The ICS in a nutshell
The Incident Command System (ICS) is a standardized framework used for the command, control, and
coordination of emergency response, providing a common approach to the management of all incidents.
Originating in the United States in the 1970s, the ICS was developed in response to challenges faced during
wildfires in California, where the absence of a unified command system led to coordination and efficiency
issues. Since then, the ICS has evolved to become a fundamental component of the National Incident
Management System (NIMS), adopted to manage emergencies of any nature and size, ensuring quick and
effective response through the integration of resources from various agencies and sectors.
The process of the ICS is characterized by its flexibility and modularity, allowing it to be adapted to any
incident, regardless of its complexity or scope. The system promotes the unification of command, ensuring
that all involved agencies operate under a common set of procedures and terminology. The ICS is organized
around five main functions: Command, Operations, Planning, Logistics, and Finance/Administration, which
provide a framework for efficient resource management, operations coordination, and decision-making
support during emergency responses.
The Planning “P”
The “Operational Period Planning Cycle” (Planning “P”) in the
context of the Incident Command System (ICS) represents a
structured approach to incident planning and management,
visualized in the shape of the letter "P." This model outlines the
sequential steps involved in the planning process, starting from
the initial response and assessment at the straight leg of the "P,"
moving into the development and updating of objectives, and then
progressing through the preparation and execution of the action
plan as depicted in the circular part of the "P." This includes
meetings, planning sessions, and briefings that ensure a
coordinated and effective response to an incident. The "Planning
P" emphasizes the importance of a cyclical planning process,
allowing for continuous reassessment and adjustment of the
action plan as the situation evolves, thereby ensuring adaptability
and effectiveness in incident management.
EXTRACTED FROM - E/L/G
0300 INTERMEDIATE
INCIDENT COMMAND
SYSTEM FOR EXPANDING
INCIDENTS, ICS 300
How the ICS process is typically executed
• The process begins when an incident is identified and reported.
• An initial assessment is conducted to understand the scope and scale of the incident.
• Based on the assessment, the ICS structure is activated.
• An Incident Commander (IC) is designated to lead the response efforts.
• Necessary personnel, resources, and equipment are mobilized.
• The IC sets up an Incident Command Post (ICP) and begins to develop an Incident Action Plan (IAP).
• The IC organizes the response effort into five major functional areas: Command, Operations, Planning, Logistics, and
Finance/Administration.
• Each area may have several specialized positions or units activated depending on the incident's requirements.
• The Planning Section develops the IAP with input from all other sections.
• The IAP outlines the overall strategy, objectives, and tactics for managing the incident.
• The IAP is updated and revised in regular planning cycles throughout the incident.
• The Operations Section leads the execution of the tactical activities specified in the IAP.
• Coordination with other agencies and partners is essential for effective execution.
• The Logistics Section is responsible for providing facilities, services, personnel, equipment, and materials.
• The Finance/Administration Section manages costs related to the incident, including procurement and claims.
• Information about the incident and response efforts is managed and disseminated to internal and external stakeholders.
• The IC or a designated Information Officer ensures that communication is consistent and accurate.
• Once the objectives of the IAP have been met, the process of demobilization begins.
• Resources are released, and personnel are demobilized in a planned and organized manner.
• Transition to recovery operations is initiated, focusing on restoring the affected area to its pre-incident condition.
• After the incident is concluded, a review or after-action report is developed.
• The goal is to identify successes, challenges, and areas for improvement.
• Lessons learned are documented and integrated into future training and planning efforts.
The five ICS “must-know” topics
Unified Command Structure
ICS emphasizes a unified
command structure, ensuring
a collaborative approach
among all participating
agencies and organizations.
This structure helps to
eliminate jurisdictional
boundaries and facilitates
effective and efficient incident
management by providing a
clear chain of command and
an organized process for
decision-making and resource
allocation.
Scalability and Flexibility
One of the core strengths of
the ICS is its scalability and
flexibility, allowing it to be
adjusted according to the size,
scope, and complexity of the
incident. The system can
expand or contract to meet the
needs of the situation, from a
single-unit response to a large-
scale multi-agency operation,
ensuring that the response is
proportional to the incident.
Standardized Organization
