This document outlines a 3-step approach to building a patient-centered environment. It discusses understanding healing through balance, considering the perspectives of healthy patients, teams, and projects. It also details the 3 stages of construction plans: schematic plans, design development plans, and bid & permit construction plans. Each stage is examined through the lenses of how it impacts patients, the project team, and the overall project. The presentation uses a case study of expanding a cath lab to demonstrate how the stages are applied.
Una encuesta sobre ciberacoso encontró que la mayoría de directores, administradores y maestros conocen el término ciberacoso y los medios que se usan, como las redes sociales. Las opiniones sobre la frecuencia de ciberacoso en la escuela estaban divididas, ya sea por falta de información o porque realmente no ocurre mucho. La mayoría apoyó la idea de prevención del ciberacoso en la universidad, aunque algunos tuvieron dudas, y había opiniones divididas sobre si conferencias o actividades lúdicas serían más efect
2575150, Significant Production Improvement of UltraLow Permeability Granitic...Mostafa Kortam
The document summarizes the significant production improvement of an ultra-low permeability granitic reservoir in Egypt utilizing channel fracturing. Key points:
1) The target formation has very low natural fracture permeability of 0.1-0.5 md, requiring channel fracturing to access oil.
2) Well SID-18 encountered an unconventional granitic formation with challenging logging responses. Analysis found the lithology consists of granite, microgranite, and metagranite fragments.
3) Testing found the formation has an ultra-low permeability. Channel fracturing was utilized to successfully commercialize this challenging asset.
This document discusses speed and how to calculate it. It defines speed as how fast an object is moving and explains that to calculate speed, the distance and time are needed. The key formula provided is:
Speed = Distance / Time
Several examples are given to demonstrate calculating speed using this formula, including Usain Bolt's speed during a 100m race. Different speed units for different contexts are also outlined such as miles/hour, km/hour, and m/s.
In this presentation, Health Well Done President Cathy Dolan-Schweitzer reveals the critical preparation your team needs to streamline patient care in the built environment.
The document discusses the benefits of exercise for mental health. Regular physical activity can help reduce anxiety and depression and improve mood and cognitive function. Exercise causes chemical changes in the brain that may help protect against mental illness and improve symptoms.
La enseñanza a distancia se caracteriza por la separación física entre profesores y estudiantes, con comunicación predominantemente asíncrona a través de Internet como medio principal de comunicación y distribución del conocimiento, aunque también puede haber encuentros presenciales puntuales.
Frutas y verduras ricas en flavonoides mejoran la saludValeria Olmedo
El estudio encontró que:
1) En hombres con alto riesgo de enfermedad cardiovascular, el consumo de 6 o más porciones diarias de frutas y verduras ricas en flavonoides se asoció con una mejora significativa de la reactividad microvascular dependiente del endotelio.
2) Este mayor consumo también se asoció con la disminución de marcadores inflamatorios como la proteína C reactiva, la molécula de adhesión vascular celular y la E-selectina, y con un aumento del óxido nítrico
Una encuesta sobre ciberacoso encontró que la mayoría de directores, administradores y maestros conocen el término ciberacoso y los medios que se usan, como las redes sociales. Las opiniones sobre la frecuencia de ciberacoso en la escuela estaban divididas, ya sea por falta de información o porque realmente no ocurre mucho. La mayoría apoyó la idea de prevención del ciberacoso en la universidad, aunque algunos tuvieron dudas, y había opiniones divididas sobre si conferencias o actividades lúdicas serían más efect
2575150, Significant Production Improvement of UltraLow Permeability Granitic...Mostafa Kortam
The document summarizes the significant production improvement of an ultra-low permeability granitic reservoir in Egypt utilizing channel fracturing. Key points:
1) The target formation has very low natural fracture permeability of 0.1-0.5 md, requiring channel fracturing to access oil.
2) Well SID-18 encountered an unconventional granitic formation with challenging logging responses. Analysis found the lithology consists of granite, microgranite, and metagranite fragments.
3) Testing found the formation has an ultra-low permeability. Channel fracturing was utilized to successfully commercialize this challenging asset.
This document discusses speed and how to calculate it. It defines speed as how fast an object is moving and explains that to calculate speed, the distance and time are needed. The key formula provided is:
Speed = Distance / Time
Several examples are given to demonstrate calculating speed using this formula, including Usain Bolt's speed during a 100m race. Different speed units for different contexts are also outlined such as miles/hour, km/hour, and m/s.
In this presentation, Health Well Done President Cathy Dolan-Schweitzer reveals the critical preparation your team needs to streamline patient care in the built environment.
The document discusses the benefits of exercise for mental health. Regular physical activity can help reduce anxiety and depression and improve mood and cognitive function. Exercise causes chemical changes in the brain that may help protect against mental illness and improve symptoms.
La enseñanza a distancia se caracteriza por la separación física entre profesores y estudiantes, con comunicación predominantemente asíncrona a través de Internet como medio principal de comunicación y distribución del conocimiento, aunque también puede haber encuentros presenciales puntuales.
Frutas y verduras ricas en flavonoides mejoran la saludValeria Olmedo
El estudio encontró que:
1) En hombres con alto riesgo de enfermedad cardiovascular, el consumo de 6 o más porciones diarias de frutas y verduras ricas en flavonoides se asoció con una mejora significativa de la reactividad microvascular dependiente del endotelio.
2) Este mayor consumo también se asoció con la disminución de marcadores inflamatorios como la proteína C reactiva, la molécula de adhesión vascular celular y la E-selectina, y con un aumento del óxido nítrico
El documento trata sobre la formación del suelo. Explica que la meteorización de las rocas madres y los cambios de temperatura causan su desintegración en pedazos más pequeños. También menciona que los microorganismos contribuyen a la creación del suelo a través de su acción sobre la superficie terrestre y las plantas. Finalmente, señala que existen otras teorías igual de válidas sobre el origen del suelo.
The document describes the Evolution modular office furniture range, which is designed to be adaptable and customizable. It offers various desk, storage, and screening solutions that can be configured into different office layouts. The range allows for open plan workspaces that facilitate collaboration as well as more private workstations. It aims to optimize the use of office space.
Este documento presenta la introducción a un tema sobre la ética del cuidado. Explica brevemente el significado de la ética y cómo la ética del cuidado se refiere a los hábitos del cuidado de uno mismo, de los demás y del entorno común. A continuación, describe las tareas que los estudiantes deben realizar, incluida la creación de una presentación multimedia, un ensayo y un mapa conceptual sobre la ética del cuidado, evaluando los recursos proporcionados.
Part 1 of the Health Well Done 3-Step Methodology is the Healthy Patient.
With HCAHPS surveys and immediate online reviews at the forefront of the healthcare industry, it's critical that your team put the needs of the patient first. This step helps each team member understand that all of the budgeting, planning, and building ultimately revolves around the patient.
