   Local knowledge and presence
•   Expertise and backing of a global organisation
•   Specialist Expertise




Group Turnover

2006/2007               USD 114 mil
2007/2008               USD 159 mil
2008/2009               USD 181 mil
2
INFRASTRUCTURE
  INTRODUCTION
Infrastructure Services




Societies changing needs constantly require ever more innovative solutions from today’s infrastructure
engineers and environmentalists. Designing and delivering infrastructure in a sustainable manner which
balances the demands of today’s society against the needs of future generations is a challenge at which our
staff excel.

Our	experience	includes:

•   Environment Engineering
•   Geotechinical and Soil Investigation
•   Site Infrastructure
•   Water Engineering
•   Waste Water Engineering
•   Rail Engineering
•   Aviation Planning
•   Roads & Highways Engineering
•   Bridge Engineering
•   Marine Engineering
•   Power Distribution
•   Telecommunication
•   Infrastructure Master Planning
•   Implementation
•   Downstream Oil & Gas Services
3
    INFRASTRUCTURE
COMPLETED	PROJECTS
Infrastructure Projects




                          Sentosa Island, Singapore

                          Sentosa is acknowledged as a place consisting of many destinations. The
                          variety of recreation opportunities available on the island is a vital part of its
                          make-up. Sentosa Development Corporation is tasked to recreate Sentosa
                          Island into a „destination‟ for tourists and residents of Singapore alike. Key
                          elements of the activities experience on Sentosa Island are:
                          • The Theme Park, Entertainment & Dining experience;
                          • The Rainforest „Eco-experience‟;
                          • The Entertainment Cultural Heritage experience;
                          • The Beach Culture;
                          • The Residential Lifestyle experience;
                          • The World Class Golfing experience; and
                          • The History and Cultural experience.

                          Meinhardt (Singapore), in association with the master planner, ML Design is
                          currently working on the re-master planning of the 281 Ha Sentosa Island in
                          Singapore. The infrastructure master planning includes roads, water supply,
                          wastewater management, storm water, power and telecommunications.



                          Seamless Connectivity at Vista (193.5 Ha)

                          Meinhardt together with MVA Asia Limited provided transportation and traffic
                          engineering study for the Vista master plan. The goals for this transportation
                          study are to obtain a quality transportation plan for the 193.7 ha Vista
                          Science Hub to complement the master plan and to study the feasibility of a
                          people mover system for Vista‟s transportation network.

                          Client: JTC Corporation




                          Physical Model Study and Construction of Offshore Breakwaters at
                          Southern Beaches, Sentosa, Singapore

                          The 3km southern beaches of Sentosa consist of three adjacent beaches,
                          namely Siloso Beach at the western end, Central Beach and Tanjong
                          Beach, at the eastern end. The beaches are artificial and were constructed
                          in 1990/1991 over an existing coastline. Since the completion of the
                          beaches, a number of coastal engineering and environmentally related
                          problems existed.

                          Meinhardt was the consultant for the model study, detailed design and
                          construction phase services for the refurbishment of 3km stretch of beach.
                          Construction of the crenulated bays and breakwaters in the form of islets at
                          Siloso, Central and Tanjong Beach Beach had been completed.

                          Client: Sentosa Development Corporation
                          Construction Cost: S$10 Million
                          Year of Completion: 2000
                          Services Provided: Project Management and Civil Engineering
Bintan Beach International Resort, Indonesia (23000 Ha)

The 23,000 Ha Bintan Beach International Resort is a “mega-resort”, about
1/3 the size of Singapore is tailored as a „Tax Free Zone (TFZ)‟ for resort and
resort related industries. The aim is to attract tourism investors and promote
tourism to this largely untouched island. This will also helps generate
economic activity to the island. Some international renowned tourism players
already operating on the island includes Club Med, Sofitel, Banyan Tree
Resort and Sedona.

Meinhardt (Singapore) were the Infrastructure Consultants for the 23,000 Ha
Bintan Beach International Resort. The infrastructure includes earthworks,
transportation, roads, water supply (potable & non-potable), sewerage, storm
water, power and telecommunications. Our scope includes audit of existing
site capability and constraints, infrastructure demand projection and
proposals, technical and financial feasibility review of options, phasing
requirements and recommendations.

Our scope also included the management of all survey (photogrammetric,
GPS and tidal) and geotechnical works on site. Construction for the Phase I
Infrastructure comprising of roadwork‟s, dam and water supply network,
power & telecommunication distribution network had been completed. As
part of the development requirement, individual investors are required to
provide sewerage and sewage treatment facility within the site.

Year of Completion: 1997




Pecatu Indah Resort, Bali, Indonesia (650 Ha)

Meinhardt (Singapore) were the infrastructure engineers and marina
consultants responsible for the masterplanning for this 650 Ha resort and new
township south of the capital Denpasar. The development shall consist of 2
golf courses, residential, commercial and retail facilities, together with a
marina.

Year of Completion: 1996




Royal Sumatra, Indonesia (250 Ha)

Meinhardt (Singapore) Pte Ltd provided infrastructure masterplanning for this
250-hectare residential, golf and country club development. The project
consists of 1600 housing lots, 18-hole golf course and central community
facilities including retail and schools. Construction of the first phase is
nearing completion.

Year of Completion: (Phase 1 Completion : 1995)
Tanjung Lesung Beach Resort, Indonesia (1500 Ha)

Meinhardt (Singapore) completed the infrastructure master planning for the
1500 Ha new township development 2.5 hours west of Jakarta. The project
includes a Jack Nicklaus golf course, residential housing, a hotel and other
mixed land use facilities.




Putri Nyale Resort, Lombok, Indonesia (1250 Ha)

Meinhardt (Singapore) are the infrastructure engineers and marina/coastal
consultants for this massive resort development on the southern coast of
Pulau Lombok. Scope of services includes master planning, design and
documentation of all utilities, as well as a 13 Ha recreational tidal lagoon.




Belitung Indah Resort, Indonesia (270 Ha)

Belitung Resort is located on the north coast of Belitung Island, South
Sumatera. The project will be developed in two primary stages. The first
stage will to develop an area of 270 Ha with a 2 kilometer beach front and a
35 hectare inland lake. The proposed resort will comprise : 4 Hotels, 18
Holes Golf Course, Golf Club House, 800 Exclusive Residentials allotments,
Marina, Village Centre, Staff Accommodation, and 6 km of two lane access
road and seven bridges at 20m span. The second stages will to develop an
additional 800 Ha area. The components for this stage will still have to be
determined. Meinhardt provided Infrastructure Masterplan, C&S, and MEP
and currently carries out detailed infrastructure engineering design
documentation

Client: PT. Putra Cipta Wahana Sejati
Architect: Peddle Thorp
Bintan Beach International Resort Township (Phase II), Indonesia (195
Ha)

The Phase 2 of the BBIR Township project comprises of developing 195 Ha
of jungle land into a township to support the BBIR development. The project
will consist of housing for managers, supervisors and non-executives
working in BBIR and supporting public amenities such as market, retail
village and cultural centre. When fully completed, the township is expected
to grow to a population of 30,000.
Meinhardt (S) were the infrastructure Consultants for the 195 Ha township
responsible for masterplanning, detailed design and construction
supervision. Our scope includes water supply (potable and non-potable),
sewerage system, stormwater, roads and walkways, power distribution and
telecommunications (telephone and MATV).




Bimantara Automotive Industrial Park Cikampek, West Java, Indonesia
(500 Ha)

The Bimantara Automotive Industrial Park is developed on a 500 Ha land
located at the end Jakarta-Cikampek toll road. The estate is tailored as
„Free Trade Zone (FTZ)‟ for automotive and related industries with Hyundai,
a car manufacturer as a main tenant. Other anchor tenants include
Kawasaki Motor Indonesia and Mando, a local car spare parts manufacturer.
The industrial estate has been planned to be fully integrated with excellent
supporting facilities such as residential, commercial, institutional and
recreational components. To realised the „FTZ‟ vision, on site state-of-the-
art dry port, bonded warehousing and customs check point are planned to
be interlinked to act as distribution centre for the estate as well as
import/export centre.

Meinhardt (Singapore) were the Infrastructure Masterplan Consultants for
the 500 Ha Bimantara Automotive Industrial Park. The infrastructure
includes earthworks, transportation, roads, water supply (potable and non-
potable), sewerage, stormwater, power and telecommunications. Our scope
includes audit of existing site capability and constraints, infrastructure
demand projection and proposals, technical and financial feasibility review of
options, development phasing requirements and recommendations.
Sudirman Central Business District, Jakarta, Indonesia (45 Ha)

This development involves approximately 45 hectares of commercial,
residential and hotel space. Meinhardt (Singapore) completed the
masterplan for the infrastructure valued at over US$300 million. Our current
commission includes the review of infrastructure construction costs. The
study involved analysing and reporting on all completed and proposed
infrastructure works including roads, tunnels, utilities and major drainage
diversion works.




Bukit Sentul - Land Development Project, Indonesia (2400 Ha)

The development comprises:
   Residential R21 – Development of a 100 Ha green field for 2,000 –
    2,500 houses. The site is undulating with maximum slope of 15% and
    is subdivided into 10 clusters. The development involves major
    earthwork of approximately 3 million cubic meter cut and 1.5 million
    cubic meter to be exported. Meinhardt provided the engineering
    infrastructure masterplan of the whole site and the engineering
    infrastructure detailed design for stage 1 – Cluster 1 and 2 (23 Ha) and
    the access road (3 km).
   Commercial C12 and C13 – C12 of about 4.3 Ha os to be developed
    into shophouses of total 104 units, 3 larger lots for anchor tenants.
   C13 of 13.6 Has will be developed into local and international schools,
    hospital, etc. Meinhardt is responsible for the infrastructure detailed
    design.

Client: PT Bukit Sentul Tbk
Masterplanner: Peddle Thorp Indonesia
Golden Pebble Beach Hotel & Resort, Dalian - China

The project comprises design consultancy services for Serviced Apartment
B, waterfront retail buildings and executive condominiums.

Services Provided: Civil & Structural Engineering services




Fort Bonifacio Global City, Philippines

Meinhardt provided the services as Master Civil Coordinator for all civil,
infrastructure and utilities reticulation for this new global city, including the
engineering design and contract management of significant packages. An
integral part of the services include the development of a Geographic
Information System to identify clashes between the services during the
design as well as implementation of State-of-the-Art city management
system subsequently, for the entire project.
Ayala Greenbelt, Philippines (22 Ha)

The Project involves the development of a 22 Ha central business district in
Makati, Metro Manilla of world class standard connected with parklands and
supporting facilities.

Services provided by Meinhardt included:
    Concept designs for water supply, storage and reuse
    Concept designs for sewerage reticulation and treatment
    Power reticulation schematics and co-generation
    Telecommunications
    Common service tunnel networks
    Fire fighting services

Features of the project involve high density reticulation with significant peak
demands. Project staging is considered complex with staggered lease
arrangements and existing utility interconnection.

Client:   Ayala Group




Harbor Town Integrated Resort, Philippines (1200 Ha)

Meinhardt (Singapore) were the infrastructure engineers for the fully
integrated coastal resort with Jack Nicklaus and Greg Norman as the golf
architects. The site is very rugged with steep rocky hills and dense
vegetation.



Sunnyville Development, Hong Kong (12 Ha)

Sunnyville involves the conversion of 98 Ha of fishponds built on mudflats
into a high class residential and golf course development in northern Hong
Kong. After filling with 4.5mm3 river sand the ground will be improved by
combinations of stone columns and surcharge for housing areas (precast
buildings on raft foundations) and vertical drains. The layout includes 12 Ha
of wetland, channels, lakes, creating a retarding basin to reduce drainage
impact on adjoining rivers. Sewage treatment effluent will be used for
irrigation.

Meinhardt‟s work includes master planning, site formation, ground
improvements, road and bridge works, utilities, drainage, sewerage, water
supply and irrigation, a river screening plant and the nearby Lut Chau
ecology reserve.
Little Palm Beach Sailing Centre, Clearwater Bay, Hong Kong

Masterplanning and submissions for extension to existing centre:
   Eastern breakwaters and protected area
   Hardstanding extension (3,600m2)
   Clubhouse extension
   Enlargement of existing West Ramp
   Access road and services review

Design & Construction:
   Strengthening, widening and lengthening of existing ramp
   Renovation of clubhouse and miscellaneous works
   Contract management

Client:   Sail Training Association, Hong Kong



Movie City. Tseung Kwan O, Hong Kong

Meinhardt was responsible for the geotechnical, civil and structural
engineering design of these new production facilities. The development
includes a new sound stage studio, workshops and post-production building.
The site is situated over proposed Mass Transit Railway and drainage
tunnels on an elevated platform surrounded by natural slopes.

Client: Shaw Brothers Limited
Architect: Kwan & Associates Architects Limited/PTP
Construction Cost: HK$400,000,000
Year of Completion: 2000




Shanghai Tianma Golf & Country Club, China

The project involved assessment of the water quality of the canals expected
to feed the lake system at the new resort and determining appropriate
management responses.

Services provided by Meinhardt included:
    Identification of water quality parameters for testing
    Analysis of laboratory results of sampling
    Recommendation of infrastructure such as floating booms, aeration
     devices and baffles to optimise lake water quality
    Irrigation management techniques to minimise public health concerns
     and land degradation after consideration of relevant guidelines in
     Australia
    Chemical and environmental engineering skills

Features of the project included determining the degree of sewage
contamination within the canals and the expected nutrient concentration
levels within the future lake system.

Client:   Shanghai Tianma Country Club Co. Ltd
Beveridge Residential Golf Course Development, Australia

The project involved an 18 hole golf course and lake system surrounded by
over a 2000 lot subdivision. Internal sewerage treatment plant and irrigation
reuse scheme assists water balancing requirements.

Services provided by Meinhardt included:
    Utility Masterplanning
    Effluent Treatment Plant Review
    Bulk Earthworks Estimation
    Review of bulk water supply options
    Authority Liaison
    Project Costings
    Site Hydrology Considerations

Features of the project included staging considerations and water reuse
options. Bulk water supply scheming and authority negotiations and
agreements.




Studio City Theme Park, Docklands Melbourne – Australia
The Project: Studio City is a 35 hectare development comprising a 15 ha.
theme park, an entertainment and retail precinct, 350 room hotel, working
film and TV studio complex and media offices. The theme park includes film
and TV venues and other active entertainments. Also included are
waterfront plaza with marine uses and extensive pedestrian circulation
features. It will be constructed on a former port area founded on alluvial
mud and silts in a major urban renewal scheme near the City Centre of
Melbourne.

Services provided by Meinhardt included the engineering, services and
infrastructural input to the planning and development work for this theme
park. One of the innovative ideas developed by Meinhardt for this project is
the building up of road subgrade formation by polystyrene blocks to reduce
settlement potential.

Features of the Meinhardt inputs were:
   Civil Engineering and foundations planning
   Bridge across stormwater channel to Moonee Ponds Creek
   Roadworks and carpark
   Utilities: planning and demand estimation for power, sewerage, water
   Bulk earthworks
   Stormwater management
   Detailed assessment of re-routed alignment of Moonee Ponds Creek
   Traffic Engineering
Agarta Universe Theme Park, Johor Bahru, Malaysia (113 Ha)

Meinhardt is providing design and construction phase services for Phase 1
of the Agarta Universe Theme Park in Johor Bahru, Malaysia, comprising a
113-hectare, US$110 million Theme Park development, including major
earth moving, water supply, lake filtration, sewerage, stormwater, roads and
carparking.




Bute Estate, Malaysia (1800 Acre)

Meinhardt (Singapore) are the civil infrastructure consultants for this
residential, industrial, commercial, retail and golf development near the new
Sepang International Airport.



44 Lot Pasir Gudang Industrial Park, Johor, Malaysia

Meinhardt (Singapore) conducted the design and documentation of
infrastructure for a 44 lot industrial park in Pasir Gudang, Malaysia.



Site Development Haii Al-Mutrafiah Jubail Industrial City, Saudia
Arabia.

The scope of services included planning, detailed design and construction
supervision. The project consisted of the planning, design and construction
of the engineering infrastructure for a community of 50,000 population,
within the Jubail Industrial City, located on the Arabian Gulf, 100 km north of
Dhahran. Detailed engineering was also undertaken for the roads and
drainage, water supply and irrigation, sewerage, power and
telecommunications. Construction cost was US$250 million.
Deep Tunnel Sewerage System
Contract T-04 (Ang Mo Kio Tunnel), Singapore

Meinhardt is providing Civil & Structural Engineering Services for Deep
Tunnel Sewerage System Contract T-04 (Ang Mo Kio Tunnel) which
comprises a 7.2km long and 30-40m deep bored tunnel of 4.3m internal
diameter, including drop shafts, access shafts, work shafts, odour control
facilities, 800m long lateral connector and other underground wastewater
structures. Ground material is generally of old alluvium.

Client: Ministry of Environment, Singapore
Contractors: Samsung Corporation
Associates: Halcrow Group Limited
Construction Cost: S$74 Million
Duration: 2000-2004
Year of Completion: 2004
Services Provided: Civil & Structural Consultancy Services




Deep Tunnel Sewerage System
Contract T-06 (Queensway Tunnel), Singapore

Meinhardt is providing Civil & Structural Engineering Services for Deep
Tunnel Sewerage System Contract T-06 (Queensway Tunnel) which
comprises a 9.7km long and 30-45m deep bored tunnel of 3.3m internal
diameter, including drop shaft, access shafts, work shafts and other
underground wastewater structures. Ground material is generally of rock,
soil and/or mixed-face conditions.
Services Provided: Civil & Structural Consultancy Services

Client: Ministry of Environment, Singapore
Contractor: Zublin International
Associates: Geoconsult Asia Singapore
Construction Cost: S$92 Million
Duration: 2000-2004
Year of Completion: 2004
Ang Mo Kio Link Sewer (Connect to DTSS T-04), Singapore

Meinhardt is providing Civil and Structural engineering consultancy services
directly to PUB for the Link Sewer Package F comprising of 7km length of
link sewers of diameter ranging from 800mm to 1800mm. These sewers
divert flows from 4 existing sewerage pumping stations into the DTSS T-04
at Drop shaft F. All sewers are constructed by pipe-jacking method.
The scope of works include topographical surveys, soil and services
investigations, engineering design of link sewers and ancillary structures
such as manholes, vortex chamber and overflow structures as well as cost
estimates; specification and tender preparation; calling and evaluation of
tender, construction supervision and finalisation of maintenance manual.

Client: PUB-Sewerage Department
Contractor: Ho Lee Construction Pte Ltd
Construction Cost: S$16.4 Million
Duration: 2002-2005
Year of Completion: 2005
Services Provided: Civil & Structural Consultancy Services




Kolam Ayer, Towner Link Sewer (Connect to DTSS T-03), Singapore

Meinhardt is providing Civil and Structural engineering consultancy services
directly to PUB for the Link Sewer Package D comprising of 5.8km length of
link sewers of diameter ranging from 750mm to 3000mm. These sewers
divert flows from the existing Cavenagh, Lorong Gelang and Towner
Sewerage Pumping stations into the DTSS T-03 at Drop shaft D. All sewers
are constructed by pipe-jacking method.
The scope of works include topographical surveys, soil and services
investigations, engineering design of link sewers and ancillary structures
such as manholes, vortex chamber and overflow structures as well as cost
estimates; specification and tender preparation; calling and evaluation of
tender, construction supervision and finalisation of maintenance manual.

Client: PUB-Sewerage Department
Contractor: Neo Corporation Pte Ltd
Construction Cost: S$32 Million
Duration: 2002-2005
Year of Completion: 2005
Services Provided: Civil & Structural Consultancy Services
NEWater Reservoir at Seletar, Singapore

Meinhardt is appointed by Public Utilities Board (PUB) to undertake design
for an underground reservoir at Seletar for NEWater Singapore. The project
comprises 2 compartment boxes of burried concrete tank which have the
capacity of holding 10,000m3 water with booster pumping station and
approximately 5km pipelines connecting from the resevoir to wafer fab
factories and Nanyang Polytechnic in Ang Mo Kio.

Client: Public Utilities Board Singapore (NEWater Dept.)
Construction Cost: S$4 Million
Year of Completion: 2003
Services Provided: Civil, Structural, Mechanical and Electrical Engineering



Chua Chu Kang Road Pumping Station, Singapore

Meinhardt provided integrated engineering consultancy services directly to
PUB for the design and construction supervision of Sewerage facilities for
proposed development at Chua Chu Kang Road. The project comprises of
3.0km length of sewers of diameter ranging from 300mm to 1200mm and a
new sewerage pumping station. These sewers sewer proposed
development along Chua Chu Kang Road as well as Tengah Airbase and
discharge all its flow into an sewer at Chua Chu Kang New Town. All sewers
are constructed by pipe-jacking method.

Client: PUB-Sewerage Department
Year of Completion: S$3.9 Million
Services Provided: Civil, Structural, Mechanical & Electrical Engineering



Upgrading of Pulau Saigon Pumping Station, Singapore

Meinhardt provided mechanical & electrical engineering consultancy
services for the upgrading of Pulau Saigon Pumping Station.
Services Provided: Mechanical & Electrical Engineering

Client: PUB- Sewerage Department
Construction Cost: S$2 Million
Year of Completion: 2003
Upgrading of Clementi Park, Wholesale Centre & Bah Soon Pah
Pumping Installations , Singapore

Meinhardt is providing mechanical & electrical engineering consultancy
services for the upgrading of Clementi Park, Wholesale Centre and Bah
Soon Pah Pumping Stations. The project includes upgrading the existing
pump sumps at Clementi Park and Wholesale Centre to cater for the
increase of flow capacity that projected for the next 20 years - mainly
involving replacement of existing pumps with bigger capacity pumps. A new
pumping main will be introduced at Wholesale Centre Pump Sump.
Conversion of the existing Boh Soon Pah Solid Divertor into a pump sump
that caters for the projected flow for the next 20 years.

Client: PUB
Year of Completion: 2004/5
Services Provided: Mechanical & Electrical Engineering



Kim Chuan Sewerage Treatment Works, Singapore

Meinhardt provided design works and periodic inspection for the erector of 3
egg-shaped digesters plant for existing Kim Chuan Sewerage Treatment
Plant.


Client: RSB-Rund-Stahl-Bau-Ges.m.b.H
Construction Cost: S$34 Million (inclusive of building works and M&E
works)
Year of Completion: 2001
Services Provided: Civil & Structural Consultancy Services
Kovan Estate - Roadside Drainage Upgrading Project, Singapore

Meinhardt is providing Civil and Structural engineering consultancy services
directly to PUB-Drainage Department for the upgrading of roadside drains
for Kovan Estate. The scope of works include topographical surveys, soil
and services investigations, engineering design of box drains, slab over
existing main drains and ancillary structures such as manholes as well as
cost estimates; specification and tender preparation; calling and evaluation
of tender, construction supervision and contract administration.

Client: PUB-Drainage Department
Contractor: Feng Ming Construction Pte Ltd
Construction Cost: S$7.154Million
Duration: 2002-2004
Year of Completion: 2004
Services Provided: Civil & Structural Consultancy Services




Western District Meat Packing Company - Organic Waste Management
Strategy
Melbourne, Australia

The Project was a research project funded by the Meat Research
Corporation. Together with a private waste management contractor,
Meinhardt assisted in the establishment of strategies to compost solid and
liquid waste streams. Successful results were achieved by adding bulking
agents to the solid waste stream before composting. The liquid waste
stream was filtered through a revolutionary new organic matter filter (this
new filter is currently being patented by the waste management contractor),
this way, only liquid reaches the sewer. The total strategy also included
diversion of solid waste, such as sheep paunch, from the sewer for
composting.
Services provided by Meinhardt included:
     Formulating Organic Waste Management Strategy
     Analysis of the performance of the organic matter filter
     Assessment of the composting operations including product quality in-
      place recycling
Features of the project included the identification of simple, cost effective
solutions to the management of a typical abattoir‟s solid and liquid waste
stream and the identification of significant savings in local water authority
Trade Waste charges.
Midfield Meats - Cleaner Production & Waste Management Detailed
Study - Warrnambool, Australia

The Project involved the evaluation and refining of existing waste
management and operational practices, so as to improve plant efficiencies
and minimize environmental impacts of the operational processes. Financial
savings were achieved through improved plant efficiencies.

Services Provided by Meinhardt included:
    Establishing a Waste/ Environmental detailed Diagnostic Report of
     current operations
    Preparation of a detailed cleaner production study
    Preparation of a comprehensive Waste/ Environmental Management
     Plan directing the sites future operations
    Features of the project included a cost effective, environmentally sound
     solution to the management of Midfield Meats abattoir in relation to
     operational processes and waste minimization.

Specific outcomes included:
   Recommended paunch and Manure Solid Waste Treatment
   Recommended changes to the proposed trade waste agreement
   Identified waste improvement targets
   Implementation Program
   Monitoring Program
Qantas Maintenance Base - Waste Management Strategy, Melbourne,
Australia

The Project involved an assessment of the airline‟s workshop waste stream,
paying particular attention to the hazardous wastes and toxic nature of
materials encountered on the site. The strategy was required to review
operations due to new EPA/ City West Water (formerly MMBW)
requirements and the restructuring by the airline of maintenance operations.
The project also considered the options involved in the relocation of the
Essendon site, concentrating operations at Tullamarine.

Services provided by Meinhardt included:
    Soil contamination surveys at both sites
    Review of occupational hazard management issues, including
     rectification costs
    Financial modelling of workshop relocation and upgrade options
    Identification of liquid waste collection, treatment and disposal options
    Waste stream minimisation through alternative operational and
     cleaning processes

Features of the project incorporated the identification of simple, cost
effective solutions/ options available to the airline in dealing with their waste
stream.
Particular consideration was given to the storage, handling and disposal of
hazardous materials and the centralisation of maintenance operations.

Client: Qantas Airways Ltd (Formerly Australian Airlines)




Melbourne Waste Management Council - Organic Recycling Strategy,
Australia

Development of organic waste management strategy for population of 3.3
million.
Melbourne City Council - Refuse Transfer Station, Australia

Refuse handling review, value management study, detailed design and
contract management for 120,000 tonnes/annum waste transfer station.




Thu Duc BOT Water Supply, Ho Chi Minh City, Vietnam

Meinhardt was employed by LVWC to act as Independent Checking
Engineer (Owner Engineer) to provide the design review, construction
management and commissioning & testing for the construction of GTM
Dumez for USD 185 Million BOT Water Supply Project in Ho Chi Minh City.

Client: Lyonnaise Des Eaux
Year of Completion: 2003
Services: Construction Management
Biosolids Composting Trial - South West Water Authority, Australia

The Project involved the development of a turned windrow composting
system to process biosolids. Research, development and demonstration
approval RD29396 was issued by the EPA to Organic Recyclers Pty Ltd to
compost sewage sludge from the Warrnambool Sewage Treatment Plant.
RD&D approval was based on the EPAV Environment Guidelines for
Composting and Other Organic Recycling Facilities. The compost trial was
conducted over a period of 12 months.

Services provided by Meinhardt included:
    Preparation of RD&D application
    Technical support in developing the processing facility.
    Development of a methodology in conjunction with Organic Recyclers
     Pty Ltd and the South West Water Authority.
    Preparation of a trial monitoring program in accordance with AS 4454-
     1997.
    Preparation of progress reports.
    Analysis of chemical test results in accordance with ARMCANZ
     Biosoilds Guidelines, Australian Standards (AS 4454-1997), NSW EPA
     Draft Biosolids Guidelines for Grade A compost.
    Recommendations with respect to the future management of biosolids
     based on trial results.

Features of the project included demonstration that biosolids are capable of
being treated through a properly managed and monitored windrow
composting operation.

Client: Organic Recyclers Pty Ltd



Western Water, Australia

The Project involved provision of specialised audit services for the internal
audit carried out at Western Water. Issues addressed in the three-year
program included water quality and quantity, dam safety, asset
management, capital works and contract management.

Services provided by Meinhardt included:
    Assessment of water quality treatment programs against Australian
     standards.
    Examination of dam safety protocol.
    Monitoring progress against asset maintenance program.
    Appraisal of demand management strategy.
    Consideration of performance of reticulation system

Features of the project included inspections of water treatment plants, dams
and lagoons to ensure procedures conformed to Western Water‟s
management systems. Areas for improvement in procedures and
management systems were also identified.

Client:   Western Water
Yarra Valley Water – Biosolids Reuse & Land Leasing Review,
Australia

The Project involved an assessment and comparative analysis of the
submissions received for the leasing of land at the treatment plant for
biosolids treatment.

Services provided by Meinhardt included:
    Development of a selection criteria in conjunction with Yarra Valley
     Water.
    Identification of all regulatory approval requirements to be obtained by
     the selected proponent.
    Preparation of an issues paper on key issues related to the lease of
     land.
    An assessment and comparative analysis of the relevant experience,
     technical and operational capabilities demonstrated by proponents
     including site development, process infrastructure, effluent reuse,
     environmental management.
    An assessment of the viability of commercial proposals including risk
     management and financial performance.
    Recommendations to Yarra Valley Water on the preferred proponents.

Features of the project included the development of an assessment criterion
and scoring system to enable comparative analysis.

Client:   Yarra Valley Water



Yarra Valley Water - Provision of professional advice at Yarra Valley
Water, Australia

The Project involved the provision of ongoing professional technical and
project management services at Yarra Valley Water.

Services provided by Meinhardt included: -
    Inspection of waste water treatment plants
    Assessment of current and future requirements of the Whittlesea
     Sewage Treatment Plant
    Exploration of upgrade options
    Preparation of tender specification documents

Features of the project included functional design and preparation of a
consultant‟s brief for the detailed design and project management services
for the upgrade of Whittlesea Sewage Treatment Plant.

Client:   Yarra Valley Water
Mekong Transport and Flood Protection, Vietnam

Meinhardt in association with Halcrow, PCI conducted the construction
supervision for road sections Can Tho to Nam Can and Dong Ha to Quang
Ngai of National Highway No. 1 and the road network in Mekong delta area.

Client: Government of Vietnam (funded by World Bank)
Construction cost: USD 6,000,000
Year of Completion: 2004




Replacement and Rehabilitation of Water Mains Stage 2, Hong Kong

The objective of this assignment is to progress the planned replacement and
rehabilitation of 700km of Hong Kong's existing water distribution assets by
preparing layout drawings, a study report, land requirements plans and
completing the Preliminary Project Feasibility Study to enable the
implementation of the works.

This includes the following major tasks:-
    Carry out desk studies and site visits to investigate the feasibility of the
     proposed water mains in terms of construction, geotechnical, traffic,
     services and utilities and environmental aspects
    Prepare drawings for the works
    Prepare the land requirement report and land requirement plans
    Consult with relevant government departments, consultants and utility
     undertakings, identifying practical constraints, alternative alignments,
     and construction methodologies, and producing a scheme for the works
    Carry out the preliminary environmental review and prepare project
     profile for approval by epd
    Costing, cost-benefit analyses and annual expenditure forecast
    Establish the recommended implementation strategy
    Submit a programme of works for the works
    Estimate the recurrent consequences to Government

Client: Water Supplies Department
Lead Consultant: Meinhardt
Construction Cost: HK$3,000,000,000
Year of Completion: 2010
Phoenix District Cooling Plants, Abu Dhabi, UAE

Meinhardt is the Principal Consultant for the Design and Build Contractor,
Samsung Corporation for the Phoenix District Coolong Plant 1 & 2 at Abu
Dhabi, UAE. The plants are developed by the Client – Tabreed, National
Central Cooling Co. (PJSC).

The project comprises two district cooling plants providing chilled water
supply to surrounding buildings. Upon final completion, Phoenix District
Cooling Plant No. 1 and 2 will have a total cooling capacity of 15,000 and
7,500 refrigeration tonnes respectively.

The two central cooling plants shall employ water cooled electric driven
centrifugal chillers and associated auxiliary equipment like cooling towers
and pumps for production and distribution of chilled water to various
buildings via a network of underground piping system. Plant 1 and 2 will
have 8x1875RT and 6x1250RT chiller respectively with a supply and return
chilled water temperature of 4.4

On site power generation using natural gas engine driven generators will
provide enough primary electrical supply to both plants for most time of the
year except for peak periods whereby back-up supply will be drawn from the
utility, ADDC. A chilled water thermal storage tank with capacity of 15,000
ton-hours will be installed for Plant No. 1 for load leveling purpose as well as
reducing the capacity of the chiller plant. Emergency loads like black starts
will be supported by 11kV HT power supply feeders from military base in the
event of total power failure from ADDC and loss of natural gas supply.

Contractor: Samsung Corporation
Construction Cost: USD 35 million
Year of Completion: 2004
Services Provided: Architectural, Civil, Structural, Mechanical and Electrical
Engineering Consultancy



Refurbishment of Naval Berths 5-14
Pakistan Naval Dockyard, Karachi, Pakistan

Meinhardt is providing civil & structural engineering consultancy services for
the Refurbishment of Naval Berths 5-14 at Pakistan Naval Dockyard,
Karachi. The length of Berths 5-14 is 900 meters.
The scope of services includes the investigation/study of the existing
condition of berths, report on rehabilitation and refurbishment of these
berths, detailed engineering design, preparation of tender drawings,
specifications and Bill of Quantities.
Oil Pier II at Karachi Port, Pakistan

Meinhardt is responsible for the civil, structural, mechanical and electrical
engineering services of this new terminal with modern liquid cargo handling
facilities, including fully balanced loading arms, adequate piping system &
manifolds and automated/ manual gate valves.
The new terminal will handle oil tankers upto 75,000 DWT and consist of
tanker berthing facility comprising jetty head/ platform flanked by breasting
and mooring dolphins on either sides.The berthing will be connected to the
shore by a trestle to provide access to the berth. Necessary infrastructure
viz. road, electrical, water connection and fire fighting facilities also
constitute a part of the project




Development of Balochistan Coast, Pakistan

Meinhardt is providing general consultancy services to the Balochistan
Coastal Development Authority (BCDA) for the development along the
Balochistan coastline. The project comprises Survey, Design, Preparation of
Tender and Contract Documents and Construction Supervision of the jetties
and fish harbours along various population centers such as Jiwani, Ganz,
Sur, Pishukan, Gwadar and Kalmat. The project also includes several other
facilities such as Approach Channels, Breakwaters, Landing Quays and
maintenance/ repair facilities to be provided with the harbours.




Edible Oil Terminal & Jetty (Liquid Cargo Terminal), Port Qasim -
Karachi,
Pakistan

Meinhardt were responsible for the provision of Engineering Design Services
and preparing submission drawings for laying of edible oil & molasses
pipelines from existing jetty to Edible Oil Terminal. The terminal consists of
29 nos. tanks of 54,000 M. Tons storage capacity with ancillary facilities.
As the second phase of the project, Meinhardt also carried out the Technical
Studies for the construction of an Edible Oil Jetty (Liquid Cargo Terminal) on
BOT basis to link the above Edible Oil Terminal with the proposed jetty to be
designed to handle ships upto 35,000 DWT.
Breakwater in Dung Quat Bay, Vietnam

Meinhardt in association with Japan Port Consultants, Ltd. prepared
preliminary design for tender services for the largest breakwater in Vietnam.
This breakwater creates and protects the berths for 50.000DWT ships.
The scope of work includes reviewing existing survey data of bathymetry,
geo-technical, meteo-hydrological, ocean-graphic, conceptual design and
establishing propagation and transmission analysis, design criteria, studying
the alternative of breakwater alignment and proposed structure and finally
proceeding with the preliminary detailed design of the breakwater with pre-
cast Accropode system together with construction schedule.

Construction cost: USD 80M




Island West Transfer Station - Western Hong Kong Island, Hong Kong

This project involved the excavation two caverns and access tunnels of
35,500m3, together with service and administration buildings at Mount
Davis, Western for Swire BFI's new Waste Transfer Station serving Hong
Kong Island.
Meinhardt achieved very substantial savings for the operator by changing
single cavern scheme to two smaller caverns, thereby reducing the fire
compartmentation volumes and therefore the cost of the caverns and their
fire prevention equipments.
Innovative solutions to environmental difficulties with fire alarm detectors
were also developed.

Client: Swire BFI Waste Services Limited
Architect: Ove Arup & Partners
Construction Cost: HK$640,000,000
(Saving of HK$600M on the original design)
M&E Cost: HK$80,000,000
Year of Completion: June 1997


Ma Wan Island – Infrastructural Facilities for Commercial/Residential
Development & Village Housing, Hong Kong

Meinhardt provided full mechanical and electrical consulting engineering
services for the reprovision of 260 village houses (each with 3-storey); 4
fisherman blocks and associated community facilities to decant the site for
the major residential and commercial development of Ma Wan Island being
planned. Meinhardt also provided M&E services for the infrastructural
facilities to support the development, including reservoir, sewage treatment
plant, ferry piers, refuse collection, water supplies, LP gas storage and
distribution, Tsing Ma Bridge connection roads – Toll Plaza and
Administration Building, Police Station, Fire Station etc.

Client: Sun Hung Kai Real Estate Agency Ltd
Architect: Simon Kwan & Associates Ltd
Year of Completion: Phase 1 – 1994, Phase 2 – July 2002
Infrastructure Facilities – In Phases commencing 2001
M&E Cost: HK$90,000,000
Roads, Highways & Bridges




                Ayer Rajah Expressway Phase IIA & IIB, Singapore

                The Phase IIA featured Expressway and 2 separate 4-lane flyovers with
                access ramps forming the interchange (curved on plan with skewed
                The Phase IIB featured 7 span bridge with 2 independent carriageways
                providing 3 lanes in each direction.
                Services Provided by the Meinhardt Group included alignment design, civil
                engineering pavement, drainage and bulk earthworks design and total
                structural bridge engineering.

                Client:   Public Work Department (PWD)




                Ayer Rajah Expressway Phase IIC & IID, Singapore

                The Projects incorporated the turnkey design of a 280m long dual 3 lane
                carriageway flyover (Stage IID) and a 5 span dual 3 lane carriageway
                interchange structure.
                Services Provided by the Meinhardt Group included alignment design, civil
                engineering pavement, drainage and bulk earthworks design and total
                structural bridge engineering.
                Features of the projects included two 45m spans, four 30m spans and a
                central span of 70m for Phase IID. The central span of the Phase IID
                structure was designed to have 17m insitu cantilevers from either side with
                a 41m drop-in span to enable uninterrupted traffic access across the
                existing road during construction.
                The Phase IIC carriageway featured 5 varying length spans between 30m
                and 40m together with ingress and egress slip roads to and from the
                expressway.

                Client:   Public Work Department (PWD)



                Jalan Ahmad Ibrahim / Corporation Road Interchange, Singapore

                Meinhardt were responsible for the planning, alignment, detail design,
                design documentation & supervision of this project comprising an
                expressway and 13-span flyover with a main span of 46m and other spans
                ranging from 33.5m to 40.5m.

                Construction Cost: S$28 million
                Year of Completion: 1987
Ulu Pandan Bridge, Singapore

Meinhardt were the consultants to the turnkey contractor for the
investigation, strengthening and change in articulation by making the
bridge continuous to eliminate replacement of bearings for piers over the
river.

Year of Completion: 1988




Oxley Rise, Singapore

Meinhardt were the design & build contractor for CTE-II project and carried
out the detail design, design documentation and construction phase
supervision for this project comprising a 7-span 3-lane flyover forming a
part of Central Expressway Project.

Construction Cost: S$320 million
Year of Completion: 1990




Clemeceau Bridge, Singapore

Meinhardt were the design & build contractor for CTE-II project and carried
out the detail design and documentation for this project comprising a 3
span/8 lane bridge and an underpass forming a part of Central Expressway
Project.

Construction Cost: S$320 million
Year of Completion: 1990
Tampines Expressway Avenue 7 & 12, Singapore

Meinhardt were the turnkey contractor’s consultants for this expressway
and interchange.

Construction Cost: S$50 million
Year of Completion: 1986




Geelong Road Project – Design and Construction Maltby Section,
Australia

The Project involved the tender design of roadworks and bridgeworks for
the widening and rehabilitation of the Maltby Section Design and onstruct
contract spanning 8.56 KM along the Princes Freeway West.

Services provided by the Meinhardt group included :
    Detailed drainage design
    Alignment and rehabilitation widening designs
    Preliminary bridge structural designs
    Environmental Management Plan

Features of the project included the construction of pavement widening and
rehabilitation of the existing pavement, stormwater and sub-surface
drainage design including the hydraulic and structural design of 2
sedimentation basins at Werribee river, widening of bridge structures over
Werribee River (90m 3 span), D1 drain and the main outfall sewer, and the
connection to the Federation Trail bike path.

Client:   Transfield
Contract: VicRoads
Geelong Road Project Design and Construct – Lara to Corio
Interchange, Australia

The Project involved the detailed design of roadworks and bridgeworks for
the widening of Princes Freeway East between the Lara Interchange and
the Corio Interchange north of Geelong, whilst allowing for the possible
future widening between the Melbourne Bound Entry Ramp Overpass
Bridge and the future development bridge.

Services provided by the Meinhardt Group included:
    Stormwater and sub-surface drainage design
    Catchment & Environment Management Plan
    Design of bridge barriers off structure barriers and foundations
    Geometric road design
    Bridge design checked by and submitted under Cardno MBK
    Quantities

Features of the project included the detailed design of the Geelong Ring
Road, Geelong Exit Ramp, Shell Exit and Entry ramps, Brodrick Road,
Rennie Road re-construction, Forrest Road realignment plus the 5.4 km (3
lane) dual carriageway widening between the Lara Interchange and the
Corio Interchange.

Client:   Transfield
Contract: VicRoads



Stirling Highway - Southern Extension, Australia

The Project involved the detailed design of a dual carriageway construction
linking Stirling Bridge to Leach Highway via High Street as part of the
eastern bypass road system for the port city of Fremantle.

Services Provided by Airey Ryan and Hill who are a Joint Venture partner
of Meinhardt Airey & Partners Pty Ltd (having a major interest shareholding
by Meinhardt Australia Pty Ltd) included:
    Bridge Site Investigation
    Traffic Bridge Detailed Design
    Detailed Highway Design
    Landscaping Documentation
    Environmental Assessments
    Services Relocations

Features of the project included design and documentation of dual
carriageway, reconstruction of existing cross roads and new highway
intersection designs, traffic bridge over a local street and pedestrian
underpass.

Client:   Main Roads Department of Western Australia
Aquatic Drive Redevelopment, Australia

The project included the conceptual and detailed design of streetscape
works, car
parking, landscaped areas and pump stations. The works also included the
relocation and planing of mature palm trees.

Services provided by Meinhardt included:
• Bulk Earthworks
• Relocation of former contaminated landfill material to EPA requirements
• Detailed design and documentation of pump station, car parks,
streetscape works, earth mounds and stormwater drainage
• Relocation of Palm Trees
• Road reserve to act as a retarding basin in a 1 in 100 year storm event
• Public and user group consultation
• Site supervision of construction works
• Project Management

Features of the project included works around the 19th Century landfill.
Pump station design to control outlet discharge into the lake. Relocation of
mature existing Palm Trees into new locations in road reserve using
specialised techniques. Car parking to provide for local user groups (ie.
Yacht Clubs, public sporting stadium users) needs and requirements.

Client:Parks Victoria (Formerly Melbourne Parks & Waterways)
Landscaping Advice: Parks Victoria


CityLink Project, Melbourne, Australia
The $1.8 Billion City Link Project consists of approximately 22km of
freeway cutting through the heart of Melbourne. The project joins three of
Melbourne’s largest arterial freeways consisting of two tunnels and
numerous bridges and many kilometers of elevated freeway.

Services provided by Meinhardt included:
• Environmental Auditing of construction sites.
• Preparation and review of site Environmental Action Plans (EAP) and
Environmental Management Plans (EMP).
• Monitoring of noise generating procedures.
• Monitoring of wastewater disposal from site including groundwater and
stormwater runoff.
• Establishment and implementation of environmental work practices and
procedures.
• Management advice of Prescribed and Low Level Contaminated Soils
including Acid Sulphate Coode Island Silt.
• Monitoring of environmentally sensitive issues on site and the
coordination of approvals from authorities

Features of the Project
The City Link Project remained in the public spotlight throughout all stages
from design to construction to commissioning. As a result Meinhardt
assisted the lead contractor in providing a state of the art environmental
management system throughout the projects construction.

Client: Transfield Obayashi Joint Venture
Kwinana Freeway Southern Extension, Australia

The Project involved the planning and detailed design of 12km of ultimate
Kwinana Freeway. Preliminary design required for the 12km of ultimate
Kwinana Freeway development comprised five diamond interchanges. The
design and construction documents for the first stage comprises the
following: a four lane divided highway from Forrest Road to Thomas Road,
including four channelised four way intersections and a channelised three
way intersection (convertible to a four way when the free way is extended)
at Thomas Road.

Services Provided by Airey Ryan and Hill who are a Joint Venture partner
of Meinhardt Airey & Partners Pty Ltd (having a major interest shareholding
by Meinhardt Australia Pty Ltd) included:
• Preliminary design of ultimate freeway development
• Detailed design of Stage 1 road and intersection works
• Environmental management plan
• Public environmental review documentation
• Service road detailed design
• 1.9 service road
• Landscaping and street lighting
• Dual use of paths and noise attenuation

Client: Main Roads Department of Western Australia




Moorabool, Yarra, & Brougham St Redevelopment, Waterfront
Geelong, Australia

Redevelopment of streetscape works and road pavements for the City of
Greater Geelong.       The project included the detailed design and
documentation of streetscape works, carparking, utilities, traffic signal
relocation, and pedestrian and vehicle pavement designs.

Design services provided by Meinhardt include:
•        Road pavement Road pavement
•        Articulated vehicle movement requirements
•        Stormwater
•        Utility provisions
•        Pedestrian footpath
•        Kerb and channel
•        Parking requirements
•        Liaison with authorities
•        Traffic light relocation

Features of the project include intersection contouring design, existing
utility retention and detailing of non-standard streetscapes.

Client: Steampacket Place Project Directorate
Landscape Architect: Taylor & Cullity
Reid Highway & Tonkin Highway, Australia

The Project, involved the preliminary design of 8km of 6 lane ultimate
freeway development for both Reid and Tonkin Highways and detailed
design of Stage 1 development of the two highways with uncurbed four
lane divided highways following in part ultimate freeway carriageway and
ramp alignments.

Services Provided by Airey Ryan and Hill who are a Joint Venture partner
of Meinhardt Airey & Partners Pty Ltd (having a major interest shareholding
by Meinhardt Australia Pty Ltd) included:
•        Ultimate concept freeway development
•        Design, document & preparation of specification of Stage 1
development
•        Highway street lighting and landscaping
•        Environment management plan

Features of the project included preliminary design of a major directional
freeway to freeway interchange, four diamond interchanges and two
overpasses, and detailed design of channelised three way junction
between the two highways and canalised four way intersections at major
cross roads.

Client:   Main Roads Department of Western Australia


Warburton Highway, Australia

The Project incorporated the evaluation, masterplanning and detailed
design of a five road intersection with Warburton Highway and minor creek
diversion for Scotchman’s Creek.

Services Provided by the Meinhardt Group included
•         Traffic impact assessment
•         Hydraulic analysis and culvert/ creek realignment design
•         Pavement, drainage and bulk earthworks design
•         Construction phase services

Features of the project included intersection alignment design constrained
by railway bridge structure, environmental controls of Scotchman’s Creek
realignment and continuous access for 5 sub-collector roads and property
entrances. Modifications to Warburton Highway provided slip lane access
to the intersection.

Client: Shire of Upper Yarra
Waterfront Geelong, Cunningham Street, Australia

The project involves the design and construction of road pavements,
kerbing, and street furniture between Deakin University and commercial
shopping from Brougham St to Western Beach Road. Delta Pty Ltd was
awarded the design and contract nominating Meinhardt (Vic) Pty Ltd as
design engineers.

Design services provided by Meinhardt include:
   Road pavement
   Articulated vehicle movement requirements
   Stormwater
   Floodway provision
   Pedestrian footpath
   Kerb and channel
   Parking requirements
   Liaison with authorities

Features of the project include provision for a CBD floodway path down
Cunningham street, design of articulated vehicle movements from Deakin
University and detailing of non-standard streetscapes.

Client: Steampacket Place Project Directorate
Contractor: Delta Pty Ltd
Landscape Architect: Taylor & Cullity




West Coast Highway Extension, Australia

The Project: The Meinhardt Group was commissioned to design and
document a new 2.5km highway linking Servetus Street with the existing
West Coast Highway.

Services Provided by Airey Ryan and Hill who are a Joint Venture partner
of Meinhardt Airey & Partners Pty Ltd (having a major interest shareholding
by Meinhardt Australia Pty Ltd) included:
•        Detailed Design & Documentation
•        Fast Track Design
•        Public Consultation

Features of the project included the single carriageway highway link
designed for future amplification to dual carriageway.

The road works passed adjacent to a Golf Course and Army Rifle range.
Negotiations by the consultant on behalf of Main Roads were required with
these two land holders, as significant earth works were required that
affected their properties.

Client:   Main Roads Department of Western Australia
Bintan Highways, Bintan Beach International Resort, Indonesia

Meinhardt is the Infrastructure Consultant for the 23,000 Ha Bintan Beach
International Resort.         The infrastructure includes earthworks,
transportation, roads, water supply (potable & non-potable), sewerage,
stormwater, power and telecommunications.
The Bintan Highways project comprises 80 km of 4 laned expressway and
bridges.    Meinhardt provided civil & structural design, detailed survey,
geotechnical and hydrological investigations and careful monitoring of
works for the project. The main 125m length bridge consisted of RC
prestressed members. Several sections of the highway passed through
swampy ground requiring soil replacement or geofabric to be laid to ensure
adequate foundations.

Client: Bintan Resort Management Pte Ltd
Construction Cost: S$20 Million
Year of Completion: 1994



Third National Highways, India
(Construction Packages III-A & III-C)

National Highway No.2 (Delhi-Calcutta) corridor forms part of the Golden
Quadrilateral, connecting 4 metropolitan cities of India namely Delhi,
Mumbai, Chennai and Calcutta. It is proposed to widen and strengthen
this corridor to a four/six lane facility out of World Bank Assistance under
the Third World Bank National Highways Project.

Meinhardt (Singapore) has been appointed by National Highways Authority
of India through World Bank competitive bid system to undertake the
construction supervision and design review for the four laning and
strengthening of the existing two lane sections from km. 115 to km. 158
and from km. 245 to km. 317 on NH-2 (Construction Packages III-A & III-
C). The civil works proposed involve large- scale construction of cement
concrete roads. Besides this, bituminous pavement construction involving
use of geo-textiles and polymer-modified bitumen are also proposed in
considerable stretches. The proposed construction technology involves
use of latest machinery and equipment. As the project is substantially
large, a comprehensive project management system incorporating Critical
Path Methods and PERT systems, computerised cost control and
budgeting, and technical QA and QC monitoring system has been
implemented for the project.