ICS provides a standardized
organizational structure that
integrates a consistent
terminology and a set of
predefined management
positions and responsibilities.
This standardization ensures
that all personnel, regardless
of their agency or geographical
location, can work together
effectively. The five main
functional areas under ICS are
Command, Operations,
Planning, Logistics, and
Finance/Administration.
Management by Objectives
The ICS process operates on
the principle of management
by objectives. This involves
setting clear, achievable
objectives for the incident
response, developing
strategies based on these
objectives, assigning
resources, and executing plans
to accomplish the objectives.
This methodical approach
ensures that all efforts are
focused and coordinated
towards the same goals.
Comprehensive Resource
Management
Effective management of
resources, including
personnel, equipment, and
supplies, is fundamental to the
success of incident
management. ICS includes
processes for identifying,
ordering, mobilizing, and
managing resources efficiently
and effectively. This ensures
that resources are available
when needed and can be
deployed quickly to where they
are most required, avoiding
duplication of efforts and
resource wastage.
BONUS: four ICS diagrams
The Incident Command System (ICS) is a structured framework used for managing emergencies and crises.
While the official documentation and training provide comprehensive guidance on implementing ICS, visual
aids such as diagrams can offer a unique and intuitive understanding of the system. The four types of
diagrams discussed here— mindmap, timeline, sequence, and procedural steps — reflect a particular and
non-official interpretation of the ICS process, aiming to elucidate the complexities of incident management
from a distinct perspective. This introduction and the diagrams that follow are the author's attempt to simplify
and visualize the ICS framework, offering an alternative viewpoint to grasp the intricate processes and
hierarchical structure of ICS.
It's important to note that these visual representations are crafted to aid in understanding and are not
substitutes for official ICS training or documentation. Each diagram type caters to different aspects of ICS,
ranging from its conceptual underpinnings to the chronological execution of tasks, providing a multifaceted
view of incident management. It’s also provided with Mermaid codes if you want to edit/adapt as you wish.
Enjoy!
Mindmap Diagram
mindmap
root((ICS Process))
IC["Incident Commander"]
Operations((Operations))
TaskExecution["Task Execution"]
ProgressReporting["Progress Reporting"]
Planning((Planning))
ActionPlanDevelopment["Action Plan Development"]
PlanUpdating["Plan Updating"]
Logistics((Logistics))
ResourceRequest["Resource Request"]
ResourceDelivery["Resource Delivery"]
Finance((Finance))
BudgetApproval["Budget Approval"]
ExpenseMonitoring["Expense Monitoring"]
Assessment["Incident Occurrence and Assessment"]
Mobilization["Activation and Mobilization"]
Establishment["Incident Command System Establishment"]
IAPDevelopment["Development of the Incident Action Plan"]
Execution["Execution of the Plan"]
ResourceManagement["Resource Management"]
InformationManagement["Information Management and Communication"]
Demobilization["Demobilization and Recovery"]
PostIncident["Post-Incident Analysis and After-Action Reporting"]
Timeline Diagram
timeline
title ICS Process Key Phases
section Incident Command System Process
Activation : Incident Commander is designated
Planning Phase : Development of action plans
Resource Mobilization : Logistics arranges for resources
Execution : Operations carries out tasks
Monitoring : Finance and Planning monitor progress and expenses
Demobilization : Resources and personnel are demobilized
Post-Incident Analysis : Review and analysis of the response effort
Sequence Diagram
%%{init: {'theme':'default', 'themeVariables': {
'primaryColor': '#ADD8E6', 'lineColor': '#ADD8E6',
'textColor': '#000000'}}}%%
sequenceDiagram
participant Incident Commander as IC
participant Operations
participant Planning
participant Logistics
participant Finance
IC->>Operations: Assign tasks
IC->>Planning: Develop action plan
IC->>Logistics: Request resources
IC->>Finance: Approve budget
Operations->>Planning: Report progress
Planning-->>IC: Update plan
Logistics->>Operations: Deliver resources
Finance-->>IC: Monitor expenses
IC->>All: Coordinate efforts
Note right of IC: Central command and control
Procedural Steps Diagram
graph TB
IC(Incident Commander)
Operations
Planning
Logistics
Finance
IC -->|Assigns tasks| Operations
IC -->|Develops action plan| Planning
IC -->|Requests resources| Logistics
IC -->|Approves budget| Finance
Operations -->|Reports progress| Planning
Planning -->|Updates plan| IC
Logistics -->|Delivers resources| Operations
Finance -->|Monitors expenses| IC
style IC fill:#ADD8E6,stroke:#333,stroke-width:2px
style Operations fill:#f9f,stroke:#333,stroke-width:2px
style Planning fill:#bbf,stroke:#333,stroke-width:2px
style Logistics fill:#fbf,stroke:#333,stroke-width:2px
style Finance fill:#bfb,stroke:#333,stroke-width:2px
Discover everything you need to know about
the ICS. Are you curious to learn more?
 Official FEMA site (Federal Emergency Management Agency)