LinkedIn es una red social profesional fundada en 2002 que conecta a millones de empresas y empleados. Los usuarios crean perfiles profesionales detallando su experiencia laboral y habilidades, y pueden conectarse con contactos y buscar empleos. La red ganó popularidad rápidamente y fue adquirida por Microsoft en 2016 por $26.2 mil millones.
Библия — самая распространённая книга на земле. Но у тех, кто открывает её впервые, возникают вопросы. Доктор богословия Александр Болотников ответит на некоторые из них. Стресс и питание, что есть, когда вы волнуетесь — три простых совета специалиста. Тема взаимоотношений мужчины и женщины, станьте на шаг ближе друг к другу.
Dissertation, Michael P. Zizzi, F-'11, UC-B -- An Anatomy of Dialogue in Teac...Michael Zizzi, PhD
This chapter introduces the study's focus on dialogue in teaching and learning. It notes a growing interest in dialogue as a preferred mode of communication and instruction in educational settings. However, existing research often considers teachers and learners separately rather than how they interact dialogically. The study aims to bring communication theory perspectives on dialogue to understandings of educational dialogue. It will analyze a faculty development program to identify elements and characteristics of dialogue in this particular context. The chapter outlines the study's theoretical commitments, research questions, and dissertation structure.
Este documento resume la Ley de Promoción Comercial Andina y Erradicación de Drogas (ATPDEA), la cual reemplaza al Antiguo Tratado de Preferencias Arancelarias Andinas (ATPA). El ATPDEA mantiene los aranceles preferenciales para Colombia, Bolivia, Perú y Ecuador y amplía los beneficios a nuevos productos como calzado, petróleo, confecciones y atún empacado al vacío. Establece normas de origen y condiciones específicas para cada producto. Su objetivo es promover el comercio
Este documento presenta una webquest sobre la ética del cuidado. Propone realizar una presentación multimedia, un ensayo y un mapa conceptual sobre la ética del cuidado a partir de tres recursos referidos. El estudiante será evaluado en estos productos y se espera que comprenda la importancia de la ética del cuidado de sí mismo, del otro y de lo que es de todos.
Антифризы и тосолы NORDIC Роснефтесинтез сохраняют идеальный для работы двигателя температурный режим, защищая от чрезмерного изнашивания деталей, коксования масла и отложения нагара.
Продлевают срок эксплуатации водяного насоса и превосходно защищают от кавитации гильзы цилиндров двигателя.
Este documento analiza la ley de propiedad industrial en México. Explica que la propiedad industrial incluye patentes, diseños industriales, modelos industriales y marcas. Detalla los antecedentes legislativos de cada una de estas áreas en México desde 1820. Finalmente, resume los aspectos clave de la legislación actual sobre propiedad industrial en México y define los conceptos de propiedad intelectual y propiedad industrial.
Este documento trata sobre la materia y la energía. Define la materia como todo lo que tiene masa y ocupa un espacio, y clasifica la materia en sólidos, líquidos y gases según sus propiedades. Explica también que la energía puede presentarse en forma mecánica, calórica, eléctrica o química y da ejemplos de cómo se manifiesta cada una.
El documento trata sobre la formación del suelo. Explica que la meteorización de las rocas madres y los cambios de temperatura desintegran las rocas en pedazos más pequeños, y factores como el hielo, el agua y el sol influyen en la creación física del suelo. También menciona que los microorganismos como hongos y bacterias contribuyen a la formación del suelo a través de su acción en la superficie de la tierra.
Este documento presenta información sobre la ciudad de Londres y sitios de interés para visitar. Londres es la capital de Inglaterra y del Reino Unido, ubicada a orillas del río Támesis, con más de 8 millones de habitantes y un importante centro financiero. El documento lista numerosos lugares populares de la ciudad como el London Eye, Big Ben, Tower Bridge y Westminster Abbey, así como áreas menos conocidas para que los lectores exploren cada rincón de Londres.
Rebecca Todd gave a presentation about her experience overlanding for 2 years through South America with her partner Bruce in their converted yellow van. They traveled independently, sleeping in their van or camping along the way. They encountered challenging weather and road conditions, but also found beautiful remote places to camp and experienced the diverse landscapes and cultures of South America. The long trip gave them an opportunity to learn and gain new perspectives on politics, history, and life.
This document provides information about the CALSAGA Annual Conference 2013 and security training resources from eduGuard. It lists contact information for CALSAGA leadership and relevant BSIS contacts. It then describes eduGuard's online security training courses, certificates, and learning management system. eduGuard provides over 80 hours of BSIS-approved security guard courses and proprietary private security officer training online.
WBS ExampleWBS #Task DescriptionDuration (hours)Milestone (Y/N)Start DateEnd DateWork Effort 1 (hours)Resource 1Work Effort 2 (hours)Resource 2Starts After TaskComments1Prepare room0YMilestone tasks have 0 duration1.1Protect or remove furniture2N1-Jan1-Jan2Painter2Helper1.2Lay down canvas or plastic floor covering2N1-Jan1-Jan2Painter2Helper1.11.3Sand and scrape walls and ceiling4N1-Jan1-Jan4Painter4Helper1.22Paint room0YMilestone tasks have 0 duration2.1Paint ceiling2N2-Jan2-Jan2Painter1.32.2Paint walls4N2-Jan2-Jan4Painter2.12.3Paint doors, windows, and trim4N2-Jan3-Jan4Painter2.23Clean up room0Y3.1Remove protective materials1N4-Jan4-Jan1Helper2.2 + 1 dayAllow day for drying3.2Vacuum floors1N4-Jan4-Jan1Helper3.13.3Touch up missed spots1N4-Jan4-Jan1Painter3.1Can start at same time as 3.23.4Secure signoff from client1N5-Jan5-Jan1Owner3.2, 3.34Project complete0Y5-Jan5-Jan1OwnerMilestone tasks have 0 duration
Resource ExampleResource NameCost per HourCost per UnitTotal UnitsTotal CostCommentsPainter2519$475Helper1010$100Owner501$50Paint (gallons)155$75Other supplies1001$100TOTAL$800
Gantt Chart ExampleWBS #Task DescriptionDuration (hours)Milestone (Y/N)Start DateEnd Date11-Dec12-Dec13-Dec14-Dec15-Dec16-Dec17-Dec1. My Health eVet Registration0Y11-Dec12-Dec1.1.1.Clinical staff3N11-Dec11-Dec1.1.2Service members2N12-Dec12-Dec2Training4Y12-Dec16-Dec2.1.How to use the online portal4N12-Dec16-Dec2.1.1.Clinical staff2N12-Dec12-Dec2.1.2.Service members4N13-Dec13-Dec2.1.3.Existing Patients1N16-Dec16-Dec3HIPPA Compliance1N11-Dec15-Dec3.1Privacy Compliance documentation1N11-Dec11-Dec3.1.1. Ensure clinical staff have read and agree to HIPPA regulations1N13-Dec13-Dec3.1.2.Ensure service members have read and agree to HIPPA regulations1N15-Dec15-Dec4Computer Access for the patient4.1Purchase72Y11-Dec13-Dec4.1.1Interion privacy study Carrel TeakN4.1.2ComputersN4.1.3PrintersN4.2Installation4.2.1Property management install the booths4Y14-Dec14-Dec4.2.2IT Helpdesk install the computer and printers2Y15-Dec15-Dec
Network ExamplePrepare in Visio, PowerPoint, or on paper and scan in
Budget ExampleFixed Costs$10,000PhaselabormaterialsTOTAL COST2 interion Carrel Teak$800.00$3,000.00$3,800.002 Computers$0.00$3,500.00$3,500.002 Printers$0.00$500.00$500.00TOTAL$800.00$7,000.00GRAND TOTAL$7,800.00
<Project Name> Version: <1.0> <Draft>
Healthcare Community Outreach
HealthCare Community outreachproject Management plan
Version 1.5
12/17/2018
<Project Name> Project Management Plan Version: <1.0> <Draft>
[Insert appropriate disclaimer(s)]
Revision Date: Error! Unknown document property name.Page 2 of 21
CDC_UP_Project_Management_Plan_Template_v1.1.docVERSION HISTORY
Version #
Implemented
By
Revision
Date
Approved
By
Approval
Date
Reason
12/10/2018
Veteran Affairs System for the homeless and low -income individuals
12/10/2018
Veteran Affairs System for the homeless and low -income individuals
12/10/2018
Veteran Affairs System for the homeless and low -i ...