Client: National Highways Authority of India
Construction Cost: US$100 Million
Year of Completion: 2004
Services Provided: Civil & Structural Consultancy Services
Contract Package No C-II A/6 0- Feasibility Study & Detailed Project,
India

The project is part of North-South Corridor of National Highways
Development Program (NHDP). There are 4 major bridges, 15 minor
bridges, 1 rail over bridge and cross drainage structures. The bridge across
river Krishna is 688.8m long and bridge across river Thungabhadra is
624m long.

Client: National Highways Authority Of India
Construction Cost: US$ 66 Million
Services Provided: Civil & Structural Engineering




NHDP-II Kottakata to Kurnool Section of N-7 from Km 133 to Km 211,
Andhra Pradesh, Contract Package No C-II A/6

The project stretch is part of North-South corridor of National Highways
Development Program (NHDP) and starts at Km. 133 near the village
Kottakatta and ends at km 211 on kurnool bypass near kurnool town. The
streach passes through rolling terrain with major outcrops at manny places
with large masses of granite rocks and boulders. There are 4 major
bridges,15 minor bridges, 1 rail over bridge and number of other cross
drainage structures. The bridge across river Krishna is 688.8m long and
bridge across river Thungabhadra at km 203 is 624m long. The project
Highway and associated bridge and cross drainage structures under NHDP
program has to be designed as Partially access controled facility with dual
2 lane/ 3 lane divided configuration with service roads in inhabited areas,
cattle/pedestrian crossings as required, way side amenities and facilities
for collection of toll.

Client: National Highways Authority Of India
Construction Cost: US$ 68 Million
Services Provided: Civil & Structural Engineering



Makran Coastal Road

Meinhardt (Singapore) Pte Ltd was part of a three-firm consortium
responsible for the Detailed Engineering of 232 km of the 700 km long
Makran Coastal Road. The road is a vital link connecting Karachi with the
coastal towns of Ormara, Pasni, Gwadar and Naval Base at Ormara. An
extensive alignment study was conducted to determine the optimum
alignment. The terrain along the alignment varies from coastal plains to
mountains.      Other activities being undertaken include topographic,
geotechnical and material surveys, geometric and pavement design and
structural design of bridges along the route.
Karachi Northern Bypass, Pakistan

Meinhardt (Singapore) Pte Ltd was responsible for the preparation of a
technical feasibility study for the Karachi Northern Bypass which is to be
implemented on a BOT basis. The Bypass when completed will provide
direct and congestion free access between the Superhighway at a point
some 30 km outside Karachi and the Port of Karachi. Proposed
interchanges enroute at the intersection of the RCD Highway, Orangi Town
and North Karachi provides further direct access to the Hub Industrial
Estate and large population centres. The technical feasibility study
included route selection, geometric and pavement design, grade separated
intersections, underpasses and culverts and soil and material investigation.
In addition, Meinhardt was also undertook to conduct several origin-
destination surveys and traffic counts to better understand existing travel
patterns and to assist in providing better estimates of traffic assignment on
the Bypass, an environmental impact assessment study and a hydrological
study to better define drainage structures along the Bypass.

Client: National Highway Authority of Pakistan
Associated Consultant: Promet Engineering Pte Ltd
Year of Completion: 1995




HCMC – Bien Hoa – Vung Tau Expressway, Vietnam

Meinhardt in association with Nippon Engineering Consultants Co.
reviewed the final feasibility study. Work includes amending detailed
design, new proposed road in connection with the National Highway
No.1A, construction and construction supervision to make the project
financially feasible.

Client: Daewoo Corporation
Year of Completion: 2006
Inner Ring Road, Kuala Lumpur, Malaysia

Meinhardt provided full civil and structural consulting engineering services
for this 60km high-standard rural road in flat and rolling terrain with 800m of
bridges.
Environmental Projects




                         Deep Tunnel Sewerage System - Contract T-04 (Ang Mo Kio Tunnel)
                         Singapore

                         Meinhardt provided Civil & Structural Engineering Services for Deep
                         Tunnel Sewerage System Contract T-04 (Ang Mo Kio Tunnel) which
                         comprises a 7.2km long and 30-40m deep bored tunnel of 4.3m internal
                         diameter, including drop shafts, access shafts, work shafts, odour
                         control facilities, 800m long lateral connector and other underground
                         wastewater structures. Ground material is generally of old alluvium.

                         Services Provided: Civil & Structural Consultancy Services
                         Client: Ministry of Environment, Singapore
                         Contractors: Samsung Corporation
                         Associates: Halcrow Group Limited
                         Project Cost: S$74 Million
                         Duration: 2000-2005
Deep Tunnel Sewerage System - Contract T-06 (Queensway Tunnel)
Singapore

Meinhardt provided Civil & Structural Engineering Services for Deep
Tunnel Sewerage System Contract T-06 (Queensway Tunnel) which
comprises a 9.7km long and 30-45m deep bored tunnel of 3.3m internal
diameter, including drop shaft, access shafts, work shafts and other
underground wastewater structures. Ground material is generally of
rock, soil and/or mixed-face conditions.

Services Provided: Civil & Structural Consultancy Services
Client: Ministry of Environment, Singapore
Contractor: Zublin International
Associates: Geoconsult Asia Singapore
Project Cost: S$92 Million
Duration: 2000-2005




Deep Tunnel Sewerage System
Ang Mo Kio Link Sewer (Connect to DTSS T-04), Singapore

Meinhardt is providing Civil and Structural engineering consultancy
services directly to PUB for the Link Sewer Package F comprising of
7km length of link sewers of diameter ranging from 800mm to 1800mm.
These sewers divert flows from 4 existing sewerage pumping stations
into the DTSS T-04 at Drop shaft F. All sewers are constructed by pipe-
jacking method. The scope of works include topographical surveys, soil
and services investigations, engineering design of link sewers and
ancillary structures such as manholes, vortex chamber and overflow
structures as well as cost estimates; specification and tender
preparation; calling and evaluation of tender, construction supervision
and finalisation of maintenance manual.

Services Provided: Civil & Structural Consultancy Services
Client: PUB-Sewerage Department
Contractor: Ho Lee Construction Pte Ltd
Project Cost: S$16.4 Million
Duration: 2002-2006
Deep Tunnel Sewerage System
Kolam Ayer, Towner Link Sewer (Connect to DTSS T-03), Singapore

Meinhardt is providing Civil and Structural engineering consultancy
services directly to PUB for the Link Sewer Package D comprising of
5.8km length of link sewers of diameter ranging from 750mm to
3000mm. These sewers divert flows from the existing Cavenagh, Lorong
Gelang and Towner Sewerage Pumping stations into the DTSS T-03 at
Drop shaft D. All sewers are constructed by pipe-jacking method. The
scope of works include topographical surveys, soil and services
investigations, engineering design of link sewers and ancillary structures
such as manholes, vortex chamber and overflow structures as well as
cost estimates; specification and tender preparation; calling and
evaluation of tender, construction supervision and finalisation of
maintenance manual.

Services Provided: Civil & Structural Consultancy Services
Client: PUB-Sewerage Department
Contractor: Neo Corporation Pte Ltd
Project Cost: S$32 Million
Duration: 2002-2006




Chua Chu Kang Road Pumping Station, Singapore

Meinhardt provided integrated engineering consultancy services directly
to PUB for the design and construction supervision of Sewerage facilities
for proposed development at Chua Chu Kang Road. The project
comprises of 3.0km length of sewers of diameter ranging from 300mm to
1200mm and a new sewerage pumping station. These sewers sewer
proposed development along Chua Chu Kang Road as well as Tengah
Airbase and discharge all its flow into an sewer at Chua Chu Kang New
Town. All sewers are constructed by pipe-jacking method.
The scope of works include topographical surveys, soil and services
investigations, engineering design of link sewers and ancillary structures
such as manholes, vortex chamber and overflow structures as well as
cost estimates; specification and tender preparation; calling and
evaluation of tender, construction supervision and finalisation of
maintenance manual.


Client: PUB-Sewerage Department
Year of Completion: S$3.9 Million
Duration: 2002-2003
Year of Completion: 2003
Services Provided: Civil, Structural, Mechanical & Electrical
Engineering
Upgrading of Pulau Saigon Pumping Station, Singapore

Meinhardt provided mechanical & electrical engineering consultancy
services for the upgrading of Pulau Saigon Pumping Station.
Services Provided: Mechanical & Electrical Engineering

Client: PUB- Sewerage Department
Construction Cost: S$2 Million
Year of Completion: 2003




Kim Chuan Sewerage Treatment Works, Singapore

Meinhardt provided design works and periodic inspection for the erector
of 3 egg-shaped digesters plant for existing Kim Chuan Sewerage
Treatment Plant.


Client: RSB-Rund-Stahl-Bau-Ges.m.b.H
Construction Cost: S$34 Million (inclusive of building works and M&E
works)
Year of Completion: 2001
Services Provided: Civil & Structural Consultancy Services
Western District Meat Packing Company - Organic Waste
Management Strategy
Melbourne, Australia

The Project was a research project funded by the Meat Research
Corporation. Together with a private waste management contractor,
Meinhardt assisted in the establishment of strategies to compost solid
and liquid waste streams. Successful results were achieved by adding
bulking agents to the solid waste stream before composting. The liquid
waste stream was filtered through a revolutionary new organic matter
filter (this new filter is currently being patented by the waste
management contractor), this way, only liquid reaches the sewer. The
total strategy also included diversion of solid waste, such as sheep
paunch, from the sewer for composting.

Services provided by Meinhardt included:
    Formulating Organic Waste Management Strategy
    Analysis of the performance of the organic matter filter
    Assessment of the composting operations including product quality
     in-place recycling

Features of the project included the identification of simple, cost effective
solutions to the management of a typical abattoir’s solid and liquid waste
stream and the identification of significant savings in local water
authority Trade Waste charges.
Midfield Meats - Cleaner Production & Waste Management Detailed
Study - Warrnambool, Australia

The Project involved the evaluation and refining of existing waste
management and operational practices, so as to improve plant
efficiencies and minimise environmental impacts of the operational
processes. Financial savings were achieved through improved plant
efficiencies.

Services Provided by Meinhardt included:
    Establishing a Waste/ Environmental detailed Diagnostic Report of
     current operations
    Preparation of a detailed cleaner production study
    Preparation of a comprehensive Waste/ Environmental
     Management Plan directing the sites future operations
    Features of the project included a cost effective, environmentally
     sound solution to the management of Midfield Meats abattoir in
     relation to operational processes and waste minimisation.

Specific outcomes included:
   Recommended paunch and Manure Solid Waste Treatment
   Recommended changes to the proposed trade waste agreement
   Identified waste improvement targets
   Implementation Program
   Monitoring Program
Qantas Maintenance Base - Waste Management Strategy,
Melbourne, Australia

The Project involved an assessment of the airline’s workshop waste
stream, paying particular attention to the hazardous wastes and toxic
nature of materials encountered on the site. The strategy was required
to review operations due to new EPA/ City West Water (formerly
MMBW) requirements and the restructuring by the airline of
maintenance operations. The project also considered the options
involved in the relocation of the Essendon site, concentrating operations
at Tullamarine.

Services provided by Meinhardt included:
    Soil contamination surveys at both sites
    Review of occupational hazard management issues, including
     rectification costs
    Financial modelling of workshop relocation and upgrade options
    Identification of liquid waste collection, treatment and disposal
     options
    Waste stream minimisation through alternative operational and
     cleaning processes

Features of the project incorporated the identification of simple, cost
effective solutions/ options available to the airline in dealing with their
waste stream.
Particular consideration was given to the storage, handling and disposal
of hazardous materials and the centralisation of maintenance
operations.

Client: Qantas Airways Ltd (Formerly Australian Airlines)




Melbourne Waste Management Council - Organic Recycling
Strategy, Australia

Development of organic waste management strategy for population of
3.3 million.
Melbourne City Council - Refuse Transfer Station, Australia

Refuse handling review, value management study, detailed design and
contract management for 120,000 tonnes/annum waste transfer station.




Biosolids Composting Trial - South West Water Authority, Australia

The Project involved the development of a turned windrow composting
system to process biosolids. Research, development and demonstration
approval RD29396 was issued by the EPA to Organic Recyclers Pty Ltd
to compost sewage sludge from the Warrnambool Sewage Treatment
Plant. RD&D approval was based on the EPAV Environment Guidelines
for Composting and Other Organic Recycling Facilities. The compost
trial was conducted over a period of 12 months.

Services provided by Meinhardt included:
    Preparation of RD&D application
    Technical support in developing the processing facility.
    Development of a methodology in conjunction with Organic
     Recyclers Pty Ltd and the South West Water Authority.
    Preparation of a trial monitoring program in accordance with AS
     4454-1997.
    Preparation of progress reports.
    Analysis of chemical test results in accordance with ARMCANZ
     Biosoilds Guidelines, Australian Standards (AS 4454-1997), NSW
     EPA Draft Biosolids Guidelines for Grade A compost.
    Recommendations with respect to the future management of
     biosolids based on trial results.

Features of the project included demonstration that biosolids are
capable of being treated through a properly managed and monitored
windrow composting operation.

Client:   Organic Recyclers Pty Ltd
Western Water, Australia

The Project involved provision of specialised audit services for the
internal audit carried out at Western Water. Issues addressed in the
three-year program included water quality and quantity, dam safety,
asset management, capital works and contract management.

Services provided by Meinhardt included:
    Assessment of water quality treatment programs against Australian
     standards.
    Examination of dam safety protocol.
    Monitoring progress against asset maintenance program.
    Appraisal of demand management strategy.
    Consideration of performance of reticulation system

Features of the project included inspections of water treatment plants,
dams and lagoons to ensure procedures conformed to Western Water’s
management systems. Areas for improvement in procedures and
management systems were also identified.

Client:   Western Water
Yarra Valley Water – Biosolids Reuse & Land Leasing Review,
Australia

The Project involved an assessment and comparative analysis of the
submissions received for the leasing of land at the treatment plant for
biosolids treatment.

Services provided by Meinhardt included:
    Development of a selection criteria in conjunction with Yarra Valley
     Water.
    Identification of all regulatory approval requirements to be obtained
     by the selected proponent.
    Preparation of an issues paper on key issues related to the lease of
     land.
    An assessment and comparative analysis of the relevant
     experience, technical and operational capabilities demonstrated by
     proponents including site development, process infrastructure,
     effluent reuse, environmental management.
    An assessment of the viability of commercial proposals including
     risk management and financial performance.
    Recommendations to Yarra Valley Water on the preferred
     proponents.

Features of the project included the development of an assessment
criterion and scoring system to enable comparative analysis.

Client:   Yarra Valley Water
Yarra Valley Water - Provision of professional advice at Yarra
Valley Water, Australia

The Project involved the provision of ongoing professional technical and
project management services at Yarra Valley Water.

Services provided by Meinhardt included: -
    Inspection of waste water treatment plants
    Assessment of current and future requirements of the Whittlesea
     Sewage Treatment Plant
    Exploration of upgrade options
    Preparation of tender specification documents

Features of the project included functional design and preparation of a
consultant’s brief for the detailed design and project management
services for the upgrade of Whittlesea Sewage Treatment Plant.

Client:   Yarra Valley Water
Mekong Transport and Flood Protection, Vietnam

Meinhardt in association with Halcrow, PCI conducted the construction
supervision for road sections Can Tho to Nam Can and Dong Ha to
Quang Ngai of National Highway No. 1 and the road network in Mekong
delta area.

Client: Government of Vietnam (funded by World Bank)
Construction cost: USD 6,000,000
Year of Completion: 2004




Thu Duc BOT Water Supply, Ho Chi Minh City, Vietnam

Meinhardt was employed by LVWC to act as Independent Checking
Engineer (Owner Engineer) to provide the design review, construction
management and commissioning & testing for the construction of GTM
Dumez for USD 185 Million BOT Water Supply Project in Ho Chi Minh
City.

Services: Construction Management
Year of Completion: 2003
Client: Lyonnaise Des Eaux
Replacement and Rehabilitation of Water Mains Stage 2, Hong
Kong

The objective of this assignment is to progress the planned replacement
and rehabilitation of 700km of Hong Kong's existing water distribution
assets by preparing layout drawings, a study report, land requirements
plans and completing the Preliminary Project Feasibility Study to enable
the implementation of the works.

This includes the following major tasks:-
    Carry out desk studies and site visits to investigate the feasibility of
     the proposed water mains in terms of construction, geotechnical,
     traffic, services and utilities and environmental aspects
    Prepare drawings for the works
    Prepare the land requirement report and land requirement plans
    Consult with relevant government departments, consultants and
     utility undertakings, identifying practical constraints, alternative
     alignments, and construction methodologies, and producing a
     scheme for the works
    Carry out the preliminary environmental review and prepare project
     profile for approval by epd
    Costing, cost-benefit analyses and annual expenditure forecast
    Establish the recommended implementation strategy
    Submit a programme of works for the works
    Estimate the recurrent consequences to Government

Construction Cost: HK$3,000,000,000
Year of Completion: 2010
Client: Water Supplies Department
Lead Consultant: Meinhardt


Island West Transfer Station - Western Hong Kong Island, Hong
Kong

This project involved the excavation two caverns and access tunnels of
35,500m3, together with service and administration buildings at Mount
Davis, Western for Swire BFI's new Waste Transfer Station serving
Hong Kong Island.
Meinhardt achieved very substantial savings for the operator by
changing single cavern scheme to two smaller caverns, thereby
reducing the fire compartmentation volumes and therefore the cost of
the caverns and their fire prevention equipments.
Innovative solutions to environmental difficulties with fire alarm detectors
were also developed.

Construction Cost: HK$640,000,000
(Saving of HK$600M on the original design)
M&E Cost: HK$80,000,000
Year of Completion: June 1997
Client: Swire BFI Waste Services Limited
Architect: Ove Arup & Partners
4
  INFRASTRUCTURE
     CURRENT	AND	
ONGOING	PROJECTS
Current Projects




Project	Name                 Project	Description                   Client        Services	             Cost	     Category           Country
                                                                                 Provided
Manama Lagoon                Manama Lagoons is a mixed-use,        Retaj         Masterplanning,       TBA       Infrastructure     Bahrain
Development                  integrated resort development                       Infrastructure,
                             incorporating two 5 star hotels,                    Civil & Structural,
                             residential apartments and villas,                  Architectural and
                             a modern retail souk, and a variety                 M&E Consultancy
                             of entertainment and lifestyle                      Services
                             facilities plus parking.
Bombay Dyeing Spring                                               Bombay        Master Planning,      TBA       Masterplanning/    India
Mills Site                                                         Dyeing        Infrastructure                  Infrastructure
                                                                                 Design and
                                                                                 Building Design
Appointment of               Meinhardt is providing                Land          Independent           TBA       Infrastructure /   Singapore
Independent & Accredited     Independent and Accredited            Transport     & Accredited                    Railway
Checker for Contracts        Checker services for Contracts        Authority     Checker
1660 and 1661, Singapore     1660 and 1661 Tuas West
                             Extension. The project comprises
                             3 stations and an interchange
                             station with Tuas South Extension
                             and a depot. It also includes a
                             7.5km long elevated rail line.
LTA Contract 9181C -         LTA Contract 9181C - Proposed         Land          M&E Engineering                 Infrastructure     Singapore
Proposed Downtown            Downtown Line Stage 3 (DTL 3)         Transpot
Line Stage 3 (DTL 3)         Rapid Transit System of Singapore     Authority
Rapid Transit System of      (Package C)
Singapore (Package C),
Singapore
QP Services for Contract     Qualified Person (Supervision)        Land          C&S Engineering       SGD 410   Infrastructure     Singapore
911 for Land Transport       Services for Contract 911 Design      Transport                           million
Authority, Singapore         and Construction of Depot for         Authority
                             Downtown Line.
Contract 917 Design and      Contract 917 Design and               Alpine Bau    Project               S$320m    Infrastructure /   Singapore
Construction of Stations     Construction of Stations and          GmbH          Management,                     Railway
and Tunnels at Sixth         Tunnels at Sixth Avenue and                         Civil & Structural,
Avenue and Blackmore for     Blackmore for Downtown Line                         Architectural and
Downtown Line Stage 2        Stage 2                                             M&E Consultancy
                                                                                 Services
Contract 918 Design and      Contract 918 Design and               Alpine Bau    Project               S$350m    Infrastructure /   Singapore
Construction of Station at   Construction of Station at Duchess    GmbH          Management,                     Railway
Duchess and Tunnels for      and Tunnels for Downtown Line                       Civil & Structural,
Downtown Line Stage 2        Stage 2                                             Architectural and
                                                                                 M&E Consultancy
                                                                                 Services
Phase 1 Jurong Rock          Contract No: JTC C01502009            Jurong        Accredited            SGD 700   Infrastructure     Singapore
Cavern at Banyan Basin,      Provision of Accredited Checking      Consultants   Checking              million
Jurong Island, Singapore     Organisation Services for             Pte Ltd
                             Design and Construction of the
                             Underground Caverns, Associated
                             Underground / Aboveground
                             Facilities and Jetty of Phase 1
                             Jurong Rock Cavern at Banyan
                             Basin, Jurong Island, Singapore
Project	Name               Project	Description                 Client          Services	        Cost	       Category         Country
                                                                               Provided
Bandar Seri Begawan        The plan includes upgrading         HOK             Civil,                       Infrastructure   Brunei
(BSB) Development          BSB into a more dynamic, vibrant    International   Infrastructure               Masterplanning
Masterplan, Brunei         and unique 21st century capital                     & Environment
Darussalam                 city with efficient communication                   Engineering
                           and transportation systems and
                           devising a landscape to make
                           BSB as a progressive, competitive
                           and sustainable commercial and
                           financial centre (with special
                           emphasis on Islamic Finance).
Al Wakra and Al Wakrah     The project comprises two           Surbana         C&S and MEP      Not         Infrastructure   Qatar
Cities Masterplan, Qatar   separate developments, the          International   Engineering      Available   Masterplanning
                           masterplan for Al Khor (35 ha)      Consultants
                           and the masterplan for Al Wakrah    Pte Ltd
                           (450ha), both of which involve a
                           multi phase development plan
                           between 2009 and 2032.
Other Current Projects




Name	of	Project	        Project	Description                       Project	Type	   Project	   Name	of	the	   Contract	    Start	   Expected	
                                                                                  Location   Client         Value		      Date     Completion	
                                                                                                                                  Date


Najibi Village, Saar,                                             Residential     Bahrain    Najibi         -            2009     2011
Bahrain                                                                                      Investment
                                                                                             Company

Manama Reef             Marina Reef development consists of       Residential     Bahrain    Crown Dilmun   12 Million   2008     2011
Residential             3 No. 7 storey high spec apartment                                   Properties     BD
Development             towers with a shared basement
                        located on Reef Island in the middle
                        of Bahrain. Approx GFA 25 000 sqm

Reef Island             Situated at a prominent, landmark         Mixed Use       Bahrain    Capital        -            2008     2011
Commercial Center       location on the Reef Island, the          Development                Management
                        proposed mixed-use development                                       House
                        consists of a 2-storey retail /
                        F&B podium connecting with the
                        healthcare, spa, entertainment
                        component and a pair of 12-storeys
                        office towers. The iconic twin towers
                        flank the entrance gateway into the
                        development and reinforce the visual
                        axis in the overall masterplan. The
                        Retail is envisioned to be modern
                        day ‘souk’, different from faceless
                        suburban shopping malls which lack
                        character.

Al-Jasra Residential                                              Residential     Bahrain    Confidential   -            2008     2010
Villa Compound

ATTA Towers,            Mixed-use development comprising a        Commercial      Bahrain    Ithmaar        USD 100      2008     2011
Bahrain                 37-Storey Residential/Hotel Tower with    (Mixed Use                 Development    million
                        Amenities, a 13-Storey Office Tower       Development)               Company
                        and 5 Levels of Basement. Total GFA
                        is 51,442.50 sqm.

Great Mall of China     The integrated retail, convention         Retail          China      Confidential   USD 265      2005     2009
at Yan Jiao, Hebei,     centre & entertainment complex is                                                   million
China                   located at Yan Jiao Development
                        Zone. The massive complex, when
                        completed in 2009, will be one
                        of the largest commercial cum
                        entertainment projects in the world,
                        covering an area of 5.5 million sqft.
                        An indoor themepark will be part of
                        the development.

Ascendas IT Park,       5 blocks of 10 to 12 storey IT building   Industrial      India      Ascendas                    2007     2009
Pune, India             with total GFA of 150,000sqm.                                        India

Bangalore Air           Meinhardt Singapore & India are           Aviation        India      SATS                        2007     2009
Cargo Complex           providing integrated engineering for
                        SATS Cargo Complex at Bangalore
                        International Airports.
Name	of	Project	      Project	Description                       Project	Type	   Project	    Name	of	the	    Contract	   Start	   Expected	
                                                                                Location    Client          Value		     Date     Completion	
                                                                                                                                 Date


Kingsgate Hotel       The project is a 3-star Hotel situated    Hotel           India       Millennium      USD 12      2007     2010
Development at        in Chennai, India. The total area of                                  Copthorne       million
Chennai, India        the plot is 1,700 sq m. The hotel                                     International
                      comprises 117 rooms, 11 storeys and                                   Ltd
                      2 levels of basement. The total plot
                      area is 18,000 sq ft and total built up
                      area is 64,000 sq ft.

Proposed Retail       Bombay Dyeing, the Wadia group            Retail          India       The Bombay      USD 60      2006     2009
Mall Development      flagship, has decided to develop                                      Dyeing & Mfg.   million
in Mumbai, India      around 2.5m sq ft of land at its                                      Co. Ltd.
(Spring Mill Town     Spring Mill in the central Mumbai
Centre)               suburb of Dadar for commercial and
                      residential purposes. The project will
                      be developed in 2 phases. Meinhardt
                      Singapore is providing Mechanical
                      & Electrical consultancy services for
                      Phase 1 of the development, which
                      consists of a 650,000 sqft shopping
                      mall with 2,400 carparking facility
                      both below and above ground and
                      landscape deck.

Kemang Village        The project comprises a mixed             Commercial      Indonesia   PT Almaron      USD 100     2007     2009/10
Mall & Residences,    development - Apartment, Hotel,           (Mixed Use                  Perkasa         million
Jakarta               Retail Mall and School - with GFA of      Development)
                      approx. 358,000 sqm.

Mixed                 Proposed mixed development project        Commercial      Indonesia   PT Mandri       TBA         2008     2011
Development           comprises Shopping Mall & School,         (Mixed Use                  Cipta
at Puri, Jakarta,     Hotel, Office & Residential Apartment     Development)                Gemilang
Indonesia             at Puri, West Jakarta. Total GFA of
                      approx. 432,000 sqm.

Siloam Specialist     The project comprises a 27-storey         Hospital        Indonesia   Lippo Realty    TBA         2006     2010
Hospital @ Aston,     specialist hospital with serviced
Jakarta               apartment facilities. GFA of 34,551
                      sqm with 13,280 sqm for carparks.

World Trade           Meinhardt Singapore in association        Commercial      Indonesia   PT. Jakarta     TBA         2008     2010
Centre II, Jakarta,   with Meinhardt Indonesia are              (Office)                    Land
Indonesia             providing Civil and Structural
                      Engineering for World Trade Centre II,
                      Jakarta. The project comprises a new
                      28-storey high rise office tower (with
                      total GFA of approx. 56,000 sqm) in
                      addition to the existing World Trade
                      Centre development. The new tower
                      will integrate with the existing GF,
                      Level 1 and B1 to B5 basement levels.
Name	of	Project	    Project	Description                         Project	Type	   Project	    Name	of	the	   Contract	   Start	   Expected	
                                                                                Location    Client         Value		     Date     Completion	
                                                                                                                                Date


The Pearl – Viva    Meinhardt Singapore is providing            Residential     Qatar       United         SGD 2.5     2006     2010/11
Bahriya, Qatar      integrated engineering services for                                     Development    billion
                    this mega development, comprising                                       Company
                    29 blocks of high-rise residential
                    towers (20-24 storey) on a 2 level
                    semi- basement carpark, townhouses
                    and retail. The project, with total GFA
                    of approx. 9 million sqft, is part of the
                    prestigious The Pearl development,
                    Qatar.

One Shenton,        Meinhardt Singapore is providing            Residential     Singapore   City           SGD 150     2005     2009/10
Singapore           C&S engineering consultancy for the                                     Development    million
                    redevelopment of No. 1 Shenton Way.                                     Ltd
                    The project involves the demolition of
                    an existing office building at the heart
                    of Singapore’s CBD (Shenton Way)
                    and the design & construction of two
                    new residential towers of up to 55
                    levels on a site area of 3,750 sqm.

Marina Bay          Meinhardt is providing integrated           Commercial      Singapore   Hongkong       SGD 2.6     2005     2010/11
Financial Centre    engineering for the mega development        (Mixed Use                  Land, Keppel   billion
(MBFC), Singapore   which comprises:                            Development)                Land and
                                                                                            Cheung Kong

                    Phase 1 – 33 & 51-storey Office Towers


                    Phase 1 – 56 storey Residential Tower
                    (Marina Bay Residence)


                    Phase 2 – 67-storey Residential Tower


                    Phase 2 – 50-storey Office Tower

Reflections at      Reflections at Keppel Bay, Singapore        Residential     Singapore   Keppel Bay     SGD 1       2007     2011
Keppel Bay,         is a residential development that                                       Pte Ltd        Billion
Singapore           features 11 Villa blocks of 6 to 8
                    storeys, 3 pairs of 24 & 41 storeys
                    curve-formed towers having vertical
                    cores. The tower crown is constructed
                    in circular steel tubes and linked by
                    3 sky bridges each. Meinhardt is
                    providing Construction Engineering
                    Analysis for the 3 pairs of 24 & 41
                    storeys curve-formed towers.

Bungalows at        Proposed 2 units of Bungalow                Residential     Singapore   A.M.           SGD 6       2008     2010
Sentosa Island,     Development at Sentosa Island. Total                                    Associates     million
Singapore           GFA is approx. 5,000 sqft.                                              (Singapore)
                                                                                            Pte Ltd
Name	of	Project	    Project	Description                       Project	Type	   Project	    Name	of	the	     Contract	   Start	   Expected	
                                                                              Location    Client           Value		     Date     Completion	
                                                                                                                                Date


Proposed            The proposed development consists         Residential     Singapore   Hiap Hoe         SGD 17      2008     2010
12-Storey           of 12 -storey luxury residential                                      Superbowl        million
Luxurious           development. The GFA is 6,853 sqm.                                    Pte Ltd JV
Condominium
Development at
5 Balmoral Road,
Singapore

Proposed Business   A 15-storey Business Park building        Industrial      Singapore   NSIAP Pte Ltd    USD 30      2007     2009/10
Park Building       with one level basement. Total                                                         million
at International    construction area is approx. 20,000
Business Park,      sqm.
Singapore

Parkview Eclat,,    The project comprises a 24-storey         Residential     Singapore   Stream Ahead     SGD 40      2006     2010
Singapore           luxurious residential tower with                                      Pte Ltd          million
                    basement carparks at Grange Road.

Meritus Mandarin    Meinhardt is providing integrated         Hotel           Singapore   Overseas         SGD 80      2006     2009/10
Singapore           engineering services for the additions                                Union            million
                    & alterations (A&A) to Meritus                                        Enterprise Ltd
                    Mandarin Hotel at Orchard Road.
                    The A&A works include: conversion
                    of existing Basement 1 to Level 5 to
                    Retail; conversion of Level 6 to retail
                    and hotel reception including function
                    rooms and ballroom; conversion of
                    Level 7 to Spa/Gym and health club
                    including a new swimming pool;
                    and conversion of Level 8 to office
                    space. When completed in 2009, the
                    hotel will have a retail space (GFA) of
                    30,000 sqm.

Sentosa Quayside    A mixed-use development of luxury         Residential     Singapore   Cityview         SGD 80      2007     2010
Collection,         residences (234-unit), commercial                                     Place Holding    million
Singapore           space and a 300-room five star hotel                                  Pte Ltd
                    at Sentosa Island. GFA is approx.
                    380,000 sqft.

Bukit Panjang       The proposed development consists         Residential     Singapore   Housing          SGD 90      2008     2011/12
Housing             of 8 residential blocks vary from 5                                   Development      million
Development,        storey to 32 storey with more than 800                                Board (HDB)
(HDB Contract       units and one 5 storey multi storey car
N6C9) , Singapore   park. The proposed GFA is 62,957
                    sqm.

Burj Dubai          Meinhardt Singapore is providing          Commercial      Singapore   Emaar            USD 100     2005     2010
Development Plots   integrated engineering services           (Mixed Use                  Properties       million
29 & 30, Dubai,     for The Burj Dubai – a mixed use          Development)
UAE                 development – located within close
                    proximity to The Dubai Mall and Burj
                    Tower at the intersection of Sheik
                    Zayed Road and Doha Street. The
                    project comprises 2 residential
                    towers of 29 and 21-storey, a 5-storey
                    podium with 3 levels of basement for
                    carparking. The total built-up area is
                    983,400 sqft.
Name	of	Project	     Project	Description                         Project	Type	   Project	    Name	of	the	     Contract	   Start	   Expected	
                                                                                 Location    Client           Value		     Date     Completion	
                                                                                                                                   Date


Livia                The proposed project comprises              Residential     Singapore   City             SGD 100     2006     2009/10
Condominium,         several phases / plots of                                               Development      million
Singapore            condominium development at                                              Ltd
                     Pasir Ris, the first phase being 730
                     units with basement carpark and
                     recreational facilities. The entire
                     development would ultimately
                     yield a total of approximately 3,000
                     condominium units. The first phase
                     development will include all necessary
                     M&E infrastructure planning / design
                     for the full development of all future
                     phases of the project.

Bedok Housing        The proposed development consists           Residential     Singapore   Housing          SGD 110     2008     2012
Development,         of 8 blocks of 14 storey residential                                    Development      million
(HDB Contract 20),   with 1000 units and one 3 storey multi                                  Board (HDB)
Singapore            storey car park. The proposed GFA is
                     89,100 sqm.

Terminal 1           Meinhardt is providing civil, structural,   Retrofitting    Singapore   Civil Aviation   SGD 120     2005     2010
Upgrading, Changi    mechanical, electrical and facade                                       Authority        million
Airport              services for the Upgrading of Terminal                                  Singapore
                     1 (T1) of Changi Airport. The A&A                                       (CAAS)
                     scopes include:
                     - To develop a welcoming and
                     distinctive façade for T1 that
                     continues to hold its own against the
                     modernistic T2 and futuristic T3.
                     - To recreate T1’s original charm by
                     providing a warm, refreshing and
                     memorable experience for air travelers
                     through its interior ambience.
                     - To enhance the processing capacity
                     of T1, in particular the check-in hall,
                     baggage reclamation and gate
                     holdrooms.
                     - To maximise the commercial
                     potential of T1.
                     - To upgrade and integrate retail, food
                     and beverage, entertainment and
                     passenger services and facilities to
                     create an exciting, lively and complete
                     airport experience for passengers.

Residential          Meinhardt Singapore is providing            Residential     Singapore   Property         SGD 130     2008     2011
development          integrated engineering services for                                     Enterprises      million
at West Coast        the 36-storey high-rise residential                                     Development
Crescent,            project with total GFA of 33,600 sqm                                    Pte Ltd
Singapore            housing a total of 270 unit of luxury
                     apartments.

Sky@Eleven,          The project comprises a 43-storey           Residential     Singapore   Times            SGD 130     2006     2009
Singapore            upmarket condominium at Thomson                                         Development      million
                     Road. The exclusive development                                         Pte Ltd
                     to be launched next year will have a
                     gross floor area in excess of 660,000
                     sqft.
Name	of	Project	     Project	Description                       Project	Type	   Project	    Name	of	the	    Contract	   Start	   Expected	
                                                                               Location    Client          Value		     Date     Completion	
                                                                                                                                Date


Cliveden at Grange   The luxurious residential development     Residential     Singapore   City            SGD 136     2007     2010/11
                     comprises 4 blocks of 24 storey                                       Development     million
                     residential towers (Total 110 Units)                                  Pte Ltd
                     with 2 level basement for carparks.
                     The development is designed for
                     highest energy efficiency to achieve
                     BCA’s Platinum Green Mark Award.

60/A Collyer         Proposed development of a new             Commercial      Singapore   Clifford        SGD 150     2006     2009/10
Quay – Change        18-storey office tower [GFA 500,000       (Office)                    Development     million
Alley Aerial Plaza   sq ft] on the existing OUH Building                                   Pte Ltd
(CAAP), Singapore    site & Conservation, Retrofitting
                     Change Alley Aerial Plaza at Collyer
                     Quay Singapore.

Resorts World        Resorts World at Sentosa will be a        Commercial      Singapore   Genting         SGD 5.2     2007     2010/11
at Sentosa,          premium integrated resort taking          (Mixed Use                  International   billion
Singapore            pride of place on a 49-ha site at         Development)
                     the northern shore of Singapore’s
                     Sentosa island. Slated for opening
                     in 2010, the Resort will house the
                     region’s first Universal Studios theme
                     park, the world’s largest oceanarium
                     Marine Life Park, the exciting Equarius
                     Water Park, a maritime museum
                     and the award-winning wellness
                     sanctuary, Espa. The Resort will have
                     six hotels, including the world’s only
                     Hotel Michael that is designed by one
                     of America’s best-known architects,
                     Michael Graves. The six hotels will
                     provide more than 1,800 rooms as
                     well as full meeting and conference
                     facilities. Meinhardt is providing MEP
                     engineering consultancy services for
                     the integrated resort.

Island City, Mixed   The mixed-use development                 Commercial      UAE         Office of       USD 100     2006     2010
Development at       comprises a 4-star hotel, residential     (Mixed Use                  Mr Rashed       million
Abu Dhabi UAE        towers, retail and townhouses. Total      Development)                Darwish Al
                     GFA of 66,650 sqm.                                                    Ketbi

Standard Chartered   Meinhardt is providing M&E                Retrofitting    UAE         Standard        TBA         2007     2009
Bank – Abu Dhabi     engineering and due dilligence to                                     Chartered
Head Office /        Standard Chartered Bank’s new head                                    Bank
Flagship Branch      office and flagship branch at Abu
                     Dhabi.

Standard Chartered   Meinhardt is providing MEP & Fire         Commercial      UAE         Standard        TBA         2007     2009
Bank – New Head      Services Engineering Design Services      (Office)                    Chartered
Office, Flagship     for the New Head Office & Flagshop                                    Bank, Dubai
Branch, Abu Dhabi    Branch Fitout Project at Ground
                     & Mezzanine Floor Crystal Tower,
                     Khalidiya Street, Standard Chartered
                     Bank, Abu Dhabi UAE.
Name	of	Project	     Project	Description                         Project	Type	   Project	   Name	of	the	   Contract	   Start	   Expected	
                                                                                 Location   Client         Value		     Date     Completion	
                                                                                                                                Date


Ocean Heights,       The project comprises a 80-storey           Residential     UAE        Damac          USD 30      2005     2010
Dubai - UAE          highrise residential tower with 3                                      Properties     million
                     basement car parking facility. The                                     Co. LLC
                     total gross floor area is approximately
                     1,300,000 sq ft. Expected Completion
                     Date by end of 2008.

Marina Plaza,        The project comprises a 38-storey           Commercial      UAE        Emaar          USD 100     2006     2009
Dubai Marina,        office tower with 4 levels of podium        (Office)                   Properties     million
Dubai, UAE           retail area and 3 levels of basement
                     carpark. Total Gross Construction
                     Area is approx. 796,500 sqft.

Proposed             The project comprises a 60-storey           Residential     UAE        Emaar          USD 100     2006     2009
Residential Tower,   high rise residential tower with a                                     Properties     million
Burj Dubai Site 35   3-storey podium housing usual
                     condominium facilities and a 4-storey
                     basement carpark. The total
                     construction floor area for the high
                     rise tower is approximately 500,000 sq
                     ft, and the floor area for the carparking
                     is 150,000 sq ft.

La Ville             Meinhardt Singapore were appointed          Residential     UAE        Sama Dubai     USD 650     2006     2010/11
Contemporaine,       as the Principal Consultant for The                                                   million
The Lagoons –        Lagoons - La Ville Contemporaine
Area 2, Dubai, UAE   Area 2 (Contract No. DIP-0410.B.03b).
                     The mixed-use development,
                     developed by the prominent Sama
                     Dubai Group, is part of the multi-
                     billlion The Lagoons project in Dubai.
                     The project (Area 2) comprises 28
                     blocks of 10-20 storey towers for
                     retail and residential usage with full
                     amenities for luxurious and modern
                     living standard. Total CFA is approx.
                     11 million sqft.

Capital Plaza, Abu   Meinhardt is providing integrated           Commercial      UAE        Reisco PMC     USD 250     2003     2010
Dhabi                engineering consultancy services for        (Mixed Use                                million
                     the Capital Plaza, located along the        Development)
                     prominent Corniche in Abu Dhabi.
                     The huge development includes a
                     31-storey hotel tower, three blocks of
                     up to 45-storey residential towers, a
                     33-storey office tower on a 9-storey
                     podium for retail and 4 levels of
                     basement for carpark.
5
INFRASTRUCTURE
 KEY	PERSONNEL
Hee	Meng	WONG
                     INFRASTRUCTURE	CONSULTANT




PROFESSIONAL	QUALIFICATIONS                                    Mover System. The road network for the One North
                                                               Development comprises approximately 18.5 km
•   BSc(Civil), University of Alberta, Canada, 1984            roads on grade of various standards, 3 flyovers,
                                                               1 underpass and a trumpet interchange. The
PROFESSIONAL	AFFILIATIONS                                      feasibility study includes road geometric design,
                                                               foundation and structural design.
•   Corporate Member of The Institution of Engineers,      •   Civil infrastructure masterplanning for the 281 Ha
    Malaysia                                                   Sentosa Island, Singapore. Infrastructure includes
•   Professional Engineer, Board of Engineers,                 water supply, sewerage, road network, earthworks,
    Malaysia, 1990                                             stormwater, power and telecommunications.
                                                               The masterplan includes geometric review of the
PROFESSIONAL	EXPERIENCE                                        8.6km of existing roads and recommendation for
                                                               improvements.
Dec 2004 – Present                                         •   Civil infrastructure masterplanning for the 54 Ha
Meinhardt Infrastructure Pte Ltd,                              Gardens By the Bay at Marina South, Singapore.
Technical Director                                             Infrastructure includes road network and main
                                                               stormwater system. The masterplan includes
1991 – Nov 2004                                                assessment and recommendations on the bulk
Meinhardt (Singapore) Pte Ltd, Design                          earth filling with surcharging over thick marine clay.
Manager                                                    •   Concept and detailed design of the airside
                                                               drainage and landside access for the 2,265
1989 – 1991                                                    Hectares Indira Gandhi International Airport,
Engineering and Environmental Consultants                      New Delhi, India. The drainage system includes
Sdn Bhd, Kuala Lumpur, Malaysia                                hrdrologic modelling and rainwater harvesting
                                                               system
1988 – 1989                                                •   Civil infrastructure masterplanning the 3,000 Ha
LP Consultants Sdn Bhd, KL, Malaysia                           Kota Lobam, Bintan, Indonesia. Infrastructure
Project Engineer                                               includes water supply, sewerage, road network,
                                                               stormwater, power and telecommunications.
1984 – 1988                                                    The masterplan includes proposal for power
Drainage and Irrigation Department, Selangor                   generation, water and wastewater treatment.
Darul Ehsan, Malaysia, District Engineer                   •   Civil infrastructure masterplanning and concept
                                                               design for the 30 Ha Eighth Gate, Damascus, Syria.
KEY	PROJECTS                                                   Infrastructure includes water supply, sewerage,
                                                               road network, earthworks, stormwater, power
•   Infrastructure masterplan and detailed design              and telecommunications. The concept design
    of the infrastructure for the S$4 billion, 23,000          includes groundwater extraction and treatment
    Hectares, Bintan Beach International Resort,               system, sewage treatment plant, roads and grade
    Bintan Island, Indonesia. This includes the detailed       separated road access.
    design, contract administration and construction       •   Civil infrastructure masterplanning the 10,400
    supervision of the 30km East- West highway and             Ha Jazan Economic City Development in Saudi
    overhead power transmission lines.                         Arabia.Infrastructure includes water supply,
•   Transportation and traffic feasibility study for the       sewerage, road network, stormwater, power and
    194 Ha One North Development, Singapore. The               telecommunications. The masterplan includes
    transportation network includes a 5.5 km People            proposal for power generation, desalination,
sewage treatment and solid waste plants.                   system incorporating Critical Path Methods and
•   Masterplanning of the roads and water supply               PERT systems, computerised cost control and
    system for the 3,200 Ha Project IV, Islamabad,             budgeting, and technical QA and QC monitoring
    Pakistan. The masterplan includes review of                system has been implemented for the project.
    options for grade separated interchanges and               The project includes the design review of the
    water supply sources.                                      construction drawings and geometrical redesign of
•   Civil infrastructure masterplanning the 10,000             considerable stretch to suit the site conditions and
    Ha Ras Az Zawr Development in Saudi                        constraints.
    Arabia. Infrastructure includes water supply,          •   Planning and design for the DTSS-Link Sewers for
    sewerage, road network, stormwater, power and              Kolam Ayer, Towner and other pumping stations
    telecommunications. The masterplan includes                comprising 7 km of jacking sewer pipes ranging
    proposal for power generation, desalination,               from 750 mm diameter to 3000 mm diameter.
    sewage treatment and solid waste plants.                   This includes liaison and co-ordination with utility
•   Civil infrastructure masterplanning the 13,500             departments on the planning and design of
    Ha Project K Airport City development in Dubai,            temporary and permanent utilities diversion.
    UAE.Infrastructure includes water supply,              •   Detailed design for the civil infrastructure
    sewerage, road network, stormwater, power and              for Universiti Teknoloji Petronas (UTP). UTP
    telecommunications. The masterplan includes                development covers an area of approximately
    proposal for power distribution, sewage treatment          400 hectares and is located in the state of Perak
    and telecommunications exchange.                           Darul Ridzuan, Malaysia. The site comprised
•   Civil infrastructure masterplanning and detailed           200 hectares of the existing Universiti Sains
    design for the Taman Rimba Alam Park                       Malaysia (USM) and its facilities and 200 hectares
    Development located in Precinct 14 and 15 of               of undeveloped forest area. Approximately 120
    the Wilayah Perseketuan Putrajaya, Malaysia.               hectares of the existing USM campus comprised
    The park development comprises of three areas              of exmining ponds. The UTP campus when
    namely the Hutan Teras Utama, Hutan Koridor                completed will comprised of 3 zones namely, the
    Timur Laut and Taman Hutan Komuniti with a total           academic core located at the centre of the site,
    combined area of 160.8 Ha. The development                 open space, athletic facilities and ceremonial
    concept, as prepared by the masterplanner is               entrance located to the east and the student
    to create a recreational park which will maintain          housing located on the north. The infrastructure
    the “Garden City” concept of Putrajaya and is              includes earthworks, roads, drainage, water supply,
    uniquely Malaysian. The park is intended to be a           sewerage, power and telecommunications
    showcase of urban forestry which exploits the site’s   •   Civil infrastructure masterplanning for the 80
    natural beauty and ambience, the magnificient and          Hectares Saigon Sports City located in District
    picturesque views of the Putrajaya development.            2 of Ho Chi Minh City, Vietnam. The site will be
    The infrastructure includes earthworks, roads,             developed into an integrated mixed development
    drainage, water supply, sewerage, power and                with sporting facilities. Infrastructure includes
    telecommunications                                         water supply, sewerage, road network, earthworks,
•   Project Manager for the Construction Supervision           stormwater, power and telecommunications. The
    of 115 km of National Highways on NH-2 in                  ‘Design and Built’ specifications for Phase 1 of
    India under the Third National Highways World              the development which comprises the sporting
    Bank Project. The civil works proposed involve             facilities was also prepared.
    large scale construction of cement concrete and        •   Design and construction phase services for Phase
    bituminous pavement construction and some 45               1 of the Agarta Universe Theme Park in Johor
    bridge/culvert crossings. As the project is very           Bahru, Malaysia, comprising 113 Ha US$110
    large, a comprehensive project management                  Million Theme Park development, including major
earth moving (6.5 million m3), water supply,                network, stormwater, tidal lagoon, water supply,
    lake filtration, sewerage, stormwater, roads and            sewerage, telecommunications and earthworks.
    carparking.                                             •   Masterplan, detailed design and documentation
•   Project Manager for the Restoration of the southern         of the water supply and sewerage system for the
    beaches in Sentosa, comprising the construction             500 hectares KIBA automotive industrial park in
    of four offshore islets as breakwater to protect the        Cikampek, Jakarta, Indonesia. This includes design
    main beaches. Other works includes reclamation              of the water and sewage treatment plant.
    and reshaping of the main beaches.                      •   Infrastructure masterplan, detailed design and
•   Civil infrastructure masterplanning for the 1,350 Ha        documentation of the civil works for the 1,800
    Lagoi Bay Development, Bintan Beach International           acres Bute Golf and Residential Estate in Sepang
    Resort, Bintan. Infrastructure includes water supply,       Malaysia.
    sewerage, road network, earthworks, stormwater,         •   Design, documentation, contract administration
    telecommunications and sewage treatment. This               and construction supervision of the stormwater
    includes preliminary design of 3km divided dual             system for the 200 Hectares Esso Refinery at Pulau
    carriageway trunk road.                                     Ayer Chawan, Singapore.
•   Infrastructure masterplanning and coastal               •   Feasibility study on Common Services Trenching
    marina preliminary design for the 650 Ha Pecatu             for the Fort Bonifacio New Central Business District
    Indah Golf and Residential development in Bali-             in Manila, Philippines.
    Indonesia.                                              •   Civil infrastructure masterplanning for the 220 Ha
•   Infrastructure masterplan, detail design,                   Urban Beach Centre, Bintan Beach International
    documentation, contract administration and                  Resort, Bintan. This includes preliminary design of
    construction supervision for the 195 Ha Bintan              3kmdivided dual carriageway trunk road
    Beach International Resort Township with a              •   Civil design and construction supervision for the
    population projection of 30,000. Infrastructure             215 Hectares Banyan Tree Resort and Golf Course,
    includes water, sewerage, road network,                     Bintan Island, Indonesia. This includes holiday
    earthworks, stormwater, telecommunications and              villas, golf clubhouse and associated infrastructure
    sewage treatment plant.                                     such as dams, access roads, water supply,
•   Civil infrastructure masterplanning, detailed               stormwater and sewerage.
    design, and construction phase services for the         •   Civil design and construction supervision of the
    250 Hectares Royal Sumatra Golf and residential             Purajaya Beach Resort, Batam Island, Indonesia.
    development in Medan, Indonesia. Infrastructure             The resort includes 40 villas and a 220-room hotel.
    includes water supply, sewerage, road network,
    earthworks, stormwater, and telecommunications
    and sewage treatment.
•   Infrastructure masterplanning for the 1,000
    Hectares Batulao Woodlands Mountain Resort
    in Philippines. This includes design of the 8km
    Dual Carriageway Highway through difficult
    terrain, hydrological modelling and water resource
    management study, sewerage, earthworks,
    stormwater and telecommunications.
•   Infrastructure masterplan and design of the
    infrastructure for the 1,200 Hectares Putri Nyale
    Resort, Lombok, Indonesia. Infrastructure works
    includes technical assessment of existing roads
    with regards to safety and capacity, internal road
Yang	San	GO
                     INFRASTRUCTURE	CONSULTANT