More Related Content

Similar to ICS (incident command system) ina a nutshell

Disaster Resistance City- Denizli
Disaster Resistance City- DenizliDisaster Resistance City- Denizli
Disaster Resistance City- Denizli
Dr. Yilmaz Ozmen
 
Management Information System(Unit 2).pptx
Management Information System(Unit 2).pptxManagement Information System(Unit 2).pptx
Management Information System(Unit 2).pptx
SURBHI SAROHA
 

Similar to ICS (incident command system) ina a nutshell (20)

Disaster Resistance City- Denizli
Disaster Resistance City- DenizliDisaster Resistance City- Denizli
Disaster Resistance City- Denizli
 
Enhancing Existing Risk Management in National Statistical Institutes by Usin...
Enhancing Existing Risk Management in National Statistical Institutes by Usin...Enhancing Existing Risk Management in National Statistical Institutes by Usin...
Enhancing Existing Risk Management in National Statistical Institutes by Usin...
 
Business continuity planning and disaster recovery
Business continuity planning and disaster recoveryBusiness continuity planning and disaster recovery
Business continuity planning and disaster recovery
 
Coordinating Security Response and Crisis Management Planning
Coordinating Security Response and Crisis Management PlanningCoordinating Security Response and Crisis Management Planning
Coordinating Security Response and Crisis Management Planning
 
Is it Necessary to Document the BCMS plan?
Is it Necessary to Document the BCMS plan?Is it Necessary to Document the BCMS plan?
Is it Necessary to Document the BCMS plan?
 
Risk crisis nad management
Risk crisis nad managementRisk crisis nad management
Risk crisis nad management
 
Eoc Operations And Management Training Mod 1
Eoc Operations And Management Training Mod 1Eoc Operations And Management Training Mod 1
Eoc Operations And Management Training Mod 1
 
h6358-ictsi-cporellano
h6358-ictsi-cporellanoh6358-ictsi-cporellano
h6358-ictsi-cporellano
 
Cloud Class
Cloud ClassCloud Class
Cloud Class
 
Asset management does not need to difficult!
Asset management does not need to difficult!Asset management does not need to difficult!
Asset management does not need to difficult!
 
Planning for security and security audit process
Planning for security and security audit processPlanning for security and security audit process
Planning for security and security audit process
 
Management Information System(Unit 2).pptx
Management Information System(Unit 2).pptxManagement Information System(Unit 2).pptx
Management Information System(Unit 2).pptx
 
A holistic approach to Safety and Asset Integrity Excellence
A holistic approach to Safety and Asset Integrity ExcellenceA holistic approach to Safety and Asset Integrity Excellence
A holistic approach to Safety and Asset Integrity Excellence
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 
Irs intro unit 2 irs overview usfs ip (1)
Irs intro unit 2 irs overview usfs ip (1)Irs intro unit 2 irs overview usfs ip (1)
Irs intro unit 2 irs overview usfs ip (1)
 
Planning for contingencies
Planning for contingenciesPlanning for contingencies
Planning for contingencies
 
Eoc Quick Reference Card April 2010
Eoc Quick Reference Card April 2010Eoc Quick Reference Card April 2010
Eoc Quick Reference Card April 2010
 
School Incident Management Presentation
School Incident Management PresentationSchool Incident Management Presentation
School Incident Management Presentation
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