At this time of the year it becomes important to understand how your projects are doing. Doing a health check will give you a great and instant view on what is going right and what needs to be improved and more importantly is the project still a viable option and will bring in the benefits
Tiffin Box - A startup by a young entrepreneur. This is the project report for his startup which contains almost all the parameters of an ideal project.
El documento trata sobre la formación del suelo. Explica que la meteorización de las rocas madres y los cambios de temperatura causan su desintegración en pedazos más pequeños. También menciona que los microorganismos contribuyen a la creación del suelo a través de su acción sobre la superficie terrestre y las plantas. Finalmente, señala que existen otras teorías igual de válidas sobre el origen del suelo.
The document describes the Evolution modular office furniture range, which is designed to be adaptable and customizable. It offers various desk, storage, and screening solutions that can be configured into different office layouts. The range allows for open plan workspaces that facilitate collaboration as well as more private workstations. It aims to optimize the use of office space.
Este documento presenta la introducción a un tema sobre la ética del cuidado. Explica brevemente el significado de la ética y cómo la ética del cuidado se refiere a los hábitos del cuidado de uno mismo, de los demás y del entorno común. A continuación, describe las tareas que los estudiantes deben realizar, incluida la creación de una presentación multimedia, un ensayo y un mapa conceptual sobre la ética del cuidado, evaluando los recursos proporcionados.
Part 1 of the Health Well Done 3-Step Methodology is the Healthy Patient.
With HCAHPS surveys and immediate online reviews at the forefront of the healthcare industry, it's critical that your team put the needs of the patient first. This step helps each team member understand that all of the budgeting, planning, and building ultimately revolves around the patient.
LinkedIn es una red social profesional fundada en 2002 que conecta a millones de empresas y empleados. Los usuarios crean perfiles profesionales detallando su experiencia laboral y habilidades, y pueden conectarse con contactos y buscar empleos. La red ganó popularidad rápidamente y fue adquirida por Microsoft en 2016 por $26.2 mil millones.
Библия — самая распространённая книга на земле. Но у тех, кто открывает её впервые, возникают вопросы. Доктор богословия Александр Болотников ответит на некоторые из них. Стресс и питание, что есть, когда вы волнуетесь — три простых совета специалиста. Тема взаимоотношений мужчины и женщины, станьте на шаг ближе друг к другу.
Dissertation, Michael P. Zizzi, F-'11, UC-B -- An Anatomy of Dialogue in Teac...Michael Zizzi, PhD
This chapter introduces the study's focus on dialogue in teaching and learning. It notes a growing interest in dialogue as a preferred mode of communication and instruction in educational settings. However, existing research often considers teachers and learners separately rather than how they interact dialogically. The study aims to bring communication theory perspectives on dialogue to understandings of educational dialogue. It will analyze a faculty development program to identify elements and characteristics of dialogue in this particular context. The chapter outlines the study's theoretical commitments, research questions, and dissertation structure.
Este documento resume la Ley de Promoción Comercial Andina y Erradicación de Drogas (ATPDEA), la cual reemplaza al Antiguo Tratado de Preferencias Arancelarias Andinas (ATPA). El ATPDEA mantiene los aranceles preferenciales para Colombia, Bolivia, Perú y Ecuador y amplía los beneficios a nuevos productos como calzado, petróleo, confecciones y atún empacado al vacío. Establece normas de origen y condiciones específicas para cada producto. Su objetivo es promover el comercio
Este documento presenta una webquest sobre la ética del cuidado. Propone realizar una presentación multimedia, un ensayo y un mapa conceptual sobre la ética del cuidado a partir de tres recursos referidos. El estudiante será evaluado en estos productos y se espera que comprenda la importancia de la ética del cuidado de sí mismo, del otro y de lo que es de todos.
Антифризы и тосолы NORDIC Роснефтесинтез сохраняют идеальный для работы двигателя температурный режим, защищая от чрезмерного изнашивания деталей, коксования масла и отложения нагара.
Продлевают срок эксплуатации водяного насоса и превосходно защищают от кавитации гильзы цилиндров двигателя.
Este documento analiza la ley de propiedad industrial en México. Explica que la propiedad industrial incluye patentes, diseños industriales, modelos industriales y marcas. Detalla los antecedentes legislativos de cada una de estas áreas en México desde 1820. Finalmente, resume los aspectos clave de la legislación actual sobre propiedad industrial en México y define los conceptos de propiedad intelectual y propiedad industrial.
Este documento trata sobre la materia y la energía. Define la materia como todo lo que tiene masa y ocupa un espacio, y clasifica la materia en sólidos, líquidos y gases según sus propiedades. Explica también que la energía puede presentarse en forma mecánica, calórica, eléctrica o química y da ejemplos de cómo se manifiesta cada una.
El documento trata sobre la formación del suelo. Explica que la meteorización de las rocas madres y los cambios de temperatura desintegran las rocas en pedazos más pequeños, y factores como el hielo, el agua y el sol influyen en la creación física del suelo. También menciona que los microorganismos como hongos y bacterias contribuyen a la formación del suelo a través de su acción en la superficie de la tierra.