PROFESSIONAL	QUALIFICATIONS                                  Dubai Metro Network comprises two lines; The
                                                             Red Line and The Green Line. The two lines have a
•   BEng(Civil), Nanyang Technological Institute,            total length of nearly 70 km, with 35 stations along
    1987                                                     the 50 km long Red Line, and 22 stations along
                                                             the 20 km Green Line. The two transfer stations
PROFESSIONAL	AFFILIATIONS                                    at Al Ittihad Square and Burjuman are common to
                                                             both lines. In total, the Dubai Metro has 18 km of
•   Senior Member of the Institution of Engineers,           tunnels, 51 km of viaduct, one major train depot
    Singapore                                                and maintenance facilities site and several auxiliary
•   Member of Singapore Structural Steel Society             stabling facilities.
•   Member of International Association of Engineering   •   Project K, United Arab Emirates: Responsible as
    Geology                                                  Project Manager for infrastructure masterplanning
•   Member of Singapore Institute of Management              of a 130 km2 of a fully integrated and self
                                                             contained development comprising an airport and
PROFESSIONAL	EXPERIENCE                                      its associated facilities, logistic park, industrial,
                                                             commercial, residential, R&D, exhibition centre and
Dec 2004 – Present                                           university.
Meinhardt Infrastructure Pte Ltd, Director               •   Contract 855 MRT Circle Line Stages 4 & 5,
                                                             Singapore (S$400m): Responsible as Principal-in-
1996 – Nov 2004                                              Charge for the temporary earth retaining structure
Parsons Brinckerhoff Pte Ltd, General Manager/Director       design services of Holland, Buona Vista and Kent
PB Merz and McLellan Pte Ltd, Vice President                 Ridge Stations and the associated cut & cover
                                                             tunnel and bored tunneling works for WH-STEC-
1993 -1996                                                   AM JV for Circlle Line Contract 855.
Maunsell Consultants (Singapore) Pte Ltd, Associate      •   Kota Lobam Masterplan, Bintan: Responsible as
                                                             Project Manager for infrastructure masterplanning
1991 -1993                                                   of a 3000 ha of a new Commercial City which
Parsons Brinckerhoff Manusell Consultants (PBMC)             consists of industrial estates, commercial centers,
Supervising Engineer                                         schools, government institutions, marina, port, park
                                                             and green belt.
1988 -1991                                               •   Riyadh Equestrian City Development Masterplan,
Expressway Construction Pte Ltd, Senior Site Engineer        Saudi Arabia: Responsible as Project Manager for
                                                             the major infrastructure facilities masterplanning
1987 -1988                                                   including road, water, power, sewerage, telecom,
Essence Building Works Pte Ltd, Site Engineer                solid waste, land sizes and cost estimation of
                                                             the major infrastructure facilities of a 56km2 of a
1986                                                         fully integrated and self contained development
Bocotra Construction Pte Ltd, Site Engineer (Trainee)        comprising town centre, commercial district,
                                                             tech park, low-rise residential villas, amenities,
KEY	PROJECTS                                                 education and recreation.
                                                         •   Circle Line Stages 4 & 5, Singapore (S$2.5b):
•   Dubai Metro, United Arab Emirates (US$3b):               Responsible as Proposal Manager to organize the
    Resposible as Principal-in-Charge for structural         proposal team with multiple sub-consultants for the
    design of the Rashidiya Main Depot and Jebel Ali         Architectural/ Engineering Consultancy Services
    Auxiliiary Depot for the Dubai Metro Project. The        for Circle Line Stages 4 & 5 to the Land Transport
authority of Singapore for the 18km rail tunnels             Principal-in-Charge of overall execution of the
    and 11 underground stations from Marymount                   project. Appointed as the Contractor’s Independent
    Station and join to Harbourfront Station. During the         Checking Engineer by the Contractor. The project
    execution of the project, perform the role of Quality        consists of approximately 8 km of viaducts, 8 km of
    Assurance Manager overseeing the delivery of                 mined tunnels and 8km of at grade section. C230 is
    the project through conceptual, preliminary, final           part of the construction of the 325km High Speed
    design and tendering phases.                                 Rail project in Taiwan.
•   Contract PL0101 Planning Feasibility and                 •   C280 Taiwan High Speed Rail Project, Taiwan
    Preliminary Engineering Design Study for an                  (US$350m): Responsible as Proposal Manager
    Additional Expressway in the North-South Corridor,           for the contract negotiation with the Contractor
    Singapore (Estimated S$3.2b): Responsible to                 and subsequently as Project Manager and then
    organize the proposal team and preparation of                Principal-in-charge. Was appointed as one of
    the proposal submission. During the execution                the design team member responsible for the
    stage, perform the role of Deputy Project Manager            detailed design of the non¬standard viaduct/
    and subsequently Project Manager for the                     bridge structures for the Lot 1 of the contract which
    proposed 20km road tunnels study and preliminary             consists of about 34km of elevated viaduct/bridge
    engineering design including traffic study, land             and part of the construction of the 325km High
    use, right of way, roadways alignment corridors,             Speed Rail project in Taiwan.
    preliminary design for C&S, M&E schemes as               •   Cable Tunnel from Senoko Power Station to
    well as the project budgetary cost estimates and             Gambas Avenue, Singapore (S$80m): Responsible
    implementation schedule.                                     as Proposal Manager for the tender design
•   Contract 552 SA – System Assurance consultancy               preparation for the Contractor and subsequently
    Services for Signalling System for Changi MRT                the Project Manager and Principal-in-Charge after
    Line, Singapore: Responsible as Proposal Manager             awarding of the Contract. The proposed tunnels
    for the tender preparation and subsequently as               include twin cable tunnels of 3.7m internal diameter
    Project Co-ordinator after winning the project to            (East and West Tunnels) and of 1.8m long with an
    liaise with specialists for the project execution.           equipment building, 3 ventilation/access shafts and
•   Architectural/Engineering Consultancy Services               associated M&E equipment.
    for the Marina Line, Singapore (Estimated S$3b):         •   Upgrading of Telok Blangah Road (Part) and
    Responsible as part of the tender preparation team           Pasir Panjang Road to Semi-Expressway Phase
    member and subsequently appointed the Project                II, Singapore (S$60m): Responsible as Proposal
    Co-ordinator after winning the project for the Stage         Manager for the tender submission as Accredited
    I feasibility study and conceptual design and Stage          Checker and subsequently as Project Manager.
    II preliminary design and preparation of D&B civil           The proposed vehicular viaduct is a 3-lane dual
    tender documentation of The Marina Line.                     carriageway and is approx. 2600m in length with 2
•   LRT for Sengkang/Punggol New Towns, Singapore                nos. of long slip ramp structures.
    (S$400m): Responsible as Proposal Manager in             •   Upgrading of Telok Blangah Road to Semi-
    the preparation of the design documentation for              Expressway Phase I, Singapore (S$68m):
    the contractor in this design and build contract.            Responsible as Proposal Manager in the design
•   Singapore Mass Rapid Transit (MRT) Tracks:                   documentation submission to the contractor in this
    Involved in the consultancy services for rail shelling       design and build contract. The contract includes
    of the existing MRT tracks.                                  desing of the 2.4km elevated viaduct structures
•   C230 Taiwan High Speed Rail Project, Taiwan                  with pier located at the central median of the
    (US$450m): Responsible as Proposal Manager                   at-grade roadway, the at-grade road widening,
    for the contract negotiation with the Contractor             utilities diversion, underpinning/reconstructing of
    and subsequently as Project Manager and then                 pedestrian bridges and slope protection, etc.
•   Assessment and Upgrading of Woodsville Flyover,         •   Road Drainage Improvement in Bukit Timah/
    Singapore: Responsible as Proposal Manager                  Holland Road Areas, Singapore: Responsible as
    and subsequently Project Manager and then                   Project Manager and subsequently as Principal-in-
    Principal-in-Charge after winning the project for           Charge for the design of the reconstruction of old
    the inspection, deck study, assessment and detail           roadside drain along the Bukit Timah/Holland Road
    design.                                                     Areas for Drainage Department of Singapore.
•   Assessment and Upgrading of Vehicular Bridges           •   Masters Golf & Country Club, Guangzhou, China
    for Pioneer Road and Jalan Ahmad Ibrahim,                   (S$100m): Responsible as Project engineer for the
    Singapore: Responsible as Proposal Manager                  planning and design of the project. The Masters
    and after winning the project hand over to the              is a 94 Ha golf and country club which consists
    designated Project Manager.                                 of a 18-hole golf course, infrastructure works
•   Structural Inspection to MRT Viaducts, Bearings             that include roads, drainage, sewerage, river
    and Tunnels, Singapore: Responsible as Proposal             walls, site formation, etc. and structural designs
    Manager during tender stage and subsequently as             of driving range, clubhouse, service apartment,
    Principal-in-Charge for the Structural Inspection to        condominiums and villas.
    MRT Viaducts, Bearings and Tunnels.                     •   Golf and Beach Resort at Rompin Village, Malaysia:
•   Sentosa People Mover System – Civil & Alignment             Involved in the design of civil works including
    Works, Singapore (S$12m): Responsible as                    earthworks, roadworks and drainage design for the
    Proposal Manager to secure the project and                  Phase 1A and 1B.
    as Project Manager in the initial stage and             •   Malaysia Shipyard Engineering Syncrolift (M$70m):
    subsequently as Principal-in charge for the detail          Involved in the concept drainage design for the
    design of the 4.3km double track alignment of               project, Pasir Gudang, Johore, Malaysia.
    the proposed People Mover System for Sentosa            •   British Petroleum Vietnam Plant: Involved in the
    Development corporation.                                    preliminary civil works design of roadworks and
•   Underground Roadway System, Singapore                       drainage for the Phase II.
    (Estimated S$4.8b): Involved in the Phase I and II      •   Admiralty Industrial Park, Singapore (S$70m):
    of the Feasibility Study, Engienering Investigation         Responsible as Project Engineer for the project
    and Design of the project which runs in the Central         which consists of 57 units of terrace, semi-
    City of Singapore.                                          detached and flatted factories. Responsible for the
•   Central Expressway Phase II (S$350m): In charged            concept and details design of the infrastructure
    of Production 7, Areas 11 to 17 of the project.             works including the roadworks, earthworks,
    Central Expressway Phase II runs from Bukit Timah           drainage and sewerage works.
    Road to Chin Swee Road.                                 •   Jurong Point Shopping Centre, Singapore
•   Deep Tunnel Sewer System Singapore (S$7b):                  (S$65m): Responsible for the design of the civil
    Responsible for the initial liaison and co-ordination       works including roadworks and drainage for the
    with various local Agencies to obtain information           7 storeys and 3 levels basement commercial
    like topographical survey, expressway alignment,            development.
    soil data, marine data for the study of the projects.
    The contract also includes provision of Project
    Management services during the construction
    stage.
•   Sewerage Facilities for Woodlands and
    Sembawang New Town, Singapore: Responsible
    as Project Manager and subsequently as Principal-
    in-Charge for the design of main sewers along
    Woodlands Avenue 8 and Gambas Avenue.
Kok	Siong	CHAN
                    INFRASTRUCTURE	CONSULTANT	




PROFESSIONAL	QUALIFICATIONS                              KEY	PROJECTS

•   BSc(Civil), University of London, UK, 1970           •   LTA – Circle Line Stage 4 & 5, C870G, Singapore
•   Post Grad Dip (Surveying), University College,           Project Director for the Architectural and
    London, UK, 1971                                         Engineering Consultancy Services for Circle Line
•   MSc(Civil), University of London, UK, 1972               Stage 4 & 5 consisting of 18km of tunnels and 11
                                                             underground stations, of which 5 are doubled up
PROFESSIONAL	AFFILIATIONS                                    as civil defence shelters. Services include concept,
                                                             preliminary and detailed design of all disciplines,
•   Member of The Institution of Civil Engineers, UK,        systemwide co¬ordination, budgetary cost
    1979                                                     estimates, construction contract documentation
•   Fellow of the Geological Society, UK, 1980               and construction supports, etc. for implementation
•   Professional Engineer of Singapore, 1983                 of the railway line project.
•   Accredited Checker, 1995                             •   LTA – North-South Expressway , Singapore
                                                             Project Director for the North-South Expressway
PROFESSIONAL	EXPERIENCE                                      feasibility study and preliminary engineering
                                                             contract, consists of establishing options for the
Nov 2004 – Present                                           alignment, interfacing with all relevant agencies
Meinhardt Infrastructure Pte Ltd, Managing Director          and authorities for lands use/acquisition, conduct
                                                             traffic analysis and studies, define expressway
1996 – Oct 2004                                              corridors, vertical and horizontal alignments,
Parsons Brinckerhoff Pte Ltd, Chief Operating Officer/       preliminary design for the tunnel structures and
Managing Director PB Merz and McLellan Pte Ltd,              M&E provisions, provide budgetary cost estimates
President/Managing Director                                  for implementation of the project.
                                                         •   PowerGrid – Senoko Cable Tunnel, Singapore
1989 -1995                                                   Project Director for proposed Senoko Cable tunnel
Maunsell Consultants (Singapore) Pte Ltd, Director           between Gambas and Senoko for the 400 KV
                                                             Transmission Line to Senoko Power Station provide
1982 -1985                                                   C&S and M&E services for twin 3.7m internal
Ove Arup & Partners, Senior Resident Engineer                diameter, 1.8km long, one equipment building and
                                                             3 access/ventilation shafts to the design and build
1980 -1982                                                   contractor.
John Brown-Ear & Wright (UK), Structural Engineer        •   Singapore Parallel Train Project, Polymer Laydown,
                                                             Storage & Shipping Facilities. As the QP/PE for
1978 -1980                                                   the QP services design review and permitting for
Sir William Halcrow & Partners (UK)                          the proposed polymer laydown, storage yard and
                                                             shipping facilities.
1977 -1978                                               •   Power Seraya Power Station Cogen Combined
Halcrow International, Saudi Arabia                          Cycle Power Plant Extension of Unit 30 and 40 at
                                                             Jurong Island. As the QP/PE for the QP services
1975 – 1977                                                  design review and permitting services.
Sir William Halcrow & Partners, UK                       •   Pulau Seraya CCPP: Owner’s engineer for the
                                                             provision of consulting and engineering services
1972 -1974                                                   for the development of 2 x 370 MW combined cycle
King’s College London, UK                                    power plant for Pulau Seraya Power Station.
•   Schering Plough Pharmaceutical Plant, Tuas,           •   MRT North East Line Contract 716: Project Director
    Singapore. QP/PE for submission, approval,                for C716, Trackworks for the North East Line
    permitting for Schering Plough Pharmaceutical             consists of 20 km twin track and in the depot.
    plant development at Tuas including multi-Purpose         Contract value S$100m.
    Product plant MPP1 & 2, Design and Research           •   Guilin View Condominium: 655 units condominium
    Building, Drum store, Warehouse, Tanker Parking           in five 30-storey towers. Contract value S$150m.
    Facilities, Off-site Utilities.                       •   Tuas Tech Park -Industrial park development
•   Mitsui Bisphenol Chemical Plant, Jurong Island,           comprising 6 blocks of 7-storey flatted industrial
    Singapore. QP/PE for design, submission,                  building with swimming pool, recreational and
    approval, permitting, construction supervision for        communal facilities at Tuas South. Contract value
    all 3 phases of Mitsui Bisphenol Chemical Plant,          S$150m.
    development in Jurong Island, the building are        •   Restoration and Refurbishment of Office Building
    steel structure construction.                             at Shanghai -Existing 7-storey building will be
•   Singapore Art Centre: Appointed as the accredited         restored and redeveloped into an upmarket office.
    checker for the Building Construction Authority           Contract value US$12m.
    for the structural design audit and checking of the   •   Gems Centre, Myanmar -20-storey mixed
    development, main feature consists of a 3D space          development at Yangon. Contract value S$100m.
    frame roof with column free space over an area of     •   Project Director for the proposed 52-storey
    110m by 65m.                                              PosBank HQ at Robinson Road (S$350m). The
•   Aerospace Exhibition Centre, Singapore: Overall           building is of steel structure with RC floor slabs.
    principal in charge of the Aerospace Exhibition       •   Project Director for the proposed LTA’s Light
    Centre project the structure straddle 200m x 200m         Rail Transit projects C801 for Bukit Panjang
    with more than 35,000 sq. m of column free space          Line (S$280m) and C802 for Buona Vista Line
    for the exhibition hall.                                  (S$230m).
•   Changi Airport Station: Appointed by the Building     •   Project Director for the Admiralty Industrial Park
    Construction Authority to provide structural design       Development at Woodlands (S$70m).
    audit for the Changi Airport station, The station     •   Project Director for the Richgold Warehouse/
    is located below ground between the existing              Factory at Tampines (S$10m).
    terminals and is 350m in length. The main feature     •   Project Director and Professional Engineer for the
    is integration of the 200m span pedestrian steel          proposed Jurong Point Shopping Centre near to
    bridge serving as platform for the underground            MRT Boon Lay Station (S$65m).
    station.                                              •   Project Manager for the design and construction
•   MRT North East Line Contract 706: Project Director        supervision for the 16 km MRT Woodlands Line
    for C706, two underground civil defence stations          (S$500m) including six stations, an underground
    and 530m cut and cover tunnel, 1.63 km bored              bus interchange and trackworks.
    tunnel. Contract value S$331m.                        •   Professional Engineer and Deputy Project Director
•   MRT North East Line Contract 710: Project Director        for design and supervision of Suntec City Project
    for C710, one 4-level underground civil defence           (S$1700m) at Marina Centre. The project consists of
    station and 2.4 km bored tunnel. Contract value           one large Convention and Exhibition Centre, 4 nos.
    S$200m.                                                   45-storey Tower Blocks and one 18-storey Tower
•   400 kV Transmission Development: QP/PE for                Block, all are steel structures and composite designs.
    submission, approval and permitting for the           •   Project Director and Professional Engineer for the
    Immersed Tube Undersea Cable Tunnel, Terminals            design and supervision of the proposed 3¬basement
    Buildings and Land Cable Tunnel at Tuas. Contract         and 4-storey Northpoint Shopping Centre at Yishun
    value S$140m.                                             (S$45m) next to MRT Yishun Station.
•   Project Director and Professional Engineer for the           English Channel including assessment of chalk
    Cherryhill Condominium at Paya Lebar (S$33m).                marl parameters for design purposes.
    Responsible for supervision, co-ordination and           •   Orange Fish Tunnel, South Africa – carried out
    contracts administration and management of all               back analyses into the test data obtained for
    aspects of construction works related to civil and           pressure gallery tests and jacking tests during
    structural works including both temporary and                the construction of the irrigation tunnel to further
    permanent works for the Treasury Building.                   examine the performance of tunnel linings under
                                                                 operation conditions.
    The project consists of excavation for six large         •   Ahmed Hamdi Tunnel, Egypt -pre-tender study
    diameter caisson foundation, 5 levels of basement,           into the complex water bearing deposits of aquifer
    3 levels of podium block and a 52-storey steel               properties of the site including analysis of large
    structure of tower block (S$300m).                           scale pumping tests and slope stability for the
                                                                 design works.
Design Engineer in the Ground Engineering                    •   River Orwell Crossing, UK – carried out office
Department involved in the design and office works for           administration of site investigation works for the
the following projects:                                          design of bridge foundation including on site
                                                                 supervision of Menard pressure meter testing
•   Rivera Retaining Wall Reconstruction, UK – carried           and analysis of results for ground bearing and
    out design for the reconstruction of an anchorage            deforming properties.
    retaining wall in landslip area and preparation          •   Research Assistant in the Department of Civil
    of contract documents, specification and bill of             Engineering carried out research work into the
    quantities for the additional site investigation work.       stress strain behaviour of granular materials.
•   Stone Marshes Development, UK – involved in the
    design of a Ro-Ro terminal for Blue Circle Cement
    Industrial including pile design for axial and lateral
    loadings, slope stability analysis for the existing
    flood banks during and after the development, and
    studies of ground movements due to filling and
    surcharging operations.
•   Resident/Material Engineer in the site Resident
    Engineer’s office for the supervision of construction
    for a multi-million pounds irrigation project covering
    an area of over 6000 hectare of land in the Wadi
    Jizan, Saudi Arabia. Responsibilities including
    managing a site laboratory for investigation as
    well as routine testing works for the construction
    of hydraulic structures and canal embankments,
    material quality control on site and supervision of
    construction works.

Assistant Engineer in the Ground Engineering
Department involved in the design works for a number
of major civil and geotechnical engineering projects:

•   Channel Tunnel, UK -involved in the feasibility
    study for the new proposed route across the
Chi-Kwong	WONG
                     INFRASTRUCTURE	CONSULTANT	




PROFESSIONAL	QUALIFICATIONS	/	AFFILIATIONS                 hotels, hospitals, commercial and institutional. He has
                                                           an intimate knowledge of the M&E industry in Hong
•   Bachelor of Laws, Manchester Metropolitan              Kong, Macau, PRC and overseas and has a well known
    University, UK (2004)                                  reputation for diligence, technical competence and
•   Master of Business Administration, Chinese             team management.
    University of Hong Kong (1982)
•   Bachelor of Science (Mechanical Engineering),          CK has a wealth of contacts and a good working
    University of Hong Kong (1973)                         relationship with all government bodies and authorities
•   Fellow of the Chartered Institution of Building        and is involved in many professional duties such as:
    Services Engineers (2002) (796015415)
•   Member of NEPA (1998) (881653)                         •   Committee Member, Building Services Division,
•   Fellow of the Hong Kong Institution of Engineers           The Hong Kong Institution of Engineers
    (1996) (FW0076767)                                     •   Discipline representative (Building Services), The
•   Register Professional Engineer (1991) (RP0076767)          Hong Kong Institution of Engineers
•   Member of Society of Fire Protection Engineers         •   HKIE’s representative for FSD Working Group for
    (102627)                                                   Fire Services Installation
•   Member of the Institution of Engineers, Australia      •   Chairman, Training Committee, The Hong Kong
    (1986) (334967)                                            Institution of Engineers
•   Member of the Institution of Electrical Engineers      •   Council Member, Association of Consulting
    (1985) (20318396)                                          Engineers Hong Kong
•   Member of the Chartered Institution of Building
    Services Engineers (1983)                              CK’s experience and stature in the industry and his
•   Chartered Engineer (1979)                              proven hands on technical ability on similar projects
•   Member of the Institution of Mechanical Engineers      makes him an ideal candidate to take on the overall
    (1979) (69439390)                                      direction of the M&E design for this project.
•   Member of the American Society of Heating,
    Refrigerating and Air Conditioning Engineers Inc.      KEY	PROJECTS
    (1979) (00810648)
•   Member of the Australian Institute of Refrigeration,   Railways
    Air Conditioning and Heating (1979)
                                                           •   West Island Line Consultancy Agreement No.
PROFESSIONAL	EXPERIENCE                                        C704 - KET Station and Overrun Tunnel (Year of
                                                               Completion: 2010) - It includes the new Kennedy
1989 – Present   Meinhardt (M&E) Limited                       Town Station and Overrun Tunnels, with significant
1987 – 1989      Lincolne Scott Australia Pty Ltd              re-provisioning and associated ground-level
(Melbourne)                                                    facilities for various government departments –
1979 – 1987      J. Roger Preston & Partners                   including EPIW and PTI – works to the existing
1973 – 1979      Young’s Engineering Co Ltd                    Sheung Wan Station to convert it from a terminus
                                                               to an intermediate station and the establishment of
RELEVANT	EXPERIENCE                                            the Site Offices and Works Areas.

CK Wong has over 36 years experience on the design,        •   KCRC Shatin to Central Link - Contract No.
documentation and contract administration of the M&E           SDC700 - Admiralty to Central West (Project
systems for major projects of all types in Hong Kong           Director; Year of Completion: 2003) - Meinhardt
and overseas. He has been involved in the full range           is a 50% JV partner acting as Lead Consultant,
of projects including railways, offices, residential,          C&S, Geotechnical, Tunnelling, M&E and Railway
Operating System Engineers for this two station             buildings, with no heavy workshops. The 160m
    package on the Shatin to Central Link project.              free spanning roof consisted of 14m deep trusses
    These stations are to be constructed on Hong                assembled on the ground and lifted into position
    Kong Island under existing buildings, infrastructure        onto concrete mega columns each end in one
    and the MTRC Admiralty Station which must be                operation.
    kept operational throughout the construction of the
    project.                                                •   Aircraft Base Maintenance Facilities at Hong Kong
                                                                International Airport (Construction Cost: 1500M;
•   LAR Hong Kong Station Phase 1 & Phase 2                     Year of Completion: 1999) - Principal Design
    (Project Manager; M&E Cost: HK$1050M,                       Consultant and Consultant Project Manager for
    Construction Cost: HK$6430M ; Year of                       these development included: three bay cantilever
    Completion: 2001) - Hong Kong Station which                 aircraft hangar (to accommodate up to B747-
    was one of the six MTRC Stations on the Lantau              600 aircraft); multi-levelled concrete workshop
    Airport Railway from Hong Kong to the new airport           (33,000m2), Ground service vehicle workshop;
    in Chek Lap Kok. Phase 1 of the station consisted           waste treatment facility and external works; aircraft
    of combined arrival/departure hall, in-town check-          docking systems and other specialist systems.
    in facilities, platforms, retail, carpark, overhead
    development, tunnels, subway link to existing           Office Building
    Central Station, ventilation building and seawater
    pump houses. Phase 2 of the station consisted of        •   One Island East, Quarry Bay (Project Director; M&E
    separate arrival/departure halls, in-town check-in          Cost: HK$717M, Construction Cost: HK$2338M;
    facilities, platforms, carparks, and provision for an       Year of Completion: 2008) - A 70-storeys office
    overhead development.                                       building comprising ground floor, 1/F lobby, 59
                                                                nos. office floors, 2 nos. skylobby floors, 3 nos.
    MTRC Yau Tong Station and Tunnels, TKO Line                 mechanical floors, 2 nos. refuge floors and 2
    Extension (Project Manager; M&E Cost: HK$270M,              basement levels of loading and unloading area with
    Construction Cost: HK$1400M; Year of Completion:            total GFA 145,000m2.
    2003) - Lead consultant for this 4 platform station
    which included the station, over 1km of stacked cut     •   Oxford House, Quarry Bay (Project Director; M&E
    and cover tunnels and all adjacent infrastructure           Cost: HK$220M, Construction Cost: HK$800M;
    diversions and provisions.                                  Year of Completion: 1999) - 40-storey Grade A
                                                                office building and underground carpark with a
•   LAR Siu Ho Wan Depot, Phase 1 (Project Manager;             total area of 47,000m2 with modern facilities.
    M&E Cost: HK$220M, Construction Cost:
    HK$850M; Year of Completion: 1998) - Phase              •   Devon House, Taikoo Place, Quarry Bay (Project
    1 of this Railway depot comprising a workshop               Director; M&E Cost: HK$250M; Year of Completion:
    and maintenance building of 35,000m2 and other              1994) - 29 storey office building with a total area of
    ancillary buildings and roadways.                           approx. 70,000m2 with modern office facilities.

Industrial/Industrial Plant                                 •    Kodak House Extension, North Point (Project
                                                                 Director; M&E Cost: HK$50M; Year of Completion:
•   HAECO Aircraft Maintenance Hangar No. 2, Chek                1992) - 22 storey 60,000m2 office building built
    Lap Kok (Construction Cost: HK$272M; Year of                 adjacent to and on top of the existing 7 storey
    Completion: 2007) - The project includes a new               Kodak House.
    three bay hangar for heavy maintenance; doors           Office/Commercial
    at front (160m) and rear (60m) and internal annex
•   I-Square, 63 Nathan Road (Project Director; M&E              Community Hall and Integrated Family Services
    Cost: HK$215M, Construction Cost: HK$1015M;                  Centre complex.
    Year of Completion: 2008) - 18-storey tower (14
    F&B floors / 3 M&E floors / 1 office floor), 11-storey   •   Agreement No. CB20070021 - Redevelopment of
    commercial podium comprising shopping arcade,                Un Chau Street Estate Phase 5 (Team Leader; Year
    shops, restaurants, cinemas, and 3 basement floor            of Completion: 2012) - 3 nos. 35 & 41-storey non-
    (2 commercial floors / 1 carpark floor) with total           standard domestic blocks with a total GFA of about
    GFA of about 57,882m2.                                       84,000m² and 1 no. 3-storey carpark block with
                                                                 recreational and social welfare facilities.
•   One International Finance Centre & IFC Mall at LAR
    Hong Kong Station (Project Leader; M&E Cost:             •   Tseung Kwan O Property Development at TKOTL
    HK$475M, Construction Cost: HK$1365M; Year                   70, Area 86 - Site AB Package Two (Project
    of Completion: 2000) - 200m high Grade A office              Director; M&E Cost: HK$680M, Construction
    tower (72,850m2 GFA) comprised 33 office floors,             Cost: HK$2300M; Year of Completion: 2014) - The
    5 floors of entrance lobbies/ plantroom/ concourse           proposed development will be implemented in
    and 4 levels of below ground carpark ramp and                two phases; Phase I includes 7 residential towers
    with 12,200m2 GFA retail portion on top of the LAR           with podium including car parks and clubhouse
    Concourse and basement carpark.                              facilities, Kindergarten Accommodation, Pedestrian
                                                                 Covered Footbridge and associated works. Paved
•   DCH Commercial Centre, Quarry Bay (Project                   pedestrian way and associated utilities services
    Director; M&E Cost: HK$138M, Construction Cost:              and Improvements Works at adjacent road
    HK$510M; Year of Completion: 2000) - 28 storey               junctions and Phase II includes 3 residential towers
    Grade A office building with 3-level basement                and related works in podium not completed in
    to provide a total area of approx. 36,000m2 with             Phase I Development and Improvements Works at
    modern office facilities.                                    adjacent road junctions.

•   Grand Central Plaza, Shatin (Project Director; M&E           The Development Site occupies an area of about
    Cost: HK$124M, Construction Cost: HK$500M;                   31,490m² and the total residential gross floor area
    Year of Completion: 1995) - Twin office towers on            of the proposed development is approximately
    top of a 7-storey commercial complex with another            309,696m².
    2-level basement carpark; total GFA 80,000m2.
                                                             •   Residential Development at Package 3, Lohas Park,
Residential                                                      TKOTL 70 (Project Director; Year of Completion:
                                                                 2011) - 4 nos. of residential towers with 49 to
•   Agreement No. CB20070021 - Redevelopment of                  54 residential floors, a podium with car parking
    Hung Hom Estate Phase 2 (Team Leader; Year of                spaces, loading/unloading spaces, clubhouse
    Completion: 2012) - 3 nos. 40 & 41-storey non-               facilities and a kindergarten accommodation. The
    standard domestic blocks with a total GFA of about           site is situated adjacent to existing Tseung Kwan O
    92,000m² and 1 no. single storey carpark block.              Depot, between the proposed Road R9 and Road
                                                                 L861. In addition, works outside the site including
•   Agreement No. CB20070021 - Redevelopment of                  2 schools and landscape estate roads are also
    Tung Tau Estate Phase 9 (Team Leader; Year of                included in the development. Proposed Residential
    Completion: 2012) - 2 nos. 33 & 37-storey non-               Development at Area 77 Ma On Shan STTL No.
    standard domestic blocks with a total GFA of                 548 (Project Director; Year of Completion: 2010) -
    about 50,000m² and 1 no. 3-storey stand-alone                6 residential towers of 23 to 25-storerys with total
1,173 apartment units, 14 nos. 3-storeys garden           23 to 27 storey deluxe residential buildings with
    houses, 2-storeys clubhouse with swimming pool,           144 units. GFA of approx. 20,000m².
    a basement carpark and a landscape area.
                                                          •   Ocean Shores, Tseung Kwan O (Project Director;
•   Residential Development at Tin Shui Wai Lot 24            M&E Cost: HK$800M, Construction Cost:
    Area 33 – Phase 2 (Project Director; Construction         HK$4000M; Year of Completion: 2003) - 5,728 flats
    Cost: HK$180M; Year of Completion: 2010) -                in 3 phases comprising 15 residential towers (47 to
    Comprehensive residential development with                48-storey) on top of a 3-level podium comprising
    site area of 161,101m² comprises of 3 blocks of           carpark, bus terminus, club house, GIC and
    47-storey and 48-storey residential towers (total         commercial area of total GFA of.375,000m².
    1,100 flats) with a public transport terminus of
    6,066m².                                              •   Hang Hau Station Property Enabling Work - MTRC
                                                              TKO Extension (Project Director; M&E Cost:
•   Residential Development at 20-34 Wood Road                HK$66M, Construction Cost: HK$330M; Year of
    (Project Director; M&E Cost: HK$38M, Construction         Completion: 2002) - Detailed design for a covered
    Cost: HK$210M; Year of Completion: 2009) - A              Public Transport Terminus which included 2 bus
    luxury residential tower of approximately 40-storey       lane, 4 GMB/Taxi lane with total floor area 8,000m²,
    of 180m high (approx. 100 flats) over a podium            retail space of 3,500m², 3 nos. of basement floors
    block including clubhouse, carpark and retail shop        for carpark and loading/ unloading areas and
    at street level.                                          scheme design planning for 6 nos. 43 storeys
                                                              residential towers.
•   Residential Development at Java Road (Project
    Director; M&E Cost: HK$35M, Construction Cost:        •   Harbourfront Landmark, Wan Hoi Street, Hung
    HK$242M; Year of Completion: 2008) - 38-storey            Hom (Project Director; M&E Cost: HK$360M,
    residential tower, each floor having 5 residential        Construction Cost: 1047M; Year of Completion:
    flats, 1-storey of clubhouse, 1-storey of landscape       2003) - 3 residential towers of 68 to 72 storey which
    garden, 2-storeys of carpark and 1-storey of shop         consisted 324 luxurious apartments units on a
    area.                                                     7-storey podium of resident club house, 3 floors of
                                                              office, a main floor lobby and 2 floors of carpark.
•   Tiu Keng Leng Station Development at TKOTL 73             Total GFA was 62,500m² on site area of 7,400m².
    Area 73B (Project Director; M&E Cost: HK$210M,
    Construction Cost: HK$1200M; Year of Completion:      Composite Residential/Commercial Development
    2008) - Five towers 52-storey residential towers
    providing 2,096 units with total GFA of 130,000m².    •   Luxury Residential & Commercial Redevelopment,
                                                              35 Clearwater Bay Road (Project Director; M&E
•   The Pacifica, West Kowloon (Project Director; M&E         Cost: HK$800M; Year of Completion: 2008) - 5
    Cost: HK$400M, Construction Cost: HK$1300M;               blocks 55-storey residential towers (total 2000 flats)
    Year of Completion: 2005) - Six nos. of 45 to             on top of a podium with multi-storey residential
    50-storey residential blocks with the maximum             carpark, 6-storey commercial complex, and 4 levels
    height of 177.3m with a prestige club house, indoor       of basement with a pedestrian subway linking the
    & outdoor swimming pools, 5 floor of podium floors        existing Choi Hung MTR Station.
    for shopping arcade, superstore and private &
    public lorry carpark at West Kowloon Reclamation.     •   North Part of West Kowloon Reclamation (Site 10),
                                                              Phase 3 (Project Director; M&E Cost: HK$60M,
•   37 Repulse Bay Road (Project Director; M&E Cost:          Construction Cost: HK$350M; Year of Completion:
    HK$45M, Year of Completion: 1994) - 3 blocks of           2005) - Shopping arcade, carparks, public
transport interchange of 3,000m² and social welfare          Road (Project Director; M&E Cost: HK$150M,
    facilities for 4,800 flats with total GFA of 35,000m².       Construction Cost: HK$950M; Year of Completion:
•   8 Clear Water Bay Road (Project Director; M&E                2003) - 10,486m² site included three residential
    Cost: HK$60M, Construction Cost: HK$800M;                    tower blocks of 52-storey residential floors (total
    Year of Completion: 2005) - 40-storey residential            988 residential flats) plus two refuge floors on top
    tower (total 316 units) on top of a multi-storey             of a 9-storey commercial podium comprising one
    carpark with over 500 parking spaces, 5-storey               basement carpark floor; four aboveground carpark
    commercial complex (approx. 4,000m²), a bus                  floors; two levels of retail shops, restaurant and
    terminus, a public traffic interchange and two levels        mega size supermarket; one level of day nursery
    of basement with a pedestrian subway linking the             and kindergarten; and one level of residential club
    existing Choi Hung MTR Station.                              house c/w outdoor swimming pool.

•   Tierra Verde & Maritime Square, LAR Tsing Yi             Hotel/Hotel Complexes
    Station (Project Director; M&E Cost: HK$600M,
    Construction Cost: HK$3000M; Year of Completion:         •   Hanoi Road K11 - Redevelopment - Hyatt Regency
    2000) - 12 blocks residential towers with GFA                Hong Kong, Tsimshatsui (Project Director; M&E
    245,700m², a podium shopping centre of 46,170m²,             Cost: HK$650M, Construction Cost: HK$2500M;
    GIC/recreation facilities and Transport Terminus.            Year of Completion: 2010) - The proposed
                                                                 development of total GFA of 103,000m2 consists
•   East Point City, Tseung Kwan O (Project Director;            of a 10-level podium which include 4-level retail
    M&E Cost: HK$341M, Construction Cost:                        (G/F to 3/F), 2-level hotel facilities (4/F to 5/F) and
    HK$1260M; Year of Completion: 1997) - 7 nos.                 4-level plant room, clubhouse and garden (6/F to
    39-storey residential blocks (total 2184 units) on           9/F). 2-level of Basement for retail, commercial &
    top of a 3-storey commercial complex/carpark and             restaurant purpose plus 2 more basement floors
    a basement carpark of total GFA of 170,000m².                for carparking and loading/unloading purpose.
                                                                 On top of the podium floors will be constructed
•   Metro City, Phase 1, Tseung Kwan O (Project                  with a 56-storey building comprising 15-storey
    Director; M&E Cost: HK$131M, Construction Cost:              384 guestroom hotel and 37-storey 345 services
    HK$950M; Year of Completion: 1997) - 6 residential           apartment, 2-storey plant room and 2-storey refuge
    blocks of 37 to 38 storeys built on top of a three           floors.
    level carpark and shop podium.
                                                             •   Hotel Development at 38 Sung Wong Toi Road,
•   HKHA On Tin Estate and Kai Tin Shopping Centre               KIL4013 SD & RP (Project Director; M&E Cost:
    Extension (Project Director; M&E Cost: HK$110M,              HK$86M; Year of Completion: 2009) - 704-room
    Construction Cost: HK$636M; Year of Completion:              3-star, 20-storey prestigious hotel with F&B and
    2004) - Two 37-storey HOS flats tower (2B & 3B)              recreational facilities including leisure/pool complex
    of total 720 units with commercial podium and                at To Kwa Wan over a landscape podium and 2
    2-storey carparks space and PTI of areas 6,305m²             level carpark. Total GFA of 21,400m2.
    GFA which includes 6 bus lane and 4 GMB lane
    with total floor area of 6,100m².PSPS at Tuen Mun        •   Dorsett Olympic Hotel Hong Kong, Tai Kok Tsui
    Town Lot 360, Area 44 (Project Director; M&E Cost:           (Project Director; M&E Cost: HK$21M, Construction
    HK$125M, Construction Cost: HK$625M; Year of                 Cost: HK$55M; Year of Completion: 2004) - 150
    Completion: 1994) - 15 residential blocks of 23 to           rooms hotel development which includes carpark,
    29 storeys plus carpark building and commercial              gymnasium, restaurants and landscape area.
    complex. Total GFA of 194,000m².
•   The Victoria Towers, J/O Canton Road and Austin          •   Lan Kwai Fong Hotel (Project Director; M&E Cost:
HK$26M, Construction Cost: HK$83M; Year of                   Pak Kau College, HKFYG Lee Shau Kee College
    Completion: 2005) - 160 room hotel development               & Ho Ming Primary School (Sponsored by Sik Sik
    which includes parking, gymnasium, and                       Yuen), Tin Shui Wai (Project Director; M&E Cost:
    restaurants.                                                 HK$50M, Construction: 249M; Year of Completion:
                                                                 2006) - Pak Kau College: The total construction
Institutional/Education                                          floor area is in the region of 12,000m² and consists
                                                                 of 36 classrooms, 6 special rooms, 4 small group
•   Teaching Complex at Western Campus, Chinese                  teaching rooms, a guidance activity room, 2
    University of Hong Kong (Project Director; M&E               interview rooms, a staff common room, a staff
    Cost: HK$58M, Construction Cost: HK$200M;                    room, a conference room, a student activity center,
    Year of Completion: 2008) - Construction of a                a library, an assembly hall, a multi-purpose area
    purpose-built multi-storey building of approximately         and other ancillary facilities. HKFYG Lee Shau Kee
    11,000m² GFA including topical communal                      College: The total construction floor area is in the
    teaching facilities, seminar/ function rooms,                region of 13,500m² and consists of 30 classrooms,
    classrooms, lecture theatres, teaching and                   16 special rooms, 3 small group teaching rooms,
    research laboratories, offices for staff and research        a guidance activity room, 2 interview rooms, a staff
    personnel, as well as pedestrian footbridge and              common room, a staff room, a conference room, a
    tunnel connections to adjacent existing buildings            student activity center, a library, an assembly hall, a
    including the United College and the Tin Ka Ping             multi-purpose area and other ancillary facilities.
    Building.
                                                                 Ho Ming Primary School (Sponsored by Sik Sik
•   Redevelopment of Marymount Primary School                    Yuen): The total construction floor area is in the
    (MPS) & Improvements to Marymount Secondary                  region of 9,500m² and consists of 24 classrooms,
    School (MSS) (Project Director; M&E Cost:                    6 special rooms, 4 small group teaching rooms,
    HK$19M, Construction Cost: HK$139M; Year of                  a guidance activity room. 2 interview room, a staff
    Completion: 2006) - Demolition of existing 4-storey          common room, a staff room, a conference room, a
    school building (MPS) with plan area about 650m²             student activity center, a library, an assembly hall, a
    and the construction of a new school complex with            multi-purpose area and other ancillary facilities.
    CFA of13,500m² shared by the MPS and MSS.
    Conversion and upgrading works are to be carried         •   Contract No. CAA G30 - ArchSD Consultancy
    out in the existing MSS retained.                            Agreement School Improvement Programme
                                                                 Phase IV - Package III (Project Director; M&E Cost:
•   ArchSD Consultancy Agreement No. CAA L006                    HK$146M, Construction Cost: HK$742M; Year
    - CCC Kei Fat Primary School & SKH Yau Tong                  of Completion: 2005) - Improvement works for
    Kei Hin Primary School (Project Director; M&E                approx. 44 primary and secondary schools. Each
    Cost: HK$26M, Construction Cost: HK$230M;                    school will be provided with a New Annex covers
    Year of Completion: 2005) - Two 36 classrooms                computer assisted learning room, language room,
    primary schools, each including 9 special rooms,             additional classrooms, remedial teaching rooms,
    4 supportive education rooms, a guidance activity            staff room, library, student activity centre, school
    room, 2 interview rooms, a staff common room,                hall, multi-purpose room, etc.
    2 staff rooms, a conference room, a student
    activity centre, a library, an assembly hall, a multi-   •   Consultancy Agreement No. CAA K06 - ArchSD
    purpose area and other ancillary facilities. The             School Improvement Programme Final Phase,
    total construction floor area for each 36 classroom          Package 6 (Project Director; M&E Cost: HK$300M,
    primary school is 12,780m².                                  Construction Cost: HK$700M; Year of Completion:
•   ArchSD Consultancy Agreement No. CAA L062 -                  2006) - Improvement works for 30 existing primary
and secondary. Each school with additional floor        Fitting Out
    area which covers computer assisted learning room,
    language room, classrooms, staff rooms, etc.            •   Shell Headquarter at Times Square (Project
                                                                Director; M&E Cost: HK$7M; Year of Completion:
•   Graduate Residences & University Centre, Senior             1993) - 6,500m2 office fitout including a computer
    Staff Quarters - Site B, Hong Kong University of            room of 100m2 equipped with UPS, CRAC and
    Science & Technology (Project Director; M&E Cost:           special fire fighting systems.
    HK$110M, Construction Cost: HK$480M; Year
    of Completion: 1998) - Consultancy services for         •   Hewlett Packard at Times Square (Project Director;
    design and construct contract won by Gammon                 M&E Cost: HK$7M; Year of Completion: 1993) -
    Construction Limited which included a Graduate              8,000m2 office fitout and computer room facilities
    Residence, University Centre and Senior Staff               with all special M&E systems.
    Quarters.
                                                            •   Standard Chartered Bank, Millennium City (Project
•   Tsui Tsin Tong Building, University of Hong                 Director; M&E Cost: HK$82M; Year of Completion:
    Kong (Project Director; M&E Cost: HK$16M,                   1999) - Office fit-out for 27 floors (Level 5 to Level
    Construction Cost: HK$50M; Year of Completion:              33) of total GFA 43,200m2 with two computer
    1996) - 12 storey building with 3 storey of Art             rooms (one for main frame/data processing
    Gallery connected to Fung Ping Shan Museum                  equipment and one for server) with total floor area
    by a bridge; 2 floors lecture rooms/theatres of             900m2.
    Professional and Continuing Education (SPACE)
    with GFA of 4,600m².                                    Additional/Alteration Works

Transportation/PTI/Tunnel                                   •   Harbour Place, Hung Hom (Project Director; Year
                                                                of Completion: 2008) - A&A works to the existing
•   Hong Kong International Airport East Hall                   buildings at Hung Hom with 7 nos. 35-storey
    Redevelopment, Chek Lap Kok, Lantau (Year                   residential towers (2470 units), podium garden,
    of Completion: 2003) - For the redevelopment                club house, retail, carpark and GIC facilities.
    of the East Hall (the main air-side departure
    hall), Meinhardt provided a world-class team            Renovation
    and produced an innovative design to meet the
    Authority’s retail ambitions. The East Hall project     •   Rehabilitation for Lai Tak Tsuen (Project Director;
    was conceived to enhance passenger circulation              Construction Cost: HK$60M; Year of Completion:
    and satisfaction, and to optimise retail revenue, but       2009) - Rehabilitation work for 8 rental blocks with
    within operational constraints.                             2677 domestic flats and 226 carparsk, 12 shops,
                                                                20 market stalls and community facilities such as
•   Lantau North-South Link, Tunnel Ventilation                 kinergarten, youth centre, elderly centre, nursery
    and Systems (M&E Cost: HK$320M; Year of                     and library. The site area is approx. 25,548m2 and
    Completion: 2000) - Investigation and preliminary           non-domestic area is around 2,432.97m2.
    design of tunnel options between Tai Ho Wan and
    Mui Wo for Highways Department.                         •   ArchSD Contract No. RF M321 D&C for the
                                                                Renovation of Libraries (Phase 1) (Project Director;
•   Kai Tak Airport Tunnel (Executive Engineer) -               Construction Cost: HK$150M)
    Responsible for mechanical, electrical & ventilation
    designs.                                                •   Mandarin Oriental Hotel Refurbishment, Central
(Project Director; M&E Cost: HK$70M; Year of              for Regional Councils Swimming Pools (Project
    Completion: 2003) - Comprehensive renovation              Director; M&E Cost: HK$66M; Year of Completion:
    works for the hotel including guest rooms, tower,         1997) - Conversion of 6 nos. pools to ozone
    podium, central plant and main distribution               sterilization plus the installation of heating in 2 nos.
    systems.
                                                          Environmental
Leisure/Recreation
                                                          •   Island West Transfer Station, Western Hong Kong
•   Contract No. SSM342 (Programme No. 385RO) -               Island (Project Director; M&E Cost: HK$80M,
    Tsim Sha Tsui Promenade Beautification (Project           Construction Cost: 640M; Year of Completion:
    Director; M&E Cost: HK$20M, Construction Cost:            2001) - Excavation of two caverns and access
    HK$240M; Year of Completion: 2007) - ‘Tsim                tunnels of 35,500m3, together with service and
    Sha Tsui Promenade Beautification’ is under               administration buildings at Mount Davis, Western
    the control of the Tourism Commission with the            for Swire BFI’s new Waste Transfer Station serving
    implementation by the Architectural Services              Hong Kong Island.
    Department.
                                                          •   Outlying Island Transfer Facilities (Project Director;
    The project involves the beautification works of          Construction Cost: HK$135M; Year of Completion:
    along the sea frontage stretching from the Ocean          2002) - Construction of seven Waste Transfer
    Terminal, the Hong Kong Cultural Centre, the              Stations for Swire BFI, located at the Outlying
    Hong Kong Museum of Art, the promedade along              Islands towns within Hong Kong Waters. Daily
    the Tsim Sha Tsui East Water Front up to the              throughputs vary between 10 and 100 tonnes/day
    International Mail Centre.                                of domestic, commercial industrial, construction
                                                              and sludge wastes.
    The objectives of this improvements works is to
    accentuate their status as the Cultural Core of       PRC
    Hong Kong and as a landmark viewed across
    Victoria Harbour from Hong Kong side. The             •   Shanghai Star City at Henan Nam Road (Year
    beautification work includes the construction of          of Completion: 2009) - The development mainly
    tourist information centre, café restaurant and           consists of commercial, hotel, retail, F&B and
    Sunday market and other facilities to improve the         entertainment facilities, site area approx. 22,780m².
    outdoor landscape including lighting and “Tide
    Dial” to enhance and harmonize the lighting effect    •   Huai Hai Zhong Lu Development in Xu Hui District,
    of “Promenade Along with the Tide”, landscape             Shanghai (Project Director; M&E Cost: HK$970M;
    areas and building facades.                               Construction Cost: HK$2900M; Year of Completion:
                                                              2010) - Mixed Development with retail, residential,
•   Programme No. 011LS - HKJC Public Swimming                and/ or service apartment hotel and offices. This
    Pool, Area 26 Phase II, Shatin (Project Director;         Development is integrated with new underground
    M&E Cost: HK$11M; Year of Completion: 1997) -             MTR lines and stations.
    Secondary pool, children’s pool, sun bathing area
    and associated facilities including pool filtration   •   Shanghai Peninsula Hotel, PRC (Project Director;
    and ozone sterilisation system.                           Year of Completion: 2009) - 250 rooms 5-star 15
                                                              storey prestigious hotel and 47 units apartment
•   Item No. 281LS - Agreement No. CAB C19                    type hotel on Bund with 3 levels basement and
    Consultancy for Building Services, Installation           carparking, swimming pool, clubhouse, retail,
    for Conversion to Ozone Sterilization System              service apartment, restaurant and landscape
garden. Total GFA of 96,000m².                         •   Galaxy Starworld Hotel, Macau (Year of
•   Hong Kong Metropolis, Shanghai, PRC (Project               Completion: 2007) - Casino and and hotel
    Director; M&E Cost: HK$48M; Year of Completion:            complex development which consists of 2 levels
    2009) - Preliminary design of E&M system include           of basement, 7 levels of casino floors, 6 levels of
    3 basement floors and 5 storey podium out of 7             entertainment floors and 18 levels of hotel floors.
    storey.                                                    The building height is approx. 160m with total GFA
                                                               97,000m2.
•   Taikoo Hui - Guangzhou Cultural Plaza
    (Guangzhou Daily News HQ), Guangzhou,                  •   Mixed Use Development at Lot B, Zone B, Macau
    PRC (Project Director; M&E Cost: HK$1000M,                 (Year of Completion: 2007) - 9 nos. of 40-storey
    Construction Cost: HK$4000M; Year of Completion:           residential towers, 1 42-storey hotel tower, 3
    2010) - The development will consist of a 39-storey        levels retail podium, 2 levels basement carpark
    office tower, a 28-storey tower of which 17 storeys        and loading/unloading bay, 4 levels of carpark
    are office and 11 storeys are boutique hotel (Swire        and 1 level of mechanical floor with a total GFA of
    Hotel Guanzhou), 27-storeys hotel (Mandarin                235,000m2.
    Oriental Guangzhou) (57,400m²), 3-level podium
    and 4-level basements.                                 •   Sumitomo Bake Lite Macau Factory, Macau
                                                               - Design and prepare the tender drawing for
    The podium and basement will include 5-storey              plumbing and drainage services for the captioned
    retail mall (100,000m²), 2-level of underground            project according to Macau’s water department
    carpark (62,000m²), and a 10-storey cultural centre        code of Practice and client’s requirement.
    (49,000m²). Total GFA of 456,000m².
                                                           •   Cooling Load Assessment Consultancy for Macau
•   Commercial Development at Chongwenmennei                   Fisherman’s Wharf, Macau
    Street, Beijing, PRC (Project Director; M&E Cost:
    HK$500M, Construction Cost: HK$1500M; Year             •   Crown Macau - Fire Engineering Consultant,
    of Completion: 2005) - 5 blocks office building            Macau - Fire Engineering Consultant for the Podium
    with one 12-storeys and four 8-storeys, 763 nos.           Entertainment Premises of the above projects. It
    carparking at Basements 2 to 3, retail and cinema          consists of Level 1, Level 1M, Level 2 Level 3/3M,
    at B1/F, G/F and 1/F. Total GFA of 198,845m².              Level 5/5M, Level 6, Level 8 and Level 9. With the
                                                               large compartment, the Architect will require a fire
•   Ice-Cream Factory, Shanghai, Jiangsu Province,             engineering approach to establish the fire provision
    PRC (Project Director; M&E Cost: HK$11M,                   and strategy for non-compliance items.
    Construction Cost: HK$130M; Year of Completion:
    1998) - An ice-cream factory with site area of         •   Casino / Hotel Block, Ponte 16, Macau - Fire
    70,000m² comprised production building, cold               Engineering Consultancy (Year of Completion:
    store, dry store, office building, services building       2007) - A Fire Engineering Report covers the
    and other ancillary buildings.                             provisions of Fire detection and fire suppression
                                                               design, smoke management strategy, means of
Macau                                                          escape and other relevant issues.