ICS (incident command system) ina a nutshell

  • 1. ICS Incident Command System in a nutshell pcssimoes
  • 2. The ICS in a nutshell The Incident Command System (ICS) is a standardized framework used for the command, control, and coordination of emergency response, providing a common approach to the management of all incidents. Originating in the United States in the 1970s, the ICS was developed in response to challenges faced during wildfires in California, where the absence of a unified command system led to coordination and efficiency issues. Since then, the ICS has evolved to become a fundamental component of the National Incident Management System (NIMS), adopted to manage emergencies of any nature and size, ensuring quick and effective response through the integration of resources from various agencies and sectors. The process of the ICS is characterized by its flexibility and modularity, allowing it to be adapted to any incident, regardless of its complexity or scope. The system promotes the unification of command, ensuring that all involved agencies operate under a common set of procedures and terminology. The ICS is organized around five main functions: Command, Operations, Planning, Logistics, and Finance/Administration, which provide a framework for efficient resource management, operations coordination, and decision-making support during emergency responses.
  • 3. The Planning “P” The “Operational Period Planning Cycle” (Planning “P”) in the context of the Incident Command System (ICS) represents a structured approach to incident planning and management, visualized in the shape of the letter "P." This model outlines the sequential steps involved in the planning process, starting from the initial response and assessment at the straight leg of the "P," moving into the development and updating of objectives, and then progressing through the preparation and execution of the action plan as depicted in the circular part of the "P." This includes meetings, planning sessions, and briefings that ensure a coordinated and effective response to an incident. The "Planning P" emphasizes the importance of a cyclical planning process, allowing for continuous reassessment and adjustment of the action plan as the situation evolves, thereby ensuring adaptability and effectiveness in incident management. EXTRACTED FROM - E/L/G 0300 INTERMEDIATE INCIDENT COMMAND SYSTEM FOR EXPANDING INCIDENTS, ICS 300
  • 4. How the ICS process is typically executed • The process begins when an incident is identified and reported. • An initial assessment is conducted to understand the scope and scale of the incident. • Based on the assessment, the ICS structure is activated. • An Incident Commander (IC) is designated to lead the response efforts. • Necessary personnel, resources, and equipment are mobilized. • The IC sets up an Incident Command Post (ICP) and begins to develop an Incident Action Plan (IAP). • The IC organizes the response effort into five major functional areas: Command, Operations, Planning, Logistics, and Finance/Administration. • Each area may have several specialized positions or units activated depending on the incident's requirements. • The Planning Section develops the IAP with input from all other sections. • The IAP outlines the overall strategy, objectives, and tactics for managing the incident. • The IAP is updated and revised in regular planning cycles throughout the incident. • The Operations Section leads the execution of the tactical activities specified in the IAP. • Coordination with other agencies and partners is essential for effective execution. • The Logistics Section is responsible for providing facilities, services, personnel, equipment, and materials. • The Finance/Administration Section manages costs related to the incident, including procurement and claims. • Information about the incident and response efforts is managed and disseminated to internal and external stakeholders. • The IC or a designated Information Officer ensures that communication is consistent and accurate. • Once the objectives of the IAP have been met, the process of demobilization begins. • Resources are released, and personnel are demobilized in a planned and organized manner. • Transition to recovery operations is initiated, focusing on restoring the affected area to its pre-incident condition. • After the incident is concluded, a review or after-action report is developed. • The goal is to identify successes, challenges, and areas for improvement. • Lessons learned are documented and integrated into future training and planning efforts.