Este documento presenta información sobre la ciudad de Londres y sitios de interés para visitar. Londres es la capital de Inglaterra y del Reino Unido, ubicada a orillas del río Támesis, con más de 8 millones de habitantes y un importante centro financiero. El documento lista numerosos lugares populares de la ciudad como el London Eye, Big Ben, Tower Bridge y Westminster Abbey, así como áreas menos conocidas para que los lectores exploren cada rincón de Londres.
Rebecca Todd gave a presentation about her experience overlanding for 2 years through South America with her partner Bruce in their converted yellow van. They traveled independently, sleeping in their van or camping along the way. They encountered challenging weather and road conditions, but also found beautiful remote places to camp and experienced the diverse landscapes and cultures of South America. The long trip gave them an opportunity to learn and gain new perspectives on politics, history, and life.
This document provides information about the CALSAGA Annual Conference 2013 and security training resources from eduGuard. It lists contact information for CALSAGA leadership and relevant BSIS contacts. It then describes eduGuard's online security training courses, certificates, and learning management system. eduGuard provides over 80 hours of BSIS-approved security guard courses and proprietary private security officer training online.
WBS ExampleWBS #Task DescriptionDuration (hours)Milestone (Y/N)Start DateEnd DateWork Effort 1 (hours)Resource 1Work Effort 2 (hours)Resource 2Starts After TaskComments1Prepare room0YMilestone tasks have 0 duration1.1Protect or remove furniture2N1-Jan1-Jan2Painter2Helper1.2Lay down canvas or plastic floor covering2N1-Jan1-Jan2Painter2Helper1.11.3Sand and scrape walls and ceiling4N1-Jan1-Jan4Painter4Helper1.22Paint room0YMilestone tasks have 0 duration2.1Paint ceiling2N2-Jan2-Jan2Painter1.32.2Paint walls4N2-Jan2-Jan4Painter2.12.3Paint doors, windows, and trim4N2-Jan3-Jan4Painter2.23Clean up room0Y3.1Remove protective materials1N4-Jan4-Jan1Helper2.2 + 1 dayAllow day for drying3.2Vacuum floors1N4-Jan4-Jan1Helper3.13.3Touch up missed spots1N4-Jan4-Jan1Painter3.1Can start at same time as 3.23.4Secure signoff from client1N5-Jan5-Jan1Owner3.2, 3.34Project complete0Y5-Jan5-Jan1OwnerMilestone tasks have 0 duration
Resource ExampleResource NameCost per HourCost per UnitTotal UnitsTotal CostCommentsPainter2519$475Helper1010$100Owner501$50Paint (gallons)155$75Other supplies1001$100TOTAL$800
Gantt Chart ExampleWBS #Task DescriptionDuration (hours)Milestone (Y/N)Start DateEnd Date11-Dec12-Dec13-Dec14-Dec15-Dec16-Dec17-Dec1. My Health eVet Registration0Y11-Dec12-Dec1.1.1.Clinical staff3N11-Dec11-Dec1.1.2Service members2N12-Dec12-Dec2Training4Y12-Dec16-Dec2.1.How to use the online portal4N12-Dec16-Dec2.1.1.Clinical staff2N12-Dec12-Dec2.1.2.Service members4N13-Dec13-Dec2.1.3.Existing Patients1N16-Dec16-Dec3HIPPA Compliance1N11-Dec15-Dec3.1Privacy Compliance documentation1N11-Dec11-Dec3.1.1. Ensure clinical staff have read and agree to HIPPA regulations1N13-Dec13-Dec3.1.2.Ensure service members have read and agree to HIPPA regulations1N15-Dec15-Dec4Computer Access for the patient4.1Purchase72Y11-Dec13-Dec4.1.1Interion privacy study Carrel TeakN4.1.2ComputersN4.1.3PrintersN4.2Installation4.2.1Property management install the booths4Y14-Dec14-Dec4.2.2IT Helpdesk install the computer and printers2Y15-Dec15-Dec
Network ExamplePrepare in Visio, PowerPoint, or on paper and scan in
Budget ExampleFixed Costs$10,000PhaselabormaterialsTOTAL COST2 interion Carrel Teak$800.00$3,000.00$3,800.002 Computers$0.00$3,500.00$3,500.002 Printers$0.00$500.00$500.00TOTAL$800.00$7,000.00GRAND TOTAL$7,800.00
<Project Name> Version: <1.0> <Draft>
Healthcare Community Outreach
HealthCare Community outreachproject Management plan
Version 1.5
12/17/2018
<Project Name> Project Management Plan Version: <1.0> <Draft>
[Insert appropriate disclaimer(s)]
Revision Date: Error! Unknown document property name.Page 2 of 21
CDC_UP_Project_Management_Plan_Template_v1.1.docVERSION HISTORY
Version #
Implemented
By
Revision
Date
Approved
By
Approval
Date
Reason
12/10/2018
Veteran Affairs System for the homeless and low -income individuals
12/10/2018
Veteran Affairs System for the homeless and low -income individuals
12/10/2018
Veteran Affairs System for the homeless and low -i ...
At this time of the year it becomes important to understand how your projects are doing. Doing a health check will give you a great and instant view on what is going right and what needs to be improved and more importantly is the project still a viable option and will bring in the benefits
Tiffin Box - A startup by a young entrepreneur. This is the project report for his startup which contains almost all the parameters of an ideal project.
This document outlines a project to establish a winter clothing manufacturing industry in Moose Jaw, Canada. The project aims to boost the local economy and provide jobs. The project team will oversee obtaining approvals, constructing facilities, procuring machinery, and implementing operations over 2.5-3 years with a budget of $1.78 million. Key milestones include completing construction, successfully implementing machinery, and generating revenue and demand for manufactured clothes. The team establishes roles, communication guidelines, and processes to manage scope, schedule, budget, quality, and risks to achieve the project's goals.
1. Project scope management involves defining and controlling what work needs to be done to successfully complete the project. This includes collecting requirements, defining the scope, and creating a scope statement and work breakdown structure (WBS).
2. The scope statement defines the project deliverables, acceptance criteria, exclusions, constraints, and assumptions. The WBS breaks down the work into smaller, more manageable components.
3. Controlling scope is important to avoid scope creep. This involves monitoring the status of the project scope against the baseline and managing any changes that occur.
The document discusses gap analysis and improvement tactics for environmental, health, and safety (EH&S) programs. It outlines how an analysis can identify gaps in areas like waste management, inventory, permits, safety, and emergency response. Common issues include lacking or outdated documentation, reactive approaches, and not fully understanding regulatory requirements. The analysis also considers budget impacts and provides immediate tactics to address issues. Case studies demonstrate how onsite support programs can help organizations improve compliance, prepare for inspections, and benefit from ongoing review and updates to procedures.