•   Macau Studio City (Year of Completion 2008) -
    The project consists of hotels (Ritz Carlton Hotel,
    Marriott Hotel, W Hotel, & Tang Hotel), services
    apartment, casino, theatre and retail with GFA
    3,450,000 ft².
John	Kin	CHANG
                     INFRASTRUCTURE	CONSULTANT




PROFESSIONAL	QUALIFICATIONS                                   Previously John was involved in the SkyPlaza tender
                                                              and responsible for the redesign of the superstructure
•   Master of Science in Structural Design, University        in precast concrete. Also, john was an integral part of
    College London, University of London (1994)               the tender team on the KDB200 KCRC West Rail-East
•   Bachelor of Engineering in Civil Engineering,             Rail Link and was responsible for the West Kowloon
    Imperial College, London (1993)                           Station design team after award of contract.

PROFESSIONAL	AFFILIATIONS                                     KEY	PROJECTS

•   Registered Professional Engineer (2000)                   1999	–	Present	
•   Chartered Engineer (1999)                                 Meinhardt	(C&S)	Ltd.	as	Technical	Director.
•   Member of Hong Kong Institute of Engineers (1999)
•   Member of Institution of Structural Engineers (1998)      Project involvement:

RELEVANT	EXPERIENCE                                           HAECO No.3 – project engineer responsible for the
                                                              scheme and detailed design for 154m span aircraft
John has a wide range of structural engineering               maintenance hangar.
experience and has been involved in several complex
projects while he has been with Meinhardt.                    KCRC KDB200 West Kowloon Station - project engineer
                                                              responsible for the tender and detailed design for the
His technical knowledge covers all aspects of structural      design and build contract involving diaphragm wall and
design and includes reinforced / precast / prestressed        pre-bored H-piles.
concrete as well as structural steelwork. John is an
extremely methodical engineer and has become an               Hong Kong International Airport, SkyPlaza - project
expert in structural steel design to the latest limit-state   engineer working with contractor at tender stage to
Codes of Practice.                                            produce alternative design using precast concrete

John’s work has involved the detailed design of the           KCRC SCL700 Admiralty Station - project engineer
New TV City for TVB and was responsible for all               responsible for the scheme and detailed design of cut
reinforced concrete and structural steelwork design           and cover/cavern station requiring underpinning of
on the project. This included the design of two large         existing footbridge and MTRC substation.
studio blocks using steel frames, long span steel
trusses and composite floor construction. The total           Hong Kong Disneyland Theme Park, Main Street -
steel for the project was approximately 2500 tonnes.          project engineer responsible for the detailed design of
John carried out all the detailed fire engineering for the    5 low rise buildings in structural steelwork with external
steelwork saving the client the steelwork fire spray and      stud wall façade construction.
associated costs.
                                                              Hong Kong International Airport, East Hall Extension
He has also been involved in the design of the East           - project engineer responsible for the detailed design
Hall Extension at the Hong Kong International Airport         of a 3-storey reinforced/pre-stress concrete building
and has been responsible for the detailed design of the       consisting of a structural steel roof, curtain wall,
project and for submitting the drawings to the Buildings      composite slabs and pre-cast T-beams, including
Department on time, within an extremely tight schedule.       extensive internal fitout consisting of shop-fronts and
John’s experience also covers working in collaboration        architectural icons.
with large contractors helping them with tender bids.
KCRC SCL300 Sha Tin to Central Feasibility Study           Sogo Department Store A&A works - site supervision of
- design engineer responsible for the preliminary          opening in diaphragm wall to provide improved access
design of the cut and cover stations and underpinning      from Causeway Bay MTRC Station
schemes for existing highway and building structures       ASD School Improvement - detailed design of major
along the proposed rail link.                              renovation work for 24 schools consisting of a 7-storey
                                                           extension and a 2-storey sports deck
TVB TV City, Tseung Kwan O, Hong Kong - design
engineer responsible for the detailed design of            United Christian Hospital - detailed design and
all structural steelwork including 2 state of the art      statutory submission of hospital extension.
production studios with structural support for acoustic
walls, maintenance catwalks and lighting fixtures.         Tseung Kwan O Area 19B - detailed design and site
                                                           supervision of a housing development consisting of 7
Aldrich Bay, Hong Kong - project engineer responsible      high rise tower blocks and a 3 level podium structure.
for the detailed design of pre-cast concrete bay
windows and staircase.

KCRC West Rail Tuen Mun Station - project engineer
responsible for the temporary works design including
earth dam and scheme for the diversion of storm water
in existing nular to enable construction of proposed
station.

1994	–	1999	
Maunsell	Consultant	Asia	Ltd.	as	Graduate	
Engineer.		

Project Involvement:

Tung Chung Station Development - Package One –
detailed design and site supervision of a high rise
residential and commercial development requiring top-
down construction.

Nestle Dairy Farm, Yuen Long – site supervision of floor
screed repair work

KCRC West Rail DD210 - demolition and reinstatement
works for petrol station

ASD Government Quarters, Fanling - tender bid for
a design and build contract of a 30-storey residential
apartment block.
Martin	WEBSTER
                     INFRASTRUCTURE	CONSULTANT




PROFESSIONAL	QUALIFICATIONS                                   the implementation of innovative procurement methods
                                                              and contract packaging employed to develop the more
•   Environmental Engineering Polytechnic Certificate         complex sections of Material Handling Systems and IT
                                                              design in advance of the building.
RELEVANT	EXPERIENCE
                                                              Contract P225 - Passenger Terminal Building (PTB)
Martin has over 20 years experience in the construction       Enhancement Works of the Hong Kong International
industry, working on complex multidiscipline Projects.        Airport. Commercial Director responsible for overall
He has extensive experience in project management             commercial delivery of the Lead Consultancy.
including design management, commercial
management, procurement management, planning                  The Project consisted of capacity enhancement
and programming analysis and specialist skills in             projects which included the reconfiguration and
commercial management of building services works.             expansion of all the Passenger Terminal Building
                                                              (PTB) arrivals concourse, departures and arrivals
Martin’s knowledge of the local market has been               immigration halls and transfer areas. Multi-phase,
established over the past 13 years working in the Hong        5-year construction programme includes multiple
Kong construction industry on large infrastructure            AAHK / CIQ stakeholders to be moved including all
projects. Recent and current projects include the             main immigration systems and hubs.
Project Directorship of multi discipline design teams
on fully integrated design projects including all             Hong Kong International Airport Contract P114 -
disciplines (Architectural, Structural, Civil, M&E and Fire   West Hall Expansion Project. Commercial Director
Engineering Services).                                        responsible for managing a multidisciplinary design
                                                              team consisting of Airport Planning, Architectural,
2005 – Present, Meinhardt Management Asia Ltd                 Civil & Structural, M&E and QS teams for this Design
2005 – 2005, ISG Asia (Hong Kong) Limited                     Feasibility Study (DFS).
2004 – 2004, OF Management
2003 – 2004, ISG (Japan) Limited Commercial Manager           The scope for the Study was to develop several
2001 – 2003, Hsin Chong Aster                                 concept designs for a major extension and
1995 – 2001, AEH JV                                           refurbishment of the existing passenger terminal at
1989 – 1995, Laing Management                                 Chek Lap Kok. Deliverables included design reports
1987 – 1989, Matthew Hall Mechanical and Electrical           detailing the options, including discussions on the
Engineers                                                     advantages and disadvantages of each, budget
1984 – 1987, Anglo Middle East Construction                   costings for each option and estimated detailed design
Consultants                                                   and construction schedules.

KEY	PROJECTS                                                  Aircraft Maintenance Hangar No. 3 (HAECO). Project
                                                              Director responsible managing a multi disciplined
2005 - Present                                                design team consisting of , Architectural, Civil &
Meinhardt Management Asia Limited – Director                  Structural, M&E, Fire Engineering and QS team to
                                                              develop a design with specific client criteria namely:
Cathay Pacific Cargo Terminal, Chek Lap Kok Airport,          To design a functional Facility that fully meets all the
Hong Kong. Project Director for the detailed design           User Requirements for the lowest cost ; To design a
of this facility, which is to be the largest cargo terminal   Facility which takes account of its anticipated life and
in the world in terms of cargo throughput when built          changing business environment; To design a Facility
(subject to franchise award). Martin is responsible for       that safeguards the design and construction of Hangar
3B at a future date; To design a Facility with a pleasing
appearance at no additional expense; To design a
Facility that is environmentally friendly taking account
of international practices.

Aircraft Maintenance Hangar No. 2 (HAECO). Project
Director responsible for delivery of the Project during
the Procurement and Construction Phases of Project
with a very short 404 day construction programme.
Martin’s hands on approach to managing the
multidiscipline design team, the main contractor and
various named subcontractors enabled the project to
be successfully completed within programme and allow
commercial operation to commence.

OTHER	EXPERIENCE

Northwest Concourse Extension Chek Lap Kok
International Airport Hong Kong – HKD 370 Million

New Airport Terminal Building Chek Lap Kok
International Airport Hong Kong – HKD 2 Billion

C1 Contract Cyberport Development – HKD 340 Million

Goldman Sachs HQ Fit Out Tokyo – USD 120 Million

Westminster and Chelsea Hospital London – GBP 180
Million

Cyberport Residential Club House Fit Out – HKD 50
Million

Auditorium and Gymnasium Fit Out Tokyo – USD 10
Million

Military Intelligence Building – GBP 60 Million

Royal Bank of Scotland HQ London – GBP 17 Million

New Underground Operations Centre – GBP 650
Million

Broadgate Phase III Union Bank of Switzerland Fit Out
– GBP 27 Million
Glenn	Stephen	MORRIS
                     INFRASTRUCTURE	CONSULTANT




PROFESSIONAL	QUALIFICATIONS                                    meter long, 13 meter working section aircraft jet
                                                               engine testing facility with a multi-storey control
•   Master of Business Administration, 1993 RMIT               building and special compressed air and fuel
•   Master of Engineering Science Degree, 1987                 storage and services installations. GFA of 1,700m2
    Monash University                                          facility designed to cater for all current and next
•   Bachelor of Engineering (Civil) 1981 Monash                generation of jet engines.
    University                                             •   HAECO Engine Strip & Build Workshop - TKO
                                                               (Construction Cost: HK$170M; Year of Completion:
RELEVANT	EXPERIENCE                                            1997) - High bay height workshop for overhaul
                                                               of jet aero-engines with materials handling
Professional Experience in the fields of masterplanning,       system with 22T cranes/monrails giving total floor
design, and full project management (concept planning/         coverage. Special ventilation system for large
design/procurement/construction/cost and program)              single compartment workshop. GFA of 4,500
of large scale end – user focussed projects. Set up            m2. Full project management and consulting
Meinhardt’s Project Management Company (Meinhardt              engineering services provided.
Asia Pty Ltd) to provide Project Management Services to    •   Component/Avionic Overhaul Facility at Tseung
the Hong Kong and Asia sector.                                 Kwan O (Design Management and Lead Civil/
                                                               Structural Engineer; Construction Cost: HK$350M;
PROFESSIONAL	EXPERIENCE                                        Year of Completion: 1999) - A 5-storey building
                                                               complex (22,000m2 GFA) to accommodate
1999- Present, Managing Director                               Component Overhaul, Avionic Overhaul, Stores
Meinhardt (Australia) Pty Ltd                                  (Engine/Component Parts), Canteen/Amenities,
                                                               Technical Training and Administration.
1993-1999, Director Meinhardt (Hong Kong) Pty Ltd
Meinhardt Management Asia Ltd                              Hospital/Health Care Centre

1991-1992, Technical Director                              •   Pok Oi Hospital - Redevelopment & Expansion
Meinhardt (Victoria) Pty Ltd Civil /Project Management         (Senior Project Manager; Construction Cost:
                                                               HK$2000M; Year of Completion: 2006) -
1988-1991, Senior Project Engineer                             Redevelopment of Pok Oi Hospital includes
Meinhardt (Victoria) Pty Ltd                                   demolition of the existing hospital in phases and
                                                               construction of temporary buildings to maintain the
1984-1988, Project Engineer                                    daily operation of the hospital at a reduced scale
Gutteridge Hoskins and Dorey Pty Ltd                           until the target completion of the new HK$1,600M,
                                                               622 beds hospital complex in late 2005.
1981-1984, Investigations Engineer                         •   Faculty of Medicine, University of Hong Kong
State River and Water Supply Commission                        (Construction Cost: HK$1200M; Year of
                                                               Completion: 2001) - 12-storey laboratory building
KEY	PROJECTS                                                   including Bio Chemistry, Physiology, Traditional
                                                               Chinese Medicine and Clinical Research
Industrial/Industrial Plant                                    Departments, and a 10 storey Academic &
                                                               Administration Block including a library, lecture
•   HAECO Jet Engine Test Cell Facility - TKO                  theatre, tutorial, common rooms, nursing studies
    (Design Management and Lead Civil/ Structural              auditorium, general office and community medicine
    Engineer; M&E Cost: HK$20M, Construction                   areas. Prior to the redevelopment, the existing
    Cost: HK$230M; Year of Completion: 1997) - 110             building was demolished. As the site is bounded
by several steep slopes, extensive geotechnical,            innovative fire safety strategy, all within a fast-track
    slope stabilisation (during the demolition), and site       12 month design programme to Contract Award.
    formation works were undertaken as part of this         •   MTRC Yau Tong Station and Tunnels, TKO Line
    project.                                                    Extension (Design Manager; M&E Cost: HK$270M,
                                                                Construction Cost: HK$1400M; Year of Completion:
Schools/Education/Institutional                                 2002) - Lead consultant for this 4 platform station
                                                                which included the station, over 1km of stacked cut
•   Sheffield City Polytechnic, UK - New lecture theatres       and cover tunnels and all adjacent infrastructure
    and seven-storey office building suspended above            diversions and provisions.
    existing gymnasium using long-span composite            •   Olympic Station Underpass & Footbridges
    flooring, storey-height bridging structures and             (Construction Cost: HK$500M; Year of Completion:
    bearings.                                                   1998) - Meinhardt was the lead consultant and
                                                                project manager providing Civil and Structural
Transportation/PTI/Tunnel                                       Services in joint venture with WORKS & RBA.
                                                                The works included a 3 storey 230m long station
•   Hong Kong International Airport East Hall                   structure including two LAL platforms with piled
    Extension, Chek Lap Kok (Project Manager; Year of           foundations over Cherry Street Underpass and a
    Completion: 2004) - Design and construction related         multicell Drainage Box Culvert. Also included were
    services for the reconfiguration and expansion of           320m ling vehicle underpass, a 150m long 75m
    the Passenger Terminal Building (PTB) East Hall.            twin span cable-stayed 6m wide footbridge and
    The works include two extension structures (approx.         five other short-span PT-concrete-box footbridges
    6,000 square metres total) and the reconfiguration          with steel framed canopy serving the Station from
    of the existing retail and F&B outlets in the airside       adjacent developments.
    departure hall.
•   Peak Tram (Design Manager) - Responsible for            Additional/Alteration Works
    car, track, bridges, slopes and retaining structures
    upgrade studies.                                        •   Li Fung Tower, Cheung Sha Wan (M&E Cost:
                                                                HK$85M, Construction Cost: HK$250M; Year
Railways                                                        of Completion: 1998) - A&A works for this
                                                                refurbishment project including conversion of two
•   MTRC TKE C617 Tseung Kwan O South Station                   industrial buildings to industrial/office buildings.
    (Design Team Leader; M&E Cost: HK$150M,
    Construction Cost: HK$600M; Year of Completion:
    2004) - The TKS Station is to be built alongside
    the new Tseung Kwan O Depot and will serve a
    projected population of 55,000 within the adjacent
    Area of Property Development. The station
    facilities also include an adjacent public transport
    interchange serving the surrounding area.
•   LAR Siu Ho Wan Depot, Phase 2 (Design Team
    Leader; M&E Cost: HK$50M, Construction Cost:
    HK$250M; Year of Completion: 2002) - Phase 2
    works included substantial building (over 9000m2)
    and trackwork provisions across a reclaimed
    site with significant settlements and required an
Tony	DOUGLAS
                    INFRASTRUCTURE	CONSULTANT




PROFESSIONAL	QUALIFICATIONS                               KEY	PROJECTS

•   Member of the Australian Institute of Project         •   Shell Australia Retail Rollout – Project Manager
    Managers                                                  responsible for the management and delivery
                                                              of Shell’s retail network expansion program.
RELEVANT	EXPERIENCE                                           Responsible for all aspects of the project delivery
                                                              including design management, procurement,
Tony has more than 16 years experience in design and          contract administration, cost control, liasing with
construction project co-ordination & delivery, working        authorities and project closeout.
on both client and consultant teams. With a strong
Construction and Project Management background,           •   Cairns Port Authority – Design Management - With
Tony as wide-ranging experience in all aspects of             a strong construction background, Tony has wide
construction project delivery, both as a design manager       ranging experience in all aspects of the Design
and a multi-disciplinary team leader. He has acted as         Management of design and construction of retail
Project Manager or Design Manager on major projects           and residential projects, both as a design manager
with contract values ranging from $5M to $74M,                and a multi-disciplinary team leader.
working on both consultant and client teams. His core
skills include a thorough appreciation of engineering,        He has acted as Project Manager or Design
architectural, programming and financial issues, multi-       Manager on major projects with contract values
disciplinary co-ordination and timely and effective           ranging from AU$5M to AU$200M, working on both
project delivery.                                             consultant and client teams. His core competency
                                                              is a thorough appreciation and application of
PROFESSIONAL	EXPERIENCE                                       engineering, programming, budget control and
                                                              financial skills which enable him to perform multi-
2004 – Present, Project/Design Manager                        disciplinary co-ordination for timely and effective
Meinhardt Australia Pty Ltd                                   project delivery.

2003 – 2004, Development/Construction Manager             •   Qantas Airlines – Project Management,
Australand Holdings Limited                                   superintendence, Muiti-discipline Design
                                                              Management and Site Coordination for the
1992 – 2003, Development Manager                              redevelopment of the existing Qantas Freight
Australand Holding Limited                                    Facility at Melbourne Airport.

1998 – 2002, Project Manager                                  The Project consists of general building works,
Annett Australia Limited                                      the replacement and expansion of the materials
                                                              handling equipment in the main facility and the
1997 - 1998, Construction Manager                             installation of new equipment in the proposed
Contract Glass & Glazing                                      “by-pass” area including cool/cold rooms, the
                                                              installation of a stand-by generator into the
1996 - 1997, Site Manager GJN Pty Ltd                         basement. The works are to be carried out while
                                                              maintaining normal operations to Qantas’ freight
1989 - 1996, Director Façade Industries Pty Ltd               business.
•   Australand Holdings Limited – Residential                •   Annett Domestic Terminal – Fixed Ground Power
    Developments (various locations) Development                 installation BNE, SYD &MEL Superintendent/
    Manager responsible for the delivery of 285                  Project Manager for Ansett Australia managing the
    Residential Apartments with-in three developments            main contractor and fore filling the roll as Contracts
    with a total construction cost $120m                         administrator, responsible for the design co-
                                                                 ordination and delivery of the project.
•   Annett Domestic Freight Terminal Redevelopment
    Masterplan -Brisbane Airport Project Manager
    responsible for the feasibility and design
    management of the facility at BNE to accommodate
    the expected increase though put of the domestic
    cargo

•   Annett Int. Freight Redevelopment – Sydney
    International Airport Superintendent/Project
    Manager for Ansett Australia managing the main
    contractor and fore filling the roll as Contracts
    administrator, responsible for the design co-
    ordination and delivery of the project.

•   Annett Int. Freight Redevelopment Masterplan –
    Melbourne Airport Project Manager responsible
    for the feasibility and design management of the
    facility at MEL to accommodate the expected
    increase though put of the domestic cargo

•   Annett Australia National Security Up-grade -
    (various locations) Project Manager reporting to the
    National Security Manager to facilitate the up-grade
    of all the freight terminal perimeter boundaries prior
    to the 2000 Olympics.

•   Annett Domestic Terminal Redevelopment –
    Sydney Domestic Airport Superintendent/Project
    Manager for Ansett Australia managing the main
    contractor and fore filling the roll as Contracts
    administrator, responsible for the design co-
    ordination and delivery of the project.
Kee	Seng	TAN		
                     ROADS	&	TRANSPORT	ENGINEER	




PROFESSIONAL	QUALIFICATIONS                                   1998 – 2000
                                                              Site Supervisor and M&E Co-ordinator Bestbuild Dev.
•   MSc (Eng) in Transport Planning and Engineering           Pte Ltd., Singapore
    (Distinction), ITS,
    University of Leeds, United Kigndom                       1996 – 1998
•   Bachelor of Engineering (1st Class Hons.) in Civil        Site Supervisor Hor Kew Pte Ltd, Singapore
    Engineering, University of Salford, UK
•   Certificate of Engineering in Building                    1996
    Services Engineering, POLIMAS Polytechnic,                Site Supervisor Kwong Chin Construction, Malaysia
    Malaysia
                                                              1995
PROFESSIONAL	AFFILIATIONS                                     M&E Trainee City Bayview Hotel Penang, Malaysia

•   Chartered Engineer, Engineering Council (EC), UK          KEY	PROJECTS
•   MICE Chartered Civil Engineer, Inst. of Civil
    Engineers (ICE), UK                                       •   M6 RMS, UK
•   Construction Skills Certification Scheme for              •   Manchester Harpurhey Gala Bingo Development,
    Manager, Construction Industry TB, UK                         UK
                                                              •   Manchester Harpurhey Golden Lion Residential
PROFESSIONAL	EXPERIENCE                                           Development, UK
                                                              •   Manchester Water Street Mixed-Use Development,
Feb 09 - Present                                                  UK
Principal Engineer Meinhardt (Singapore) Pte Ltd              •   Merseytravel Interchange Improvement Scheme,
                                                                  UK
2007 – 2008                                                   •   Midland Motorway Box RMS and Accident
Dept Head / Principle Engineer Designate Hyder                    Analysis, UK
Consulting Limited, Hong Kong                                 •   Ramp Metering Support Project, UK
                                                              •   Rochdale Queensway Neighbh’d Mixed-Use
2006 – 2007                                                       Redevelopment, UK
Senior Traffic Engineer Sinclair Knight Merz,                 •   Salford Quay Dock Office Development, UK
Manchester, UK                                                •   Sheffield Nelson Mandela Redevelopment, UK
                                                              •   Slough Town Centre Traffic Analysis, UK
2003 – 2006                                                   •   St. Helens Eccleston Work Redevelopment, UK
Transport Engineer/Planner Atkins, Manchester, UK             •   St. Helsn Rugby Football Club Traffic Study, UK
                                                              •   Wakefield Waterfront Redevelopment Master
2001 – 2002                                                       Planning, UK
Senior Residence Castle Irwell Student Village, Salford, UK   •   Wales Port Talbot Renewable Energy Plant
                                                                  Development, UK
2001                                                          •   Chek Lap Kok New CAD Development, Hong Kong
Assistant Structural Engineer Mivan Limited,                  •   Chek Lap Kok New CAD Design and Construct,
Manchester, UK                                                    Hong Kong
                                                              •   Kowloon – City University 3+3+4 Extension
2000 – 2002                                                       Development, Hong Kong
Night Concierge Copthorne Hotel Manchester,                   •   Kowloon Inter-Reservoir Transfer Scheme, Hong
Manchester, UK                                                    Kong
•   Pak Sek Kok Environmental Study, Hong Kong
•   New Territory – Lingnam Academic Building
    Development, Hong Kong
•   Shatin Pass Estate Temporary Traffic Management,
    Hong Kong
•   Tseung Kwan O Hospital Extension, Hong Kong
•   Tuen Mun Area 44 Complex & Fish Market
    Redevelopment, Hong Kong
•   Tuen Mun – Heung Sze Wui Road Traffic Study,
    Hong Kong
•   Tuen Mun Highway Widening Temporary Traffic
    Management, Hong Kong
•   Wo Hup Sek Crematorium and Columbarium
    Redevelopment, Hong Kong
•   Wog Tai Sin Phase 3 Temporary Traffic
    Management, Hong Kong
•   20 Tolls Traffic Forecasting and Operation &
    Maintenance, China
•   Beijing International Copyright Trading Centre
    Development, China
•   Beijing Simatai Great Wall, Salam Resort and Spa,
    China
•   Guangdong Huizhou – Dan Shui Development,
    China
•   Guangdong Shenzhen Bus Rapid Transit, China
•   Dalian Coastal International Centre Mixed-Use
    Development, China
•   Tianjin Comprehensive Transportation Study, China
•   Da Nang – Quang Nam, Salam Resort and Spa
    Development, Vietnam
•   Hanoi Chau Boc Complex Redevelopment,
    Vietnam
•   Hanoi – Hai Phong – Lach Huyen Bridge Highway
    Traffic, Vietnam
•   Truong Le Mountain – Eco Tourism Resort
    Development, Vietnam
•   Hyderabad Hyatt Regency Hotel Development,
    India
•   Hyderabad Uppal Mixed Development Mall
    Development, India
Dr.	Ing	Hieng	WONG
                     GEOTECHNICAL	CONSULTANT




Dr. Wong is a registered professional engineer with          has considerable experience. He was a geotechnical
over thirty years of experience in the field of              consultant on a number of deep excavation projects
geotechnical and civil engineering. This experience          for buildings, including the Raffles City Complex, the
extends over a wide range of facilities. His                 Capital Tower, the Fullerton Square, the Empress
experiences have included the planning and                   Place Building, the Regency House and the Hillside
supervising field exploration, laboratory testing,           Condominium. He was a consultant or conducted
engineering analysis report preparation, foundation          research on the design and construction of the
and earth works design and construction                      underpass and tunnels for the underpass at the Bukit
supervision.                                                 Timah Road and Farrer Road and for the Central
                                                             Expressway, the pedestrian underpass at Maxwell Road
Dr. Wong is the Geotechnical Team Leader                     and the vehicular underpasses beneath the aprons at
representing Meinhardt in Contracts C870D and                Changi Airport. He has also been a consultant on deep
C870H.                                                       excavation and tunnelling on various MRT projects. Dr.
                                                             Wong was a consultant on the Lippo Life City project in
Dr. Wong has significant experience on the                   Jakarta, Indonesia involving thirteen 39-storey high-rise
geotechnical aspects of the design and construction          building, all with deep basements.
of infrastructure facilities, high-rise buildings and deep
basements. He performed research on the                      The following is a summary of the projects Dr Wong
performances of full-scale test sections of braced           worked on that are relevant to Contract
excavations for two subway tunnels in Boston.                870G:
                                                             a) Deep basement projects: Raffles City Complex,
He was a consultant on tunnelling and cut and cover             Capital Tower, Regency House, Fullerton Square,
excavations during the construction of the mass rapid           Hillside Condominium, Empress Place Building,
transit system in Singapore. He has also worked on              Changi water reclamation plant;
a number of deep excavation projects for high-rise           b) Cut and cover tunnels: Underpass along Bukit
buildings, depressed roadways, and below ground                 Timah/Dunearn Roads at Adam/Farrer Roads,
storm water storage facilities. Other transportation            Central Expressway; MBTA tunnels in Boston, USA
projects Dr. Wong was the lead geotechnical engineer         c) Underground MRT Stations: NSL Dhoby Ghaut
on include an expressway on soft ground, vehicular              Station, NEL Dhoby Ghaut Station; CCL3 Bartley,
tunnel underpass beneath airport aprons. He was also            Serangoon, Lorong Chuan and Marymount
consulted or conducted research on the design and               stations, interaction between the construction
construction of the underpass and tunnels for                   of SMU basements and the Museum station for
the underpass at the Bukit Timah Road and Farrer                Marina Line, Harbour Front Interchange Station and
Road and for the Central Expressway.                            One North Station..
                                                             d) Bored tunnels: Six km long CCL3 twin tunnels
Dr Wong was a consultant on several contracts of the            from Bartley to Marymount; NSL tunnel from
North-East Line. Currently he was a consultant for the          Dhoby Ghaut to City Hall; NEL tunnels from Clarke
Marina Line advance work at Dhoby Ghuat station.                Quay to Dhoby Ghaut, DTSS Contract T02 tunnel,
Currently he is the consultant on the advance work              Senoko cable tunnel, Seletar Link Sewer tunnel,
for the deep excavation for the Marina Line depot at            Bi-County Water Tunnel, Maryland, USA, proposed
Kim Chuan, and the geotechnical team leader for the             Supercolliding Superconductor Tunnels, New York.
design of Contract 870C, 870D and 870H for the               e) MRT Depots: NSL Bishan depot, CCL2 Kim Chuan
proposed Circle Line.                                           depot;
                                                             f) Underpinning: Federal Courthouse Building,
Performance of deep excavations and of basement and             Philadelphia, USA, Foochow Church next to NEL
belowground structures is an area in which Dr. Wong             Contract 706, Conversion of Empress Place to
Second Wing of the Asian Civilisation Museum,           PROFESSIONAL	EXPERIENCE
    building at Duxton Hill, Fullerton Hotel, buildings
    along CCL3 tunnels.                                     Mitic Associates
                                                            • Consultant, Meinhardt 2001 – to date
PROFESSIONAL	QUALIFICATIONS                                 • Principal Consultant, 1998 - to date

•   Imperial College, London University - BSc in Civil      School of Civil & Structural Engineering, Nanyang
    Engineering with First Class Honours - 1967             Technological University
•   Massachusetts Institute of Technology - MSc in          • Professor, 1992 to 1998
    Geotechnical Engineering - 1968
•   Massachusetts Institute of Technology - Doctorate       GCE Consultants, Inc. East Brunswick, NJ;
    in Geotechnical Engineering – 1971                      1988-February, 1992
                                                            • President, 1988-1992
PROFESSIONAL	AFFILIATIONS
                                                            Ebasco Services Incorporated, New York, NY; 1978-83
•   Tunnelling and Underground Construction Society         and 1986-88
    (Singapore) – Member and Past President                 • Head-Geotechnical Services Department, 1986-
•   American Society of Civil Engineers - Member               1988
•   Institution of Engineers, Singapore – Member            • Senior Consultant, 1986-1988
•   University Appointment: Professor of Civil              • Consultant, 1978-1983
    Engineering, Nanyang Technological University,
•   Singapore 1992 - 1998                                   Dames & Moore, Cranford, NJ ; 1971-72 and 1974-78
•   University Appointment: Adjunct Professor of Civil      • Technical Consultant, 1977-1978
    Engineering, Columbia University, New                   • Project Manager, 1974-1976
•   York, New York, 1987-1989
•   University Appointment: Adjunct Professor of Civil      Massachusetts Institute of Technology, Cambridge,
    Engineering Polytechnic University, New                 Massachusetts; 1968-1971
•   York, New York, and-1986 - 1987                         • Research Assistant
•   University Appointment: Associate Professor,
    Nanyang Technological Institute, Singapore,             T William Lambe & Associates, Cambridge,
•   1983-1986                                               Massachusetts; 1967-1968
•   University Appointment - Adjunct Associate              • Engineer
    Professor of Civil Engineering, Columbia
•   University, New York, New York, 1979-1983
•   University Appointment - Lecturer, University of
    Singapore, Singapore 1972-1974

AWARD

Dr Wong is a Year 2000 winner of the Thomas A
Middlebrooks Award from the American Society of Civil
Engineers, believed to be the first time this prestigious
award for geotechnical engineering was given outside
of North America.
Daphne	YIP
                    GEOTECHNICAL	ENGINEER




PROFESSIONAL	QUALIFICATIONS                                •   Defence Medical Research Institute (DMRI),
                                                               Singapore
•   B.Eng (Civil) (Hons) University of Glasgow, UK, 1999   •   Marina Business Financial Centre Phase II,
•   M.Sc (Geotechnical Engineering) City University,           Singapore
    London, UK, 1999-2000                                  •   National Library Board Building, Bugis (Tender
                                                               Design), Singapore
PROFESSIONAL	EXPERIENCE                                    •   No.1 Robina House Shenton Way, Singapore
                                                           •   Ocean Heights, Dubai
2000 - Present                                             •   One Raffles Quay, Singapore
Meinhardt (Singapore) Pte Ltd                              •   Relocation of Merlion Extension Park, Singapore
Senior Geotechnical Engineer                               •   Shanghai Luwan Plot 117 (Tender Design), China
                                                           •   Capital Plaza, Abu Dhabi
KEY	PROJECTS                                               •   Signature Tower, Dubai
                                                           •   Uptown Cairo, Village D and K, Egypt
•   Transmission cable tunnel from Seraya to Labrador      •   Tai Po Satellite Station (Tender Design), Hong Kong
    C301 (Tender Design), Singapore                        •   Poramboke Land, Tamil Nadu (Due Dilligence),
•   Transmission cable tunnel C201 and C203 (Tender            India
    Design), Singapore                                     •   Viva Bahriya, The Pearl Qatar, Qatar
•   DTSS Link Sewers Package D Kolom Ayer Tunnels,         •   Rayan Marina, Qatar
    Singapore                                              •   Sui Generis Condominium, Singapore
•   DTSS Link Sewers Package F Ang Mo Kio Tunnels,         •   Parisian Condominum, Singapore
    Singapore                                              •   Infrastructure Works at Banyang Road/Meranti
•   Circle Line Contract 870D HarbourFront Station,            Crescent/Meranti Road/Meranti Lane – Ground
    Singapore                                                  Improvement Works, Singapore
•   Circle Line Contract 870E and F, (Tender Design)       •   Construction of Roads, Drains, Sewers & Soil
    Singapore                                                  Improvement Works at Jurong Island Highway
•   Circle Line Stage 1 Contract 824 (Tender Design),          Extension, Jurong Island – Ground Improvement
    Singapore                                                  Works, Singapore
•   Circle Line Stage 1 Contract 825, Singapore
•   Circle Line Stage 3 Contract 851A , Singapore
•   Circle Line Stage 5 Contract 855 , Singapore
•   Deep Tunnel Sewerage System Contract
•   T-04 and T-06, Singapore
•   Kallang/Paya Lebar Expressway Contract 421,
    Singapore
•   Kallang/Paya Lebar Expressway Contract 422,
    Singapore
•   Kallang/Paya Lebar Expressway Contract 424,
    Singapore
•   Agartha Universe, Johor Bahru
•   Biopolis, Buona Vista, Singapore
•   Cairnhill Condominium, Singapore
•   Capital Plaza, Abu Dhabi, UAE
•   CIL Factory, Baddi, India
•   City Square Residences, Singapore
•   City Square Mall, Singapore
6
SUPPORTING
DOCUMENTS
MEINHARDT
  AWARDS
Awards




Awards                                              Year   Project	Title                    Firm’s	Involvement	in	Project

Built Environment Leadership Gold Class
                                                                                            Civil, Structural, Mechanical &
(Category - Multi Disciplinary - Structural / M&E   2009   Meinhardt (Singapore) Pte Ltd
                                                                                            Electrical Engineer
Consultancy Services)

BCA Design and Engineering Safety Excellence                                                Civil, Structural, Mechanical &
                                                    2009   The Sail @ Marina Bay
Awards                                                                                      Electrical Engineer

BCA Design and Engineering Safety Excellence
                                                    2009   Circle Line 1 C825               Specialist Geotechnical Engineer
Awards (Merit Award)

                                                                                            Civil, Structural, Mechanical &
BCA Green Mark Platinum Award                       2009   Asia Square Tower 1
                                                                                            Electrical Engineer

                                                           Credit Suisse Regional Data      Project Manager and Mechanical &
BCA Green Mark Platinum Award                       2009
                                                           Centre                           Electrical Engineer

                                                           Marina Bay Financial Centre      Civil, Structural, Mechanical &
BCA Green Mark Gold Plus Award                      2009
                                                           (Phase 2)                        Electrical Engineer

BCA Green Mark District - Gold Plus Award           2009   Resorts World at Sentosa         Mechanical & Electrical Engineer

                                                           Quayside Collection
BCA Green Mark Platinum Award                       2009                                    Mechanical & Electrical Engineer
                                                           (Residential)

BCA Green Mark Gold Plus Award                      2009   Livia                            Mechanical & Electrical Engineer

BCA Green Mark Gold Award                           2009   1A International Business Park   Civil & Structural Engineer

BCA Green Mark Gold Award                           2009   50 Collyer Quay                  Civil & Structural Engineer

                                                                                            Civil, Structural, Mechanical &
BCA Green Mark Gold Award                           2009   Marina Bay Suites
                                                                                            Electrical Engineer

                                                                                            Civil, Structural, Mechanical &
BCA Green Mark Gold Award                           2009   One Raffles Quay
                                                                                            Electrical Engineer

                                                                                            Civil, Structural, Mechanical &
BCA Green Mark Gold Award                           2009   Six Battery Road
                                                                                            Electrical Engineer

President’s Design Award                            2009   Republic Polytechnic             Civil, Structural & Façade Engineer

BCA Design and Engineering Safety Excellence                                                Civil, Structural, Mechanical &
                                                    2008   One Raffles Quay
Awards (Merit Award)                                                                        Electrical Engineer

BCA Award for Construction Excellence               2008   The Pier @ Robertson Quay        Mechanical & Electrical Engineer

BCA Award for Construction Excellence               2008   The Shaughnessy                  Civil & Structural Engineer

BCA Green Mark Gold-Plus Award                      2008   Aalto                            Mechanical & Electrical Engineer

                                                           Marina Bay Financial Centre      Civil, Structural, Mechanical &
BCA Green Mark Gold Award                           2008
                                                           (Phase 1)                        Electrical Engineer

BCA Green Mark Gold Award                           2008   One Shenton                      Civil & Structural Engineer

Honorable Nominee for Best Tall Building - Asia                                             Civil, Structural, Mechanical &
                                                    2008   One Raffles Quay
And Australasia                                                                             Electrical Engineer
Awards                                            Year   Project	Title                     Firm’s	Involvement	in	Project

Prix d’Excellence Awards 2008 (Winner in Office                                            Civil, Structural, Mechanical &
                                                  2008   One Raffles Quay
Category)                                                                                  Electrical Engineer

BCA Award for Best Buildable Design               2007   The Pier @ Robertson Quay         Mechanical & Electrical Engineer

BCA Green Mark Platinum Award                     2007   City Square Mall                  Civil & Structural Engineer

BCA Green Mark Platinum Award                     2007   Cliveden at Grange                Mechanical & Electrical Engineer

BCA Green Mark Gold Award                         2007   HSBC Building                     Civil & Structural Engineer

                                                                                           Civil, Structural, Mechanical &
BCA Green Mark Gold Award                         2007   Marina Bay Residences
                                                                                           Electrical Engineer

                                                                                           Civil, Structural, Mechanical &
President’s Design Award                          2007   1 Moulmein Rise
                                                                                           Electrical Engineer

                                                                                           Civil, Structural, Mechanical &
President’s Design Award                          2007   Bishan Community Library
                                                                                           Electrical Engineer

                                                                                           Civil, Structural, Mechanical &
Aga Khan Award for Architecture 2007              2007   1 Moulmein Rise
                                                                                           Electrical Engineer

                                                         University of Technology
Aga Khan Award for Architecture 2007              2007   Petronas, Bandar Seri Iskandar,   Civil & Structural Engineer
                                                         Malaysia

BCA Award for Best Buildable Design               2006   The Esparis                       Civil & Structural Engineer

BCA Award for Construction Excellence             2006   Goldenhill Park Condominium       Mechanical & Electrical Engineer

BCA Green Mark Platinum Award                     2006   Republic Polytechnic              Civil & Structural Engineer

BCA Green Mark Gold-Plus Award                    2006   City Square Residences            Civil & Structural Engineer

                                                                                           Civil, Structural, Mechanical &
BCA Green Mark Gold-Plus Award                    2006   RiverGate
                                                                                           Electrical Engineer

                                                                                           Civil, Structural, Mechanical &
BCA Green Mark Gold Award                         2006   The Sail @ Marina Bay
                                                                                           Electrical Engineer

BCA Award for Best Buildable Design               2005   Goldenhill Park Condominium       Mechanical & Electrical Engineer

BCA Award for Construction Excellence             2005   Newton.GEMS                       Civil & Structural Engineer

BCA Green Mark Award                              2005   The Pier @ Robertson              Mechanical & Electrical Engineer

                                                                                           Civil, Structural, Mechanical &
FIABCI Prix d’ Excellence                         2005   1 Moulmein Rise
                                                                                           Electrical Engineer

BCA Award for Best Buildable Design               2004   Newton.GEMS                       Civil & Structural Engineer

BCA Award for Construction Excellence             2004   HarbourFront Office Towers        Mechanical & Electrical Engineer

BCA Award for Construction Excellence             2004   Modena Condominium                Civil & Structural Engineer

                                                         NTUC FairPrice Fresh Food         Civil, Structural, Mechanical &
BCA Award for Construction Excellence             2004
                                                         Distribution Centre               Electrical Engineer
Awards                                               Year   Project	Title                       Firm’s	Involvement	in	Project

The Singapore Structural Steel Society - Design             National Library Board – New
                                                     2004                                       Structural Engineer for Steel Contractor
Awards Scheme 2004                                          HQ

                                                            1 Moulmein Rise
ACES Engineering Design Excellence Merit                                                        Civil, Structural, Mechanical &
                                                     2003
Certificate 2003                                                                                Electrical Engineer


                                                            Parkview Square
                                                                                                Civil, Structural, Mechanical &
BCA Certificate of Merit for Best Buildable Design   2003
                                                                                                Electrical Engineer


ACES Engineering Design Excellence Award                                                        Civil, Structural, Mechanical &
                                                     2002   Parkview Square
2002                                                                                            Electrical Engineer

                                                                                                Civil, Structural, Mechanical &
BCA Award for Best Buildable Design                  2002   STMicroelectronics AMK 8
                                                                                                Electrical Engineer

The Singapore Structural Steel Society - Design                                                 Civil, Structural, Mechanical &
                                                     2002   Parkview Square
Awards Scheme 2002                                                                              Electrical Engineer

                                                            Redevelopment of Gurkha
BCA Certificate of Merit for Best Buildable Design   2001                                       Civil & Structural Engineer
                                                            Cantonment Phase 2B

                                                                                                Civil, Structural, Mechanical &
BCA Certificate of Merit for Best Buildable Design   2001   The French School
                                                                                                Electrical Engineer

BCA Certificate of Merit for Construction                   Institute of Materials Research &   Civil, Structural, Mechanical &
                                                     2001
Excellence                                                  Engineering                         Electrical Engineer

BCA Certificate of Merit for Construction
                                                     2001   The Springbloom Condominium         Mechanical & Electrical Engineer
Excellence

ACES Engineering Design Excellence Award                                                        Civil, Structural, Mechanical &
                                                     2000   Centennial Tower
2000                                                                                            Electrical Engineer

AUSTRADE & SABC - Award for Excellence
                                                     2000   Meinhardt (Singapore) Pte Ltd       -
Exporter of Australian Services & Technology

                                                                                                Civil, Structural, Mechanical &
BCA Award for Construction Excellence                2000   Centennial Tower
                                                                                                Electrical Engineer

BCA Certificate of Merit for Best Buildable Design   2000   Capital Square                      Civil & Structural Engineer

                                                            National Heritage Board –           Civil, Structural, Mechanical &
BCA Certificate of Merit for Best Buildable Design   2000
                                                            Central Repository                  Electrical Engineer

BCA Certificate of Merit for Construction
                                                     2000   Capital Square                      Civil & Structural Engineer
Excellence

                                                                                                Civil, Structural, Mechanical &
BCA Award for Best Buildable Design                  1999   Centennial Tower
                                                                                                Electrical Engineer

BCA Award for Best Buildable Design                  1999   Great Eastern Mansion               Civil & Structural Engineer
Awards                                       Year   Project	Title                   Firm’s	Involvement	in	Project

                                                                                    Civil, Structural, Mechanical &
BCA Award for Construction Excellence        1999   Conrad International
                                                                                    Electrical Engineer

Society of Project Managers - The Most
                                             1999   Meinhardt (Singapore) Pte Ltd   -
Outstanding Engineering Firm Award

URA Architectural Heritage Awards            1999   Capital Square                  Civil & Structural Engineer

                                                    Melbourne Airport Short-term
Award for Excellence in Construction         1998                                   Civil & Structural Engineer
                                                    Car Park

Property Council Award for Public Building          Melbourne Airport Short-term
                                             1998                                   Civil & Structural Engineer
Category                                            Car Park

                                                    Seagate Technology              Civil, Structural, Mechanical &
CIDB Award for Best Buildable Design         1997
                                                    International Ang Mo Kio        Electrical Engineer

                                                                                    Civil, Structural, Mechanical &
CIDB Award for Construction Excellence       1997   Ritz Carlton Millenia
                                                                                    Electrical Engineer

CIDB Certificate of Merit for Construction
                                             1997   Orchard Parksuites              Mechanical & Electrical Engineer
Excellence

Top 100 International Design Firms           1997   Meinhardt Group                 -

                                                                                    Civil, Structural, Mechanical &
CIDB Award for Best Buildable Design         1996   Millenia Tower
                                                                                    Electrical Engineer

                                                                                    Civil, Structural, Mechanical &
CIDB Award for Best Buildable Design         1996   Ritz Carlton Millenia
                                                                                    Electrical Engineer

CIDB Certificate of Merit for Construction                                          Civil, Structural, Mechanical &
                                             1995   Elizabeth Hotel
Excellence                                                                          Electrical Engineer

CIDB Certificate of Merit for Construction
                                             1995   Stamford House                  Mechanical & Electrical Engineer
Excellence

                                                                                    Civil, Structural, Mechanical &
CIDB Award for Best Buildable Design         1994   The Sovereign
                                                                                    Electrical Engineer

CIDB Award for Best Buildable Design         1992   Compaq Asia Computer Factory    Civil & Structural Engineer

CIDB Award for Construction Excellence       1992   Compaq Asia Computer Factory    Civil & Structural Engineer

                                                    Becton Dickinson Medical
CIDB Award for Best Buildable Design         1991                                   Civil & Structural Engineer
                                                    Products Factory

                                                                                    Civil, Structural, Mechanical &
CIDB Award for Construction Excellence       1989   OUB Centre
                                                                                    Electrical Engineer

CIDB Certificate of Merit for Construction          Singapore Technology Centre
                                             1988                                   Civil & Structural Engineer
Excellence                                          Building

                                                    Rialto Towers, Melbourne,
ACEA Engineering Award                       1986                                   Civil & Structural Engineer
                                                    Australia
Green Mark Awards
for Environmental Sustainability




Awards                                Year   Project	Title                           Firm’s	Involvement	in	Project

                                                                                     Civil, Structural, Mechanical &
BCA Green Mark Platinum Award         2009   Asia Square Tower 1
                                                                                     Electrical Engineer

                                                                                     Project Manager and Mechanical &
BCA Green Mark Platinum Award         2009   Credit Suisse Regional Data Centre
                                                                                     Electrical Engineer

BCA Green Mark Platinum Award         2009   Quayside Collection (Residential)       Mechanical & Electrical Engineer

BCA Green Mark Platinum Award         2007   City Square Mall                        Civil & Structural Engineer

BCA Green Mark Platinum Award         2007   Cliveden at Grange                      Mechanical & Electrical Engineer

BCA Green Mark Platinum Award         2006   Republic Polytechnic                    Civil & Structural Engineer

BCA Green Mark District - Gold Plus
                                      2009   Resorts World at Sentosa                Mechanical & Electrical Engineer
Award

BCA Green Mark Gold-Plus Award        2008   Aalto                                   Mechanical & Electrical Engineer

BCA Green Mark Gold-Plus Award        2006   City Square Residences                  Civil & Structural Engineer

                                                                                     Civil, Structural, Mechanical &
BCA Green Mark Gold-Plus Award        2006   RiverGate
                                                                                     Electrical Engineer

                                                                                     Civil, Structural, Mechanical &
BCA Green Mark Gold Plus Award        2009   Marina Bay Financial Centre (Phase 2)
                                                                                     Electrical Engineer

BCA Green Mark Gold Plus Award        2009   Livia                                   Mechanical & Electrical Engineer

BCA Green Mark Gold Award             2009   1A International Business Park          Civil & Structural Engineer

BCA Green Mark Gold Award             2009   50 Collyer Quay                         Civil & Structural Engineer

                                                                                     Civil, Structural, Mechanical &
BCA Green Mark Gold Award             2009   Marina Bay Suites
                                                                                     Electrical Engineer

                                                                                     Civil, Structural, Mechanical &
BCA Green Mark Gold Award             2009   One Raffles Quay
                                                                                     Electrical Engineer

                                                                                     Civil, Structural, Mechanical &
BCA Green Mark Gold Award             2009   Six Battery Road
                                                                                     Electrical Engineer

                                                                                     Civil, Structural, Mechanical &
BCA Green Mark Gold Award             2008   Marina Bay Financial Centre (Phase 1)
                                                                                     Electrical Engineer

BCA Green Mark Gold Award             2008   One Shenton                             Civil & Structural Engineer

BCA Green Mark Gold Award             2007   HSBC Building                           Civil & Structural Engineer

                                                                                     Civil, Structural, Mechanical &
BCA Green Mark Gold Award             2007   Marina Bay Residences
                                                                                     Electrical Engineer

                                                                                     Civil, Structural, Mechanical &
BCA Green Mark Gold Award             2006   The Sail @ Marina Bay
                                                                                     Electrical Engineer

BCA Green Mark Gold Award             2005   The Pier @ Robertson                    Mechanical & Electrical Engineer
MEINHARDT
CERTIFICATES
Issue Date: 29 October 2009                                                                    Direct Line                          03 8681 9710
                                                                                                Direct Fax                           03 8681 9888
                                                                                                E-mail                        fergusont@willis.com
TO WHOM IT MAY CONCERN




Re: Confirmation of Insurance – Professional Indemnity Annual Policy
In our capacity as Insurance Broker to the Named Insured shown below, we confirm having arranged the following insurance, the
details of which are correct as at the Issue Date:

Named Insured:                      Meinhardt (Singapore) Pte Ltd and others including:

                                   Meinhardt International Pte Ltd
                                   Jurutera Perunding Meinhardt Sdn Bhd
                                   Meinhardt Malaysia Sdn Bhd
                                   Meinhardt Pakistan (Pvt) Ltd
                                   Meinhardt Infrastructure Pte Ltd


Insurer(s):                        Lloyd’s, London and others – 100%

Policy Number:                     P9A316804P1S
Insured Activities:                Consulting Engineers, Planners and Managers
Covering:                          Breach of professional duty arising from any act error or omission.
Limit of Indemnity:                AUD 10,000,000 each and every claim and in the aggregate costs and expenses in addition.
Reinstatements:                    2 automatic reinstatements
Excess:                            As per policy, each and every claim including costs and expenses
Expiry Date:                       4.00pm, 1 November 2010




Signed for and on behalf of
Willis Australia Limited


Disclaimer:
This document has been prepared at the request of our client and does not represent an insurance policy, guarantee or warranty and cannot be relied
upon as such. All coverage described is subject to the terms, conditions and limitations of the insurance policy and is issued as a matter of record
only. This document does not alter or extend the coverage provided or assume continuity beyond the Expiry Date. It does not confer any rights under
the insurance policy to any party. Willis Australia Limited is under no obligation to inform any party if the insurance policy is cancelled, assigned or
changed after the Issue Date.
                                                                                                                                        Willis Australia Ltd
                                                                                                                                       ABN 90 000 321 237
                                                                                                                                          AFSL No: 240600







Environmental, Quality and Health & Safety Policies
Meinhardt’s management endeavours to ensure our Clients achieve their goals through our
innovative and high quality engineering services exceeding their expectations. We deliver
these by:

•    Striving to understand and exceed our Clients’ expectations in a timely and
     responsive manner;
•    Providing cost effective, innovative and buildable solutions;
•    Doing everything right first time;
•    Commitment to the highest standards of ethics and integrity;
•    Promoting Environmentally friendly solutions that prevent pollution;
•    Promoting a culture of Health & Safety in all our Projects.

