FOUNDATION IN NATURAL AND BUILT ENVIRONMENT
MARCH 2015
INTRODUCTION TO CONSTRUCTION INDUSTRY [ QSB30105 ]
FINAL PROJECT :
DEVELOPMENT PROPOSAL
NAME : CHIN KE NI KELLY (0324021)
CRYSTAL CHIA FYE JZNG (0323964)
TUTOR : MS. ANN SEE PENG
1.PROJECT INTRODUCTION
For this final assignment, we were assigned to search
for a specific empty land outside the boundaries of
Taylor’s University to initiate a small construction
project as a group of 2 along with an individual project
proposal.
The size of the land chosen should be between 50m x
50m (2500m2
) - 50m x 70m (3500m2
) which is
mentioned in the project brief. Furthermore, we are also
required to serve one of the proposal mentioned, which
includes : Recreation, Commercial, Industrial,
Agricultural, Tourism, and Residential area.
The objective of this project is to enable students to
develop an understanding of the building team, its
organization, duties and inter-relations. Besides that, it is
to develop an awareness of their professional
responsibilities and to appreciate their profession in
the construction industry.
The learning outcomes of this project is that students
will be able to explain the need to coordinate and
develop an understanding of coherent working relations
among various industry players and to improve the
communication channels. Secondly, students will have
the ability to document their observations and
understanding from interview session and research
resources as well as to communicate their findings in a
systematic and convincing presentation and reports.
Lastly, students will have the ability to justify the
feasibility of a development and improve the proposal to
serve the purpose of the development.
2. PROJECT SITE
2.1 Project Location
The piece of land we selected is an undeveloped piece of
barren land, thus we decided to select this particular
land. The land is located at Persiaran Damai Utama 2,
Puchong, Selangor. Besides that, the total size of the
land is 8114m2, therefore we chose to develop 3500m2
of the land.
The chosen land is faced to the North, and there are a
few commercial blocks located right in the opposite of
the land. Furthermore, there is a T-junction beside the
land that is linked to the Kinrara Residence.
2.2 Site Location
Zoning
RED ZONE - Our Site
BLUE ZONE – Residential Area
YELLOW ZONE – Commercial Area
2.3 Images Of The Site
The view
of the
land from
the
roadside.
The main
road from
the right
side of
the land.
The main
road from
the left
side of
the land.
Commercial blocks across the streets from the land.
Residential area located near the land.
2.4 Site Analysis
Our total area of site is 8114m2
and it is totally flat,
empty and abandon. We decided the size of our land to
be 3500 m2
.
The amount of rainfall of our site is 2,800mm to
3,000mm
Our land is facing to the north.
Legend
Sunrise
Sunset
Wind Direction
sunset
sunris
e
Legend
Bad view
Good View
Road direction
Site
2.5 Site Context
A. Kinrara Residence
B
C
A
D
B. Flat
C. Commercial Blocks
D. Our Site

ICI FINAL PROJECT ( GROUP )

  • 1.
    FOUNDATION IN NATURALAND BUILT ENVIRONMENT MARCH 2015 INTRODUCTION TO CONSTRUCTION INDUSTRY [ QSB30105 ] FINAL PROJECT : DEVELOPMENT PROPOSAL NAME : CHIN KE NI KELLY (0324021) CRYSTAL CHIA FYE JZNG (0323964) TUTOR : MS. ANN SEE PENG
  • 2.
    1.PROJECT INTRODUCTION For thisfinal assignment, we were assigned to search for a specific empty land outside the boundaries of Taylor’s University to initiate a small construction project as a group of 2 along with an individual project proposal. The size of the land chosen should be between 50m x 50m (2500m2 ) - 50m x 70m (3500m2 ) which is mentioned in the project brief. Furthermore, we are also required to serve one of the proposal mentioned, which includes : Recreation, Commercial, Industrial, Agricultural, Tourism, and Residential area. The objective of this project is to enable students to develop an understanding of the building team, its organization, duties and inter-relations. Besides that, it is to develop an awareness of their professional responsibilities and to appreciate their profession in the construction industry.
  • 3.
    The learning outcomesof this project is that students will be able to explain the need to coordinate and develop an understanding of coherent working relations among various industry players and to improve the communication channels. Secondly, students will have the ability to document their observations and understanding from interview session and research resources as well as to communicate their findings in a systematic and convincing presentation and reports. Lastly, students will have the ability to justify the feasibility of a development and improve the proposal to serve the purpose of the development.
  • 4.
    2. PROJECT SITE 2.1Project Location The piece of land we selected is an undeveloped piece of barren land, thus we decided to select this particular land. The land is located at Persiaran Damai Utama 2, Puchong, Selangor. Besides that, the total size of the land is 8114m2, therefore we chose to develop 3500m2 of the land. The chosen land is faced to the North, and there are a few commercial blocks located right in the opposite of the land. Furthermore, there is a T-junction beside the land that is linked to the Kinrara Residence.
  • 5.
    2.2 Site Location Zoning REDZONE - Our Site BLUE ZONE – Residential Area YELLOW ZONE – Commercial Area
  • 6.
    2.3 Images OfThe Site The view of the land from the roadside. The main road from the right side of the land. The main road from the left side of the land.
  • 7.
    Commercial blocks acrossthe streets from the land. Residential area located near the land.
  • 8.
    2.4 Site Analysis Ourtotal area of site is 8114m2 and it is totally flat, empty and abandon. We decided the size of our land to be 3500 m2 . The amount of rainfall of our site is 2,800mm to 3,000mm Our land is facing to the north. Legend Sunrise Sunset Wind Direction sunset sunris e
  • 9.
  • 10.
    2.5 Site Context A.Kinrara Residence B C A D
  • 12.
  • 14.