SCIENTIFIC MERIT ACTION RESEARCH TEMPLATE (SMART) FORMa..docxkenjordan97598
SCIENTIFIC MERIT ACTION RESEARCH TEMPLATE (SMART) FORM
a.k.a. “Research Plan”
School of Public Service LeadershipScientific Merit Process
Learners who are doing action research for their dissertation will use this form to go through the process of scientific merit review. The goals of this process are: (1) to facilitate the planning of the details of your action research project, (2) to ensure that the proposed project has rigor and allows for scientific merit review, and (3) to facilitate your progress through the dissertation. This is not an addition to your dissertation but rather a step to assist you in obtaining mentor, committee, school, and IRB approval more efficiently. You must obtain mentor, committee, and school approval of your Research Plan before submitting your IRB application.
Scientific Merit Criteria
The following criteria will be used to establish scientific merit. The purpose of the review will determine if the proposed project:
1. Contributes to society by improving a practice
2. Documents need for change by utilizing evidence-based needs assessment
3. Meets certain “Hallmarks” of a good action research project including:
a. Action research design
i. Practical
ii. Participatory
iii. Defined Action PlanScientific Merit ApprovalYour completed SMART form will be approved, not approved, or deferred for major or minor revisions. Your committee will use a checklist to determine if the study meets the criteria for scientific merit and the committee will provide specific feedback designed to identify any issues that need to be resolved related to the scientific merit. You will have up to three opportunities to submit this form for committee approval.
Obtaining scientific merit approval does not guarantee you will obtain IRB approval. The IRB review will focus on ethical issues. A detailed ethical review will be conducted during the process of IRB approval.Recommendations for How to Use This FormThe SMART form is intended to help you and your mentor plan the design and details of your dissertation. Once your mentor approves your SMART form, your entire committee will review the form for scientific merit. When the entire committee approves your SMART form, then it will be submitted for school approval. It is recommended that you use this form in a step-by-step way to help plan your design. Expect that you will go through a few revisions before your mentor and committee approve this form.
Tips for filling out the SMART form:
· Prepare your answers in a separate Word document, as editing and revising will be easier.
· Copy/paste items into the right-hand fields when they are ready.
· Don’t delete the descriptions in the left column!
· Don’t lock the form, as that will stop you from editing and revising within the form.
· Leave no blank spaces in the form. If an item does not apply to your study, type “NA” in its field.
· Read the item descriptions carefully. Items request very specific information. Be sure you understa.
This document provides details on a proposed recreational district pavilion project at Taylor's University Lakeside Campus. Key points:
- The project involves constructing a recreational facility using shipping containers on a 600m2 site currently used as a parking area.
- The facility will include indoor and outdoor recreation spaces, a lounge, cafeteria, offices, and other amenities to accommodate workshops and events.
- Sustainability is a priority, requiring reuse of materials and renewable energy sources like solar power.
- Initial site analysis was conducted to understand the context and constraints. Container structures were selected for their modular design and quick assembly.
- A project team is assembled with defined roles for architects, engineers, landscape
This webinar provided an overview of engaging public and patient partners in rapid reviews. It discussed the National Collaborating Centre for Methods and Tools' rapid evidence service which responds to priority public health questions from decision makers within 5-10 days by modifying rapid review processes. It highlighted challenges of tight timelines for partner engagement and solutions like training partners. Presenters from patient and researcher perspectives shared insights around meaningful engagement in rapid reviews.
Assignment 1: Project Proposal4
Assignment 1: Project Proposal
Mark McLeod
BUS419 – Project Estimating & Budgeting
Dr. Carlos J Febry
Date:4/19/19
Selected project
The selected project will involve the development of an information system for the general management of the Mundi Hospital. The main aim of the system will be to establish the desired efficiency, manage human resources, manage patient’s records with ease as well as automate finance department of the Hospital. By implementing the proposed project, the hospital will have aligned the operations of the hospital towards achieving the set goals and objectives.
Project goals and objectives
One of the goals of the proposed information system will be reducing the wait time from hours to forty-five minutes upon signing into the hospital. The goal will be achieved through with the help of the following objectives:
· Faster determination of patient’s requirements
· Easier scheduling of patients appointments
· The system does the faster appointment schedule
The second goal of the system will be facilitating easier financial management. The goal will be achieved through the following objective
· To establish faster payments for the services offered
· Faster generation of financial reports trends
· Easier tracking of transaction made by the hospital
The last goal that Mundui Hospital wishes to achieve through the system is the efficient management of human resources. The goal will be achieved through the fowling objectives
· Monitoring of employees performance
· Manage employees affairs such as promotions and salaries
Key project customers and stakeholders
Project stakeholders involve all the parties that will be impacted by the new system during the development and implementation of the project. The critical project customers for the Mundui hospital Information will be the patients as well as the hospital staff. The system will help hospital staff to manage to perform their duties within the stipulated time frame thus reducing the wait time for the patients. Patients will also rely on the system to determine their wait time to see a doctor or time taken to receive any service needed within Mundi Hospital. The hospital management is a sponsor of the project and thus expects that the proposed information system will be developed within the stipulated time as well as the allocated budget. Any deviation from the proposed requirements will be an unwelcome move to the project sponsor. Deviation from the original plan would imply an increased cost of the project or unwanted delays.
The hospital wishes to attract more customers who are cautious of what to expect before making their final decisions regarding healthcare services. The system will help the hospital eliminate the problem of unwanted delays resulting from the manual operation of patients records as well handling of wait time for the patients. The project hopes to receive more support from other investors if the proof of the.
Project Name Project CharterVersion 1.0 DraftHealth.docxdenneymargareta
<Project Name> Project Charter
Version: <1.0> <Draft>Healthcare Community Outreach project Management plan
LITE Version <1.0>
12/09/2018VERSION HISTORY
Version #
Implemented
By
Revision
Date
Approved
By
Approval
Date
Reason
1.0
UP Template Version: 11/30/06
TABLE OF CONTENTS
1Introduction2
51.1Purpose of Project Management Plan
52project And Product Overview
53ScoPE
53.1Objectives
53.2High-Level Requirements
53.3Assumptions
53.4Constraints
63.5Major Deliverables/Milestones
63.6Work Breakdown Structure
11Appendix A: Project Management Plan Approval
12APPENDIX B: REFERENCES
13APPENDIX C: KEY TERMS
1 Introduction
1.1 Purpose of Project Management Plan
The purpose of the Project Management Plan (PMP) for the Community Healthcare Outreach is reaching out to the homeless and deprived, low income individuals. With the atmosphere and location for poverty-stricken people, it is almost impracticable and unbearable for them to uphold a detailed and straightforwardly available health care reports. Healthcare Community Outreach believes that personal health record (PHR) technology could help citizens have admission to their health record. A contributor has contributed ten thousand dollars for the project. Our panel has evaluated a diversity of options for PHR, identifying the achievement and management expenses and the controlled accessible financial plan. We have selected the greatest profitable technique towards supplying PHRs that is industrialized by the Veterans Affairs (VA) Health System. The anticipated audience of the Community Healthcare Outreach Project Management Plan is all project stakeholders as well as the project sponsor, senior leadership and the project team.2 project And Product Overview
Healthcare Community Outreach Health Records is reaching out to the homeless and deprived, low income individuals, so that they will receive their health care records using the Veterans Affairs Health System. The requirement for this project is the guaranteeing the systems’ confidentially and the staff will oversee everyone’s needs obtaining their medical records3 ScoPE
3.1 Objectives
To Design, plan, implement, and set measurement and controls of a personal health record (PHR) system that will help constituents have access to medical record anywhere and anytime. The organization has chosen to use the Veterans Affairs (VA) Health System that is available for free to anyone.3.2 High-Level Requirements
The Veterans Affairs (VA) Health System is free and is web base. This system does not require a network infrastructure to house or support. All the organization needs are available computers and mobile devices with access to the internet. The organization be capable of promoting, assisting and educating their constituents on the benefits and how to use the PHR system available. Therefore, personnel need to be trained in how to navigate the PHR website and how to guide new users that need registration.3.3 Assumptions
The P ...