In order to achieve these, it is important that Meinhardt clearly understand our client's
requirements, and implement and maintain an effective integrated management system.
The Integrated Management System, adopted by Meinhardt is based on the requirements of
IS0 9001:2008, ISO 14001:2004, and OHSAS 18001:2007. It is established to meet the
following objectives and reflect our management attitude towards the:

•    Provision of high Quality Engineering Solutions,
•    Development of Environmentally friendly design solutions and prevention of pollution.
•    Provision of Safe & Healthy office work environment and develop safe engineering
     solutions, prevention of injury and ill-health.

The management is committed to understand, comply and meeting contractual obligations
(including legal requirements) so that our clients, our business partners and ourselves can
mutually benefit from the relationship.

Meinhardt values its people associated with the provision of services and is committed to
developing and training them to their fullest potential.

Quality cannot be delivered by procedured systems and available technology alone. It
requires the application of care, consideration and imagination by each participating
individual to deliver quality, environmentally friendly and safe engineering solution.

Therefore, all our people associated with the provision of professional services shall be
required to understand, implement and maintain the Integrated Management System in so
far as it relates to their individual functions within the company.

The management is committed to continually improve the effectiveness of the integrated
management system.



                                     Dr. Shahzad Nasim
Saudi	Arabia                               Abu	Dhabi

P O Box 300511, Riyadh 11372               Al Niyadi Building
7th Floor, North Tower                     Unit 603, Delma St, Sector 16
Faisal Foundation - Al Khaiyria Building   Airport Road
King Fahd Highway, Olaya, Riyadh           Abu Dhabi, UAE
Kingdom of Saudi Arabia
                                           T: +971 50 451 1826
T: +966 506 293 561                        E: abudhabi@meinhardtmena.com
F: +973 1715 1899
Email: saudiarabia@meinhardtmena.com       Qatar

Bahrain                                    P O Box 24431
                                           12th Floor, Amwal Tower
P O Box 21277                              Westbay
12th Floor, GB Corp Tower                  Doha, Qatar
Bahrain Financial Harbour
Manama, Bahrain                            T: +974 411 7840
                                           E: qatar@meinhardtmena.com
T: +973 1715 1888
F: +973 1715 1899                          Singapore	
E: bahrain@meinhardtmena.com
                                           168 Jalan Bukit Merah
Dubai                                      #09-01 Surbana One
                                           Singapore 150168
P O Box 38349
Gold & Diamond Park, Bldg 4                T: +65 6273 5255
Unit 130, Sheikh Zayed Road                F: +65 6274 0788
Dubai, UAE
                                           www.meinhardtmena.com
T: +971 04 3416686                         www.meinhardt.com.sg
E: dubai@meinhardtmena.com                 www.meinhardtgroup.com