  • 5. The five ICS “must-know” topics Unified Command Structure ICS emphasizes a unified command structure, ensuring a collaborative approach among all participating agencies and organizations. This structure helps to eliminate jurisdictional boundaries and facilitates effective and efficient incident management by providing a clear chain of command and an organized process for decision-making and resource allocation. Scalability and Flexibility One of the core strengths of the ICS is its scalability and flexibility, allowing it to be adjusted according to the size, scope, and complexity of the incident. The system can expand or contract to meet the needs of the situation, from a single-unit response to a large- scale multi-agency operation, ensuring that the response is proportional to the incident. Standardized Organization ICS provides a standardized organizational structure that integrates a consistent terminology and a set of predefined management positions and responsibilities. This standardization ensures that all personnel, regardless of their agency or geographical location, can work together effectively. The five main functional areas under ICS are Command, Operations, Planning, Logistics, and Finance/Administration. Management by Objectives The ICS process operates on the principle of management by objectives. This involves setting clear, achievable objectives for the incident response, developing strategies based on these objectives, assigning resources, and executing plans to accomplish the objectives. This methodical approach ensures that all efforts are focused and coordinated towards the same goals. Comprehensive Resource Management Effective management of resources, including personnel, equipment, and supplies, is fundamental to the success of incident management. ICS includes processes for identifying, ordering, mobilizing, and managing resources efficiently and effectively. This ensures that resources are available when needed and can be deployed quickly to where they are most required, avoiding duplication of efforts and resource wastage.
  • 6. BONUS: four ICS diagrams The Incident Command System (ICS) is a structured framework used for managing emergencies and crises. While the official documentation and training provide comprehensive guidance on implementing ICS, visual aids such as diagrams can offer a unique and intuitive understanding of the system. The four types of diagrams discussed here— mindmap, timeline, sequence, and procedural steps — reflect a particular and non-official interpretation of the ICS process, aiming to elucidate the complexities of incident management from a distinct perspective. This introduction and the diagrams that follow are the author's attempt to simplify and visualize the ICS framework, offering an alternative viewpoint to grasp the intricate processes and hierarchical structure of ICS. It's important to note that these visual representations are crafted to aid in understanding and are not substitutes for official ICS training or documentation. Each diagram type caters to different aspects of ICS, ranging from its conceptual underpinnings to the chronological execution of tasks, providing a multifaceted view of incident management. It’s also provided with Mermaid codes if you want to edit/adapt as you wish. Enjoy!
  • 7. Mindmap Diagram mindmap root((ICS Process)) IC["Incident Commander"] Operations((Operations)) TaskExecution["Task Execution"] ProgressReporting["Progress Reporting"] Planning((Planning)) ActionPlanDevelopment["Action Plan Development"] PlanUpdating["Plan Updating"] Logistics((Logistics)) ResourceRequest["Resource Request"] ResourceDelivery["Resource Delivery"] Finance((Finance)) BudgetApproval["Budget Approval"] ExpenseMonitoring["Expense Monitoring"] Assessment["Incident Occurrence and Assessment"] Mobilization["Activation and Mobilization"] Establishment["Incident Command System Establishment"] IAPDevelopment["Development of the Incident Action Plan"] Execution["Execution of the Plan"] ResourceManagement["Resource Management"] InformationManagement["Information Management and Communication"] Demobilization["Demobilization and Recovery"] PostIncident["Post-Incident Analysis and After-Action Reporting"]
  • 8. Timeline Diagram timeline title ICS Process Key Phases section Incident Command System Process Activation : Incident Commander is designated Planning Phase : Development of action plans Resource Mobilization : Logistics arranges for resources Execution : Operations carries out tasks Monitoring : Finance and Planning monitor progress and expenses Demobilization : Resources and personnel are demobilized Post-Incident Analysis : Review and analysis of the response effort
  • 9. Sequence Diagram %%{init: {'theme':'default', 'themeVariables': { 'primaryColor': '#ADD8E6', 'lineColor': '#ADD8E6', 'textColor': '#000000'}}}%% sequenceDiagram participant Incident Commander as IC participant Operations participant Planning participant Logistics participant Finance IC->>Operations: Assign tasks IC->>Planning: Develop action plan IC->>Logistics: Request resources IC->>Finance: Approve budget Operations->>Planning: Report progress Planning-->>IC: Update plan Logistics->>Operations: Deliver resources Finance-->>IC: Monitor expenses IC->>All: Coordinate efforts Note right of IC: Central command and control
  • 10. Procedural Steps Diagram graph TB IC(Incident Commander) Operations Planning Logistics Finance IC -->|Assigns tasks| Operations IC -->|Develops action plan| Planning IC -->|Requests resources| Logistics IC -->|Approves budget| Finance Operations -->|Reports progress| Planning Planning -->|Updates plan| IC Logistics -->|Delivers resources| Operations Finance -->|Monitors expenses| IC style IC fill:#ADD8E6,stroke:#333,stroke-width:2px style Operations fill:#f9f,stroke:#333,stroke-width:2px style Planning fill:#bbf,stroke:#333,stroke-width:2px style Logistics fill:#fbf,stroke:#333,stroke-width:2px style Finance fill:#bfb,stroke:#333,stroke-width:2px
  • 11. Discover everything you need to know about the ICS. Are you curious to learn more?  Official FEMA site (Federal Emergency Management Agency)