This document discusses the importance of project management for drug development. It explains that project management aims to deliver projects on time and on budget by using planning, execution, and closeout processes. It also discusses the need to use both "horizontal" project management processes and "vertical" drug development processes. The "horizontal" processes provide business controls for schedule and budget, while the "vertical" processes define the scientific and regulatory steps to develop and test new drugs. By combining these two types of processes, project managers can help ensure new drugs are successfully developed and delivered to market as planned.
Managing Qualiity in health and social care.docxwrite4
The document discusses a Care Quality Commission report on the Royal United Hospital in Bath. It finds that the hospital struggled with high demand and lacked capacity during winter 2012-2013, resulting in patients waiting in corridors and day surgery being used for overnight stays. Patient safety indicators and incident reporting rates were poor compared to other trusts. Elective surgeries were being cancelled and patients faced long wait times. Staff engagement and morale were low. The trust was not meeting several quality standards and received compliance actions from previous CQC inspections.
This document discusses planning and scheduling concepts. It defines planning as identifying project objectives and activities needed to complete the project, while scheduling involves determining task durations and applying them to the plan. Effective planning is conceptual, dynamic, cyclical and iterative. Key aspects of planning include defining scope, establishing a work breakdown structure, identifying resources, establishing timelines and determining budgets. Constructability analysis examines construction methods and costs to reduce time and costs. Value engineering provides alternatives to optimize functionality, quality and costs. Stakeholder considerations must also be identified and evaluated during planning.
This 'how to' guide builds upon the overarching framework set out in The route to success in end of life care - achieving quality in acute hospitals, published in 2010. The route to success highlighted best practice models developed by acute hospital Trusts, providing a comprehensive framework to enable hospitals to deliver high quality care to people at the end of life.
This 'how to' guide aims to help clinicians, managers and directors implement The route to success more effectively, drawing on valuable learning from the NHS Institute for Innovation and Improvement's Productive Ward: Releasing time to care™ series.
This guide contains individual sections that can be worked on in any given order, dependent upon the individual hospital and its current end of life care provisions. These can be downloaded below:
Introduction
Section 1: prepare
Section 2: assess and diagnose
Section 3: plan
Section 4: treat
Section 5: evaluate
Section 6: sustain
Section 7: further resources
Cover
It places emphasis on existing 'enabling' tools and models, which support and follow a person-centred pathway. These are Advance Care Planning, Electronic Palliative Care Co-ordination Systems (EPaCCS), AMBER Care Bundle, Rapid Discharge Home to Die Pathway, and the Liverpool Care Pathway.
The 'how to' guide box set is complemented by an e-version, containing 14 podcasts. These cover topics such as the 'enabling' tools, communications skills, DNACPR, environments of care, implementing care after death guidance and the use of data and metrics.
Publication by the National End of Life Programme which became part of NHS Improving Quality in May 2013
The document provides guidelines for conducting a project health check when a project is not meeting its goals. It outlines indicators of troubled projects, such as lack of documentation and cost/schedule issues. The guidelines describe a 5-step process to implement a health check: 1) define a charter, 2) outline an assessment plan, 3) conduct the check, 4) present a report, and 5) implement an approved plan. The health check evaluates project management, governance, and identifies priority areas for improvement.
This document contains 20 multiple choice questions related to project management concepts and processes. The questions cover topics such as project life cycles, project organization structures, roles of project managers, and the importance of planning, scheduling and budgeting processes.
Janet Davies - International Business Festival 2018Innovation Agency
Presentation by Janet Davies, Lancashire and Cumbria Innovation Alliance Test Bed Programme Manager: Test bed - the search for technology that enables future care at the International Business Festival 2018, 26 June, Exhibition Centre Liverpool
Similar to In Other Words: 3-Step Approach to Reading Plans (20)
LGBTQ+ Adults: Unique Opportunities and Inclusive Approaches to CareVITASAuthor
This webinar helps clinicians understand the unique healthcare needs of the LGBTQ+ community, primarily in relation to end-of-life care. Topics include social and cultural background and challenges, healthcare disparities, advanced care planning, and strategies for reaching the community and improving quality of care.
Let's Talk About It: Breast Cancer (What is Mindset and Does it Really Matter?)bkling
Your mindset is the way you make sense of the world around you. This lens influences the way you think, the way you feel, and how you might behave in certain situations. Let's talk about mindset myths that can get us into trouble and ways to cultivate a mindset to support your cancer survivorship in authentic ways. Let’s Talk About It!
Hypertension and it's role of physiotherapy in it.Vishal kr Thakur
This particular slides consist of- what is hypertension,what are it's causes and it's effect on body, risk factors, symptoms,complications, diagnosis and role of physiotherapy in it.
This slide is very helpful for physiotherapy students and also for other medical and healthcare students.
Here is summary of hypertension -
Hypertension, also known as high blood pressure, is a serious medical condition that occurs when blood pressure in the body's arteries is consistently too high. Blood pressure is the force of blood pushing against the walls of blood vessels as the heart pumps it. Hypertension can increase the risk of heart disease, brain disease, kidney disease, and premature death.
The best massage spa Ajman is Chandrima Spa Ajman, which was founded in 2023 and is exclusively for men 24 hours a day. As of right now, our parent firm has been providing massage services to over 50,000+ clients in Ajman for the past 10 years. It has about 8+ branches. This demonstrates that Chandrima Spa Ajman is among the most reasonably priced spas in Ajman and the ideal place to unwind and rejuvenate. We provide a wide range of Spa massage treatments, including Indian, Pakistani, Kerala, Malayali, and body-to-body massages. Numerous massage techniques are available, including deep tissue, Swedish, Thai, Russian, and hot stone massages. Our massage therapists produce genuinely unique treatments that generate a revitalized sense of inner serenely by fusing modern techniques, the cleanest natural substances, and traditional holistic therapists.