Infrastructure Capability

  • 1.
  • 3.
    Contents 1. MEINHARDT PROFILE 2. INFRASTRUCTURE INTRODUCTION 3. INFRASTRUCTURE COMPLETED PROJECTS 4. INFRASTRUCTURE CURRENT/ONGOING PROJECTS 5. INFRASTRUCTURE KEY PERSONNEL 6. SUPPORTING DOCUMENTS
  • 5.
  • 6.
  • 7.
    Our vision To bethe leading global provider of engineering, technology and management services, with the long term focus of building a sustainable future. Our Mission To deliever the highest level of professional excellence through dynamic, innovative and cost-effective solutions that will enhance the sustainability of the environment and create exceptional value for our clients, users and community at lare. In doing so, we set new industry benchmarks that will transform the next generation of engineering.
  • 9.
    Introduction One of fewengineering firms in the world that truly Leveraging on our strong international presence, each offers a comprehensive range of services, Meinhardt of our offices operates as an integral part of the Group Group has been a pioneering force in the engineering to support our clients across the continental borders. industry since its beginnings in 1955. Our geographical reach and diverse expertise allow us to identify opportunities and deliver highly innovative Known for its best-in-class expertise and a successful engineering services globally. history of project delivery, Meinhardt Singapore is part of the Meinhardt Group, a global multi-disciplinary firm With a distinguished track record, Meinhardt continues that provides a full spectrum of integrated engineering, to lead the way for its forward thinking and creative infrastructure and project management services across a solutions, and building a reputation as one of the most wide range of market sectors. Both the International trusted and respected engineering firms in the world and Asian headquarters for the Group are incorporated today. in Singapore. Today, the Group maintains 33 offices throughout 17 countries and employs more than 3,000 professional staff. In Singapore, Meinhardt is a 400-person organization, making it one of the largest integrated engineering firms locally. 3,000+ Professional Staff
  • 10.
    Middle East andNorth Africa Since 1997, Meinhardt Singapore has been managing Through the years, Meinhardt has evolved to play a and providing key integrated engineering services in the greater role in serving our clients by offering specialist Middle East and North Africa regions, covering projects skills in the areas of project management, facade, in the United Arab Emirates, Bahrain, Saudi Arabia, lighting design, environmental, aviation, infrastructure Kuwait, Qatar and Libya. as well as other specific capabilities such as geotechnical and seismic engineering. In working with our specialist Harnessed with a wealth of experience and resources, business units, we are able to further streamline our we have in the last decade become one of the fastest processes and translate tangible benefits to the clients. growing companies in the region, employing over 120 staff in the Middle East. Our offices are strategically Our holistic approach ensures our clients benefit from a located, with the capabilities to lead and undertake fully coordinated and seamless integration throughout super-scale buildings and infrastructure projects in the all stages of the project. region and beyond. In expanding our reach in a significant way, Meinhardt has not only demonstrated resilience and flexibility in adapting to a new environment and the needs of our clients, but also our professional excellence through strong and reliable performance.
  • 11.
    Our Services Infrastructure • Water Engineering • Waste Water Engineering • Rail Engineering • Aviation Planning • Roads & Highways Engineering • Bridge Engineering • Marine Engineering • Power Distribution • Environment Engineering • Infrastructure Master Planning • Implementation • Downstream Oil & Gas Services PM/CM Services Built Environment • Project Management • Principal / Lead Consultancy • Construction Management • Master Planning & Land-Use Planning • Site Supervision and QA/QC • Landscape & Interior Design • Value Engineering • Environmental Sustainability • Contracts and Cost Control • Structural / Civil Engineering • Planning and Programming • Electrical Engineering • Communication Management • Mechanical Engineering • Appointment of Consultants • Architectural Engineering • Site Identification • Fire Performance Engineering • Due Diligence and Feasibility Studies • Hydraulic Engineering • Project Brief • Communications Engineering • Project Design and Documentation • Specialist Lighting Design • Appointment of Contractors/Subcontractors • Vertical Transportation Engineering • Tender Management • Geotechnical Engineering • Contract Administration • Seismic Engineering • Variation Order Assessment and Recommendation • Certification of Payments and Final Accounts • Defects Identification/Rectification Assessment and Sign-Off • Handover to Tenants/Buyers • Operations and Maintenance
  • 12.
    Our Locations Abu Dhabi Brisbane Hanoi Jakarta Lahore Miami Singapore Adelaide Chennai Ho Chi Jeddah London New Delhi Sydney Bahrain Dallas Minh City Karachi Macau Riyadh Tripoli Bangkok Doha Hong Kong Kuala Manila Shanghai Beijing Dubai Islamabad Lumpur Melbourne Shenzhen
  • 13.
    Engineering a GreenFuture Meinhardt is one of the leading firms with highest Our Environmentally Sustainable Design team comprises number of BCA’s Green Mark Platinum and Gold Plus of accredited Green Mark professionals who are able awards in Singapore. These awards demonstrate our to assist our clients in designing and constructing excellence and leadership in green practices. greener buildings. We participate in and promote early in environmentally beneficial solutions and technologies As the foremost, globally integrated specialist in that optimize energy and resources. environmental consultancy, our unwavering commitment towards sustainability embraces all project phases from Through environmentally responsible and financially initial concept and feasibility, to implementation and sustainable solutions, we offer clients a pragmatic post operations. approach to integrating sustainability to their operations, with the aim of bringing a high-quality built environment.
  • 14.
    Meinhardt Organization Chart MEINHARDT GROUP PTY LTD (Incorporated in Australia) MEINHARDT INTERNATIONAL PTE LTD (Incorporated in Singapore) Meinhardt Façade Meinhardt Meinhardt Asia Pte Ltd Meinhardt Australia Pty Ltd Technology Pty Ltd USA & UK (Incorporated in Singapore) (Incorporated in Australia) (Incorporated in Australia) Meinhardt London MFT Australia Meinhardt Singapore Meinhardt (VIC) Meinhardt MENA Meinhardt (NSW) Meinhardt Dallas MFT Singapore Bahrain, Dubai, Abu Dhabi, Qatar & Libya Meinhardt Miami MFT Dubai Meinhardt (QLD) Meinhardt Arabia Meinhardt (SA) MFT China Meinhardt India Hong Kong, Beijing, (Delhi & Chennai) Shanghai Meinhardt Infrastructure Meinhardt China & Environment Hong Kong, Shanghai, - MFT London Beijing, Shenzhen, Macau Meinhardt Infrastructure - Meinhardt Aviation & Environment Meinhardt Mgt Ltd - Asset Management Pty Ltd Meinhardt Thailand Meinhardt Light Art Meinhardt Indonesia Meinhardt Malaysia Meinhardt Philippines Meinhardt Vietnam Ho Chi Minh, Hanoi Meinhardt Pakistan Karachi, Islamabad, Lahore
  • 15.
    Meinhardt Human Capital Middle East Singapore Australia 120 570 380 Total Staff Total Staff Total Staff Other Countries 1,975 Total Staff Resources and Equipment • 33 Offices • State of the art technology • Local knowledge and presence • Expertise and backing of a global organisation • Specialist Expertise Group Turnover 2006/2007 USD 114 mil 2007/2008 USD 159 mil 2008/2009 USD 181 mil
  • 17.
  • 19.
    Infrastructure Services Societies changingneeds constantly require ever more innovative solutions from today’s infrastructure engineers and environmentalists. Designing and delivering infrastructure in a sustainable manner which balances the demands of today’s society against the needs of future generations is a challenge at which our staff excel. Our experience includes: • Environment Engineering • Geotechinical and Soil Investigation • Site Infrastructure • Water Engineering • Waste Water Engineering • Rail Engineering • Aviation Planning • Roads & Highways Engineering • Bridge Engineering • Marine Engineering • Power Distribution • Telecommunication • Infrastructure Master Planning • Implementation • Downstream Oil & Gas Services
  • 21.
    3 INFRASTRUCTURE COMPLETED PROJECTS
  • 23.
    Infrastructure Projects Sentosa Island, Singapore Sentosa is acknowledged as a place consisting of many destinations. The variety of recreation opportunities available on the island is a vital part of its make-up. Sentosa Development Corporation is tasked to recreate Sentosa Island into a „destination‟ for tourists and residents of Singapore alike. Key elements of the activities experience on Sentosa Island are: • The Theme Park, Entertainment & Dining experience; • The Rainforest „Eco-experience‟; • The Entertainment Cultural Heritage experience; • The Beach Culture; • The Residential Lifestyle experience; • The World Class Golfing experience; and • The History and Cultural experience. Meinhardt (Singapore), in association with the master planner, ML Design is currently working on the re-master planning of the 281 Ha Sentosa Island in Singapore. The infrastructure master planning includes roads, water supply, wastewater management, storm water, power and telecommunications. Seamless Connectivity at Vista (193.5 Ha) Meinhardt together with MVA Asia Limited provided transportation and traffic engineering study for the Vista master plan. The goals for this transportation study are to obtain a quality transportation plan for the 193.7 ha Vista Science Hub to complement the master plan and to study the feasibility of a people mover system for Vista‟s transportation network. Client: JTC Corporation Physical Model Study and Construction of Offshore Breakwaters at Southern Beaches, Sentosa, Singapore The 3km southern beaches of Sentosa consist of three adjacent beaches, namely Siloso Beach at the western end, Central Beach and Tanjong Beach, at the eastern end. The beaches are artificial and were constructed in 1990/1991 over an existing coastline. Since the completion of the beaches, a number of coastal engineering and environmentally related problems existed. Meinhardt was the consultant for the model study, detailed design and construction phase services for the refurbishment of 3km stretch of beach. Construction of the crenulated bays and breakwaters in the form of islets at Siloso, Central and Tanjong Beach Beach had been completed. Client: Sentosa Development Corporation Construction Cost: S$10 Million Year of Completion: 2000 Services Provided: Project Management and Civil Engineering
  • 24.
    Bintan Beach InternationalResort, Indonesia (23000 Ha) The 23,000 Ha Bintan Beach International Resort is a “mega-resort”, about 1/3 the size of Singapore is tailored as a „Tax Free Zone (TFZ)‟ for resort and resort related industries. The aim is to attract tourism investors and promote tourism to this largely untouched island. This will also helps generate economic activity to the island. Some international renowned tourism players already operating on the island includes Club Med, Sofitel, Banyan Tree Resort and Sedona. Meinhardt (Singapore) were the Infrastructure Consultants for the 23,000 Ha Bintan Beach International Resort. The infrastructure includes earthworks, transportation, roads, water supply (potable & non-potable), sewerage, storm water, power and telecommunications. Our scope includes audit of existing site capability and constraints, infrastructure demand projection and proposals, technical and financial feasibility review of options, phasing requirements and recommendations. Our scope also included the management of all survey (photogrammetric, GPS and tidal) and geotechnical works on site. Construction for the Phase I Infrastructure comprising of roadwork‟s, dam and water supply network, power & telecommunication distribution network had been completed. As part of the development requirement, individual investors are required to provide sewerage and sewage treatment facility within the site. Year of Completion: 1997 Pecatu Indah Resort, Bali, Indonesia (650 Ha) Meinhardt (Singapore) were the infrastructure engineers and marina consultants responsible for the masterplanning for this 650 Ha resort and new township south of the capital Denpasar. The development shall consist of 2 golf courses, residential, commercial and retail facilities, together with a marina. Year of Completion: 1996 Royal Sumatra, Indonesia (250 Ha) Meinhardt (Singapore) Pte Ltd provided infrastructure masterplanning for this 250-hectare residential, golf and country club development. The project consists of 1600 housing lots, 18-hole golf course and central community facilities including retail and schools. Construction of the first phase is nearing completion. Year of Completion: (Phase 1 Completion : 1995)
  • 25.
    Tanjung Lesung BeachResort, Indonesia (1500 Ha) Meinhardt (Singapore) completed the infrastructure master planning for the 1500 Ha new township development 2.5 hours west of Jakarta. The project includes a Jack Nicklaus golf course, residential housing, a hotel and other mixed land use facilities. Putri Nyale Resort, Lombok, Indonesia (1250 Ha) Meinhardt (Singapore) are the infrastructure engineers and marina/coastal consultants for this massive resort development on the southern coast of Pulau Lombok. Scope of services includes master planning, design and documentation of all utilities, as well as a 13 Ha recreational tidal lagoon. Belitung Indah Resort, Indonesia (270 Ha) Belitung Resort is located on the north coast of Belitung Island, South Sumatera. The project will be developed in two primary stages. The first stage will to develop an area of 270 Ha with a 2 kilometer beach front and a 35 hectare inland lake. The proposed resort will comprise : 4 Hotels, 18 Holes Golf Course, Golf Club House, 800 Exclusive Residentials allotments, Marina, Village Centre, Staff Accommodation, and 6 km of two lane access road and seven bridges at 20m span. The second stages will to develop an additional 800 Ha area. The components for this stage will still have to be determined. Meinhardt provided Infrastructure Masterplan, C&S, and MEP and currently carries out detailed infrastructure engineering design documentation Client: PT. Putra Cipta Wahana Sejati Architect: Peddle Thorp
  • 26.
    Bintan Beach InternationalResort Township (Phase II), Indonesia (195 Ha) The Phase 2 of the BBIR Township project comprises of developing 195 Ha of jungle land into a township to support the BBIR development. The project will consist of housing for managers, supervisors and non-executives working in BBIR and supporting public amenities such as market, retail village and cultural centre. When fully completed, the township is expected to grow to a population of 30,000. Meinhardt (S) were the infrastructure Consultants for the 195 Ha township responsible for masterplanning, detailed design and construction supervision. Our scope includes water supply (potable and non-potable), sewerage system, stormwater, roads and walkways, power distribution and telecommunications (telephone and MATV). Bimantara Automotive Industrial Park Cikampek, West Java, Indonesia (500 Ha) The Bimantara Automotive Industrial Park is developed on a 500 Ha land located at the end Jakarta-Cikampek toll road. The estate is tailored as „Free Trade Zone (FTZ)‟ for automotive and related industries with Hyundai, a car manufacturer as a main tenant. Other anchor tenants include Kawasaki Motor Indonesia and Mando, a local car spare parts manufacturer. The industrial estate has been planned to be fully integrated with excellent supporting facilities such as residential, commercial, institutional and recreational components. To realised the „FTZ‟ vision, on site state-of-the- art dry port, bonded warehousing and customs check point are planned to be interlinked to act as distribution centre for the estate as well as import/export centre. Meinhardt (Singapore) were the Infrastructure Masterplan Consultants for the 500 Ha Bimantara Automotive Industrial Park. The infrastructure includes earthworks, transportation, roads, water supply (potable and non- potable), sewerage, stormwater, power and telecommunications. Our scope includes audit of existing site capability and constraints, infrastructure demand projection and proposals, technical and financial feasibility review of options, development phasing requirements and recommendations.
  • 27.
    Sudirman Central BusinessDistrict, Jakarta, Indonesia (45 Ha) This development involves approximately 45 hectares of commercial, residential and hotel space. Meinhardt (Singapore) completed the masterplan for the infrastructure valued at over US$300 million. Our current commission includes the review of infrastructure construction costs. The study involved analysing and reporting on all completed and proposed infrastructure works including roads, tunnels, utilities and major drainage diversion works. Bukit Sentul - Land Development Project, Indonesia (2400 Ha) The development comprises:  Residential R21 – Development of a 100 Ha green field for 2,000 – 2,500 houses. The site is undulating with maximum slope of 15% and is subdivided into 10 clusters. The development involves major earthwork of approximately 3 million cubic meter cut and 1.5 million cubic meter to be exported. Meinhardt provided the engineering infrastructure masterplan of the whole site and the engineering infrastructure detailed design for stage 1 – Cluster 1 and 2 (23 Ha) and the access road (3 km).  Commercial C12 and C13 – C12 of about 4.3 Ha os to be developed into shophouses of total 104 units, 3 larger lots for anchor tenants.  C13 of 13.6 Has will be developed into local and international schools, hospital, etc. Meinhardt is responsible for the infrastructure detailed design. Client: PT Bukit Sentul Tbk Masterplanner: Peddle Thorp Indonesia
  • 28.
    Golden Pebble BeachHotel & Resort, Dalian - China The project comprises design consultancy services for Serviced Apartment B, waterfront retail buildings and executive condominiums. Services Provided: Civil & Structural Engineering services Fort Bonifacio Global City, Philippines Meinhardt provided the services as Master Civil Coordinator for all civil, infrastructure and utilities reticulation for this new global city, including the engineering design and contract management of significant packages. An integral part of the services include the development of a Geographic Information System to identify clashes between the services during the design as well as implementation of State-of-the-Art city management system subsequently, for the entire project.
  • 29.
    Ayala Greenbelt, Philippines(22 Ha) The Project involves the development of a 22 Ha central business district in Makati, Metro Manilla of world class standard connected with parklands and supporting facilities. Services provided by Meinhardt included:  Concept designs for water supply, storage and reuse  Concept designs for sewerage reticulation and treatment  Power reticulation schematics and co-generation  Telecommunications  Common service tunnel networks  Fire fighting services Features of the project involve high density reticulation with significant peak demands. Project staging is considered complex with staggered lease arrangements and existing utility interconnection. Client: Ayala Group Harbor Town Integrated Resort, Philippines (1200 Ha) Meinhardt (Singapore) were the infrastructure engineers for the fully integrated coastal resort with Jack Nicklaus and Greg Norman as the golf architects. The site is very rugged with steep rocky hills and dense vegetation. Sunnyville Development, Hong Kong (12 Ha) Sunnyville involves the conversion of 98 Ha of fishponds built on mudflats into a high class residential and golf course development in northern Hong Kong. After filling with 4.5mm3 river sand the ground will be improved by combinations of stone columns and surcharge for housing areas (precast buildings on raft foundations) and vertical drains. The layout includes 12 Ha of wetland, channels, lakes, creating a retarding basin to reduce drainage impact on adjoining rivers. Sewage treatment effluent will be used for irrigation. Meinhardt‟s work includes master planning, site formation, ground improvements, road and bridge works, utilities, drainage, sewerage, water supply and irrigation, a river screening plant and the nearby Lut Chau ecology reserve.
  • 30.
    Little Palm BeachSailing Centre, Clearwater Bay, Hong Kong Masterplanning and submissions for extension to existing centre:  Eastern breakwaters and protected area  Hardstanding extension (3,600m2)  Clubhouse extension  Enlargement of existing West Ramp  Access road and services review Design & Construction:  Strengthening, widening and lengthening of existing ramp  Renovation of clubhouse and miscellaneous works  Contract management Client: Sail Training Association, Hong Kong Movie City. Tseung Kwan O, Hong Kong Meinhardt was responsible for the geotechnical, civil and structural engineering design of these new production facilities. The development includes a new sound stage studio, workshops and post-production building. The site is situated over proposed Mass Transit Railway and drainage tunnels on an elevated platform surrounded by natural slopes. Client: Shaw Brothers Limited Architect: Kwan & Associates Architects Limited/PTP Construction Cost: HK$400,000,000 Year of Completion: 2000 Shanghai Tianma Golf & Country Club, China The project involved assessment of the water quality of the canals expected to feed the lake system at the new resort and determining appropriate management responses. Services provided by Meinhardt included:  Identification of water quality parameters for testing  Analysis of laboratory results of sampling  Recommendation of infrastructure such as floating booms, aeration devices and baffles to optimise lake water quality  Irrigation management techniques to minimise public health concerns and land degradation after consideration of relevant guidelines in Australia  Chemical and environmental engineering skills Features of the project included determining the degree of sewage contamination within the canals and the expected nutrient concentration levels within the future lake system. Client: Shanghai Tianma Country Club Co. Ltd
  • 31.
    Beveridge Residential GolfCourse Development, Australia The project involved an 18 hole golf course and lake system surrounded by over a 2000 lot subdivision. Internal sewerage treatment plant and irrigation reuse scheme assists water balancing requirements. Services provided by Meinhardt included:  Utility Masterplanning  Effluent Treatment Plant Review  Bulk Earthworks Estimation  Review of bulk water supply options  Authority Liaison  Project Costings  Site Hydrology Considerations Features of the project included staging considerations and water reuse options. Bulk water supply scheming and authority negotiations and agreements. Studio City Theme Park, Docklands Melbourne – Australia The Project: Studio City is a 35 hectare development comprising a 15 ha. theme park, an entertainment and retail precinct, 350 room hotel, working film and TV studio complex and media offices. The theme park includes film and TV venues and other active entertainments. Also included are waterfront plaza with marine uses and extensive pedestrian circulation features. It will be constructed on a former port area founded on alluvial mud and silts in a major urban renewal scheme near the City Centre of Melbourne. Services provided by Meinhardt included the engineering, services and infrastructural input to the planning and development work for this theme park. One of the innovative ideas developed by Meinhardt for this project is the building up of road subgrade formation by polystyrene blocks to reduce settlement potential. Features of the Meinhardt inputs were:  Civil Engineering and foundations planning  Bridge across stormwater channel to Moonee Ponds Creek  Roadworks and carpark  Utilities: planning and demand estimation for power, sewerage, water  Bulk earthworks  Stormwater management  Detailed assessment of re-routed alignment of Moonee Ponds Creek  Traffic Engineering
  • 32.
    Agarta Universe ThemePark, Johor Bahru, Malaysia (113 Ha) Meinhardt is providing design and construction phase services for Phase 1 of the Agarta Universe Theme Park in Johor Bahru, Malaysia, comprising a 113-hectare, US$110 million Theme Park development, including major earth moving, water supply, lake filtration, sewerage, stormwater, roads and carparking. Bute Estate, Malaysia (1800 Acre) Meinhardt (Singapore) are the civil infrastructure consultants for this residential, industrial, commercial, retail and golf development near the new Sepang International Airport. 44 Lot Pasir Gudang Industrial Park, Johor, Malaysia Meinhardt (Singapore) conducted the design and documentation of infrastructure for a 44 lot industrial park in Pasir Gudang, Malaysia. Site Development Haii Al-Mutrafiah Jubail Industrial City, Saudia Arabia. The scope of services included planning, detailed design and construction supervision. The project consisted of the planning, design and construction of the engineering infrastructure for a community of 50,000 population, within the Jubail Industrial City, located on the Arabian Gulf, 100 km north of Dhahran. Detailed engineering was also undertaken for the roads and drainage, water supply and irrigation, sewerage, power and telecommunications. Construction cost was US$250 million.
  • 33.
    Deep Tunnel SewerageSystem Contract T-04 (Ang Mo Kio Tunnel), Singapore Meinhardt is providing Civil & Structural Engineering Services for Deep Tunnel Sewerage System Contract T-04 (Ang Mo Kio Tunnel) which comprises a 7.2km long and 30-40m deep bored tunnel of 4.3m internal diameter, including drop shafts, access shafts, work shafts, odour control facilities, 800m long lateral connector and other underground wastewater structures. Ground material is generally of old alluvium. Client: Ministry of Environment, Singapore Contractors: Samsung Corporation Associates: Halcrow Group Limited Construction Cost: S$74 Million Duration: 2000-2004 Year of Completion: 2004 Services Provided: Civil & Structural Consultancy Services Deep Tunnel Sewerage System Contract T-06 (Queensway Tunnel), Singapore Meinhardt is providing Civil & Structural Engineering Services for Deep Tunnel Sewerage System Contract T-06 (Queensway Tunnel) which comprises a 9.7km long and 30-45m deep bored tunnel of 3.3m internal diameter, including drop shaft, access shafts, work shafts and other underground wastewater structures. Ground material is generally of rock, soil and/or mixed-face conditions. Services Provided: Civil & Structural Consultancy Services Client: Ministry of Environment, Singapore Contractor: Zublin International Associates: Geoconsult Asia Singapore Construction Cost: S$92 Million Duration: 2000-2004 Year of Completion: 2004
  • 34.
    Ang Mo KioLink Sewer (Connect to DTSS T-04), Singapore Meinhardt is providing Civil and Structural engineering consultancy services directly to PUB for the Link Sewer Package F comprising of 7km length of link sewers of diameter ranging from 800mm to 1800mm. These sewers divert flows from 4 existing sewerage pumping stations into the DTSS T-04 at Drop shaft F. All sewers are constructed by pipe-jacking method. The scope of works include topographical surveys, soil and services investigations, engineering design of link sewers and ancillary structures such as manholes, vortex chamber and overflow structures as well as cost estimates; specification and tender preparation; calling and evaluation of tender, construction supervision and finalisation of maintenance manual. Client: PUB-Sewerage Department Contractor: Ho Lee Construction Pte Ltd Construction Cost: S$16.4 Million Duration: 2002-2005 Year of Completion: 2005 Services Provided: Civil & Structural Consultancy Services Kolam Ayer, Towner Link Sewer (Connect to DTSS T-03), Singapore Meinhardt is providing Civil and Structural engineering consultancy services directly to PUB for the Link Sewer Package D comprising of 5.8km length of link sewers of diameter ranging from 750mm to 3000mm. These sewers divert flows from the existing Cavenagh, Lorong Gelang and Towner Sewerage Pumping stations into the DTSS T-03 at Drop shaft D. All sewers are constructed by pipe-jacking method. The scope of works include topographical surveys, soil and services investigations, engineering design of link sewers and ancillary structures such as manholes, vortex chamber and overflow structures as well as cost estimates; specification and tender preparation; calling and evaluation of tender, construction supervision and finalisation of maintenance manual. Client: PUB-Sewerage Department Contractor: Neo Corporation Pte Ltd Construction Cost: S$32 Million Duration: 2002-2005 Year of Completion: 2005 Services Provided: Civil & Structural Consultancy Services
  • 35.
    NEWater Reservoir atSeletar, Singapore Meinhardt is appointed by Public Utilities Board (PUB) to undertake design for an underground reservoir at Seletar for NEWater Singapore. The project comprises 2 compartment boxes of burried concrete tank which have the capacity of holding 10,000m3 water with booster pumping station and approximately 5km pipelines connecting from the resevoir to wafer fab factories and Nanyang Polytechnic in Ang Mo Kio. Client: Public Utilities Board Singapore (NEWater Dept.) Construction Cost: S$4 Million Year of Completion: 2003 Services Provided: Civil, Structural, Mechanical and Electrical Engineering Chua Chu Kang Road Pumping Station, Singapore Meinhardt provided integrated engineering consultancy services directly to PUB for the design and construction supervision of Sewerage facilities for proposed development at Chua Chu Kang Road. The project comprises of 3.0km length of sewers of diameter ranging from 300mm to 1200mm and a new sewerage pumping station. These sewers sewer proposed development along Chua Chu Kang Road as well as Tengah Airbase and discharge all its flow into an sewer at Chua Chu Kang New Town. All sewers are constructed by pipe-jacking method. Client: PUB-Sewerage Department Year of Completion: S$3.9 Million Services Provided: Civil, Structural, Mechanical & Electrical Engineering Upgrading of Pulau Saigon Pumping Station, Singapore Meinhardt provided mechanical & electrical engineering consultancy services for the upgrading of Pulau Saigon Pumping Station. Services Provided: Mechanical & Electrical Engineering Client: PUB- Sewerage Department Construction Cost: S$2 Million Year of Completion: 2003
  • 36.
    Upgrading of ClementiPark, Wholesale Centre & Bah Soon Pah Pumping Installations , Singapore Meinhardt is providing mechanical & electrical engineering consultancy services for the upgrading of Clementi Park, Wholesale Centre and Bah Soon Pah Pumping Stations. The project includes upgrading the existing pump sumps at Clementi Park and Wholesale Centre to cater for the increase of flow capacity that projected for the next 20 years - mainly involving replacement of existing pumps with bigger capacity pumps. A new pumping main will be introduced at Wholesale Centre Pump Sump. Conversion of the existing Boh Soon Pah Solid Divertor into a pump sump that caters for the projected flow for the next 20 years. Client: PUB Year of Completion: 2004/5 Services Provided: Mechanical & Electrical Engineering Kim Chuan Sewerage Treatment Works, Singapore Meinhardt provided design works and periodic inspection for the erector of 3 egg-shaped digesters plant for existing Kim Chuan Sewerage Treatment Plant. Client: RSB-Rund-Stahl-Bau-Ges.m.b.H Construction Cost: S$34 Million (inclusive of building works and M&E works) Year of Completion: 2001 Services Provided: Civil & Structural Consultancy Services
  • 37.
    Kovan Estate -Roadside Drainage Upgrading Project, Singapore Meinhardt is providing Civil and Structural engineering consultancy services directly to PUB-Drainage Department for the upgrading of roadside drains for Kovan Estate. The scope of works include topographical surveys, soil and services investigations, engineering design of box drains, slab over existing main drains and ancillary structures such as manholes as well as cost estimates; specification and tender preparation; calling and evaluation of tender, construction supervision and contract administration. Client: PUB-Drainage Department Contractor: Feng Ming Construction Pte Ltd Construction Cost: S$7.154Million Duration: 2002-2004 Year of Completion: 2004 Services Provided: Civil & Structural Consultancy Services Western District Meat Packing Company - Organic Waste Management Strategy Melbourne, Australia The Project was a research project funded by the Meat Research Corporation. Together with a private waste management contractor, Meinhardt assisted in the establishment of strategies to compost solid and liquid waste streams. Successful results were achieved by adding bulking agents to the solid waste stream before composting. The liquid waste stream was filtered through a revolutionary new organic matter filter (this new filter is currently being patented by the waste management contractor), this way, only liquid reaches the sewer. The total strategy also included diversion of solid waste, such as sheep paunch, from the sewer for composting. Services provided by Meinhardt included:  Formulating Organic Waste Management Strategy  Analysis of the performance of the organic matter filter  Assessment of the composting operations including product quality in- place recycling Features of the project included the identification of simple, cost effective solutions to the management of a typical abattoir‟s solid and liquid waste stream and the identification of significant savings in local water authority Trade Waste charges.
  • 38.
    Midfield Meats -Cleaner Production & Waste Management Detailed Study - Warrnambool, Australia The Project involved the evaluation and refining of existing waste management and operational practices, so as to improve plant efficiencies and minimize environmental impacts of the operational processes. Financial savings were achieved through improved plant efficiencies. Services Provided by Meinhardt included:  Establishing a Waste/ Environmental detailed Diagnostic Report of current operations  Preparation of a detailed cleaner production study  Preparation of a comprehensive Waste/ Environmental Management Plan directing the sites future operations  Features of the project included a cost effective, environmentally sound solution to the management of Midfield Meats abattoir in relation to operational processes and waste minimization. Specific outcomes included:  Recommended paunch and Manure Solid Waste Treatment  Recommended changes to the proposed trade waste agreement  Identified waste improvement targets  Implementation Program  Monitoring Program
  • 39.
    Qantas Maintenance Base- Waste Management Strategy, Melbourne, Australia The Project involved an assessment of the airline‟s workshop waste stream, paying particular attention to the hazardous wastes and toxic nature of materials encountered on the site. The strategy was required to review operations due to new EPA/ City West Water (formerly MMBW) requirements and the restructuring by the airline of maintenance operations. The project also considered the options involved in the relocation of the Essendon site, concentrating operations at Tullamarine. Services provided by Meinhardt included:  Soil contamination surveys at both sites  Review of occupational hazard management issues, including rectification costs  Financial modelling of workshop relocation and upgrade options  Identification of liquid waste collection, treatment and disposal options  Waste stream minimisation through alternative operational and cleaning processes Features of the project incorporated the identification of simple, cost effective solutions/ options available to the airline in dealing with their waste stream. Particular consideration was given to the storage, handling and disposal of hazardous materials and the centralisation of maintenance operations. Client: Qantas Airways Ltd (Formerly Australian Airlines) Melbourne Waste Management Council - Organic Recycling Strategy, Australia Development of organic waste management strategy for population of 3.3 million.
  • 40.
    Melbourne City Council- Refuse Transfer Station, Australia Refuse handling review, value management study, detailed design and contract management for 120,000 tonnes/annum waste transfer station. Thu Duc BOT Water Supply, Ho Chi Minh City, Vietnam Meinhardt was employed by LVWC to act as Independent Checking Engineer (Owner Engineer) to provide the design review, construction management and commissioning & testing for the construction of GTM Dumez for USD 185 Million BOT Water Supply Project in Ho Chi Minh City. Client: Lyonnaise Des Eaux Year of Completion: 2003 Services: Construction Management
  • 41.
    Biosolids Composting Trial- South West Water Authority, Australia The Project involved the development of a turned windrow composting system to process biosolids. Research, development and demonstration approval RD29396 was issued by the EPA to Organic Recyclers Pty Ltd to compost sewage sludge from the Warrnambool Sewage Treatment Plant. RD&D approval was based on the EPAV Environment Guidelines for Composting and Other Organic Recycling Facilities. The compost trial was conducted over a period of 12 months. Services provided by Meinhardt included:  Preparation of RD&D application  Technical support in developing the processing facility.  Development of a methodology in conjunction with Organic Recyclers Pty Ltd and the South West Water Authority.  Preparation of a trial monitoring program in accordance with AS 4454- 1997.  Preparation of progress reports.  Analysis of chemical test results in accordance with ARMCANZ Biosoilds Guidelines, Australian Standards (AS 4454-1997), NSW EPA Draft Biosolids Guidelines for Grade A compost.  Recommendations with respect to the future management of biosolids based on trial results. Features of the project included demonstration that biosolids are capable of being treated through a properly managed and monitored windrow composting operation. Client: Organic Recyclers Pty Ltd Western Water, Australia The Project involved provision of specialised audit services for the internal audit carried out at Western Water. Issues addressed in the three-year program included water quality and quantity, dam safety, asset management, capital works and contract management. Services provided by Meinhardt included:  Assessment of water quality treatment programs against Australian standards.  Examination of dam safety protocol.  Monitoring progress against asset maintenance program.  Appraisal of demand management strategy.  Consideration of performance of reticulation system Features of the project included inspections of water treatment plants, dams and lagoons to ensure procedures conformed to Western Water‟s management systems. Areas for improvement in procedures and management systems were also identified. Client: Western Water
  • 42.
    Yarra Valley Water– Biosolids Reuse & Land Leasing Review, Australia The Project involved an assessment and comparative analysis of the submissions received for the leasing of land at the treatment plant for biosolids treatment. Services provided by Meinhardt included:  Development of a selection criteria in conjunction with Yarra Valley Water.  Identification of all regulatory approval requirements to be obtained by the selected proponent.  Preparation of an issues paper on key issues related to the lease of land.  An assessment and comparative analysis of the relevant experience, technical and operational capabilities demonstrated by proponents including site development, process infrastructure, effluent reuse, environmental management.  An assessment of the viability of commercial proposals including risk management and financial performance.  Recommendations to Yarra Valley Water on the preferred proponents. Features of the project included the development of an assessment criterion and scoring system to enable comparative analysis. Client: Yarra Valley Water Yarra Valley Water - Provision of professional advice at Yarra Valley Water, Australia The Project involved the provision of ongoing professional technical and project management services at Yarra Valley Water. Services provided by Meinhardt included: -  Inspection of waste water treatment plants  Assessment of current and future requirements of the Whittlesea Sewage Treatment Plant  Exploration of upgrade options  Preparation of tender specification documents Features of the project included functional design and preparation of a consultant‟s brief for the detailed design and project management services for the upgrade of Whittlesea Sewage Treatment Plant. Client: Yarra Valley Water
  • 43.
    Mekong Transport andFlood Protection, Vietnam Meinhardt in association with Halcrow, PCI conducted the construction supervision for road sections Can Tho to Nam Can and Dong Ha to Quang Ngai of National Highway No. 1 and the road network in Mekong delta area. Client: Government of Vietnam (funded by World Bank) Construction cost: USD 6,000,000 Year of Completion: 2004 Replacement and Rehabilitation of Water Mains Stage 2, Hong Kong The objective of this assignment is to progress the planned replacement and rehabilitation of 700km of Hong Kong's existing water distribution assets by preparing layout drawings, a study report, land requirements plans and completing the Preliminary Project Feasibility Study to enable the implementation of the works. This includes the following major tasks:-  Carry out desk studies and site visits to investigate the feasibility of the proposed water mains in terms of construction, geotechnical, traffic, services and utilities and environmental aspects  Prepare drawings for the works  Prepare the land requirement report and land requirement plans  Consult with relevant government departments, consultants and utility undertakings, identifying practical constraints, alternative alignments, and construction methodologies, and producing a scheme for the works  Carry out the preliminary environmental review and prepare project profile for approval by epd  Costing, cost-benefit analyses and annual expenditure forecast  Establish the recommended implementation strategy  Submit a programme of works for the works  Estimate the recurrent consequences to Government Client: Water Supplies Department Lead Consultant: Meinhardt Construction Cost: HK$3,000,000,000 Year of Completion: 2010
  • 44.
    Phoenix District CoolingPlants, Abu Dhabi, UAE Meinhardt is the Principal Consultant for the Design and Build Contractor, Samsung Corporation for the Phoenix District Coolong Plant 1 & 2 at Abu Dhabi, UAE. The plants are developed by the Client – Tabreed, National Central Cooling Co. (PJSC). The project comprises two district cooling plants providing chilled water supply to surrounding buildings. Upon final completion, Phoenix District Cooling Plant No. 1 and 2 will have a total cooling capacity of 15,000 and 7,500 refrigeration tonnes respectively. The two central cooling plants shall employ water cooled electric driven centrifugal chillers and associated auxiliary equipment like cooling towers and pumps for production and distribution of chilled water to various buildings via a network of underground piping system. Plant 1 and 2 will have 8x1875RT and 6x1250RT chiller respectively with a supply and return chilled water temperature of 4.4 On site power generation using natural gas engine driven generators will provide enough primary electrical supply to both plants for most time of the year except for peak periods whereby back-up supply will be drawn from the utility, ADDC. A chilled water thermal storage tank with capacity of 15,000 ton-hours will be installed for Plant No. 1 for load leveling purpose as well as reducing the capacity of the chiller plant. Emergency loads like black starts will be supported by 11kV HT power supply feeders from military base in the event of total power failure from ADDC and loss of natural gas supply. Contractor: Samsung Corporation Construction Cost: USD 35 million Year of Completion: 2004 Services Provided: Architectural, Civil, Structural, Mechanical and Electrical Engineering Consultancy Refurbishment of Naval Berths 5-14 Pakistan Naval Dockyard, Karachi, Pakistan Meinhardt is providing civil & structural engineering consultancy services for the Refurbishment of Naval Berths 5-14 at Pakistan Naval Dockyard, Karachi. The length of Berths 5-14 is 900 meters. The scope of services includes the investigation/study of the existing condition of berths, report on rehabilitation and refurbishment of these berths, detailed engineering design, preparation of tender drawings, specifications and Bill of Quantities.
  • 45.
    Oil Pier IIat Karachi Port, Pakistan Meinhardt is responsible for the civil, structural, mechanical and electrical engineering services of this new terminal with modern liquid cargo handling facilities, including fully balanced loading arms, adequate piping system & manifolds and automated/ manual gate valves. The new terminal will handle oil tankers upto 75,000 DWT and consist of tanker berthing facility comprising jetty head/ platform flanked by breasting and mooring dolphins on either sides.The berthing will be connected to the shore by a trestle to provide access to the berth. Necessary infrastructure viz. road, electrical, water connection and fire fighting facilities also constitute a part of the project Development of Balochistan Coast, Pakistan Meinhardt is providing general consultancy services to the Balochistan Coastal Development Authority (BCDA) for the development along the Balochistan coastline. The project comprises Survey, Design, Preparation of Tender and Contract Documents and Construction Supervision of the jetties and fish harbours along various population centers such as Jiwani, Ganz, Sur, Pishukan, Gwadar and Kalmat. The project also includes several other facilities such as Approach Channels, Breakwaters, Landing Quays and maintenance/ repair facilities to be provided with the harbours. Edible Oil Terminal & Jetty (Liquid Cargo Terminal), Port Qasim - Karachi, Pakistan Meinhardt were responsible for the provision of Engineering Design Services and preparing submission drawings for laying of edible oil & molasses pipelines from existing jetty to Edible Oil Terminal. The terminal consists of 29 nos. tanks of 54,000 M. Tons storage capacity with ancillary facilities. As the second phase of the project, Meinhardt also carried out the Technical Studies for the construction of an Edible Oil Jetty (Liquid Cargo Terminal) on BOT basis to link the above Edible Oil Terminal with the proposed jetty to be designed to handle ships upto 35,000 DWT.
  • 46.
    Breakwater in DungQuat Bay, Vietnam Meinhardt in association with Japan Port Consultants, Ltd. prepared preliminary design for tender services for the largest breakwater in Vietnam. This breakwater creates and protects the berths for 50.000DWT ships. The scope of work includes reviewing existing survey data of bathymetry, geo-technical, meteo-hydrological, ocean-graphic, conceptual design and establishing propagation and transmission analysis, design criteria, studying the alternative of breakwater alignment and proposed structure and finally proceeding with the preliminary detailed design of the breakwater with pre- cast Accropode system together with construction schedule. Construction cost: USD 80M Island West Transfer Station - Western Hong Kong Island, Hong Kong This project involved the excavation two caverns and access tunnels of 35,500m3, together with service and administration buildings at Mount Davis, Western for Swire BFI's new Waste Transfer Station serving Hong Kong Island. Meinhardt achieved very substantial savings for the operator by changing single cavern scheme to two smaller caverns, thereby reducing the fire compartmentation volumes and therefore the cost of the caverns and their fire prevention equipments. Innovative solutions to environmental difficulties with fire alarm detectors were also developed. Client: Swire BFI Waste Services Limited Architect: Ove Arup & Partners Construction Cost: HK$640,000,000 (Saving of HK$600M on the original design) M&E Cost: HK$80,000,000 Year of Completion: June 1997 Ma Wan Island – Infrastructural Facilities for Commercial/Residential Development & Village Housing, Hong Kong Meinhardt provided full mechanical and electrical consulting engineering services for the reprovision of 260 village houses (each with 3-storey); 4 fisherman blocks and associated community facilities to decant the site for the major residential and commercial development of Ma Wan Island being planned. Meinhardt also provided M&E services for the infrastructural facilities to support the development, including reservoir, sewage treatment plant, ferry piers, refuse collection, water supplies, LP gas storage and distribution, Tsing Ma Bridge connection roads – Toll Plaza and Administration Building, Police Station, Fire Station etc. Client: Sun Hung Kai Real Estate Agency Ltd Architect: Simon Kwan & Associates Ltd Year of Completion: Phase 1 – 1994, Phase 2 – July 2002 Infrastructure Facilities – In Phases commencing 2001 M&E Cost: HK$90,000,000
  • 47.
    Roads, Highways &Bridges Ayer Rajah Expressway Phase IIA & IIB, Singapore The Phase IIA featured Expressway and 2 separate 4-lane flyovers with access ramps forming the interchange (curved on plan with skewed The Phase IIB featured 7 span bridge with 2 independent carriageways providing 3 lanes in each direction. Services Provided by the Meinhardt Group included alignment design, civil engineering pavement, drainage and bulk earthworks design and total structural bridge engineering. Client: Public Work Department (PWD) Ayer Rajah Expressway Phase IIC & IID, Singapore The Projects incorporated the turnkey design of a 280m long dual 3 lane carriageway flyover (Stage IID) and a 5 span dual 3 lane carriageway interchange structure. Services Provided by the Meinhardt Group included alignment design, civil engineering pavement, drainage and bulk earthworks design and total structural bridge engineering. Features of the projects included two 45m spans, four 30m spans and a central span of 70m for Phase IID. The central span of the Phase IID structure was designed to have 17m insitu cantilevers from either side with a 41m drop-in span to enable uninterrupted traffic access across the existing road during construction. The Phase IIC carriageway featured 5 varying length spans between 30m and 40m together with ingress and egress slip roads to and from the expressway. Client: Public Work Department (PWD) Jalan Ahmad Ibrahim / Corporation Road Interchange, Singapore Meinhardt were responsible for the planning, alignment, detail design, design documentation & supervision of this project comprising an expressway and 13-span flyover with a main span of 46m and other spans ranging from 33.5m to 40.5m. Construction Cost: S$28 million Year of Completion: 1987
  • 48.
    Ulu Pandan Bridge,Singapore Meinhardt were the consultants to the turnkey contractor for the investigation, strengthening and change in articulation by making the bridge continuous to eliminate replacement of bearings for piers over the river. Year of Completion: 1988 Oxley Rise, Singapore Meinhardt were the design & build contractor for CTE-II project and carried out the detail design, design documentation and construction phase supervision for this project comprising a 7-span 3-lane flyover forming a part of Central Expressway Project. Construction Cost: S$320 million Year of Completion: 1990 Clemeceau Bridge, Singapore Meinhardt were the design & build contractor for CTE-II project and carried out the detail design and documentation for this project comprising a 3 span/8 lane bridge and an underpass forming a part of Central Expressway Project. Construction Cost: S$320 million Year of Completion: 1990
  • 49.
    Tampines Expressway Avenue7 & 12, Singapore Meinhardt were the turnkey contractor’s consultants for this expressway and interchange. Construction Cost: S$50 million Year of Completion: 1986 Geelong Road Project – Design and Construction Maltby Section, Australia The Project involved the tender design of roadworks and bridgeworks for the widening and rehabilitation of the Maltby Section Design and onstruct contract spanning 8.56 KM along the Princes Freeway West. Services provided by the Meinhardt group included :  Detailed drainage design  Alignment and rehabilitation widening designs  Preliminary bridge structural designs  Environmental Management Plan Features of the project included the construction of pavement widening and rehabilitation of the existing pavement, stormwater and sub-surface drainage design including the hydraulic and structural design of 2 sedimentation basins at Werribee river, widening of bridge structures over Werribee River (90m 3 span), D1 drain and the main outfall sewer, and the connection to the Federation Trail bike path. Client: Transfield Contract: VicRoads
  • 50.
    Geelong Road ProjectDesign and Construct – Lara to Corio Interchange, Australia The Project involved the detailed design of roadworks and bridgeworks for the widening of Princes Freeway East between the Lara Interchange and the Corio Interchange north of Geelong, whilst allowing for the possible future widening between the Melbourne Bound Entry Ramp Overpass Bridge and the future development bridge. Services provided by the Meinhardt Group included:  Stormwater and sub-surface drainage design  Catchment & Environment Management Plan  Design of bridge barriers off structure barriers and foundations  Geometric road design  Bridge design checked by and submitted under Cardno MBK  Quantities Features of the project included the detailed design of the Geelong Ring Road, Geelong Exit Ramp, Shell Exit and Entry ramps, Brodrick Road, Rennie Road re-construction, Forrest Road realignment plus the 5.4 km (3 lane) dual carriageway widening between the Lara Interchange and the Corio Interchange. Client: Transfield Contract: VicRoads Stirling Highway - Southern Extension, Australia The Project involved the detailed design of a dual carriageway construction linking Stirling Bridge to Leach Highway via High Street as part of the eastern bypass road system for the port city of Fremantle. Services Provided by Airey Ryan and Hill who are a Joint Venture partner of Meinhardt Airey & Partners Pty Ltd (having a major interest shareholding by Meinhardt Australia Pty Ltd) included:  Bridge Site Investigation  Traffic Bridge Detailed Design  Detailed Highway Design  Landscaping Documentation  Environmental Assessments  Services Relocations Features of the project included design and documentation of dual carriageway, reconstruction of existing cross roads and new highway intersection designs, traffic bridge over a local street and pedestrian underpass. Client: Main Roads Department of Western Australia
  • 51.
    Aquatic Drive Redevelopment,Australia The project included the conceptual and detailed design of streetscape works, car parking, landscaped areas and pump stations. The works also included the relocation and planing of mature palm trees. Services provided by Meinhardt included: • Bulk Earthworks • Relocation of former contaminated landfill material to EPA requirements • Detailed design and documentation of pump station, car parks, streetscape works, earth mounds and stormwater drainage • Relocation of Palm Trees • Road reserve to act as a retarding basin in a 1 in 100 year storm event • Public and user group consultation • Site supervision of construction works • Project Management Features of the project included works around the 19th Century landfill. Pump station design to control outlet discharge into the lake. Relocation of mature existing Palm Trees into new locations in road reserve using specialised techniques. Car parking to provide for local user groups (ie. Yacht Clubs, public sporting stadium users) needs and requirements. Client:Parks Victoria (Formerly Melbourne Parks & Waterways) Landscaping Advice: Parks Victoria CityLink Project, Melbourne, Australia The $1.8 Billion City Link Project consists of approximately 22km of freeway cutting through the heart of Melbourne. The project joins three of Melbourne’s largest arterial freeways consisting of two tunnels and numerous bridges and many kilometers of elevated freeway. Services provided by Meinhardt included: • Environmental Auditing of construction sites. • Preparation and review of site Environmental Action Plans (EAP) and Environmental Management Plans (EMP). • Monitoring of noise generating procedures. • Monitoring of wastewater disposal from site including groundwater and stormwater runoff. • Establishment and implementation of environmental work practices and procedures. • Management advice of Prescribed and Low Level Contaminated Soils including Acid Sulphate Coode Island Silt. • Monitoring of environmentally sensitive issues on site and the coordination of approvals from authorities Features of the Project The City Link Project remained in the public spotlight throughout all stages from design to construction to commissioning. As a result Meinhardt assisted the lead contractor in providing a state of the art environmental management system throughout the projects construction. Client: Transfield Obayashi Joint Venture
  • 52.
    Kwinana Freeway SouthernExtension, Australia The Project involved the planning and detailed design of 12km of ultimate Kwinana Freeway. Preliminary design required for the 12km of ultimate Kwinana Freeway development comprised five diamond interchanges. The design and construction documents for the first stage comprises the following: a four lane divided highway from Forrest Road to Thomas Road, including four channelised four way intersections and a channelised three way intersection (convertible to a four way when the free way is extended) at Thomas Road. Services Provided by Airey Ryan and Hill who are a Joint Venture partner of Meinhardt Airey & Partners Pty Ltd (having a major interest shareholding by Meinhardt Australia Pty Ltd) included: • Preliminary design of ultimate freeway development • Detailed design of Stage 1 road and intersection works • Environmental management plan • Public environmental review documentation • Service road detailed design • 1.9 service road • Landscaping and street lighting • Dual use of paths and noise attenuation Client: Main Roads Department of Western Australia Moorabool, Yarra, & Brougham St Redevelopment, Waterfront Geelong, Australia Redevelopment of streetscape works and road pavements for the City of Greater Geelong. The project included the detailed design and documentation of streetscape works, carparking, utilities, traffic signal relocation, and pedestrian and vehicle pavement designs. Design services provided by Meinhardt include: • Road pavement Road pavement • Articulated vehicle movement requirements • Stormwater • Utility provisions • Pedestrian footpath • Kerb and channel • Parking requirements • Liaison with authorities • Traffic light relocation Features of the project include intersection contouring design, existing utility retention and detailing of non-standard streetscapes. Client: Steampacket Place Project Directorate Landscape Architect: Taylor & Cullity
  • 53.
    Reid Highway &Tonkin Highway, Australia The Project, involved the preliminary design of 8km of 6 lane ultimate freeway development for both Reid and Tonkin Highways and detailed design of Stage 1 development of the two highways with uncurbed four lane divided highways following in part ultimate freeway carriageway and ramp alignments. Services Provided by Airey Ryan and Hill who are a Joint Venture partner of Meinhardt Airey & Partners Pty Ltd (having a major interest shareholding by Meinhardt Australia Pty Ltd) included: • Ultimate concept freeway development • Design, document & preparation of specification of Stage 1 development • Highway street lighting and landscaping • Environment management plan Features of the project included preliminary design of a major directional freeway to freeway interchange, four diamond interchanges and two overpasses, and detailed design of channelised three way junction between the two highways and canalised four way intersections at major cross roads. Client: Main Roads Department of Western Australia Warburton Highway, Australia The Project incorporated the evaluation, masterplanning and detailed design of a five road intersection with Warburton Highway and minor creek diversion for Scotchman’s Creek. Services Provided by the Meinhardt Group included • Traffic impact assessment • Hydraulic analysis and culvert/ creek realignment design • Pavement, drainage and bulk earthworks design • Construction phase services Features of the project included intersection alignment design constrained by railway bridge structure, environmental controls of Scotchman’s Creek realignment and continuous access for 5 sub-collector roads and property entrances. Modifications to Warburton Highway provided slip lane access to the intersection. Client: Shire of Upper Yarra
  • 54.
    Waterfront Geelong, CunninghamStreet, Australia The project involves the design and construction of road pavements, kerbing, and street furniture between Deakin University and commercial shopping from Brougham St to Western Beach Road. Delta Pty Ltd was awarded the design and contract nominating Meinhardt (Vic) Pty Ltd as design engineers. Design services provided by Meinhardt include:  Road pavement  Articulated vehicle movement requirements  Stormwater  Floodway provision  Pedestrian footpath  Kerb and channel  Parking requirements  Liaison with authorities Features of the project include provision for a CBD floodway path down Cunningham street, design of articulated vehicle movements from Deakin University and detailing of non-standard streetscapes. Client: Steampacket Place Project Directorate Contractor: Delta Pty Ltd Landscape Architect: Taylor & Cullity West Coast Highway Extension, Australia The Project: The Meinhardt Group was commissioned to design and document a new 2.5km highway linking Servetus Street with the existing West Coast Highway. Services Provided by Airey Ryan and Hill who are a Joint Venture partner of Meinhardt Airey & Partners Pty Ltd (having a major interest shareholding by Meinhardt Australia Pty Ltd) included: • Detailed Design & Documentation • Fast Track Design • Public Consultation Features of the project included the single carriageway highway link designed for future amplification to dual carriageway. The road works passed adjacent to a Golf Course and Army Rifle range. Negotiations by the consultant on behalf of Main Roads were required with these two land holders, as significant earth works were required that affected their properties. Client: Main Roads Department of Western Australia
  • 55.
    Bintan Highways, BintanBeach International Resort, Indonesia Meinhardt is the Infrastructure Consultant for the 23,000 Ha Bintan Beach International Resort. The infrastructure includes earthworks, transportation, roads, water supply (potable & non-potable), sewerage, stormwater, power and telecommunications. The Bintan Highways project comprises 80 km of 4 laned expressway and bridges. Meinhardt provided civil & structural design, detailed survey, geotechnical and hydrological investigations and careful monitoring of works for the project. The main 125m length bridge consisted of RC prestressed members. Several sections of the highway passed through swampy ground requiring soil replacement or geofabric to be laid to ensure adequate foundations. Client: Bintan Resort Management Pte Ltd Construction Cost: S$20 Million Year of Completion: 1994 Third National Highways, India (Construction Packages III-A & III-C) National Highway No.2 (Delhi-Calcutta) corridor forms part of the Golden Quadrilateral, connecting 4 metropolitan cities of India namely Delhi, Mumbai, Chennai and Calcutta. It is proposed to widen and strengthen this corridor to a four/six lane facility out of World Bank Assistance under the Third World Bank National Highways Project. Meinhardt (Singapore) has been appointed by National Highways Authority of India through World Bank competitive bid system to undertake the construction supervision and design review for the four laning and strengthening of the existing two lane sections from km. 115 to km. 158 and from km. 245 to km. 317 on NH-2 (Construction Packages III-A & III- C). The civil works proposed involve large- scale construction of cement concrete roads. Besides this, bituminous pavement construction involving use of geo-textiles and polymer-modified bitumen are also proposed in considerable stretches. The proposed construction technology involves use of latest machinery and equipment. As the project is substantially large, a comprehensive project management system incorporating Critical Path Methods and PERT systems, computerised cost control and budgeting, and technical QA and QC monitoring system has been implemented for the project. Client: National Highways Authority of India Construction Cost: US$100 Million Year of Completion: 2004 Services Provided: Civil & Structural Consultancy Services
  • 56.
    Contract Package NoC-II A/6 0- Feasibility Study & Detailed Project, India The project is part of North-South Corridor of National Highways Development Program (NHDP). There are 4 major bridges, 15 minor bridges, 1 rail over bridge and cross drainage structures. The bridge across river Krishna is 688.8m long and bridge across river Thungabhadra is 624m long. Client: National Highways Authority Of India Construction Cost: US$ 66 Million Services Provided: Civil & Structural Engineering NHDP-II Kottakata to Kurnool Section of N-7 from Km 133 to Km 211, Andhra Pradesh, Contract Package No C-II A/6 The project stretch is part of North-South corridor of National Highways Development Program (NHDP) and starts at Km. 133 near the village Kottakatta and ends at km 211 on kurnool bypass near kurnool town. The streach passes through rolling terrain with major outcrops at manny places with large masses of granite rocks and boulders. There are 4 major bridges,15 minor bridges, 1 rail over bridge and number of other cross drainage structures. The bridge across river Krishna is 688.8m long and bridge across river Thungabhadra at km 203 is 624m long. The project Highway and associated bridge and cross drainage structures under NHDP program has to be designed as Partially access controled facility with dual 2 lane/ 3 lane divided configuration with service roads in inhabited areas, cattle/pedestrian crossings as required, way side amenities and facilities for collection of toll. Client: National Highways Authority Of India Construction Cost: US$ 68 Million Services Provided: Civil & Structural Engineering Makran Coastal Road Meinhardt (Singapore) Pte Ltd was part of a three-firm consortium responsible for the Detailed Engineering of 232 km of the 700 km long Makran Coastal Road. The road is a vital link connecting Karachi with the coastal towns of Ormara, Pasni, Gwadar and Naval Base at Ormara. An extensive alignment study was conducted to determine the optimum alignment. The terrain along the alignment varies from coastal plains to mountains. Other activities being undertaken include topographic, geotechnical and material surveys, geometric and pavement design and structural design of bridges along the route.
  • 57.
    Karachi Northern Bypass,Pakistan Meinhardt (Singapore) Pte Ltd was responsible for the preparation of a technical feasibility study for the Karachi Northern Bypass which is to be implemented on a BOT basis. The Bypass when completed will provide direct and congestion free access between the Superhighway at a point some 30 km outside Karachi and the Port of Karachi. Proposed interchanges enroute at the intersection of the RCD Highway, Orangi Town and North Karachi provides further direct access to the Hub Industrial Estate and large population centres. The technical feasibility study included route selection, geometric and pavement design, grade separated intersections, underpasses and culverts and soil and material investigation. In addition, Meinhardt was also undertook to conduct several origin- destination surveys and traffic counts to better understand existing travel patterns and to assist in providing better estimates of traffic assignment on the Bypass, an environmental impact assessment study and a hydrological study to better define drainage structures along the Bypass. Client: National Highway Authority of Pakistan Associated Consultant: Promet Engineering Pte Ltd Year of Completion: 1995 HCMC – Bien Hoa – Vung Tau Expressway, Vietnam Meinhardt in association with Nippon Engineering Consultants Co. reviewed the final feasibility study. Work includes amending detailed design, new proposed road in connection with the National Highway No.1A, construction and construction supervision to make the project financially feasible. Client: Daewoo Corporation Year of Completion: 2006
  • 58.
    Inner Ring Road,Kuala Lumpur, Malaysia Meinhardt provided full civil and structural consulting engineering services for this 60km high-standard rural road in flat and rolling terrain with 800m of bridges.
  • 59.
    Environmental Projects Deep Tunnel Sewerage System - Contract T-04 (Ang Mo Kio Tunnel) Singapore Meinhardt provided Civil & Structural Engineering Services for Deep Tunnel Sewerage System Contract T-04 (Ang Mo Kio Tunnel) which comprises a 7.2km long and 30-40m deep bored tunnel of 4.3m internal diameter, including drop shafts, access shafts, work shafts, odour control facilities, 800m long lateral connector and other underground wastewater structures. Ground material is generally of old alluvium. Services Provided: Civil & Structural Consultancy Services Client: Ministry of Environment, Singapore Contractors: Samsung Corporation Associates: Halcrow Group Limited Project Cost: S$74 Million Duration: 2000-2005
  • 60.
    Deep Tunnel SewerageSystem - Contract T-06 (Queensway Tunnel) Singapore Meinhardt provided Civil & Structural Engineering Services for Deep Tunnel Sewerage System Contract T-06 (Queensway Tunnel) which comprises a 9.7km long and 30-45m deep bored tunnel of 3.3m internal diameter, including drop shaft, access shafts, work shafts and other underground wastewater structures. Ground material is generally of rock, soil and/or mixed-face conditions. Services Provided: Civil & Structural Consultancy Services Client: Ministry of Environment, Singapore Contractor: Zublin International Associates: Geoconsult Asia Singapore Project Cost: S$92 Million Duration: 2000-2005 Deep Tunnel Sewerage System Ang Mo Kio Link Sewer (Connect to DTSS T-04), Singapore Meinhardt is providing Civil and Structural engineering consultancy services directly to PUB for the Link Sewer Package F comprising of 7km length of link sewers of diameter ranging from 800mm to 1800mm. These sewers divert flows from 4 existing sewerage pumping stations into the DTSS T-04 at Drop shaft F. All sewers are constructed by pipe- jacking method. The scope of works include topographical surveys, soil and services investigations, engineering design of link sewers and ancillary structures such as manholes, vortex chamber and overflow structures as well as cost estimates; specification and tender preparation; calling and evaluation of tender, construction supervision and finalisation of maintenance manual. Services Provided: Civil & Structural Consultancy Services Client: PUB-Sewerage Department Contractor: Ho Lee Construction Pte Ltd Project Cost: S$16.4 Million Duration: 2002-2006
  • 61.
    Deep Tunnel SewerageSystem Kolam Ayer, Towner Link Sewer (Connect to DTSS T-03), Singapore Meinhardt is providing Civil and Structural engineering consultancy services directly to PUB for the Link Sewer Package D comprising of 5.8km length of link sewers of diameter ranging from 750mm to 3000mm. These sewers divert flows from the existing Cavenagh, Lorong Gelang and Towner Sewerage Pumping stations into the DTSS T-03 at Drop shaft D. All sewers are constructed by pipe-jacking method. The scope of works include topographical surveys, soil and services investigations, engineering design of link sewers and ancillary structures such as manholes, vortex chamber and overflow structures as well as cost estimates; specification and tender preparation; calling and evaluation of tender, construction supervision and finalisation of maintenance manual. Services Provided: Civil & Structural Consultancy Services Client: PUB-Sewerage Department Contractor: Neo Corporation Pte Ltd Project Cost: S$32 Million Duration: 2002-2006 Chua Chu Kang Road Pumping Station, Singapore Meinhardt provided integrated engineering consultancy services directly to PUB for the design and construction supervision of Sewerage facilities for proposed development at Chua Chu Kang Road. The project comprises of 3.0km length of sewers of diameter ranging from 300mm to 1200mm and a new sewerage pumping station. These sewers sewer proposed development along Chua Chu Kang Road as well as Tengah Airbase and discharge all its flow into an sewer at Chua Chu Kang New Town. All sewers are constructed by pipe-jacking method. The scope of works include topographical surveys, soil and services investigations, engineering design of link sewers and ancillary structures such as manholes, vortex chamber and overflow structures as well as cost estimates; specification and tender preparation; calling and evaluation of tender, construction supervision and finalisation of maintenance manual. Client: PUB-Sewerage Department Year of Completion: S$3.9 Million Duration: 2002-2003 Year of Completion: 2003 Services Provided: Civil, Structural, Mechanical & Electrical Engineering
  • 62.
    Upgrading of PulauSaigon Pumping Station, Singapore Meinhardt provided mechanical & electrical engineering consultancy services for the upgrading of Pulau Saigon Pumping Station. Services Provided: Mechanical & Electrical Engineering Client: PUB- Sewerage Department Construction Cost: S$2 Million Year of Completion: 2003 Kim Chuan Sewerage Treatment Works, Singapore Meinhardt provided design works and periodic inspection for the erector of 3 egg-shaped digesters plant for existing Kim Chuan Sewerage Treatment Plant. Client: RSB-Rund-Stahl-Bau-Ges.m.b.H Construction Cost: S$34 Million (inclusive of building works and M&E works) Year of Completion: 2001 Services Provided: Civil & Structural Consultancy Services
  • 63.
    Western District MeatPacking Company - Organic Waste Management Strategy Melbourne, Australia The Project was a research project funded by the Meat Research Corporation. Together with a private waste management contractor, Meinhardt assisted in the establishment of strategies to compost solid and liquid waste streams. Successful results were achieved by adding bulking agents to the solid waste stream before composting. The liquid waste stream was filtered through a revolutionary new organic matter filter (this new filter is currently being patented by the waste management contractor), this way, only liquid reaches the sewer. The total strategy also included diversion of solid waste, such as sheep paunch, from the sewer for composting. Services provided by Meinhardt included:  Formulating Organic Waste Management Strategy  Analysis of the performance of the organic matter filter  Assessment of the composting operations including product quality in-place recycling Features of the project included the identification of simple, cost effective solutions to the management of a typical abattoir’s solid and liquid waste stream and the identification of significant savings in local water authority Trade Waste charges.
  • 64.
    Midfield Meats -Cleaner Production & Waste Management Detailed Study - Warrnambool, Australia The Project involved the evaluation and refining of existing waste management and operational practices, so as to improve plant efficiencies and minimise environmental impacts of the operational processes. Financial savings were achieved through improved plant efficiencies. Services Provided by Meinhardt included:  Establishing a Waste/ Environmental detailed Diagnostic Report of current operations  Preparation of a detailed cleaner production study  Preparation of a comprehensive Waste/ Environmental Management Plan directing the sites future operations  Features of the project included a cost effective, environmentally sound solution to the management of Midfield Meats abattoir in relation to operational processes and waste minimisation. Specific outcomes included:  Recommended paunch and Manure Solid Waste Treatment  Recommended changes to the proposed trade waste agreement  Identified waste improvement targets  Implementation Program  Monitoring Program
  • 65.
    Qantas Maintenance Base- Waste Management Strategy, Melbourne, Australia The Project involved an assessment of the airline’s workshop waste stream, paying particular attention to the hazardous wastes and toxic nature of materials encountered on the site. The strategy was required to review operations due to new EPA/ City West Water (formerly MMBW) requirements and the restructuring by the airline of maintenance operations. The project also considered the options involved in the relocation of the Essendon site, concentrating operations at Tullamarine. Services provided by Meinhardt included:  Soil contamination surveys at both sites  Review of occupational hazard management issues, including rectification costs  Financial modelling of workshop relocation and upgrade options  Identification of liquid waste collection, treatment and disposal options  Waste stream minimisation through alternative operational and cleaning processes Features of the project incorporated the identification of simple, cost effective solutions/ options available to the airline in dealing with their waste stream. Particular consideration was given to the storage, handling and disposal of hazardous materials and the centralisation of maintenance operations. Client: Qantas Airways Ltd (Formerly Australian Airlines) Melbourne Waste Management Council - Organic Recycling Strategy, Australia Development of organic waste management strategy for population of 3.3 million.
  • 66.
    Melbourne City Council- Refuse Transfer Station, Australia Refuse handling review, value management study, detailed design and contract management for 120,000 tonnes/annum waste transfer station. Biosolids Composting Trial - South West Water Authority, Australia The Project involved the development of a turned windrow composting system to process biosolids. Research, development and demonstration approval RD29396 was issued by the EPA to Organic Recyclers Pty Ltd to compost sewage sludge from the Warrnambool Sewage Treatment Plant. RD&D approval was based on the EPAV Environment Guidelines for Composting and Other Organic Recycling Facilities. The compost trial was conducted over a period of 12 months. Services provided by Meinhardt included:  Preparation of RD&D application  Technical support in developing the processing facility.  Development of a methodology in conjunction with Organic Recyclers Pty Ltd and the South West Water Authority.  Preparation of a trial monitoring program in accordance with AS 4454-1997.  Preparation of progress reports.  Analysis of chemical test results in accordance with ARMCANZ Biosoilds Guidelines, Australian Standards (AS 4454-1997), NSW EPA Draft Biosolids Guidelines for Grade A compost.  Recommendations with respect to the future management of biosolids based on trial results. Features of the project included demonstration that biosolids are capable of being treated through a properly managed and monitored windrow composting operation. Client: Organic Recyclers Pty Ltd
  • 67.
    Western Water, Australia TheProject involved provision of specialised audit services for the internal audit carried out at Western Water. Issues addressed in the three-year program included water quality and quantity, dam safety, asset management, capital works and contract management. Services provided by Meinhardt included:  Assessment of water quality treatment programs against Australian standards.  Examination of dam safety protocol.  Monitoring progress against asset maintenance program.  Appraisal of demand management strategy.  Consideration of performance of reticulation system Features of the project included inspections of water treatment plants, dams and lagoons to ensure procedures conformed to Western Water’s management systems. Areas for improvement in procedures and management systems were also identified. Client: Western Water
  • 68.
    Yarra Valley Water– Biosolids Reuse & Land Leasing Review, Australia The Project involved an assessment and comparative analysis of the submissions received for the leasing of land at the treatment plant for biosolids treatment. Services provided by Meinhardt included:  Development of a selection criteria in conjunction with Yarra Valley Water.  Identification of all regulatory approval requirements to be obtained by the selected proponent.  Preparation of an issues paper on key issues related to the lease of land.  An assessment and comparative analysis of the relevant experience, technical and operational capabilities demonstrated by proponents including site development, process infrastructure, effluent reuse, environmental management.  An assessment of the viability of commercial proposals including risk management and financial performance.  Recommendations to Yarra Valley Water on the preferred proponents. Features of the project included the development of an assessment criterion and scoring system to enable comparative analysis. Client: Yarra Valley Water
  • 69.
    Yarra Valley Water- Provision of professional advice at Yarra Valley Water, Australia The Project involved the provision of ongoing professional technical and project management services at Yarra Valley Water. Services provided by Meinhardt included: -  Inspection of waste water treatment plants  Assessment of current and future requirements of the Whittlesea Sewage Treatment Plant  Exploration of upgrade options  Preparation of tender specification documents Features of the project included functional design and preparation of a consultant’s brief for the detailed design and project management services for the upgrade of Whittlesea Sewage Treatment Plant. Client: Yarra Valley Water
  • 70.
    Mekong Transport andFlood Protection, Vietnam Meinhardt in association with Halcrow, PCI conducted the construction supervision for road sections Can Tho to Nam Can and Dong Ha to Quang Ngai of National Highway No. 1 and the road network in Mekong delta area. Client: Government of Vietnam (funded by World Bank) Construction cost: USD 6,000,000 Year of Completion: 2004 Thu Duc BOT Water Supply, Ho Chi Minh City, Vietnam Meinhardt was employed by LVWC to act as Independent Checking Engineer (Owner Engineer) to provide the design review, construction management and commissioning & testing for the construction of GTM Dumez for USD 185 Million BOT Water Supply Project in Ho Chi Minh City. Services: Construction Management Year of Completion: 2003 Client: Lyonnaise Des Eaux
  • 71.
    Replacement and Rehabilitationof Water Mains Stage 2, Hong Kong The objective of this assignment is to progress the planned replacement and rehabilitation of 700km of Hong Kong's existing water distribution assets by preparing layout drawings, a study report, land requirements plans and completing the Preliminary Project Feasibility Study to enable the implementation of the works. This includes the following major tasks:-  Carry out desk studies and site visits to investigate the feasibility of the proposed water mains in terms of construction, geotechnical, traffic, services and utilities and environmental aspects  Prepare drawings for the works  Prepare the land requirement report and land requirement plans  Consult with relevant government departments, consultants and utility undertakings, identifying practical constraints, alternative alignments, and construction methodologies, and producing a scheme for the works  Carry out the preliminary environmental review and prepare project profile for approval by epd  Costing, cost-benefit analyses and annual expenditure forecast  Establish the recommended implementation strategy  Submit a programme of works for the works  Estimate the recurrent consequences to Government Construction Cost: HK$3,000,000,000 Year of Completion: 2010 Client: Water Supplies Department Lead Consultant: Meinhardt Island West Transfer Station - Western Hong Kong Island, Hong Kong This project involved the excavation two caverns and access tunnels of 35,500m3, together with service and administration buildings at Mount Davis, Western for Swire BFI's new Waste Transfer Station serving Hong Kong Island. Meinhardt achieved very substantial savings for the operator by changing single cavern scheme to two smaller caverns, thereby reducing the fire compartmentation volumes and therefore the cost of the caverns and their fire prevention equipments. Innovative solutions to environmental difficulties with fire alarm detectors were also developed. Construction Cost: HK$640,000,000 (Saving of HK$600M on the original design) M&E Cost: HK$80,000,000 Year of Completion: June 1997 Client: Swire BFI Waste Services Limited Architect: Ove Arup & Partners
  • 73.
    4 INFRASTRUCTURE CURRENT AND ONGOING PROJECTS
  • 74.
    Current Projects Project Name Project Description Client Services Cost Category Country Provided Manama Lagoon Manama Lagoons is a mixed-use, Retaj Masterplanning, TBA Infrastructure Bahrain Development integrated resort development Infrastructure, incorporating two 5 star hotels, Civil & Structural, residential apartments and villas, Architectural and a modern retail souk, and a variety M&E Consultancy of entertainment and lifestyle Services facilities plus parking. Bombay Dyeing Spring Bombay Master Planning, TBA Masterplanning/ India Mills Site Dyeing Infrastructure Infrastructure Design and Building Design Appointment of Meinhardt is providing Land Independent TBA Infrastructure / Singapore Independent & Accredited Independent and Accredited Transport & Accredited Railway Checker for Contracts Checker services for Contracts Authority Checker 1660 and 1661, Singapore 1660 and 1661 Tuas West Extension. The project comprises 3 stations and an interchange station with Tuas South Extension and a depot. It also includes a 7.5km long elevated rail line. LTA Contract 9181C - LTA Contract 9181C - Proposed Land M&E Engineering Infrastructure Singapore Proposed Downtown Downtown Line Stage 3 (DTL 3) Transpot Line Stage 3 (DTL 3) Rapid Transit System of Singapore Authority Rapid Transit System of (Package C) Singapore (Package C), Singapore QP Services for Contract Qualified Person (Supervision) Land C&S Engineering SGD 410 Infrastructure Singapore 911 for Land Transport Services for Contract 911 Design Transport million Authority, Singapore and Construction of Depot for Authority Downtown Line. Contract 917 Design and Contract 917 Design and Alpine Bau Project S$320m Infrastructure / Singapore Construction of Stations Construction of Stations and GmbH Management, Railway and Tunnels at Sixth Tunnels at Sixth Avenue and Civil & Structural, Avenue and Blackmore for Blackmore for Downtown Line Architectural and Downtown Line Stage 2 Stage 2 M&E Consultancy Services Contract 918 Design and Contract 918 Design and Alpine Bau Project S$350m Infrastructure / Singapore Construction of Station at Construction of Station at Duchess GmbH Management, Railway Duchess and Tunnels for and Tunnels for Downtown Line Civil & Structural, Downtown Line Stage 2 Stage 2 Architectural and M&E Consultancy Services Phase 1 Jurong Rock Contract No: JTC C01502009 Jurong Accredited SGD 700 Infrastructure Singapore Cavern at Banyan Basin, Provision of Accredited Checking Consultants Checking million Jurong Island, Singapore Organisation Services for Pte Ltd Design and Construction of the Underground Caverns, Associated Underground / Aboveground Facilities and Jetty of Phase 1 Jurong Rock Cavern at Banyan Basin, Jurong Island, Singapore
  • 75.
    Project Name Project Description Client Services Cost Category Country Provided Bandar Seri Begawan The plan includes upgrading HOK Civil, Infrastructure Brunei (BSB) Development BSB into a more dynamic, vibrant International Infrastructure Masterplanning Masterplan, Brunei and unique 21st century capital & Environment Darussalam city with efficient communication Engineering and transportation systems and devising a landscape to make BSB as a progressive, competitive and sustainable commercial and financial centre (with special emphasis on Islamic Finance). Al Wakra and Al Wakrah The project comprises two Surbana C&S and MEP Not Infrastructure Qatar Cities Masterplan, Qatar separate developments, the International Engineering Available Masterplanning masterplan for Al Khor (35 ha) Consultants and the masterplan for Al Wakrah Pte Ltd (450ha), both of which involve a multi phase development plan between 2009 and 2032.
  • 77.
    Other Current Projects Name of Project Project Description Project Type Project Name of the Contract Start Expected Location Client Value Date Completion Date Najibi Village, Saar, Residential Bahrain Najibi - 2009 2011 Bahrain Investment Company Manama Reef Marina Reef development consists of Residential Bahrain Crown Dilmun 12 Million 2008 2011 Residential 3 No. 7 storey high spec apartment Properties BD Development towers with a shared basement located on Reef Island in the middle of Bahrain. Approx GFA 25 000 sqm Reef Island Situated at a prominent, landmark Mixed Use Bahrain Capital - 2008 2011 Commercial Center location on the Reef Island, the Development Management proposed mixed-use development House consists of a 2-storey retail / F&B podium connecting with the healthcare, spa, entertainment component and a pair of 12-storeys office towers. The iconic twin towers flank the entrance gateway into the development and reinforce the visual axis in the overall masterplan. The Retail is envisioned to be modern day ‘souk’, different from faceless suburban shopping malls which lack character. Al-Jasra Residential Residential Bahrain Confidential - 2008 2010 Villa Compound ATTA Towers, Mixed-use development comprising a Commercial Bahrain Ithmaar USD 100 2008 2011 Bahrain 37-Storey Residential/Hotel Tower with (Mixed Use Development million Amenities, a 13-Storey Office Tower Development) Company and 5 Levels of Basement. Total GFA is 51,442.50 sqm. Great Mall of China The integrated retail, convention Retail China Confidential USD 265 2005 2009 at Yan Jiao, Hebei, centre & entertainment complex is million China located at Yan Jiao Development Zone. The massive complex, when completed in 2009, will be one of the largest commercial cum entertainment projects in the world, covering an area of 5.5 million sqft. An indoor themepark will be part of the development. Ascendas IT Park, 5 blocks of 10 to 12 storey IT building Industrial India Ascendas 2007 2009 Pune, India with total GFA of 150,000sqm. India Bangalore Air Meinhardt Singapore & India are Aviation India SATS 2007 2009 Cargo Complex providing integrated engineering for SATS Cargo Complex at Bangalore International Airports.
  • 78.
    Name of Project Project Description Project Type Project Name of the Contract Start Expected Location Client Value Date Completion Date Kingsgate Hotel The project is a 3-star Hotel situated Hotel India Millennium USD 12 2007 2010 Development at in Chennai, India. The total area of Copthorne million Chennai, India the plot is 1,700 sq m. The hotel International comprises 117 rooms, 11 storeys and Ltd 2 levels of basement. The total plot area is 18,000 sq ft and total built up area is 64,000 sq ft. Proposed Retail Bombay Dyeing, the Wadia group Retail India The Bombay USD 60 2006 2009 Mall Development flagship, has decided to develop Dyeing & Mfg. million in Mumbai, India around 2.5m sq ft of land at its Co. Ltd. (Spring Mill Town Spring Mill in the central Mumbai Centre) suburb of Dadar for commercial and residential purposes. The project will be developed in 2 phases. Meinhardt Singapore is providing Mechanical & Electrical consultancy services for Phase 1 of the development, which consists of a 650,000 sqft shopping mall with 2,400 carparking facility both below and above ground and landscape deck. Kemang Village The project comprises a mixed Commercial Indonesia PT Almaron USD 100 2007 2009/10 Mall & Residences, development - Apartment, Hotel, (Mixed Use Perkasa million Jakarta Retail Mall and School - with GFA of Development) approx. 358,000 sqm. Mixed Proposed mixed development project Commercial Indonesia PT Mandri TBA 2008 2011 Development comprises Shopping Mall & School, (Mixed Use Cipta at Puri, Jakarta, Hotel, Office & Residential Apartment Development) Gemilang Indonesia at Puri, West Jakarta. Total GFA of approx. 432,000 sqm. Siloam Specialist The project comprises a 27-storey Hospital Indonesia Lippo Realty TBA 2006 2010 Hospital @ Aston, specialist hospital with serviced Jakarta apartment facilities. GFA of 34,551 sqm with 13,280 sqm for carparks. World Trade Meinhardt Singapore in association Commercial Indonesia PT. Jakarta TBA 2008 2010 Centre II, Jakarta, with Meinhardt Indonesia are (Office) Land Indonesia providing Civil and Structural Engineering for World Trade Centre II, Jakarta. The project comprises a new 28-storey high rise office tower (with total GFA of approx. 56,000 sqm) in addition to the existing World Trade Centre development. The new tower will integrate with the existing GF, Level 1 and B1 to B5 basement levels.
  • 79.
    Name of Project Project Description Project Type Project Name of the Contract Start Expected Location Client Value Date Completion Date The Pearl – Viva Meinhardt Singapore is providing Residential Qatar United SGD 2.5 2006 2010/11 Bahriya, Qatar integrated engineering services for Development billion this mega development, comprising Company 29 blocks of high-rise residential towers (20-24 storey) on a 2 level semi- basement carpark, townhouses and retail. The project, with total GFA of approx. 9 million sqft, is part of the prestigious The Pearl development, Qatar. One Shenton, Meinhardt Singapore is providing Residential Singapore City SGD 150 2005 2009/10 Singapore C&S engineering consultancy for the Development million redevelopment of No. 1 Shenton Way. Ltd The project involves the demolition of an existing office building at the heart of Singapore’s CBD (Shenton Way) and the design & construction of two new residential towers of up to 55 levels on a site area of 3,750 sqm. Marina Bay Meinhardt is providing integrated Commercial Singapore Hongkong SGD 2.6 2005 2010/11 Financial Centre engineering for the mega development (Mixed Use Land, Keppel billion (MBFC), Singapore which comprises: Development) Land and Cheung Kong Phase 1 – 33 & 51-storey Office Towers Phase 1 – 56 storey Residential Tower (Marina Bay Residence) Phase 2 – 67-storey Residential Tower Phase 2 – 50-storey Office Tower Reflections at Reflections at Keppel Bay, Singapore Residential Singapore Keppel Bay SGD 1 2007 2011 Keppel Bay, is a residential development that Pte Ltd Billion Singapore features 11 Villa blocks of 6 to 8 storeys, 3 pairs of 24 & 41 storeys curve-formed towers having vertical cores. The tower crown is constructed in circular steel tubes and linked by 3 sky bridges each. Meinhardt is providing Construction Engineering Analysis for the 3 pairs of 24 & 41 storeys curve-formed towers. Bungalows at Proposed 2 units of Bungalow Residential Singapore A.M. SGD 6 2008 2010 Sentosa Island, Development at Sentosa Island. Total Associates million Singapore GFA is approx. 5,000 sqft. (Singapore) Pte Ltd
  • 80.
    Name of Project Project Description Project Type Project Name of the Contract Start Expected Location Client Value Date Completion Date Proposed The proposed development consists Residential Singapore Hiap Hoe SGD 17 2008 2010 12-Storey of 12 -storey luxury residential Superbowl million Luxurious development. The GFA is 6,853 sqm. Pte Ltd JV Condominium Development at 5 Balmoral Road, Singapore Proposed Business A 15-storey Business Park building Industrial Singapore NSIAP Pte Ltd USD 30 2007 2009/10 Park Building with one level basement. Total million at International construction area is approx. 20,000 Business Park, sqm. Singapore Parkview Eclat,, The project comprises a 24-storey Residential Singapore Stream Ahead SGD 40 2006 2010 Singapore luxurious residential tower with Pte Ltd million basement carparks at Grange Road. Meritus Mandarin Meinhardt is providing integrated Hotel Singapore Overseas SGD 80 2006 2009/10 Singapore engineering services for the additions Union million & alterations (A&A) to Meritus Enterprise Ltd Mandarin Hotel at Orchard Road. The A&A works include: conversion of existing Basement 1 to Level 5 to Retail; conversion of Level 6 to retail and hotel reception including function rooms and ballroom; conversion of Level 7 to Spa/Gym and health club including a new swimming pool; and conversion of Level 8 to office space. When completed in 2009, the hotel will have a retail space (GFA) of 30,000 sqm. Sentosa Quayside A mixed-use development of luxury Residential Singapore Cityview SGD 80 2007 2010 Collection, residences (234-unit), commercial Place Holding million Singapore space and a 300-room five star hotel Pte Ltd at Sentosa Island. GFA is approx. 380,000 sqft. Bukit Panjang The proposed development consists Residential Singapore Housing SGD 90 2008 2011/12 Housing of 8 residential blocks vary from 5 Development million Development, storey to 32 storey with more than 800 Board (HDB) (HDB Contract units and one 5 storey multi storey car N6C9) , Singapore park. The proposed GFA is 62,957 sqm. Burj Dubai Meinhardt Singapore is providing Commercial Singapore Emaar USD 100 2005 2010 Development Plots integrated engineering services (Mixed Use Properties million 29 & 30, Dubai, for The Burj Dubai – a mixed use Development) UAE development – located within close proximity to The Dubai Mall and Burj Tower at the intersection of Sheik Zayed Road and Doha Street. The project comprises 2 residential towers of 29 and 21-storey, a 5-storey podium with 3 levels of basement for carparking. The total built-up area is 983,400 sqft.
  • 81.
    Name of Project Project Description Project Type Project Name of the Contract Start Expected Location Client Value Date Completion Date Livia The proposed project comprises Residential Singapore City SGD 100 2006 2009/10 Condominium, several phases / plots of Development million Singapore condominium development at Ltd Pasir Ris, the first phase being 730 units with basement carpark and recreational facilities. The entire development would ultimately yield a total of approximately 3,000 condominium units. The first phase development will include all necessary M&E infrastructure planning / design for the full development of all future phases of the project. Bedok Housing The proposed development consists Residential Singapore Housing SGD 110 2008 2012 Development, of 8 blocks of 14 storey residential Development million (HDB Contract 20), with 1000 units and one 3 storey multi Board (HDB) Singapore storey car park. The proposed GFA is 89,100 sqm. Terminal 1 Meinhardt is providing civil, structural, Retrofitting Singapore Civil Aviation SGD 120 2005 2010 Upgrading, Changi mechanical, electrical and facade Authority million Airport services for the Upgrading of Terminal Singapore 1 (T1) of Changi Airport. The A&A (CAAS) scopes include: - To develop a welcoming and distinctive façade for T1 that continues to hold its own against the modernistic T2 and futuristic T3. - To recreate T1’s original charm by providing a warm, refreshing and memorable experience for air travelers through its interior ambience. - To enhance the processing capacity of T1, in particular the check-in hall, baggage reclamation and gate holdrooms. - To maximise the commercial potential of T1. - To upgrade and integrate retail, food and beverage, entertainment and passenger services and facilities to create an exciting, lively and complete airport experience for passengers. Residential Meinhardt Singapore is providing Residential Singapore Property SGD 130 2008 2011 development integrated engineering services for Enterprises million at West Coast the 36-storey high-rise residential Development Crescent, project with total GFA of 33,600 sqm Pte Ltd Singapore housing a total of 270 unit of luxury apartments. Sky@Eleven, The project comprises a 43-storey Residential Singapore Times SGD 130 2006 2009 Singapore upmarket condominium at Thomson Development million Road. The exclusive development Pte Ltd to be launched next year will have a gross floor area in excess of 660,000 sqft.
  • 82.
    Name of Project Project Description Project Type Project Name of the Contract Start Expected Location Client Value Date Completion Date Cliveden at Grange The luxurious residential development Residential Singapore City SGD 136 2007 2010/11 comprises 4 blocks of 24 storey Development million residential towers (Total 110 Units) Pte Ltd with 2 level basement for carparks. The development is designed for highest energy efficiency to achieve BCA’s Platinum Green Mark Award. 60/A Collyer Proposed development of a new Commercial Singapore Clifford SGD 150 2006 2009/10 Quay – Change 18-storey office tower [GFA 500,000 (Office) Development million Alley Aerial Plaza sq ft] on the existing OUH Building Pte Ltd (CAAP), Singapore site & Conservation, Retrofitting Change Alley Aerial Plaza at Collyer Quay Singapore. Resorts World Resorts World at Sentosa will be a Commercial Singapore Genting SGD 5.2 2007 2010/11 at Sentosa, premium integrated resort taking (Mixed Use International billion Singapore pride of place on a 49-ha site at Development) the northern shore of Singapore’s Sentosa island. Slated for opening in 2010, the Resort will house the region’s first Universal Studios theme park, the world’s largest oceanarium Marine Life Park, the exciting Equarius Water Park, a maritime museum and the award-winning wellness sanctuary, Espa. The Resort will have six hotels, including the world’s only Hotel Michael that is designed by one of America’s best-known architects, Michael Graves. The six hotels will provide more than 1,800 rooms as well as full meeting and conference facilities. Meinhardt is providing MEP engineering consultancy services for the integrated resort. Island City, Mixed The mixed-use development Commercial UAE Office of USD 100 2006 2010 Development at comprises a 4-star hotel, residential (Mixed Use Mr Rashed million Abu Dhabi UAE towers, retail and townhouses. Total Development) Darwish Al GFA of 66,650 sqm. Ketbi Standard Chartered Meinhardt is providing M&E Retrofitting UAE Standard TBA 2007 2009 Bank – Abu Dhabi engineering and due dilligence to Chartered Head Office / Standard Chartered Bank’s new head Bank Flagship Branch office and flagship branch at Abu Dhabi. Standard Chartered Meinhardt is providing MEP & Fire Commercial UAE Standard TBA 2007 2009 Bank – New Head Services Engineering Design Services (Office) Chartered Office, Flagship for the New Head Office & Flagshop Bank, Dubai Branch, Abu Dhabi Branch Fitout Project at Ground & Mezzanine Floor Crystal Tower, Khalidiya Street, Standard Chartered Bank, Abu Dhabi UAE.
  • 83.
    Name of Project Project Description Project Type Project Name of the Contract Start Expected Location Client Value Date Completion Date Ocean Heights, The project comprises a 80-storey Residential UAE Damac USD 30 2005 2010 Dubai - UAE highrise residential tower with 3 Properties million basement car parking facility. The Co. LLC total gross floor area is approximately 1,300,000 sq ft. Expected Completion Date by end of 2008. Marina Plaza, The project comprises a 38-storey Commercial UAE Emaar USD 100 2006 2009 Dubai Marina, office tower with 4 levels of podium (Office) Properties million Dubai, UAE retail area and 3 levels of basement carpark. Total Gross Construction Area is approx. 796,500 sqft. Proposed The project comprises a 60-storey Residential UAE Emaar USD 100 2006 2009 Residential Tower, high rise residential tower with a Properties million Burj Dubai Site 35 3-storey podium housing usual condominium facilities and a 4-storey basement carpark. The total construction floor area for the high rise tower is approximately 500,000 sq ft, and the floor area for the carparking is 150,000 sq ft. La Ville Meinhardt Singapore were appointed Residential UAE Sama Dubai USD 650 2006 2010/11 Contemporaine, as the Principal Consultant for The million The Lagoons – Lagoons - La Ville Contemporaine Area 2, Dubai, UAE Area 2 (Contract No. DIP-0410.B.03b). The mixed-use development, developed by the prominent Sama Dubai Group, is part of the multi- billlion The Lagoons project in Dubai. The project (Area 2) comprises 28 blocks of 10-20 storey towers for retail and residential usage with full amenities for luxurious and modern living standard. Total CFA is approx. 11 million sqft. Capital Plaza, Abu Meinhardt is providing integrated Commercial UAE Reisco PMC USD 250 2003 2010 Dhabi engineering consultancy services for (Mixed Use million the Capital Plaza, located along the Development) prominent Corniche in Abu Dhabi. The huge development includes a 31-storey hotel tower, three blocks of up to 45-storey residential towers, a 33-storey office tower on a 9-storey podium for retail and 4 levels of basement for carpark.
  • 85.
  • 87.
    Hee Meng WONG INFRASTRUCTURE CONSULTANT PROFESSIONAL QUALIFICATIONS Mover System. The road network for the One North Development comprises approximately 18.5 km • BSc(Civil), University of Alberta, Canada, 1984 roads on grade of various standards, 3 flyovers, 1 underpass and a trumpet interchange. The PROFESSIONAL AFFILIATIONS feasibility study includes road geometric design, foundation and structural design. • Corporate Member of The Institution of Engineers, • Civil infrastructure masterplanning for the 281 Ha Malaysia Sentosa Island, Singapore. Infrastructure includes • Professional Engineer, Board of Engineers, water supply, sewerage, road network, earthworks, Malaysia, 1990 stormwater, power and telecommunications. The masterplan includes geometric review of the PROFESSIONAL EXPERIENCE 8.6km of existing roads and recommendation for improvements. Dec 2004 – Present • Civil infrastructure masterplanning for the 54 Ha Meinhardt Infrastructure Pte Ltd, Gardens By the Bay at Marina South, Singapore. Technical Director Infrastructure includes road network and main stormwater system. The masterplan includes 1991 – Nov 2004 assessment and recommendations on the bulk Meinhardt (Singapore) Pte Ltd, Design earth filling with surcharging over thick marine clay. Manager • Concept and detailed design of the airside drainage and landside access for the 2,265 1989 – 1991 Hectares Indira Gandhi International Airport, Engineering and Environmental Consultants New Delhi, India. The drainage system includes Sdn Bhd, Kuala Lumpur, Malaysia hrdrologic modelling and rainwater harvesting system 1988 – 1989 • Civil infrastructure masterplanning the 3,000 Ha LP Consultants Sdn Bhd, KL, Malaysia Kota Lobam, Bintan, Indonesia. Infrastructure Project Engineer includes water supply, sewerage, road network, stormwater, power and telecommunications. 1984 – 1988 The masterplan includes proposal for power Drainage and Irrigation Department, Selangor generation, water and wastewater treatment. Darul Ehsan, Malaysia, District Engineer • Civil infrastructure masterplanning and concept design for the 30 Ha Eighth Gate, Damascus, Syria. KEY PROJECTS Infrastructure includes water supply, sewerage, road network, earthworks, stormwater, power • Infrastructure masterplan and detailed design and telecommunications. The concept design of the infrastructure for the S$4 billion, 23,000 includes groundwater extraction and treatment Hectares, Bintan Beach International Resort, system, sewage treatment plant, roads and grade Bintan Island, Indonesia. This includes the detailed separated road access. design, contract administration and construction • Civil infrastructure masterplanning the 10,400 supervision of the 30km East- West highway and Ha Jazan Economic City Development in Saudi overhead power transmission lines. Arabia.Infrastructure includes water supply, • Transportation and traffic feasibility study for the sewerage, road network, stormwater, power and 194 Ha One North Development, Singapore. The telecommunications. The masterplan includes transportation network includes a 5.5 km People proposal for power generation, desalination,
  • 88.
    sewage treatment andsolid waste plants. system incorporating Critical Path Methods and • Masterplanning of the roads and water supply PERT systems, computerised cost control and system for the 3,200 Ha Project IV, Islamabad, budgeting, and technical QA and QC monitoring Pakistan. The masterplan includes review of system has been implemented for the project. options for grade separated interchanges and The project includes the design review of the water supply sources. construction drawings and geometrical redesign of • Civil infrastructure masterplanning the 10,000 considerable stretch to suit the site conditions and Ha Ras Az Zawr Development in Saudi constraints. Arabia. Infrastructure includes water supply, • Planning and design for the DTSS-Link Sewers for sewerage, road network, stormwater, power and Kolam Ayer, Towner and other pumping stations telecommunications. The masterplan includes comprising 7 km of jacking sewer pipes ranging proposal for power generation, desalination, from 750 mm diameter to 3000 mm diameter. sewage treatment and solid waste plants. This includes liaison and co-ordination with utility • Civil infrastructure masterplanning the 13,500 departments on the planning and design of Ha Project K Airport City development in Dubai, temporary and permanent utilities diversion. UAE.Infrastructure includes water supply, • Detailed design for the civil infrastructure sewerage, road network, stormwater, power and for Universiti Teknoloji Petronas (UTP). UTP telecommunications. The masterplan includes development covers an area of approximately proposal for power distribution, sewage treatment 400 hectares and is located in the state of Perak and telecommunications exchange. Darul Ridzuan, Malaysia. The site comprised • Civil infrastructure masterplanning and detailed 200 hectares of the existing Universiti Sains design for the Taman Rimba Alam Park Malaysia (USM) and its facilities and 200 hectares Development located in Precinct 14 and 15 of of undeveloped forest area. Approximately 120 the Wilayah Perseketuan Putrajaya, Malaysia. hectares of the existing USM campus comprised The park development comprises of three areas of exmining ponds. The UTP campus when namely the Hutan Teras Utama, Hutan Koridor completed will comprised of 3 zones namely, the Timur Laut and Taman Hutan Komuniti with a total academic core located at the centre of the site, combined area of 160.8 Ha. The development open space, athletic facilities and ceremonial concept, as prepared by the masterplanner is entrance located to the east and the student to create a recreational park which will maintain housing located on the north. The infrastructure the “Garden City” concept of Putrajaya and is includes earthworks, roads, drainage, water supply, uniquely Malaysian. The park is intended to be a sewerage, power and telecommunications showcase of urban forestry which exploits the site’s • Civil infrastructure masterplanning for the 80 natural beauty and ambience, the magnificient and Hectares Saigon Sports City located in District picturesque views of the Putrajaya development. 2 of Ho Chi Minh City, Vietnam. The site will be The infrastructure includes earthworks, roads, developed into an integrated mixed development drainage, water supply, sewerage, power and with sporting facilities. Infrastructure includes telecommunications water supply, sewerage, road network, earthworks, • Project Manager for the Construction Supervision stormwater, power and telecommunications. The of 115 km of National Highways on NH-2 in ‘Design and Built’ specifications for Phase 1 of India under the Third National Highways World the development which comprises the sporting Bank Project. The civil works proposed involve facilities was also prepared. large scale construction of cement concrete and • Design and construction phase services for Phase bituminous pavement construction and some 45 1 of the Agarta Universe Theme Park in Johor bridge/culvert crossings. As the project is very Bahru, Malaysia, comprising 113 Ha US$110 large, a comprehensive project management Million Theme Park development, including major
  • 89.
    earth moving (6.5million m3), water supply, network, stormwater, tidal lagoon, water supply, lake filtration, sewerage, stormwater, roads and sewerage, telecommunications and earthworks. carparking. • Masterplan, detailed design and documentation • Project Manager for the Restoration of the southern of the water supply and sewerage system for the beaches in Sentosa, comprising the construction 500 hectares KIBA automotive industrial park in of four offshore islets as breakwater to protect the Cikampek, Jakarta, Indonesia. This includes design main beaches. Other works includes reclamation of the water and sewage treatment plant. and reshaping of the main beaches. • Infrastructure masterplan, detailed design and • Civil infrastructure masterplanning for the 1,350 Ha documentation of the civil works for the 1,800 Lagoi Bay Development, Bintan Beach International acres Bute Golf and Residential Estate in Sepang Resort, Bintan. Infrastructure includes water supply, Malaysia. sewerage, road network, earthworks, stormwater, • Design, documentation, contract administration telecommunications and sewage treatment. This and construction supervision of the stormwater includes preliminary design of 3km divided dual system for the 200 Hectares Esso Refinery at Pulau carriageway trunk road. Ayer Chawan, Singapore. • Infrastructure masterplanning and coastal • Feasibility study on Common Services Trenching marina preliminary design for the 650 Ha Pecatu for the Fort Bonifacio New Central Business District Indah Golf and Residential development in Bali- in Manila, Philippines. Indonesia. • Civil infrastructure masterplanning for the 220 Ha • Infrastructure masterplan, detail design, Urban Beach Centre, Bintan Beach International documentation, contract administration and Resort, Bintan. This includes preliminary design of construction supervision for the 195 Ha Bintan 3kmdivided dual carriageway trunk road Beach International Resort Township with a • Civil design and construction supervision for the population projection of 30,000. Infrastructure 215 Hectares Banyan Tree Resort and Golf Course, includes water, sewerage, road network, Bintan Island, Indonesia. This includes holiday earthworks, stormwater, telecommunications and villas, golf clubhouse and associated infrastructure sewage treatment plant. such as dams, access roads, water supply, • Civil infrastructure masterplanning, detailed stormwater and sewerage. design, and construction phase services for the • Civil design and construction supervision of the 250 Hectares Royal Sumatra Golf and residential Purajaya Beach Resort, Batam Island, Indonesia. development in Medan, Indonesia. Infrastructure The resort includes 40 villas and a 220-room hotel. includes water supply, sewerage, road network, earthworks, stormwater, and telecommunications and sewage treatment. • Infrastructure masterplanning for the 1,000 Hectares Batulao Woodlands Mountain Resort in Philippines. This includes design of the 8km Dual Carriageway Highway through difficult terrain, hydrological modelling and water resource management study, sewerage, earthworks, stormwater and telecommunications. • Infrastructure masterplan and design of the infrastructure for the 1,200 Hectares Putri Nyale Resort, Lombok, Indonesia. Infrastructure works includes technical assessment of existing roads with regards to safety and capacity, internal road
  • 90.
    Yang San GO INFRASTRUCTURE CONSULTANT PROFESSIONAL QUALIFICATIONS Dubai Metro Network comprises two lines; The Red Line and The Green Line. The two lines have a • BEng(Civil), Nanyang Technological Institute, total length of nearly 70 km, with 35 stations along 1987 the 50 km long Red Line, and 22 stations along the 20 km Green Line. The two transfer stations PROFESSIONAL AFFILIATIONS at Al Ittihad Square and Burjuman are common to both lines. In total, the Dubai Metro has 18 km of • Senior Member of the Institution of Engineers, tunnels, 51 km of viaduct, one major train depot Singapore and maintenance facilities site and several auxiliary • Member of Singapore Structural Steel Society stabling facilities. • Member of International Association of Engineering • Project K, United Arab Emirates: Responsible as Geology Project Manager for infrastructure masterplanning • Member of Singapore Institute of Management of a 130 km2 of a fully integrated and self contained development comprising an airport and PROFESSIONAL EXPERIENCE its associated facilities, logistic park, industrial, commercial, residential, R&D, exhibition centre and Dec 2004 – Present university. Meinhardt Infrastructure Pte Ltd, Director • Contract 855 MRT Circle Line Stages 4 & 5, Singapore (S$400m): Responsible as Principal-in- 1996 – Nov 2004 Charge for the temporary earth retaining structure Parsons Brinckerhoff Pte Ltd, General Manager/Director design services of Holland, Buona Vista and Kent PB Merz and McLellan Pte Ltd, Vice President Ridge Stations and the associated cut & cover tunnel and bored tunneling works for WH-STEC- 1993 -1996 AM JV for Circlle Line Contract 855. Maunsell Consultants (Singapore) Pte Ltd, Associate • Kota Lobam Masterplan, Bintan: Responsible as Project Manager for infrastructure masterplanning 1991 -1993 of a 3000 ha of a new Commercial City which Parsons Brinckerhoff Manusell Consultants (PBMC) consists of industrial estates, commercial centers, Supervising Engineer schools, government institutions, marina, port, park and green belt. 1988 -1991 • Riyadh Equestrian City Development Masterplan, Expressway Construction Pte Ltd, Senior Site Engineer Saudi Arabia: Responsible as Project Manager for the major infrastructure facilities masterplanning 1987 -1988 including road, water, power, sewerage, telecom, Essence Building Works Pte Ltd, Site Engineer solid waste, land sizes and cost estimation of the major infrastructure facilities of a 56km2 of a 1986 fully integrated and self contained development Bocotra Construction Pte Ltd, Site Engineer (Trainee) comprising town centre, commercial district, tech park, low-rise residential villas, amenities, KEY PROJECTS education and recreation. • Circle Line Stages 4 & 5, Singapore (S$2.5b): • Dubai Metro, United Arab Emirates (US$3b): Responsible as Proposal Manager to organize the Resposible as Principal-in-Charge for structural proposal team with multiple sub-consultants for the design of the Rashidiya Main Depot and Jebel Ali Architectural/ Engineering Consultancy Services Auxiliiary Depot for the Dubai Metro Project. The for Circle Line Stages 4 & 5 to the Land Transport
  • 91.
    authority of Singaporefor the 18km rail tunnels Principal-in-Charge of overall execution of the and 11 underground stations from Marymount project. Appointed as the Contractor’s Independent Station and join to Harbourfront Station. During the Checking Engineer by the Contractor. The project execution of the project, perform the role of Quality consists of approximately 8 km of viaducts, 8 km of Assurance Manager overseeing the delivery of mined tunnels and 8km of at grade section. C230 is the project through conceptual, preliminary, final part of the construction of the 325km High Speed design and tendering phases. Rail project in Taiwan. • Contract PL0101 Planning Feasibility and • C280 Taiwan High Speed Rail Project, Taiwan Preliminary Engineering Design Study for an (US$350m): Responsible as Proposal Manager Additional Expressway in the North-South Corridor, for the contract negotiation with the Contractor Singapore (Estimated S$3.2b): Responsible to and subsequently as Project Manager and then organize the proposal team and preparation of Principal-in-charge. Was appointed as one of the proposal submission. During the execution the design team member responsible for the stage, perform the role of Deputy Project Manager detailed design of the non¬standard viaduct/ and subsequently Project Manager for the bridge structures for the Lot 1 of the contract which proposed 20km road tunnels study and preliminary consists of about 34km of elevated viaduct/bridge engineering design including traffic study, land and part of the construction of the 325km High use, right of way, roadways alignment corridors, Speed Rail project in Taiwan. preliminary design for C&S, M&E schemes as • Cable Tunnel from Senoko Power Station to well as the project budgetary cost estimates and Gambas Avenue, Singapore (S$80m): Responsible implementation schedule. as Proposal Manager for the tender design • Contract 552 SA – System Assurance consultancy preparation for the Contractor and subsequently Services for Signalling System for Changi MRT the Project Manager and Principal-in-Charge after Line, Singapore: Responsible as Proposal Manager awarding of the Contract. The proposed tunnels for the tender preparation and subsequently as include twin cable tunnels of 3.7m internal diameter Project Co-ordinator after winning the project to (East and West Tunnels) and of 1.8m long with an liaise with specialists for the project execution. equipment building, 3 ventilation/access shafts and • Architectural/Engineering Consultancy Services associated M&E equipment. for the Marina Line, Singapore (Estimated S$3b): • Upgrading of Telok Blangah Road (Part) and Responsible as part of the tender preparation team Pasir Panjang Road to Semi-Expressway Phase member and subsequently appointed the Project II, Singapore (S$60m): Responsible as Proposal Co-ordinator after winning the project for the Stage Manager for the tender submission as Accredited I feasibility study and conceptual design and Stage Checker and subsequently as Project Manager. II preliminary design and preparation of D&B civil The proposed vehicular viaduct is a 3-lane dual tender documentation of The Marina Line. carriageway and is approx. 2600m in length with 2 • LRT for Sengkang/Punggol New Towns, Singapore nos. of long slip ramp structures. (S$400m): Responsible as Proposal Manager in • Upgrading of Telok Blangah Road to Semi- the preparation of the design documentation for Expressway Phase I, Singapore (S$68m): the contractor in this design and build contract. Responsible as Proposal Manager in the design • Singapore Mass Rapid Transit (MRT) Tracks: documentation submission to the contractor in this Involved in the consultancy services for rail shelling design and build contract. The contract includes of the existing MRT tracks. desing of the 2.4km elevated viaduct structures • C230 Taiwan High Speed Rail Project, Taiwan with pier located at the central median of the (US$450m): Responsible as Proposal Manager at-grade roadway, the at-grade road widening, for the contract negotiation with the Contractor utilities diversion, underpinning/reconstructing of and subsequently as Project Manager and then pedestrian bridges and slope protection, etc.
  • 92.
    Assessment and Upgrading of Woodsville Flyover, • Road Drainage Improvement in Bukit Timah/ Singapore: Responsible as Proposal Manager Holland Road Areas, Singapore: Responsible as and subsequently Project Manager and then Project Manager and subsequently as Principal-in- Principal-in-Charge after winning the project for Charge for the design of the reconstruction of old the inspection, deck study, assessment and detail roadside drain along the Bukit Timah/Holland Road design. Areas for Drainage Department of Singapore. • Assessment and Upgrading of Vehicular Bridges • Masters Golf & Country Club, Guangzhou, China for Pioneer Road and Jalan Ahmad Ibrahim, (S$100m): Responsible as Project engineer for the Singapore: Responsible as Proposal Manager planning and design of the project. The Masters and after winning the project hand over to the is a 94 Ha golf and country club which consists designated Project Manager. of a 18-hole golf course, infrastructure works • Structural Inspection to MRT Viaducts, Bearings that include roads, drainage, sewerage, river and Tunnels, Singapore: Responsible as Proposal walls, site formation, etc. and structural designs Manager during tender stage and subsequently as of driving range, clubhouse, service apartment, Principal-in-Charge for the Structural Inspection to condominiums and villas. MRT Viaducts, Bearings and Tunnels. • Golf and Beach Resort at Rompin Village, Malaysia: • Sentosa People Mover System – Civil & Alignment Involved in the design of civil works including Works, Singapore (S$12m): Responsible as earthworks, roadworks and drainage design for the Proposal Manager to secure the project and Phase 1A and 1B. as Project Manager in the initial stage and • Malaysia Shipyard Engineering Syncrolift (M$70m): subsequently as Principal-in charge for the detail Involved in the concept drainage design for the design of the 4.3km double track alignment of project, Pasir Gudang, Johore, Malaysia. the proposed People Mover System for Sentosa • British Petroleum Vietnam Plant: Involved in the Development corporation. preliminary civil works design of roadworks and • Underground Roadway System, Singapore drainage for the Phase II. (Estimated S$4.8b): Involved in the Phase I and II • Admiralty Industrial Park, Singapore (S$70m): of the Feasibility Study, Engienering Investigation Responsible as Project Engineer for the project and Design of the project which runs in the Central which consists of 57 units of terrace, semi- City of Singapore. detached and flatted factories. Responsible for the • Central Expressway Phase II (S$350m): In charged concept and details design of the infrastructure of Production 7, Areas 11 to 17 of the project. works including the roadworks, earthworks, Central Expressway Phase II runs from Bukit Timah drainage and sewerage works. Road to Chin Swee Road. • Jurong Point Shopping Centre, Singapore • Deep Tunnel Sewer System Singapore (S$7b): (S$65m): Responsible for the design of the civil Responsible for the initial liaison and co-ordination works including roadworks and drainage for the with various local Agencies to obtain information 7 storeys and 3 levels basement commercial like topographical survey, expressway alignment, development. soil data, marine data for the study of the projects. The contract also includes provision of Project Management services during the construction stage. • Sewerage Facilities for Woodlands and Sembawang New Town, Singapore: Responsible as Project Manager and subsequently as Principal- in-Charge for the design of main sewers along Woodlands Avenue 8 and Gambas Avenue.
  • 93.
    Kok Siong CHAN INFRASTRUCTURE CONSULTANT PROFESSIONAL QUALIFICATIONS KEY PROJECTS • BSc(Civil), University of London, UK, 1970 • LTA – Circle Line Stage 4 & 5, C870G, Singapore • Post Grad Dip (Surveying), University College, Project Director for the Architectural and London, UK, 1971 Engineering Consultancy Services for Circle Line • MSc(Civil), University of London, UK, 1972 Stage 4 & 5 consisting of 18km of tunnels and 11 underground stations, of which 5 are doubled up PROFESSIONAL AFFILIATIONS as civil defence shelters. Services include concept, preliminary and detailed design of all disciplines, • Member of The Institution of Civil Engineers, UK, systemwide co¬ordination, budgetary cost 1979 estimates, construction contract documentation • Fellow of the Geological Society, UK, 1980 and construction supports, etc. for implementation • Professional Engineer of Singapore, 1983 of the railway line project. • Accredited Checker, 1995 • LTA – North-South Expressway , Singapore Project Director for the North-South Expressway PROFESSIONAL EXPERIENCE feasibility study and preliminary engineering contract, consists of establishing options for the Nov 2004 – Present alignment, interfacing with all relevant agencies Meinhardt Infrastructure Pte Ltd, Managing Director and authorities for lands use/acquisition, conduct traffic analysis and studies, define expressway 1996 – Oct 2004 corridors, vertical and horizontal alignments, Parsons Brinckerhoff Pte Ltd, Chief Operating Officer/ preliminary design for the tunnel structures and Managing Director PB Merz and McLellan Pte Ltd, M&E provisions, provide budgetary cost estimates President/Managing Director for implementation of the project. • PowerGrid – Senoko Cable Tunnel, Singapore 1989 -1995 Project Director for proposed Senoko Cable tunnel Maunsell Consultants (Singapore) Pte Ltd, Director between Gambas and Senoko for the 400 KV Transmission Line to Senoko Power Station provide 1982 -1985 C&S and M&E services for twin 3.7m internal Ove Arup & Partners, Senior Resident Engineer diameter, 1.8km long, one equipment building and 3 access/ventilation shafts to the design and build 1980 -1982 contractor. John Brown-Ear & Wright (UK), Structural Engineer • Singapore Parallel Train Project, Polymer Laydown, Storage & Shipping Facilities. As the QP/PE for 1978 -1980 the QP services design review and permitting for Sir William Halcrow & Partners (UK) the proposed polymer laydown, storage yard and shipping facilities. 1977 -1978 • Power Seraya Power Station Cogen Combined Halcrow International, Saudi Arabia Cycle Power Plant Extension of Unit 30 and 40 at Jurong Island. As the QP/PE for the QP services 1975 – 1977 design review and permitting services. Sir William Halcrow & Partners, UK • Pulau Seraya CCPP: Owner’s engineer for the provision of consulting and engineering services 1972 -1974 for the development of 2 x 370 MW combined cycle King’s College London, UK power plant for Pulau Seraya Power Station.
  • 94.
    Schering Plough Pharmaceutical Plant, Tuas, • MRT North East Line Contract 716: Project Director Singapore. QP/PE for submission, approval, for C716, Trackworks for the North East Line permitting for Schering Plough Pharmaceutical consists of 20 km twin track and in the depot. plant development at Tuas including multi-Purpose Contract value S$100m. Product plant MPP1 & 2, Design and Research • Guilin View Condominium: 655 units condominium Building, Drum store, Warehouse, Tanker Parking in five 30-storey towers. Contract value S$150m. Facilities, Off-site Utilities. • Tuas Tech Park -Industrial park development • Mitsui Bisphenol Chemical Plant, Jurong Island, comprising 6 blocks of 7-storey flatted industrial Singapore. QP/PE for design, submission, building with swimming pool, recreational and approval, permitting, construction supervision for communal facilities at Tuas South. Contract value all 3 phases of Mitsui Bisphenol Chemical Plant, S$150m. development in Jurong Island, the building are • Restoration and Refurbishment of Office Building steel structure construction. at Shanghai -Existing 7-storey building will be • Singapore Art Centre: Appointed as the accredited restored and redeveloped into an upmarket office. checker for the Building Construction Authority Contract value US$12m. for the structural design audit and checking of the • Gems Centre, Myanmar -20-storey mixed development, main feature consists of a 3D space development at Yangon. Contract value S$100m. frame roof with column free space over an area of • Project Director for the proposed 52-storey 110m by 65m. PosBank HQ at Robinson Road (S$350m). The • Aerospace Exhibition Centre, Singapore: Overall building is of steel structure with RC floor slabs. principal in charge of the Aerospace Exhibition • Project Director for the proposed LTA’s Light Centre project the structure straddle 200m x 200m Rail Transit projects C801 for Bukit Panjang with more than 35,000 sq. m of column free space Line (S$280m) and C802 for Buona Vista Line for the exhibition hall. (S$230m). • Changi Airport Station: Appointed by the Building • Project Director for the Admiralty Industrial Park Construction Authority to provide structural design Development at Woodlands (S$70m). audit for the Changi Airport station, The station • Project Director for the Richgold Warehouse/ is located below ground between the existing Factory at Tampines (S$10m). terminals and is 350m in length. The main feature • Project Director and Professional Engineer for the is integration of the 200m span pedestrian steel proposed Jurong Point Shopping Centre near to bridge serving as platform for the underground MRT Boon Lay Station (S$65m). station. • Project Manager for the design and construction • MRT North East Line Contract 706: Project Director supervision for the 16 km MRT Woodlands Line for C706, two underground civil defence stations (S$500m) including six stations, an underground and 530m cut and cover tunnel, 1.63 km bored bus interchange and trackworks. tunnel. Contract value S$331m. • Professional Engineer and Deputy Project Director • MRT North East Line Contract 710: Project Director for design and supervision of Suntec City Project for C710, one 4-level underground civil defence (S$1700m) at Marina Centre. The project consists of station and 2.4 km bored tunnel. Contract value one large Convention and Exhibition Centre, 4 nos. S$200m. 45-storey Tower Blocks and one 18-storey Tower • 400 kV Transmission Development: QP/PE for Block, all are steel structures and composite designs. submission, approval and permitting for the • Project Director and Professional Engineer for the Immersed Tube Undersea Cable Tunnel, Terminals design and supervision of the proposed 3¬basement Buildings and Land Cable Tunnel at Tuas. Contract and 4-storey Northpoint Shopping Centre at Yishun value S$140m. (S$45m) next to MRT Yishun Station.
  • 95.
    Project Director and Professional Engineer for the English Channel including assessment of chalk Cherryhill Condominium at Paya Lebar (S$33m). marl parameters for design purposes. Responsible for supervision, co-ordination and • Orange Fish Tunnel, South Africa – carried out contracts administration and management of all back analyses into the test data obtained for aspects of construction works related to civil and pressure gallery tests and jacking tests during structural works including both temporary and the construction of the irrigation tunnel to further permanent works for the Treasury Building. examine the performance of tunnel linings under operation conditions. The project consists of excavation for six large • Ahmed Hamdi Tunnel, Egypt -pre-tender study diameter caisson foundation, 5 levels of basement, into the complex water bearing deposits of aquifer 3 levels of podium block and a 52-storey steel properties of the site including analysis of large structure of tower block (S$300m). scale pumping tests and slope stability for the design works. Design Engineer in the Ground Engineering • River Orwell Crossing, UK – carried out office Department involved in the design and office works for administration of site investigation works for the the following projects: design of bridge foundation including on site supervision of Menard pressure meter testing • Rivera Retaining Wall Reconstruction, UK – carried and analysis of results for ground bearing and out design for the reconstruction of an anchorage deforming properties. retaining wall in landslip area and preparation • Research Assistant in the Department of Civil of contract documents, specification and bill of Engineering carried out research work into the quantities for the additional site investigation work. stress strain behaviour of granular materials. • Stone Marshes Development, UK – involved in the design of a Ro-Ro terminal for Blue Circle Cement Industrial including pile design for axial and lateral loadings, slope stability analysis for the existing flood banks during and after the development, and studies of ground movements due to filling and surcharging operations. • Resident/Material Engineer in the site Resident Engineer’s office for the supervision of construction for a multi-million pounds irrigation project covering an area of over 6000 hectare of land in the Wadi Jizan, Saudi Arabia. Responsibilities including managing a site laboratory for investigation as well as routine testing works for the construction of hydraulic structures and canal embankments, material quality control on site and supervision of construction works. Assistant Engineer in the Ground Engineering Department involved in the design works for a number of major civil and geotechnical engineering projects: • Channel Tunnel, UK -involved in the feasibility study for the new proposed route across the
  • 96.
    Chi-Kwong WONG INFRASTRUCTURE CONSULTANT PROFESSIONAL QUALIFICATIONS / AFFILIATIONS hotels, hospitals, commercial and institutional. He has an intimate knowledge of the M&E industry in Hong • Bachelor of Laws, Manchester Metropolitan Kong, Macau, PRC and overseas and has a well known University, UK (2004) reputation for diligence, technical competence and • Master of Business Administration, Chinese team management. University of Hong Kong (1982) • Bachelor of Science (Mechanical Engineering), CK has a wealth of contacts and a good working University of Hong Kong (1973) relationship with all government bodies and authorities • Fellow of the Chartered Institution of Building and is involved in many professional duties such as: Services Engineers (2002) (796015415) • Member of NEPA (1998) (881653) • Committee Member, Building Services Division, • Fellow of the Hong Kong Institution of Engineers The Hong Kong Institution of Engineers (1996) (FW0076767) • Discipline representative (Building Services), The • Register Professional Engineer (1991) (RP0076767) Hong Kong Institution of Engineers • Member of Society of Fire Protection Engineers • HKIE’s representative for FSD Working Group for (102627) Fire Services Installation • Member of the Institution of Engineers, Australia • Chairman, Training Committee, The Hong Kong (1986) (334967) Institution of Engineers • Member of the Institution of Electrical Engineers • Council Member, Association of Consulting (1985) (20318396) Engineers Hong Kong • Member of the Chartered Institution of Building Services Engineers (1983) CK’s experience and stature in the industry and his • Chartered Engineer (1979) proven hands on technical ability on similar projects • Member of the Institution of Mechanical Engineers makes him an ideal candidate to take on the overall (1979) (69439390) direction of the M&E design for this project. • Member of the American Society of Heating, Refrigerating and Air Conditioning Engineers Inc. KEY PROJECTS (1979) (00810648) • Member of the Australian Institute of Refrigeration, Railways Air Conditioning and Heating (1979) • West Island Line Consultancy Agreement No. PROFESSIONAL EXPERIENCE C704 - KET Station and Overrun Tunnel (Year of Completion: 2010) - It includes the new Kennedy 1989 – Present Meinhardt (M&E) Limited Town Station and Overrun Tunnels, with significant 1987 – 1989 Lincolne Scott Australia Pty Ltd re-provisioning and associated ground-level (Melbourne) facilities for various government departments – 1979 – 1987 J. Roger Preston & Partners including EPIW and PTI – works to the existing 1973 – 1979 Young’s Engineering Co Ltd Sheung Wan Station to convert it from a terminus to an intermediate station and the establishment of RELEVANT EXPERIENCE the Site Offices and Works Areas. CK Wong has over 36 years experience on the design, • KCRC Shatin to Central Link - Contract No. documentation and contract administration of the M&E SDC700 - Admiralty to Central West (Project systems for major projects of all types in Hong Kong Director; Year of Completion: 2003) - Meinhardt and overseas. He has been involved in the full range is a 50% JV partner acting as Lead Consultant, of projects including railways, offices, residential, C&S, Geotechnical, Tunnelling, M&E and Railway
  • 97.
    Operating System Engineersfor this two station buildings, with no heavy workshops. The 160m package on the Shatin to Central Link project. free spanning roof consisted of 14m deep trusses These stations are to be constructed on Hong assembled on the ground and lifted into position Kong Island under existing buildings, infrastructure onto concrete mega columns each end in one and the MTRC Admiralty Station which must be operation. kept operational throughout the construction of the project. • Aircraft Base Maintenance Facilities at Hong Kong International Airport (Construction Cost: 1500M; • LAR Hong Kong Station Phase 1 & Phase 2 Year of Completion: 1999) - Principal Design (Project Manager; M&E Cost: HK$1050M, Consultant and Consultant Project Manager for Construction Cost: HK$6430M ; Year of these development included: three bay cantilever Completion: 2001) - Hong Kong Station which aircraft hangar (to accommodate up to B747- was one of the six MTRC Stations on the Lantau 600 aircraft); multi-levelled concrete workshop Airport Railway from Hong Kong to the new airport (33,000m2), Ground service vehicle workshop; in Chek Lap Kok. Phase 1 of the station consisted waste treatment facility and external works; aircraft of combined arrival/departure hall, in-town check- docking systems and other specialist systems. in facilities, platforms, retail, carpark, overhead development, tunnels, subway link to existing Office Building Central Station, ventilation building and seawater pump houses. Phase 2 of the station consisted of • One Island East, Quarry Bay (Project Director; M&E separate arrival/departure halls, in-town check-in Cost: HK$717M, Construction Cost: HK$2338M; facilities, platforms, carparks, and provision for an Year of Completion: 2008) - A 70-storeys office overhead development. building comprising ground floor, 1/F lobby, 59 nos. office floors, 2 nos. skylobby floors, 3 nos. MTRC Yau Tong Station and Tunnels, TKO Line mechanical floors, 2 nos. refuge floors and 2 Extension (Project Manager; M&E Cost: HK$270M, basement levels of loading and unloading area with Construction Cost: HK$1400M; Year of Completion: total GFA 145,000m2. 2003) - Lead consultant for this 4 platform station which included the station, over 1km of stacked cut • Oxford House, Quarry Bay (Project Director; M&E and cover tunnels and all adjacent infrastructure Cost: HK$220M, Construction Cost: HK$800M; diversions and provisions. Year of Completion: 1999) - 40-storey Grade A office building and underground carpark with a • LAR Siu Ho Wan Depot, Phase 1 (Project Manager; total area of 47,000m2 with modern facilities. M&E Cost: HK$220M, Construction Cost: HK$850M; Year of Completion: 1998) - Phase • Devon House, Taikoo Place, Quarry Bay (Project 1 of this Railway depot comprising a workshop Director; M&E Cost: HK$250M; Year of Completion: and maintenance building of 35,000m2 and other 1994) - 29 storey office building with a total area of ancillary buildings and roadways. approx. 70,000m2 with modern office facilities. Industrial/Industrial Plant • Kodak House Extension, North Point (Project Director; M&E Cost: HK$50M; Year of Completion: • HAECO Aircraft Maintenance Hangar No. 2, Chek 1992) - 22 storey 60,000m2 office building built Lap Kok (Construction Cost: HK$272M; Year of adjacent to and on top of the existing 7 storey Completion: 2007) - The project includes a new Kodak House. three bay hangar for heavy maintenance; doors Office/Commercial at front (160m) and rear (60m) and internal annex
  • 98.