DECODING THE RISKS - ALCOHOL, TOBACCO & DRUGS.pdfDr Rachana Gujar
Introduction: Substance use education is crucial due to its prevalence and societal impact.
Alcohol Use: Immediate and long-term risks include impaired judgment, health issues, and social consequences.
Tobacco Use: Immediate effects include increased heart rate, while long-term risks encompass cancer and heart disease.
Drug Use: Risks vary depending on the drug type, including health and psychological implications.
Prevention Strategies: Education, healthy coping mechanisms, community support, and policies are vital in preventing substance use.
Harm Reduction Strategies: Safe use practices, medication-assisted treatment, and naloxone availability aim to reduce harm.
Seeking Help for Addiction: Recognizing signs, available treatments, support systems, and resources are essential for recovery.
Personal Stories: Real stories of recovery emphasize hope and resilience.
Interactive Q&A: Engage the audience and encourage discussion.
Conclusion: Recap key points and emphasize the importance of awareness, prevention, and seeking help.
Resources: Provide contact information and links for further support.
Exploring the Benefits of Binaural Hearing: Why Two Hearing Aids Are Better T...Ear Solutions (ESPL)
Binaural hearing using two hearing aids instead of one offers numerous advantages, including improved sound localization, enhanced sound quality, better speech understanding in noise, reduced listening effort, and greater overall satisfaction. By leveraging the brain’s natural ability to process sound from both ears, binaural hearing aids provide a more balanced, clear, and comfortable hearing experience. If you or a loved one is considering hearing aids, consult with a hearing care professional at Ear Solutions hearing aid clinic in Mumbai to explore the benefits of binaural hearing and determine the best solution for your hearing needs. Embracing binaural hearing can lead to a richer, more engaging auditory experience and significantly improve your quality of life.
This particular slides consist of- what is Pneumothorax,what are it's causes and it's effect on body, risk factors, symptoms,complications, diagnosis and role of physiotherapy in it.
This slide is very helpful for physiotherapy students and also for other medical and healthcare students.
Here is a summary of Pneumothorax:
Pneumothorax, also known as a collapsed lung, is a condition that occurs when air leaks into the space between the lung and chest wall. This air buildup puts pressure on the lung, preventing it from expanding fully when you breathe. A pneumothorax can cause a complete or partial collapse of the lung.
Can Allopathy and Homeopathy Be Used Together in India.pdfDharma Homoeopathy
This article explores the potential for combining allopathy and homeopathy in India, examining the benefits, challenges, and the emerging field of integrative medicine.
TEST BANK For Accounting Information Systems, 3rd Edition by Vernon Richardso...rightmanforbloodline
TEST BANK For Accounting Information Systems, 3rd Edition by Vernon Richardson, Verified Chapters 1 - 18, Complete Newest Version
TEST BANK For Accounting Information Systems, 3rd Edition by Vernon Richardson, Verified Chapters 1 - 18, Complete Newest Version
TEST BANK For Accounting Information Systems, 3rd Edition by Vernon Richardson, Verified Chapters 1 - 18, Complete Newest Version
About this webinar: This talk will introduce what cancer rehabilitation is, where it fits into the cancer trajectory, and who can benefit from it. In addition, the current landscape of cancer rehabilitation in Canada will be discussed and the need for advocacy to increase access to this essential component of cancer care.
MBC Support Group for Black Women – Insights in Genetic Testing.pdfbkling
Christina Spears, breast cancer genetic counselor at the Ohio State University Comprehensive Cancer Center, joined us for the MBC Support Group for Black Women to discuss the importance of genetic testing in communities of color and answer pressing questions.
5. Objectives
1. Learn 3’step integrated approach to building
a patient centered environment.
2. Define the 3 stages of construction plans.
1. What to look for when you are a member of
a patient centered project team.
Healthwelldone.com
7. Agenda
3 Stages Of The Plans
• Schematic Plan
• Design Development plan
• Bid & Permit Construction plan
What To Look For 3 Perspectives and 3 Stages
Healthwelldone.com
10. 3 Stages of the Plans
Stage One Schematic Plan
Stage Two Design Development Plan
Stage Three Bid & Permit Construction Plan
Healthwelldone.com
11. Case Study – EP Cath Lab
Needs
• Larger Procedure & Control
Room
• Dedicated storage area
• Equipment room
• Radiology storage room
Location
• Existing Cath Lab replacing
outdated equipment
• Radiology department
behind
• Cath Lab 2 adjacent
• Clean storage and janitor
closet adjacent
• MRI waiting room adjacent
Healthwelldone.com
12. Stage I – Schematic Plan
I am going to show you a SP we are going to look
at it from 3 perspectives
1. Patient and staff traffic paths.
2. What Equipment needed in the space?
3. Space reconfiguration impacts on budget
Healthwelldone.com
16. Schematic Plan
Healthy Patient
1. Who is the patient?
2. Why are they using this space?
3. How does the space impact them?
Healthwelldone.com
17. Schematic Plan
Healthy Team
1. Do we have everyone on the team?
2. Does everyone understand their role?
3. How will the team make decisions?
Healthwelldone.com
18. Schematic Plan
Healthy Project
1. Do we have a budget?
2. Can we meet the schedule?
3. Process and rules for engagement?
Healthwelldone.com
20. Definition- Stage Two
Design Development Plans
1. Contract documents phase.
2. Drawings and finish boards
3. Project estimate can be established.
Healthwelldone.com
21. Design Development Plan
Healthy Patient
1. Patient Construction Phasing schedule –
something new
2. Team Storage supplies – something new
3. Equipment placement
Healthwelldone.com
22. Design Development Plan
Healthy Team
1. Input from each department.
2. Hospital approval for phasing plan.
3. Communication, communication.
Healthwelldone.com
23. Design Development Plan
Healthy Project
1. Behind the wall details and logistics.
2. Does the budget to include the phases?
3. Who is removing the existing equipment?
Healthwelldone.com
24. Stage Three
Bid & Permit Construction Plans
1. Contract documents for construction
• Equipment
• Furniture
• Square footage
• Electrical & Technology Integration
• Structural
• Ventilation
• Water
Healthwelldone.com
26. Bid & Permit Construction Plan
Healthy Patient
1. Medical equipment secrets.
2. Patient safety
3. Adjacent patient areas during construction.
Healthwelldone.com
27. Bid & Permit Construction Plan
Healthy Team
1. Technology requirements coordinated with
the medical equipment installation teams.
Healthwelldone.com
Coordinate
Integrate
28. Bid & Permit Construction Plan
Healthy Team
1. Are the logistics clear for construction and
delivery of all equipment
Healthwelldone.com
29. Bid & Permit Construction Plan
Healthy Team
1. Where are we going to store all the existing
equipment?
Healthwelldone.com
30. Bid & Permit Construction Plan
Healthy Project
1. Medical equipment and trades translated?
Healthwelldone.com
31. Bid & Permit Construction Plan
Healthy Project
1. Plans include infection prevention &
phasing?