    I-Square, 63 Nathan Road (Project Director; M&E Community Hall and Integrated Family Services Cost: HK$215M, Construction Cost: HK$1015M; Centre complex. Year of Completion: 2008) - 18-storey tower (14 F&B floors / 3 M&E floors / 1 office floor), 11-storey • Agreement No. CB20070021 - Redevelopment of commercial podium comprising shopping arcade, Un Chau Street Estate Phase 5 (Team Leader; Year shops, restaurants, cinemas, and 3 basement floor of Completion: 2012) - 3 nos. 35 & 41-storey non- (2 commercial floors / 1 carpark floor) with total standard domestic blocks with a total GFA of about GFA of about 57,882m2. 84,000m² and 1 no. 3-storey carpark block with recreational and social welfare facilities. • One International Finance Centre & IFC Mall at LAR Hong Kong Station (Project Leader; M&E Cost: • Tseung Kwan O Property Development at TKOTL HK$475M, Construction Cost: HK$1365M; Year 70, Area 86 - Site AB Package Two (Project of Completion: 2000) - 200m high Grade A office Director; M&E Cost: HK$680M, Construction tower (72,850m2 GFA) comprised 33 office floors, Cost: HK$2300M; Year of Completion: 2014) - The 5 floors of entrance lobbies/ plantroom/ concourse proposed development will be implemented in and 4 levels of below ground carpark ramp and two phases; Phase I includes 7 residential towers with 12,200m2 GFA retail portion on top of the LAR with podium including car parks and clubhouse Concourse and basement carpark. facilities, Kindergarten Accommodation, Pedestrian Covered Footbridge and associated works. Paved • DCH Commercial Centre, Quarry Bay (Project pedestrian way and associated utilities services Director; M&E Cost: HK$138M, Construction Cost: and Improvements Works at adjacent road HK$510M; Year of Completion: 2000) - 28 storey junctions and Phase II includes 3 residential towers Grade A office building with 3-level basement and related works in podium not completed in to provide a total area of approx. 36,000m2 with Phase I Development and Improvements Works at modern office facilities. adjacent road junctions. • Grand Central Plaza, Shatin (Project Director; M&E The Development Site occupies an area of about Cost: HK$124M, Construction Cost: HK$500M; 31,490m² and the total residential gross floor area Year of Completion: 1995) - Twin office towers on of the proposed development is approximately top of a 7-storey commercial complex with another 309,696m². 2-level basement carpark; total GFA 80,000m2. • Residential Development at Package 3, Lohas Park, Residential TKOTL 70 (Project Director; Year of Completion: 2011) - 4 nos. of residential towers with 49 to • Agreement No. CB20070021 - Redevelopment of 54 residential floors, a podium with car parking Hung Hom Estate Phase 2 (Team Leader; Year of spaces, loading/unloading spaces, clubhouse Completion: 2012) - 3 nos. 40 & 41-storey non- facilities and a kindergarten accommodation. The standard domestic blocks with a total GFA of about site is situated adjacent to existing Tseung Kwan O 92,000m² and 1 no. single storey carpark block. Depot, between the proposed Road R9 and Road L861. In addition, works outside the site including • Agreement No. CB20070021 - Redevelopment of 2 schools and landscape estate roads are also Tung Tau Estate Phase 9 (Team Leader; Year of included in the development. Proposed Residential Completion: 2012) - 2 nos. 33 & 37-storey non- Development at Area 77 Ma On Shan STTL No. standard domestic blocks with a total GFA of 548 (Project Director; Year of Completion: 2010) - about 50,000m² and 1 no. 3-storey stand-alone 6 residential towers of 23 to 25-storerys with total
  • 99.
    1,173 apartment units,14 nos. 3-storeys garden 23 to 27 storey deluxe residential buildings with houses, 2-storeys clubhouse with swimming pool, 144 units. GFA of approx. 20,000m². a basement carpark and a landscape area. • Ocean Shores, Tseung Kwan O (Project Director; • Residential Development at Tin Shui Wai Lot 24 M&E Cost: HK$800M, Construction Cost: Area 33 – Phase 2 (Project Director; Construction HK$4000M; Year of Completion: 2003) - 5,728 flats Cost: HK$180M; Year of Completion: 2010) - in 3 phases comprising 15 residential towers (47 to Comprehensive residential development with 48-storey) on top of a 3-level podium comprising site area of 161,101m² comprises of 3 blocks of carpark, bus terminus, club house, GIC and 47-storey and 48-storey residential towers (total commercial area of total GFA of.375,000m². 1,100 flats) with a public transport terminus of 6,066m². • Hang Hau Station Property Enabling Work - MTRC TKO Extension (Project Director; M&E Cost: • Residential Development at 20-34 Wood Road HK$66M, Construction Cost: HK$330M; Year of (Project Director; M&E Cost: HK$38M, Construction Completion: 2002) - Detailed design for a covered Cost: HK$210M; Year of Completion: 2009) - A Public Transport Terminus which included 2 bus luxury residential tower of approximately 40-storey lane, 4 GMB/Taxi lane with total floor area 8,000m², of 180m high (approx. 100 flats) over a podium retail space of 3,500m², 3 nos. of basement floors block including clubhouse, carpark and retail shop for carpark and loading/ unloading areas and at street level. scheme design planning for 6 nos. 43 storeys residential towers. • Residential Development at Java Road (Project Director; M&E Cost: HK$35M, Construction Cost: • Harbourfront Landmark, Wan Hoi Street, Hung HK$242M; Year of Completion: 2008) - 38-storey Hom (Project Director; M&E Cost: HK$360M, residential tower, each floor having 5 residential Construction Cost: 1047M; Year of Completion: flats, 1-storey of clubhouse, 1-storey of landscape 2003) - 3 residential towers of 68 to 72 storey which garden, 2-storeys of carpark and 1-storey of shop consisted 324 luxurious apartments units on a area. 7-storey podium of resident club house, 3 floors of office, a main floor lobby and 2 floors of carpark. • Tiu Keng Leng Station Development at TKOTL 73 Total GFA was 62,500m² on site area of 7,400m². Area 73B (Project Director; M&E Cost: HK$210M, Construction Cost: HK$1200M; Year of Completion: Composite Residential/Commercial Development 2008) - Five towers 52-storey residential towers providing 2,096 units with total GFA of 130,000m². • Luxury Residential & Commercial Redevelopment, 35 Clearwater Bay Road (Project Director; M&E • The Pacifica, West Kowloon (Project Director; M&E Cost: HK$800M; Year of Completion: 2008) - 5 Cost: HK$400M, Construction Cost: HK$1300M; blocks 55-storey residential towers (total 2000 flats) Year of Completion: 2005) - Six nos. of 45 to on top of a podium with multi-storey residential 50-storey residential blocks with the maximum carpark, 6-storey commercial complex, and 4 levels height of 177.3m with a prestige club house, indoor of basement with a pedestrian subway linking the & outdoor swimming pools, 5 floor of podium floors existing Choi Hung MTR Station. for shopping arcade, superstore and private & public lorry carpark at West Kowloon Reclamation. • North Part of West Kowloon Reclamation (Site 10), Phase 3 (Project Director; M&E Cost: HK$60M, • 37 Repulse Bay Road (Project Director; M&E Cost: Construction Cost: HK$350M; Year of Completion: HK$45M, Year of Completion: 1994) - 3 blocks of 2005) - Shopping arcade, carparks, public
  • 100.
    transport interchange of3,000m² and social welfare Road (Project Director; M&E Cost: HK$150M, facilities for 4,800 flats with total GFA of 35,000m². Construction Cost: HK$950M; Year of Completion: • 8 Clear Water Bay Road (Project Director; M&E 2003) - 10,486m² site included three residential Cost: HK$60M, Construction Cost: HK$800M; tower blocks of 52-storey residential floors (total Year of Completion: 2005) - 40-storey residential 988 residential flats) plus two refuge floors on top tower (total 316 units) on top of a multi-storey of a 9-storey commercial podium comprising one carpark with over 500 parking spaces, 5-storey basement carpark floor; four aboveground carpark commercial complex (approx. 4,000m²), a bus floors; two levels of retail shops, restaurant and terminus, a public traffic interchange and two levels mega size supermarket; one level of day nursery of basement with a pedestrian subway linking the and kindergarten; and one level of residential club existing Choi Hung MTR Station. house c/w outdoor swimming pool. • Tierra Verde & Maritime Square, LAR Tsing Yi Hotel/Hotel Complexes Station (Project Director; M&E Cost: HK$600M, Construction Cost: HK$3000M; Year of Completion: • Hanoi Road K11 - Redevelopment - Hyatt Regency 2000) - 12 blocks residential towers with GFA Hong Kong, Tsimshatsui (Project Director; M&E 245,700m², a podium shopping centre of 46,170m², Cost: HK$650M, Construction Cost: HK$2500M; GIC/recreation facilities and Transport Terminus. Year of Completion: 2010) - The proposed development of total GFA of 103,000m2 consists • East Point City, Tseung Kwan O (Project Director; of a 10-level podium which include 4-level retail M&E Cost: HK$341M, Construction Cost: (G/F to 3/F), 2-level hotel facilities (4/F to 5/F) and HK$1260M; Year of Completion: 1997) - 7 nos. 4-level plant room, clubhouse and garden (6/F to 39-storey residential blocks (total 2184 units) on 9/F). 2-level of Basement for retail, commercial & top of a 3-storey commercial complex/carpark and restaurant purpose plus 2 more basement floors a basement carpark of total GFA of 170,000m². for carparking and loading/unloading purpose. On top of the podium floors will be constructed • Metro City, Phase 1, Tseung Kwan O (Project with a 56-storey building comprising 15-storey Director; M&E Cost: HK$131M, Construction Cost: 384 guestroom hotel and 37-storey 345 services HK$950M; Year of Completion: 1997) - 6 residential apartment, 2-storey plant room and 2-storey refuge blocks of 37 to 38 storeys built on top of a three floors. level carpark and shop podium. • Hotel Development at 38 Sung Wong Toi Road, • HKHA On Tin Estate and Kai Tin Shopping Centre KIL4013 SD & RP (Project Director; M&E Cost: Extension (Project Director; M&E Cost: HK$110M, HK$86M; Year of Completion: 2009) - 704-room Construction Cost: HK$636M; Year of Completion: 3-star, 20-storey prestigious hotel with F&B and 2004) - Two 37-storey HOS flats tower (2B & 3B) recreational facilities including leisure/pool complex of total 720 units with commercial podium and at To Kwa Wan over a landscape podium and 2 2-storey carparks space and PTI of areas 6,305m² level carpark. Total GFA of 21,400m2. GFA which includes 6 bus lane and 4 GMB lane with total floor area of 6,100m².PSPS at Tuen Mun • Dorsett Olympic Hotel Hong Kong, Tai Kok Tsui Town Lot 360, Area 44 (Project Director; M&E Cost: (Project Director; M&E Cost: HK$21M, Construction HK$125M, Construction Cost: HK$625M; Year of Cost: HK$55M; Year of Completion: 2004) - 150 Completion: 1994) - 15 residential blocks of 23 to rooms hotel development which includes carpark, 29 storeys plus carpark building and commercial gymnasium, restaurants and landscape area. complex. Total GFA of 194,000m². • The Victoria Towers, J/O Canton Road and Austin • Lan Kwai Fong Hotel (Project Director; M&E Cost:
  • 101.
    HK$26M, Construction Cost:HK$83M; Year of Pak Kau College, HKFYG Lee Shau Kee College Completion: 2005) - 160 room hotel development & Ho Ming Primary School (Sponsored by Sik Sik which includes parking, gymnasium, and Yuen), Tin Shui Wai (Project Director; M&E Cost: restaurants. HK$50M, Construction: 249M; Year of Completion: 2006) - Pak Kau College: The total construction Institutional/Education floor area is in the region of 12,000m² and consists of 36 classrooms, 6 special rooms, 4 small group • Teaching Complex at Western Campus, Chinese teaching rooms, a guidance activity room, 2 University of Hong Kong (Project Director; M&E interview rooms, a staff common room, a staff Cost: HK$58M, Construction Cost: HK$200M; room, a conference room, a student activity center, Year of Completion: 2008) - Construction of a a library, an assembly hall, a multi-purpose area purpose-built multi-storey building of approximately and other ancillary facilities. HKFYG Lee Shau Kee 11,000m² GFA including topical communal College: The total construction floor area is in the teaching facilities, seminar/ function rooms, region of 13,500m² and consists of 30 classrooms, classrooms, lecture theatres, teaching and 16 special rooms, 3 small group teaching rooms, research laboratories, offices for staff and research a guidance activity room, 2 interview rooms, a staff personnel, as well as pedestrian footbridge and common room, a staff room, a conference room, a tunnel connections to adjacent existing buildings student activity center, a library, an assembly hall, a including the United College and the Tin Ka Ping multi-purpose area and other ancillary facilities. Building. Ho Ming Primary School (Sponsored by Sik Sik • Redevelopment of Marymount Primary School Yuen): The total construction floor area is in the (MPS) & Improvements to Marymount Secondary region of 9,500m² and consists of 24 classrooms, School (MSS) (Project Director; M&E Cost: 6 special rooms, 4 small group teaching rooms, HK$19M, Construction Cost: HK$139M; Year of a guidance activity room. 2 interview room, a staff Completion: 2006) - Demolition of existing 4-storey common room, a staff room, a conference room, a school building (MPS) with plan area about 650m² student activity center, a library, an assembly hall, a and the construction of a new school complex with multi-purpose area and other ancillary facilities. CFA of13,500m² shared by the MPS and MSS. Conversion and upgrading works are to be carried • Contract No. CAA G30 - ArchSD Consultancy out in the existing MSS retained. Agreement School Improvement Programme Phase IV - Package III (Project Director; M&E Cost: • ArchSD Consultancy Agreement No. CAA L006 HK$146M, Construction Cost: HK$742M; Year - CCC Kei Fat Primary School & SKH Yau Tong of Completion: 2005) - Improvement works for Kei Hin Primary School (Project Director; M&E approx. 44 primary and secondary schools. Each Cost: HK$26M, Construction Cost: HK$230M; school will be provided with a New Annex covers Year of Completion: 2005) - Two 36 classrooms computer assisted learning room, language room, primary schools, each including 9 special rooms, additional classrooms, remedial teaching rooms, 4 supportive education rooms, a guidance activity staff room, library, student activity centre, school room, 2 interview rooms, a staff common room, hall, multi-purpose room, etc. 2 staff rooms, a conference room, a student activity centre, a library, an assembly hall, a multi- • Consultancy Agreement No. CAA K06 - ArchSD purpose area and other ancillary facilities. The School Improvement Programme Final Phase, total construction floor area for each 36 classroom Package 6 (Project Director; M&E Cost: HK$300M, primary school is 12,780m². Construction Cost: HK$700M; Year of Completion: • ArchSD Consultancy Agreement No. CAA L062 - 2006) - Improvement works for 30 existing primary
  • 102.
    and secondary. Eachschool with additional floor Fitting Out area which covers computer assisted learning room, language room, classrooms, staff rooms, etc. • Shell Headquarter at Times Square (Project Director; M&E Cost: HK$7M; Year of Completion: • Graduate Residences & University Centre, Senior 1993) - 6,500m2 office fitout including a computer Staff Quarters - Site B, Hong Kong University of room of 100m2 equipped with UPS, CRAC and Science & Technology (Project Director; M&E Cost: special fire fighting systems. HK$110M, Construction Cost: HK$480M; Year of Completion: 1998) - Consultancy services for • Hewlett Packard at Times Square (Project Director; design and construct contract won by Gammon M&E Cost: HK$7M; Year of Completion: 1993) - Construction Limited which included a Graduate 8,000m2 office fitout and computer room facilities Residence, University Centre and Senior Staff with all special M&E systems. Quarters. • Standard Chartered Bank, Millennium City (Project • Tsui Tsin Tong Building, University of Hong Director; M&E Cost: HK$82M; Year of Completion: Kong (Project Director; M&E Cost: HK$16M, 1999) - Office fit-out for 27 floors (Level 5 to Level Construction Cost: HK$50M; Year of Completion: 33) of total GFA 43,200m2 with two computer 1996) - 12 storey building with 3 storey of Art rooms (one for main frame/data processing Gallery connected to Fung Ping Shan Museum equipment and one for server) with total floor area by a bridge; 2 floors lecture rooms/theatres of 900m2. Professional and Continuing Education (SPACE) with GFA of 4,600m². Additional/Alteration Works Transportation/PTI/Tunnel • Harbour Place, Hung Hom (Project Director; Year of Completion: 2008) - A&A works to the existing • Hong Kong International Airport East Hall buildings at Hung Hom with 7 nos. 35-storey Redevelopment, Chek Lap Kok, Lantau (Year residential towers (2470 units), podium garden, of Completion: 2003) - For the redevelopment club house, retail, carpark and GIC facilities. of the East Hall (the main air-side departure hall), Meinhardt provided a world-class team Renovation and produced an innovative design to meet the Authority’s retail ambitions. The East Hall project • Rehabilitation for Lai Tak Tsuen (Project Director; was conceived to enhance passenger circulation Construction Cost: HK$60M; Year of Completion: and satisfaction, and to optimise retail revenue, but 2009) - Rehabilitation work for 8 rental blocks with within operational constraints. 2677 domestic flats and 226 carparsk, 12 shops, 20 market stalls and community facilities such as • Lantau North-South Link, Tunnel Ventilation kinergarten, youth centre, elderly centre, nursery and Systems (M&E Cost: HK$320M; Year of and library. The site area is approx. 25,548m2 and Completion: 2000) - Investigation and preliminary non-domestic area is around 2,432.97m2. design of tunnel options between Tai Ho Wan and Mui Wo for Highways Department. • ArchSD Contract No. RF M321 D&C for the Renovation of Libraries (Phase 1) (Project Director; • Kai Tak Airport Tunnel (Executive Engineer) - Construction Cost: HK$150M) Responsible for mechanical, electrical & ventilation designs. • Mandarin Oriental Hotel Refurbishment, Central
  • 103.
    (Project Director; M&ECost: HK$70M; Year of for Regional Councils Swimming Pools (Project Completion: 2003) - Comprehensive renovation Director; M&E Cost: HK$66M; Year of Completion: works for the hotel including guest rooms, tower, 1997) - Conversion of 6 nos. pools to ozone podium, central plant and main distribution sterilization plus the installation of heating in 2 nos. systems. Environmental Leisure/Recreation • Island West Transfer Station, Western Hong Kong • Contract No. SSM342 (Programme No. 385RO) - Island (Project Director; M&E Cost: HK$80M, Tsim Sha Tsui Promenade Beautification (Project Construction Cost: 640M; Year of Completion: Director; M&E Cost: HK$20M, Construction Cost: 2001) - Excavation of two caverns and access HK$240M; Year of Completion: 2007) - ‘Tsim tunnels of 35,500m3, together with service and Sha Tsui Promenade Beautification’ is under administration buildings at Mount Davis, Western the control of the Tourism Commission with the for Swire BFI’s new Waste Transfer Station serving implementation by the Architectural Services Hong Kong Island. Department. • Outlying Island Transfer Facilities (Project Director; The project involves the beautification works of Construction Cost: HK$135M; Year of Completion: along the sea frontage stretching from the Ocean 2002) - Construction of seven Waste Transfer Terminal, the Hong Kong Cultural Centre, the Stations for Swire BFI, located at the Outlying Hong Kong Museum of Art, the promedade along Islands towns within Hong Kong Waters. Daily the Tsim Sha Tsui East Water Front up to the throughputs vary between 10 and 100 tonnes/day International Mail Centre. of domestic, commercial industrial, construction and sludge wastes. The objectives of this improvements works is to accentuate their status as the Cultural Core of PRC Hong Kong and as a landmark viewed across Victoria Harbour from Hong Kong side. The • Shanghai Star City at Henan Nam Road (Year beautification work includes the construction of of Completion: 2009) - The development mainly tourist information centre, café restaurant and consists of commercial, hotel, retail, F&B and Sunday market and other facilities to improve the entertainment facilities, site area approx. 22,780m². outdoor landscape including lighting and “Tide Dial” to enhance and harmonize the lighting effect • Huai Hai Zhong Lu Development in Xu Hui District, of “Promenade Along with the Tide”, landscape Shanghai (Project Director; M&E Cost: HK$970M; areas and building facades. Construction Cost: HK$2900M; Year of Completion: 2010) - Mixed Development with retail, residential, • Programme No. 011LS - HKJC Public Swimming and/ or service apartment hotel and offices. This Pool, Area 26 Phase II, Shatin (Project Director; Development is integrated with new underground M&E Cost: HK$11M; Year of Completion: 1997) - MTR lines and stations. Secondary pool, children’s pool, sun bathing area and associated facilities including pool filtration • Shanghai Peninsula Hotel, PRC (Project Director; and ozone sterilisation system. Year of Completion: 2009) - 250 rooms 5-star 15 storey prestigious hotel and 47 units apartment • Item No. 281LS - Agreement No. CAB C19 type hotel on Bund with 3 levels basement and Consultancy for Building Services, Installation carparking, swimming pool, clubhouse, retail, for Conversion to Ozone Sterilization System service apartment, restaurant and landscape
  • 104.
    garden. Total GFAof 96,000m². • Galaxy Starworld Hotel, Macau (Year of • Hong Kong Metropolis, Shanghai, PRC (Project Completion: 2007) - Casino and and hotel Director; M&E Cost: HK$48M; Year of Completion: complex development which consists of 2 levels 2009) - Preliminary design of E&M system include of basement, 7 levels of casino floors, 6 levels of 3 basement floors and 5 storey podium out of 7 entertainment floors and 18 levels of hotel floors. storey. The building height is approx. 160m with total GFA 97,000m2. • Taikoo Hui - Guangzhou Cultural Plaza (Guangzhou Daily News HQ), Guangzhou, • Mixed Use Development at Lot B, Zone B, Macau PRC (Project Director; M&E Cost: HK$1000M, (Year of Completion: 2007) - 9 nos. of 40-storey Construction Cost: HK$4000M; Year of Completion: residential towers, 1 42-storey hotel tower, 3 2010) - The development will consist of a 39-storey levels retail podium, 2 levels basement carpark office tower, a 28-storey tower of which 17 storeys and loading/unloading bay, 4 levels of carpark are office and 11 storeys are boutique hotel (Swire and 1 level of mechanical floor with a total GFA of Hotel Guanzhou), 27-storeys hotel (Mandarin 235,000m2. Oriental Guangzhou) (57,400m²), 3-level podium and 4-level basements. • Sumitomo Bake Lite Macau Factory, Macau - Design and prepare the tender drawing for The podium and basement will include 5-storey plumbing and drainage services for the captioned retail mall (100,000m²), 2-level of underground project according to Macau’s water department carpark (62,000m²), and a 10-storey cultural centre code of Practice and client’s requirement. (49,000m²). Total GFA of 456,000m². • Cooling Load Assessment Consultancy for Macau • Commercial Development at Chongwenmennei Fisherman’s Wharf, Macau Street, Beijing, PRC (Project Director; M&E Cost: HK$500M, Construction Cost: HK$1500M; Year • Crown Macau - Fire Engineering Consultant, of Completion: 2005) - 5 blocks office building Macau - Fire Engineering Consultant for the Podium with one 12-storeys and four 8-storeys, 763 nos. Entertainment Premises of the above projects. It carparking at Basements 2 to 3, retail and cinema consists of Level 1, Level 1M, Level 2 Level 3/3M, at B1/F, G/F and 1/F. Total GFA of 198,845m². Level 5/5M, Level 6, Level 8 and Level 9. With the large compartment, the Architect will require a fire • Ice-Cream Factory, Shanghai, Jiangsu Province, engineering approach to establish the fire provision PRC (Project Director; M&E Cost: HK$11M, and strategy for non-compliance items. Construction Cost: HK$130M; Year of Completion: 1998) - An ice-cream factory with site area of • Casino / Hotel Block, Ponte 16, Macau - Fire 70,000m² comprised production building, cold Engineering Consultancy (Year of Completion: store, dry store, office building, services building 2007) - A Fire Engineering Report covers the and other ancillary buildings. provisions of Fire detection and fire suppression design, smoke management strategy, means of Macau escape and other relevant issues. • Macau Studio City (Year of Completion 2008) - The project consists of hotels (Ritz Carlton Hotel, Marriott Hotel, W Hotel, & Tang Hotel), services apartment, casino, theatre and retail with GFA 3,450,000 ft².
  • 105.
    John Kin CHANG INFRASTRUCTURE CONSULTANT PROFESSIONAL QUALIFICATIONS Previously John was involved in the SkyPlaza tender and responsible for the redesign of the superstructure • Master of Science in Structural Design, University in precast concrete. Also, john was an integral part of College London, University of London (1994) the tender team on the KDB200 KCRC West Rail-East • Bachelor of Engineering in Civil Engineering, Rail Link and was responsible for the West Kowloon Imperial College, London (1993) Station design team after award of contract. PROFESSIONAL AFFILIATIONS KEY PROJECTS • Registered Professional Engineer (2000) 1999 – Present • Chartered Engineer (1999) Meinhardt (C&S) Ltd. as Technical Director. • Member of Hong Kong Institute of Engineers (1999) • Member of Institution of Structural Engineers (1998) Project involvement: RELEVANT EXPERIENCE HAECO No.3 – project engineer responsible for the scheme and detailed design for 154m span aircraft John has a wide range of structural engineering maintenance hangar. experience and has been involved in several complex projects while he has been with Meinhardt. KCRC KDB200 West Kowloon Station - project engineer responsible for the tender and detailed design for the His technical knowledge covers all aspects of structural design and build contract involving diaphragm wall and design and includes reinforced / precast / prestressed pre-bored H-piles. concrete as well as structural steelwork. John is an extremely methodical engineer and has become an Hong Kong International Airport, SkyPlaza - project expert in structural steel design to the latest limit-state engineer working with contractor at tender stage to Codes of Practice. produce alternative design using precast concrete John’s work has involved the detailed design of the KCRC SCL700 Admiralty Station - project engineer New TV City for TVB and was responsible for all responsible for the scheme and detailed design of cut reinforced concrete and structural steelwork design and cover/cavern station requiring underpinning of on the project. This included the design of two large existing footbridge and MTRC substation. studio blocks using steel frames, long span steel trusses and composite floor construction. The total Hong Kong Disneyland Theme Park, Main Street - steel for the project was approximately 2500 tonnes. project engineer responsible for the detailed design of John carried out all the detailed fire engineering for the 5 low rise buildings in structural steelwork with external steelwork saving the client the steelwork fire spray and stud wall façade construction. associated costs. Hong Kong International Airport, East Hall Extension He has also been involved in the design of the East - project engineer responsible for the detailed design Hall Extension at the Hong Kong International Airport of a 3-storey reinforced/pre-stress concrete building and has been responsible for the detailed design of the consisting of a structural steel roof, curtain wall, project and for submitting the drawings to the Buildings composite slabs and pre-cast T-beams, including Department on time, within an extremely tight schedule. extensive internal fitout consisting of shop-fronts and John’s experience also covers working in collaboration architectural icons. with large contractors helping them with tender bids.
  • 106.
    KCRC SCL300 ShaTin to Central Feasibility Study Sogo Department Store A&A works - site supervision of - design engineer responsible for the preliminary opening in diaphragm wall to provide improved access design of the cut and cover stations and underpinning from Causeway Bay MTRC Station schemes for existing highway and building structures ASD School Improvement - detailed design of major along the proposed rail link. renovation work for 24 schools consisting of a 7-storey extension and a 2-storey sports deck TVB TV City, Tseung Kwan O, Hong Kong - design engineer responsible for the detailed design of United Christian Hospital - detailed design and all structural steelwork including 2 state of the art statutory submission of hospital extension. production studios with structural support for acoustic walls, maintenance catwalks and lighting fixtures. Tseung Kwan O Area 19B - detailed design and site supervision of a housing development consisting of 7 Aldrich Bay, Hong Kong - project engineer responsible high rise tower blocks and a 3 level podium structure. for the detailed design of pre-cast concrete bay windows and staircase. KCRC West Rail Tuen Mun Station - project engineer responsible for the temporary works design including earth dam and scheme for the diversion of storm water in existing nular to enable construction of proposed station. 1994 – 1999 Maunsell Consultant Asia Ltd. as Graduate Engineer. Project Involvement: Tung Chung Station Development - Package One – detailed design and site supervision of a high rise residential and commercial development requiring top- down construction. Nestle Dairy Farm, Yuen Long – site supervision of floor screed repair work KCRC West Rail DD210 - demolition and reinstatement works for petrol station ASD Government Quarters, Fanling - tender bid for a design and build contract of a 30-storey residential apartment block.
  • 107.
    Martin WEBSTER INFRASTRUCTURE CONSULTANT PROFESSIONAL QUALIFICATIONS the implementation of innovative procurement methods and contract packaging employed to develop the more • Environmental Engineering Polytechnic Certificate complex sections of Material Handling Systems and IT design in advance of the building. RELEVANT EXPERIENCE Contract P225 - Passenger Terminal Building (PTB) Martin has over 20 years experience in the construction Enhancement Works of the Hong Kong International industry, working on complex multidiscipline Projects. Airport. Commercial Director responsible for overall He has extensive experience in project management commercial delivery of the Lead Consultancy. including design management, commercial management, procurement management, planning The Project consisted of capacity enhancement and programming analysis and specialist skills in projects which included the reconfiguration and commercial management of building services works. expansion of all the Passenger Terminal Building (PTB) arrivals concourse, departures and arrivals Martin’s knowledge of the local market has been immigration halls and transfer areas. Multi-phase, established over the past 13 years working in the Hong 5-year construction programme includes multiple Kong construction industry on large infrastructure AAHK / CIQ stakeholders to be moved including all projects. Recent and current projects include the main immigration systems and hubs. Project Directorship of multi discipline design teams on fully integrated design projects including all Hong Kong International Airport Contract P114 - disciplines (Architectural, Structural, Civil, M&E and Fire West Hall Expansion Project. Commercial Director Engineering Services). responsible for managing a multidisciplinary design team consisting of Airport Planning, Architectural, 2005 – Present, Meinhardt Management Asia Ltd Civil & Structural, M&E and QS teams for this Design 2005 – 2005, ISG Asia (Hong Kong) Limited Feasibility Study (DFS). 2004 – 2004, OF Management 2003 – 2004, ISG (Japan) Limited Commercial Manager The scope for the Study was to develop several 2001 – 2003, Hsin Chong Aster concept designs for a major extension and 1995 – 2001, AEH JV refurbishment of the existing passenger terminal at 1989 – 1995, Laing Management Chek Lap Kok. Deliverables included design reports 1987 – 1989, Matthew Hall Mechanical and Electrical detailing the options, including discussions on the Engineers advantages and disadvantages of each, budget 1984 – 1987, Anglo Middle East Construction costings for each option and estimated detailed design Consultants and construction schedules. KEY PROJECTS Aircraft Maintenance Hangar No. 3 (HAECO). Project Director responsible managing a multi disciplined 2005 - Present design team consisting of , Architectural, Civil & Meinhardt Management Asia Limited – Director Structural, M&E, Fire Engineering and QS team to develop a design with specific client criteria namely: Cathay Pacific Cargo Terminal, Chek Lap Kok Airport, To design a functional Facility that fully meets all the Hong Kong. Project Director for the detailed design User Requirements for the lowest cost ; To design a of this facility, which is to be the largest cargo terminal Facility which takes account of its anticipated life and in the world in terms of cargo throughput when built changing business environment; To design a Facility (subject to franchise award). Martin is responsible for that safeguards the design and construction of Hangar
  • 108.
    3B at afuture date; To design a Facility with a pleasing appearance at no additional expense; To design a Facility that is environmentally friendly taking account of international practices. Aircraft Maintenance Hangar No. 2 (HAECO). Project Director responsible for delivery of the Project during the Procurement and Construction Phases of Project with a very short 404 day construction programme. Martin’s hands on approach to managing the multidiscipline design team, the main contractor and various named subcontractors enabled the project to be successfully completed within programme and allow commercial operation to commence. OTHER EXPERIENCE Northwest Concourse Extension Chek Lap Kok International Airport Hong Kong – HKD 370 Million New Airport Terminal Building Chek Lap Kok International Airport Hong Kong – HKD 2 Billion C1 Contract Cyberport Development – HKD 340 Million Goldman Sachs HQ Fit Out Tokyo – USD 120 Million Westminster and Chelsea Hospital London – GBP 180 Million Cyberport Residential Club House Fit Out – HKD 50 Million Auditorium and Gymnasium Fit Out Tokyo – USD 10 Million Military Intelligence Building – GBP 60 Million Royal Bank of Scotland HQ London – GBP 17 Million New Underground Operations Centre – GBP 650 Million Broadgate Phase III Union Bank of Switzerland Fit Out – GBP 27 Million
  • 109.
    Glenn Stephen MORRIS INFRASTRUCTURE CONSULTANT PROFESSIONAL QUALIFICATIONS meter long, 13 meter working section aircraft jet engine testing facility with a multi-storey control • Master of Business Administration, 1993 RMIT building and special compressed air and fuel • Master of Engineering Science Degree, 1987 storage and services installations. GFA of 1,700m2 Monash University facility designed to cater for all current and next • Bachelor of Engineering (Civil) 1981 Monash generation of jet engines. University • HAECO Engine Strip & Build Workshop - TKO (Construction Cost: HK$170M; Year of Completion: RELEVANT EXPERIENCE 1997) - High bay height workshop for overhaul of jet aero-engines with materials handling Professional Experience in the fields of masterplanning, system with 22T cranes/monrails giving total floor design, and full project management (concept planning/ coverage. Special ventilation system for large design/procurement/construction/cost and program) single compartment workshop. GFA of 4,500 of large scale end – user focussed projects. Set up m2. Full project management and consulting Meinhardt’s Project Management Company (Meinhardt engineering services provided. Asia Pty Ltd) to provide Project Management Services to • Component/Avionic Overhaul Facility at Tseung the Hong Kong and Asia sector. Kwan O (Design Management and Lead Civil/ Structural Engineer; Construction Cost: HK$350M; PROFESSIONAL EXPERIENCE Year of Completion: 1999) - A 5-storey building complex (22,000m2 GFA) to accommodate 1999- Present, Managing Director Component Overhaul, Avionic Overhaul, Stores Meinhardt (Australia) Pty Ltd (Engine/Component Parts), Canteen/Amenities, Technical Training and Administration. 1993-1999, Director Meinhardt (Hong Kong) Pty Ltd Meinhardt Management Asia Ltd Hospital/Health Care Centre 1991-1992, Technical Director • Pok Oi Hospital - Redevelopment & Expansion Meinhardt (Victoria) Pty Ltd Civil /Project Management (Senior Project Manager; Construction Cost: HK$2000M; Year of Completion: 2006) - 1988-1991, Senior Project Engineer Redevelopment of Pok Oi Hospital includes Meinhardt (Victoria) Pty Ltd demolition of the existing hospital in phases and construction of temporary buildings to maintain the 1984-1988, Project Engineer daily operation of the hospital at a reduced scale Gutteridge Hoskins and Dorey Pty Ltd until the target completion of the new HK$1,600M, 622 beds hospital complex in late 2005. 1981-1984, Investigations Engineer • Faculty of Medicine, University of Hong Kong State River and Water Supply Commission (Construction Cost: HK$1200M; Year of Completion: 2001) - 12-storey laboratory building KEY PROJECTS including Bio Chemistry, Physiology, Traditional Chinese Medicine and Clinical Research Industrial/Industrial Plant Departments, and a 10 storey Academic & Administration Block including a library, lecture • HAECO Jet Engine Test Cell Facility - TKO theatre, tutorial, common rooms, nursing studies (Design Management and Lead Civil/ Structural auditorium, general office and community medicine Engineer; M&E Cost: HK$20M, Construction areas. Prior to the redevelopment, the existing Cost: HK$230M; Year of Completion: 1997) - 110 building was demolished. As the site is bounded
  • 110.
    by several steepslopes, extensive geotechnical, innovative fire safety strategy, all within a fast-track slope stabilisation (during the demolition), and site 12 month design programme to Contract Award. formation works were undertaken as part of this • MTRC Yau Tong Station and Tunnels, TKO Line project. Extension (Design Manager; M&E Cost: HK$270M, Construction Cost: HK$1400M; Year of Completion: Schools/Education/Institutional 2002) - Lead consultant for this 4 platform station which included the station, over 1km of stacked cut • Sheffield City Polytechnic, UK - New lecture theatres and cover tunnels and all adjacent infrastructure and seven-storey office building suspended above diversions and provisions. existing gymnasium using long-span composite • Olympic Station Underpass & Footbridges flooring, storey-height bridging structures and (Construction Cost: HK$500M; Year of Completion: bearings. 1998) - Meinhardt was the lead consultant and project manager providing Civil and Structural Transportation/PTI/Tunnel Services in joint venture with WORKS & RBA. The works included a 3 storey 230m long station • Hong Kong International Airport East Hall structure including two LAL platforms with piled Extension, Chek Lap Kok (Project Manager; Year of foundations over Cherry Street Underpass and a Completion: 2004) - Design and construction related multicell Drainage Box Culvert. Also included were services for the reconfiguration and expansion of 320m ling vehicle underpass, a 150m long 75m the Passenger Terminal Building (PTB) East Hall. twin span cable-stayed 6m wide footbridge and The works include two extension structures (approx. five other short-span PT-concrete-box footbridges 6,000 square metres total) and the reconfiguration with steel framed canopy serving the Station from of the existing retail and F&B outlets in the airside adjacent developments. departure hall. • Peak Tram (Design Manager) - Responsible for Additional/Alteration Works car, track, bridges, slopes and retaining structures upgrade studies. • Li Fung Tower, Cheung Sha Wan (M&E Cost: HK$85M, Construction Cost: HK$250M; Year Railways of Completion: 1998) - A&A works for this refurbishment project including conversion of two • MTRC TKE C617 Tseung Kwan O South Station industrial buildings to industrial/office buildings. (Design Team Leader; M&E Cost: HK$150M, Construction Cost: HK$600M; Year of Completion: 2004) - The TKS Station is to be built alongside the new Tseung Kwan O Depot and will serve a projected population of 55,000 within the adjacent Area of Property Development. The station facilities also include an adjacent public transport interchange serving the surrounding area. • LAR Siu Ho Wan Depot, Phase 2 (Design Team Leader; M&E Cost: HK$50M, Construction Cost: HK$250M; Year of Completion: 2002) - Phase 2 works included substantial building (over 9000m2) and trackwork provisions across a reclaimed site with significant settlements and required an
  • 111.
    Tony DOUGLAS INFRASTRUCTURE CONSULTANT PROFESSIONAL QUALIFICATIONS KEY PROJECTS • Member of the Australian Institute of Project • Shell Australia Retail Rollout – Project Manager Managers responsible for the management and delivery of Shell’s retail network expansion program. RELEVANT EXPERIENCE Responsible for all aspects of the project delivery including design management, procurement, Tony has more than 16 years experience in design and contract administration, cost control, liasing with construction project co-ordination & delivery, working authorities and project closeout. on both client and consultant teams. With a strong Construction and Project Management background, • Cairns Port Authority – Design Management - With Tony as wide-ranging experience in all aspects of a strong construction background, Tony has wide construction project delivery, both as a design manager ranging experience in all aspects of the Design and a multi-disciplinary team leader. He has acted as Management of design and construction of retail Project Manager or Design Manager on major projects and residential projects, both as a design manager with contract values ranging from $5M to $74M, and a multi-disciplinary team leader. working on both consultant and client teams. His core skills include a thorough appreciation of engineering, He has acted as Project Manager or Design architectural, programming and financial issues, multi- Manager on major projects with contract values disciplinary co-ordination and timely and effective ranging from AU$5M to AU$200M, working on both project delivery. consultant and client teams. His core competency is a thorough appreciation and application of PROFESSIONAL EXPERIENCE engineering, programming, budget control and financial skills which enable him to perform multi- 2004 – Present, Project/Design Manager disciplinary co-ordination for timely and effective Meinhardt Australia Pty Ltd project delivery. 2003 – 2004, Development/Construction Manager • Qantas Airlines – Project Management, Australand Holdings Limited superintendence, Muiti-discipline Design Management and Site Coordination for the 1992 – 2003, Development Manager redevelopment of the existing Qantas Freight Australand Holding Limited Facility at Melbourne Airport. 1998 – 2002, Project Manager The Project consists of general building works, Annett Australia Limited the replacement and expansion of the materials handling equipment in the main facility and the 1997 - 1998, Construction Manager installation of new equipment in the proposed Contract Glass & Glazing “by-pass” area including cool/cold rooms, the installation of a stand-by generator into the 1996 - 1997, Site Manager GJN Pty Ltd basement. The works are to be carried out while maintaining normal operations to Qantas’ freight 1989 - 1996, Director Façade Industries Pty Ltd business.
  • 112.
    Australand Holdings Limited – Residential • Annett Domestic Terminal – Fixed Ground Power Developments (various locations) Development installation BNE, SYD &MEL Superintendent/ Manager responsible for the delivery of 285 Project Manager for Ansett Australia managing the Residential Apartments with-in three developments main contractor and fore filling the roll as Contracts with a total construction cost $120m administrator, responsible for the design co- ordination and delivery of the project. • Annett Domestic Freight Terminal Redevelopment Masterplan -Brisbane Airport Project Manager responsible for the feasibility and design management of the facility at BNE to accommodate the expected increase though put of the domestic cargo • Annett Int. Freight Redevelopment – Sydney International Airport Superintendent/Project Manager for Ansett Australia managing the main contractor and fore filling the roll as Contracts administrator, responsible for the design co- ordination and delivery of the project. • Annett Int. Freight Redevelopment Masterplan – Melbourne Airport Project Manager responsible for the feasibility and design management of the facility at MEL to accommodate the expected increase though put of the domestic cargo • Annett Australia National Security Up-grade - (various locations) Project Manager reporting to the National Security Manager to facilitate the up-grade of all the freight terminal perimeter boundaries prior to the 2000 Olympics. • Annett Domestic Terminal Redevelopment – Sydney Domestic Airport Superintendent/Project Manager for Ansett Australia managing the main contractor and fore filling the roll as Contracts administrator, responsible for the design co- ordination and delivery of the project.
  • 113.
    Kee Seng TAN ROADS & TRANSPORT ENGINEER PROFESSIONAL QUALIFICATIONS 1998 – 2000 Site Supervisor and M&E Co-ordinator Bestbuild Dev. • MSc (Eng) in Transport Planning and Engineering Pte Ltd., Singapore (Distinction), ITS, University of Leeds, United Kigndom 1996 – 1998 • Bachelor of Engineering (1st Class Hons.) in Civil Site Supervisor Hor Kew Pte Ltd, Singapore Engineering, University of Salford, UK • Certificate of Engineering in Building 1996 Services Engineering, POLIMAS Polytechnic, Site Supervisor Kwong Chin Construction, Malaysia Malaysia 1995 PROFESSIONAL AFFILIATIONS M&E Trainee City Bayview Hotel Penang, Malaysia • Chartered Engineer, Engineering Council (EC), UK KEY PROJECTS • MICE Chartered Civil Engineer, Inst. of Civil Engineers (ICE), UK • M6 RMS, UK • Construction Skills Certification Scheme for • Manchester Harpurhey Gala Bingo Development, Manager, Construction Industry TB, UK UK • Manchester Harpurhey Golden Lion Residential PROFESSIONAL EXPERIENCE Development, UK • Manchester Water Street Mixed-Use Development, Feb 09 - Present UK Principal Engineer Meinhardt (Singapore) Pte Ltd • Merseytravel Interchange Improvement Scheme, UK 2007 – 2008 • Midland Motorway Box RMS and Accident Dept Head / Principle Engineer Designate Hyder Analysis, UK Consulting Limited, Hong Kong • Ramp Metering Support Project, UK • Rochdale Queensway Neighbh’d Mixed-Use 2006 – 2007 Redevelopment, UK Senior Traffic Engineer Sinclair Knight Merz, • Salford Quay Dock Office Development, UK Manchester, UK • Sheffield Nelson Mandela Redevelopment, UK • Slough Town Centre Traffic Analysis, UK 2003 – 2006 • St. Helens Eccleston Work Redevelopment, UK Transport Engineer/Planner Atkins, Manchester, UK • St. Helsn Rugby Football Club Traffic Study, UK • Wakefield Waterfront Redevelopment Master 2001 – 2002 Planning, UK Senior Residence Castle Irwell Student Village, Salford, UK • Wales Port Talbot Renewable Energy Plant Development, UK 2001 • Chek Lap Kok New CAD Development, Hong Kong Assistant Structural Engineer Mivan Limited, • Chek Lap Kok New CAD Design and Construct, Manchester, UK Hong Kong • Kowloon – City University 3+3+4 Extension 2000 – 2002 Development, Hong Kong Night Concierge Copthorne Hotel Manchester, • Kowloon Inter-Reservoir Transfer Scheme, Hong Manchester, UK Kong
  • 114.
    Pak Sek Kok Environmental Study, Hong Kong • New Territory – Lingnam Academic Building Development, Hong Kong • Shatin Pass Estate Temporary Traffic Management, Hong Kong • Tseung Kwan O Hospital Extension, Hong Kong • Tuen Mun Area 44 Complex & Fish Market Redevelopment, Hong Kong • Tuen Mun – Heung Sze Wui Road Traffic Study, Hong Kong • Tuen Mun Highway Widening Temporary Traffic Management, Hong Kong • Wo Hup Sek Crematorium and Columbarium Redevelopment, Hong Kong • Wog Tai Sin Phase 3 Temporary Traffic Management, Hong Kong • 20 Tolls Traffic Forecasting and Operation & Maintenance, China • Beijing International Copyright Trading Centre Development, China • Beijing Simatai Great Wall, Salam Resort and Spa, China • Guangdong Huizhou – Dan Shui Development, China • Guangdong Shenzhen Bus Rapid Transit, China • Dalian Coastal International Centre Mixed-Use Development, China • Tianjin Comprehensive Transportation Study, China • Da Nang – Quang Nam, Salam Resort and Spa Development, Vietnam • Hanoi Chau Boc Complex Redevelopment, Vietnam • Hanoi – Hai Phong – Lach Huyen Bridge Highway Traffic, Vietnam • Truong Le Mountain – Eco Tourism Resort Development, Vietnam • Hyderabad Hyatt Regency Hotel Development, India • Hyderabad Uppal Mixed Development Mall Development, India
  • 115.
    Dr. Ing Hieng WONG GEOTECHNICAL CONSULTANT Dr. Wong is a registered professional engineer with has considerable experience. He was a geotechnical over thirty years of experience in the field of consultant on a number of deep excavation projects geotechnical and civil engineering. This experience for buildings, including the Raffles City Complex, the extends over a wide range of facilities. His Capital Tower, the Fullerton Square, the Empress experiences have included the planning and Place Building, the Regency House and the Hillside supervising field exploration, laboratory testing, Condominium. He was a consultant or conducted engineering analysis report preparation, foundation research on the design and construction of the and earth works design and construction underpass and tunnels for the underpass at the Bukit supervision. Timah Road and Farrer Road and for the Central Expressway, the pedestrian underpass at Maxwell Road Dr. Wong is the Geotechnical Team Leader and the vehicular underpasses beneath the aprons at representing Meinhardt in Contracts C870D and Changi Airport. He has also been a consultant on deep C870H. excavation and tunnelling on various MRT projects. Dr. Wong was a consultant on the Lippo Life City project in Dr. Wong has significant experience on the Jakarta, Indonesia involving thirteen 39-storey high-rise geotechnical aspects of the design and construction building, all with deep basements. of infrastructure facilities, high-rise buildings and deep basements. He performed research on the The following is a summary of the projects Dr Wong performances of full-scale test sections of braced worked on that are relevant to Contract excavations for two subway tunnels in Boston. 870G: a) Deep basement projects: Raffles City Complex, He was a consultant on tunnelling and cut and cover Capital Tower, Regency House, Fullerton Square, excavations during the construction of the mass rapid Hillside Condominium, Empress Place Building, transit system in Singapore. He has also worked on Changi water reclamation plant; a number of deep excavation projects for high-rise b) Cut and cover tunnels: Underpass along Bukit buildings, depressed roadways, and below ground Timah/Dunearn Roads at Adam/Farrer Roads, storm water storage facilities. Other transportation Central Expressway; MBTA tunnels in Boston, USA projects Dr. Wong was the lead geotechnical engineer c) Underground MRT Stations: NSL Dhoby Ghaut on include an expressway on soft ground, vehicular Station, NEL Dhoby Ghaut Station; CCL3 Bartley, tunnel underpass beneath airport aprons. He was also Serangoon, Lorong Chuan and Marymount consulted or conducted research on the design and stations, interaction between the construction construction of the underpass and tunnels for of SMU basements and the Museum station for the underpass at the Bukit Timah Road and Farrer Marina Line, Harbour Front Interchange Station and Road and for the Central Expressway. One North Station.. d) Bored tunnels: Six km long CCL3 twin tunnels Dr Wong was a consultant on several contracts of the from Bartley to Marymount; NSL tunnel from North-East Line. Currently he was a consultant for the Dhoby Ghaut to City Hall; NEL tunnels from Clarke Marina Line advance work at Dhoby Ghuat station. Quay to Dhoby Ghaut, DTSS Contract T02 tunnel, Currently he is the consultant on the advance work Senoko cable tunnel, Seletar Link Sewer tunnel, for the deep excavation for the Marina Line depot at Bi-County Water Tunnel, Maryland, USA, proposed Kim Chuan, and the geotechnical team leader for the Supercolliding Superconductor Tunnels, New York. design of Contract 870C, 870D and 870H for the e) MRT Depots: NSL Bishan depot, CCL2 Kim Chuan proposed Circle Line. depot; f) Underpinning: Federal Courthouse Building, Performance of deep excavations and of basement and Philadelphia, USA, Foochow Church next to NEL belowground structures is an area in which Dr. Wong Contract 706, Conversion of Empress Place to
  • 116.
    Second Wing ofthe Asian Civilisation Museum, PROFESSIONAL EXPERIENCE building at Duxton Hill, Fullerton Hotel, buildings along CCL3 tunnels. Mitic Associates • Consultant, Meinhardt 2001 – to date PROFESSIONAL QUALIFICATIONS • Principal Consultant, 1998 - to date • Imperial College, London University - BSc in Civil School of Civil & Structural Engineering, Nanyang Engineering with First Class Honours - 1967 Technological University • Massachusetts Institute of Technology - MSc in • Professor, 1992 to 1998 Geotechnical Engineering - 1968 • Massachusetts Institute of Technology - Doctorate GCE Consultants, Inc. East Brunswick, NJ; in Geotechnical Engineering – 1971 1988-February, 1992 • President, 1988-1992 PROFESSIONAL AFFILIATIONS Ebasco Services Incorporated, New York, NY; 1978-83 • Tunnelling and Underground Construction Society and 1986-88 (Singapore) – Member and Past President • Head-Geotechnical Services Department, 1986- • American Society of Civil Engineers - Member 1988 • Institution of Engineers, Singapore – Member • Senior Consultant, 1986-1988 • University Appointment: Professor of Civil • Consultant, 1978-1983 Engineering, Nanyang Technological University, • Singapore 1992 - 1998 Dames & Moore, Cranford, NJ ; 1971-72 and 1974-78 • University Appointment: Adjunct Professor of Civil • Technical Consultant, 1977-1978 Engineering, Columbia University, New • Project Manager, 1974-1976 • York, New York, 1987-1989 • University Appointment: Adjunct Professor of Civil Massachusetts Institute of Technology, Cambridge, Engineering Polytechnic University, New Massachusetts; 1968-1971 • York, New York, and-1986 - 1987 • Research Assistant • University Appointment: Associate Professor, Nanyang Technological Institute, Singapore, T William Lambe & Associates, Cambridge, • 1983-1986 Massachusetts; 1967-1968 • University Appointment - Adjunct Associate • Engineer Professor of Civil Engineering, Columbia • University, New York, New York, 1979-1983 • University Appointment - Lecturer, University of Singapore, Singapore 1972-1974 AWARD Dr Wong is a Year 2000 winner of the Thomas A Middlebrooks Award from the American Society of Civil Engineers, believed to be the first time this prestigious award for geotechnical engineering was given outside of North America.
  • 117.
    Daphne YIP GEOTECHNICAL ENGINEER PROFESSIONAL QUALIFICATIONS • Defence Medical Research Institute (DMRI), Singapore • B.Eng (Civil) (Hons) University of Glasgow, UK, 1999 • Marina Business Financial Centre Phase II, • M.Sc (Geotechnical Engineering) City University, Singapore London, UK, 1999-2000 • National Library Board Building, Bugis (Tender Design), Singapore PROFESSIONAL EXPERIENCE • No.1 Robina House Shenton Way, Singapore • Ocean Heights, Dubai 2000 - Present • One Raffles Quay, Singapore Meinhardt (Singapore) Pte Ltd • Relocation of Merlion Extension Park, Singapore Senior Geotechnical Engineer • Shanghai Luwan Plot 117 (Tender Design), China • Capital Plaza, Abu Dhabi KEY PROJECTS • Signature Tower, Dubai • Uptown Cairo, Village D and K, Egypt • Transmission cable tunnel from Seraya to Labrador • Tai Po Satellite Station (Tender Design), Hong Kong C301 (Tender Design), Singapore • Poramboke Land, Tamil Nadu (Due Dilligence), • Transmission cable tunnel C201 and C203 (Tender India Design), Singapore • Viva Bahriya, The Pearl Qatar, Qatar • DTSS Link Sewers Package D Kolom Ayer Tunnels, • Rayan Marina, Qatar Singapore • Sui Generis Condominium, Singapore • DTSS Link Sewers Package F Ang Mo Kio Tunnels, • Parisian Condominum, Singapore Singapore • Infrastructure Works at Banyang Road/Meranti • Circle Line Contract 870D HarbourFront Station, Crescent/Meranti Road/Meranti Lane – Ground Singapore Improvement Works, Singapore • Circle Line Contract 870E and F, (Tender Design) • Construction of Roads, Drains, Sewers & Soil Singapore Improvement Works at Jurong Island Highway • Circle Line Stage 1 Contract 824 (Tender Design), Extension, Jurong Island – Ground Improvement Singapore Works, Singapore • Circle Line Stage 1 Contract 825, Singapore • Circle Line Stage 3 Contract 851A , Singapore • Circle Line Stage 5 Contract 855 , Singapore • Deep Tunnel Sewerage System Contract • T-04 and T-06, Singapore • Kallang/Paya Lebar Expressway Contract 421, Singapore • Kallang/Paya Lebar Expressway Contract 422, Singapore • Kallang/Paya Lebar Expressway Contract 424, Singapore • Agartha Universe, Johor Bahru • Biopolis, Buona Vista, Singapore • Cairnhill Condominium, Singapore • Capital Plaza, Abu Dhabi, UAE • CIL Factory, Baddi, India • City Square Residences, Singapore • City Square Mall, Singapore
  • 119.
  • 121.
  • 123.
    Awards Awards Year Project Title Firm’s Involvement in Project Built Environment Leadership Gold Class Civil, Structural, Mechanical & (Category - Multi Disciplinary - Structural / M&E 2009 Meinhardt (Singapore) Pte Ltd Electrical Engineer Consultancy Services) BCA Design and Engineering Safety Excellence Civil, Structural, Mechanical & 2009 The Sail @ Marina Bay Awards Electrical Engineer BCA Design and Engineering Safety Excellence 2009 Circle Line 1 C825 Specialist Geotechnical Engineer Awards (Merit Award) Civil, Structural, Mechanical & BCA Green Mark Platinum Award 2009 Asia Square Tower 1 Electrical Engineer Credit Suisse Regional Data Project Manager and Mechanical & BCA Green Mark Platinum Award 2009 Centre Electrical Engineer Marina Bay Financial Centre Civil, Structural, Mechanical & BCA Green Mark Gold Plus Award 2009 (Phase 2) Electrical Engineer BCA Green Mark District - Gold Plus Award 2009 Resorts World at Sentosa Mechanical & Electrical Engineer Quayside Collection BCA Green Mark Platinum Award 2009 Mechanical & Electrical Engineer (Residential) BCA Green Mark Gold Plus Award 2009 Livia Mechanical & Electrical Engineer BCA Green Mark Gold Award 2009 1A International Business Park Civil & Structural Engineer BCA Green Mark Gold Award 2009 50 Collyer Quay Civil & Structural Engineer Civil, Structural, Mechanical & BCA Green Mark Gold Award 2009 Marina Bay Suites Electrical Engineer Civil, Structural, Mechanical & BCA Green Mark Gold Award 2009 One Raffles Quay Electrical Engineer Civil, Structural, Mechanical & BCA Green Mark Gold Award 2009 Six Battery Road Electrical Engineer President’s Design Award 2009 Republic Polytechnic Civil, Structural & Façade Engineer BCA Design and Engineering Safety Excellence Civil, Structural, Mechanical & 2008 One Raffles Quay Awards (Merit Award) Electrical Engineer BCA Award for Construction Excellence 2008 The Pier @ Robertson Quay Mechanical & Electrical Engineer BCA Award for Construction Excellence 2008 The Shaughnessy Civil & Structural Engineer BCA Green Mark Gold-Plus Award 2008 Aalto Mechanical & Electrical Engineer Marina Bay Financial Centre Civil, Structural, Mechanical & BCA Green Mark Gold Award 2008 (Phase 1) Electrical Engineer BCA Green Mark Gold Award 2008 One Shenton Civil & Structural Engineer Honorable Nominee for Best Tall Building - Asia Civil, Structural, Mechanical & 2008 One Raffles Quay And Australasia Electrical Engineer
  • 124.
    Awards Year Project Title Firm’s Involvement in Project Prix d’Excellence Awards 2008 (Winner in Office Civil, Structural, Mechanical & 2008 One Raffles Quay Category) Electrical Engineer BCA Award for Best Buildable Design 2007 The Pier @ Robertson Quay Mechanical & Electrical Engineer BCA Green Mark Platinum Award 2007 City Square Mall Civil & Structural Engineer BCA Green Mark Platinum Award 2007 Cliveden at Grange Mechanical & Electrical Engineer BCA Green Mark Gold Award 2007 HSBC Building Civil & Structural Engineer Civil, Structural, Mechanical & BCA Green Mark Gold Award 2007 Marina Bay Residences Electrical Engineer Civil, Structural, Mechanical & President’s Design Award 2007 1 Moulmein Rise Electrical Engineer Civil, Structural, Mechanical & President’s Design Award 2007 Bishan Community Library Electrical Engineer Civil, Structural, Mechanical & Aga Khan Award for Architecture 2007 2007 1 Moulmein Rise Electrical Engineer University of Technology Aga Khan Award for Architecture 2007 2007 Petronas, Bandar Seri Iskandar, Civil & Structural Engineer Malaysia BCA Award for Best Buildable Design 2006 The Esparis Civil & Structural Engineer BCA Award for Construction Excellence 2006 Goldenhill Park Condominium Mechanical & Electrical Engineer BCA Green Mark Platinum Award 2006 Republic Polytechnic Civil & Structural Engineer BCA Green Mark Gold-Plus Award 2006 City Square Residences Civil & Structural Engineer Civil, Structural, Mechanical & BCA Green Mark Gold-Plus Award 2006 RiverGate Electrical Engineer Civil, Structural, Mechanical & BCA Green Mark Gold Award 2006 The Sail @ Marina Bay Electrical Engineer BCA Award for Best Buildable Design 2005 Goldenhill Park Condominium Mechanical & Electrical Engineer BCA Award for Construction Excellence 2005 Newton.GEMS Civil & Structural Engineer BCA Green Mark Award 2005 The Pier @ Robertson Mechanical & Electrical Engineer Civil, Structural, Mechanical & FIABCI Prix d’ Excellence 2005 1 Moulmein Rise Electrical Engineer BCA Award for Best Buildable Design 2004 Newton.GEMS Civil & Structural Engineer BCA Award for Construction Excellence 2004 HarbourFront Office Towers Mechanical & Electrical Engineer BCA Award for Construction Excellence 2004 Modena Condominium Civil & Structural Engineer NTUC FairPrice Fresh Food Civil, Structural, Mechanical & BCA Award for Construction Excellence 2004 Distribution Centre Electrical Engineer
  • 125.
    Awards Year Project Title Firm’s Involvement in Project The Singapore Structural Steel Society - Design National Library Board – New 2004 Structural Engineer for Steel Contractor Awards Scheme 2004 HQ 1 Moulmein Rise ACES Engineering Design Excellence Merit Civil, Structural, Mechanical & 2003 Certificate 2003 Electrical Engineer Parkview Square Civil, Structural, Mechanical & BCA Certificate of Merit for Best Buildable Design 2003 Electrical Engineer ACES Engineering Design Excellence Award Civil, Structural, Mechanical & 2002 Parkview Square 2002 Electrical Engineer Civil, Structural, Mechanical & BCA Award for Best Buildable Design 2002 STMicroelectronics AMK 8 Electrical Engineer The Singapore Structural Steel Society - Design Civil, Structural, Mechanical & 2002 Parkview Square Awards Scheme 2002 Electrical Engineer Redevelopment of Gurkha BCA Certificate of Merit for Best Buildable Design 2001 Civil & Structural Engineer Cantonment Phase 2B Civil, Structural, Mechanical & BCA Certificate of Merit for Best Buildable Design 2001 The French School Electrical Engineer BCA Certificate of Merit for Construction Institute of Materials Research & Civil, Structural, Mechanical & 2001 Excellence Engineering Electrical Engineer BCA Certificate of Merit for Construction 2001 The Springbloom Condominium Mechanical & Electrical Engineer Excellence ACES Engineering Design Excellence Award Civil, Structural, Mechanical & 2000 Centennial Tower 2000 Electrical Engineer AUSTRADE & SABC - Award for Excellence 2000 Meinhardt (Singapore) Pte Ltd - Exporter of Australian Services & Technology Civil, Structural, Mechanical & BCA Award for Construction Excellence 2000 Centennial Tower Electrical Engineer BCA Certificate of Merit for Best Buildable Design 2000 Capital Square Civil & Structural Engineer National Heritage Board – Civil, Structural, Mechanical & BCA Certificate of Merit for Best Buildable Design 2000 Central Repository Electrical Engineer BCA Certificate of Merit for Construction 2000 Capital Square Civil & Structural Engineer Excellence Civil, Structural, Mechanical & BCA Award for Best Buildable Design 1999 Centennial Tower Electrical Engineer BCA Award for Best Buildable Design 1999 Great Eastern Mansion Civil & Structural Engineer
  • 126.
    Awards Year Project Title Firm’s Involvement in Project Civil, Structural, Mechanical & BCA Award for Construction Excellence 1999 Conrad International Electrical Engineer Society of Project Managers - The Most 1999 Meinhardt (Singapore) Pte Ltd - Outstanding Engineering Firm Award URA Architectural Heritage Awards 1999 Capital Square Civil & Structural Engineer Melbourne Airport Short-term Award for Excellence in Construction 1998 Civil & Structural Engineer Car Park Property Council Award for Public Building Melbourne Airport Short-term 1998 Civil & Structural Engineer Category Car Park Seagate Technology Civil, Structural, Mechanical & CIDB Award for Best Buildable Design 1997 International Ang Mo Kio Electrical Engineer Civil, Structural, Mechanical & CIDB Award for Construction Excellence 1997 Ritz Carlton Millenia Electrical Engineer CIDB Certificate of Merit for Construction 1997 Orchard Parksuites Mechanical & Electrical Engineer Excellence Top 100 International Design Firms 1997 Meinhardt Group - Civil, Structural, Mechanical & CIDB Award for Best Buildable Design 1996 Millenia Tower Electrical Engineer Civil, Structural, Mechanical & CIDB Award for Best Buildable Design 1996 Ritz Carlton Millenia Electrical Engineer CIDB Certificate of Merit for Construction Civil, Structural, Mechanical & 1995 Elizabeth Hotel Excellence Electrical Engineer CIDB Certificate of Merit for Construction 1995 Stamford House Mechanical & Electrical Engineer Excellence Civil, Structural, Mechanical & CIDB Award for Best Buildable Design 1994 The Sovereign Electrical Engineer CIDB Award for Best Buildable Design 1992 Compaq Asia Computer Factory Civil & Structural Engineer CIDB Award for Construction Excellence 1992 Compaq Asia Computer Factory Civil & Structural Engineer Becton Dickinson Medical CIDB Award for Best Buildable Design 1991 Civil & Structural Engineer Products Factory Civil, Structural, Mechanical & CIDB Award for Construction Excellence 1989 OUB Centre Electrical Engineer CIDB Certificate of Merit for Construction Singapore Technology Centre 1988 Civil & Structural Engineer Excellence Building Rialto Towers, Melbourne, ACEA Engineering Award 1986 Civil & Structural Engineer Australia
  • 127.
    Green Mark Awards forEnvironmental Sustainability Awards Year Project Title Firm’s Involvement in Project Civil, Structural, Mechanical & BCA Green Mark Platinum Award 2009 Asia Square Tower 1 Electrical Engineer Project Manager and Mechanical & BCA Green Mark Platinum Award 2009 Credit Suisse Regional Data Centre Electrical Engineer BCA Green Mark Platinum Award 2009 Quayside Collection (Residential) Mechanical & Electrical Engineer BCA Green Mark Platinum Award 2007 City Square Mall Civil & Structural Engineer BCA Green Mark Platinum Award 2007 Cliveden at Grange Mechanical & Electrical Engineer BCA Green Mark Platinum Award 2006 Republic Polytechnic Civil & Structural Engineer BCA Green Mark District - Gold Plus 2009 Resorts World at Sentosa Mechanical & Electrical Engineer Award BCA Green Mark Gold-Plus Award 2008 Aalto Mechanical & Electrical Engineer BCA Green Mark Gold-Plus Award 2006 City Square Residences Civil & Structural Engineer Civil, Structural, Mechanical & BCA Green Mark Gold-Plus Award 2006 RiverGate Electrical Engineer Civil, Structural, Mechanical & BCA Green Mark Gold Plus Award 2009 Marina Bay Financial Centre (Phase 2) Electrical Engineer BCA Green Mark Gold Plus Award 2009 Livia Mechanical & Electrical Engineer BCA Green Mark Gold Award 2009 1A International Business Park Civil & Structural Engineer BCA Green Mark Gold Award 2009 50 Collyer Quay Civil & Structural Engineer Civil, Structural, Mechanical & BCA Green Mark Gold Award 2009 Marina Bay Suites Electrical Engineer Civil, Structural, Mechanical & BCA Green Mark Gold Award 2009 One Raffles Quay Electrical Engineer Civil, Structural, Mechanical & BCA Green Mark Gold Award 2009 Six Battery Road Electrical Engineer Civil, Structural, Mechanical & BCA Green Mark Gold Award 2008 Marina Bay Financial Centre (Phase 1) Electrical Engineer BCA Green Mark Gold Award 2008 One Shenton Civil & Structural Engineer BCA Green Mark Gold Award 2007 HSBC Building Civil & Structural Engineer Civil, Structural, Mechanical & BCA Green Mark Gold Award 2007 Marina Bay Residences Electrical Engineer Civil, Structural, Mechanical & BCA Green Mark Gold Award 2006 The Sail @ Marina Bay Electrical Engineer BCA Green Mark Gold Award 2005 The Pier @ Robertson Mechanical & Electrical Engineer
  • 129.
  • 135.
    Issue Date: 29October 2009 Direct Line 03 8681 9710 Direct Fax 03 8681 9888 E-mail fergusont@willis.com TO WHOM IT MAY CONCERN Re: Confirmation of Insurance – Professional Indemnity Annual Policy In our capacity as Insurance Broker to the Named Insured shown below, we confirm having arranged the following insurance, the details of which are correct as at the Issue Date: Named Insured: Meinhardt (Singapore) Pte Ltd and others including: Meinhardt International Pte Ltd Jurutera Perunding Meinhardt Sdn Bhd Meinhardt Malaysia Sdn Bhd Meinhardt Pakistan (Pvt) Ltd Meinhardt Infrastructure Pte Ltd Insurer(s): Lloyd’s, London and others – 100% Policy Number: P9A316804P1S Insured Activities: Consulting Engineers, Planners and Managers Covering: Breach of professional duty arising from any act error or omission. Limit of Indemnity: AUD 10,000,000 each and every claim and in the aggregate costs and expenses in addition. Reinstatements: 2 automatic reinstatements Excess: As per policy, each and every claim including costs and expenses Expiry Date: 4.00pm, 1 November 2010 Signed for and on behalf of Willis Australia Limited Disclaimer: This document has been prepared at the request of our client and does not represent an insurance policy, guarantee or warranty and cannot be relied upon as such. All coverage described is subject to the terms, conditions and limitations of the insurance policy and is issued as a matter of record only. This document does not alter or extend the coverage provided or assume continuity beyond the Expiry Date. It does not confer any rights under the insurance policy to any party. Willis Australia Limited is under no obligation to inform any party if the insurance policy is cancelled, assigned or changed after the Issue Date. Willis Australia Ltd ABN 90 000 321 237 AFSL No: 240600
  • 138.
         Environmental, Quality andHealth & Safety Policies Meinhardt’s management endeavours to ensure our Clients achieve their goals through our innovative and high quality engineering services exceeding their expectations. We deliver these by: • Striving to understand and exceed our Clients’ expectations in a timely and responsive manner; • Providing cost effective, innovative and buildable solutions; • Doing everything right first time; • Commitment to the highest standards of ethics and integrity; • Promoting Environmentally friendly solutions that prevent pollution; • Promoting a culture of Health & Safety in all our Projects. In order to achieve these, it is important that Meinhardt clearly understand our client's requirements, and implement and maintain an effective integrated management system. The Integrated Management System, adopted by Meinhardt is based on the requirements of IS0 9001:2008, ISO 14001:2004, and OHSAS 18001:2007. It is established to meet the following objectives and reflect our management attitude towards the: • Provision of high Quality Engineering Solutions, • Development of Environmentally friendly design solutions and prevention of pollution. • Provision of Safe & Healthy office work environment and develop safe engineering solutions, prevention of injury and ill-health. The management is committed to understand, comply and meeting contractual obligations (including legal requirements) so that our clients, our business partners and ourselves can mutually benefit from the relationship. Meinhardt values its people associated with the provision of services and is committed to developing and training them to their fullest potential. Quality cannot be delivered by procedured systems and available technology alone. It requires the application of care, consideration and imagination by each participating individual to deliver quality, environmentally friendly and safe engineering solution. Therefore, all our people associated with the provision of professional services shall be required to understand, implement and maintain the Integrated Management System in so far as it relates to their individual functions within the company. The management is committed to continually improve the effectiveness of the integrated management system. Dr. Shahzad Nasim
  • 152.
    Saudi Arabia Abu Dhabi P O Box 300511, Riyadh 11372 Al Niyadi Building 7th Floor, North Tower Unit 603, Delma St, Sector 16 Faisal Foundation - Al Khaiyria Building Airport Road King Fahd Highway, Olaya, Riyadh Abu Dhabi, UAE Kingdom of Saudi Arabia T: +971 50 451 1826 T: +966 506 293 561 E: abudhabi@meinhardtmena.com F: +973 1715 1899 Email: saudiarabia@meinhardtmena.com Qatar Bahrain P O Box 24431 12th Floor, Amwal Tower P O Box 21277 Westbay 12th Floor, GB Corp Tower Doha, Qatar Bahrain Financial Harbour Manama, Bahrain T: +974 411 7840 E: qatar@meinhardtmena.com T: +973 1715 1888 F: +973 1715 1899 Singapore E: bahrain@meinhardtmena.com 168 Jalan Bukit Merah Dubai #09-01 Surbana One Singapore 150168 P O Box 38349 Gold & Diamond Park, Bldg 4 T: +65 6273 5255 Unit 130, Sheikh Zayed Road F: +65 6274 0788 Dubai, UAE www.meinhardtmena.com T: +971 04 3416686 www.meinhardt.com.sg E: dubai@meinhardtmena.com www.meinhardtgroup.com