2. Team sign off and review?
Healthwelldone.com
What is wrong with this picture? Is this the best environment for a patient and or staff member? Why? Does this look clean and are we sure everything is plugged in correctly?
Little better but could be a staff and patient safety issue.
Looks a bit different. This was a project that was well done. The overriding Planetree school of thought is to use the physical environment to enhance healing, health and wellbeing. The staff described this space “as like working in a theater”. They were going to be able to perform on stage. They could feel a harmony when they moved in the space using the equipment. So how do you get to this? You need an approach a way to tackle a project like this and you have to have a way to translate construction plans into a space that works for the staff and patient. Today I am going to talk to you about a 3 step approach
A 3 step approach to navigating each stage of building a patient centered environment. We are also going to define the 3 plan stages and what to look for when you are on a team working to build a patient centered environment.
Today we are going to define three step approach to building a patient centered environment. The elements within that 3 step approach.
We are going to define the 3 stages of plans that we all use as tools to communication and get a project done. The schematic plan, design development plan and the bid and permit set of plans. Then we are going to put this all together so it equals a good strategy to approaching a patient centered building project. There is so much information coming at you and we are all stretched and this will show you how to avoid problems before they hit a project. We only have 30 mines today so I cannot cover everything but I a handout for all of you that gives you symbols and abbreviations. Definitions and plans to help guide you through this very fast presentation so let’s get started.
We talked about the 3 steps to tacking a project and the 3 stages of plans let’s move forward to out the two together. Many people on the construction side of the table are very process oriented. That is a good thing. They Healthy project rings true to their ears but from my perspective when you are working on a patient centered healing environment you need to have an understanding of healing and a balance of process. I speak about this from the patient side because when I was a patient I realized that I approached projects from a process side. Needing to get this project done on time and on budget. It was all about getting it done. Since then I have concluded that you need to have both and maybe even be stronger on the side of understanding of healing. This is where the clinical side of the table needs to be strong. To think a little out of the box because now we are working in a preventative care.
This is the mother ship the 3 step approach to a patient centered project. If you keep your eye on all three of these you will end up with a patient centered healing environment.
First and foremost you have your healthy patient. The patient is the reason why you are spending all this money, spending all this time together as a team, and really becoming engaged and present as a member of this team. Giving it you all. Because it matters this is all connected. Take it from me one day you or a loved one can become a patient and you don’t want to be sitting in that hospital bed thinking that the facility or project manager who built this place was thinking just about the budget and schedule. So let’s focus on who is this patient, Why are they here and how does the space impact them. Today’s patient is better educated on their health, uses the internet to learn and or chat with similar interest groups. Wants to find alternative modalities to healing and has a higher expectation for their medical professionals to educate and formulate a relationship with them by using their own information they have tracked with a personal monitor on blood pressure, blood sugar, activity and caloric intake. The Healthy Team is a group of professionals with a diverse background with different specialties that can share their wisdom, experience and expertise with the team be able the feel that what they have to say is important to the project. They are on this team from the beginning to the end of the project. The healthy project gives all of this structure. Teams work better whey they have structure, a process and rules to play by. They need to have a method to organize and document all the information that goes into getting a project done. The weekly project meetings notes, plans and specifications, budgets, schedules, reports to management to name a few. When a process is in place the team feels confident that they know what is going on and have less fear that things are falling through the cracks. The 5 steps are listed in your handout for more information.
Schematic plans – this is the beginning when define the scope and the program. Rough draft of your ideas for what you need in the space along with the space identified for the renovation or new building location. Design development drawings this is where you have signed off on the Schematic plan in concept, and need to move on to the details, what will live in the space and what is going on behind the walls to support it. Electrical data etc. and these plans are a part of the contract set that means that changes that you make to the concepts may impact the budget and schedule. The bid and permit construction plans are where all the details, logistics infection prevention and any other details are included on the plans so that you can get accurate pricing and a very good time line or schedule for the project construction. These plans become a part of the construction contract as all activities, pricing and schedule will dictate how well everyone will perform.
An architect or engineer puts a set of plans together based on a scope. This is the scope we are going to work with today. This is what we are going to do. We are looking at three stages and this is an appr
What is important at this stage? Figure out what is needed, how will the patient, staff travel in and out of the space. What impacts our planning, do we need more space, do we need to repurpose space? What kinds of mechanicals are in the space, for example do I have enough power, ventilation? What is critical now for me to move forward to the next stage.
1 What is needed equipment and support space 2. what is the patient and staff path in and out of the space. 3. What will impact the project that we need to communicate.
1 What is needed equipment and support space 2. what is the patient and staff path in and out of the space. 3. What will impact the project that we need to communicate.
1 What is needed equipment and support space 2. what is the patient and staff path in and out of the space. 3. What will impact the project that we need to communicate.
A patient that has filiation in their heart. This physician that works on them is the electrician for the heart. Changes the electrical currents to help the heart beat on a regular basis. The patient gets put under while they are in this room but they still need some privacy so we put in an obscured glass. They are using this space for a delicate procedure so the ventilation requirements were Class B surgery room. Matter of life and death. Really understanding the staff needs and working habits is very important for this patient.
Phasing depicted Phase 1B and 1C, Storage and 3 is Equipment placement.
1.Does all the medical equipment have electric and data. 2. Are the patient safety zones labeled 3. Where are you going to store all of your equipment when you close down this room are your logistics in order?
The project team needs to start the project identifying what technology will reside in the space and throughout the project keep gathering information so that you can integrate the technology and coordinate everyone of those vendors so that all the equipment and technology work in harmony.
Is there someone on the team responsible to make sure that equipment delivery and construction shut downs have been scheduled and communicated to the hospital or practice. Surprises are costly and cause much stress.
Tagging and making a inventory list as well as finding a location to store equipment that resides in the space that is going under construction is very important. Should have three tags. 1. Stays on site and is used in other rooms. 2. Can go offsite for storage. 3. Dispose.
Check all pages of the plans to confirm that all the equipment has electrical, data, mechanical, and structural depicted on the plans. This could be a costly mistake if some things are left out. This also causes much finger pointing. It is always better to have the team check each page of the plans to check on this coordination
Can you see that the infection prevention requirements are depicted on the plans as well as the phasing because this has a cost associated with it. As I spoke about in the last slide having a review of all the pages of the plans confirms you have caught everything. Always make sure the whole team signs off on the plans.
This is a patient centered environment that was well done. A place that enhances healing, health and wellbeing. It feels like a place where the medical team can perform, a place that really matters. In closing I would like to leave you with this question if you were the patient on that table would you want to be in a EP Cath lab like this? Let me help you get there, let’s do it together. Write on the back of your business card what your biggest project problem is and leave it with me. Also if you want to download 5 things that drive you nuts on a project and how to avoid them please go to my website and use the promo code planetree. Thank you and may all your projects be done well.